Loading...
HomeMy WebLinkAbout20190455 Ver 1_Beaufort 159_Permit Package_201904101 li�;hW�ly North Carolina Department of Transportation /���—, Stormwater I� � ,,,,.,,,,,, Highway Stormwater Program \��) STORMWATER MANAGEMENT PLAN �"��%_�' (Version 2.07; Released October 2016) FOR NCDOT PROJECTS WBS Element: 17BP.2.R.86 TIP No.: County(ies): Beaufort Page 1 of 3 General Project Information WBS Element: 17BP.2.R.86 TIP Number: Project Type: Brid e Replacement Date: 1/11/2019 NCDOT Contact: Robert T. Turnbull, Environmental Services, Inc. Contractor / Desi ner: HNTB North Carolina, P.C. / James A. B rd, PE Address: 4901 Trademark Dr. Address: 343 E. Six Forks Road Raleigh, NC 27610 Suite 200 Ralei h, NC 27609 Phone: 919 212-1760 Phone: 919 424-0437 Email: rturnbull esinc.cc Email: 'ab rd hntb.com Cit ITown: Pinetown Count ies : Beaufort River Basin s: Tar-Pamlico CAMA Count ? Yes Wetlands within Project Limits? Yes Pro'ect Description Pro'ect Len th lin. miles or feet : 0.284 mi. Surroundin Land Use: Rural Residential and Agriculture Proposed Pro'ect Existin Site Pro'ect Built-Upon Area ac. 1.9 ac. 0.7 ac. Typical Cross Section Description: 2- 10' asphalt paved lanes with 2' paved shoulders, 4' grass shoulders. 2- 10' asphalt paved lanes with grass shoulders. Wetlands are present in the northwest and southwest quadrants and will be impacted. Annual Avg Daily Traffic (veh/hr/day): Desi n/Future: Year: Existin : Year: General Project Narrative: State project 17BP.2.R.86 involves the replacement of Beaufort County Bridge #060159 on SR 1611 (Jones Bridge Rd.) over Pungo Creek. The existing bridge consists of 1@ (Description of Minimization of Water 25' - 6", 2@ 30' - 0", and 1@ 25' - 6" prestressed concrete channels, concrete caps, and timber piles. It is to be replaced with a 2@ 40' - 0", 1@ 45' - 0" 21" cored slab (125' Quality Impacts) total length, 33' total width) at the same location. The project includes 0.16 miles of roadway improvements on the north end of the bridge and 0.10 on the south end of the bridge. In accordance with Tar-Pamlico River Buffer Regulations, the proposed bridge does not contain deck drains. Since the bridge is in normal crown, the stormwater from the bridge and approaches will be collected by two storm drainage systems at -DRV3- station 11+00 Rt. and -L- 19+00 RT. The storm drainage system on -DRV3- will be discharged into Pungo Swamp, and the system on -L- will discharge into a proposed ditch, which later discarges into Pungo Swamp. Class'I' rip rap pads are specified at the drainage outlets to lower discharge velocity and to minimize impacts. The roadside ditches in the northeast and northwest quadrant will be impacted by the proposed slope stakes. The ditch in the northwest quadrant will flow from north to south and will outlet into Pungo Creek to match existing drainage patterns. The proposed ditch will be a special lateral V-ditch with 3:1 or flatter front slopes and 3:1 back slopes. The ditch in the northeast quadrant will flow from south to north to match existing drainage patterns. The proposed ditch will be a special lateral V-ditch with 3:1 or flatter front slopes and 3:1 back slopes. Waterbody Information Surface Water Body (1): Pungo Creek NCDWR Stream Index No.: 29-34-35-1 NCDWR Surface Water Classification for Water Body Primary Classification: Class C None Supplemental Classification: Swamp Waters (Sw) (NSW) Other Stream Classification: Impairments: None Aquatic T&E Species? No Comments: NRTR Stream ID: Buffer Rules in Effect: Tar-Pamlico Project Includes Bridge Spanning Water Body? Yes Deck Drains Discharge Over Buffer? No Dissipator Pads Provided in Buffer? No Deck Drains Discharge Over Water Body? No (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the (If yes, provide justification in the General Project Narrative) General Project Narrative) .