Loading...
HomeMy WebLinkAboutWQ0040760_Application (FTSE)_20190409B U R T 0 N E N O I N E E B I N C. TRANSMITTAL Attention: Water Quality Section Company: Mooresville Regional Office Address: 610 E. Center Avenue Mooresville, NC 28115 Phone #: 704-663-1699 From: Matthew Graham Project Name: Aspire Huntersville Education Village Project Number: 018-729.001 Date: 2019.03.29 AP5 -I 2'M - Burton Engineering Associates Re: Private Sanitary Sewer Fast Track Application Package Via: RUPS ❑USPS ❑Courier ❑Hand Deliver ❑Pick Up Copies Date Pages Description 1 03/28/2019 8 NCDEQ SS FTA Application (Private) 1 03/28/2019 17 Sealed Pump Station Design Calculations 1 03/28/2019 1 CLTWater Flow Acceptance (Private) 1 03/28/2019 1 Cover Letter for NCDEQ SS Submittal 1 03/28/2019 1 USGS Map 1 03/28/2019 1 Aspire Carolinas Foundation NC Secretary of State Filing 1 03/28/2019 1 Check to NCDEQ for $480.00 ❑ As Requested R For Approval ❑ For Your Use R For Review and Comment If you have any questions concerning this information, please contact Burton Engineering Associates by calling (704) 553-8881 or by emailing mgraham@burtonengineering.com Sincerely, Matthew Graham Burton Engineering Associates PLEASE NOTIFY AT ONCE IF ALL ENCLOSURES ARE NOT INCLUDED 5950 Fairview Rd STE 100 * Charlotte, NC 28210 * 704.553.8881 B U R T 0 N E N G t N F[. RI NG COVER LETTER Project Name: Aspire Huntersville Education Village Project Location: Project Number: From: Date: Subject: 11414 Beatties Ford Rd, Town of Huntersville, North Carolina 018-229-001 Carlton Burton, PE — Burton Engineering Associates March 28, 2019 DWR Fast Track Sewer System Extension Application (FTA 04-16) —Private APR -1 Aspire Carolinas Foundation, Inc is proposing the construction a K-8 school campus in the Town of Huntersville, North Carolina off Beatties Ford Rd. The site is proposed to be served by 29 LF of new private 8" gravity, two new private sanitary sewer manholes, 1,624 LF of new private 2" PVC force main, and a proposed private wet well pump station. Three 4" PVC gravity sewer laterals (not to be permitted) will branch out from the permitted sanitary sewer manhole to serve the school buildings. The proposed system will connect to a proposed public sanitary sewer manhole located on the south side of Platon Ave. Private Sewer to be Permitted: • 29 LF of Private 8" PVC Gravity Sewer • 1,624 LF of Private 2" PVC Force Main Sewer • 2 Private Sanitary Sewer Manholes • 1 Private Wet Well Pump Station Attached Application Documents • FTA 04-16 • Site Maps • Pump Station Calculation Package • Articles of Incorporation Filing • Check for Application Fees • Flow Acceptance Form • Power Reliability Plan • Construction Plans If you have any questions concerning this information, please contact me at (204) 553-8881 or by email at CBurton@BurtonEngineering.com. Sincerely, 3 Carlton Burton, PE 5950 Fairview Rd STE 100 1 Charlotte, NC 28210 1 204.553.8881 State of North Carolina Department of Environmental Quality Division of Water Resources 15A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION 'Division of Water Resources FTA 04-16 & SUPPORTING DOCUMENTATION Application Number: �W Q% (to be completed by DwR) APR .