Loading...
HomeMy WebLinkAbout20181182 Ver 2_Revised Set_20190417Strickland, Bev From: Mularski, Eric <Eric.Mularski@hdrinc.com> Sent: Wednesday, April 17, 2019 4:22 PM To: Johnson, Alan Cc: Hoyt, Kelly Subject: RE: [External] Bumgarner Property Culvert Replacement Project - 20181182, Version 2 Attachments: BumgarnerSet4.17.19_Revised.pdf External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov Alan. Attached are the revised plans. Please let us know if you require any additional information to process our request. Thank you, Eric Mularski, Pws D 704-973-6878 M 704-806-1521 hdrinc.com/follow-us From: Johnson, Alan [mailto:alan.johnson@ncdenr.gov] Sent: Tuesday, April 16, 2019 4:13 PM To: Mularski, Eric <Eric.Mularski @hdrinc.com> Subject: RE: [External] Bumgarner Property Culvert Replacement Project - 20181182, Version 2 Based on this info, I will go ahead and issue the approval. Submit the culvert plans as soon as possible. thanks From: Mularski, Eric <Eric.Mularski@hdrinc.com> Sent: Tuesday, April 16, 2019 4:10 PM To: Johnson, Alan <alan.iohnson@ncdenr.gov> Cc: Hoyt, Kelly <Kelly.Hoyt@duke-energy.com>; Velasquez, Johanna <Johanna.Velasquez@hdrinc.com>; Baysden, Robert <Robert.Baysden@hdrinc.com> Subject: [External] Bumgarner Property Culvert Replacement Project - 20181182, Version 2 External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov Alan, We apologize, there is a discrepancy with the permanent impacts totals for the recently submitted Pre -Construction Notification for the Bumgarner Property Culvert Replacement Project (Project ID# 20181182, Version 2). We neglected to include impacts from the original approval dated August 30, 2018 (attached). The stream impact table for Section D.3 of the PCN should read. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream width length Permanent (P) or intermittent DWQ — non -404, (feet) (linear feet) Temporary (T) (INT)? other) S1 P T Tributary to South Fill (CMPs) Fork Catawba INTR DWQ 10 25 River S2 P T Tributary to South Fill (Rip Rap) Fork Catawba INTR DWQ 10 20 River S3 P T Tributary to South De -Watering Fork Catawba INTR DWQ 10 60 River 3h. Total stream and tributary impacts 45 (Permanent) 60 (Temporary) 105 (TOTAL) 3i. Comments: The project will result in approximately 45 linear feet of permanent impacts associated with the installation of the CMPs and downstream rip rap dissipater pad. Approximately 60 linear feet of temporary impacts are associated with de- watering for the pump around, impervious dikes, the stabilized outlet section, and the sediment removal device. Additionally, we are in the process of revising the culvert design plans to include the northern culvert as the "Baseflow" culvert. The southern culvert will be elevated approximately 1 foot to serve as the "Overflow' culvert. The invert elevation on the plans (SHEET OOC-001) and the cross-section and profile details (SHEET OOC-02) will be revised to reflect this change. The plans will be forwarded as soon as possible. We apologize for any inconvenience and appreciate your review of this application. Sincerely, Eric Mularski, Pws Environmental and Regulatory Team Lead HDR 440 S. Church Street Charlotte, NC 28202 D 704-973-6878 M 704-806-1521 Eric.mularski(cD_hdrinc.com hdrinc.com/follow-us From: Johnson, Alan[mailto:alan.iohnson@ncdenr.gov] Sent: Tuesday, April 16, 2019 2:22 PM To: Hoyt, Kelly <Kelly.Hoyt@duke-energy.com> Subject: project *** Exercise caution. This is an EXTERNAL email. DO NOT open attachments or click links from unknown senders or unexpected email. *** So, you have 25 ft for culvert and 20 ft of (new) riprap. So total permanent impact is 45 ft. DM%I-on of Water RC!-tiourcr� Alan D Johnson — Senior Environmental Specialist NC Dept. of Environment & Natural Resources (NCDENR) Division of Water Resources - Water Quality Regional Operations 610 East Center Ave., Suite 301, Mooresville, NC 28115 Phone: (704) 235-2200 Fax: (704) 663-6040 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. 3 BUMGARNER PROPERTY CULVERT REPLACEMENT MAIDEN, CATAWBA COUNTY, NORTH CAROLINA FEBRUARY 2019 CONTACT INFORMATION OWNER: DUKE ENERGY CAROLINAS, LLC 526 SOUTH CHURCH STREET CHARLOTTE, NC 28202 CONTACT: RANDY N. VELTRI PHONE: (704) 382-2741 VICINITY MAP (N.T.S.) N ENGINEERING FIRM: HDR ENGINEERING, INC. OF THE CAROLINAS 440 SOUTH CHURCH STREET, SUITE 1000 CHARLOTTE, NC 28202 N.C.B.E.L.S. License Number F-0116 CONTACT: ROBERT BAYSDEN, PE PHONE: (704) 973-6883 1 2 3 ISSUE DATE DESCRIPTION HDR Engineering Inc. of the Carolinas 440 S. Church St. Suite 1000 Charlotte, NC 28202-2075 704.338.6700 N.C.B.E.L.S. License Number F-0116 SHEET INDEX OOG-01 COVER SHEET OOG-02 OVERVIEW PLAN, LEGEND AND NOTES OOC-01 CULVERT PLAN OOC-02 CULVERT PROFILE & CROSS SECTION OOC-03 EROSION & SEDIMENT CONTROL OOD-01 CIVIL DETAILS - SHEET 1 OOD-02 CIVIL DETAILS - SHEET 2 SPECIFICATIONS 1) UTILIZE THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL MANUAL AND SPECIFICATIONS FOR EROSION CONTROL AND STABILIZATION. 