� � „ � Hi hWa North Carolina Department of Transportation �Stormwater Highway Stormwater Program �: \�_ STORMWATER MANAGEMENT PLAN ��"�`� (Version 2.07; Released October 2016) FOR NCDOT PROJECTS WBS Element: 17BP2.R.86 TIP No.: County ies : Beaufort Page 2 of 3 Swales Station & Coordinates Surface Base Front Back Drainage Recommended Actual Longitudinal Rock BMP Sheet (Road and Non Road Water Width Slope Slope Area Treatm't Length Length Slope Q2 V2 Q10 V10 Checks Associated w/ No. Pro'ects Bod it H:1 H:1 ac ft ft °/a cfs f s cfs f s Used Buffer Rules? 4 -L- Sta. 17+75 RT (1)Pungo 0.0 3.0 3.0 0.8 75 569 0.47°/ 2.0 1.1 2.3 1.1 No No 35.53617, -76.77409 Creek Additional Comments Hi hWa North Carolina Department of Transportation �°��"����` �Stormwater � 7� ,,,,,,.,,,,, Highway Stormwater Program ���. � STORMWATER MANAGEMENT PLAN \- "'='`'/ (Version 2.07; Released October 2016) FOR NCDOT PROJECTS WBS Element: TIP No.: County(ies : Beaufort Page 3 of 3 Preformed Scour Holes and Energy Dissipators Station & Coordinates Drainage Pipe/Structure BMP Sheet (Road and Non Road Surface Energy Dissipator Area Conveyance Dimensions Q10 V10 Associated w/ No. Pro'ects Water Bod Type Riprap T pe ac Structure (in) (cfs) (fps) Buffer Rules? 4 -L- Sta. 17+77 LT (1)Pungo Riprap Energy Class I 0.7 Pipe 24 1.9 0.4 N/A 35.53615, -76.77429 Creek Dissipator Basin 4 -L-17+06 RT (1)Pungo Riprap Energy Classl 1.5 Pipe 24 3.0 0.4 N/A 35.53601, -76.77385 Creek Dissipator Basin 4 -L-17+75 RT (1)Pungo Riprap Energy Classl 0.8 Ditch - 2.3 0.4 N/A 35.53617, -76.77409 Creek Dissipator Basin Additional Comments ' Refer to the NCDOT Best Management Practices Toolbox (2014), NCDOT Standards, the Federal Highway Administration (FHWA) Hydraulic Engineering Circular No. 14 (HEC-14), Third Edition, Hydraulic Design of Energy Dissipators for Culverts and Channels (July 2006), as applicable, for design guidance and criteria. ����� �� ����� �������� � N( 1.� 2 DOCUMENT NOT CONSIDERED FINAL UNLE55 ALL SIGNATURES COMPLETED � � � i � � E � a � r _ � � �� o� Nm ��� ��� � e. N e= GRAPHIC SCALES DESIGN DATA PROJECT LENGTH Prepo�ed in tl� Office of: H1'DRAULICS ENGINEER �INTB HNTB NORTH CAROLINA, P.C. 343 E. Six Forks Road, Suite 200 ADT 2013 = 350 Ra�eigh, North caro�ina 2�sos 50 25 0 50 700 Nc ��cense No: c-iaea �oqp ADT 2033 = 660 �� °� �' Q� K= 10 % zois sraxDann srsciFrcezroNs a@ `�oo PLANS LENGTH OF ROADWAY PROJECT 17BP.2.R.86 = 0.260 MILES � D= 60 % DOUGLAS WHEATLEY, PE �E o � S O Z S O S O � OO — PROJECT ENGINEER SIGNATURE: w� T— 6 %* LENGTH OF STRUCTURE PROJECT 176P.2.R.86 = 0.024 MILES RIGHT OF WAY DATE: � o V= 45 MPH FEBRUARY 6, 2019 ROADWAY DESIGN PROFILE HORIZONTAL ROY H. TELLIER, PE ENGINEER ��� �Q ( ) * TTST =2% DUAL 4% TOTAL LENGTH OF PROJECT 176P.2.R.86 = 0.284 MILES PRo�Ecr Dssrcx ExcrnEen �p o �Qo�' 10 5 0 10 20 FUNC CLASS = LETTIIVG DATE: � ppQ� LOCAL JUNE 26, 2019 HEATHER C. LANE PE PROFILE (VERTICAL) SUB—REGIONAL TIER xcnor coxzncr PE S7GNATURE: � � �INTB pc PROJECT REFERENCE NO SHEET NO. N � � �e ae�s�°;on��rppsa�rs�;sas UBP.2.R.86 