HomeMy WebLinkAbout420010_Plan of Action_20190304Y1wStlZUot0 PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: AWS420010 Facility Name: 8152 County; Halifax Certified Operator Name: William E. Bain, Jr. Operator Number. AWA991343 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Name/ID: Spillway(Y or N): Level(inches): Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 8152 ---. N 17.5 2. Check all applicable items t�1a1a� ct Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: As Conditions Permit hereby certify that I have reviewed the Information listed above and included within the attached Pian of Action, and to the best of my knowledge and ability, the information is accurate and correct. Murphy -Brown, LLC Phone: Facility Owner/Manager (print) �,-l3zerwi. A, X'avr;t, 6&)&,za , Dale: Facility Owner/Mang (signature) 910-293-3434 3/4/2019 11. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: 8152 line m r 1432.3 Ib PAN 2. Structure ID: line m = lb PAN 3. Structure ID: line m = Ib PAN 4. Structure ID: line m = Ib PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = Ib PAN n. lines 1+2+3+4+5+6= 1432.3 lb PAN Ill. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN �res�r PERIOD. DO NOT LIST 1=lt=1LU5 IU WHIUM rArd � AlmixuI aC „rr V'Cv LJ'""I v .. 11. ,o. tract # p. field # q. crop r_ acres s. remaining IRR t. TOTAL PAN u. application window' 2 PAN balance BALANCE FOR (,blacre) FIELD (lbs.) column r x s T3546 Zone 2 Bermuda 8.05 253.06 2037.1 Mar -Sept T3546 Zone 5 Bermuda 6.76 192.10 1298.6 Mar -Sept `State current crop ending application Cate or next crop application ueyun,n,y Ucd 1U1 avanauM receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 3335.7 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section 11) = 1432.3 Ib. PAN PoA (30 Day) 2/21 /00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Namelldentifier (ID): 18152 2. Current liquid volume in 25 yr,/24 hr. storm storage & structural freeboard a. current liquid level according to marker 17.5 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.3 inches c. line b - line a (inches in red zone) = 1.8 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 187129 ftz e. line c112 x line d x 7.48 gallons/ft3 212292 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 254943 ft3 h. current herd # 2411 certified herd #F--- 2411 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i +j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1 1/24/2019 m. ((lines e + k)11000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2121100 254943 ft' ft3 109159 ft3 453914 gallons 2.15 lbs/1000 gal. 1432.3 lbs. PAN x. Crop's remaining PAN balance (line v from section Ill) = 3335.7 lb. PAN y. Overall PAN balance (w - x) _ -1903 Ib. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Irrigation onto existing spray fields will continue as weather and field conditions permit. Additional land is available for pumping if needed. PoA (30 Day) 2121100