HomeMy WebLinkAbout420010_Plan of Action_20190304Y1wStlZUot0
PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: AWS420010
Facility Name: 8152
County; Halifax
Certified Operator Name: William E. Bain, Jr. Operator Number. AWA991343
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Lagoon Name/ID:
Spillway(Y or N):
Level(inches):
Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5
8152
---. N
17.5
2. Check all applicable items
t�1a1a� ct
Liquid level is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are
within acceptable ranges.
X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A
30 day Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste
to be pumped and hauled is reflected in section III tables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information. Contact and secure approval from the DWQ prior to transfer of waste to a site
not covered in the facility's CAWMP.
Operation will be partially or fully depopulated.
*Attach a complete schedule with corresponding animal units and dates fro depopulation
*if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: As Conditions Permit
hereby certify that I have reviewed the Information listed above and included within the
attached Pian of Action, and to the best of my knowledge and ability, the information is
accurate and correct.
Murphy -Brown, LLC Phone:
Facility Owner/Manager (print)
�,-l3zerwi. A, X'avr;t, 6&)&,za , Dale:
Facility Owner/Mang (signature)
910-293-3434
3/4/2019
11. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Structure ID: 8152 line m r 1432.3 Ib PAN
2. Structure ID: line m = lb PAN
3. Structure ID: line m = Ib PAN
4. Structure ID: line m = Ib PAN
5. Structure ID: line m = lb PAN
6. Structure ID: line m = Ib PAN
n. lines 1+2+3+4+5+6= 1432.3 lb PAN
Ill. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
�res�r
PERIOD. DO NOT LIST 1=lt=1LU5 IU WHIUM rArd � AlmixuI aC „rr V'Cv LJ'""I v .. 11.
,o. tract # p. field # q. crop r_ acres s. remaining IRR t. TOTAL PAN u. application window'
2 PAN balance BALANCE FOR
(,blacre) FIELD (lbs.)
column r x s
T3546 Zone 2 Bermuda 8.05 253.06 2037.1 Mar -Sept
T3546 Zone 5 Bermuda
6.76 192.10 1298.6 Mar -Sept
`State current crop ending application Cate or next crop application ueyun,n,y Ucd 1U1 avanauM
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 3335.7 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section 11) = 1432.3 Ib. PAN
PoA (30 Day) 2/21 /00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Namelldentifier (ID): 18152
2. Current liquid volume in 25 yr,/24 hr. storm storage & structural freeboard
a. current liquid level according to marker 17.5 inches
b. designed 25 yr./24 hr. storm & structural freeboard 19.3 inches
c. line b - line a (inches in red zone) = 1.8 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 187129 ftz
e. line c112 x line d x 7.48 gallons/ft3 212292 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 254943 ft3
h. current herd # 2411 certified herd #F--- 2411
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i +j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 1 1/24/2019
m. ((lines e + k)11000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA (30 Day) 2121100
254943 ft'
ft3
109159 ft3
453914 gallons
2.15
lbs/1000 gal.
1432.3 lbs. PAN
x. Crop's remaining PAN balance (line v from section Ill) = 3335.7 lb. PAN
y. Overall PAN balance (w - x) _ -1903 Ib. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
Irrigation onto existing spray fields will continue as weather and field conditions permit. Additional land is
available for pumping if needed.
PoA (30 Day) 2121100