2) UTILIZE CIVIL & ENVIRONMENTAL CONSULTANTS, INC. FOR CMP DESIGN. DUKE ENERGY 400 S. TRYON STREET PO BOX 1007 CHARLOTTE N.C. 28201-1007 TELEPHONE NO. (704)382-6658 SHEET 1 OF 7 I AS 1�'� � I ' OGC- 07 \ i �795- 1 El - 48" CMP (WASHED-OUT)--\ 1 i I i --794_ \ \ O 17�/x \ / TEMPORARY BRIDGE II II� II 1� \ I 1 � II h / SELF -INSPECTION EFFECTIVE OCTOBER 1, 2010, PERSONS RESPONSIBLE FOR LAND DISTURBING ACTIVITIES MUST INSPECT THE SEDIMENT AND EROSION CONTROL MEASURES ON A PROJECT AFTER EACH PHASE OF THE PROJECT TO MAKE SURE THAT THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN IS BEING FOLLOWED. SELF -INSPECTION REPORTS ARE REQUIRED. A SAMPLE SELF -INSPECTION REPORT, AS WELL AS DETAILS OF THE SELF -INSPECTION PROGRAM, CAN BE FOUND ON THE LAND QUALITY WEB SITE: http://portal.ncdenr.org/web/Ir/erosion AS A MINIMUM, THE INSPECTIONS SHALL BE PERFORMED AFTER EACH OF THE FOLLOWING PHASES OF A PLAN: 1. INSTALLATION OF PERIMETER EROSION AND SEDIMENT CONTROL MEASURES 2. CLEARING AND GRUBBING OF EXISTING GROUND COVER 3. COMPLETION OF ANY PHASE OF GRADING THAT REQUIRES PROVISION OF STABILIZATION 4. COMPLETION OF CONSTRUCTION OR DEVELOPMENT 5. QUARTERLY UNTIL THE ESTABLISHMENT OF PERMANENT GROUND COVER IS FULLY ESTABLISHED. PLEASE NOTE THESE INSPECTION REQUIREMENTS ARE IN ADDITION TO NPDES INSPECTION REQUIREMENTS. IF YOU HAVE QUESTIONS ABOUT THE SELF -INSPECTION PROGRAM, PLEASE CONTACT NCDEQ ASHEVILLE REGIONAL OFFICE 828-296-4500. EROSION AND SEDIMENT CONTROL NARRATIVE PROJECT INFORMATION THIS EROSION AND SEDIMENT CONTROL (E&SC) PLAN ADDRESSES THE INSTALLATION OF A DOUBLE 84" CMP CULVERT IN AN UNNAMED TRIBUTARY OF THE SOUTH FORK CATAWBA RIVER JUST NORTH OF BLACKBURN BRIDGE ROAD. THE PROJECT LOCATION IS OUTSIDE OF MAIDEN, CATAWBA COUNTY, NORTH CAROLINA. THE LOCATION OF THE E&SC BMP FEATURES SHOWN ON SHEET OOC-03 WERE DEVELOPED BASED ON TOPOGRAPHIC INFORMATION AND AERIAL IMAGERY, AND SUBJECT TO CHANGE BASED ON FIELD CONDITIONS. PROTECTING THE TRIBUTARY IS THE CRITICAL ELEMENT OF THIS PROJECT AND A PUMP AROUND IS PLANNED TO PROVIDE MOVEMENT OF BASE FLOW AROUND THE CONSTRUCTION ZONE DURING CULVERT PLACEMENT. A CLEAN WATER ACT SECTION 404/401 PRE CONSTRUCTION NOTIFICATION HAS BEEN APPROVED BY THE US ARMY CORPS OF ENGINEERS (SAW -2018-01686) AND THE NC DIVISION OF WATER RESOURCES (DWR# 18-1182) FOR LINEAR STREAM DISTURBANCE TOTALING: 25 LF - PERMANENT IMPACTS (CULVERT) 60 LF - TEMPORARY (DIKES & PUMP AROUND) EROSION AND SEDIMENT CONTROL MEASURES PROPOSED EROSION AND SEDIMENTATION CONTROL MEASURES TO BE UTILIZED DURING THE CULVERT INSTALLATION, INCLUDE: 1. CONSTRUCTION ENTRANCE, USE EXISTING JOCK LOOP PROJECT ACCESS 2. COMPOST SOCKS (WATTLES) 3. EXISTING ACCESS DRIVE STABILIZATION 4. SILT FENCE 5. RIP -RAP SLOPE STABILIZATION 6. SEEDING PROJECT CONSTRUCTION SEQUENCE THE FOLLOWING PROJECT SEQUENCE SHALL BE FOLLOWED: 1. OBTAIN PLAN APPROVAL AND PERMITS PRIOR TO BEGINNING WORK. 2. HOLD PRE -CONSTRUCTION MEETING 3. COORDINATE CONSTRUCTION SCHEDULE WITH THE PROPERTY OWNER 4. INSTALL CONSTRUCTION ENTRANCE WHERE APPLICABLE WITHIN DUKE ENERGY R/W. 5. STABILIZE EXISTING DRIVE ACCESS. 6. INSTALL PERIMETER E&SC MEASURES (I.E. SILT FENCE) 7. INSTALL PUMP AROUND SYSTEM INCLUDING IMPERVIOUS DIKES AND EROSION CONTROL MEASURES. 8. EXCAVATE THE CHANNEL BED WHERE THE CULVERTS WILL BE PLACED 18" AND PLACE A 6" BED OF COMPACTED #57 STONE FOR CULVERT BEDDING. PIPE INVERTS TO BE SET 12" BELOW EXISTING STREAM ELEVATION WITH 6" OF STONE BEDDING. 9. INSTALL CULVERTS AND ALL NECESSARY COMPACTED BACKFILL. 10. STABILIZE 2:1AND STEEPER SLOPES WITH CLASS 1 RIP -RAP ON LAYER OF NON -WOVEN GEOTEXTILE FABRIC (15" DEPTH). 11. STABILIZE ALL EXPOSED AREAS, AND REMOVE EROSION CONTROL MEASURES AND PERFORM FINAL SITE RESTORATION. MAINTENANCE PLAN THE MAINTENANCE PLAN SHALL BE FOLLOWED UNTIL THE SITE IS STABILIZED. MAINTENANCE OF SEDIMENT AND EROSION CONTROL MEASURES WILL BE PERFORMED BY A SUBCONTRACTOR. 1. ALL SEDIMENT AND EROSION CONTROL DEVICES AND PLANTED AREAS SHALL BE INSPECTED EVERY SEVEN (7) CALENDAR DAYS AND AFTER EACH RAINFALL OCCURRENCE THAT EXCEEDS ONE-HALF (1/2 ) INCH WITHIN A 24-HOUR PERIOD. DAMAGED OR INEFFECTIVE DEVICES SHALL BE REPAIRED OR REPLACED, AS NECESSARY, AS SOON AS PRACTICAL. 2. ALL TEMPORARY CONTROL DEVICES (I.E. SILT FENCE) SHALL BE REMOVED ONCE CONSTRUCTION IS COMPLETE AND THE EXPOSED AND RE -GRADED SECTIONS ARE STABILIZED. 3. ALL SEEDED AREAS SHALL BE FERTILIZED, RE -SEEDED AS NECESSARY AND MULCHED, ACCORDING TO THE SEEDING PLAN (SHEET OOD-03) TO MAINTAIN A VIGOROUS, DENSE VEGETATION COVER. 