Loading...
HomeMy WebLinkAbout20190490 Ver 1_Land Quality Correspondence_20180910ROY COOPER Governor MICHAEL S.REGAN Secretory WILLIAM E. (TOBY) VINSON, JR Interim Director NORTH CAROLINA Environmental Quality September 10, 2018 LETTER OF APPROVAL WITH MODIFICATIONS AND PERFORMANCE RESERVATIONS Mr. Daniel Clay Cartwright 382 N. Gregory Road Shawboro, NC 27973 RE: Erosion and Sedimentation Control Plan No. Camde-2019-003 Project Name: Sleepy Hollow Estates Location: Sleepy Hollow Road County: Camden River Basin: Pasquotank Date Received by LQS: August 20, 2018 Acres Approved: 9.3 Project Type: New Project Description: Grading associated with the development of a residential subdivision, as shown on the plans received by this office on August 20, 2018. Dear Sir: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. (NOTE: Attached is a list of modifications and performance reservations for conducting this land disturbing activity) This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as required by 15A NCAC 4B.0129, unless modified by other legislation. Please be advised that 15A NCAC 413.01 18(a) requires that a copy of the approved erosion and sedimentation control plan be on file at the job site. Also, you should consider this letter as giving the Notice required by G. S. 113A -61.1(x) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Program is performance oriented, requiring protection of existing natural resources and adjoining properties through the use of reasonable and appropriate Best Management Practices throughout the course of the project. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (G.S. 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. wan, cur._w.D wwmuaarw.i.nuor, North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Washington Regional Office 1943 Washington Square Mail I Washington, North Carolina 27889 252.946.6481 Daniel Clay Cartwright September 10, 2018 Page 12 — -- — Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility/Ownership Form, which you have submitted. You are required to file an amended form if there is any change in the information included on the form. NOTE: Neither this approval nor the financial responsibility/liability cited in it automatically transfer with a change in project ownership. In addition, 15A NCAC 413.0127(c) requires that you notify this office of the proposed starting date for this project (using the enclosed Project Information Sheet). Please notify us if you plan to have a preconstruction conference. Please be aware that your project will be covered by the enclosed NPDES General Stormwater Permit NCGO10000 (Construction Activities). You should first become familiar with all of the requirements for compliance with the enclosed permit. Sincerely, Samir Dumpor Regional Engineer Enclosures cc w/o enc: Kim Hamby, PE, Timmons group(email) Daniel Clay Cartwright (email) WaRO Division of Water Resources Daniel Clay Cartwright September 10, 2018 Page 13 The developer is responsible for the control of sediment on-site. If the approved erosion and sedimentation control measures prove insufficient, the developer must take those additional steps necessary to stop sediment from leaving this site (NCGS 113A-57(3)). Each sediment storage device must be inspected after each storm event (NCGS 113A - 54.1(e)). Maintenance and/or clean out is necessary anytime the device is at 50% capacity. All sediment storage measures will remain on site and functional until all grading and final landscaping of the project is complete (15A NCAC 04B .0113). 2. All existing ditches on this project site are assumed to be left undisturbed by the proposed development unless otherwise noted. The removal of vegetation within any existing ditch or channel is prohibited unless the ditch or channel is to be regarded with side slopes of 2 horizontal to 1 vertical or less steep (15A NCAC 04B .0124 (d)). Bank slopes may be mowed, but stripping of vegetation is considered new earth work and is subject to the same erosion control requirements as new ditches (NCGS I I3A-52(6)). 3. The developer is responsible for obtaining all permits and approvals necessary for the development of this project prior to the commencement of this land disturbing activity. This could include our agency's Stormwater regulations and the Division of Water Resources' enforcement requirements within Section 401 of the Clean Water Act, the U.S. Army Corps of Engineers' jurisdiction of Section 404 of the Clean Water Act, the Division of Coastal Management's CAMA requirements, the Division of Solid Waste Management's landfill regulations, the Environmental Protection Agency and/or The U.S. Army Corps of Engineers jurisdiction of the Clean Water Act, local County or Municipalities' ordinances, or others that may be required. This approval cannot supersede any other permit or approval. 4. Adequate and appropriate measures must be properly installed downstream, within the limits of disturbance, of any land disturbing activity to prevent sediment from leaving the limits of disturbance, entering existing drainage systems, impacting an on- site natural watercourse or adjoining property. (NCGS 113A-57) Daniel Clay Cartwright September 10, 2018 Page 14 PROJECT INFORMATION SHEET APPROVAL DATE: September 10 2018 RESPONSIBLE PARTY: PROJECT NAME: COUNTY: OFF-SITE BORROW AND/OR DISPOSAL SITE: START-UP DATE: CONTRACTOR: ON-SITE CONTACT: ON-SITE PHONE NO.: OFFICE PHONE NO.: Daniel Clay Cartwright Hollow Estates Camden NO.: Camde-2019-003 NO.: COMPLETE & RETURN THIS FORM PRIOR TO THE START OF CONSTRUCTION TO: N.C.D.E.N.R. LAND QUALITY SECTION ATTN: James Edwards 943 WASHINGTON SQUARE MALL WASHINGTON, NORTH CAROLINA 27889