Loading...
HomeMy WebLinkAbout20190465 Ver 1_Bridge to Culvert PBO Key_20190410Appendix A3 Section 7 Mussel Programmatic Process — Bridge to Culvert Replacement Divisions i-8 for Qwarf 1Nedgernussel, Tar River Spinymussel, and Yellow Lance Cannot use Section 7 does not apply. � Does project have a federal nexus (federal funding, federal permit, or federal land)? Yes No Effect No Is project in 12- digit Section 7 HUC? MA-NLAA No Yes Were listed species observed? Yes Cannot use programmatic process. Contact USFWS MA-NLAA = May Affect, Not Likely to Adversely Affect programmatic process. Contact USFWS. Yes Does project intersect identified stream reaches or a tributary within 0.25 mile of such? Or does project occur within designated critical habitat? No Yes Conduct survey. *This programmatic process assumes that all appropriate BMPs and on-site conservation measures regarding design, construction, and erosion control are implemented.