HomeMy WebLinkAbout310466_2018 Compliance inspection_20180308�� Division of Water Resources
Facility Number - ivision of Soil and Water Conservation
0 Other Agency (/
Type of Visit: 'Compliance Inspection 0 Operation Review O Structure Evaluation O Technical Assistance
Reason for Visit: (Routine O Complaint O Follow-up O Referral O Emergency O Otherf'� O Denied Access 1A /
Date of Visit: Arrival Time: Departure Time: County: 1J�% ll7 Region: V (/ (Ro
Farm Name: Owner Email:
Owner Name:
Mailing Address:
Physical Address:
Phone:
Facility Contact: C Title:
Onsite Representative: I�VQi 1,(, / 1 ' WJ1
Certified Operator: ✓ fc "its prowKs
Back-up Operator:
Location of Farm:
Swine
Latitude:
Phone:
Integrator:
Certification Number: Ig U 3 L
Certification Number:
Design Current Design Current
Capacity Pop. Wet Poultry Capacity Pop.
Layer
pI INon-Layer
Wcan to Finish
Wean to Feeder
Feeder to Finish
Farrow to Wean
Farrow to Feeder
Farrow to Finish
Gilts
Boars
Other
Othcr
Poults
Design Current
Discharees and Stream Impacts
1. Is any discharge observed from any part of the operation?
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made?
b. Did the discharge reach waters of the State? (If yes, notify DWR)
c. What is the estimated volume that reached waters of the State (gallons)? _
d. Does the discharge bypass the waste management system? (If yes, notify DWR)
2. Is there evidence of a past discharge from any part of the operation?
3. Were there any observable adverse impacts or potential adverse impacts to the waters
of the State other than from a discharge?
Longitude:
Design Current
Cattle Capacity Pop.
DairyCow
Dai Calf
DairyHeifer
D Cow
Non -Dairy
Beef Stocker
Beef Feeder
Beef Brood Cow
❑ Yes 0 No ❑ NA ❑ NE
❑ Yes ❑ No ❑ NA ❑ NE
❑ Yes ❑ No ❑ NA ❑ NE
❑ Yes ❑ No ❑ NA ❑ NE
❑ Yes No ❑ NA ❑ NE
❑ Yes No ❑ NA ❑ NE
Page I of 3 21412015 Continued
Facili Number: - Date of inspection:
Waste Collection & Treatment
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes
a. If yes, is waste level into the structural freeboard? ❑ Yes
Structure 1 Structure 2 Structure 3
Identifier:
�) Ll
Spillway?:
Designed Freeboard (in):
Observed Freeboard (in):
2
Structure 4 Structure 5
5. Are there any immediate threats to the integrity of any of the structures observed?
(i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on -site which are not properly addressed and/or managed through a
waste management or closure plan?
ANo ❑ NA ❑ NE
❑ No ❑ NA ❑ NE
Structure 6
❑ Yes t No
[—]Yes 19 No
❑ NA ❑ NE
❑NA ❑NE
If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR
7. Do any of the structures need maintenance or improvement? ❑ Yes pO No ❑ NA ❑ NE
8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes iJ(1 No ❑ NA ❑ NE
(not applicable to roofed pits, dry stacks, and/or wet stacks) '�"�
9. Does any part of the waste management system other than the waste structures require ❑ Yes b� No ❑ NA ❑ NE
maintenance or improvement?
Waste Application
10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes �0 No ❑ NA ❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.)
❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area
12. Crop Type(s):
13. Soil Type(s):
14. Do the receiving crops differ from those designated in the CAWMP?
15. Does the receiving crop and/or land application site need improvement?
16. Did the facility fail to secure and/or operate per the irrigation design or wettable
acres determination?
17. Does the facility lack adequate acreage for land application?
18. Is there a lack of properly operating waste application equipment?
Reauired Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available?
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check
the appropriate box.
❑ WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements
❑ Yes No
❑ Yes No
❑ Yes No
❑ Yes No
❑ Yes No
❑ NA ❑ NE
❑ NA ❑ NE
❑ NA ❑ NE
❑NA ❑NE
❑NA ❑NE
❑ Yes No ❑ NA ❑ NE
❑ Yes No ❑ NA ❑ NE
❑ Other:
21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes 0 No
❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers
❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rainfall Inspections
22. Did the facility fail to install and maintain a rain gauge? ❑ Yes No
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes No
❑ NA ❑ NE
❑ Weather Code
❑ Sludge Survey
❑NA ONE
❑ NA ❑ NE
Page 2 of 3 21412015 Continued
Facie • Number: tf Date of Inspection:
24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes No ❑ NA ❑ NE
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes No ❑ NA ❑ NE
the appropriate box(es) below.
❑ Failure to complete annual sludge survey [:]Failure to develop a POA for sludge levels
❑ Non -compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance:
26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes No ❑ NA ❑ NE
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No NA ❑ NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes NNo ❑ NA ❑ NE
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern?
If yes, contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the
permit? (i.e., discharge, freeboard problems, over -application)
31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below.
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
❑ Yes �yNo ❑ NA ❑ NE
❑ Yes X No ❑ NA ❑ NE
❑ Yes XNo ❑ NA ❑ NE
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP?
❑ Yes
No ❑ NA
❑ NE
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative?
❑ Yes9No
No ❑ NA
❑ NE
34. Does the facility require a follow-up visit by the same agency?
❑ Yes
❑ NA
❑ NE
Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments.
Use drawings of facility to better explain situations (use additional pages as necessary).
— 9b htu�es
Reviewer/Inspector Name: Phone:
Reviewer/Inspector Signature: Date: 3 L0