Loading...
HomeMy WebLinkAboutFINAL DEQ Response to Proposed IMP Changes 4-04-19 Approved Sampling Summary AttachmentWells for Quarterly Monitoring (33) AB-2155* AB-25SS* AB-29SS* AB-32D AB-33D AB-33SS* AB-34S AB-35PW5* AB-38SS* AB-10BR*/ BRL* GWA-3 BRL* GWA-4BRL* GWA-SBRL* GWA-6BRL* CP-1S*/D* CP-2S*/D* CP-35*/D* CP-45*/D* CP-SS*/D* CP-6S*/D*/BR* BG-1BR* CCR-265* / D* / BR* CCR-16BR* Table 2.1- Allen Allen Steam Station - IMP Optimization Summary of Wells, Frequency, & Parameters (to begin Q12019) Comprehensive Water Level Sweep to occur Semi -Annually Modification - March 2019 Wells for Semi -Annual Monitoring! (103) AB-04S/D/BR GWA-055/D/BRA AB-06R GWA-06S / DA / BRA AB-09S / D AB-10S / D GWA-075 / D GWA-085 AB-13S/D GWA-09S/D/BR AB-14D / BR AB-205 / D GWA-145 / DA GWA-15S / D AB-21S/SL/D**/BRL GWA-195/D** AB-22S/D/BR/BRL GWA-22S/D GWA-23S/D** AB-24S/SL/D**/BR AB-25S/SL/BRU**/BR** GWA-24SA/D/BR AB-26S / D AB-30S AS-12S / D BG-01S / DA AB-32S BG-2S / D / 2BRA2 AB-335 AB-34D BG-3S / D BG-4S / D / BR AB-35S / D* * / BR GWA-16S/D AB-36S / D GWA-21S / DA / BR AB-375 / D GWA-26S / D AB-385 / D / BR AB-39S / D GWA-01S / D / BR Comprehensive Water Level Sweeps (includes wells in Semi- Annual, Quarterly, and Discontinued Monitoring Lists) GWA-02S / D GWA-03S / D / BRA GWA-045 / D / BR Optimized Quarterly & Seml-An nual Parameters for "Non -Hew Wells" 2018 CSA Update Cols (Total & Dissolved Where Applicable) Additional Water Quality Parameters (Total & Dissolved Where Applicable) _ Antimony _ _ Lithium Aluminum Arsenic Manganese _ Alkalinity (CO3/HCO3) Beryllium Molybdenum — — —� Calcium_ Boron—�_ Nickel Chloride W� Cadmium_ Selenium -Dissolved Oxygen (DO) Chromium (total) —Chromium — Strontium Re_d_ox Potential (Eh) (hexav_alent) Sulfate Magnesium_ Cobalt _ Thallium +Nitrite —-� Iron__ �_ _ Total Dissolved Solids (TDS) _ _Nitrate Oxidation -Reduction Potential (ORP) Vanadium —�—� pH --�_�-Potassium _�_-�-- �Specific Conductance Sodium —Total Organic Carbon (TOC) Temperature Turbidity Discontinue Sampling Wells/Water Level Only (23) AB-01R AB-02/D AB-05 AB-06A AB-11D AB-23S / BRU* AB-27S /D / BR AB-28S / D AB-29S / SL / D AB-30D AB-31S GWA-08D GWA-17S / D GWA-18S / D To Be Replaced No well replacements planned at this time GWA-6D Notes: IMP = Interim Monitoring Plan CSA= Comprehensive Site Assessment ON = Constituents of Interest LAMA=Coal Ash Management Act NCDEQ= North Carolina Department of Envrionmental Quality Semi -Annual monitoring events are scheduled to be performed concurrently with two Quarterly monitoring events per year and will Include the wells listed under Quarterly for respective events. *New wells installed as part of the CAMA program will be monitored quarterly. Samples from these wells will be analyzed for parameters formerly Included as part of the 4th Quarter 20181MP and additional constituents analyzed voluntarily (see Table 1). After four quarterly events, the monitoring frequency and/or parameter list for the new wells will be re-evaluated with NCDEQ and maybe reduced and/or optimized. Replacement wells will not be considered "new wells" and will follow the respective monitoring protocol for he well in which they replace; however, additional parameters may be included voluntarily. ** Denotes well was previously approved by DEQ to be sampled for boron and sulfate only in historic versions of the IMP due to elevated pH. Respective well is proposed to remain a boron -and -sulfate -only sample location; however, if the pH improves with redevelopment to fa115 8.5 at such well, the well will be sampled for the complete appropriate parameter suite for that well; Le. "optimized non -new well" or "new well" lists as proposed herein. Wells for Quarterly Monitoring (32) AS-MDx A -025x 1 SLx I Dx LZR" x x AB-045 / BRL AB-05S AB-09BRA AB-10Sx / Dx / BRx / BRLx AS-015x / Dx AS-02Dx AS-03Sx / Dx BG-01DA GWA-01S .GWA-09S / D / BRA GWA-10S / D GWA-14D GWA-15BR M W-01D MW-08BRA MW-11BRL Table 2.4 - Buck Buck Steam Station - IMP Optimization Summary of Wells, Frequency, & Parameters (to begin Q12019) Comprehensive Water Level Sweep to occur Semi -Annually Wells for Semi -Annual Monitor Lngl(74) AB-04SL M W-06BR AB-OSSL MW-07S / D MW-085 / D AB-06BRU AB-07S /BRU MW-09S / D AB-8S/BRU MW-11S/D/BR AB-09S / BRUA BG-01S / BRA M W-125 / D M W-13D BG-02S / D GWA-145 / D BG-03S/BRU GWA-15S/D GWA-01D GWA-165/D/BR GWA-02S/BRA /BRU MW-OSS/D GWA-11S / D GWA-12S/BRU GWA-13SR/D GWA-7S / D GWA-8D GWA-9S/D GWA-14S GWA-18S GWA-15S / D GWA-20S Comprehensive Water LevelSweeps (includes wells in Semi - Annual, Quarter& and Discontinued Monitoring Lists) GWA-16S / D/ BR GWA-17S GWA-18S/DA GWA-19S/D GWA-20S / D M W-03S / D MW-04S / D M W-SS / D Optimized Quarterly & Semi -Annual Parameters for "Non -New Wells" (Total & Dissolved Where Applicable) Antimony Arsenic_ Barium Iron Manganese Nickle Aluminum Alkalinity(CO3/HCO3) Calcium Boron Selenium Chloride Chromium (total) Sulfate Dissolved Oxygen (DO) Chromium(heiavalent) Thallium Total Dissolved Solids (TDS) Lithium Magnesium Cobalt Vanadium Nitrate + Nitrite Oxidation -Reduction Potential (ORP) PH Phosphorus Potassium Redox Potential (Eh) Sodium Specific Conductance Strontium Temperature Turbidh Discontinue Sampling Wells/Water Level Only (7) AB-04BRU AB-OSBRU GWA-06S GWA-14BR M W-01S M W-06D M W-06S To Be Replaced AB-04BRl SG-01DA, GWA- 09BRA,GWA-09D, GWA-09S, GWA-14D None planned at this time, except for wells to be replaced IMP= Interim Monitoring Plan = Comprehensive Site Assessment .is = Constituents of Interest MA = Coal Ash Management Act N_ C_DEQ = North Carolina Department of Envrionmental Quality Semi -Annual monitoring events are scheduled to be performed concurrently with two Quarterly monitoring events per year and will include the wells listed under Quarterly for respective vents. 'New wells installed as part of the CAMA program will be monitored quarterly. Samples from these wells will be analyzed for parameters formerly included as part of the 4th Quarter 2018 IMP and additional constituents analyzed voluntarily (see Table 1). After four quarterly events, the monitoring frequency and/or parameter list for the new wells will be re-evaluated with NCDEQ and may be reduced and/or optimized. Replacement wells will not be considered "new wells" and will follow the respective monitoring protocol for the well in which they replace; however, additional parameters may be included voluntarily. Well located In basin; will be sampled quarterly until closed for excavation. Wells for Quarterly Monitoring (3) MW-25BR* MW-25BRL* MW-25BRLL* Table 2.5 - Cape Fear Cape Fear Steam Electric Plant - IMP Optimization Summary of Wells, Frequency, & Parameters (to begin Q12019) Comprehensive Water Level Sweep to occur Semi -Annually Modification - March 2019 Wells for Semi -Annual Monitoringt . ABMW-03/S/BR MW-17SU/SL/BR ABMW-02SU/SL MW-21SU/SL/BR ABMW-03 / SR / BR MW-22S/BR ABMW-04/S _ ABMW-05S/BR MW-23S/D/BR MW-24S/BR BG M W-04 PZ-01 BGTMW-04 PZ-02 CM W_01 CMW-02 CMW-03 PZ-03S / D PZ-D4 PZ-05 CMW-05R PZ-06 CMW-06 PZ-08 CMW-07 Comprehensive Water Level sweeps (includes wells in Semi - Annual, Quarterly, and Discontinued Monitoring Lists) CMW-08 CTM W_01 CTM W-02 CTMW-07 CTMW-08 MW-06BR MW-09 / BR MW-10 / D / BR / BRL MIN-11 MW-12 / BR MW-15SU/SL/ BR MW-16S / BR Optimized Quarterly & Semi -Annual Parameters for "Non -New Wells" (Total and Dissolved as Applicable) Aluminum Manganese Alkalinity (CO3/HCO3) ___ A_ntimony + _ Molybdenum _ Calcium -------Antimony _W Arsenic _ ~Nickel _ Chloride _ Barium Selenium _ Dissolved Oxygen (DO) Beryllium Strontium Redox Potential (Eh) Boron Sulfate Magnesium _ Thallium Nitrate+Nitrite _Chrom_ium(total) Chromium (hexavalent) _� _ Total Dissolved Solids (TDS) _ _ Oxidation -Reduction Potential (ORP) Cobalt Vanadium pH _ Zinc _ Potassium _Iron Lithium _ _ Specific Conductance _ Sodium _ Total Organic Carbon (TOC) Temperature Turbidity Discontinue Sampling Wells/Water Level Only (9) ABMW-5 MW-13 MW-18S MW-19S MW-20S / BR MW-SBRR PZ-07 PZ-09 PZ-10 To Be Rep laced No well replacements planned