Loading...
HomeMy WebLinkAbout100029_INSPECTIONS_20171231NUHTH CAHQLINA Department of Environmental Qual II [] DSWC Animal Feedlot Operation Review EaDWQ Animal Feedlot Operation Site Inspection = �3 outine O Com laint O [` OII(t\i--tE ) of l)��' } inti €ctii)n O Rollo-.,°-u of DSWC review O Other Date of Inspection Facifrty Number Tilne of Inspection ' c 24 hr. (hh:mm) Farm Status: ® Registered ❑ Applied for JXcertified Permitted Total Time fin fraction of hours (ex.1.25 for l hr 1_ min)) Spent on Review or Inspection (includes Travel and processing) 0 Not O erational Date Last Operated:. ............. Farm Natue:....�= 3�1a.+�.................'Lf..'A �.......... ,t±n. t. .LL.. .ft city:.. -�}! Cr . ........................... ---a.............. OwnerName:..... ................. .f G ................................... Phone No:....... ......_O v...............,.................... Facility Contact: ,. ..............�.fl...� .N.... �--............, Title:........ ........'.:?. �.�"..Q......... .............. Phone No:................................................... l�lailiugAddress: Fa+!-�.;�1.�...... .. lr"..�.L....A..��..................n.5.P........................................................ .......................... ,. Onsite Representative.../.(!K . ...............(,% R/!5. ...................................... Integrator :...... Ce.ft— 1 A45........................................... Z Certified Operator:,.,.., . .�...............................................Operator Cert cat►on Number:. j. �... .................... Location of Farm: Latitude 0• Q4 044 Longitude • Q& .4 Type of Operation Design ; Current Design Current Design Current Swine _ ;Capacity; Population :::Poultry. Capdcity,Population (attic Capacity Pdpulatton ❑ Wean to Feeder ........ .... ceder to Finish 3WO ❑ Farrow to Wean ❑ Farrow to Feeder ❑ Farrow to Finish ❑ Other Subsurface Drains Present HE] Lagoon Area General 1. Are there any buffers that need maintenaneelimprovement? 2. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? b. If discharge is observed, did it reach Surface Water? (If yes, notify DWQ) c. if discharge is observed, what is the estimated flow in gal/nun? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) 3. Is there evidence of past discharge from any part of the open onI 4. Were there any adverse impacts to the waters of the State other than from a discharge? 5. Does any part of the wasee management system (other than lagoons/holding ponds) require 4/30/97 maintenance/improvement? Spray Field Area Yes ❑ No ❑ Yes IN No Q Yes ®'tiro ❑ Yes 0 No ❑ Yes ® No ❑ Yes 9 No Z) Yes ❑ No KYes ❑ No Confinued on back r • Facility Number: — '01 6. Is facility not in compliance with any applicable setback criteria in effect at the time of design? 7. Did the facility fail to have a certified operator in responsible charge? 