Loading...
HomeMy WebLinkAbout20030989 Ver 2_Triage Comments_20070208• ?. _ Plan Deta117ncomplete - - Who ]toviewed: • `~~~~ ^ P1ea8e provide a location map for the project. • Please show alI stream impacts including eli fill elopes, dissipaters, and bank stabilization on the siteplan. Please show all wetland impacts including fill slopes on the site plan. _ I e Indic p P ~ . k ^ Please indicate proposed Io layout as over ys on the sits plan. ~~ ~~ . ~ . ~ ~~ ~] Please indicate tho locatio of the prot tadoverlays on the site plan. ` '1 ~~a ~ ~ , ~ . G ~ or non tsola~wetl n~ds •atroarns and other waters of the State as over/1\a/ys on tho site~plWan. Please locate all isolate Please provide cross section details showing the provisions for aquatic life passages ^ Please locate any plannccl•sower lines on the sife plan. • ^ Please provide the location of any proposed stormwater management practicAS sa required by LiC . ^ Please provide detail for the stonnwator management practices as required by CiC • ^ Please specify the perceat of project imperviousness area based on the estimated built-out conditions: • ^ Please indicate all atormwat ~o~alla on the site plan. • Please indicate the diflhse flow provision measures do the site plan. ~ ~ ~ ~ - ^ Please indicate whothar•or not the proposed impacts already been conducted .. Avoidance•and/or Aflnimlzatbn Not Provided • The labeled as on the plane doss not appear to be necessary. Please eliminate the . or provide additional information as to why it is necessary fior this pro,~ect. ~ . • . ^ This Office believes that the labeled on the plans as can be moved. or reconfigured to avoid the impacts to the .. .Please revise the plans to avoid the impacts. ~ • ^. ~ This'Office believes that the •lalieled on the plans as~ ~ can be moved or reconfigured to.;minimize the iii~pacts tp'the . Ploaso revise the pleas to minimize the impacts. ^ The atormwater discharges at the location on the plans labeled will. not provide diffpse flow through the buffer because . Please sevlse the plane and provide calculations to show that di8bse tlow will bo.achieved tJuough the entirebu~. ]fit is not possible to achimvo•difluseflow through.the entire buffer-than it may bm necessary to' provide stonnwater manag~n~t • practices that ranove nutrients beforo the stormwater can be discharged through the. buffer. • Other ~.. ^•. The application foe was insuf6eiont~becauso over 150 feet of stream and/or over 1 acre ofwetland'impacts were requested Please provide $ .This additional foe musf be received before your application caa be reviewed. . ^ Pleasse wmpkta Section(s) on theapplication. - ^ Pleaseprovide a signed copy of the application.' ^ Pleaao provide , copies of the application, . copies of ~tho site plans and other supporting information: _ ^ • Pleasasubnut elxtronic Cp-D files showing ~ ; via email to ian.mcmtllan(r~ncntail.net and CD; ~. Mitigation - ~ ^ of compensatory mitigation is required for this project. ~ Please provide•a compensatory mitigation plan.. The plan must conform to tharequireanents in 15 A NCAC 2H :0500 and must boappropriate toth~type-of impacts proposed. ^ Please indicsta which 404 Permit the USACE would use to authorize this project. .