Loading...
HomeMy WebLinkAboutNCC190042_ESC Approval Submitted_20190415 ROY COOPER Governor MICHAEL S.CtEGAN Secrsfrrry 4 S,DANIEL SMITH NORTH CAROLINA interim otreaor Em ronmentalQua!!ty April 1, 2019 LETTER OF APPROVAL Town of Lewisville ATTN: William H. Perkins, Jr PO Box 547 Lewisville, NC 27023 RE: Project Name: U-5617: Williams Road Gateway Project Project ID: FORSY-2019-033 County: Forsyth City: Lewisville Address: Williams Rd. (SR1173) River Basin: Yadkin-PeeDee Stream Classification: Other Submitted By: Kimley Horn, by Jeff Moore, PE Date Received by LQS: March 28, 2019 Plan Type: Residential/Commercial - New Dear Mr. Perkins: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan shall expire three (3) years following the date of approval, if no land-disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. Forth Carolina Department of Environmental Quality 1 Dtvtsion of Energy,Mtnerat and Land Resources Winston-Salem Regional Offlce 1 450 Hanes Mill Road,Suite 300 1 Winston-Salem,North Carolina 27103 ORMCARCUKA �'"� 336-776,9800 Letter of Approval Town of Lewisville April 1, 2019 Page 2 of 3 As of March 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form may be accessed at ded.nc.gov/NCG01. Please direct questions about the N0I form to Annette Lucas at Annette.lucas@ncdenr.g_ov or Paul Clark at Pau,l_.clark@ncdenr;gov.After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCG01 permit. However, on or after May 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days.. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Letter of Approval Town of Lewisville April 1, 2019 Page 3 of 3 Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference.Your cooperation is appreciated. Sincerely, thtaLentz, El Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval NCG01 Fact Sheet cc: Kimley Horn ATTN: Jeff Moore 421 Fayetteville St. Suite 600 Raleigh, NC 27601 WSRO File r � i- ,A c 4) � 4.4 WD M ng a; cd cl CJ U w cl PTO �°,, ♦, p 1 � •� C" CS © o ra 4-4 � 5 U w w 6 zz ci Iz Ln o •� �" N U �y . ��� � \\�. . � � � . � ?�» . �` �� . � � Fact Sheet on the New NCG01 Permit DW QZA April 2019 M�.�..�. The NC Construction General Permit(also known:as" iltdoe)was renewed on April 1,2019 The updated permit does not significantly than a the measures g that are required to tie implemented on:'construction sites However; .. there are:.some organizational and technical updates tothe permit as described below.Most notably,there is a new process in which construction sitogwill obtain official coyerage under air NCG01 permit through an electronic process. DEMLR worked with a broad tearti:of:stak'eholders to nmake all of the,se updates. Ifyou have questions; contact Annette Lucas at Arinette:lucas ncdenr. ov or(919)707 3639. Organizational Updates Acronyms to Know The new permit: COC: Certificate of Coverage, proof of coverage under an NCG01 permit • Repeats state requirements for E&SC DEMLR: NC Division of Energy, Mineral, and Land Resources Plans and organizes them with federal E&SC: Erosion &Sedimentation Control construction activity requirements; a-NOI: Notice of Intent, application form for the NCG01 permit • Is clearly organized by topic; and a-NOT: Notice of Termination, form for closing out the NCG01 permit • Has less text and more tables. SWPPP: Stormwater Pollution Prevention Plan,required by the NCG01 Technical Updates The new permit: • Requires that the E&SC Plan meet SWPPP requirements (p. 2); • Provides a list of items that must be included in the SWPPP, such as the construction sequence, plans, calculations, etc. (p. 2-4);� • Has updated language on bypasses and upsets that is tailored to construction activities (p. 10); • Puts all timeframes for inspections, record-keeping and reporting in The NCGO1 Process "calendar days" for clarity and The new NCG01 applies to permits approved an or after April 1,2019. consistency(p. 11-14);2 Permittees will no longer receive a copy of the NCG01 permit in the mail • Changes the inspection frequency with their E&SC Plan approvals and be considered as covered undei the (during business hours) least permit. Federal rules require that DEMLR receive an NOI on each every storr m > 1.0 inch (previously 0.5 once per calendar dayss ann d after construction project and issue each'construction project its own COC, Inch);' and Under the new NCG01 process, construction sites will continue to • Excludes weekends, state and federal receive approval for E&SC Plans from either DEMLR or the delegated holidays from normal business hours local E&SC program just like before,After receiving E&SC Plan approval, unless construction activities take permittees will officially obtain coverage under the NCG01 by place (p. 23). completing an e-NOI (available at deg.nc.gov/NCG01). The e-NOI will only take about 20 minutes to fill out and submit on-line. � This list is based on