8. Are there lagoons or storage ponds on site which need to be properly closed? Structures (Lagoons and/or Holding Ponds) 9. Is storage capacity (freeboard plus storm storage) less than adequate? Freeboard (ft): Structure I Structure 2 Structure 3 Structure 4 2.0 ................... .................... ...................................... ... ................................... .... I ........ I.................. ❑ Yes Q No ❑ Yes ULNo ❑ Yes ;a No ❑ Yes ® No Structure J Structure 6 ....................................I........................ 10. Is seepage observed from any of the structures? ❑ Yes [( No 11. Is erosion, or any other threats to the integrity of any of the structures observed? ❑ Yes 21 No 12. Do any of the structures need maintenancelimprovement? Wyes ❑ No (If any of questions 9-12 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 13. Do any of the structures lack adequate minimum or maximum liquid level markers? ❑ Yes VNo Waste Application 14. Is there physical evidence of over application? ❑ Yes ® No (If in excess of WMP, or runoff entering waters of the State, notify DWQ) 15. Crop type............�-.?................................................. Ai.z.............. ........................... J�..6.:.......... ................. ,.... .............................. I .... .... ........... 16. Do the receiving crops differ with those designated in the Animal Waste Management Plan (AWMP)? ❑ Yes JO No 17. Does the facility have a lack of adequate acreage for land application? ❑ Yes M No 18. Does the receiving crop need improvement? [aYes ❑ No 19. Is there a lack of available waste application equipment? ❑ Yes [A No 20. Does facility require a follow-up visit by same agency? ❑ Yes ® No 21. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yes No For Certified Facilities Only 22. Does the facility fail to have a copy of the Animal Waste Management Plan readily available? ❑ Yes f0 No 23. Were any additional problems noted which cause noncompliance of the Certified AWMP? EJ Yes 19 No 24. Does record keeping need improvement? 5ff Yes ❑ No � • f y . �,5, l j �, �c.� � � f b �� � .� b t • � h �sf �'>~ ,� ,u-�,�c. r s � � � d� `rgs � :� ww b+t e- * 71U 1 0 A €, nJCs N • �^+ V > i A R € Ia S tJ � - €-5 t,. b t • S �r v� v�v�� c�-�c,r R � � b ..-�. �� f��t r�.nz-t � f� g 4 : A""SS' . TV �.1� ✓ i • S cs�vo�+ti �.��.r�iS Reviewer/Inspector Name Reviewer/Inspector Signature: Date: 7 , / e - ,r Jr' cc: Division of Water Quality, Water Quality Section, Facility Assessment Unit 4/30/97 ' L-16-98 FRI 11:30 PM MARVIN_L.EVANS 19102875090 P.01 R�d-% I ri665II'aER (.;" y 6 M rtle He Ash, N.C. 24' Phone & Fax (910 a Farm #96.a i i FARM Road NUARY '1998 a oon Im tion �ietd Reca �1� - ru w Foitn f4 Each Field per trop Cycle Q racf 01 field # 1 acili reld Sze a s 15 _ r exm OWMr AarAn L. & mvy R. Evan (r i firma on Owal �- ersAddress 656 M eed Rd.. MIvV i rrigations Op oCs �T----- -� i ksh, NC 2 20 Ndress I-- Hers ptwoe81 910 287-3 5 - I - emlor`s Phon .0 I .. I. . - -- -... . rrsm Waste tltilizaFien t _ - s (7' --� - LB/ACR B �4325.95. 