at this time No well replacements pfannea at this time r.C1 nterim Monitoring Plan omprehensive Site Assessment Constituents of Interest =Coal Ash Management Act = North Carolina Department of Envrionmental Quality t5emi-Annual monitoring events are scheduled to be performed concurrently with two Quarterly monitoring events per year and will include the wells listed under Quarterly for respective events. [.New wells installed as part ofthe CAMA program will be monitored quarterly. Samples from these wells will be analyzed for parameters formerly Included as part ofthe 4th uarter 2018 IMP and additional constituents analyzed voluntarily (seeTable 1). After four quarterly events, the monitoring frequency and/or parameter list forthe new wells will e re-evaluated with NCDEQ and may be reduced and/or optimized. Replacement wells will not be considered "new wells" and will follow the respective monitoring protocol for e well in which they replace; however, additional parameters may be included voluntarily. Table 2.6 - giffside Cliffs(de Steam Station - IMP Optimization Summary of Wells, Frequency, & Parameters (to begin Q12019) Comprehensive Water Level Sweep to occur Semi -Annually Mod rcatlon - March 1019 Wells for Quarterly Monitoring (106) AB-15/D/BROR GWA-64BRL' AB-2S/D/BRO GWA-65BR'/BRL' ,3S'/SL'/MA15'IVBRUA/13R/BRA GWA-66BRL' AB-45s/SL'/UA15'/LA35'/D/BR GWA-678R'/BRL' AS-4S GWA-68BRL' IB-7S' 1'y DA CCRQ2BR' CCR-17BR' CLMW-2 UMW-351 / D' GWA-11BR' / BRL' GWA-20S l EN BR' _ -215' / BRU' / BR' / BRL' GWA-22S' / BRU GWA-34BR' GWA-38S GWA-395' GWA-40S' GWA-47D Webs fur Seml-Annusl Monitoringf (147) AB-SS11 BRU/BR AB-65'/0 I BR GWA-31D/BRA GWA-33S/D/Bit _ AS-15B/D AS-25'/D'/Bit AS-38RU GWA-345 GWA-355/1) GWA-360 D' AS41) GWA-375/D AS-55/BRU BR GWA-38D AS-6S/D/BRA GWA-42S' AS-70/BRA GWA-43S/D BG-1S'l Dz GWA-44S/D/BR CCPMW-15'/D' _ GWA-45D GWA-46D CCR-7S/D OCR -SD GWA-48BR GWA-511) CCR-125/D CCR-13D CCR-151) GWA-565/D MW-2DA CCR4B-15/D MW-851 I D CCR-IB-35/D MW-105/D CCR-US-35/D CCR-1.1545/D MW-21D/BR MW-220R/DR CLMW-l' MW-23S/D/DR CLMW-5S CLMW-6 MW-24D'/DR' MW-25DR CLP-1"' MW-305'/D' CLP-2"' GWA-1BRU MW-32S'/D'/BR' MW-345/BRU GWA-25'/BRU'/BR' MW-36S/BRU GWA-3D' MW-385' D'/BR' GWA-45'/D' MW-40S/BRU GWA-55/BRU MW-42S/DA GWA-105/D US -ID GWA-11S'/BRU' U5.2D'/8R US-45/D/BRA U5-5D'/Bit GWA-12S/BRU GWA-13BR GWA-145/0/Bit US-61) GWA-23D GWA-24S/D/BR US-BS/D/BR Comprehensive Water Level Sweeps (Indudeswellsinsemi- Annuol, 4uartedy, oM Dismnrinuednfanrtonnp GWA-25S GWA-26S GWA-27DA'/BR' GWA-285/BRU/8R GWA-29D'/BRA GWA-305 BR Usrs) metro for•Non-Nnr WNIV Additional Water Quality Parameters total & Dissolved Where App 1(®ble _ Aluminum Alkalinity(CO3MC03) _ Barium Beryllium _ Calcium _ Chloride Dissolved Oxygen_ (00) Fluoride Lithium Magnesium Nitrate+NltrRe Oxidation -Reduction Potential (ORP) pH Potisslum It"" Pglardlal (Ehl Selenium Specific Conductance Sodium phosphv.ru, Total Organ. crttbcm(I Drl —_ Tempt*acur e TurhlJu AS-7BRA .—MR US-2S-SLA 7 CL6BW-slap MWiC M W-70 MW-11D IMP = Interim Monitoring Plan CSA= Comprehenshre Site Assessment 001s =Constituents of Interest LAMA =Coal Ash Management Act NMEQ= North Carolina Department of E-r! .mental Quality tSemi-Annual monitoring events are scheduled m be performed concurrently with two Quarterly monitoring events par Vear and will Include the wells listed under Quarterly for respective werns. 'New wells Installed as part of the LAMA program will be monitored quarterly. samples fromthese wells will be analyzed for parameters formerly Included as part ofthe 4ch Quarter M181MP and additional wrenhuerus analyzed voluntarily (see Table 1). After four quarterly events, the monitoring frequency and/or parameter list forth, new wells will be re-evaluated with NCDEQ and may be reduced and/or optimized. Replacement wells will not be considered'newwelts' and will follow the respect monhonng proceed forth, wellln whlchthey replace; however, additional parameters may be Included voluntarily. "Wells were previously approved by DEQto be sampled for boron ands,1(ate only in histoncversi,re ofthe IMP due to elevated pH. Wellsthat exhibit elevated pH a re proposed to remain a boron-and-sulf endy sample location,• however, Rthe pH Improves with redevelopment to fall S8.5 acted, wall, the well will be sampled forthe complete appropriate parametersuite forthat well; Le.'opdmized non-reerweir well"Ilmaspropesedhw,l,. Nowellsarecurrmtly Baggedwhhthis rtebmmaybeinth,f tum. "' Wells were previously approved by DEQto be sampled for boron only In hiserieverslom of the IMP due to these locations being Installed as pdezometere Intended for water lavd only. 