— I %plc, All items must be completed or the application will be returned I. APPLICANT INFORMATION: 1. Applicant's name: Aspire Carolinas Foundation, Inc (company, municipality, HOA, utility, etc.) 2. Applicant type: ❑ Individual ® Corporation ❑ General Partnership ❑ Privately -Owned Public Utility ❑ Federal ❑ State/County ❑ Municipal ❑ Other 3. Signature authority's name: Jennifer Nichols per 15A NCAC 02T 0106(b) Title: Executive Director 4. Applicant's mailing address: 91 Hubbard St City: Belmont State: NC Zip: 28012- 5. Applicant's contact information: Phone number: (104) 651-4811 Email Address: jennifer@aspirecarolinas.org II. PROJECT INFORMATION: 1. Project name: Aspire Huntersville Education Village 2. Application/Project status: ® Proposed (New Permit) ❑ Existing Permit/Project If a modification, provide the existing permit number: WQ00_ and issued date: If new construction but part of a master plan, provide the existing permit number: WQ00_ 3. County where project is located: Mecklenburg 4, Approximate Coordinates (Decimal Degrees): Latitude: 35.376517' Longitude:-80.907266' 5. Parcel ID (if applicable): 01515143 & 01515113 (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: 1. Professional Engineer: Carlton Burton License Number: 12557 Firm: Burton Engineering Associates, Firm #C-1157 Mailing address: 5950 Fairview Rd, st100 City: Charlotte State: NC Zip: 28210- Phone number: (704) 553-8881 Email Address: cburton@burtoneng.com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: McDowell Creek Owner Name: CLTWater Permit Number: NC00036277 V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF): 1. Permit Number(s): WQ_ Downstream (Receiving) Sewer Size: _ inch System Wide Collection System Permit Number(s) (if applicable): WQCS_ Owner Name(s): FORM: FTA 04-16 Page 1 of 5 VI. GENERAL REQUIREMENTS 1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? ❑ Yes ❑No ®N/A 2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational (FORM: DEV) been attached? ❑ Yes ❑No ®N/A 3. If the Applicant is a Home/Prouty Owners' Association, has an Operational Agreement (FORM: HOA) been attached? ❑ Yes ❑No ®N/A 4. Origin of wastewater: (check all that apply): ❑ Residential Owned ❑ Retail (stores, centers, malls) ❑ Car Wash ❑ Residential Leased ❑ Retail with food preparation/service ❑ Hotel and/or Motels ® School / preschool / day care ❑ Medical / dental / veterinary facilities ❑ Swimming Pool /Clubhouse ❑ Food and drink facilities ❑ Church ❑ Swimming Pool/Filter Backwash ❑ Businesses / offices / factories ❑ Nursing Home ❑ Other (Explain in Attachment) 5. Nature of wastewater: 100 % Domestic/Commercial % Commercial % Industrial (See 15A NCAC 02T .0103(20)) ),Is there a Pretreatment Program in effect? ❑ Yes ® No 6. Has a flow reduction been approved under 15A NCAC 02T .0114(00 ❑ Yes ® No ➢ If yes, provide a copy of flow reduction approval letter 7. Summarize wastewater generated by project: Establishment Type (see 02T.0114(f)) Daily Design Flow a,s No. of Units Flow Student 15 gal/day 749 11235 GPD Employee 25 gal/day 108 2700 GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD Total 13935 GPD a See 15A NCAC 02T .0114(b), (d), (e)(1) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-4). b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.01141 shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 13935 GPD (per 15A NCAC 02T .0114) ➢ Do not include future flows or previously permitted allocations If permitted flow is zero, indicate why: ❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line ❑ Flow has already been allocated in Permit Number: ❑ Rehabilitation or replacement of existing sewer with no new flow expected ❑ Other (Explain): FORM: FTA 04-16 Page 2 of 5 VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers): 1. Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material 8 19 PVC 8 10 PVC ➢ Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria ➢ Section III contains information related to minimum slopes for gravity sewer(s) ➢ Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC VIII. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pump Stations/Force Mains): COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROTECT 1. Pump station number or name: PR Pump Station 2. Approximate Coordinates (Decimal Degrees): Latitude: 35.376517' Longitude:-80.9072660 3. Design flow of the pump station: 0.0360 millions gallons per day (firm capacity) 4. Operational point(s) of the pump(s): 10 gallons per minute at 78 feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material 2 1674 PVC 6. Power reliability in accordance with 15A NCAC 02T .0305(h)(1): ❑ Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(1)(B). ➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day ➢ Must be permanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per day: ® Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T .0305(h)(1)(C) or ❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C): ➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station. ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. FORM: FTA 04-16 Page 3 of 5 IX. ' SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T.0305(f)): 1. Does the project comply with all separations found in 15A NCAC 02T.0305(f) & (s) ® Yes ❑ No ➢ 15A NCAC 02T.0305(f) contains minimum separations that shall be provided for sewer systems: Setback Parameter* Separation Required Storm sewers and other utilities not listed below (vertical) 24 inches Water mains vertical -water over sewer including in benched trenches) 18 inches Water mains (horizontal) 10 feet Reclaimed water lines vertical - reclaimed over sewer) 18 inches Reclaimed water lines (horizontal - reclaimed over sewer) 2 feet **Any private or public water supply source, including any wells, WS-I waters of Class I or Class II impounded reservoirs used as a source of drinking water 100 feet **Waters classified WS (except WS-1 or WS-V), B, SA, ORW, HQW, or SB from normal high water (or tide elevation) and wetlands (see item IX.2) 50 feet **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches 10 feet Any building foundation 5 feet Any basement 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any swimming pools 10 feet Final earth grade (vertical) 36 inches ➢ 15A NCAC 02T.0305(e) contains alternatives where separations in 02T.0305(f) cannot be achieved. ➢ **Stream classifications can be identified using the Division's NC Surface Water Classifications weboaee ➢ If noncompliance with 02T.0305(t) or (e). see Section X of this application 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) ❑ Yes ❑ No ® N/A ➢ See the Division's draft separation requirements for situations where separation cannot be meet ➢ No variance is required if the alternative design criteria specified is utilized in design and construction ➢ As built documents should reference the location of areas effected 3. Does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? ❑ Yes ❑ No ® N/A ➢ This would include Trout Buffered Streams per 15A NCAC 2B.0202 4. Does the project require coverage/authorization under a 404 Nationwide or ❑ Yes ® No individual permits or 401 Water Quality Certifications? ➢ Information can be obtained from the 401 & Buffer Permitting Branch 5. Does project comply with 15A NCAC 02T.0105(c)(6) (additional permits/certifications)? ❑ Yes ® No Per 15A NCAC 02T.0105(c)(6), directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 6. Does