Loading...
HomeMy WebLinkAboutNCG200516_Ltr re Compliance Rpt_20190218ROY COOPER NORTH CAROLINA Governor Environmental Quality MICHAEL S. REGAN Secretary WILLIAM E. (TOBY) VINSON, JR.. intern titrector February 18, 2019 IrneL Alloys Attention: Mike Oruska 3000 Stitt Street, Suite 'l50 Monroe NC 28110 Subject: Compliance Evaluation Inspection Imet Alloys NPDES Stormwater Certificate of Coverage- NCG200516 Union County, North Carolina Dear Mr. Oruska: RFC' FEB 2 6 2013 OFNR. LAND Ql),Al !7' STORil�1i #lj*ER PENI'Vil i i WG Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection we conducted at the Imet Alloys Monroe facility on February 12, 2019. Please note that in the stormwater inspection report summary we ask that you conduct additional sampling, clean spills and remove contarninaLed soils as quickly as possible, and get a lid for the metal dumpster. The report should be self-explanatory; however, should you have any questions, please do not hesitate to contact me at (704) 663-1699 or by E-mail at jaines.Irroore(Oncdenr.gov. Enclosure c: Stormwater Permitting Branch Sincerely, VMes Moore Assistant Regional Engineer Hr.MIU,, Q meter �a�e�.,,xuraa�ry North Carolina Department of Environmental Qualo I Division of Energy, llmerat and Land Resources Mooresville Regional Office 1610 East Center Avenue, Suite 301 j Mooresville, North Carolina 28115 7046631699 Permit: NCG200516 SOC: County: Union Region: Mooresville Contact Person: Mike Oruska Compliance Inspection Report Effective: 02/22/17 Expiration: 12/31/19 Owner: Imet Alloys Effective: Expiration: Facility: IMETAIIoys 3000 Stitt St Ste 150 Monroe NC 28110 Title: Phone: 704-225-9932 Directions to Facility: the facility is located on the south side of Stitt Street at the junction of Stitt St and Spud Smith St in east Monroe, NC. System Classifications: Primary ORC: Certification: Phone: Secondary OKU(s): On -Site Representative(s): Related Permits: Inspection Date: 02/12/2019 Entry Time: 03:45PM Exit Time: 05:OOPM Primary Inspector: Lily C Kay Phone: 704-663-1699 Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Wholesale Trade of Metal Waste and Scrap Stormwater Discharge COG Facility Status: ❑ Compliant Not Compliant Question Areas: Storm Water (See attachment summary) Page: 1 Permit: NCG200516 Owner - Facility:lmet Alloys Inspection Date: 02/12/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: Two spills were recorded in the past year and .the latest one was January 19, 2019. The latest spill has not been cleaned and stormwater was in conact with the petroleum on the ground and running towards the outfall. It is recommended to clean any spill as quickly as possible and to maintain absorbants on site until the spill can be cleaned. The facility has had Copper and Zinc results above the benchmark limitations and is conducting Teir II monitoring. Additional monitoring is recommended from the roof drains and a non-conact rain water sample to determine if montoring relief is an option. The metal dumpster does not have a lid and there was a minor amount of copper wiring in the dumpster. Page: 2 Permit: NCG200516 Owner - Facility: ]met Alloys Inspection Date: 02112/2019 Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan'? ® ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? ® ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ■ ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ® ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? . ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ® ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ® ❑ ❑ ❑ # Does the Plan Include a BMP surrrrrrary? ■ ❑ ❑ ❑ # Does the Plan includo a Spill Prevention and Response Plan (SPRP)? ®❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ® ❑ ❑ ❑ # Does the facility provide and document Employee Training? ® ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ® ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ® ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ® ❑ ❑ n Has the Stormwater Pollution Prevention Plan been implemented? ®❑ ❑ ❑ Comment: The SWPPP appeared complete and accurate. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ® ❑ ❑ ❑ Comment: Analytical Monitorinq Yes No NA NE Has the facility conducted its Analytical monitoring? ® ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ® ❑ ❑ ❑ Comment: The facility has had issues with Copper and Zinc in the past and is conducting Teir II monitoring. Sampling from the roof drains on the back of the building and non -contact rain water is recommended. Review these results with my office to determine if monitoring relief is an option. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ®❑ ❑ ❑ # Were all outfails observed during the inspection? ® ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ® ❑ ❑ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ® ❑ ❑ ❑ Comment: Page: 3