4 , WETLAND & STREAM IMPACTS NAD 8� Zo„ �, SHEETNO. � PERMIT DRAWING ROADWAY DESIGN HYDRAULICS BEGIN PROJECT 17BP.2.R.86 ALL wEiLANDS AREAS DETERMINED BY ROBERT ENGINEER ENGINEER �___ -�sTa Il+so.00 TR�NB��� AS WET�ANOS WA & WB SHEET 2 OF 10 . � �� � , � J � I �G / / W3 SAMUEL ��: � SITE 1 SCALE 1" = 40' FILL IN WETLANDS = <0.01 Ac/316 SF - �e �aeo � Wl RE7A� � � � � TEMPORARY IMPACTS IN SURFACE WATER = <0.01 Ac /104 SF - FILL IN WETLANDS = 0.03 Ac/1221 SF � I °� � � � � � � � � � � FILL IN � / � � �50, s� � � � t � � � � � r .Tqp F � F � � * � � � � � � �i WETLAND �E E-�_ g� 5 � F��FR� 1O / � I I \ �F' _ � � � � � c —�--___ E � � ,p� -I'isr 7 �, m � F � �, \ � � �PocK[t W� � �� � % / F F — — — F � / � - - �- - _ � ��� � � ...� ., � V A�V �� � p _ ------- � � f�7 � � � C v� � `I1 F� wca� � � � ��\� . \P DMOVE y BGIFG�F��' .__._ ___ _` _ _ _ _ -- �. _ N (i \� � .. y ... � .,� -- . _ _ „ _ � - � __ • Q/ 1 F \ y --�— �---� - - `—? _-- �a 2 x ��, a/ F . �. ..E --- � � � I rez� � c E, N— E------�E� F.+ r� � � o � � — F \\ �\ �/ N/ m./ 4. � F I �-��� PUE SPECIAL LAT. o- I C Q T „ -,, . \� � r . , - . .� ... . - � � — 'V' DITCH N ... . � � � � . � x �_ . � x .�.� _.� �. ' � � .� � �� � 15" RCP-IV SFE DEfAIL 1 � I O � a �� � `_F x ��— _ �:y�. "C i1'� pUE O3 I ,.RFTApy\�. ' .. —'_—__.���" , j - � �.... �� PCE . JANET "' � ii i _ 'r � �puE W4 � z > � _ _ � �o/' �— —F �/ P� � IMPACTS IN SURFACE WATER = <0.01 Ac/172 SF 5 F TEMPORARY IMPACTS IN SURFACE WATER = <0.01 Ac/254 SF La,� x . _. x ..�- �-9 1� / .. C\..\ � 1 .\�T-1 N \ N \- �° \ � "' y � I �' I�-- [9 r 1 \ \\ N .� "� "' � �P�E � � a�E o ` 1 ��55 ""° R'PR^P / i S ETCH OF BRIDGE \ � TO SHOULDER p "�� � � V d.T TO SCALE -g�-3-' �-PUE� � —_ a 'L r�\ pOINTELEV. IN REL TIONS�IIP TO PAVE/�IENT �� A � �� P� �� � � � m z i AT 1 °? �� �� E� V _ —,I I�, x� 1 � W2 — � , , �1, qT_� � � „ oera�i oqT^MaH IMPACTS IN SURFACE WATER =<0.01 Ac/63 SF � oeNores Fu�iN — SfOo��I6f6I f� �� TY E—III ti TYPE—III �� sPEcin� �n1Eaq� v� oircN R�P E�r F WETLAND ���„��m�=, "�"°��'., TEMPORARY IMPACTS W SURFACE WATER = <0.01 Ac/187 SF � Go�,a � s�ao c�;e,-�� ��URF�ACE WATERTS W � A W N �� 0 0 � N O � N I N SPECIAL LAT. DENOTES TEMPORARY � � O � N � A O � ' V' D I T C H IMPACTS IN SURFACE WATER ��FRom°�w'srn'v'+°+ssioTOraza'soareT ss..����� SEeDE7AIL1 � �NrlO �' � � TYPE-III <� FROM STA.11 � 65 TO STA. 1� � 85 PT aoM srai�+oe ro sr,in-,e xr ,/ TYP -III _ NOTE: SEE SHEET 26-1 FOR HORIZONTAL ALIGNMENT INFORMATION ���� ���GIN l3fill�GF ��� -� '� �, �� , ��_'J �- � __ Stao i6f74 f; — �� � ��, — — � — — — _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ -=_- -- _ _ DITCH LEGEND - � � � RIGHT DITCH -------- � � � !_ 2�� 10' 0' � a� � Q —�0� � E ° -2�� 0 r m� � � °'" -30 o� ,m �� 10 + 00 N: - PROP 11.25° BEND -� ROTATE AS NEEDED �� - � � � � � , � � --_— ___ -- --- ,— ---- _ ���� ��� �� ��������������� � � BEGIN PROP WATER LINE WL STA 10+45.30 � � ��� . . . .. ....... .. . W/ PROP GATE VALVE L STA 14+91.17 � .. :� . .. . .'.. WL STA 10+39.25 RT 24.32' .�. -. L STA 14+85.28 RT 23.9' ELEV = 3.15� �� � ELEV = 3.15� � BEGIN GRADE PI = �21 2S.00 --- -�-- -- - --- --- - i - END PROP WATER LINE. -L- STA llt SO.00 - � W/EGATET�ALVESTING ELEV. = 10.67' EL = 9.97' PI = 14+00.00 PI = 15+50.00 ! � w� sra is+�s.ss K= 234 + EL = 7.22' EL = 7.75' � e�EVA= o s5 sa aT 2i.i' VC = 150' K= 78 K= 231 BORE PIT SIZE -- _-_-.