this project include any sewer collection lines that are deemed "high -priority?" Per 15A NCAC 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. ❑ Yes ® No ❑ N/A ➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FORM: FTA 04-16 Page 4 of 5 X. ' CERTIFICATIONS: I. Does the submitted system comply with 15A NCA T, lhgdimm um Dgg rC ritep J,, r the Per and Forg Mang; Imo, tay 4;dnL and the Gravy__Sewer Mmigfm Des g+, n Criteri4 latest 6y aloft as ® Yes ❑ No If No, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for review. Approval of the request is required prior to submittal of the Fast Track Application and supporting documents 2. Professional Engineer's Certification: Carlton Burton, PE _...__ attest that this application for (Professional Engineer's name from Application Item 111.1.) has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my'signature and seat signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE. In accordance with General Statutes 143 215.6A and 143-215.613, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. North Carolina Professional Engineer's seal, signature, and date: SEAS, r 12S57 I�C9..'..P....^:7Ttv`a��vv��*/ aGINE�.- 0�- L Z'��'\4��141'VTg\3......3. Applicant's Certification per 15A NCAC 02T .0106(p 1, attest that this application for (Signature Authority's name &•tale from Application Item L3 ) has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE- In accordance with General Statutes 14-121$ 6A and 14-3 23.613, any person who knowingly makes any false statement, representation, or certification in anry application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. Signature: 9111t I 1� Date: March 28, 2019 FORM: FTA 04.16 Page 5 of 5 APR V�" "'I State of North Carolina Department of Environmental Quality Division of Water Resources ADIVIslan of Water Resources Flow Tracking for Sewer Extension Applications (FTSE 10-18) Entity Requesting Allocation: Button Engineering Project Name for which flow is being requested: ASPIRE Huntersville Education Village More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: McDowell Creek WWTP b. WWTP Facility Permit #: NC0036277 c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used A11 flows are in MGD 12.0 0.651 5.033 0,013935 5.698 47.5 II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Pump Average Approx. Not Yet Total Current Station Station Firm Daily Flow** Current Tributary Flow Plus (Name or Permit Capacity, * (Firm / pf), Avg. Daily Daily Flow, Obligated Available Number) No. MOD MGD Flow, MGD MGD Flow Capacity*** * The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): Unknown Downstream Permit Number: Unknown Page 1 of 6 FTSE 10-18 III. Certification Statement: 1 Keri Cantrell certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. A., (3 2/12/2019 Signing Official Signature Date Chief Engineer Title of Signing Official Page 2of6 FTSE 10-18 44" pud tla"��� ttc'1N,itM�"�� �q a ama a ,Y(,d+s Fyy,MRp cv Approximate Site Location Y 2ix5 antaVon Center )tar Center ga h; t bra nII m vgr 2000 ft r SITE VICINITY PLAN ASPIRE BEATTIES FORD ROAD AND HAMBRIGHT ROAD HUNTERSVILLE, NORTH CAROLINA PROJECT NO.: 1335-19-010 Aspire - HEV Wastewater Pump Station Force Main Design Calculations B U R T U N E N G I N E E P I N G Project Name: Aspire - HEV Location: Huntersville Designed By: CTB Checked By: CTB Date: 3/25/2019 Project No.: SEAL ` 12557GINS Jtf ,ry"�T.t9t���2 Independence Crossing Wastewater Pump Station Force Main Project Summary Project Name: Aspire - HEV Average Daily Flow (gpm): 3.82 Pump Operational Point No. 1 (gpm@tdh): 28gpm @ 48 TDH Pump Operational Point, No. 2 (gpm@tdh): Pump Manufacturer: Barnes Model Number: XSGV-L Impeller Diameter. 