'Select wells to be sampled for Radium (226+2281 quarterly sampling includes additional assessment monitoring wells scheduled to be 1-11ed in 2019. The proposed monitoring well locations are based on additional data needs and as requested by NCDEQ, dual well Installation locations will be determined based on held conditions. Wells for Quarterly Monitoring (7) BG-1DA GWA-4S/D GWA-SBR/BRD GWA-6BR GWA-9BR Table 2.7 - Dan River Dan River Steam Station - IMP Optimization Summary of Wells, Frequency, & Parameters (to begin Q12019) Comprehensive water level sweep to occur semi-annually - March 2019 Wells for Semi -Annual Monitoringt (44) _ BG-5S/0 _—_—_—_�— NIW-225/D/BR —�— BG-10S/D/BR— MW-23D/BR _ GWA-6S/D i MW-317BR/BRL GWA-7S/D— MW-20S/D — GWA-85/D/BR --' .__.�CCR-03S/D -- _ GWA-9S/ID I LF-CCR-04S/D GWA-101) — _ — �GWA_12S/D — — — .LF-CCR-0SS/D _ GWA-14S/D —__--, Comprehensive Water GWA-15D --- —GWA-16S/D _ Level Sweeps _ __ ......... - _ _ (includes wells inSemi- GWA-17D _ Annuai, Quarterly, and -- GWA-20S/D — ----MW-12/D Discontinued Monitoring ---_ i Lists) ----- MW75/D 0ptimlied Quarterly & Semi -Annual Parameters for "Non New Wells" (Total) Antimony _Arsenic Manganese Aluminum -Molybdenum Alkalinity(CO3/HCO3)— _ Beryllium —� — Nickel _ Calcium Calcium Baron Selenium_— Chloride—_______ Beryllium— —Strontium Dissolved Oxygen (DO) Chromium (total) - __ Sulfate_ Redox Potential (Eh) Chromium (hexavalent) __ _ Total Dissolve_d_Solids (TDS) _ Lithium Cobalt —Vanadium Magnesium_—_ Iron _ —�� _ Oxidation -Reduction Potential (OW) PH Phosphorus Potassium Specific Conductance _ _ Sodium Radium (226+228) —Total Organic Carbon (TOC) Temperature ____ Turbidity _— -- Interim %= Comprehensive Site Assessment Is = Constituents of Interest MA = Coal Ash Management Act = North Carolina Department of Envrionmental Discontinue Sampling Wells/Water Level Only (1) GWA-10S riSIG�-11D None Semi -Annual monitoring events are scheduled to be performed concurrently with two Quarterly monitoring events per year and will include the wells listed under Quarterly for espective events. 'New wells installed as part of the LAMA program will be monitored quarterly. Samples from these wells will be analyzed for parameters formerly included as part of the 4th ivarter 2018 IMP and additional constituents analyzed voluntarily (see Table 1). After four quarterly events, the monitoring frequency and/or parameter list for the new wells will )e re-evaluated with NCDEQ and maybe reduced and/or optimized. Replacement wells will not be considered "new wells" and will follow the respective monitoring protocol for he well in which they replace; however, additional parameters may be included voluntarily. Wells for Quarterly Monitoring (12) Active Basin ABMW-IS AMW-155 BGMW-9 CMW-5 DMW-2 MIN-1 MW-3 Inactive Basins IABMW-3S IMW-45 IMW-65* IMW-75* DMW-3 Table 2.8 - " H.F. Lee Energy Complex - IMP Optimization Summary of Wells, Sampling Frequency, & Parameters (to begin Q12019) Comprehensive Water Level Sweep to occur Semi -Annually Modification - March 2019 Wells for Semi -Annual Monitoringt (50) Active Basin Inactive Basins ABMW-1 AMW-6RBC AMW-11S/BC AMW-12S/BC IABMW-1/S IABMW-25 IABMW-3 IMW-1S/BC AMW-13S/BC IMW-2BC AMW-14S/BC IMW-3S/BC AMW-15BC IMW-46C IMW-55/BC SMW-3 AMW-16BC AMW-17S/BC AMW-185 SMW-4 AMW-19S/BC BW-1 AMW-205/BC CW-1 _ CW-3 CW-4 SMW-5 AMW-225/BC AMW-23S/BC CCR-1005 CMW-6R CTMW-1 MW-2 Comprehensive Water Level