4. ALL SEEDED AREAS SHALL BE RE -FERTILIZED IN THE SECOND YEAR UNLESS GROWTH IS FULLY ADEQUATE. DISTURBANCE TOTAL DISTURBANCE: 0.13 ACRES HDR Engineering Inc. of the Carolinas 440 S. Church St. Suite 1000 Charlotte, NC 28202-2075 704.338.6700 N.C.B.E.L.S. License Number F-0116 SPECIAL NOTE: IN ADDITION TO DESIGNED AND SHOWN MEASURES, ADDITIONAL EROSION AND SEDIMENT CONTROL BMPS MAY BE UTILIZED AS NEEDED IN POTENTIAL AREAS OF DISTURBANCE, WHICH MAY STABILIZATION OF EXISTING ACCESS ROADS, SILT FENCE, WATTLES, OR MATTING EROSION AND SEDIMENT CONTROL LEGEND SILT FENCE ulSILT FENCE ROCK OUTLET -LOD- LIMITS OF DISTURBANCE DIKE FOR PUMP AROUND PUMP AROUND HOSING CLASS 1 RIP -RAP (18") ON LAYER OF NON -WOVEN GEOTEXTILE FABRIC ,SI EE -77 2 OF 7 25548 ' ,Q4117119 Z 10 0 10 20 SCALE: 1 " = 10' DUKE ENERGY 400 S. TRYON STREET PO BOX 1007 CHARLOTTE N.C. 28201-1007 TELEPHONE NO. (704)382-6658 W III WN Al - 7w MIN �7Qn D/RECTION OF � SOW 9n, 0 0 U — -u ACCESS DRIVE CENTERLINE ALIGNMENT STA: 10+00.00 SLOPE 10:1 TO EXISTING GRADE SEE NOTE 4 ROAD BERM ELEVATION OVER PIPE: 796.84' 40 LINEAR FEET OF 84" CMP (2) PER CEPLANS & SPECIFICATIONS _-7g4 PIPE 1 N: 676496.150 E: 1323938.035 INV ELEV: 787.95' CHANNEL INV: 788.95' PIPE 2 J N: 676487.483 E: 1323943.023 INV ELEV: 788.95' CHANNEL INV: 789.95' \ EXISTING DUKE ENERGY RIGHT OF WAY EXISTING JOCK'S LOOP IMPROVEMENT ESC MEASURES CUL VERT PL241V EXISTING JOCK'S LOOP IMPROVEMENT ESC MEASURES EXISTING DUKE ENERGY RIGHT OF WAY \ \\ \DIRECTO ' off. ION .84' ACCESS DRIVE. SEE CEC PLANS FOR DETAILS ACCESS DRIVE CENTERLINE ALIGNMENT STA: 10+97.00 S-HEE77 3 OF 7 HDR Engineering Inc. of the Carolinas 440 S. Church St. Suite 1000 Charlotte, NC 28202-2075 704.338.6700 N.C.B.E.L.S. License Number F-0116 CULVERT PLAN GENERAL NOTES: 1. SEE SHEET OOG-02 FOR EROSION CONTROL NOTES. 2. SEE SHEET OOC-03 FOR EROSION CONTROL PLAN. 3. SEE SHEET OOC-02 FOR GRAVEL DRIVE CENTERLINE PROFILE AND DOUBLE CULVERT PROFILE. 4. ARMOR SLOPES 2:1 AND STEEPER WITH CLASS 1 RIP -RAP 18" THICK ON LAYER OF NON -WOVEN GEOTEXTILE FABRIC. 5. 20' CLASS 1 RIP RAP OUTLET PROTECTION BELOW PROPOSED CULVERTS WILL BE KEYED IN TO PREVENT WASHOUT AND INSTALLED AT AN ELEVATION TO MAINTAIN AQUATIC PASSAGE AND PROMOTE SURFACE WATER FLOW DURING LOW FLOW CONDITIONS. FA • 25548 ✓/♦_ 3 n04117119� .........••.. � 10 0 10 20 SCALE: 1 " = 10' DUKE ENERGY. 400 S. TRYON STREET PO BOX 1007 CHARLOTTE N.C. 28201-1007 TELEPHONE NO. (704)382-6658 790' r� — —vil —vi—l— ki ll " 11 PIPE INV AT C/L OF ROAD: 788.20' CHANNEL INV AT C/L OF ROAD: 789.20' GRAVEL DRIVE CENTERLINE PROFILE SCALE: H: 1 "=20', V: 1 "=4' LOOKING UPSTREAM APPROXIMATE PROPOSED GRADING APPROXIMATE EXISTING GRADING DOUBLE CULVERT SECTION SCALE: 1"=5' ffifflAINAWNWA Aff 790' .11 PROPOSED RIP RAP SLOPE STABILIZATION 790' STA: 10+00.00 CULVERT INV ELEV: 787.95' CHANNEL ELEV: 788.95' 9+75 7' 10+00 PROPOSED STRUCTURAL FILL MATERIAL. SEE CEC SHEETS. 800' 20' PROPOSED GRADE ELEV: 797.84' 10+50 PROPOSED 84" CULVERT EXISTING GRADE 790' STA: 10+40.00 CULVERT INV ELEV: 788.45' CHANNEL ELEV: 789.45' 10+75 PROPOSED CHANNEL C/L STA: 10+20.00 SEE CROSS SECTION THIS SHEET CULVERT INV: 788.20' CHANNEL INV: 789.20' PIPE 1 CULVERT PROFILE SCALE: H: 1 "=20'; V: 1 "=4' 800' PROPOSED RIP RAP SLOPE STABILIZATION STA: 10+00.00 CULVERT INV ELEV: 788.95' CHANNEL ELEV: 789.95' 9+75 PROPOSED STRUCTURAL FILL MATERIAL. SEE CEC SHEETS. 800' 20' PROPOSED GRADE I / ELEV: 797.84' PROPOSED 84" CULVERT EXISTING GRADE 790' STA: 10+40.00 CULVERT INV ELEV: 789.45' CHANNEL ELEV: 790.45' 10+00 10+50 10+75 PROPOSED CHANNEL C/L STA: 10+20.00 SEE CROSS SECTION THIS SHEET CULVERT INV: 789.20' CHANNEL INV: 790.20' PIPE 2 CULVERT PROFILE SCALE: H: 1 "=20'; V: 1 "=4' SHEET 4 OF 7 1C1171-1! 1111. •. IF 2" RO'/ 25548 O F,04117119� T•M.. B P 1"8111111"' oo HDR Engineering Inc of the Carolinas 440 S. Church St. Suite 1000 Charlotte, NC 28202-2075 704.338.6700 N.C.B.E.L.S. License Number F-0116 4 DUKE ENERGY 400 S. TRYON STREET PO BOX 1007 CHARLOTTE N.C. 28201-1007 TELEPHONE NO. (704)382-6658 00 / Q) LIMITS OF DISTURBANCE N\Z 1 / J I o I - ❑ / �❑ / bo►r I I Q�OgR SILT FENCE STONE OUTLET (TYP) OQ SEE DETAIL 3 SHEET OOD-01 0�6 / Q O 0 0 0 SEE DETAIL 3 SHEET OOD-01 LJ 0 ��• � � • IMPERVIOUS DIKE FOR PUMP AROUND. SEE DETAIL 2 SHEET OOD-01 FOR DIKE AND PUMP AROUND PLAN. 0 0 U \ \ \ \ \ \ \ / 1 EXISTING JOCK'S LOOP EROSION CONTROL AND ACCESS MEASURES \ L Ul ---795— OD LOD _ \ I o c 790 • `� ° J \ \ I I �1 _ _794 FLEXIBLE HOSING FOR PUMPAROUND o \ SILT FENCE (TYP) PER DETAIL 4 SHEET OOD-01 O) \ O� \ C>- o of \ \ \ \ o\ \ zz \ IMPERVIOUS DIKE FOR / °Q PUMP AROUND. SEE DETAIL 2 SHEET OOD 01 FOR DIKE AND PUMP AROUND PLAN. SILT FENCE (TYP) PER DETAIL 4 SHEET OOD-01 / ° / / / i ❑� r / �� Li S'I ET77 5 Off' 7 HDR Engineering Inc. of the Carolinas 440 S. Church St. Suite 1000 Charlotte, NC 28202-2075 704.338.6700 N.C.B.E.L.S. License Number F-0116 EROSION AND SEDIMENT CONTROL GENERAL NOTES: 1. SEE SHEET OOG-02 FOR EROSION CONTROL NOTES.. 2. SEE SHEET OOD-03 FOR SEEDING SPECIFICATIONS. 3. COORDINATE HOSING LOCATION WITH ACTIVE CONSTRUCTION MEANS AND METHODS. EROSION AND SEDIMENT CONTROL LEGEND SF SILT FENCE ulSILT FENCE ROCK OUTLET -LOD- LIMITS OF DISTURBANCE DIKE FOR PUMP AROUND 00 PUMP AROUND HOSING (SEE NOTE 3) R- FA 25548 = -)3 04/17/19 = 0 :ANG 1 NE- 10 0 10 20 SCALE: 1 " = 10' DUKE ENERGY. 