HomeMy WebLinkAboutNC0004979_Other Correspondence_20190404 tDUKE Allen Steam Station
ENERGY® 253 Plant Allen 2
Belmont, NC 28012
April 4, 2019
Linda Culpepper, Director
North Carolina Division of Water Resources
1617 Mail Service Center
Raleigh, NC 27699-1616
REC tVEa'DEN►R/DWR
Subject: Duke Energy Carolinas, LLC APR O
Allen Steam Station 8 2019
Special Order by Consent Water Resources
EMC SOC WQ S 17-009 Perrniflsng Section
Completion Notification
Dear Ms. Culpepper:
In accordance with the NC Environmental Management Commission Special Order by Consent,
EMC SOC WQ S 17-009, Duke Energy Carolinas, LLC. (Duke) is hereby submitting this
notification that construction of the Dry bottom ash handling conversion project was completed
on March 31, 2019. This notice fulfills our obligation found in the subject Order's Section 2.b.
If you have any questions, please contact Elizabeth Glenn (980) 373-053).
I certify, under penalty of law, that this document and all attachments were prepared under my
direction or supervision in accordance with a system designed to assure that qualified personnel
properly gather and evaluate the information submitted. Based on my inquiry of the person or
persons who manage the system, or those persons directly responsible for gathering the
information, the information submitted is, to the best of my knowledge and belief true, accurate,
and complete. I am aware that there are significant penalties for submitting false information,
including the possibility of fines and imprisonment for knowing violations.
Sincerely,
Terry W. Tuck
General Manager II
Fossil/Hydro Operations - Carolinas Coal Generation
Page 2
Cc: Bob Sledge
NC Division of Water Resources
1617 Mail Service Center
Raleigh, NC 27699-1617
Mr. Corey Basinger- Regional Office Supervisor NC DWR
610 East Center Avenue,
Suite 301
Mooresville, NC 28115
SME/FileNet
Shannon Langley—via email
UPS Tracking: Raleigh (LC): 1Z X67 601 24 9315 4735
Mooresville (CB): 1Z X67 601 24 9352 2757
Raleigh (BS): 1Z X67 601 24 9122 8347