-. �_:_i_:.,:_:_:�_:_,_.i_:_, VC = 150' VC = 150' CONTRACTOR BY ' � (—)0.9300% ap STREAM BRIDGE HYDRAULIC DATA DESIGN DISCHARGE = 3609 CFS DESIGN FREQUENCY = 25_ YRS DESIGN Hw ELEVAT�ON = 63 FT BASE DISCHARGE = 546/ CFS BASE FREOUENCY = I00 YRS BASE HW ELEVATION = 7.8 FT OVERTOPPING DISCHARGE = 4068 CFS OVERTOPPIN� FREQUENCY= l l0 (+) YRS OVERTOPPING ELEVATION = 6.68 FT DATE OF SURVEY = 12-2/-2017 W.S.ELEVATION AT DATE OF SURVEY =-029 FT - _ � � ����, � ���. � ����, � ���, �� �� ���1 %/ _ � ����, _ - ����. ° �. � �•.,-...,., :;:::::;s � , - • . .......................... .. � • � . �����Y������p����������� - =� FJ /' '• �������������������������� ' • � � � 1 �� ♦ ��••••♦•♦ ,•• -+41 _ - - �����o������m������o�� � � ' •� � �����o������o����������� . .. �������������m������o�� , � ' iiii�uiiiiii��iiiiiuiiii � � � � � �� o������o�a���o������ " �����u������u����������� ..�. . . � • 11 �������������������������� � � � . � ..�. . . � . � �����o������m������o�� .� • . ��o�o���o�o���o������ � � � � . ����������������������o�� �; : � � iiiiiaiiiiiiaiiiiiii�iii � � � ■ . . , . , . . . ■ u�m��u�m��u��u��u - � ' o�ouo��ouo�o�uo��o��000 . � � ' ' � oi oo����oo����o�����000000� • • , � �o �����o������o������������������������ � - � . ■o� ��o�o���o�o���o������o�o���oo� " �o� ....................................... � .. . .... �����o������o������������������������ � • .� �o� ��������������������������������������� ■ ��y 1 � • ����� �� ��Y���� �Y��� ������� ��Y��������� �� 1' _ _� :� � � ��Y� 1 � �� �� �� �� �� . �� �� �� • �� � �� �� �� �� �� � � �INTB pc PROJECT REFERENCE NO SHEET NO. N _ � �e ae�s�°;on��rppsa�rs�;sas UBP.2.R.86 4 , WETLAND & STREAM IMPACTS NAD 8� Zo„ �, SHEETNO. � PERMIT DRAWING ROADWAY DESIGN HYDRAULICS BEGIN PROJECT 17BP.2.R.86 ALL wEiLANDS AREAS DETERMINED BY ROBERT ENGINEER ENGINEER �_=sTa Il+so.00 TR�NB��� AS WET�ANOS WA & WB SHEET 3 OF 10 • --� �O J � - �G � ,.'V W3 SAMUEL L i�� � $ITE 1 SCALE 1" = 40' FILL IN WETLANDS = <0.01 Ac/316 SF - oe iaeo Pc Wl RE7A� � � � � TEMPORARY IMPACTS IN SURFACE WATER = <0.01 Ac /104 SF - FILL IN WETLANDS = 0.03 Ac/1221 SF oc � � � � � � � � � � o � , � � �so, � � � �i� � �� � � � � � � � � �; FILL IN �� r .ra,� - F � F � * � � � � � � WETLAND E E �_ a� s � � F��R � � � �� � �`�' _ � � * � 1 � -f--_�__ E w _ � REr -risr� ..,, . . ... F,� ! m ; � . `� � � ocKct W� � � t��' F --- F --- F --� � - - - -. �r--- f/7 � P � 9j� / 2 ,� '. � � � � � � . � \ c �, 1 I � �,,, -s D � P o��� F —' � ii � � � � . REM� � 7 B GI FG ..� . . . . . _ _ - N � F � ��� ` ` � � � � a/ F I E � ----- �-a— N �_----- --� F r r ; _ � � � o � � 1 1 �, r� F � � —�— E _ _ C < _,� -I- ,,- __ �1, F � � <. � , � � " _� _ � c � T82G � �"�` . \ \ N .. � � � PUE SPECIAL LAT. ' — N ��� I I Q T � /� ```` ��".� \ � \ / � / . � 1 � / � ` � � � I � i � 15" RCP-IV �V' DITCH I �E .. . . �. .. . � � � _ � .. . ..<. . . '.�c _ _ _ x � ,� � �.. � -...y �.: SEE DEfAIL 1 �) O r .... F. .. . _ _' . �� ' "�F _ ' _��-�' `� �'" pUE O3 � � , �_ , �— 11 , . . RFTA/N \ . ' ... �_ . .. j .'E .�, .. pCE . � � � �� � � ,'.y / - '� � �pUE . � _ `, ' W4 ' 4A N M �'� o i _ _—F � P� � IMPACTS IN SURFACE WATER = <0.01 Ac /172 SF O 7 Y � � — , % " F � I �� �F \ N TEMPORARY IMPACTS IN SURFACE WATER = <0.01 Ac/254 SF - � . - � �y � '�=yF —�- • 1� � � � ��14T-1 N � � � "' � a I� - 8 f ' � � � . . N I � � '"� NI rn'�• : P�E � � „E o ` 1 CLA55 "II" RIPRAP � i S ETCH OF BRIDGE \ � -BL- 3—� �— PUE �� �_ µ��a 4 ` TO SHOULDER d.T TO SCALE � �F � POINT ELEV I � IN REL TIONS�iIP TO PAVE/�IENT �� � �� � � E � � E V _ -, I I� m z i AT 1°� � \ AT-1 � r � W2— � , , '�. � oET^�� � �q�^Ma H IMPACTS IN SURFACE WATER = <0.01 Ac /63 SF � oeNores Fu� iN — SfOo��I6 f6I f� �� TY E-III � ti TYPE-III �� sPEcint �n1Eaq� v� oircN R�P E�r F WETLAND ���„��m�=, "�"°�`�'., TEMPORARY IMPACTS W SURFACE WATER = <0.01 Ac/187 SF � Go�a � siao c�;a,-�� ��URF�ACE WATERTS W � A W N �� 0 0 � N O � N I N SPECIAL LAT. DENOTES TEMPORARY � � O � N � A O � ' V' D I T C H IMPACTS IN SURFACE WATER ��FRom °�w'srn'v'+°+ssroTO�n. za'so ereT ss..