400 S. TRYON STREET PO BOX 1007 CHARLOTTE N.C. 28201-1007 TELEPHONE NO. (704)382-6658 FLi 0 c7 c� U a M N m b 0 CD 0 3 7 0 0 0 0 N q U 0 0 co LO CA 0 7 coa co m 3 Q TEMPORARY FLEXIBLE HOSE FILTER FA TYI Tno nr- BANK TEMPORARY '_ED OUTLET) APPF -• " "Tr BA WATER TOP 01 SEDIMENT REMOVAL DEVICE C`TAO11 1717-f1 n1 ITI CT rXIBLE 4ENT TEMPORARY STABILIZED OUTLET SECTION A000nV1kAATr `1SE FLOW ») 0 FLOW + 1' N) 3AG/STONE (CLASS A) NOTE 8) TEMPORARY FLEXIBLE HOSE AREA FLOW IMPERVIOUS DIKE (SEE NOTE 8) 4- 0 7- 7 MPERVIOUS MEMBRANE TYPE 2 IMPERVIOUS DIKE DETAIL DEWATERING PUMP SEDIMENT REMOVAL DEVICE (SEE DETAIL, THIS SHEET) NOTES: 1. SEDIMENT FILTER BAG FABRIC SHALL BE GEOTEXTILE MANUFACTURED FROM WOVEN POLYPROPYLENE OR POLYMER MATERIAL. SEDIMENT FILTER BAG FABRIC MAY BE MADE FROM RECYCLED POLYMER MATERIALS. POLYMER MATERIALS SHALL NOT CONTAIN BIODEGRADABLE FILLER MATERIALS AND SHALL CONFORM TO THE REQUIREMENTS IN ASTM DESIGNATION: E 204 2. SEDIMENT FILTER BAG FABRIC SHALL CONFORM TO THE FOLLOWING REQUIREMENTS: 3. THE SEDIMENT FILTER BAG SHALL BE 10'X12'X1.5' (MIN) AND SHALL BE COMPLETE WITH LIFTING LOOPS AND DUMP STRAPS ATTACHED AT THE BOTTOM TO FACILITATE EMPTYING OF THE SEDIMENT FILTER BAG. 4. LIFTING STRAPS, SHOULD BE PLACED UNDER THE DEWATERING SEDIMENT FILTER BAG TO FACILITATE REMOVAL AFTER USE. 5. PLACE THE DEWATERING SEDIMENT FILTER BAG ON A LEVEL STABILIZED AREA OVER DENSE VEGETATION/STRAW, OR GRAVEL (IF INCREASED DRAINAGE SURFACE AREA IS NEEDED). 6. INSERT DISCHARGE HOSE FROM PUMP INTO THE DEWATERING SEDIMENT FILTER BAG A MINIMUM OF SIX INCHES (6") AND TIGHTLY SECURE WITH ATTACHED STRAP TO PREVENT WATER FROM FLOWING OUT OF THE UNIT WITHOUT BEING FILTERED. 7. REPLACE THE UNIT WHEN ONE HALF (1/2) FULL OF SEDIMENT OR WHEN SEDIMENT HAS REDUCED THE FLOW RATE OF THE PUMP DISCHARGE TO AN IMPRACTICAL RATE. 8. REMOVE THE UNIT AND SEDIMENT FROM ENVIRONMENTALLY SENSITIVE AREA AND WATERWAYS. AT THE APPROVED DISPOSAL SITE OPEN OR SLIT THE UNIT, REMOVE SEDIMENT AND GRADE SMOOTHLY INTO EXISTING TOPOGRAPHY. DISPOSE OF THE DEWATERING SEDIMENT FILTER BAG, AT AN APPROPRIATE RECYCLING OR SOLID WASTE FACILITY. DEWATERING SEDIMENT FILTER BAG NOT TO SCALE CLEAN WATER PUMP -AROUND PUMP TEMPORARY FLEXIBLE HOSE EXISTING CHANNEL IMPERVIOUS DIKE (SEE DETAIL, THIS SHEET) TEMPORARY STABILIZED OUTLET (SEE DETAIL THIS SHEET) PUMP AROUND DETAIL 2 NOT TO SCALE IN vANWAMA GENERAL NOTES: 1. ALL CHANNEL WORK INVOLVING EXCAVATION SHALL BE PERFORMED IN DRY CONDITIONS OR IN CHANNEL SECTIONS ISOLATED BY IMPERVIOUS DIKES AND KEPT DE -WATERED. 2. THE CONTRACTOR SHALL NOT DISTURB MORE AREA THAN CAN BE STABILIZED THE SAME WORKING DAY. 3. PUMP -AROUND PUMP AND HOSE SHALL ADEQUATELY CONVEY BASEFLOW (APPROX. 1 CFS). DE -WATERING PUMP SHALL ADEQUATELY DE -WATER THE WORKING AREA AT THE DOWNSTREAM IMPERVIOUS DIKE. 4. GRAVITY -BASED GEOTEXTILE BAG FILTERS SHALL BE USED TO COLLECT SILT AND SEDIMENT FROM WORK AREA DEWATERING. THE DESIGNER MAY SPECIFY A SEDIMENT BASIN OR OTHER SEDIMENT CONTROL MEASURE IN LIEU OF A SEDIMENT BAG IF SITE CONDITIONS ARE FAVORABLE (I.E. - TREES WILL NOT BE IMPACTED FOR BASIN EXCAVATION, ETC.). 5. EFFLUENT FROM CLEAN WATER PUMP AROUND MAY BE DISCHARGED DIRECTLY INTO STABILIZED OUTLET (NO SEDIMENT REMOVAL DEVICE REQUIRED). 6. A STABILIZED OUTLET SHALL BE USED TO CONTROL THE EFFLUENT FROM ALL PUMPING OPERATIONS. THE DESIGNER SHALL SPECIFY ALL MATERIALS AND DIMENSIONS ASSOCIATED WITH STABILIZED OUTLETS. 7. FILTER FABRIC AS SPECIFIED BY THE DESIGNER SHALL BE USED UNDERNEATH ALL STONE/RIP RAP PLACED FOR SEDIMENT BAGS, STABILIZED OUTLETS, SPLASH PADS. 8. IMPERVIOUS DIKES SHALL BE CONSTRUCTED TO ISOLATE THE IN -STREAM WORKING AREA. AN IMPERVIOUS FABRIC MEMBRANE AND SAND BAGS OR STONE, AS SPECIFIED BY THE DESIGNER, SHALL BE USED TO CREATE THE DIKES. 9. THE WORK SEQUENCE IN PUMP -AROUND OPERATIONS PROCEEDS TYPICALLY AS FOLLOWS: A. INSTALL SEDIMENT REMOVAL DEVICE AND TEMPORARY STABILIZED OUTLETS AT THE DOWNSTREAM END OF WORKING AREA. B. INSTALL PUMP -AROUND PUMP AND FLEXIBLE HOSE. C. INSTALL UPSTREAM IMPERVIOUS DIKE AND BEGIN PUMPING (CLEAN WATER) DOWNSTREAM TO STABILIZED OUTLET. D. INSTALL DOWNSTREAM IMPERVIOUS DIKE AND DE -WATERING PUMP. E. PERFORM CHANNEL WORK IN ACCORDANCE WITH THE PLANS IN THE WORKING AREA. F. DE -WATER THE WORKING AREA (AS NEEDED) INTO THE SEDIMENT REMOVAL DEVICE AND TEMPORARY STABILIZED OUTLET. G. UPON COMPLETION OF WORK, REMOVE ANY SEDIMENT ACCUMULATION BEHIND IMPERVIOUS DIKES. H. REMOVE DOWNSTREAM AND THEN UPSTREAM DIKES AND ALL PUMPS AND HOSE. I. SEED AND MULCH ALL DISTURBED AREAS PER THE PLANTING PLAN. MINIMUM 10 GAUGE LINE WIRES Mm 1�L'TAILS SILT FENCE. SEE DETAIL 3 THIS SHEET NCDOT CLASS A RIP RAP V-6" HIGH 4' STEEL POST (1.33 LB/LIN FT STEEL - 5 FT MIN LENGTH) F /j 8' MAX. SPACING INSTALL HARDWARE - CLOTH TO SUPPORT STONE AT OUTLETS. 