HomeMy WebLinkAbout680020_Compliance Evaluation Inspection_20190321W _(_ 69 1 OQ QL �} 3 26- I?
WDivislon of Water Resources
Facility Number - 0 Division of Soil and Water Conservation
0 Other Agency
Type of Visit: 0 Com nce Inspection Operation Review 0 Structure Evaluation 0 Technical Assistance
Reason for Visit: Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access
Date of Visit: Arrival Time: Departure Time: County: 19flz
Region:
Farm Name: -� r' �1� a%� �� Owner Email:
Owner Name:
Mailing Address:
Physical Address:
Facility Contact: Title:
Onsite Representative: �/Y] t(� A I ¢
Certified Operator:
Back-up Operator:
Location of Farm: Latitude:
Swine
Wean to Finish
Wean to Feeder
Feeder to Finish
Farrow to Wean
Farrow to Feedei
Farrow to Finish
Gilts
Boars
Other
Other
Phone:
Phone:
Integrator:
Certification Number:
Certification Number:
Longitude:
Design Current Design Current
Capacity Pop. Wet Poultry Capacity Pop.
La er
Non -La er
N
Other
Poults
Design Current
Design Current
Cattle Capacity Pop.
Dai Cow
Dairy Calf
Dairy Heifer
Dry Cow
.Non -Dairy
Beef Stocker
Beef Feeder
Beef Brood Cow
Discharges and Stream Impacts
1. Is any discharge observed from any part of the operation? ❑ Yes dNo ❑ NA ❑ NE
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made? ❑ Yeso ❑ NA ❑ NE
b. Did the discharge reach waters ofthe State? (Ifyes, notify DWR) ❑ Yes tNo ❑ NA ❑ NE
c.What is the estimated volume that reached waters of the State (gallons)?
d. Does the discharge bypass the waste management system? (If yes, notify DWR) [] YesVNo
❑ NA ❑ NE
2. Is there evidence of a past discharge from any part of the operation? [:]Yes • ❑ NA ❑ NE
3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes Zo❑ NA ❑ NE
of the State other than from a discharge?
Page 1 of 3 2/4/2015 Continued
Facility Number: , Date of Inspection:
❑ Yes
r
d No
❑ NA
❑ NE
Waste Collection & Treatment
❑ Yes
FZ/No
❑ NA
❑ NE
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate?
❑ Yes
o
❑ NA
❑ NE
a. If yes, is waste level into the structural freeboard?
❑ Yes
to
❑ NA
❑ NE
Structure I Structure 2 Structure 3 Structure 4
Structure 5
Structure
6
❑ NE
Identifier:
Spillway?:
Designed Freeboard (in):
Observed Freeboard (in): 3 C)
5. Are there any immediate threats to the integrity of any of the structures observed?
❑ Yes
No
❑ NA
❑ NE
(i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on-site which are not properly addressed and/or managed through a
❑ Yes
ZNo
❑ NA
❑ NE
waste management or closure plan?
If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmentaVNo
threat, notify DWR
7. Do any of the structures need maintenance or improvement? ❑ Yes ❑ NA ❑ NE
8. Do any of the structures lack adequate markers as required by the permit? [:]Yes ❑ NA ❑ NE
(not applicable to roofed pits, dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require [:]Yes No ❑ NA ❑ NE
maintenance or improvement?
Waste ADDlication
10. Are there any required buffers, setbacks, or compliance alternatives that need [:]Yes No NA ❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes, check the appropriate box below. 0 Yes No ❑ NA ❑ NE
❑ Excessive Ponding [] Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.)
❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area
12. Crop Type(s): 1-
13. Soil Type(s):
14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes VN9
❑ NA C-]NE
15. Does the receiving crop and/or Iand application site need improvement? ❑ Yes ❑ NA ❑ NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes Cj"No ❑ NA ❑ NE
acres determination?
17. Does the facility lack adequate acreage for land application?
❑ Yes
r
d No
❑ NA
❑ NE
18. Is there a lack of properly operating waste application equipment?
❑ Yes
FZ/No
❑ NA
❑ NE
Required Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available?
E]Yes
d
❑ NA
❑ NE
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check
❑ Yes
�o
❑ NA
❑ NE
the appropriate box.
❑ WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other:
21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes [�(No ❑ NA ❑ NE
❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code
❑ Rainfall []Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V Rainfall Inspections//,"❑ Sludge Survey
22. Did the facility fail to install and maintain a rain gauge? ❑ Yes o ❑ NA FINE
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NA ❑ NE
Page 2 of 3 21412015 Continued
Facility Number: - 1:Z2 jDate of Inspection: / I'
24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes fo E] Yes NA NE
❑
25. Is the facility out of compliance with permit conditions related to sludge? if yes, check ❑ Yes f' ' " NA ❑ NE
the appropriate box(es) below.
❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels
❑ Non-compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non -compliance -
26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes V
No NA [:]NE
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑YesNo ❑ NA ❑ NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and?or document
❑ Yes ❑ No ❑ NA ❑ NE
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern?
❑ Yes ❑ No ❑ NA ❑ NE
If yes, contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the
❑ Yes ❑ No ❑ NA ❑ NE
permit? (i.e., discharge, freeboard problems, over -application)
31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below.
❑ Yes ❑ No ❑ NA ❑ NE
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP?
❑ Yes ❑ No ❑ NA ❑ NE
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on-site representative?
❑ Yes ❑ No ❑ NA ❑ NE
34. Does the facility require a follow-up visit by the same agency?
❑ Yes ❑ No ❑ NA ❑ NE
Reviewer/Inspector Name: Phone: /7/ V z,�, o
Reviewer/Inspector Signature: f2 pate: 7 zi
Page 3 of 3 21412015