�� ��� See DE7AIL 1 ��Nr l0 �' � � TYPE-II I <� FROM STA.11 � 65 TO S7A. 1� � 85 �Ri oM srai�+os o sr,in-,e ,/ TYP -III _ NOTE: SEE SHEET 26-1 FOR HORIZONTAL ALIGNMENT INFORMATION ���� = r','/N /3f�/�;G� � � l�" —� �, - �, ; ,, � j � _ _ Stao i6f74 f; — �� � ��, — — � — — — __ __ _ __ __ _ _ __ _ __ _ __ _ _ _ _ _ -=_- -- _ _ DITCH LEGEND _ � � � RIGHT DITCH -------- !_ 2�� 10' 0' � a� � Q —�0� � E ° —2�� 0 r m� � � °'" —30 o� ,m �� 10 + 00 N: - PROP 11.25° BEND -� ROTATE AS NEEDED �� - � � � � � , � � --_- ___ -- --- ,- ---- _ ���� ��� �� ��������������� � � BEGIN PROP WATER LINE WL STA 10+45.30 � � ��� . . . .. ....... .. . W/ PROP GATE VALVE L STA 14+91.17 � .. :� . .. . .'.. WL STA 10+39.25 RT 24.32' .�. -. L STA 14+85.28 RT 23.9' ELEV = 3.15� �� � ELEV = 3.15� � BEGIN GRADE PI = �21 2S.00 --- -�-- -- - --- --- - i - END PROP WATER LINE. -L- STA llt SO.00 - � W/EGATET�ALVESTING ELEV. = 10.67' EL = 9.97' PI = 14+00.00 PI = 15+50.00 ! � w� sra is+�s.ss K= 234 + EL = 7.22' EL = 7.75' � e�EVA= o s5 sa aT 2i.i' VC = 150' K= 78 K= 231 BORE PIT SIZE -- _-_-.-. �_:_i_:.,:_:_:�_:_,_.i_:_, VC = 150' VC = 150' CONTRACTOR BY ' � (-)0.9300% ap STREAM BRIDGE HYDRAULIC DATA DESIGN DISCHARGE = 3609 CFS DESIGN FREQUENCY = 25_ YRS DESIGN Hw ELEVAT�ON = 63 FT BASE DISCHARGE = 546/ CFS BASE FREOUENCY = I00 YRS BASE HW ELEVATION = 7.8 FT OVERTOPPING DISCHARGE = 4068 CFS OVERTOPPIN� FREQUENCY= l l0 (+) YRS OVERTOPPING ELEVATION = 6.68 FT DATE OF SURVEY = 12-2/-2017 W.S.ELEVATION AT DATE OF SURVEY =-029 FT - _ � � ����, � ���. � ����, � ���, �� �� ���1 %/ _ � ����, _ - ����. ° �. � �•.,-...,., :;:::::;s � , - • . .......................... .. � • � . �����Y������p����������� - =� FJ /' '• �������������������������� ' • � � � 1 �� ♦ ��••••♦•♦ ,•• -+41 _ — — �����o������m������o�� � � ' •� � �����o������o����������� . .. �������������m������o�� , � ' iiii�uiiiiii��iiiiiuiiii � � � � � �� o������o�a���o������ " �����u������u����������� ..�. . . � • 11 �������������������������� � � � . � ..�. . . � . � �����o������m������o�� .� • . ��o�o���o�o���o������ � � � � . ����������������������o�� �; : � � iiiiiaiiiiiiaiiiiiii�iii � � � ■ . . , . , . . . ■ u�m��u�m��u��u��u - � ' o�ouo��ouo�o�uo��o��000 . � � ' ' � oi oo����oo����o�����000000� • • , � �o �����o������o������������������������ � - � . ■o� ��o�o���o�o���o������o�o���oo� " �o� ....................................... � .. . .... �����o������o������������������������ � • .� �o� ��������������������������������������� ■ ��y 1 � • ����� �� ��Y���� �Y��� ������� ��Y��������� �� 1' _ _� :� � � ��Y� 1 � �� �� �� �� �� . �� �� �� • �� � �� �� �� �� �� � 6 , � _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ -=_- -- _ _ DITCH LEGEND - � � � �_ RIGHT DITCH -------- !