9" MAX I (RECOMMENDED) 18" STORAGE HEIGHT 24" DESIGN TYPE DRAINAGE AREA (APPROX.) Specification 1/4 Requirements Grab tensile strength Silt Fenny (one inch grip), pounds, minimum in each direction 255 ASTM Designation: D 4632 or appropriate test method for specific polymer Elongation, percent, minimum in each direction X -Machine Direction 15 ASTM Designation: D 4632 or appropriate test method for specific polymer Permittivity£ ASTM( D 4401 sec -1 Permittivity, 1/sec., minimum Apparent opening Si'ze2 ASTM! D 4751 mm 1.5 ASTM Designation: D 4491 (30) If° Ultraviolet Stabiiliity ASTM D 4355 Retained Flow rate, gallons per minute per square foot, minimum Strength 200 ASTM Designation: D 4491 Ultraviolet stability, percent tensile strength retained after 500 hours, minimum 80 ASTM Designation: D 4355 (xenon-erc lamp and water spray weathering method) 3. THE SEDIMENT FILTER BAG SHALL BE 10'X12'X1.5' (MIN) AND SHALL BE COMPLETE WITH LIFTING LOOPS AND DUMP STRAPS ATTACHED AT THE BOTTOM TO FACILITATE EMPTYING OF THE SEDIMENT FILTER BAG. 4. LIFTING STRAPS, SHOULD BE PLACED UNDER THE DEWATERING SEDIMENT FILTER BAG TO FACILITATE REMOVAL AFTER USE. 5. PLACE THE DEWATERING SEDIMENT FILTER BAG ON A LEVEL STABILIZED AREA OVER DENSE VEGETATION/STRAW, OR GRAVEL (IF INCREASED DRAINAGE SURFACE AREA IS NEEDED). 6. INSERT DISCHARGE HOSE FROM PUMP INTO THE DEWATERING SEDIMENT FILTER BAG A MINIMUM OF SIX INCHES (6") AND TIGHTLY SECURE WITH ATTACHED STRAP TO PREVENT WATER FROM FLOWING OUT OF THE UNIT WITHOUT BEING FILTERED. 7. REPLACE THE UNIT WHEN ONE HALF (1/2) FULL OF SEDIMENT OR WHEN SEDIMENT HAS REDUCED THE FLOW RATE OF THE PUMP DISCHARGE TO AN IMPRACTICAL RATE. 8. REMOVE THE UNIT AND SEDIMENT FROM ENVIRONMENTALLY SENSITIVE AREA AND WATERWAYS. AT THE APPROVED DISPOSAL SITE OPEN OR SLIT THE UNIT, REMOVE SEDIMENT AND GRADE SMOOTHLY INTO EXISTING TOPOGRAPHY. DISPOSE OF THE DEWATERING SEDIMENT FILTER BAG, AT AN APPROPRIATE RECYCLING OR SOLID WASTE FACILITY. DEWATERING SEDIMENT FILTER BAG NOT TO SCALE CLEAN WATER PUMP -AROUND PUMP TEMPORARY FLEXIBLE HOSE EXISTING CHANNEL IMPERVIOUS DIKE (SEE DETAIL, THIS SHEET) TEMPORARY STABILIZED OUTLET (SEE DETAIL THIS SHEET) PUMP AROUND DETAIL 2 NOT TO SCALE IN vANWAMA GENERAL NOTES: 1. ALL CHANNEL WORK INVOLVING EXCAVATION SHALL BE PERFORMED IN DRY CONDITIONS OR IN CHANNEL SECTIONS ISOLATED BY IMPERVIOUS DIKES AND KEPT DE -WATERED. 2. THE CONTRACTOR SHALL NOT DISTURB MORE AREA THAN CAN BE STABILIZED THE SAME WORKING DAY. 3. PUMP -AROUND PUMP AND HOSE SHALL ADEQUATELY CONVEY BASEFLOW (APPROX. 1 CFS). DE -WATERING PUMP SHALL ADEQUATELY DE -WATER THE WORKING AREA AT THE DOWNSTREAM IMPERVIOUS DIKE. 4. GRAVITY -BASED GEOTEXTILE BAG FILTERS SHALL BE USED TO COLLECT SILT AND SEDIMENT FROM WORK AREA DEWATERING. THE DESIGNER MAY SPECIFY A SEDIMENT BASIN OR OTHER SEDIMENT CONTROL MEASURE IN LIEU OF A SEDIMENT BAG IF SITE CONDITIONS ARE FAVORABLE (I.E. - TREES WILL NOT BE IMPACTED FOR BASIN EXCAVATION, ETC.). 5. EFFLUENT FROM CLEAN WATER PUMP AROUND MAY BE DISCHARGED DIRECTLY INTO STABILIZED OUTLET (NO SEDIMENT REMOVAL DEVICE REQUIRED). 6. A STABILIZED OUTLET SHALL BE USED TO CONTROL THE EFFLUENT FROM ALL PUMPING OPERATIONS. THE DESIGNER SHALL SPECIFY ALL MATERIALS AND DIMENSIONS ASSOCIATED WITH STABILIZED OUTLETS. 7. FILTER FABRIC AS SPECIFIED BY THE DESIGNER SHALL BE USED UNDERNEATH ALL STONE/RIP RAP PLACED FOR SEDIMENT BAGS, STABILIZED OUTLETS, SPLASH PADS. 8. IMPERVIOUS DIKES SHALL BE CONSTRUCTED TO ISOLATE THE IN -STREAM WORKING AREA. AN IMPERVIOUS FABRIC MEMBRANE AND SAND BAGS OR STONE, AS SPECIFIED BY THE DESIGNER, SHALL BE USED TO CREATE THE DIKES. 9. THE WORK SEQUENCE IN PUMP -AROUND OPERATIONS PROCEEDS TYPICALLY AS FOLLOWS: A. INSTALL SEDIMENT REMOVAL DEVICE AND TEMPORARY STABILIZED OUTLETS AT THE DOWNSTREAM END OF WORKING AREA. B. INSTALL PUMP -AROUND PUMP AND FLEXIBLE HOSE. C. INSTALL UPSTREAM IMPERVIOUS DIKE AND BEGIN PUMPING (CLEAN WATER) DOWNSTREAM TO STABILIZED OUTLET. D. INSTALL DOWNSTREAM IMPERVIOUS DIKE AND DE -WATERING PUMP. E. PERFORM CHANNEL WORK IN ACCORDANCE WITH THE PLANS IN THE WORKING AREA. F. DE -WATER THE WORKING AREA (AS NEEDED) INTO THE SEDIMENT REMOVAL DEVICE AND TEMPORARY STABILIZED OUTLET. G. UPON COMPLETION OF WORK, REMOVE ANY SEDIMENT ACCUMULATION BEHIND IMPERVIOUS DIKES. H. REMOVE DOWNSTREAM AND THEN UPSTREAM DIKES AND ALL PUMPS AND HOSE. I. SEED AND MULCH ALL DISTURBED AREAS PER THE PLANTING PLAN. MINIMUM 10 GAUGE LINE WIRES Mm 1�L'TAILS SILT FENCE. SEE DETAIL 3 THIS SHEET NCDOT CLASS A RIP RAP V-6" HIGH 4' STEEL POST (1.33 LB/LIN FT STEEL - 5 FT MIN LENGTH) F /j 8' MAX. SPACING INSTALL HARDWARE - CLOTH TO SUPPORT STONE AT OUTLETS. 9" MAX I (RECOMMENDED) 18" STORAGE HEIGHT 24" DESIGN TYPE DRAINAGE AREA (APPROX.) WEIR LENGTH (L) MIN. 1/4 1/2 ACRE 4.0 FT SILT FENCE STONE OUTLET NOT TO SCALE Table 6.62b Specifications For Sediment Fence IFabric HDR Engineering Inc. of the Carolinas ST 4 (1. )ST5 IN LE440 S. Church St. Suite 1000 Charlotte, NC 28202-2075 704.338.6700 SILT FENCE N.C.B.E.L.S. License Number F-0116 -n F_ O 1;-6" M PONDING HEIGHT STEEL POST 36 in. ABOVE GRADE (MAX.) RUNOFF # 57 WASHED ROCK SECTION DETAIL TRENCH WITH GRAVEL STQNE (8" THICK) 8" FABRIC TRENCH Temporary Silt (Fence IMateriall (Property Requirements Supported' Un -Supported' Type of Test Material. Units Silt Fenny Silt Fancy Value Grab Strength ASTM D 4632 N (Ibs) Machine Direction 400 550 MARV (00) (90). X -Machine Direction 400 450 MARV (90) (90) Permittivity£ ASTM( D 4401 sec -1 0.05 0.05 MARV Apparent opening Si'ze2 ASTM! D 4751 mm 0.60 0.60 Max. ARV' (US Sieve #) (30) (30) If° Ultraviolet Stabiiliity ASTM D 4355 Retained 70%° atter 70°x° after Typical Strength 500h of exposure 500h of exposure Siilt Fence support shalil consist of 14 gage steel wire with a mesh spacing of 150 mm (6 inches), or prefabricated poylmer mesh of aquivallent strength. These default values are based on empirical evidence with .a variety of sediment. Farr environmentally sensitive areas, .a reviewof previous experience and/or site or re-gironallly specific geotextile tests in accordance with Test Method D 5141 should be performled by the agency to confirm suiitabilliity of these requirements. As measured in accordance with Test Method D 4632. 