1 m u� � L�.(1) (z) 3) (4} (5) (6) (7) (8} f9f 00)i (11) A � N � J m I Date Start Tirne End Time Total #of Spridders aw Rate TOW Volume Volume MMeAnalysis PAN AppliD Nitrogen Mirudes O esaung (c�UYnin) (gallons? r Acre PAN bd M) Batartice W ! (3) -(2) (6) x (5) x (4) (gelfacse) (lWIDO0 gal) (8) x (8 11000 �(iial M) y �f A (i3 10 1 �-....-D �0.0 2,3 0,00 �---- - 4325.85 UT 0.0 2.3 0.D>) 1 4325,95 l�- 01 0.012.3 D,Da7 1 4325.95 Q) 0 0.01 2.3 0.00 4325,S5 a 0 0 0 2.3 0,00 4325.95- > 0 0 b 2.3 0.00 4325.95 i Q.0 0 0.0 - 2.3 2,3 --_ D.DO 0.00 432 i.951 - 4325.95 z r _ DI 0.0 2.3 0.00 4325.95 0 D.0 2.3 0,00 ' 4325,951 7 a ' 0 0,01 2.3 coo 4-325.95 F 0 0.01 2.3 0 00 4325.35 0 0.0 - -2.3 0.00 4325 95 01 0.0 i 2.31 0.00 1 4325,95 01 0.0 2.3 _ 0.00 _ 025.95 M 0 0.0 2.3 0.00 4325.95 " 0 0.0 2.3 0.00' 43,25,95 ., 01 0.0 0.00 4325.95 Prop Cyde To li I _ - -JE<BRUARYI 1998 goon Mg4tion Field Recoro Ii Pne Form far Each Field per p Cycle r j ract # 1 Field 0 1 Eadity # field Size a s 15 1 arm Owner' arum L. d,-try R. Evans jmgBhon Operaf "Same" Ownem Ad ess 5656 MyrtLe iead Rd., NW ' Irrigations Opera om a t ksb, NC 2 20 ress ; { Chmer's Phope # 910 287-32 5 pe rafts Phont # T oastat I Recommended RAN LoacgrigI LBJACRE =6 4325 + I Il (1) (2) (3) (4) (5) 1 8 (7) Date Sfa+! rime End Tyne 'Foul # of 9pnniders I F1s3w Rate Total Volume Volume Waste Arwiysis PAN Applied MCragen mm/ddNr I Minutes Opemong gaihitin) (gOons; per Acre PAID! (tx(acre) Balance (6) x (5) x (4) 1 (gatfacre) pM11000 gal) (8) x (9) ! 10DO (blaars - Or. -Feb 98 0:00 rf2:30 150 14 9.8 2058L► 1372.0 2.3 3.16 4M.79 12:30 5:30 180 B 9.81 10584: 705.61 2.aj 1,621 4321,17 �A __- 07-Feb-96 00 2.00 180 ?0 9.51 77640 1176-0 2.3 2.70 43'16.47 2:00 5:00 180 8 9.81 141121 940.9 2.3 2. r6 4316.30 06-Feb-99 i 1:OD 3:30 3:30 150 6:30 180 14 1D 9.81 9.8 20580 17640 1372.0 1176.0 2.3 2.31 3.16 2.70 431315 431044 ' 13-Feb-98 , 1:00 4:00 180 12 9.6 21168 1411.2 2.3 3,25 430720 Fe�98 2:0 :Oil �f 17640 1176..6r- Z. _.._..._Z.70--_- -49- --- 5:00 8:00 180 5 9.8 8820 580A 2.3 1.35 430CS.14 18- 0-98 1 1:00 4:00 180 10 9.8 17M 1176.0 2.3 2,70 � 4300,43 - �nn - 0 0.0 0.00 4300.43 0.0 OM 4 300.43T ! I 0 0.0 0.00 4300.43 _ 0 O'D 0.00 4300.43 0 0.0 0,001 43DD.143 _ 0 0.0 0.0,01 43DO.43 i 0 0.0 O.DO 43C)D.43 ` 1)0.0 O.DO 4300.43, r r 0 0.01 0.9 4 3DD.431 y4 AH(;H f + a oon Irri tior) FIM ReC5" -� ne Form fdr Each Field per p Cycle i racl ft i 1 reJd # l acili # ' ield Size t3 s 9 5 Owmrj Marvin i.. & ucy R. Evans rigelion Operat Inigulions Sartre" _ is Address 6GSfi M le ead Rd., NVb' Opera or's h, IBC 2 20 (Address i F �,� r"s PhcOe # �910 287- 6 rator S Phon # f From Li4i]ization Atari - . _-- .