Loading...
HomeMy WebLinkAboutNCG030511_Compliance Evaluation_20190405ROY COOPER NORTH CAROLINA Qovarnor Environmental Quality MICHAELS.REGAN Secretary WILLIAM E. (TOBY) VINSON, JR. Interim Director April 5, 2019 RECEIVE® Scott Technologies Inc. Attention: Jose Concepcion APR 10 2019 4320 Goldmine Rd. Monroe, North Carolina 28112 LAND QUALITY SECTION DAM SAFETY Subject: Compliance Evaluation Inspection Scott Technologies Inc. NPDES Stormwater Certificate of Coverage- NCG030511 Union County, North Carolina Dear Mr. Concepcion: Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection we conducted at the Scott Technologies Monroe facility on April 2, 2019. Please note that in the stormwater inspection report summary we ask that you stabilize minor erosion at the curbs of the loading dock. The report should be self-explanatory; however, should you have any questions, please do not hesitate to contact me at (704) 663-1699 or by E-mail at james.moore@ncdenr.gov. Enclosure c: Stormwater Permitting Branch Sincerely, �amesMoore Assistant Regional Engineer ;�E � North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Mooresville Regional Office 1 610 East Center Avenue. Suite 301 1 Mooresville, North Carolina 28115 704.663.1699 COMID11ance Insaection Resort Permit: NCG030511 Effective: 11/01/18 Expiration: 05/31/21 Owner: Scott Technologies Inc SOC: Effective: Expiration: Facility: Scott Safety 4320 Goldmine Rd County: Union Region: Mooresville Monroe NC 28112- Contact Person: Jose Concepcion Title: Phone: 704-296-3349 Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 04/02/2019 Primary Inspector: Lily C Kay Secondary Inspector(s): Certification: Phone: Entry Time: 11:45AM Exit Time: 12:30PM Phone: 704-663-1699 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Metal Fabrication Stormwater Discharge COC Facility Status: 0 Compliant 0 Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 permit: NCG030511 Owner - Facility: Scott Technologies Inc Inspection date: 04/02/2019 Inspection Type • Compliance Evaluation Reason for Visit: Routine Inspection Summary: This was a routine. compliance evaluation inspection and the records were complete and readily available. All qualitative monitoring reports, employee training records, annual certifications were reviewed and were complete and accurate. All outlets were observed and the representative sampling point from a previous technical assistance inspection should be used to avoid comingling the discharge with another industrial facility's discharge. Exceedances at outlet SDO#3 and SDO#4 for copper and zinc were observed and a tier 1 response was submitted. The sample for -the first half of 2019 did not have any exceedances of the banchmark limitaions. Some minor erosion at the curbs was observed and should be stabilized to avoid sedimentation pollution. The facility appears to be in compliance with their stormwater permit. If you have any questions, please contact me at Lily.Kay@ncdenr.gov or by phone at (704) 235-2137. Page 2of3 t permit: NCG030511 Owner - Facility: Scott Technologies Inc Inspection Date: 04/02/2019 Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? E ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? ■ ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? 0 ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? 0 ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? N ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? E ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? 0 ❑ ❑ ❑ # Does the Plan include a BMP summary? N ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? 0 ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? 0 ❑ ❑ ❑ # Does the facility provide and document Employee Training? 0 ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? 0 ❑ ❑ ❑ # Is the Plan reviewed and updated annually? N ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? N ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? E ❑ ❑ ❑ Comment: Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? 0 ❑ ❑ ❑ Comment: Analytical Monitorinq Yes No NA NE Has the facility conducted its Analytical monitoring? N ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? N ❑ ❑ ❑ Comment: Exceedances at outlet SDO#3 and SD0#4 for copper and zinc were observed and a tier 1 response was submitted. The sample for the first half of 2019 did not have any exceedances of the banchmark limitaions. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? N ❑ ❑ ❑ # Were all outfalls observed during the inspection? 0 ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? 0 ❑ ❑ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ ❑ ❑ Comment: Page 3 of 3