HomeMy WebLinkAbout20061161 Ver 2_Triage Comments_20061208nw~;~ 2ao6 l ~ -~ irer~ Daze - Who Reviewed ~ ULZ,
? . ~~
Phan Detail Incomplete -
^ Please provide a location map for the project. Nv, - ~~~
Please show all stream impacts including all fill slop ,dissipaters, and bank stabilization on the site plan.
~. Please show all wetland impacts including fill elopes on the site plan. Np~ e L~ ~ :,j,,.LUs~ /fi~r~!~
Please indicate all buffer impacts on the sito plan. i(Jd j- C~ ~/~~ US/-/b9
^ Pleaso indicate proposed lot layout as overlays on the site plea.
Pleaso indicate the location of the protected buffrxa as overlays on the site plan. /v~~ ~ cSf ~ d~ Z' ~' L.o( 6~~U
D~cl ~1~i~S
^ Please locate elI isolated or non-isolated wetlands,streams and othar watora of the State as overlays on the site plan.
^ Please provide cross section details showing tho provisions for aquatic life passage. ?~ ~' ~
~ ~cC ~Jky!C/1~
Please locate say planned•sewar lines on the sifo plan. ~j~jb l U , SF~j I C 62 ~.~I/4fUN 1
~.
^ Pleaso provido the location of any proposed stormwater management practices as requited by
^ Please provide dotail for the atormwatce management practices as required by OC ~ ! l> 1~ W
Ploase the erceat of • ro ed im erviouanesa aroa based on the estimated built-out conditions: p T/(.t 6G~~
r1s~ o~ (~_ ~~rLP~I~S U~-~~-
^ Pleesa iadieate all atormwatar',~o~}tfalls on the site plaxi. p~ ~ ~
^ Please indic;ato the diflhse flow provision measuros do tho situ plan. L.~U~'L SP,Q~q/'~~ - !N SFIL(FS ~ ~
^ Please indicate whetha~or not theproposed impaata already been conducted
Avoidance and/or Minimization Not Provided ~ ~ •
^ ~ The labeled as ~_ on the plena dons not appear to be necessary. Please oliminate the . or provide additional
infonnakion $s to why it is necessary for this p%~ed. ,
• ^ This Office boliox+es that the labeled on tho plans as can be moved. or reconfigured to avoid tho impacts to the
• . Please roviae the plans to avoid the impede.
^. This~Office believes that tho labeled on tho plans es~ ~ can be moved or rerAnfigured to. minimize tho impacts to'the
. Please revise tho plaits to minimizo the impacts.
^ Tho stonnwatar dischargers at tho location oa the plans labeled will. not provide diffpse flow through tho buffar because
. Please revise the plans sad provide calculations in show that dii~se i~ow will be achieved through the eutirebuffar. If it
is not possible ~ achieve• diffuse flow through. the entire buffar then it may be necessary to' provide atormwatar managomoat
practices that remove nutrients before the stormwatar can be discharged through the. buffer. .
Other
i
^•. The application fee was insuflieient~because ova 150 feet of stream and/or over 1 acre oi`wetland'impacts were requested Please
provide S . ~ 'This additional foe must bo received before your application can be reviewed.
^ Pleasse compkxo Section(s) on the apg~lication. -
^ Please provide a signed copy of the application.
^ Please provide ,copies of the application, . copies of •the site plans and other aupportin'g information:
_ ^ Pleeaesubmit electronic CAD files showing ~ ;via: email to ian.mcmillan~nc~nai].net and CD: •
Mitigation
^ of compensatory ~ mitigation is required for this project. ~ Please provid'e's compensatory mitigati
. ~ plan must conform to tharequireinenta in 15 A NCAC 2H :0500 and must be appropriate to the typo propo
^ Please indicate which 404 Permit the USACE would use to authorize this project.
The
~(/~ `T`v sN~ Hov.S~ ~or~~~Jfs aN Lofs r.~l cJcs o263t,
l~Tl3-?
L D ~ ~ ~ S ~C~)1 C - ~~ l ~ ~M~Jd A/ S~~) C' - S~ ~ ~v~ l
~~R ~ ~ ~~~
vN 7
Sf~TI ~ A~P~4 ~ C6T ~ Sf~ll (' ~R~Q~