- ro T ecommendee TIAN LoSCW i LBJACRE =8 4300,43 1) (2) 1 (3) (4) 5 6 ( Date Start Time End Time ToW # of Sprinklers Flow Rain; To4al Vokme Votume Waste Ana sis PAN Applied Nilrogen m Minutes Operating (gaitmin) (gaBpns) per Aare PAN Qblaere) Balance (6) x (5) x (4) (gavacre) pfyi 00D gal} i8) x (S) l 1 DDO miscre) i3 - 10 01-mar--9B 1:00 1:30 30 14 3,6 T_4116 274.4 2.31 OM 429S.80I 2:D0 30 5 9.8 1470 98.0 2.3 0.23 4M.57 _ 200 700 60 41 9.S 2352 156.8 231 036 4299.2i :00 130 30 10 9.8 2940 196.0 2.3 045 4258.76 0 0.0 0.00 4298.76 10_[yiat-98 000 1:00 60 10 9.61 .$ 5880 . 392.0 23 090 4297 85 100 2:00 60 _ 14; 98 8232 50.81 2.3 1 26 4296,60 �- - 7UO----- - - -- -- -- - --" . - - -- - --429&-1 -- - 9.8 0 0.0 0.9U 4296.15 14-Mar 98 D00 2:00 120 10 98 11760 784.0 23 1.001 4294.34 2a0 -0 1 S464 2,52----42!�C34 - 0 0.0 0 DO 4294.34 0 0.0 D.DO 4294,E 01 0.0 D.DO 4294.34 0 0.0 _ O,DO 0-00 4294.34 D.DO 0 i'T0.0 0 r 0.0 0. DO 0.00 0 0.0 0.DO O.DO 00 0 0.D 0.00 T 0.00 0 D.o 0.00 D.DO ers Adckess 56 myriie dead Rd., NW I irrigalions Opera or's "Sari" h, NC_ 2_ 20 Mdress 1 erls P e # 91 D 287-5 a Pperators Phan rorn Waste iltihzaiion Plan {CTOPType Recommended FIAN Loa(f n2 , _ LBlAGRE "B 4294.34 I w _ (1) (2) (3) _ (4) (5) (6) _ (8) 9) (10) (11} II Date . Ster1 Time End Trrne Talal # of Sprin4ders Now Rafe To& Voiume Volume sste Art0 sls PAN Applied NItr-agen I } nwyddlyr Mimrtes erabng (gaflrnin) (,gallons) per Acre PAN (lblacre) Baiance x (5) x (4) (gaviacre) (Ib/1000 gal) (8) x (9) f 1000 (Iblacre) / A _10 T^_ ----2.70 `---4291.04 14ts� $$ D.Op :00 E8G 9.8 i7G40 5176.0 2.3 1:00 :00 T - 12_ '1d 9.8 16464 1097.E 2.3 2.52 4289,11 0 0.0 0.00 4289.11 0 O U 0.00 _ 4289.11 — 0 0.0 0.00 4289.11 r 0 0.0 0.00 42-9.11 02 0.0 _ 0.00 0.00 i 0 a.0 0.00 0.00 0 0.0 i 0,00 O.OD I ► ►► 0.00 1998 ion m 0 r~ 07 N Q m H # 1 Field ;4 15 aMn L. & ucy R. '3666 Myrtle erad R NC 2d42D AN Loading LBJ14CF?E�=B I pale I & tt Time i End Time I Total I # of Sprinklers I Flow Rate I Total Vdume f Volume IUti+este Aneyis I PAN Applied [ Nitrogen I 1- 3 i:40 180 :00 60 :00 6D ,1:00 18D '(2:OQ 18D 3:00 186 1�8(i 12:OD , 183 18D 180 12D m 12D 12D 10 9.8 117G0 784.0 14 9.8 2469E 1646A 14 9.8 246961 16464- S 9.8 2940 196.OT 3 10 9,8 17r>41 9,81 176401 117.6E 1176.0 - 1-4 --'------9:Brt---- -:]; . ......---f646-4- - -- 10 9.8 17640 1176.0 14 9.8 24696 1 1646.4 10 9.8 17640 1176.0 14, 9.8 24696 1646.4 - 8 9.8 14112 940.81 14 8i 9.8 24696 9.8A4112 1646.4 ; 944.8 51 9.8 • &S20 588.0 141 9.8 16464 1097.E 5 9.8 5880 i 392.0 1 42B8.21 2.3 3.79 2.3 3.7'9 2.31 0.45 2.31 0.27' 2,31 2.70 { 2.11 2.70 2.31 2,70 4261.07 2.3 1 3.79 4257.28 2.3' 2.16 4255.12 2.3 3.79 4251.33 2.3 ; 2.16 4249.17 i 1999 1 1 .. I Form Traci 0 1 Field # �_ iofd Size a s 15 ern Oumer w%4n L. & kjW R. Evans Cvmeft Addess 656 Myrtle ead Rd,. NW vner`s Phone 9 f2) f31 f4) (5) i n f- 'I } 7 fDate Start Tim End Time Total 0 of SpnnWers Row Rate I ToV Volume Vot>umtn Vbste Analysis PAN Apptted Nitrogen mnVddkjr Minutes (3} - (2) Operating (gaIfiiin) (.9wb ) (G) x 5) x (4) per Acre fgaiiacre) PAN t I�cm) � (MOOD € glance '�rc) 11 I b&,l+. rRw 0:00 :00 �180 � ^_ 14 9.S I ^ 24696 ! 