HomeMy WebLinkAbout20030989 Ver 2_Triage Comments_20070208• ?. _
Plan Deta117ncomplete - -
Who ]toviewed: • `~~~~
^ P1ea8e provide a location map for the project. •
Please show alI stream impacts including eli fill elopes, dissipaters, and bank stabilization on the siteplan.
Please show all wetland impacts including fill slopes on the site plan. _
I e Indic p P ~ .
k
^ Please indicate proposed Io layout as over ys on the sits plan. ~~ ~~
. ~ . ~ ~~
~] Please indicate tho locatio of the prot tadoverlays on the site plan. ` '1 ~~a ~ ~ , ~ .
G ~ or non tsola~wetl n~ds •atroarns and other waters of the State as over/1\a/ys on tho site~plWan.
Please locate all isolate
Please provide cross section details showing the provisions for aquatic life passages
^ Please locate any plannccl•sower lines on the sife plan. •
^ Please provide the location of any proposed stormwater management practicAS sa required by LiC .
^ Please provide detail for the stonnwator management practices as required by CiC •
^ Please specify the perceat of project imperviousness area based on the estimated built-out conditions: •
^ Please indicate all atormwat ~o~alla on the site plan. •
Please indicate the diflhse flow provision measures do the site plan. ~ ~ ~ ~ -
^ Please indicate whothar•or not the proposed impacts already been conducted
..
Avoidance•and/or Aflnimlzatbn Not Provided
• The labeled as on the plane doss not appear to be necessary. Please eliminate the . or provide additional
information as to why it is necessary fior this pro,~ect. ~ .
• . ^ This Office believes that the labeled on the plans as can be moved. or reconfigured to avoid the impacts to the
.. .Please revise the plans to avoid the impacts. ~ •
^. ~ This'Office believes that the •lalieled on the plans as~ ~ can be moved or reconfigured to.;minimize the iii~pacts tp'the
. Ploaso revise the pleas to minimize the impacts.
^ The atormwater discharges at the location on the plans labeled will. not provide diffpse flow through the buffer because
. Please sevlse the plane and provide calculations to show that di8bse tlow will bo.achieved tJuough the entirebu~. ]fit
is not possible to achimvo•difluseflow through.the entire buffer-than it may bm necessary to' provide stonnwater manag~n~t
• practices that ranove nutrients beforo the stormwater can be discharged through the. buffer. •
Other
~..
^•. The application foe was insuf6eiont~becauso over 150 feet of stream and/or over 1 acre ofwetland'impacts were requested Please
provide $ .This additional foe musf be received before your application caa be reviewed. .
^ Pleasse wmpkta Section(s) on theapplication. -
^ Pleaseprovide a signed copy of the application.'
^ Pleaao provide , copies of the application, . copies of ~tho site plans and other supporting information:
_ ^ • Pleasasubnut elxtronic Cp-D files showing ~ ; via email to ian.mcmtllan(r~ncntail.net and CD; ~.
Mitigation
- ~ ^ of compensatory mitigation is required for this project. ~ Please provide•a compensatory mitigation plan.. The
plan must conform to tharequireanents in 15 A NCAC 2H :0500 and must boappropriate toth~type-of impacts proposed.
^ Please indicsta which 404 Permit the USACE would use to authorize this project. .