HomeMy WebLinkAboutWQ0040459_Application (FTSE)_20190307State of North Carolina
DWR
Department of Environmental Quality
Division of Water Resources
15A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION
Division of Water Resources FTA OAI-16 & SUPPORTING DOCUMENTATION
Application Number: (to be by []wR)
complcicd
All items must be completed or the application will be returned
I. APPLICANT INFORMATION.
1.
Applicant's name: City of Durham (company, municipality, HOA, utility, etc.)
2.
Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership ❑ Privately -Owned Public Utility
❑ Federal ❑ State. -County ® Municipal ❑ Other
3.
Signature authority's name: Donald F. Greeley, PE, PLS per_NCAC 07� .i106fb1
Title. Director of Water Mana acment
4.
Applicant's mailing address: 101_City Hall Plaza
City: Durham State: NC Zip: 27701-_'
5.
Applicant's contact information:
."
�,
Phone number: 919) 5604381 Email Address: Don.Greelcy a durhamnc.eov
O
C3
[I. PROJECT INFORMATION:
� N �
L
Project name: Southeast Regional Lift Station and Force Main
r`
2.
Application/Project status: ® Proposed (New Permit) ❑ Lxisting Permit/Project
c rac
o
If a modification, provide the existing permit number, WQ00 and issued date:
If new construction but part of a master plan, provide the existing permit number: WQ00
A
U
3.
County where project is located: Durham
4.
Approximate Coordinates (Decimal Degrees): Latitude: 35.9707 Longitude:-78.7709'
5.
Parcel ID (if applicable): 221996
(or Parcel ID to closest downstream sewer)
111. CONSULTANT INFORMATION:
I. Professional Engineer: Christopher Belk License Number: 028398
Firm: Hazen and Sawyer
Mailing address: 4011 WestChase Blvd, Suite 500
City: Raleigh State: NC Zip: 27607-
Phone number: (919) 833-7152 Email Address: 6elk0hazenandsawyer.com
IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION:
I. Facility Name: North Durham Water Reclamation Facility Permit Number: NC0023841
Owner Name: City of Durham
V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF):
I. Permit Number(s): WQNIA - Discharges to Treatment Facility Downstream (Receiving) Sewer Size: 30 inch
Syst!vm Widg Collection System Perniit Nuni erfs] (if npp1icab101: WOCS00005
Owner Name(s): City of Durham
FORM: FTA 04-16 Page 1 of 5
VI. GENERAL REQUIREMENTS
1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached?
❑ Ycs [:]No ®NIA
2_ If the Applicant is a Developer of lots to be sold, has a Dcvcloper's Operational Agreement (FORM: DEV1 been attached?
❑ Ycs ❑No ®N.'A
3, If the Applicant is a I#orate?Property Owners' Association, has an Operational At*rccmenl (FORM: HQA� been attached?
❑ Yes []No ®N'A
4. Origin of wastewater; (check all that apply):
® Residential Owned ® Retail (stores, centers, malls) ❑ Car Wash
® Residential Leased ® Retail with food preparation/service ❑ Hotel andfor Motels
® School / preschool I day care ® Medical i dental ?'veterinary facilities ® Swimming Pool /Clubhouse
® Food and drink facilities ® Church ❑ Swimming PooliFilter Backwash
® Businesses / offices i factories ❑ Nursing Home ❑ Other (Explain in Attachment)
S, Nature of wastewater: 99 % DomesticiCommercial % Commercial
] % Industrial (See 15A NCAC 02T .0103 20 )
1 :,Is there a Pretreatment Program in effect? ❑ Yes ® No
6. Has a flow reduction been approved under 15A NC .)T .01 I ? ❑ Yes ® No
If yes, provide a copy of flow reduction aporoval letter
7. Summarize wastewater generated by project:
Establishment Type (see 02T.0 440
Daily Design Flow'•'
No. of Units
Flow
NIA
gulf
GPD
gall
GPD
gall
GPD
gal/
GPD
gal/
GPD
gall
GPD
Total
GAD
a See I56 NCAC 02T_,01 14(b), (d). (call and rc 2 for caveats to wastewater design flow rates (i.e., minimum flow per
dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas;
and residential property located south or cast ofthe Atlantic Intracoastal Waterway to be used as vacation rentals as defined
in G.S. 42A4).
b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.01 14] shall be
determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data.
