Loading...
HomeMy WebLinkAboutNCG060306_Letter with Compliance Inspection Report_20190218Energy, Mineral and Land Resources ENVIRONMENTAL QUALITY February 18, 2019 Purina Animal Nutrition, I.I.C. Attention: Mr. Chad White 173 McNess Road SlaLesvillc, Noah Caioliaa 28677 Subject: Stormwater Inspection Report NPDES Stormwater Permit NCG060306 Iredell County, North Carolina Dear Mr. White: ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Interim Director FEB 2 6 2013 DENR-LAND QUALJTIr STORM WER PLKrvg11 1 ING Enclosed please find a copy of the Compliance Inspection Report for the initial inspection conducted at the Purina Animal Nutrition, LLC. facility located at 173 McNess Road on January 23, 2019. The report should be self- explanatory, however, should you have any questions concerning these reports, please do not hesitate to contact me at (704) 663-1699 or by email at Holliday.Keen(a),ncdenr.gov. Sincerely, M O�K oore Assistant Regional Engineer Land Quality Section /HVK Enclosure: Inspection Report cc: Stormwater Permitting Program, Certificate of Coverage NCG060306 MRO-Land Quality Section, Stormwater Files-NCG060306 State of North Carolina I Environmental Quality I Energy, Mineral and Land Resources Mooresville Regional Office 1 610 East Center Ave Ste 301 1 Mooresville, NC 28115 704 663 1699 T Permit: NCG060306 SOC: County: Irodoll Region: Mooresville Contact Person: Chad White Directions to Facility: System Classifications: Primary ORC: Secondary ORG(s)- On-Site Representative(s): Related Permits: Compliance Inspection Report Effective: 11/01/18 Expiration: 05/31/21 Owner: Land O'Lakes Effective: Expiration: Facility: Purina Animal Nutrition, LLC 173 McNess Rd Statesville NC 28677 Title: Phone: 704-924-5100 Inspection Date: 01/23/2019 Primary Inspector: Holliday Keen Secondary Inspector(s): Certification: Phone: EntryTime: 10:OOAM Exit Time: 11:OOAM Phone: Christopher Graybeal Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Food/Tobacco/Soaps/Cosmetics/Public Warehousing Stormwater Discharge COC Facility Status: Compliant Not Compliant Question Areas: Storm Water (See attachment summary) Page: 1 Permit: NCGO60306 Owner - Facility: Land O'Lakes Inspection Date: 01/23/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: This inspection was conducted in response to a Notice of Intent for permit coveratge under General Permit NCG060000. Upon inspection, we found that this site is already permitted under Certificate of Coverage NCG060306 and does not require an additional permit number. Please update the SWPPP and conduct analytical and qualitative monitoring in accordance with the general permit under Certificate of Coverage NCG060306. If you have any questions, please contact my office at 704-235-2148. Page: 2 Permit: NCGO60306 Owner - Facility: Land O'Lakes Inspection Date: 01/23/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ® ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? ® ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ® ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ® ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ®❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ® ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ® ❑ ❑ ❑ # Dooc tho Plan include a BMP summary? ® ❑ ❑ ❑ # Does the flan include a Spill Prevention and Response flan (SPRP)? ® ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ® ❑ ❑ ❑ # Does the facility provide and document Employee Training? ❑ N ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ® ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ❑ ®❑ ❑ # DoeR the Plan inClUde. a Stormwater Facility Inspection Program? ■ n n n Has the Stormwater Pollution Prevention Plan been implemented? 0 ❑ ❑ ❑ Comment: The SWPPP has not been updated for roughly 5 years at the time of inspection. Please review your SWPPP and modify as necessary including records of employee training and spill reports. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ❑ 0 ❑ ❑ Comment: Redcent qualitative monitorinq was not documented in the SWPPP. Please conduct qualitative monitoring and store records in the SWPPP. Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ N ❑ ❑ # Has the facility conducted its Analytical monitoring frorn Vehicle Maintenance areas? ❑ ❑ N ❑ Comment: Recent analytical monitoring was not documented in the SWPPP. Please conduct analvtical monitoring and store records in the SWPPP. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? E ❑ ❑ ❑ # Were all outfalls observed during the inspection? 0 ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ E ❑ # Has the facility evaluated all illicit (non stormwater) discharges? 0 ❑ ❑ ❑ Comment: Ensure all sampling points are documented and labeled on the site maps. Page: 3