Loading...
HomeMy WebLinkAbout20061161 Ver 2_Triage Comments_20061208nw~;~ 2ao6 l ~ -~ irer~ Daze - Who Reviewed ~ ULZ, ? . ~~ Phan Detail Incomplete - ^ Please provide a location map for the project. Nv, - ~~~ Please show all stream impacts including all fill slop ,dissipaters, and bank stabilization on the site plan. ~. Please show all wetland impacts including fill elopes on the site plan. Np~ e L~ ~ :,j,,.LUs~ /fi~r~!~ Please indicate all buffer impacts on the sito plan. i(Jd j- C~ ~/~~ US/-/b9 ^ Pleaso indicate proposed lot layout as overlays on the site plea. Pleaso indicate the location of the protected buffrxa as overlays on the site plan. /v~~ ~ cSf ~ d~ Z' ~' L.o( 6~~U D~cl ~1~i~S ^ Please locate elI isolated or non-isolated wetlands,streams and othar watora of the State as overlays on the site plan. ^ Please provide cross section details showing tho provisions for aquatic life passage. ?~ ~' ~ ~ ~cC ~Jky!C/1~ Please locate say planned•sewar lines on the sifo plan. ~j~jb l U , SF~j I C 62 ~.~I/4fUN 1 ~. ^ Pleaso provido the location of any proposed stormwater management practices as requited by ^ Please provide dotail for the atormwatce management practices as required by OC ~ ! l> 1~ W Ploase the erceat of • ro ed im erviouanesa aroa based on the estimated built-out conditions: p T/(.t 6G~~ r1s~ o~ (~_ ~~rLP~I~S U~-~~- ^ Pleesa iadieate all atormwatar',~o~}tfalls on the site plaxi. p~ ~ ~ ^ Please indic;ato the diflhse flow provision measuros do tho situ plan. L.~U~'L SP,Q~q/'~~ - !N SFIL(FS ~ ~ ^ Please indicate whetha~or not theproposed impaata already been conducted Avoidance and/or Minimization Not Provided ~ ~ • ^ ~ The labeled as ~_ on the plena dons not appear to be necessary. Please oliminate the . or provide additional infonnakion $s to why it is necessary for this p%~ed. , • ^ This Office boliox+es that the labeled on tho plans as can be moved. or reconfigured to avoid tho impacts to the • . Please roviae the plans to avoid the impede. ^. This~Office believes that tho labeled on tho plans es~ ~ can be moved or rerAnfigured to. minimize tho impacts to'the . Please revise tho plaits to minimizo the impacts. ^ Tho stonnwatar dischargers at tho location oa the plans labeled will. not provide diffpse flow through tho buffar because . Please revise the plans sad provide calculations in show that dii~se i~ow will be achieved through the eutirebuffar. If it is not possible ~ achieve• diffuse flow through. the entire buffar then it may be necessary to' provide atormwatar managomoat practices that remove nutrients before the stormwatar can be discharged through the. buffer. . Other i ^•. The application fee was insuflieient~because ova 150 feet of stream and/or over 1 acre oi`wetland'impacts were requested Please provide S . ~ 'This additional foe must bo received before your application can be reviewed. ^ Pleasse compkxo Section(s) on the apg~lication. - ^ Please provide a signed copy of the application. ^ Please provide ,copies of the application, . copies of •the site plans and other aupportin'g information: _ ^ Pleeaesubmit electronic CAD files showing ~ ;via: email to ian.mcmillan~nc~nai].net and CD: • Mitigation ^ of compensatory ~ mitigation is required for this project. ~ Please provid'e's compensatory mitigati . ~ plan must conform to tharequireinenta in 15 A NCAC 2H :0500 and must be appropriate to the typo propo ^ Please indicate which 404 Permit the USACE would use to authorize this project. The ~(/~ `T`v sN~ Hov.S~ ~or~~~Jfs aN Lofs r.~l cJcs o263t, l~Tl3-? L D ~ ~ ~ S ~C~)1 C - ~~ l ~ ~M~Jd A/ S~~) C' - S~ ~ ~v~ l ~~R ~ ~ ~~~ vN 7 Sf~TI ~ A~P~4 ~ C6T ~ Sf~ll (' ~R~Q~