Sweeps (includes wells in Semi- Annual, Quarterly, and Discontinued Monitoring Lists) LOLA LLMW-1/5 LLMW-2/S Optimized Quarterly & Semi -Annual Parameters for "Non -New Wells" (Total) , Antimony Arsenic _ Selenium_ Strontium Alkalinity(CO3/HCO3) Aluminum Calcium _ _ _ Barium Sulfate B_oron_ __ _ _ �_ Thallium Dissolved Oxygen (DO) _ Chloride Total Dissolved Solids_ (TDS) Hexavalent Chromium Chromium (total) Vanadium Redox Potential (Eh) Cobalt Iron _ Lithium_____ Manganese Magnesium Nitrate + Nitrite Oxidation -Reduction Potential (ORP) pH Phosphorus Potassium Specific Conductance Sodium Temperature Turbid' Discontinue Sampling Wells/Water Level Only (9) Active Basin AMW-9BC AMW-21S/BC BGMW-10 CMW-7 CMW-8 CMW-10 DMW-1 Inactive Basins CW-2 tact No well replacements planned at this time Wells within the footprint of the Active Basin are slated for abandonment in 2019. ABM W-1/S r nterim Monitoring Plan omprehensive Site Assessment onstituents of Interest Coal Ash Management Act =North Carolina Department of Envrionmental Quality Annual monitoring events are scheduled to be performed concurrently with two quarterly monitoring events per year and will include the wells listed under "Wells for Quarterly Monitoring" for respective events. *New wells installed as part of the CAMA program will be monitored quarterly. Samples from these wells will be analyzed for parameters formerly included as part of the 4th Quarter 2018 IMP and additional constituents analyzed voluntarily (see Table 1). After four quarterly events, the monitoring frequency and/or parameter list for the new wells will be re- valuated with NCDEQ and may be reduced and/or optimized. Replacement wells will not be considered "new wells" and will follow the respective monitoring protocol for the well in E hich they replace; however, additional parameters may be included voluntarily. Wells for Quarterly Monitoring (62) AB-10SL/D/BR/BRL'' AB-12S3/D'/BR' AB-14D/DU AS-15SL AB-16DU AB-SS'/D'/B R'/B RLs/B RLLs/BRLLL3' AB-20S AB-21S AS-28R'' AB-3S AB-5S3/D3/DU'/BR' AB-6S/D/BRA/BRL AB-7DU AB-8DU AL-1S'/D'/BR3/BRCj AL-2S/D/BR/BRL/B RLL/B RLLL3' AL-3D/BR AL4D/BR/BRL CCR-9S'/DA' GWA-2DA GWA-105 GWA-SSS'/D' MW-14BR'/BRL'' MW-6S3/D3 MW-753/D' MW W!D' MW-9S3/D' Table 2.9 - Marshall Marshall Steam Station - IMP Optimization Summary of Wells, Frequency, & Parameters (to begin Q12019) Comprehensive Water Level Sweep to occur Semi -Annually Modfffcatlon - March 2019 Weill fur Semi -Annual Monitoringt (59) AB-12SL3 _ GWA-6S'/D' AB-14S GWA-7S/D AB-15D/BR GWA-8S/D AB-20D GWA-9BR AB-21D GWA-10D AB-2S'/D' GWA-11S'/D3/BR' AB-31) GWA-12S'/D"/BR' AB-9S/D/BR GWA-13S/DA" AL-3S GWA-145/D BG-iS'/D3/BRA' MW-1 BG-253/BR3 MW43/D' BG-3S3/D'/BR3 MW-7 GWA-1S'/D'/BR3 MW-125/D GWA-3S/D MW-13S/D GWA-4S/D MW-14S3/D' GWA-5S/D OB-1(Dry Ash Landfill) Comprehensive Water Level Sweeps (includes wells in Semi -Annual, quarterly, and Discontinued Monitoring Lists) Optimized Quarterly & Semi -Annual Parameters for "Non -New" Wells 2018 CSA Update MIS (Total & Dissolved if Applicable) Additional Water quality Parameters (Total & Dissolved if Applicable) Antimony Manganese Aluminum Arsenic Molybdenum Alkalinity (003/1-1003) Barium Nickel Calcium Beryllium Radium (226+228) 3 Dissolved Oxygen (DO) Boron Selenium Fluoride Cadmium Strontium Lithium Chloride Sulfate Magnesium Chromium (total) Total Dissolved Solids (TDS) Nitrate+Nitrite Chromium hexavalent) Thallium Oxidation -Reduction Potential rORP) Cobalt Vanadium pH Iron Potassium Specific Conductance Sodium • Temperature Total Organic Carbon (toci Turbidity Notes: IMP = Interim Monitoring Plan CSA = Comprehensive Site Assessment Cots = Constituents of Interest CAMA = Coal Ash Management Act NCDEQ= North Carolina Department of Envdonmental Quality t5emi-Annual monitoring events are scheduled to be perfom ed concurrently with two Quarterly monitoring events per year and will include the wells listed under Quarterly for respective events. *New wells installed as part of the CAMA program will be monitored quarterly. Samples