89-099 MAXIMUM FRONT VIEW MINIMUM 12-1/2 GAUGE INTERMEDIATE WIRES 0 N TEMPORARY SILT FENCE DETAIL NO TO SCALE STEEL POST (1.33 LB/LIN FT STEEL - 5 FT MIN LENGTH) WOVEN WIRE FABRIC SILT FENCE FABRIC FILL SLOPE 5' MIN GRADE TRENCH IN SILT FENCE 8" DOWN AND 4" FORWARD ALONG TRENCH. COMPACT THOROUGHLY AFTER PLACEMENT. SIDE VIEW '')YE 'T 6 Off' 7 r 25548 J 73 •; 04/17/19 • _ NOTE: 1. USE SILT FENCE ONLY WHEN DRAINAGE AREA DOES NOT EXCEED 1/4 ACRE AND NEVER IN AREAS OF CONCENTRATED FLOW. 2. SILT FENCE IS TO BE SECURELY FASTENED TO EACH STEEL SUPPORT POST OR TO WOVEN WIRE WHICH IS IN TURN ATTACHED TO THE STEEL FENCE POST. 3. INSPECT FREQUENTLY AND REPAIR OR REPLACE PROMPTLY AS NEEDED. 4. REMOVE SEDIMENT DEPOSITED AS NEEDED TO PROVIDE STORAGE VOLUME FOR THE NEXT RAIN AND TO REMOVE PRESSURE ON THE SILT FENCE. UNIFORMLY DISTRIBUTE ON THE SOURCE AREA PRIOR TO TOPSOILING. DUKE E NERGY 400 S. TRYON STREET PO BOX 1007 CHARLOTTE N.C. 28201-1007 TELEPHONE NO. (704)382-6658 IIII.■■■■■■■■■■■■■IIIII� 110 74, ������ ���� ►���� ������ liPii' iii' ....... • • ..mswo.. FRONT VIEW MINIMUM 12-1/2 GAUGE INTERMEDIATE WIRES 0 N TEMPORARY SILT FENCE DETAIL NO TO SCALE STEEL POST (1.33 LB/LIN FT STEEL - 5 FT MIN LENGTH) WOVEN WIRE FABRIC SILT FENCE FABRIC FILL SLOPE 5' MIN GRADE TRENCH IN SILT FENCE 8" DOWN AND 4" FORWARD ALONG TRENCH. COMPACT THOROUGHLY AFTER PLACEMENT. SIDE VIEW '')YE 'T 6 Off' 7 r 25548 J 73 •; 04/17/19 • _ NOTE: 1. USE SILT FENCE ONLY WHEN DRAINAGE AREA DOES NOT EXCEED 1/4 ACRE AND NEVER IN AREAS OF CONCENTRATED FLOW. 2. SILT FENCE IS TO BE SECURELY FASTENED TO EACH STEEL SUPPORT POST OR TO WOVEN WIRE WHICH IS IN TURN ATTACHED TO THE STEEL FENCE POST. 3. INSPECT FREQUENTLY AND REPAIR OR REPLACE PROMPTLY AS NEEDED. 4. REMOVE SEDIMENT DEPOSITED AS NEEDED TO PROVIDE STORAGE VOLUME FOR THE NEXT RAIN AND TO REMOVE PRESSURE ON THE SILT FENCE. UNIFORMLY DISTRIBUTE ON THE SOURCE AREA PRIOR TO TOPSOILING. DUKE E NERGY 400 S. TRYON STREET PO BOX 1007 CHARLOTTE N.C. 28201-1007 TELEPHONE NO. (704)382-6658 DEFINITION Controlling runoff and erosion on disturbed areas by establishing vegetative cover with seed. PURPOSE To reduce erosion and decrease sediment yield from disturbed areas, and o permanently stabilize such areas in a manner that is economical, adapts to site conditions, and allows selection of the most appropriate plant materials. SPECIFICATIONS SEEDBED REQUIREMENTS Establishment of vegetation should not be attempted on sites that are unsuitable due to excessive soil compaction, inappropriate soil texture, poor drainage, concentrated overland flow, or steepness of slope until measures have been taken to correct these problems. To maintain a good stand of vegetation, the soil must meet certain minimum requirements as a growth medium. The existing soil should have these criteria: • Enough fine—grained (silt and clay) material to maintain adequate moisture and nutrient supply (available water capacity of at least .05 inches water to 1 inch of soil). • Sufficient pore space to permit root penetration. • Sufficient depth of soil to provide an adequate root zone. the depth to rock or impermeable layers such as hardpans should be 12 inches or more, expect on slopes steeper than 2:1 where the addition of soil is not feasible. • A favorable pH range for plan growth, usually 6.0 — 6.5. • Free from large roots, branches, stones, large clods of earth, or trash of any kind. Clods and stones may be left on slopes steeper than 3:1 if they are to be hydro seeded. If any of the above criteria are not met — i.e., if existing soil is too coarse, dense, shallow or acidic to foster vegetation — special amendments are required. the soil conditioners described below may be beneficial or, preferably, top soil may be applied. SEEDBED PREPARATION Install necessary mechanical erosion and sedimentation control practices before seeding, and complete grading according to the approved plan. Lime and fertilizer needs should be determined by soil tests. Direction, sample cartons, and information sheets are available through county Agricultural Extension offices. Testing is also done by commercial laboratories. When soil test results are not available, follow rates suggested in the seeding specifications shown at right. Application rates usually fall into the following ranges. • Ground agricultural limestone: Light—textured, sandy soils: 1 to 1-1/2 tons/acre Heavy—textured, clayey soils: 2 — 3 tons/acre • Fertilizer: Grasses: 800-1200 Ib/acre of 10-10-10 (or the equivalent) Grass—legume mixtures: 800-1200 