Loading...
HomeMy WebLinkAbout20190506 Ver 1_MOA__B-5349_Final_Approval_20190418NCFMP and NCDOT MOA Project Review PROJECT INFORMATION Project TIP: Sch Let Date: CLOMR Case Number: Municipality: Cou nty:, CID Number: Project Engineer: Project Reviewer: B-5349 5/15/2018 N/A N/A Alamance 370002 William H. Elam, Jr. Matthew Dudley, PE Stream Name: Route Number: Road Name on Panel: Effective FIS Date: Panel Number: Panel Effective Date: Bounding Stations: West Back Creek MODEL STATUS Type of Study (detailed, limited, redelineated): Detailed Effective Model on File? YES Effective Model Format (HEC-RAS, HEC2, Other): HEC-RAS 4.1.0 Proposed Model Format (HEC-RAS, HEC2, HEC-RAS 4.1.0 Other): PROJECT SPECIFIC NOTES (pre-model review) SR 1149 Huffman Mill Road 11/17/2017 8843 11/17/2017 9316/14965 This project has a maximum decrease of 0.8-ft and will be submitted as a MOA type 2b. Please note there is an increase of 0.1-ft at station 9723 BR D. REVIEW COMMENTS: 1. Please resolve the negative surcharges at the stations 10363 and 9763 in the corrected effective plan. Revised. Verified. No action needed. 2. If possible please resolve the surcharge greater than 1 foot at station 9723 BR D in both the corrected effective and revised plans. Resolved in the revised plan but I could not resolve the surcharge greater than 1 foot in the corrected effective plan without causing a negative surcharges upstream. Verified. Surcharges above 1' at internal bridge sections are not preferred, but can be allowed if removal causes issues elsewhere outside of the structure. No further action needed. 3. For the Corrected Effective and Revised plans, please explain in the narrative the reason for Manning's n-values differences at station 9763. Please support your explanation with photographic evidence. Upstream toe RS 9763 —The n-values changed based on the proposed excavation and proposed driveway. The upstream toe will now mimic the existing/proposed downstream toe. Verified. The reviewer confirmed that this minor n-value adjustmen�t does not affect the MOA type or approval. fVo action needed. 4. Please note that the center reach length for cross sections 10363, 9971, 9763, and 9690 are not equal to that cross section minus the next downstream cross section. The difference in stationing should match. Please consider updating the stationing or discuss the reason for discrepancy. Revised. Verified. (�o action needed. 5. Please verify the dimensions of the structure at section RS 9723. The proposed structure suggests a two span (1@50' and 1@100') as stated in the BSR and project narrative. The HEC- RAS model displays a three span (1@50' 1@65' and 1@35') bridge. The wrong model was placed in the previous submittal. The comments from this review were incorporated in the current model. Verified. No action needed. 6. Please consider lowering the ineffective elevation at station 9723 to the minimum structure elevation. Revised. Verified. iVo action needed. a e�w.cn..n c.n'. a+� . r+. Lv,. qmh xw WdB�OM "� "'• �}p ^^d.��^--A-�"n 7JJ o� �.,rsAnrn��rece.s....,0..:9 ea.saxit �fl�o..orm.�.r��ri a.�n ���m �, � '1 � � �.�m �.�.�..,,e.�,. — --�-,- --------- - I .R� „� .r� � x� ..s . .ro . �. �_ -- ---- _ _. . • — --- -- - -_ � MINOR COMMENTS: 1. Please confirm FIS effective date listed on the FEMA coordination form. Suggested effective date is 11/17/2017. Revised. Verified. IVo action needed. 2. Please consider moving the downstream limit of the project to RS 9316; as the submitted tie-in (RS 9518) is a newly added section. Revised. Verified. f�o action needed. 3. The title sheet from plans proposes bridge over Back Creek. Please verify stream name as West Back Creek on title sheet. Will coordinate with the project manager to get the title sheet updated Verified. No action needed. 4. Please consider renaming the .dgn file to follow the nomenclature "20180116 SR1149 MOA" Per our guidelines - Micro-Station (CADD) file (name file: "yyyymmdd_TIP_MOA.dgn") — Updated. Verified. No action needed. Please update the narrative as appropriate to include discussion of the encroachment station modifications from the corrected effective to revised plan. Incorporated. Verifiied. fVo ac�ion needed. NOTES FOR NCFMP: Please note that the HEC-RAS model has an additional flow change location at RS 30117 (2400 cfs for the 100 yr event). This flow change is included in the effective model so no action is needed by DOT. FINAL DETERMINATION: This project is recommended for approval as a type 2b project. ���" � 3/16/2018 Matthew B. Dudley, PE, CFM ESP — Project Manager Date \\`\\\\`���tt�C A � �l ��''. N � �_ ��F(�SS%09'��� _ •a SEAI r' - = 3_7_�9_8 ' _ ..- � ��� �•��� � '�./9� , f � � . � \\�� .� `` ������H�� $�;��; `�� 3I! �![