_ I �INTB pc PROJECT REFERENCE NO SHEET NO. BUFFER IMPACTS — T— � �� �a�5e����"�°� s�����,��� ,�BP.z.R.sb 4 NAD 83�NA 2011 RNJ SHEET NO. BEGIN PROJECT 17BP.2.R.86 P E RM I T D RAW I N G R�AENGIN DRSIGN HENGINEERS ALL wEiLANDS AREAS DETERMINED BY ROBERT � —L— STA 1� +so.00 TR�Ne��� AS WET�ANOS WA & WB S H E ET 6 O F 10 �—� o � s2 i �� � ZONE 1 BUFFER IMPACTS = V57 SF � ZONE 2 BUFFER IMPACTS = 1915 SF � A��OWABLE IMPACTS ZONE 1 SAMUEL L�: DL I ����� ALLOWABLE IMPACTS ZONE 2 Jd � � i I ZONE 1 BUFFER IMPACTS = 1779 SF � BO1 � �*� � � � �, � ZONE 2 BUFFER IMPACTS = 2155 SF � * � � � , � � � � o i � .,'�., s ,� � � �r � � � * I I 00 � 1 \ \ ��-� �: � �-',� � � � t � � C . E—�'}---E�_EBL 5 l . Tq , , \� F . , . � .._ � �F - � � . - � ---- '— ,p F S�/ �. �, �\ � x \ � � � �PpcKEt w� � �� � �i F x- � �- _ ��_ � — F � �,V/ � � . .. \� � \'. \\ � �. —__—�,--�_� _-_ �/7 � � v x �V A� �� �"ce��6��" _ �I �\ P �� F _. * - ? � \ �..• Q �, I /U�\I \ E � 7 BGIFG�� ._. - - _ _ - ., � � \ F �� � oi - �/ 1 �? � � —� ' " —; '�- ' � �,` - —�?� —F � r � h F ���� F�� --- � � T82GI �t C � C E F \ � .< ,� . . K/ T I '..�^ ; F �� ':. � y-r — -- : _ - - , / _ c O Z � \ N ��c - � � PUE srEan� vr. I o- I p m �rr "' - �� 'V'DITCH �E „ r y .... � �\\ �`�... x _.. � _x x ._,���. " - ���.�� ��PUE SEEDEfAILI f I O � F �� - F �. �-.-�" _�� pUE O3 I � �'� - -_ r ,.RAqin�V �----- _ �,�,� _ � p E� -�, I � ARiE JR s �� �� i�� ��� � TRANSPORTATION FACILITY LINE O II K I O / N�. — -� � F � 1 . _ � � � i— _ _. �� N - � ' I � . Q_, F — — � I �F \ \ � <�.,,, a' x . -__x :� —s i x r- \ 1 � r�4T-� \\ \- "' � � � i _- n ' . � � �\i� .�VA g�_ q�o .� "I �' ' ` �eQE � � m � ` 1 � S ETCH `�OF BRIDGE i \ � �- PUE_� � "�. � d.\ TO SCALE —g� 3- � — � � � IN REL TIONS IP TO PAVE ENT � Fc � 8 � � �° � � AT 1 °� �V \ E— `� V _ , -, I I;,� � o I I � — - i '��i qT_� ., SfOo �6f6� �f� � � �`n D E T A I L 1 D E T A I L 2 — T Y E- I I I T Y P E- I I I �% SPECIpI LnTERAL 'V' DITCH kIP ENi �ro„o �m��, �o„o ���., 64 � o�aa-�� � ZONE 1 BUFFER IMPACTS = 392 SF u�, A w ^' v, o o � I ra o ZONE 1 BUFFER IMPACTS = 2925 SF ZONE 2 BUFFER IMPACTS = 2V SF o 0 o a N o A o, ZONE 2 BUFFER IMPACTS = 2150 SF sPecin� �nr. V' DITCH ��FRom°�w'srn'v'+°+ssioTOsraza-'soar�� ss������� SEEDE7AIL1 � -BM-10 TYPE-III <� FROM STA.11 � 65 TO STA. 1� � 85 PT aoM srai�+oe ro sr,in-,e xr �/ TYP -III _ NOTE: SEE SHEET 26-1 FOR HORIZONTAL ALIGNMENT INFORMATION ���� ����,/N /3/�/�;G� �� Il� ,', �) � ` __ Stao i6f74 f% — �� � �, — — � — — — 2�� 10' 0' � ° —�0� � E ° —2�� 0 r m� � � °'" —30 o� ,m �� 10 + 00 N: PROP 11.25° BEND - ROTATE AS NEEDED �� �� �� ��� ��� ������ ������� � �� BEGIN PROP WATER LINE WL STA 10+45.30 . . .�. ....... .. . W/ PROP GATE VALVE L STA 14+91.17 WL STA 10+39.25 RT 24.32' .�. L STA 14+85.28 RT 23.9' ELEV = 3.15� �� ELEV = 3.15� BEGIN GRADE PI = 12+25.00 -- -`- - - - --- -- - -L- STA 11 + 50.00 - ELEV. = 10.67' EL = 9.97' PI = 14+00.00 PI = 15+50.00 � K= 234 + EL = 7.22' EL = 7.75' � BORE PIT SIZE VC = 150' K= 78 K= 231 DETERMINED BY i---- ---.;_- VC = 150' VC = 150' CONTRACTOR ' � (-)0.9300% ap STREAM END PROP WATER LINE. TIE-IN TO EXISTING W/ GATE VALVE WL STA 15+75.99 L STA 20+21.90 RT 21.1� ELEV = 0.65 BRIDGE HYDRAULIC DATA DESIGN DISCHARGE = 3609 CFS DESIGN FREQUENCY = 25_ YRS DESIGN Hw ELEVAT�ON = 63 FT BASE DISCHARGE = 546/ CFS BASE FREOUENCY = I00 YRS BASE HW ELEVATION = 7.8 FT OVERTOPPING DISCHARGE = 4068 CFS OVERTOPPIN� FREQUENCY= l l0 (+) YRS OVERTOPPING ELEVATION = 6.68 FT DATE OF SURVEY = 12-2/-2017 W.S.ELEVATION AT DATE OF SURVEY =-029 FT _ _ � � ����, � ���. � ����, � ���, �� �� ���1 %/ _ � ���., _ -- ����. ° �CCC�. � �•.,-....., :;:::::;s � , - � . .......................... ..