Loading...
HomeMy WebLinkAbout960010_ENFORCEMENT_20171231NORTH CAROLINA Department of Environmental Qual ENFORCEMENT ENFORCEMENT ENFORCEMENT - - - -- -------_. -- -- - - - -- - - _- - - - State of North Carolina - - = VII& STATES -_ Department -of Environment. and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Wayne McDevitt, Secretary A. Preston Howard, Jr., P.E., Director CERTIFIED MAIL RETURN RECEIPT REQUESTED December 29, 1998. Mr. Roy G. Nations Roy G. Nations Swine Farm 407 N. Herman Street Goldsboro, NC 27530 SUBJECT: Notice of Deficiency Animal Feedlot Operation Site Inspection Roy G. Nations Swine Farm Facility No. 96-10 Wayne County Dear Mr. Nations: QUAM On October 20, 1998,George Pettus of Goldsboro Hog Farm and I of the Division of Water Quality from the Washington Regional Office conducted an Animal Feedlot Operation Site Inspection at the Roy G. Nations Swine Farm in Wayne County. A copy of the inspection report is attached for your review. In general, this inspection included verifying that: (1) the farm has a Certified Animal Waste Management Plan (CAWMP); (2) the farm is complying with requirements of the State Rules 15 NCAC 211.0217, Senate Bill 1217, and the Certified Animal Waste Management Plan; (3) the farm operation's waste management system is being operated properly under the direction of a Certified Operator; (4) the required records are being kept; (5) there are no signs of seepage, erosion, and/or runoff. The following deficiencies were observed during the inspection In accordance with condition III, item 4 of your General Permit you are required to analyze the animal waste as close to the time of application as practical and at least within 60 days (before or after) of the date of application. This condition has not been met and it is suggested to pull waste sample quarterly. 943 Washington Square Mall, Washington, NC 27889 Telephone (252) 946-6481 FAX (252) 975-3716 An Equal Opportunity Affirmative Action Employer 50% recycled / 10% post -consumer paper - . Roy G. Nations -Swine Farm December 29, 1998 In addition to the aforementioned deficiencies, 'it is important that you determine the wetted acreage in each irrigation pull and map these patterns out in relationship to your waste management plan. The IRR-2 records can be kept by irrigation pull and the computations completed by wetted acres. It is very important as the owner and the Operator in Charge that you resolve these aforementioned deficiencies and any other problems that may arise, as soon as possible. For additional assistance, please contact your Technical Specialist. Nothing in this letter should be taken as absolving this facility of the responsibility and liability of any violations that have resulted or may result from these deficiencies. Failure to comply with your Certified Animal Waste Management Plan and General Permit could result in civil penalty assessment and/or revocation of your General Permit. Thank you for your cooperation and assistance during the inspection. Should you have further questions or comments regarding this inspection, do not hesitate to call at (252) 946-6481, ext. 318. Sincerely, Lyn B. Hardison Environmental Specialist cc: George Pettus Wayne County SWCD Office DSWC-WaRO (w/out attachments) Compliance Group (w/out attachments) WQ Central Files ,WaRO 19 Koutine p t-ompiamt p rouow-up m uwy inspection p rouow-up of u�wt., review p Utner Facility Number D—E= Date of Inspection Time of Inspection ® 24 hr. (hh:mm) 13 Registered 0 Certified 13 Applied for Permit 0 Permitted 113 Not Opera= Date Last Operated: Farm Name: Roy.:G..Nation.Savine.Earm..................................................................... County: Wayne WaRO OwnerName: Roy.!G..................................... Nation ......................................................... Phone No: 9.19-.135-.6261 .......................................................... Facility Contact: Title: ............................................................... Phone No: Mailing Address: 40.7A.Herman.St................................................................................ Go.IdabAru..NC...................................................... 2753.Q .............. Onsite Representative: Chaxles..CArbett,. berio.P..Castanedo,.lGeurge..... Integrator:GaldabAra.Hog.Farms....................................... Certified Operator: Ray..G.................................... Nation.............................:................. Operator Certification Number: 18628 ............................ Location of Farm: Latitude ©0©' ®" Longitude ©• ®' ®" ❑ Wean to Feeder ® Feeder to Finish ❑ Farrow to Wean ❑ Farrow to Feeder ❑, arrow to Finis ❑ Gilts ❑ Boars e a , t eslgn - urren esign urren Poultry, Capacity' Population. Cattle Capacity„ Population` i= ... , tt ❑ ayer ❑ Datry 4 ❑ Non -Layer 1 ❑ Non -Dairy „❑Other Total Design, Capadty , 59760 wa t , ; TotA;SSM, , •� < .t4ha ' 1. Are there any buffers that need maintenance/improvement? ❑ Yes ® No 2. Is any discharge observed from any part of the operation? ❑ Yes ® No Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? ❑ Yes ®No b. If discharge is observed, did it reach Surface Water? (If yes, notify DWQ) ❑ Yes ig No c. If discharge is observed, what is the estimated flow in gal/min? n/a d. Does discharge bypass a lagoon system? (If yes, notify DWQ) ❑ Yes ®No 3. Is there evidence of past discharge from any part of the operation? ❑ Yes ® No 4. Were there any adverse impacts to the waters of the State other than from a discharge? ❑ Yes N No 5. Does any part of the waste management system (other than lagoons/holding ponds) require ❑ Yes ®No maintenance/improvement? 6. Is facility not in compliance with any applicable setback criteria in effect at the time of design? ❑ Yes ®No 7. Did the facility fail to have a certified operator in responsible charge? ❑ Yes ®'No 7/25/97 Continued on back 8. 'Are there lagoons or storage ponds on site which need to be properly closed? -J - - Yes Structures (Laeoons.Holdin¢ Ponds. Flush Pits. etc.) , . - - - - - - 9. Is storage capacity (freeboard plus storm storage) less than adequate? E3 Yes N®o . Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Freeboard(fl):.............2.%3...................................................................::........................................................................................................................ 10. Is seepage observed from any of the structures? p Yes ® No 11. Is erosion, or any other threats to the integrity of any of the structures observed? p Yes N No 12. Do any of the structures need maintenance/improvement? p Yes ® No (If any of questions 9-12 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 13. Do any of the structures lack adequate minimum or maximum liquid level markers? p Yes N No Waste Application 14. Is there physical evidence of over application? p Yes ® No (If in excess of WMP, or runoff entering waters of the State, notify DWQ) 15. Crop type ...... Coastal.BermudaGcass ....... Small.Grain�.4..WMeatBarlry............................................................................................................. 16. Do the receiving crops differ with those designated in the' Aniimal Waste Management Plan (AWMP)? Yes p ®No 17. Does the facility have a lack of adequate acreage for land application? p Yes ®No 18. Does the receiving crop need improvement? p Yes ®No 19. Is there a lack of available waste application equipment? p Yes ®No 20. Does facility require a follow-up visit by same agency? p Yes ®No 21. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? p Yes N No 22. Does record keeping need improvement? p Yes ®No For Certified or Permitted Facilities Only 23. Does the facility fail to have a copy of the Animal Waste Management Plan readily available? p Yes ®No 24. Were any additional problems noted which cause noncompliance of the Certified AWMP? p Yes ®No 25. Were any additional problems noted which cause noncompliance of the Permit? ® Yes p No ��- a wl♦Y iIV lu■SAMS eorres�ioniletice about liiis visit:. ' .. • ' :::::: :::::::' :::. • : :