Loading...
HomeMy WebLinkAboutNCG090025_Inspection Rpt_20190410ROY COOPER Governor MICHAEL S. REGAN Secretary WILLIAM E. (TOBY) t/INSON, JR. interim Director NORTH CAROLINA Environmental QuaW April 10, 2019 Bonakemi USA Inc. Attention: Lisa King, SHE Compliance Specialist 4275 Corporate Center Drive Mom oe, North Carolina 28110 Subject: Compliance Evaluation Inspection Bonakemi USA Inc. NPDES Stormwater Certificate of Coverage- NCG090025 Union County, North Carolina Dean Ms. King: RF-6_,,F1\/Fr) APR 16 2031 DENR-LAND QIIAI !TY STORMVVATER PERMITTING Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection we conducted at the Bonakemi USA Monroe facility on April 2, 2019. Please note that in the stormwater inspection report summary we ask that you update your site map. The report should be self-explanatory; however, should you have any questions, please do not hesitate to contact me at (704) 663-1699 or by E-mail at james.moore@ncdenr.gov. Enclosure c: Stormwater Permitting Branch Sincerely, �aes Moore Assistant Regional Engineer n - 1EQ5 Dnpft3n4Mtal ElrMkaYncr.[e7ilwFi1'r'l JI" North Carolina Department of Environmental Quality Division of Energy, Mineral and Land Resources Mooresville Regional Office 1 610 East Center Avenue. Suite 301 f Mooresville, North Carolina 281115 704.663.1699 Permit: NCGO90025 SOC: County: Union Region: Mooresville Contact Person: Lisa King Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 04/02/2019 Primary Inspector: Lily C Kay Secondary Inspector(s): Compliance Inspection Report Effective: 11/01/18 Expiration: 05/31/21 Owner: Bonakemi USA Inc Effective: Expiration: Facility: BonaKemi USA, Inc. 4275 Corporate Ctr Dr Monroe NC 28110 Title: Phone: 704-220-6954 Certification: Phone: Entry Time: 03:25PM Exit Time: 04:15PM Phone: 704-663-1699 Reason for Inspection: Complaint Inspection Type: Compliance Evaluation Permit Inspection Type: Paints, Varnishes, Lacquers Stormwater Discharge COC Facility Status: Compliant Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCGO90025 Owner - Facility: Bonakemi USA Inc Inspection Date: 04/02/2019 Inspection Type: Compliance Evaluation Reason for Visit: Complaint Inspection Summary: The facility has a complete SWPPP and good sluiinwalei pollution preverdiun program overall. T'he facility has a complete SWPPP, but the map needs a bit more detail with the location of the chemicals, secondary containment, and sump pumps, and to have the stormwater flow directions added. If you have any questions, please contact me at Lily. Kay@ncdenr.gov or by phone at (704) 235-2137. Page 2 of 3 II b Permit: NCG090025 Owner - Facility: Bonakemi USA Inc Inspection Date: 04/02/2019 Inspection Type: Compliance Evaluation Reason for Visit: Complaint Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? # Does the Plan include a General Location (USGS) map? ® El ❑ El # Does the Plan include a "Narrative Description of Practices"? ® El 0 ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ® ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? # Has the facility evaluated feasible alternatives to current practices? ® ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ® ❑ # Doeb Ilia Plan Inulude a BMI, :, urninary? ❑ # Doos tho Plan includo a Spill Provontion and Rosponso Plan (SPRP)? E El El❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ® p ❑ # Does the facility provide and document Employee Training? # Does the Plan include a list of Responsible Party(s)? # Is the Plan reviewed and updated annually? # Does the Plan include a Stormwater Facility Inspection Program? Has the Stormwater Pollution Prevention Plan been implemented? Comment: The facility has a complete SWPPP, but the map needs a bit more detail with the location of the chemicals, secondary containment, and sump pumps, and to have the stormwater flow directions added. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? E El ❑ ❑ Comment: The qualitative montioring reports were complete and the discharge did reflect the reports. Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring'? ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? Cornrrient. The DMRs were witiulete and the buicl Iinaik liiriitations have riot been exceeded in the past two years. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? # Were all outfalls observed during the inspection? ® ❑ # If the facility has representative outfall status, is it properly documented by the Division? ® p El ❑ # Has the facility evaluated all illicit (non stormwater) discharges? Comment: Page 3 of 3