Loading...
HomeMy WebLinkAbout310770_INSPECTIONS_20171231NORTH CAROLINA Department of Environmental Qual Type of Visit: Compliance Inspection 0 Operation Review Q Structure Evaluation O Technical Assistance Reason for Visit: _,Olioutine O Complaint O Follow-up Q Referral Q Emergency O Other Q Denied Access Y�YYYYYY� •r- r Date of Visit: I I ►'ytJ(1 1I Arrival Time: Departure Time: County: Farm Name: Q Owner Email: Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: Title: Phone: Onsite Representative: Nam, i Certified Operator: /�} o 40 Back-up Operator: Location of Farm: Latitude: Integrator: Region: Certification Number: 2 6 0 q g- Certification Number: Longitude: Swine Wean to Finish Design Current Capacity Pap. Wet Poultry Layer Design C•apaeity Current Pop. Cattle Dairy Cow Design Current C►apacity Pup. Wean to Feeder I INon-Layer I Dairy Calf eeder to Finish "7 Daig Heifer Farrow to Wean Farrow to Feeder Farrow to Finish Dr. P,oul_ f Layers Design Ca ac[ Current P,o , D Cow Non -Dairy Beef Stocker Gilts Non -Layers Beef Feeder Boars Pullets Beef Brood Cow Other Other Turlce s Turkey Poults Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? ❑ [/] Yes �No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ Yes,,ET]No ❑ Yes �No ❑NA ❑NE ❑ NA ❑ NE ❑ NA 0 NE Page l of 3 21412015 Continued Facili Number: jDate of Inspection: Waste Collection & Treatment 4. Is Storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? � ❑ Yes o `"o ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: 1 Spillway?: Designed Freeboard (in): Observed Freeboard (in): , 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes �Vo ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes �No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes ,ETNo ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes •E5*No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes ;:]-No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes­4ET'No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yesj;�'No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 tbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes Z'f o ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes, No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes JJ<o ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes,,[D'No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yesiff No ❑ NA ❑ NE _Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes ,12'No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes _12'1Go ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑Design ❑Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? Ifyes, check the appropriate box below. ❑ Yeses <o ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ET'T�o ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes —E]I o ❑ NA ❑ NE Page 2 of 3 21412015 Continued Facili Number: - Date of —Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes _12-Wo ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes�❑'r4o ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes_�Wo ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes Ej'No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the []Yes F,;'No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ;D No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ,E5ON'o ❑ NA ❑ NE 34. Does the facility require afollow-up visit by the same agency? ❑Yes � - ' V ❑ NA ❑ NE Comments. (refer to questions ft Explain any.YES. answers and/or any additional recommendations or any other comments. Use drawings of facility to better- explain situations (use additional pages as necessary). Reviewer/Inspector Name: Reviewer/Inspector Signature: Page 3 of 3 lyl•--�� Iv �i a Phone: 90-7 — / 3L Date: !iL! 2/4/20I5 r .t Type of Visit: O Zvoutine pliance Inspection O Operation Review Q Structure Evaluation Q Technical Assistance Reason for Visit: 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: 3, Arrival Time: ® Departure Time: f County: - Region: Farm Name: Owner Name: Mailing Address: Physical Address: Facility Contact: Owner Email: Phone: Title: Phone: Onsite Representative: JOL gq:MyqI's iLl j Integrator: Certified Operator: Certification Number: 2�((7 a" Back-up Operator: Location of Farm: Latitude: Certification Number: Longitude: Design Current Swine Capacity Pop. Wean to Finish Design Current Wet Poultry Capacity Pop. La er Design Current Cattle Capacity Pop. Dai Cow Wean to Feeder Non -La er DairyCalf Feeder to Finish 6 DairyHeifer Farrow to Wean Design Current D Cow Farrow to Feeder 13 r P,o .Itr, C•_a aci P,o , Non -Dairy Farrow to Finish La ers Beef Stocker Gilts Non -La ers Beef Feeder Boars Pullets Turkeys Turkey Poults Other Beef Brood Cow Other Other Discharges and Stream Impacts /No 1. Is any discharge observed from any part of the operation? ❑ Yes E2 ❑ NA NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes ❑ Ng ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes =�/ / ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes No ❑ NA ❑ NE of the State other than from a discharge? Page I of 3 21412015 Continued Facili Number: Date of Inspection: Iff F Waste Collection & Treatment ` 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes a. If yes, is waste level into the structural freeboard? ❑ Yes Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Identifier: LA &Z/No ❑ NA ❑ NE ❑ No ❑ NA [] NE Structure 6 Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes ZNo ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes] No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmen I threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes o ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes VNo ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes [2�No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes o ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes o ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes o ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes [yNo ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box. ❑WUP El Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes dNo [DNA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes gNo ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ NA ❑ NE Page 2 of 3 21412015 Continued Facie Number: - Date of Inspection: 0#jjajJ6 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes �No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes �/No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes 2f No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑Yes No ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? ❑ Yes [//No ❑ NA ❑ NE ❑ Yes do ❑ NA ❑ NE ❑Yes �o ❑NA ❑NE ❑ Yes WNo ❑ NA ❑ NE ❑ Yes ❑ Yes ❑ Yes [j ❑NA ❑NE ❑NA ❑NE No ❑ NA ❑ NE Comments(refer to. question #.):„Explain anyNES answers and/or_any additional recommendations_or any other comments. Use drawings of facility to better explain situation s (use additional pages as necessary). . 0 L/C 76 WAS IV RAJ-�4FAb(. qII/((, <7q 112Otar^' I�, ao bay �M- Reviewer/Inspector Name: Reviewer/Inspector Signatur Page 3 of 3 O/M Date: 91'�2 / I U 5 Type of Visit: (3 rRoutine pliance Inspection O Operation Review O Structure Evaluation O Technical Assistance Reason for Visit: O Complaint O Follow-up O Referral O Emergency O Other O Denied Access Date of Visit: 7 Arrival Time: Departure Time: County: 1 P( Region: Farm Name: Owner Email: Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: Title: OnsiteRepresentative:y��Afi�� / ill _u&g- Integrator: Certified Operator: Back-up Operator: Location of Farm: Latitude: Phone: Certification Number: d� V Certification Number: Longitude: Design Current Design Current Design Current Swine Capacity Pap. Wet Poultry Capacity Pop. Cattle Capacity Pop. Wean to Finish I I Layer I Dairy Cow Wean to Feeder I INon-Layer I Dairy Calf Feeder to Finish Farrow to Wean Design C+urrent Da' Heifer Cow Farrow to Feeder D . P,ouih: Ca aei P,o , Non -Dairy Farrow to Finish I GiltsI ILayers INon-Layers I Beef Stocker Beef Feeder BoarsI JPullets Turkeys Beef Brood Cow Other Turkey Poults Outer Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? [—]Yes No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes � ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters [] Yes No ❑ NA ❑ NE of the State other than from a discharge? Page 1 of 3 21412014 Continued FaciIi Number: -;7 7 Date of lns ection: 4 1 1-111 Waste Collection & Treatment 4- [s storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE StructureStructure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): _--1—� 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes 0 No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a []Yes No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environment 1 threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes 40 ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes EJ/No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. [:]Yes �3No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13, Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes Z j o ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes o ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes o ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes o ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes YNo ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists El Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes CdNo ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1 " Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? [:]Yes I �J 1� ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes II No ❑ NA ❑ NE Page 2 of 3 21412014 Continued Facili Number: - Date of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes YNo d�o ❑ NA ❑ NE 25. -Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey [:]Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes o ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? [:]Yes WNo ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or GAWMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? Reviewer/Inspector Signatur Page 3 of 3 ❑ Yes �o ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE [:]Yes WNo ❑ NA ❑ NE ❑ Yes EJ/No ❑ NA ❑ NE ❑ Yes ❑ Yes ❑ Yes F�o ❑ NA ❑ NE o ❑ NA ❑ NE No ❑ NA ❑ NE "1 1 /is- 214.12015 Type of Visit: Q C pliance Inspection O Operation Review Q Structure Evaluation O Technical Assistance Reason for Visit: Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 ��f) Denied Access Date of Visit: Arrival Time: Departure Time: ® County: :Dyp ciRegion: Farm Name: Owner Email: Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: Title: Onsite Representative: Integrator: Certified Operator: Back-up Operator: Location of Farm: Latitude: Phone: Certification Number: Certification Number: Longitude: Desigu Current Design Current Swine Capacity Pop. Wet Poultry Capacity Pop. Wean to Finish Layer Design Current Cattle Capacity Pop. Da Cow Da' Calf DairyHeifer Wean