website guidance by the DEMLR Sediment Program. initially, there will be no charge associated with applying for an NCG01 Z The number of calendar days was permit but on or around June 1, 2019, DEMLR will begin charging a $100 selected to be as equivalent as annual general permit fee as required.per§143-215.3D. possible with the previous permit. DEMLR is working on creating a single application form that will allow an ' The intent is to provide predictability applicant to simultaneously apply for an E&SC permit and an NCG01 to the inspection schedule. COC,That effort is part of a larger Permit Transformation project at j DEMLR. I Q&a About the New N_GC01 Permit Why do construction sites have to do this extra application step? How does the new NCG01 affect the DEMLR is required by the EPA to issue a specific COC to every construction delegated local E&SC Programs? site that disturbs one acre or more. DEMLR is working to create a form Local programs will continue to review that combines the E&:SC plan approval and a-NOI processes, but that will and approve E&SC plans, However, take more time, For now, DEMLR has created an efficient a-NOI process. they will no longer send copies of the NCG01 with E&SC Plan approvals. If an E&SC Plan is approved before April 1,which permit applies? DEMLR will provide sample language to Projects with already approved E&SC Plans will automatically follow the use in local E&SC Plan approvals to new NCGO1 permit, but will not need to fill out an e-NOI or pay an annual advise permittees that they must permit fee. However,the permittees should print the new permit and the submit an e-NQI to DEMLR. two standard detail sheets and have them on site. Will DEMLR offer tools to help permittees comply with the new NCG01? Yes, DEMLR will provide two sample plan sheets at deg.nc.gov/NCGO1 that a „y can be placed into the E&SC plan set. The first covers the site stabilization and materials handling portions of the permit. The second sheet covers the inspection, record-keeping and reporting portions of the permit. How will the new a-NQI submittal and COC process work? Permittees will apply for E&SC Plan approvals from either DEMLR or the delegated local E&SC program like before,The E&SC approval letter will instruct the permittee to visit de ub dec[.nc.gov/NCGO1 NCGO1 to submit an e-NOI form Local programs are not required to DEMLR.The permittee may begin the construction activity after check if permittees have submittee d e- submittal of the e-NQI. The permittee is required to print a copy of the NQIs to DEMLR. However, if they wish permit and retain it on site. Initially,the COC will be issued for free but on to do this voluntarily,there will be.a or around June 1, 2019, a $100 annual general permit fee will be charged. tool available on DEMLR's web site for them to view a list of construction Who is allowed to submit an a-NQI form? projects that have submitted e-NOIs. Submittal must be by a responsible corporate officer that owns or operates the activity, such as a president, secretary,treasurer, or vice When local programs close out an E&SC president or a manager that is authorized in accordance with IV.B.6 of the Plan, the close-out letter will advise NCG01 permit. Additional signatory options are set forth in IV.13.6 of the NOT. Dees that they must submit an e- perm l it. It is possible for consultant to prepare the e-NOI, save it as a draft, ong uage. DEMLR will provide sample and email it to the responsible entity for signature & submittal. lang Local programs may approve E&SC What happens to the COC when the construction activity is complete? plans that meet state ppro sediment laws When a project is complete,the permittees will contact DEMLR or the local and rules even if those plans are not delegated program to close out the E&SC Plan. After DEMLR or the local and r compliant with all of the plans ar E&SC program inform the permittee of the project close out via inspection 01 requirements, However, their report,the permittee will visit de .nc. ov NCG01 to submit an e-NOT. permittees will be required to add two Will there be a grace period for adherence to the new process? plan sheets(which will be provided by DEMLR does not have the authority to grant a grace period from a DEMLR)to their E&SC Plans to ensure federally mandated permit. Permittees Will be informed of the new that they fully comply with the ground process via web site, E&SC Plan approval letters and list servs. If a stabilization, materials handling, and construction activity disturbs one acre or more (or is part of common plan inspection, record-keeping and of development that disturbs one acre or more) fails to submit an e-N01 reporting portion of the NCGO1 permit. after approval of its E&SC Plan, this is a violation of federal permitting requirements and the permittee could be subject to a penalty assessment.