from these wells will be analyzed for parameters formerly included as part ofthe 4th Quarter 2018 IMP and additional constituents analyzed voluntarily (see Table 1). After four quarterly events, the monitoring frequency and/or parameter list for the new wells will be re- valuated with NCDEQ and may be reduced and/or optimized. Replacement wells will not be considered "new wells" and will follow the respective monitoring protocol for the well in which they replace; however, additional parameters may be included voluntarily. " Denotes well was previously approved by DEQto be sampled for boron and sulfate only in historic versions of the IMP due to elevated pH. Respective well is proposed to remain a boronand-sulfateonly sample location; however, if the pH improves with redevelopment to fall 58.5 at such well, the well will be sampled for the complete appropriate parameter suite for that well; i.e. "optimized non -new well" or "new well" lists as proposed herein. t Indicates OCR network well added to IMP per Brandy Costner request (conference call 9/5/18) Fall currently Included on IMP list that is proposed to be removed from IMP (LAMA) sampling; will continue to be sampled under applicable landfill permit requirements. 'Total radium to be analyzed at select locations in accordance with 04 2018 IMP Discontinue Sampling Wells/Water Level Only (27) AB-10S AB-11S/D AB-13S/D AB-16S/D A84S/SL/D AB-75/D AB-8S/D GWA-2S MS-8z MS-10, MS-11z MS-13z MW-10S/D MW-33S/D M W-2z MW-3z MW-5z 08.1 fAth Basin AB-17S/D AB-18S/D/DU To Be Replaced (2) AB-175 D Wells for Quarterly Monitoring (5) ABMW-4X' CW-2' MW-16S / D' / BR' Table 2.10 - Mayo Mayo Steam Electric Plant - IMP Optimization Summary of Wells, Frequency, & Parameters (to begin Q12019) Modification - March 2019 11 Wells for Semi -Annual Monitoringt (29) ABMW-1' MW-3BR ABMW-2 / BR / BRL MW-SBR ABMW-3/S MW-9BRL ABMW-41) / BR MW-12S' / D' BG-1' M W-13 BR BG-2' MW-18D / BR CW-1/D MW-19D/BR Comprehensive Water Level Sweeps (includes wells in Semi- Annuol, Quarterly, and Discontinued Monitoring Lists) CW-2D' CW-3 CWA C W-5 1 CW-6 M W-2 M W-3' Optimized Quarterly & Semi -Annual Parameters for "Non -New Wells" 2017 CSA Update COls (Total & Dissolved Where Applicable) Additional Water Quality parameters (Total & Dissolved Where Applicable) ....... Arsenic I Manganese Alkalinity (CO3/HCO3) Barium ------ Molybdenum -- CalciumBoron Radium (226+228) Chloride (total) Strontium Magnesium L—C—hro—mium m (hexavalent) Sulfate Nitrate+Nitrite Cobalt Total Dissolved Solids (TDS) pH Iron Uranium (233+234+236+238) -- Potassium Vanadium Sodium _ _ Total Organic Carbon (TOC) Discontinue Sampling Wells/Water Level Only (4) M W-4 M W-8BR MW-10BR MW-14BR Tn 8' Re A;eed No well replacements planned at this time AB7MMW-4 r Interim MonitoringPlan Comprehensive Site Assessment Constituents of Interest Coal Ash Management Act Q= North Carolina Department of Envrionmental Quality -Annual monitoring events are scheduled to be performed concurrently with two Quarterly monitoring events per year and will include the wells listed under Quarterly or respective events. `New wells installed as part of the CAMA program will be monitored quarterly. Samples from these wells will be analyzed for parameters formerly included as part of the 4th Quarter 2018 IMP and additional constituents analyzed voluntarily (see Table 1). After four quarterly events, the monitoring frequency and/or parameter list for the new wells ill be re-evaluated with NCDEQ and may be reduced and/or optimized. Replacement wells will not be considered "new wells" and will follow the respective monitoring protocol for the well in which they replace; however, additional parameters may be included voluntarily. ' Select wells to be sampled for radium 226 and 228. These select wells are to be monitored for total radium. If concentrations are greater than the Federal MCL, sample uarterly. If concentrations are less than the Federal MCL, reduce total radium sampling to semi-annually and reevaluate historical