5.00" Horse Power: 2 Voltage: 230 V 1 Ph Force Main Diameter (in): 2" Force Main Length (ft): 1750 "All Pumps On" conditioi "All Pumps Off' conditio a a � v a o t C 7 � Ca a a 9 "e P � w— e y O .C4 � WW DEL yy Yg 6 cs pa p wo G U 3-i R y Y Uq � N 3� e° y =e 7 Cr m A yC 1 4 � o m n a A Q N �t a 0 0 O m m a ,° n . .q9 m — q� 3 •3 pA ^]q� 3 5 C C U i4 2 J,' y A O 4 a 5 g ? $ A o 3 's v sp,6n sgge g n m o o e 3• &" S �� 9 a ° ° .9 g�g � � � .. r s ` •9 Es B s .e .g� � � � � 9 a �Oo o z ti ti ti t� t� a b U o� '� [c c� i� � chi > S w 6 V U P y �x e e< e a a eeeeevaeeee<veveveeveveeeveeeveee .a 0 0 0 0 0 0 0 00000000000000000000000000a00000 Q U vm, U a 2 O U a o �wz �H° a E-� y r. Vi "e N 3 fee x � x °d u G IA S F 3000005 GCF w �x V A n°w 7xxu q ow"wd tirlxwr ffi ° a �9���z.�oaa�oza2axa���ti(�ooy��'y�� N¢m W U kD Design Pumping Flow Rate Peaking Factor Calculation Service Area Population = 30,000 FOR RESID. APPLICATIONS (SETPOP. AT 30KFOR COMM. USES) Peak Factor = 18 + 4P 4+4P Calculated Peak Factor = 2.5 Design Peak Factor = 2.5 Determine Minimum Pump Rate Average Daily Flow = 13,935 GPD Peak Flow= 34838 GPD Minimum Pumping Rate Required = 24 GPM Design Pumping Rate = 25 GPM 0 Cycle Time & Wet Well Geometry Target Cycles Per Hour ADF = 10 gpm Pumping Rate = 25 gpm Time = 20.0 min. Cycles Per Hour = 3.0 Check Cycles Per Hour: OK Check Cycles Per Hour: OK Determine Wet well Diameter Required Volume = Pick Wet Well Diameter = Pick Wet Well Cycle = Volume in Cycle = 119 jFt 5.0 1.0 147 Vertical Datum Used: JNAVD 88 Determine Wet Well Invert & Float Elevations Wet well Dia. = 5.0 Ft Top Elev= 714.50 I Gnd Elev= 714.00 SS Invert In= 706.00 Alarm = 700.75 TOTAL HT 1 Lag On = 699.75 17.50 1 Lead On =i 698.75 1.0 Pumps Off, 697.75 min. sub.(per mfr) 0.75 Bottom Invert Elev*=1697.00 *As required for complete submergence (a Force Main & Piping Design Off -Site Force Main Data Design Pump Rate (gpm) = 25 Select Force Main Size (in) =� Velocity (fps) = 2.55 Meets Minimum Velocity Requirement? OK Meets Maximum Velocity Requirement? OK Required Pump? Consider Grinder Pump Line Length (ft) = 1,750 Account for Minor Losses = 5% Equiv Length (ft) = 1,838 Connection Point.Nw MH at Prop. Line High Pt.— 723 Inv PS= 697.5 Hs= 25.5 Pump Station Piping Data Design Pump Rate (gpm) = Pick Wet Well & Valve Vault Piping Size (in) = Velocity (fps) = Meets Minimum Velocity Requirement? Meets Maximum Velocity Requirement? 25 1.25 6.54 OK> 2 FPS OK < 8 FPS Item Number of Fittings L/D Ratio Equivalent Length 45 bend 90 bend 22.5 bend Branch Tee Flow Check valve Plug Valve 2 16 3.33 2 30 6.25 0 9 0.00 1 60 6.25 11 135 14.06 1 17 1.77 0.00 0.00 0.00 Equivalent Fitting Length (ft) = Wet Well & Valve Vault Piping Length (ft) = Total Equivalent Pump Station Pipe Length (ft) = Equivalent Off -Site Diameter Length (ft) = 32 20 52 509 Total Equivalent Force Main Length (ft) = 2346 Pump Selection Force Main Diameter (in) = 2 Equivalent Force Main Length (ft) = 2346 Hazen -Williams C Factor= 140 Minimum Required Pump Rate (GPM) = 24 Design Pumping Rate (GPM) = 25 Pressure Head at Connection Pressure Head "Only Proposed L0nII:TDH at Connection Pump Station Static Head "All On" Pump Head GPM "All On" (feet) On" (feet) (feet) TDH (feet)Velocity (fps) (feet) 0 0 0 25.5 26 26 0.0 82.0 10 " 0 0 25.5 32 1.0 76.0 20 0 0 25.5 4S 2.0 70.0 30 0 0 25.5 74 M1O 3.1 65.0 40 0 0 25.5 108 4.1 57.0 50 0 0. 