Loading...
HomeMy WebLinkAboutNCC190056_ESC Approval Submitted_20190417 ROY COOPER (iimmor e, :a MICHAEL S. REGAN Secretan Energy,Mineral S. D AN N Y SMITH and Land Resources lntenm Director ENVIRONMENTAL QUALITY April 16,2019 LETTER OF APPROVAL County of Stanly Attention: Andy Lucas, County Manager 1000-10 North 1st Street Albemarle,North Carolina 28001 RE: Project Name: East Side FD Communication Tower [Express Review] Acres Approved: 1.11 Project ID: STANL-2019-014 County: Stanly City: Albemarle Address: Highway 24/27 River Basin: Yadkin—Pee Dee Stream Classification: C, Other Submitted By: County of Stanly Date Received by LQS: April 16, 2019 Plan Type: New Dear Mr. Lucas: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan approval shall expire three (3) years following the date of approval, if no land-disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form may be accessed at deq.nc.gov/NCGO1. Please direct questions about the NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCGOI permit. However, on or after May 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office in Raleigh. Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: State of North Carolina I Environmental Quality I Energy,Mineral and Land Resources Mooresville Regional Office 1 610 East Center Ave Sic 301 1 Mooresville,NC 29115 704 663 16" T Letter of Approval County ofStanly April 16, 2019 Page 2 cal'2 I 'File approved E&SC plan as welkas any approved deviation. ? The NCGO I permit and the COC,once it is received. 3. Records of inspections made during the previous 30 days. Also, this letter gives the notice required by G'.S. I I-3A-6 1.1(a) Of 01,11- right ot' periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection ol'existing natural resources and adjoining properties. If'. following the corn tile neerne nt, of* this project, time erosion and sedimentation control plan Is Inadequate to meet the rCCILlirenients ofthe Sedimentation Pollution Control Act ol' 197) (North Carolina General Statute I 13A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval ofthis plan is conditioned UP011 YOUr C0111pliance with F`cderal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply, to this land- disturbing activity. ']'his approval does not supersede any other permit or approval. Please note that this approval is based in part on, the accuracy of. the itif'ormation provided in the I inancial Responsibility Form. which you provided. You are requested to file an amended fortll il'thcre is anv changes in (lie information included on the, lorni. In addition, it Would be helpful it"YOU notify this office of the proposed siarrling date fior this projJect. Please notify its if you plan to have a preconstruction, conference. Your cooperation is appreciated. Sincerely, I anier,"I EpIhl,,1)I,1 CTEISC Assistant Regional Engineer t,,,ind QUalily SCC6011 TH E `tic I osures: Certificate of,�kpproval NC G01 Fact Sheet c via, E-mail: Sam Smith. PE'.. Chambers; Engineering, PA Rachel Carter, Chanibers LI'llginecring. PA I Heather Reynolds, C hambers F"ngineering. PA c: Inspection Department coo 101 '4044 0 Mpg 0-4 In CM oil � I i I �. " ,;,„ww+ ^y "may° , cd Ul m44 �p CIA AVI y ul TJI IW f p� Iu i. �i