exceedances as possibly anomalous. If etermined to be anomalous, discontinue sampling for total radium. Background wells BG-1 and BG-2 will also be included in semiannual sampling of total radium for ongoing omparative purposes. Wells for Quarterly Monitoring (23) CPA-1S*/D* CPA-2S*/D* CPA-3S*/D* CPA-4S* CPA-SS*/D* CPA-6S* CPA-7S*/D* GWA-11S/D GWA-12S/D GWA-20S GWA-2BRU GWA-3SA/D/BR GWA-9D M W-6D Table 2.11- Riverbend Riverbend Steam Station - IMP Optimization Summary of Wells, Frequency, & Parameters (to begin Q12019) Comprehensive Water level Sweep to Occur Semi -Annually Modification - February 2019 Wells for Semi -Annual Monill: ingi (6S AB-8S/D MW-1S/D MW-2SA/D BG-1S/DA BG-4S/D MW-3S/D BG-SD/BR MW-4S/D GWA-1S/BRU MW-SS/D MW-6S GWA-2S/BR GWA-4S/D/BR MW-7SR/D/BRA MW-ES/I/D GWA-55/D GWA-6S/D MW-9/9DA/9BRA GWA-7S/D/BR MW-SO GWA-8S/D MW-11SR/DR GWA-9S/BR MW-13 MW-14 GWA-10S/BRU GWA-13St MW-15/15DA/15BR GWA-14S/D OB-1 (water level only) GWA-155/13 OB-2 (water level only) Comprehensive Water Level Sweeps (includes wells in Semi - Annual, Quarterly, and Discontinued Monitoring Lists) GWA-20DA/BR GWA-22S/D/BRA Optimized Quarterly & Semi -Annual Parametersfor "Non -New Wells" (Total) Antimony Iron Manganese Aluminum Alkalinity(CC3/HCO3) Arsenic Beryllium Strontium Calcium Boron Sulfate Dissolved Oxygen (DO) Chromium (total) Total Dissolved Solids (TDS) Redox Potential (Eh) Chromium (hexavalent) Vanadium Lithium Cobalt Magnesium Molybdenum Nickel Nitrate + Nitrite Oxidation -Reduction Potential (ORP) pH Phosphorus Potassium Sodium Specific Conductance Temperature Thallium Turbid! Discontinue Sampling Its/Water Level Only {, BG-35/D BG-4BR GWA-13D To Be Replaced 4 GWA-9BRA GWA-20BRA GWA-22SA MW-45A AB-15/0 AB-2S/D GWA-235/DA/BR Noses MP - IrtMrim MortRaNng Plan A = Comprehensive Site Assessment Is = Constituents of Interest A * Coal Ash Management Act COEQ = North Carolina Department of Environmental Quality. +Semi -Annual monitoring events are scheduled to be performed concurrently with two Quarterly monitoring events per year and will include the wells listed under Quarterly for respective events. .New wells installed as part ofthe CAMA program will be monitored quarterly. Samples from these wells will be analyzed for parameters formerly included as part ofthe 4th Quarter 2018IMP and additional constituents analyzed voluntarily (see Table 1). After four quarterly events, the monitoring frequency and/or parameter list for the new wells will be m- evaluated with NCDEQand maybe reduced and/or optimized. Replacement wells will not be considered "new wells" and will follow the respective monitoring protocol for the well in hich they replace; however, additional parameters maybe included voluntarily. GWA-13S will be temporarily sampled until replacement well GWA-22SA is installed. After GWA-22SA is installed: 1. Sampling of GWA-13S will be discontinued 2. Semi-annual water level measurements of GWA-13S will continue 3. Semi-annual sampling and water level measurements ofGWA-22SA will beitin Table 2.13 - Sutton L.V. Sutton Energy Complex - IMP Optimization Summary of Wells, Frequency, & Parameters (to begin Q12019) Comprehensive Water Level Sweep to occur Semi -Annually vfodificat' March 2019 Wells for Quarterly Monitoring (38) Wells for Semi -Annual Monitoringi (48) Discontinue Sampling Wells/Water Level Only (20) AW-01C AW-02C AW-02D AW-051) AW-0611-1) AW-06R-E AW-0711-1) AW-09D MW-11 MW-19 MW-22B MW-28B MW-32C MW-38B MW-38D MW-39B MW-39D MW-40B MW40D SMW-06D To Be Replaced No well replacements planned at this time No wells are scheduled to be abandoned at this time. MW-12R MW-45B' AW-03C AW-04C AW-05C AW-08C MW-40C SMW-04C MW-33C MW-45C* SMW-01C MW-46B* MW-46C* MW-47B* SMW-05C SMW-06C SMW-02C SMW-03C AW-09C MW-05C MW-08B MW-47C* MW-07C MW-O.5CD MW-081) MW-4BB' MW-16D MW-05D MW-41B MW-48C* MW-493* MW-20 MW-20D MW-OSR-E Mw-08 MW-41C MW-41D MW-49C* MW-21C MW-08E FPA-1B' MW-50B' MW-22C MW-37B FPA-1C* FPA-2B' MW-50C* MW-23B MW-37C MW-23C MW-23D MW-37CD MW-37D FPA-2C' FPA-3B* MW-23E