8. Wastewater generated by project: 0 GPD (per 15A NCAC 02T _0114)
D Do not include future flows or previously permitted allocations
Ifpermitted flow is zero, indicate why:
® Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line
❑ Flow has already been allocated in Permit Number:
❑ Rehabilitation or replacement of existing sewer with no new now expected
❑ Other (Explain);
FORM: FTA 04-16 Page 2 of 5
VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC Gravit Sewers):
1. Summarize gravity sewer to be permitted:
Size (inches)
Length (feet)
Material
54
481
FRP
42
2,192
FRP
30
6,545
FRP
24
5,094
FRP or PVC
20
2,921
FRP or PVC
18
12
10
8
2,718
1,039
205
193
PVC
PVC or DIP
PVC
DIP
11 _M
Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria
D Section III contains information related to minimum slopes for gravity scwcr(s)
i- Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC
VII1. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pump Stations/Force Mains):
COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT
1. Pump station number or name- Southeast Regional Lift Station
2. Approximate Coordinates (Decimal Degrees): Latitude: 35.9707 , Longitude:-78.7709
3, Design flow of the pump station: 10 millions gallons per day (firm capacity)
4. Operational point(s) of the pump(s): 2315 gallons per minute at 247 feet total dynamic head (TDH)
5. Summarize the force main to be permitted (for this Pump Station):
Size (inches)
Length (feet)
Material
30
14,467
DIP or FRP
6. Power reliability in accordance with 15A NCAC 02T .0305(h)(1):
® Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(1)(13);
Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day
Must be permanent to facility
Or if the pump station has an average daily flow less than 15,000 gallons per day:
❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T
.0305(h)(1)(C)
or
❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C):
It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement)
and is compatible with the station.
I f the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage
capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided
in the case of a multiple station power outage.
FORM: FTA 04-16 Page 3 of 5
IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T.0305(f)):
I. Does the project comply with all separations found in 15A NCAF, Q2T .0305(() & ie1
> 15A NCAC 02T.0305(f) contains minimum separations that shall be nrovided for sewcr systcros:
®Yes El No
Setback Parameter*
Separation Required
Storm sewers and other utilities not listed below vertical
24 inches
Water mains vertical -water over sewer including in benched trenches
18 inches
Water mains horizontal
10 feet
Reclaimed water lines vertical - reclaimed over sewer
18 inches
Reclaimed water lines horizontal - reclaimed over sewer
2 feet
**Any private or public water supply source, including any wells, WS-1 waters of Class I or
Class II impounded reservoirs used as a source of drinking water
100 feet
**Waters classified WS (except WS-I or WS-V), B, SA, ORW, I-IQW, or SB from normal
high water or tide elevation and wetlands see item IX.2
50 feet
**Any other stream, lake, impoundment, or ground water lowering and surface drainage
ditches I
10 feet
Any building foundation
5 feet
Any basement
10 feet
Top slope of embankment or cuts of 2 feet or more vertical height
10 feet
Drainage systems and interceptor drains
5 feet
Any swimming pools
10 feet
Final earth grade (vertical)
36 inches
);- 15A_ NCAC' 023'.0305(j contains alternatives where separations in 02T.0305(f) cannot be achieved.
**Stream classifications can be identified using the Division's NC Surfacc Water Classifications wcbnugc
If noncompliance with 02T.0305(f) or (g). sec Section X of this application
2. Does the project comply with separation requirements for wetlands? (50 feet of separation) ❑ Yes ® No ❑ N.-'A
r See the Division's draft separation requirements for situations where separation cannot be meet
No variance is required if the alternative design criteria specified is utilired in design and construction
As built documents should reference the location of areas effected
3. Does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? ❑ Yes ® No ❑ N!A
> This would include Trout Buffered Streams per 15A NCAC 213.0202
4. Does the project require coverage/authorization under a 404 Nationwide or ® Yes ❑ No
individual permits or 401 Water Quality Certifications?
i Information can be obtained from the 401 & Buffer Permitting Branch
5. Does project comply with 15A NCAC 02T.0I05(e)(6) (additional permitsicertifications)? ® Yes []No
Per I5A NCAC 02T.0105(c)(6), directly related environmental permits or certification applications are being prepared, have
been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and
sedimentation control plans, stormwater management plans, etc.).
6. Does this project include any sewer collection lines that are deemed "high priority?"
Per 15A NCAC 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer
positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer.
[:]Yes ® No ❑ NrA
> if yes, include an attachment with details for each line, including type (aerial line, size, material, and location).
High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections
documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit.
FORM: FTA 04-16 Page 5 of 5
X. CERTIFICATIONS:
1. Does the submitted system comply with 15A NCAC 02L the Minimum Design Criteria for the Permitting of Pump Stations
and Force. Mains latest version), and the Gravity- Sewer Minimum Design Criteria (latest version) as applicable?
® Yes ❑ No
If No, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for
review. Approval orthe request is required prior to submittal of the Fast Track Application and supporting documents.