1646-4 2.3 -=3.79 iA� 4.238.08, :DO :00 180 10 9.8 1764U 1176.0 -- 2.3 2.7E µ l 4235.38 l 09-Art-$6 0:00 030 :30 14 9.8 T4116 T MA 2.3 0.63' 4234.75 I_24-Jut-98 % Il'X ISO _ 10 9.81 14700 980.E Y 2.3 2.25 4232.49 1:30 :0D OD 150 :30 150; 14 S 9.8 9.8 245BO 11760 1372.0 784. D 2.3 2.3 3.16 1.80 4229.34 4227.53 :30 :DO -- 150 5 9.81 73£0 -- 49D 0 2.3 1A3 42.26.4t 2` cit19$ :30 f to - 151) 10 � 9A 1 147D0 , 98D.a ! 2.3 2.25 4224.1� 55 t 1:Op :30 130 :0b 150 7 ~ 14 i 5 9,81 9.8 20580 73b01 1372.01 u A9D.fl 2.3 2.3 3.16 1.13 4221.001 4219.87 , lti-Jun-so p.6u 1:00 lbo ol 9.51 Iwo 490,01 2.3 1.14$ 1:00 .30 150 10 9 B 747 Op 9$0.0 2.3 2.25 4214.69 :30 :00 150 14 9.8 20580 1372,0 2.3 3.16 4211.53 1 27.lurr,98 :D0 nD:30 15D T10 9,8. 14700 984.0 2.3 2,25 4209.28 1:00 P :OD 120 14 9.8 16464 1097.6 2.3 2.5Y2 4206, 75 I t3 0.0 ON 4206.75 I D 0.0 0,00 4206.75 0 0.01 0,00 1 4206,75 DUNE 1998 agoon Img bon Field R jLne Form i r Each Field (- iTract #1 3 ield - #- �_ 2 i iwd Size a res 22, - - - - arm Owner arvin L 8, ucy R. vans l i er's Arkfpsc r3FM Merfl, f,-qri Rd N[W I et's Pho # _f 9 287� 0 j �f ewor's ane # s i I-- '�.�_ _� ` �rxs fAlasd ubu,.fion pig. Dale � S%rt Time End 1 ime Total of Span Flow PEE a TotalVol=4 Vokym NeSte A119 AN Apoiec !Nitrogen mrrelddJy! Minutes Operating (gaVmin) (gabr)s) per Acre PAN (Vacre) Balance (2) 6) x (5) x 4 (g Vacre) IM 000 gal) 8) x (9) 110 (Iblacre) 7 I A 8- 1�00 27-Jun-961 ^�10 - 250.0 25W 113.61 1 ^i 2.3I 0.26:M 4206.49. V V.U! i U,VU 41Vb." U 0 0-0 - 0.00 4206.49 Q ; 0 0.4 Q00 4206.49 > ! 0 0.0 0.00 4206.49 w 0 0.0 0.001 4206.49 J -- - -0 -�:4 _ - - 0:00 ..-4206.49- I 0 0.0 0.00 4206.49 z 0 0.0 0.001 4206.49 �.0 £0 6,49-- 0 0.0 0.00 4206,49 a ' R 0 0.0 1 0.00 4206.49 l DI 0.0 i 0.00' 4205-49 a 0 0.0 0.001 4206.49 0 , 0.0 0.001 4206.49 Dj 0.0 - 0.00 4206.49 --0.00 0.0 4206.49 0 0.0 0.00 4206-49 r.1 0 0.0 ( O.Oti 4206.491 0.26 , 4208.23 OD Form for Each Field FTracl # 1 Field # 1 # Size (ages) 151 ft Otn Waste UlltzMon Masi I i - . . 7 - - i19 R/Af_PM--R' iT d?ng &9. se End Time Total 0 of Sprinklers ' Flog Rate f Total Volume I Volume Waste Analysis I PAN Applied Nitrogen l'v hAes Operatin (gallmfn) (goons) pet Acre Balance x (5} x (4) s (gaVaae {Iblf D00 al (8) x (9 / ]000 I oh/acre) 0:30 150. 14 9.81 20580 1372.D 2.3 3.161 4203.33 � :00 1501 10 9.8 r 14700 980.0 2.3 Z251 4201.08 :30 j 1501 31 9.8 i 4410 244.0 2.3 0.68 420DA0 I :00 150 8 9.8 11760 , 784.0 2.3 1.80 4198.60 , �0:30 i50 5 9.81 73501 490 0 2.3 1.13' 4197.47 ii:D4 150 10 9.8 14700 980 D , 2.3 2. 5 _ 4195.22 ��030,, 150 14 981 20680 1372 0 2.3 3.16 4192.0.6 . - - - - 150 8 9 8 11760 784 0 . 2,3 1.80 4190.26 110:30 150 14 9 B 20b80 1372.0 2.3 3.16 418711 :00 150 10 9.8 147001 980.0 23 2.27 4184.83 490.0 D _P60030 15D 8 9.8 0 0.0 2.3 0.00 4183.7 150 14 9.8( 20580 1372.0 2.3 3.16 4180.55 1:30 1501 10 9.8 14700 980.0 2.31 2.25 4176.30 :30 15_D 8 9.8 1 f 760 784.0 2.3 f .80 4178 49 DO _ 15D, S. 9.8 73501 490.0 2.31 1.131 4175.37 , 0.30 150 10 9.8 147001 980,0 Z.3 2.25) 4173.111 :00 15D 8 9.8 11760 784.0 2.3 1.801 4171.31 :00 50 5 ; 9.S 24501 163.31 2.3 0361 4167.78 0:30 150 10! 