Loading...
HomeMy WebLinkAboutNC0004979_Other Correspondence_20190404 tDUKE Allen Steam Station ENERGY® 253 Plant Allen 2 Belmont, NC 28012 April 4, 2019 Linda Culpepper, Director North Carolina Division of Water Resources 1617 Mail Service Center Raleigh, NC 27699-1616 REC tVEa'DEN►R/DWR Subject: Duke Energy Carolinas, LLC APR O Allen Steam Station 8 2019 Special Order by Consent Water Resources EMC SOC WQ S 17-009 Perrniflsng Section Completion Notification Dear Ms. Culpepper: In accordance with the NC Environmental Management Commission Special Order by Consent, EMC SOC WQ S 17-009, Duke Energy Carolinas, LLC. (Duke) is hereby submitting this notification that construction of the Dry bottom ash handling conversion project was completed on March 31, 2019. This notice fulfills our obligation found in the subject Order's Section 2.b. If you have any questions, please contact Elizabeth Glenn (980) 373-053). I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Sincerely, Terry W. Tuck General Manager II Fossil/Hydro Operations - Carolinas Coal Generation Page 2 Cc: Bob Sledge NC Division of Water Resources 1617 Mail Service Center Raleigh, NC 27699-1617 Mr. Corey Basinger- Regional Office Supervisor NC DWR 610 East Center Avenue, Suite 301 Mooresville, NC 28115 SME/FileNet Shannon Langley—via email UPS Tracking: Raleigh (LC): 1Z X67 601 24 9315 4735 Mooresville (CB): 1Z X67 601 24 9352 2757 Raleigh (BS): 1Z X67 601 24 9122 8347