25.5 151 151 11 5.1 L 8.0 mp Manufacturer: Barnes Model Number: XSGV-L npeller Diameter: 5 Horsepower: Voltage: 230V 1 Phase a nn.nw_..oanon....aoo...nnn annnna._.nnuo..nonnnom mnn..no ..n.n..u.•.n.....p.pnnn. nnno:w_.�uunonnan ........aoonnu.w_..00no.o.o nnn..'.,.n..nnnnnO..n.n...n. ..O..n..nY.•.�\..I'm .......Y.....n... "a oniiiiiii �iiii Mo... FEMME I 0iiiiiiii::.��:iiiiiiiiii:i nnmmnnnnh..�n.......w...n.nn........... mm�.-.nno.mnunh_va .annao..a:.nnu.v..nnannno �nnnn..r.uum.o.nn.. nnnnnn.a_ gnnnmmnY.vnnnh.\o n. unnn .m o:,�nnnnn. ..n.. _1 mnnn\nY..unm, mm�oh.�.mmonmonon. omunn mm�nnn onm n m no.._..�nnuunn.w:•u.nn.ua...nnonmuono. nnnn. •.�mm�nnn.aunnnm:mm\�.mm�m u. n..,�n\Y:�qunn.n.n.nn..nn\: .� .n..uaaoa.vonnnaw.omw.omom on.rnnnnn ..n�.n.n...s..auman . .....Y.J....nn.n :. .... ............ .. .... .. MOON! nn.0027moso I no gon ::i\. munnYC-.�nh[.O.w�n...nw]........L .nnnn.: vmn\�nnnnn in.onnn ni..-.nh.,p.aumggqm,onnonnuu i.n .._ "'�n.h.n�uwzvmnn.o:v.nn..v.mnn.nn .n]gn.w_.n.J.nn..nnnnY9nnnnnnn ............0.. ' nmm\Y.nnnm\.,nu. on.no.n.amau.:.mvoo:.anwnou.a.un.om mm�nunnomnm:..nwnnw. vn:mm:vmn.�unnnm. nnw ann�nnmm .nn ..:np.n.:n.\aiu:.zn.: annnmom nn..... mn.n..nvnonn:n�.nwraham:.unvnnvaom ... ....._ IME 0 w_vh.on.omamnm n.uunuuuvunnu...�.n.no:.nwau...nunvna ...o....00.......nnn.� nnomnunomun.n.n: q.�.\:.O\:..\.9.\J...n.n.... a w�.nwv.:,n.voonnn nn.mnnn.omunnn.n\.-io: iiiiiiii� v.w.ncvwnomnn d U E N U C 0 L 0 LL a c R Q. E IL E > V1 C 0 d co = C 0 C. z E _ a � a a N �f#r O o 0 O O O O O O T W rl (D � V m N ci 0 O O O O O N O OD fD (ld) HU1 In m 0 rl No O O O O V N I Station Operation Check Proposed Operational Point No.l C=140 NEW 33 GPM @ 82 TDH Check Wet well Cycle Times Wet well Wet well Wet well Wet well Diameter Area Cycle Volume (feet) (gal / VF) (ft) (gal) 5.0 147 1.0 147 Fill = Wet well Volume = ADF Run = Wet well Volume = Pump Rate - ADF 15.2 minutes 6.3 minutes Total = 21.5 minutes Cycle Time = 2.8 Cycles / Hour Meets Minimum Cycle Time? OK Meets Maximum Cycle Time? OK Station Operation Check Proposed Operational Point No. 2 C=120 OLD 34.5 GPM @ 111 TDH Check Wet well Cycle Times Wet well Wet well Wet well Wet well Diameter Area Cycle Volume (feet) (gal / VF) (ft) (gal) 5.0 147 1.0 147 Fill = Wet well Volume = 15.2 minutes ADF Run = Wet well Volume = 5.9 minutes Pump Rate - ADF Total = 21.1 minutes Cycle Time = 2.8 Cycles / Hour Meets Minimum Cycle Time? OK Meets Maximum Cycle Time? OK QN Buoyancy Calculations concrete wet well Wet well Outside Dimensions 6.00 Feet Wet well Inside Dimensions 5.00 Feet Wet well Top Slab Elevation 714.50 Feet Wet well Invert Elevation 697.00 Feet Extended Base Slab Diameter 8.00 Feet Extended Base Slab Thickness 1.00 Feet Top Slab Thickness 0.50 Feet Calculate Total Volume of Wet well Structure Volume of Wet well Riser Sections= 495 jcf Volume of Wet well Extended Base= 50 cf Total Volume of Wet well Structure-1 545 Jcf Calculate Total Volume of Water Displaced H2O Displaced = (Volume of Wet well Structure) * (62.41bs/cf) H2O Displaced= 33995 lbs Calculate Submerged Weight of Wet well Components Section Total Rt Weight Top Slab Thickness (ft.) 0.50 1 1238 Riser - Total Vertical Ft. 17.50 13244 Base Slab Thickness (ft.) 1.00 4403 Totals= 19 18886 Total Weight of Concrete in Wet well= 18886 lbs. Calculate Weight of Soil Above Extended Base/Footing Total Area of Extended Base 50 sf Total Area of Wet well Riser 28 sf Area of Extended Base less Wet well 22 sf Height of Soil Above Extended Base 23 ft Volume of Soil Above Extended Base 506 cf Weight