�• � . �����p������p����������� - =� F /' '• �������������������������� '• � � � 1 �� ♦ y�i�. �•�-�� _-- �����m�����m������o�� � � ' •� � �����o������o����������� . .. �������������m������o�� , � ' iiii�uiiiiii��iiiiiuiiii � � � � � oo�uo�o�a�000uo � �����Y������p����������� ..�. . . � • 11 �������������������������� � � � . � ..�. . . � . � �����o������m������o�� .� • . ��o�o���o�o���o������ � � � � . ����������������������o�� �; : � � iiiiiaiiiiiiaiiiiiii�iii � � � ■ . . , . , . . . ■ u�m��u�m��u��u��u - � ' o�ouo��ouo�o�uo��o��000 . � � ' ' � oi oo����oo����oo����000000� • • , � ' �o ��o�m��o�m��o��o��o�m��oo� � - - � • �o� ��o�o������o���o������o�o���oo� •• �o� o��o��o��o��o��o��o��o��000� / .. . uo ��������������������������������������� �' .� �o� ��������������������������������������� ■ ��y 1 � • ����� �� ��Y������Y��� ������� ��Y���������� �� 1' _ _� :� � � ■ ��Y� 1 � �� �� �� �� �� . �� �� �� • �� � �� �� �� �� �� � 6 , � �INTB pc i�sag PROJECT REFERENCE NO SHEET NO. BUFFER IMPACTS — � �` °a�s`�'°�'`°` s`������ "BP.�.R.86 4 NAD ay�,a Zo» PERMIT DRAWISNG � SHEET NO. ROADWAY DESIGN HYDRAULICS BEGIN PROJECT 17BP.2.R.86 ALL wEiLANDS AREAS DETERMINED BY ROBERT ENGINEER ENGINEER TRUNBULL AS wETLANDS wA & WB _ i —L— STA II + 50.00 7 � _'��' --�� �e, B2 �� J/�� � ZONE 1 BUFFER IMPACTS = 1757 SF ' '/ �J, � ZONE 2 BUFFER IMPACTS = 1915 SF � A��OWABLE IMPACTS ZONE 1 ��/ � $AMUEI L�: I ALLOWABLE IMPACTS ZONE 2 �L � � � ����� ZONE 1 BUFFER IMPACTS = 1779 SF � BO1 \ �*� � � � �, -- ZONE 2 BUFFER IMPACTS = 2155 SF � * � � � . � � � � � a � i � � � � .�so- ;� � � � � � � * i � I � lO „TqpF _ , , , \ ` \F ;: � � -�. � � � t t � � � E�—E�._ BL 5 F��R � _ ��� � � � 1 � c --- --�—_ E -ris� I � --� � � � � - - -- ..,, �4 � X \ � �PpCKET WP � t /-/ F K - _ - _ . � F- ' �� � � \ � � ___�_�_ _... __ _ � RE � \ �;<-_ -_.�--- f/7 .... r�9/N 1 , � .. . � � \x � �\ \� U `WLe\ �6����—__ ,_ - D . � .. . �Pi � �� ...... -F�_ ��- ..� ~ � � \� F F � � F � - ' �; ------ ` <=-� _ � i _ � /I � \ B GIFG ��� T � y E � � � y� �� , ai � ��� �� 1� ti _—_—_---'-�---F �— '�� � ��� \ � o � ..a/ � � � I � - � �-�-E-. _p. __ ���E � E�� O Z ,-'�„1!`_�..� ,._ � � T82GI _ _ _ , . \ \ � N' � _. L_� x ^.. r� F . . . � � PUE C V EDITCH T' N O m � ,l`" h \ � .,.. /� `' � �� � \ � /' . -c x . -�'- � � PUE SEE DEfAIL 1 �� II . O I � " f.. � _ .. � x. - � -- . �--- � � � O r J 0 �� i ��F _ _�--' t "�"r , _� pU� � 3 ��_ , . R�q/iy � � � � .. .. �:a �� P E . _ �, I � ARIE J�t & . �. � � �� �� � j� `�\ TRANSPORTATION FACILITY LINE O . II i\ K OO • i � � . '��� � --1 �o� � --_ - , _,—F �„I! �� � �I - -• � � � � . � _ F __ — _ — , . . — \ .. 1 \:..,T11� � N N � , 3 �', , __ � � „ �� _ � - � a � '�—rE �- � � � i "� � `AT � AA "' _ � .c �„ � � - a n .._ � � � � �\i� .�V� �-g�m�° y .� "� '� '' PQE � � `'`� � ` 1 i S ETCH OF BRIDGE \ � -BL-3—' �puE � �_ � � � IN REL TIONS IP TO PAVE ENT � dTTo scn�e - �Fc � � 8 � � �° � � AT 1 °� �� �\ E— '� V _ -,I Ir x2 1 I � � — � ���;' ��_ " AT-1 � ., STOo �6 f6� f� � � v�, DETAIL 1 DETAIL 2 - TY E-III TYPE-III �% SPECInI LnTERAI 'V' DITCH kIP ENi ��o„o �m��, �o„o ���., 64 � o�aa--�� � ZONE 1 BUFFER IMPACTS = 392 SF u�, A w ^' v, o o � I ra o ZONE 1 BUFFER IMPACTS = 2925 SF ZONE 2 BUFFER IMPACTS = 217 SF o 0 o a o ZONE 2 BUFFER IMPACTS = 2150 SF sPEci"� �"T. ^' o N N A o, V' DITCH ��FRom°�w'srn'v'+°+ssroTO�aza'so�er�� ss������� SeEDE7AIL1 � -BM-10 TYPE-III <� FROM STA.11 � 65 TO S7A. 1� � 85 RT aoM srai�+os ro sr,in-,e er �/ TYP -III _ NOTE: SEE SHEET 26-1 FOR HORIZONTAL ALIGNMENT INFORMATION ���� '/N /3/�/�;G� �� I l� ,', �) � ` __ Stao i6f74 f% — �� � �, — — � — — — __ __ _ __ __ _ _ __ _ __ _ __ _ _ _ _ _ -=_- -- _ _ DITCH LEGEND _ � � � RIGHT DITCH -------- ' 2�� 10' 0' � ° -�0� � E ° —2�� 0 r m� � � °'" —30 o� ,m �� 10 + 00 N: PROP 11.25° BEND - ROTATE AS NEEDED �� �� �� ��� ��� ������ ������� � �� BEGIN PROP WATER LINE WL STA 10+45.30 . . .