9.8 147001 980.0 1 2.3 2 25� 4165.52 :013 150 14 9.8 267050 17803.33 2.3 40.971 4124.56 :30 150 8 9.8 '117601 784.01 2.3 1.801 4122,75 :DO 150 3 9,81 44101 294.01 2.3 0,68 4122.09 0:30 15D 10 9.8 i 147001 950.0 i 2.3 2.25 4119.82 06 15D 8 9.8; 117601 784.0 2.3 1.8D 411a.02 5:30 15D 5 9.6 73501 490 0 :00 I _ 150t 141 9.81 205801 1372.0E 2,31 3.16 4113.741 GULY "CONTINUO i [ }2rur gwri lrrigif.tjon Field R600rd 'Same' � I ne Form fc r Each. Field er Crop fle Tact # field #� 1 aalit # leM Size acres 15 amt Gwnerj arvin L, & Ucy R Evans rriclation o rater owner's Myrtle -Lead Rd„ UN nigauons D ratorhs h NC 28K20 Ndress w� s Phoi e # 310 287-5C 90 emtor's F hone # From Waste Lttifiiation rop Type Vecommwx0ad PAN Loa ing LeIACFi 4113,20 , - ' �- Date i Stare Time End 7irne I Total of Spn,nO Flow Rate ctal Volarmn Volume ante Asia AN Appli Nitrogen mmiddtyr y _0 Minutes Operating (gaftin) (gdons) I per Acre PAN (Jtafacxe) Ratance 6} x (5) x (4 (gal/acre) XW1000 gaO 8) x (9)14 lucre) 1 !A l 8-30 �OS-�uI 98 ---_� 9.6 _ 20580 4110.04 44 :00 0:30 ^^-- 9`30 150 -+so- � 14 1372.0 r 2.3 r 3.16 _ :30 150 3 W, 1 44-10 294-0I 2.31 0.68 410824 :30 .Go 150 10 9.8 31 2.25-1� 9 09WJuF 1003Q. - - - -- - .-.1.rn . I 14i.._. 9.8 .- .20580' .. 1372.0. _ 2,31 [ �1:00 (l0:30 :00 :34 rm - 1501 150 5 9.8 9.8 11760 784.0E 73350 490.0' 2.3 2.3 1.80 1.13 4101.03 4099.90 :30 :00 150 10 9.S 14700 980.01 2.3 2,25 4097.65 104Us 98 :00 0,30�~ 150 10 9.8 14700 980.011, 2.3 2,25' 4095.39 [ OP.30 0:00 150 14 9,51 20580 1372.0 2.3 216 4U= 2.24 j T :04 :34 150 a 9.8 11760 784.3 2.3 1.801 4090.43 -- P:3,0 t 150 5 9,81 01 0.0 2.3 , 0,00 1 4090.43 11-JW-98,8:00 0,30 Y10;3�] S:CFO tl50 150 14 10 9.8 9.8 2WQ 14700 1372.0 2.3 880.0, 2.3' 2.161 2.251 4087281 4085-O3 - 0:00 :30 150 8 9.8 11760 784.01 2.3 1,80 1 4083.22 :30 .00 150 511 9.8 7350 490.0 i 2.3 1.131 4082.09 13- JiA-98 :00 0 30 150 10 9.8 14700 980.0 2.3 2.25 . 4079.84 1030 :00 150 8 9.81 117,90 784,0 2,31 '1.80 j 4-078,04 :00 .30 150 5 9.8 7350 490.0 2.31 t l 31 4076 91 _ :00 14 9. 3 3,16 , 4073-ZE J 9.8 Oj 0.0 2.3 0,00 4073,761 .._ �- 1 i 1 s.81 0 4.0 2,3 a.oa, 4073,76 J �j Z r� 9'e 0 (��, 2.3 -0.001 40-73:76 S.81 0 ? 0.0 2.31 0.00 4073-76 i 9.8 0 0.0 2.3 0.00, 4073,76 9.81 0 I 0,0 2.3 0.00 4073.76 9.8 0 0 2.3 0.00 4073.76 9.8 0 0.0 2.3, 0.001 4073.76 I 9.8; 0; 0,0 2.31 0.00t 45On,76 l"`1 5P c-r Site Requires Imm diate Attention: NO Facility No. 10 - Z c� DIVISION OF ENVIRONMENTAL MANAGEMENT ANIMAL FEEDLOT OPERATIONS STTE VISITATION RECORD DATE: `t L , 1995 Time: 3� Farm Name/Owner: aut-itntL Cmmarw C M 14 rtVl� �VA�s Mailing Address: County: 'F>K U r.LS Integrator: Phone: On Site Representative: Phone: Physical Address/Location: Type of Operation: Swine ✓ Poultry Cattle Design Capacity: Number of Animals on