Ib/acre of 5-10-10 (or the equivalent) Apply lime and fertilizer evenly and incorporate into the top 4-6 inches of soil by disking or other suitable means. Operate machinery on the contour. When using a hydro seeder, apply lime and fertilizer to a rough, loose surface. Roughen surfaces prior to seeding. Complete seedbed preparation by breaking up large clods and raking into a smooth, uniform surface (slopes less than 3:1). Fill in or level depressions that can collect water. Broadcast seed into a freshly loosened seedbed that has not been sealed by rainfall. SEEDING Seeding dates given in the seeding mixture specification are designated as "best" or "possible". Seedings properly carried out within the "best" dates have a high probability of success. It is also possible to have satisfactory establishment when seeding outside these dates. However, as you deviate from them, the probability of failure increases rapidly. Seeding on the last date shown under "possible" may reduce changes of success by 30-50%. Always take this into account in scheduling land—disturbing activities. Use certified seed for permanent seeding whenever possible. Labeling of—non—certified seed is also required by law. Labels contain important information on seed purity, germination, and presence of wood seeds. Seeds must meet State standards for content of noxious weeds. Do not accept seed containing "prohibited" noxious weed seed. Inoculate legume seed with rhizobium bacteria appropriate to the species of legume. Apply seed uniformly with a cyclone seeder, drop—type spreader, drill, cultipacker seeder, or hydro seeder on firm, friable seedbed. When using a drill or cultipacker seeder, plant small grains no more than 1 inch deep, grasses and legumes no more than 1/2 inch. Equipment should be calibrated in the field for the desires seeding rate. When using broadcast—seeding methods, subdivide the area into workable sections and determine the amount of seed needed for each section. Apply one—half the seed while moving back and forth across the area, making a uniform pattern: then apply the second half in the some way, but moving at right angles to the first pass. Mulch all plantings immediately after seeding. HYDRO SEEDING surface roughening is particularly important when hydro seeding, as a roughened slope will provide some natural coverage for lime, fertilizer, and seed. The surface should not be compacted or smooth. Fine seedbed preparation is not necessary for hydro seeding operations: large clods, stones, and irregularities provide cavities in which seeds can lodge. Rate wood fiber (cellulose) application should be at least 2,000 Ib/acre. Apply legume inoculants at four times the recommended rate when adding inoculant to a hydro seeder slurry. If a machinery breakdown of 1/2 to 2 hours occurs, add 50% more seed to the tank, based on the proportion of the slurry remaining. This should compensate for damage seed. Beyond 2 hours, a full rate of new seed may be necessary. Lime is not normally applied with a hydraulic seeder because it is abrasive. It can be blown onto steep slopes in dry form. MAINTENANCE Generally, a stand of vegetation cannot be determined to by fully established until soil cover has been maintained for one full year from planting. Inspect seeded areas for failure and make necessary repairs and reseedings within the same season, if possible. Reseeding --If a stand has inadequate cover, re—evaluate choice of plant materials and quantities of lime and fertilizer. Re—establish the stand after seedbed preparation or over—seed the stand. Consider seeding temporary, annual species if the time of year is not appropriate for permanent seeding. If vegetation fails to grow, soil must be tested to determine if acidity or nutrient imbalance is responsible. Fertilization --On the typical disturbed site, full establishment usually requires re—fertilization in the second growing season. Fine turf requires annual maintenance fertilization. Use soil tests if possible or follow the guidelines given for the specific seeding mixture. TEMPORARY SEEDING SPECIFICATIONS Seeding mixture (fall) Species* Rate (Ib/acre Rye Grain (Secale cereale) 120 Seeding Mixute (late winter early spring Species* Rate (Ib/acre Rye Grain (Secale cereale) 120 Seeding Mixture (summed Species* Rate (Ib/acre German Millet (Setaria italica) 40 Seeding dates (Piedmont) Fall: Aug. 15 — Dec. 30 Late winter (early spring): Jan. 1 — May 1 Late Summer: May 1 — Aug. 15 Soil amendments Follow recommendations of soil tests or apply 2,000 Ib/acre ground agricultural limestone and 750 Ib/acre 10-10-10 fertilizer. GENERAL SEEDING SPECIFICATIONS NO TO SCALE ,III� AV A _DE77A ILS" Mulch Apply 4,000 Ib/acre straw. Anchor mulch by tacking with asphalt, roving or a mulch anchoring tool. A dish with blades set nearly straight can be used as a mulch anchoring tool. Maintenance Re—fertilize if growth is not fully adequate. reseed, re—fertilize and mulch immediately following erosion or other damage. Pursuant to G.S. 113A-57(2), the angle for graded slopes and fills shall