Loading...
HomeMy WebLinkAboutFINAL DEQ Response to Proposed IMP Changes_20190404ROY COOPER Governor MICHAEL S. REGAN Secretary LINDA CULPEPPER Director Paul Draovitch Senior Vice President Environmental, Health & Safety Duke Energy 526 South Church Street Mail Code EC3XP Charlotte, North Carolina 28202 NORTH CAROLINA Environmental Quality April 4, 2019 Subject: Response to the Optimized Interim Monitoring Plans (IMP) for 14 Duke Energy Facilities - Modification Request Annual Reports - Modification Request Dear Mr. Draovitch: On March 20, 2019, the North Carolina Department of Environmental Quality Division of Water Resources (Division) received the proposed Optimized IMP for 14 Duke Energy Facilities - Modification Request Annual Reports - Modification Request (Modification Request). This letter requested changes to direction provided to Duke Energy by the Division in the December 21, 2018 correspondence concerning the Optimized IMP along with proposed changes to the scope and/or reporting schedule for Interim Action Effectiveness Reports for the Asheville, Belews Creek, and Sutton facilities. Modification of Interim MonitoringPlan lans The Division has reviewed and hereby approves Modification Request for implementation of the Optimized IMPS apart from the following which require justification subject to approval. The following changes were noted from the previous optimized IMPs approved by the Division on December 21, 2018. • Asheville O Wells EXT-D and MW-8BR were moved from quarterly sampling to water level only. Please provide justification for this change. • Belews Creek O Wells AB-1BRD, AB-2BR, AB-2BRD, and AB-3BRD were removed from quarterly sampling. Please provide justification for this change. North Carolina Department of Environmental Quality I Division of Water Resources QE J 512 North Salisbury Street 1 1636 Mail Service Center I Raleigh, North Carolina 27699-1636 919.707.9000 • Roxboro o Wells ABMW-7BRLL, MW-01BRL, MW-108BRL, MW-205BRL, and MW-208BRL were removed from quarterly sampling. Please provide justification for this change. IMP Annual Monitoring Reports The Division has reviewed and hereby approves the Modification Request concerning the due dates for the IMP Annual Monitoring Reports. The due dates for these reports shall be as follows: • April 30, 2019 —Allen, Belews Creek, Cliffside, Marshall, Mayo, and Roxboro. • July 31, 2019 — Asheville, Buck, Cape Fear, Dan River, H. F. Lee, Riverbend, Sutton, and Weatherspoon. Interim Action Effectiveness Reports The Division has reviewed and hereby approves Modification Request concerning Interim Action Effectiveness Reports. The due dates for these reports shall be as follows: May 15, 2019 — Sutton July 31, 2019 — Asheville and Belews Creek Revisions to the tables in the Modification Request are expected based on the detailed review items documented in this letter unless compelling rationale is provided to substantiate these changes to the December 21, 2018 Optimized IMP direction. The Division may require changes to the content, format and schedule of the IMP Annual Monitoring Reports and Interim Action Effectiveness Reports after review of the pending submittals. If you have any questions, please contact Steve Lanter (Central Office) at (919) 707-3667. Sincerel , l Jon Risga a d, Chief Animal Feeding Operations and Groundwater Section cc: WQROS Regional Offices WQROS Central File Copy