�. ....... .. . W/ PROP GATE VALVE L STA 14+91.17 WL STA 10+39.25 RT 24.32' .�. L STA 14+85.28 RT 23.9' ELEV = 3.15� �� ELEV = 3.15� BEGIN GRADE PI = 12+25.00 -- -`- - - - --- -- - -L- STA 11 + 50.00 - ELEV. = 10.67' EL = 9.97' PI = 14+00.00 PI = 15+50.00 � K= 234 + EL = 7.22' EL = 7.75' � BORE PIT SIZE VC = 150' K= 78 K= 231 DETERMINED BY i---- ---.;_- VC = 150' VC = 150' CONTRACTOR ' � (-)0.9300% ap STREAM END PROP WATER LINE. TIE-IN TO EXISTING W/ GATE VALVE WL STA 15+75.99 L STA 20+21.90 RT 21.1� ELEV = 0.65 BRIDGE HYDRAULIC DATA DESIGN DISCHARGE = 3609 CFS DESIGN FREQUENCY = 25 YRS DESIGN Hw ELEVAT�ON = 63 FT BASE DISCHARGE = 546/ CFS BASE FREOUENCY = I00 YRS BASE HW ELEVATION = 7.8 FT OVERTOPPING DISCHARGE = 4068 CFS OVERTOPPIN� FREQUENCY= l l0 (+) YRS OVERTOPPING ELEVATION = 6.68 FT DATE OF SURVEY = 12-2/-2017 W.S.ELEVATION AT DATE OF SURVEY =-029 FT _ _ � � ����, � ���. � ����, � ���, �� �� ���1 %/ _ � ���., _ -- ����. ° �CCC�. � �•.,-....., :;:::::;s � , - � . .......................... ..�• � . �����p������p����������� - =� F /' '• �������������������������� '• � � � 1 �� ♦ y�i�. �•�-�� _-- �����m�����m������o�� � � ' •� � �����o������o����������� . .. �������������m������o�� , � ' iiii�uiiiiii��iiiiiuiiii � � � � � oo�uo�o�a�000uo � �����Y������p����������� ..�. . . � • 11 �������������������������� � � � . � ..�. . . � . � �����o������m������o�� .� • . ��o�o���o�o���o������ � � � � . ����������������������o�� �; : � � iiiiiaiiiiiiaiiiiiii�iii � � � ■ . . , . , . . . ■ u�m��u�m��u��u��u - � ' o�ouo��ouo�o�uo��o��000 . � � ' ' � oi oo����oo����oo����000000� • • , � ' �o ��o�m��o�m��o��o��o�m��oo� � - - � • �o� ��o�o������o���o������o�o���oo� •• �o� o��o��o��o��o��o��o��o��000� / .. . uo ��������������������������������������� �' .� �o� ��������������������������������������� ■ ��y 1 � • ����� �� ��Y������Y��� ������� ��Y���������� �� 1' _ _� :� � � ■ ��Y� 1 � �� �� �� �� �� . �� �� �� • �� � �� �� �� �� �� WETLAND AND SURFACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 1 L Sta. 16+16 to Sta. 20+02 21" Cored Slab Bridge 0.0353 0.005 0.013 18 38 2 L Sta. 25+09 to Sta. 25+48 Roadway Fill <0.000 TOTALS*: 0.0356 0.005 0.013 18 38 *Rounded totals are sum of actual impacts NOTES: Permanent Fill in Wetlands: 1552 SF Permanent Surface Water Impacts: 235 SF Temporary Surface Water Impacts: 545 SF Revised 2016 09 09 RIPARIAN BUFFER IMPACTS SUMMARY IMPACT BUFFER TYPE ALLOWABLE MITIGABLE REPLACEMENT ROAD PARALLEL ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2 SITE NO. STRUCTURE SIZE / TYPE STATION (FROM/TO) CROSSING BRIDGE IMPACT (ft2) (ft2) (ft2) (ft2) (ft2) (ft2) (ft2) (ft2) B1 21" CORED SLAB BRIDGE -L-16+27 TO 17+09 LT X 1778.800 2155.000 3933.800 B2 21" CORED SLAB BRIDGE -L- 17+90 TO 18+42 LT X 1757.000 1915.000 3672.000 B3 21" CORED SLAB BRIDGE -L- 16+47 TO 17+09 RT X 2925.000 2150.000 5075.000 B4 21" CORED SLAB BRIDGE -L- 17+68 TO 18+16 RT X 392.000 217.000 609.000 TOTAL: 6852.800 6437.000 13289.800 0 0 0 0 0 Rev. SEP 2016 Rev.Jan 2009