Loading...
HomeMy WebLinkAbout20190443 Ver 1_B-5308_Sampson Bridge 152 Courtesy Notification_signed_20190409 STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION ROY COOPER JAMES H. TROGDON, III GOVERNOR SECRETARY Mailing Address: NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 5501 BARBADOS BOULEVARD CASTLE HAYNE, NC 28429-5647 Telephone: (910 341-2000 Fax: (910) 675-0143 Customer Service: 1-877-368-4968 Website: www.ncdot.gov Location: 5501 BARBADOS BOULEVARD CASTLE HAYNE, NC 28429-5647 April 9, 2019 Brad Shaver, NCDOT Coordinator Joanne Steenhuis, NCDOT Coordinator Wilmington Regulatory Field Office NC Department of Environmental Quality US Army Corps of Engineers Division of Water Resources 69 Darlington Avenue 127 Cardinal Drive Ext. Wilmington, NC 28403 Wilmington, NC 28405 Subject: Courtesy Notification for Section 404 Nationwide Permits 3 and Section 401 General Certifications 4132 for proposed replacement of Bridge No. 152 over Caesar Swamp on SR 1455 (Payton Daniels Road) in Sampson County. WBS No. 17BP.3.R.79, TIP No. B-5308 Dear Mr. Shaver and Ms. Steenhuis: The North Carolina Department of Transportation (NCDOT) is proposing to replace Bridge No. 152 over Caesar Swamp on SR 1455 (Payton Daniels Rd.) in Sampson County. The existing 4 span - 70 ft. bridge will be replaced with two span - 95 ft. bridge. A preliminary jurisdictional determination (PJD) was acquired on this project on September 15, 2015 and the project was assigned Action Id No. SAW-2015-01092. Impacts associated with the bridge include 0.096 acres of permanent wetland impacts (fill and mechanized clearing) and 0.016 acres of beneficial excavation to match adjacent floodplain. The project also includes 0.031 acres of temporary impacts (hand clearing) for aerial utility work. There are no impacts proposed with the waterline relocation and STAR communications bore. The attached bridge and utility permit drawings provides more details on the proposed impacts. Regulatory Approvals Section 404 Permit: NCDOT is proposing to construct this project under the conditions of Nationwide 3. Based on the current design and impacts, notification requirements are not applicable for this project and written approval from the USACE is not required. NCDOT will abide by all conditions listed in NW 3, and will include a copy of the certifications in the permit package and/or contract. Section 401 Permit: The associated 401 General Certification 4132 will also apply to this project. Notification thresholds or circumstances for these certifications are not applicable to this project therefore written concurrence from the Division of Water Resources (DWR) is not required. NCDOT will abide by all conditions listed in GC 4132, and will include a copy of the certifications in the permit package and/or contract. If you have any questions or need additional information, please feel free to contact me. Sincerely, Mason Herndon NCDOT Division 3 Environmental Program Supervisor ec: Kristi Lynn Carpenter, Division of Water Resources Enclosures (Version 2.01; Released December 2014) B-5308 TIP No.:B-5308 County(ies):Sampson Page 1 of 1 TIP Number:Date: Phone:Phone: Email:Email: County(ies): CAMA County? Yes Design/Future:Year:2038 Existing:Year: Threatened/Endangered Species?No Comments: No No No No Deck Drains Discharge Over Water Body?(If yes, provide justification in the General Project Narrative)(If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative)(If yes, provide justification in the General Project Narrative) ac. 2 lane road with 10' travel lanes and no paved shoulder with a total bridge length of 70 ft and width of 24 ft. 553 dan.duffield@summitde.net Project Includes Bridge Spanning Water Body?Deck Drains Discharge Over Buffer?Dissipator Pads Provided in Buffer? NRTR Stream ID: Annual Avg Daily Traffic (veh/hr/day): Existing Site Project Length (lin. miles or feet): ac. Surface Water Body (1): Class CNCDWR Surface Water Classification for Water Body N/ABuffer Rules in Effect:Caesar Swamp None 306 2 lane road with 10' travel lanes and no paved shoulder with total bridge length of 95 ft and width of 33 ft. Waterbody Information 2018 NCDWR Stream Index No.: B-5308 Impairments: Other Stream Classification: Primary Classification: Project Built-Upon Area (ac.) State Project B-5308 involves the replacement of NCDOT Bridge 810152 on SR 1455 (Payton Daniels Rd) over Caesar Swamp. The existing structure is an RC floor on timber joists. The proposed structure will be a 1@45', 1@50' 21" concrete cored slab bridge. The proposed bridge is FEMA Zone AE in the DFIRM Map 3720154000J studied in "Limited Details" methods. The proposed bridge will maintain the existing level of service. There are two proposed outfalls on the begin of bridge side to allow proper drainage for the bridge and minimize disturbance in the surrounding wetlands. Rip Rap outlet pads will be utilized to dissipate the flow and minimize erosion and there is one proposed riprap base ditch (riprap used to stabilize the ditch) at the end of bridge side to redirect flow coming towards the project site. Summit Design and Engineering Services North Carolina Department of Transportation Highway Stormwater Program STORMWATER MANAGEMENT PLAN FOR NCDOT PROJECTS Project Type: NCDOT Hydraulics Unit Address: General Project Information 17BP.3.R.59 WBS Element: Bridge ReplacementWBS Element: Dan Duffield, P.E.NCDOT Contact: (919) 707-6608 100 East Six Forks Road, Suite 300 Raleigh, NC 27609 Contractor / Designer: (919) 322-0115 jlmoore6@ncdot.gov Address: 8/13/2018 SampsonClement Jon Moore, P.E. 1020 Birch Ridge Drive River Basin(s): City/Town: 0.78 Typical Cross Section Description: Surrounding Land Use: General Project Narrative: (Description of Minimization of Water Quality Impacts) No Rural Area with Agricultural or Residential Land Uses Caesar Swamp 18-68-1-17-4-(2) 0.38 0.156 lin. Miles Project Description Proposed Project Cape Fear None Supplemental Classification: Swamp Waters (Sw) Wetlands within Project Limits? HandExisting Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts StreamNo. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design(ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft)120+26 / 21+28 (LT)ROADWAY FILL0.025 0.012122+01 / 22+65 (LT) ROADWAY FILL0.013 0.008120+12 / 21+28 (RT) ROADWAY FILL0.008 0.015122+11 / 22+71 (RT) ROADWAY FILL0.005 0.007120+75 / 21+24 (RT) ROADWAY FILL0.004121+24 / 22+06 BRIDGE**0.016TOTALS*: 0.055 0.016 0.041Rounded totals are sum of actual impactsTotal Permanent Fill in Wetlands = 2395.80 sfTotal Excavation in Wetlands = 696.96 sfTotal Mechanized Clearing in Wetlands = 1805.40 sfRevised 2013 10 24SHEET 7OF72017 02 16SAMPSON COUNTYNC DEPARTMENT OF TRANSPORTATIONB-5308 WETLAND PERMIT IMPACT SUMMARYSURFACE WATER IMPACTSWETLAND IMPACTSDIVISION OF HIGHWAYS Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 1 17+39 / 23+ 26 (LT)UTILITY EASEMENT 0.031 TOTALS*:0.031 Rounded totals are sum of actual impacts Total Hand Clearing in Wetlands = 1369.29 sf Revised 2013 10 24 SHEET 7 OF 7 2017 02 16 SAMPSON COUNTY NC DEPARTMENT OF TRANSPORTATION B-5308 WETLAND PERMIT IMPACT SUMMARY SURFACE WATER IMPACTSWETLAND IMPACTS DIVISION OF HIGHWAYS