of Soil Above Extended Base (estimated) 50 lbs/cf Total Weight of Soil Above Extended Base 25290 lbs/cf Flotation Protection Required? Weight of Concrete and Weight of Soil Above Extended Base:PNqO lbs Weight of Water Displaced By Wet Well: lbs Flotation Protection Required? (9 Buoyancy Calculations fiberglass wet well Wet well Outside Dimensions 9.00 Feet Wet well Inside Dimensions 8.00 Feet Wet well Top Slab Elevation 50.50 Feet Wet well Invert Elevation 27.00 Feet Extended Base Slab Diameter 11.00 Feet Extended Base Slab Thickness Top Slab Thickness Calculate Total Volume of Wet well Structure Volume of Wet well Riser Sections=1 1494 jcf Volume of Wet well Extended Base=l 95 jef Total Volume of Wet well Structure 1589 jcf Calculate Total Volume of Water Displaced H2O Displaced = (Volume of Wet well Structure) * (62.4 lbs/cf) H2O Displaced= 99168 lbs Calculate Submerged Weight of Wet well Components Section Total Ht Weight Top Slab Thickness (ft.) 0.50 2786 Riser - Total Vertical Ft. 23.50 27486 Base Slab Thickness (11.) 1.00 8325 Totals= 25 38597 Total Weight of Concrete in Wet well= 38597 lbs. Calculate Weight of Soil Above Extended Base/Footing Total Area of Extended Base 95 sf Total Area of Wet well Riser 64 sf Area of Extended Base less Wet well 31 sf Height of Soil Above Extended Base 23 ft Volume of Soil Above Extended Base 723 cf Weight of Soil Above Extended Base (estimated) 50 lb: Total Weight of Soil Above Extended Base 36128 lbE Flotation Protection Required? Weight of Concrete and Weight of Soil Above Extended Base: IYES lbs Weight of Water Displaced By Wet Well: lbs Flotation Protection Required? Reliability Calculations If Qadf is less than 15000 gpd, the portable power/servics options are avaialable subject storage equal to or greater than the response time agreed to by the Maintenance provider. Qadf= 13,935 gpd 9.68 gpm PS Dia= 5 ft. (ID) Response Vol CF Vol al Available (hrs) Volume per VF of LS 19.63 CF Inv. PS 697.00 Min Subm. 0.75 El. At Pump Off 697.75 Invert in from sewers 706.00 Top of PS elev 714.50 Station Depth= 17.50 Building Sewer Lateral Information All laterals drain from buildings to Ml all Bld'g sewer laterals start at -2.5 BFF. 161.99 1211.66 2.09 328.88 2460.04 4.24 FFE LL._. In o e Fall Inv cP bld'g Liu Ext SITne Fall Inv a MH Bld'g 1 715.1 n/a 0.02 0.00 712.6 200 0.010 2.00 710.60 (crawl) Bld'g 2 715.1 60 0.01 0.60 712 832 0.006 4.99 707.01 Bld'g 3 715.1 440 0.01 4.40 708.2 45 0.006 0.27 707.93 SOSID: 1638286 Date Filed: 11/16/2017 1:56:00 PM Elaine F. Marshall North Carolina Secretary of State C2017 313 00733 Stale of North Carolina Department of the Secretary of State ARTICLES OF INCORPORATION NONPROFIT CORPORATION Pursuant to §35A-2.02 of the General Statutes of North Carolina, the undersigned corporation does hereby submit these Articles of Incorporation for the purpose of forming a nonprofit corporation. 1. The name of the nonprofit corporation is: Aspire Carolinas Foundation, Inc. 2. 7✓ (Check only if applicable.) The corporation is a charitable or religious corporation as defined in NCGS §55A-1-40(4). I The name of the initial registered agent is: Jennifer R. NICh015 4. The street address and county of the initial registered agent's office of the corporation is: Number and Street: 91 Hubbard St. City: Belmont State: N_ Zip Code: 28012 County: Gaston The mailing address ifdifferenl front the street address of the initial registered agent's office is: Number and Street or PO Box: City: State: NCB Zip Code: County: 5. The name and address of each incorporator is as follows: Name Address Jennifer R Nichols 91 Hubbard St., Belmont, NC 28012 6, (Check either "a" or'-b" below,) aLt fhe corporation will have members. b[l'he corporation will not have members. 