be no greater than the angle that can be retained by vegetative cover or other adequate erosion—control devices or structures. In any event, 3H:1V or greater slopes left exposed will within 7 calendar days of completion of any phase of grading, be planted or otherwise provided with temporary or permanent ground cover, devices, or structures sufficient to restrain erosion. Pursuant to G.S. 113A-57(3). Provisions for permanent groundcover sufficient to retrain erosion must be accomplished for all disturbed areas within 14 working days following completion of construction or development. *REF: 6.10 A, B and C, NC Erosion and Sediment Control Planning and Design Manual, 2006 PERMANENT SEEDING SPECIFICATIONS NOTE: DO NOT APPLY FERTILIZER IN THE STREAM CHANNEL STABILIZATION REQUIREMENTS: Stabilization for this project shall comply with the time frame guidelines as specified by the NCG-010000 general construction permit effective August 3, 2011 issued by the North Carolina Department of Environmental Quality Division of Water Resources. Temporary or permanent ground cover stabilization shall occur within 7 calendar days from the last land—disturbing activity, with the following exceptions in which temporary or permanent ground cover shall be provided in 14 calendar days from the last land—disturbing activity: Slopes between 2:1 and 3:1, with a slope length of 10 ft. or less Slopes 3:1 or flatter, with a slope of length of 50 ft. or less Slopes 4:1 or flatter The stabilization timeframe for High Quality Water (HQW) Zones shall be 7 calendar days with no exceptions for slope grades or lengths. High Quality Water Zones (HQW) Zones are defined by North Carolina Administrative Code 15A NCAC 04A.0105 (25). Temporary and permanent ground cover stabilization shall be achieved in accordance with the provisions in this contract and as directed. NATIVE GRASS SEEDING AND MULCHING: (West) Native Grass Seeding and Mulching shall be performed on the disturbed areas of wetlands and riparian areas, and adjacent to Stream Relocation and/or trout stream construction within a 50 foot zone on both sides of the stream or depression, measured from top of stream bank or center of depression. The stream bank of the stream relocation shall be seeded by a method that does not alter the typical cross section of the stream bank. Native Grass Seeding and Mulching shall also be performed in the permanent soil reinforcement mat section of preformed scour holes, and in other areas as directed. The kinds of seed and fertilizer, and the rates of application of seed, fertilizer, and limestone, shall be as stated below. During periods of overlapping dates, the kind of seed to be used shall be determined. All rates are in pounds per acre. August 1 — June 1 May 1 — September 1 18# Creeping Red Fescue 18# Creeping Red Fescue 8# Big Bluestem 8# Big Bluestem 6# Indiangrass 6# Indiangrass 4# Switchgrass 4# Switchgrass 35# Rye Grain 25# German or Browntop Millet 500# Fertilizer 500# Fertilizer 4000# Limestone 4000 Limestone Approved Creeping Red Fescue Cultivars: Aberdeen Boreal Epic Cindy Lou Fertilizer shall be 10-20-20 analysis. A different analysis of fertilizer may be used provided the 1-2-2 ratio is maintained and the rate of application adjusted to provide the same amount of plant food as a 10-20-20 analysis and as directed. Temporary Seeding Fertilizer shall be the some analysis as specified for Seeding and Mulching and applied at the rate of 400 pounds and seeded at the rate of 50 pounds per acre. German Millet or Browntop Millet shall be used in summer months and rye grain during the remainder of the year. The Engineer will determine the exact dates for using each kind of seed. Fertilizer Topdressing Fertilizer used for topdressing shall be 16-8-8 grade and shall be applied at the rate of 500 pounds per acre. A different analysis of fertilizer may be used provided the 2-1-1 ratio is maintained and the rate of application adjusted to provide the same amount of plant food as 16-88 analysis and as directed. Supplemental Seeding The kinds of seed and proportions shall be the same as specified for Seeding and Mulching, and the rate of application may vary from 25# to 75# per acre. The actual rate per acre will be determined prior to the time of topdressing and the Contractor will be notified in writing of the rate per acre, total quantity needed, and areas on which to apply the supplemental seed. Minimum tillage equipment, consisting of a sod seeder shall be used for incorporating seed into the soil as to prevent disturbance of existing vegetation. A clodbuster (ball and chain) may be used where degree of slope prevents the use of a sod seeder. Mowing The minimum mowing height shall be 6 inches. 7 OF 7 In 0 I. ' 25548 J' 3 04/17/1911 0 = F 11"11111111000% 1nnn11110 HDR Engineering Inc. of the Carolinas 440 S. Church St. Suite 1000 Charlotte, NC 28202-2075 704.338.6700 N.C.B.E.L.S. License Number F-0116 DUKE ENERGY 400 S. TRYON STREET PO BOX 1007 CHARLOTTE N.C. 28201-1007 TELEPHONE NO. (704)382-6658 S11E_ET,-00D-02 DWR DF4bn M Wtl , Rmuttn