MW-37E FPA-3C* MW-24RB MWAIE FPA-4B* FPA-4C* MW-13R' MW-24RC ABMW-02D MW-27B ABMW-02S MW-27C MW-16 MW-13R-D' MW-28C MW-36B MW-15R* MW-31R-C SMW-01B MW-15R-D' MW-36C MW-38C MW-39C SMW-05B SMW-06B MW-058 MW-43B' MW-43C- MW-44B* Comprehensive Site Semiannual water level sweep (includes wells In Semi -Annual, Quarterly, and Discontinued Monitoring Lists) MW-44C* Optimized Quarterly & Semi -Annual Parameters for "Non -New" Wells (Total) Arsenic Strontium Alkalinity (003/1­10031 Boron Sulfate Aluminum Chloride TDS (Total Dissolved Solids) Barium Chromium (hexavalent) Vanadium Calcium Cobalt Dissolved Oxygen I DOI Iron Lithium Mangy nese Magnesium Molybdenum NRrate + Nitrite PH Oxidation -Reduction Potential ORP Selenlum Potassium Redox Potential Eh Sodium Specific Conductance Temperature Total O riipflk Cm hnn (TOCI Fluoride Turbidit N s IMP = Interim Monitoring Plan A = Comprehensive Site Assessment Ols = Constituents of Interest AMA = Coal Ash Management Act NCDEQ= North Carolina Department of Envrionmental Quality tSemi-Annual monitoring events are scheduled to he performed concurrently with two Quarterly monitoring events peryear and will include the wells listed under Quarterlyfor respective events, *New wells installed as part ofthe CAMA program will be monitored quarterly. Samples from these wells will he analyzed for parameters formerly included as part of the 4th Quarter 20181MP and ,dditional constituents analyzed voluntarily (see Table 1). After four quarterly events, the monitoring frequency and/or parameter list for the new wells will be re-evaluated with NCDEQ and may be reduced and/or optimized. Replacement wells will not be considered "new wells" and will follow the respective monitoring protocol for the well in which they replace; however, additional parameters may be included valuntarilc Wells for Quarterly Monitoring (20) BW-4DA- CPA-15'/I* CPA-21' CPA-35'/I* CPA-4S'/I' CPA-55'/I' CPA-6S'/I* CPA-7S*/I* CPA-BS'/I* MW-2 (fuel oil well)* MW-4 (fuel oil well)* MW-5511 PW-1 (DEP p2) Table 2.14 - Weatherspoon Weatherspoon Power Plant - IMP Optimization Summary of Wells, Frequency, & Parameters (to begin Q12019) Comprehensive Water Level Sweep to occur Semi -Annually Wells for Semi -Annual Munitor1ng4 (26) AW-02S MW-33S/I/D AW-03S/l MW-411 BW-2S1 MW-521 BW-3Ss/Is AW-045 AW-05S BW-051/I' CCR-201-BG1 AW-065 CW-2 BW-5S CW-31 CCR-1071 MW-41 1MW-1s MW-2z MW-51 MW-31 Comprehensive Water Level Sweeps(indudes wells in Semi -Annual, Quarterly, and Discontinued Monitoring Lisa) Optimized Quarterly & Semi -Annual Parameters for "Non -New Wells" I Nickel Boron I Selenium I trthium Chloride 5trantwm Magnesium Chromium (total) iullata Nitrate + Nitrite Chromium (hexavalent) thallmm Oxidation -Reduction Potential JNPi Cobalt I Total Dissuived Sends nasY I ff Discorttinue Sampling Wells/Water Level Only (14) AW-015/I/D AW-02D AW-03D BW-01 BW-3D B W-4D CW-1 MW-41D MW-531/D M W-54D MW-SSD To Be Replace 2) h-•,16 (re)laced by CCR-1.,: ) MW-7 (replaced by CCR-107) =MW-7 MP = Interim Monitoring Plan SA = Comprehensive Site Assessment -OIs= Constituents of Interest MA= Coal Ash Management Act NCDEQ= North Carolina Department of Emnlonmental Quality -Es to be sampled for radionuclides (also bolded tact) +emi-Annual monitoring events are mheduled to be performed concurrently with two Quarterly monitoring events per year and will include the wells listed under Quarterly for respective events. •New wells installed as part of the COMA program will be monitored quarterly. Samples from these wells will be analyzed for parameters formerly Included as part of the 4th Quarter 2019IMP and additional constituents analyzed olunterily (see Table 1). After four quarterly events, the monitoring frequency and/or parameter list for the new wells will be re-evaluated with NCDEQ and maybe reduced and/or optimized. Replacement wells will not be onsidered "new wells" and will follow the respective monitoring protocol for the well In which they replace; however, additional parameters may be included voluntarily.