7. Attached are provisions regarding the distribution of the corporation's assets upon its dissolution. 8. Any other provisions which the corporation elects to include are attached. 1l0SIN1'.SS l(LOISTRA"f WN I)WISION p. 0. 80X 29622 RALLIGI-1. NC 276264)622 rRerised.fagun, 20171 /4u•e0'-01 9. The street address and county of the principal office of the corporation is: Principal Office Telephone Number: 704-651-4811 Number and Street 91 Hubbard St. Cary. Belmont state: NC Zip Code:28012 County: Gaston The mailing address jfdifferent from the street address of the principal office is: Number and Street or PO Box: City: State: Zip Code: County: 10. (Optional): Listing, of Officers (See instructions for why this is imoortantl Name Address Title Marty McCarthy 4205 Quail Hunt Lane Chair, Board of Directors Charlotte, NC 28226 Barksdale Halton 1530 Queens Rd, PH 1 Vice Chair, Board of Charlotte, NC 28207 Directors Privacy Redaction11. (Optional): Please provide a business e-mail a The Secretary of State's Office will e-mail th when a document is filed. The e-mail provided will not be viewable on the website. For more information on why this service is being offered, please see the instructions for this document. 12. These articles will be effective upon filing, unless a future time and/or date is specified: This is the g day ofNovember 2017 Jen 's nanre and NOTES: I. Filing fee is $60. This document must he tiled with the Seerelary ol'Statc. Director Bt1SlNUSS REGISTRATION DIVISION P.O. BOX 29622 RALEIGH. NC 27626.0622 /Revised August 26171 Farm :A-01 Addendum of provisions regarding the distribution of the Aspire Carolinas Foundation, Inc. assets upon its dissolution. Distributions Upon Dissolution Upon the dissolution of the corporation, the Board of Directors shall, after paying or making provision for the payment of all of the liabilities of the corporation, dispose of all of the assets of the corporation exclusively for the purposes of the corporation in such manner, or to such organization or organizations organized and operated exclusively for the religious, charitable, educational, scientific or literary purposes as shall at the time qualify as an exempt organization or organizations under Section(c)(3) of the Code as the Board of Directors shall determine. The preferred organization would be the Dale Halton Foundation, Charlotte, NC, if still in existence. Any such assets not so disposed of shall be disposed of by the Superior Court of the county in which the principal office of the corporation is then located, exclusively for such purposes or to such organizations, such as the court shall determine, which are organized and operated exclusively for such purposes, or to such governments for such purposes. North Carolina Secretary of State Search Results Page 1 of 1 • Upload a PDF Filing • Order a Document Online • Add Entity to My Email Notification List • View Filings Non -Profit Corporation LegaL Name Aspire Carolinas Foundation, Inc. Information Sosld: 1638286 Status: Current -Active Citizenship: Domestic Date Formed: 11/16/2017 Registered Agent: Nichols, Jennifer R Addresses Principal Office 91 Hubbard St. Belmont, NC 28012 Reg Office 91 Hubbard St. Belmont, NC 28012 Reg Mailing 91 Hubbard St. Belmont, NC 28012 https://www.sosnc.gov/online_services/search/Business_Registration—Results 4/3/2019