2. Professional Engineer's Certification-,
I, nrac� !SGlK �
(Professional Eneii
name from Application Item III.1.)
attest that this application for
has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications,
engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best
of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer
Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting
of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this
submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and
have judged it to be consistent with the proposed design.
NOTE - In accordance with General Statutes 143-215.6A and 143-2I5.613, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation.
North Carolina Proressional Engineer's seal, signature, and date:
Applicant's Certification per I 5A NCAC 02T .0106(b):
A_ /`.~ 72C6;C�Y �.�1 i C rdi+L attest that this application for
(Signature Authority's name & title from Application Item 1.3,)
has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of
this application are not completed and that if all required supporting documentation and attachments are not included, this
application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non -
discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties,
injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition
of this permit be violated. I also understand that if all required parts of this application package are not completed and that if
all required supporting information and attachments are not included, this application package will be returned to me as
incomplete.
NOTE - In accordance with General Statutes 143.-215.6A and 143-215.6B, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation.
Signature:Date:
vel
FORM: FTA 04-I6 Page 5 of 5
2 = ic
YJL )poll r
Nlil
pJ7.
Hazen
March 7, 2019
Hazen and Sawyer
4011 WestChase Boulevard, Suite 500
Raleigh, NC 27607 • 919 833,7152
Mr. Ted Cashion
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Water Quality Regional Operations Section
512 N. Salisbury St., Suite 925
Raleigh, North Carolina 27604
NC Dept of Environmental Quality
MAR - 7 2019
Raleigh Regional Office
{' T
r v✓ U�v cJ �J `51
14J
Re: Southeast Regional Lift Station Gravity Sewer and Force Main
Dear Mr. Cashion:
Hazen and Sawyer is pleased to submit two (2) copies of the Southeast Regional Lift Station
Gravity Sewer and Force Main application package to request issuance of a Sewer Permit for
the Gravity Sewer and Force Main associated with the Southeast Regional Lift Station (SRLS)
for the City of Durham.
The new SRLS and its associated pipelines have been divided into separate contracts. The
SRLS contract has a longer construction duration and has already been permitted by NCDENR.
This application only pertains to the Gravity Sewer and Force Main contract.
Proiect Description
The new SRLS will serve an area bounded by US 98, HWY 70, Sherron Rd and the Durham
County line. The area is currently served by five existing lift stations, which convey flow to the
North Durham Water Reclamation Facility (NDWRF) through the Lick Creek Pump Station
(LCPS) located in the adjacent Little Lick Creek Drainage Basin, or by pumping directly into the
LCPS force main. As part of this project, three (3) of these lift stations will be eliminated and
their basins will flow by gravity into the new SRLS. The remaining lift stations will stay in service
but will discharge into interceptors for conveyance to the SRLS. The City of Durham expects
significant development in the SRLS sewershed and the SRLS and associated pipelines have
been designed to convey these additional flows as development occurs.
The SRLS will convey flow through the SRLS Force Main to the LCPS effluent force main.
Expected flows for the SRLS are 10 mgd for Phase 1 and 23 mgd for Phase 2. The SRLS Force
Main Phase 1 will convey flows to the LCPS effluent force main for the duration of Phase 1.
Phase 2 of the project includes the extension of the SRLS Force Main to the North Durham
Water Reclamation Facility (NDWRF). The Phase 2 SRLS Force Main will be needed when
combined flows from the Lick Creek Pump Station and SRLS exceed approximately 22 mgd.
The Phase 2 Force Main will be interconnected with the LCPS Force Main allowing both pump
stations to utilize the new force main, providing system redundancy and flexibility and also
facilitating improvements/replacement of the existing LCPS FM. Phase 2 is not included in this
application and will be permitted separately.
hazenandsawyer.com
*r
Hazen
Encroachments/Permits
Encroachments and permits in progress include the following:
• Sedimentation and Erosion Control
• NCDOT Right of Way Encroachment Agreement
• NCDOT Driveway Permits
• USACE 404/401 WQC
• Water Extension Permit (City of Durham)
Items Included in Application Package
The following lists all the items included with this application package:
1) Check for $480
Two Copies of each of the following:
2) Cover Letter
3) Site Maps (USGS and Street Level)
4) Fast track Sewer System Extension Application
Mr. `Ceti Cashion
March 7, 2019
The flow tracking/acceptance form is not included in the submittal as there is no additional flow
associated with the new pipelines.
If you have any questions regarding this submittal, please don't hesitate to contact me at 919-
755-8603 or jennessy@hazenandsawyer.com.
Best Regards,
James Hennessy, P.E.
Principal Engineer
Hazen and Sawyer
Cc: James Harding, P.E., City of Durham
Chris Belk, P.E., Hazen and Sawyer
hazenandsawyer.com
Page 2 of'?