Site: DEM Certification Number: ACE DEM Certification number: ACNEW Latitude: Longitude: " Elevation: Feet Circle Yes or No Does the Animal Waste Lagoon have sufficient freeboard of 1 Foot + 25 year 24 hour storm event . (approximately 1 Foot + 7 inches) IaY No Actual Freeboard: Ft. Inches Was any seepage observed from the lagoon(s)? Yes or No Was any erosion observed? Yes or No Is adequate land available for spray? Yes or No Is the cover crop adequate? Yes or No Crop(s) being utilized: Does the facility meet SCS minimum setback criteria? 200 Feet from Dwellings? Yes or No 100 Feet from Wells? Yes or No Is the animal waste stockpiled within 100 Feet of USGS Blue fine Stream? Yes or No Is animal waste land applied or spray irrigated within 25 Feet of a USGS Map Blue Line? Yes or No Is animal waste discharged into waters of the state by roan -made ditch, flushing system, or other similar man-made devices? Yes or No If Yes, Please Explain. Does the facility maintain adequate waste management records (volumes of manure, land applied, spray irrigated on specific acreage with cover crop)? Yes or No Additional Comments: rtAs 6E€pa e V r-4 0 ° �,-ooX_s OK. • Inspector Name cc: Facility Assessment Unit (;5 ,J Signature Use Attachments if Needed • • 07-s4 E,S--Site Requires 1m-mcdiatc Attention: Facility No. _ 10. 29 DIVISION OF EN-VIRONNIEN fAL MANAGEMENT A.NfMAL FEEDLOT OPERATIONS SITE VISITATION RECORD DATE: � , 1995 4-0 FarmNa7me%Owner:,. Jk-, eeA Mailing Address: County. integrator F,r Nl) Phone: On Site Representative: i Physical Address/Location: Type of Operation: Swine — Poultry Cattle ~ Design Capacity: C 1f 'dumber of Animals on Site: a o ca o wRA/`` �N DEM Certification Number: ACE DEM Certification Number: A.CNEW�_____ Latitude3 4 ° 09 ` -'- " Longitude: 78 _° 30 ' 3 -7 " Elevation: Feet Circle Yes or NTa Does the Animal Waste Lagoon have sufficient freeboax•d of 1 Fcxst + 25 year 24 hour storm, evert (approximately 1 Foot + 7 inches) Yes or No _-actual Frz�;boaxd: .el. Was any seep-e: observed from the- lagc�on(s)' Yes. .. No Was any erasion obscavt•d`? Yes is. Is adequate land available for spray? rpor No is the cover crop adequate? Yes or No Crop(s) being utilized: IttAfrAl Does the facility meet SCS minimum setback crteria? 200 Feet from Dwellings? e�r No 100 Feet from Wells? Y6 or No Is the animal waste stockpiled within 100 Feet of USGS Blue Line Stream? Yes or No Is animal waste land applied or spray irrigated within 25 Feet of a USGS Map Blue Line? Yes or No Is animal waste.discharged into waters of the state by man-made ditch, flashing system, or other similar man-made devices? Yes oT9 If Yes, Please Explain. Does the facility tuaintain adequate waste trianagernent records (volumes of manure, land applied, spray irrigated an specific acreage with cover crop)? Yes rZ Additional Comments: 1n- `i . Inspector Name"' Signature W1 cc; Facility Assessment Unit Use Attachments if Needed.