to Feeder Non -La er Feeder to Finish Farrow to Wean Farrow to Feeder Design Current 1D . P�oult r Ca aci_ P,a , Dry Cow Non -Dairy Farrow to Finish Layers Beef Stocker Gilts Non -Layers Beef Feeder Beef Brood Cow Boars Pullets Other Other Turke s Turkey Pouets Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? ❑ Yes No ❑ NA ❑ NE [:]Yes [—]No [:]Yes ❑ No (DNA ❑ NE ❑ NA ❑ NE [:]Yes FNo ❑ NA ❑ NE ❑ Yes ❑ NA ❑ NE ❑ Yes ❑ NA ❑ NE Page I of 3 21412011 Continued r$cility Number: ) Date of Inspection: f Waste Collection & Treatment 4 Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes a. If yes, is waste level into the structural freeboard? ❑ Yes E St��j trl Structure 2 Structure 3 Structure 4 Structure 5 Identifier: LA Spillway?: WNo ❑ NA ONE [:]No ❑ NA ❑ NE Structure 6 Designed Freeboard (in): 22 Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes h10 ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmen threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes Zo [3 NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes [ ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) — / 9. Does any part of the waste management system other than the waste structures require ❑ Yes PO ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes 0 No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ZNio ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ,/ No [DNA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes �To ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? 18. Is there a lack of properly operating waste application equipment? Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check the appropriate box. ❑WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements [:]Yes � ❑ Yes �o ❑ Yes �`Nq Yes No ❑ Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspecti��NOV Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑Yes No ❑ NA ❑ NE ❑ NA ❑ NE ❑ NA ❑ NE ❑ NA ❑ NE ❑ NA ❑ NE Page 2 of 3 21412014 Continued FF ility Number: jDate of Inspection: Cf 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑Yes �N ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑Yes No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes VN0o NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑Yes [] NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? ❑ Yes o ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE [:)Yes /No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes ❑ Yes ❑ Yes ❑ NA ❑ NE ❑ NA ❑ NE No ❑ NA ❑ NE Comments (refer to question ft Explain any YES answers andlor any additional recommendations or any other comments Use drawings of facility to better explain situations (use additionalpages as necessary): Reviewer/Inspector Name: Reviewer/Inspector Signature: Phone: M Date: 11 Page 3 of 3 / 2141201 Type of Visit: O Co pliance Inspection V Operation Review O Structure Evaluation O Technical Assistance Reason for Visit: Routine Q Complaint Q Follow-up O Referral O Emergency O Other O Denied Access Date of Visit: Arrival Time: Departure Time: 1///) County: Region: Farm Name: Owner Email: Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: Onsite Representative: >JON Certified Operator: Back-up Operator: Location of Farm: Title: Latitude: Phone: Integrator: Certification Number: 6 Certification Number: Longitude: Swine Wean to Finish Design Current Capacity Pop. Design Current Wet Poultry Capacity Pop. Layer Design Current Cattle Capacity Pop. Dairy Cow Wean to Feeder Non -La er I Ell Dairy Calf Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Design Current Dz, P,o_ultr. Ca aci. P. I Layers Dairy Heifer D Cow Non -Dairy Beef Stocker Gilts Non -La ers Beef Feeder Beef Brood Cow Boars Pullets Turkeys Turkey Poults Other Other Other Discharges and Stream Imoacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes 2 No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWQ) ❑ Yes ❑ No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWQ) ❑ Yes ❑ No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes �N ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes No ❑ NA ❑ NE of the State other than from a discharge? Page I of 3 21412011 Continued FaciliNumber: 7- Date of Inspection: *aste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? 0 Yes [Z/No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? [:]Yes [:]No ❑ NA ❑ NE Stn}cture 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: t,//A Spillway?: Designed Freeboard (in): Observed Freeboard (in): T 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes �No[_] ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes CNo ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes l�o ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes ❑ No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require [:]Yes 21 XO ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. [:]Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes Q No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes I,d'1 o ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes [• - ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes ❑'No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes [,311qo' ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? [:]Yes �10 ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes � ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. 0 Yes EJ4<o ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections P Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes No ❑ NA ❑ NE Page 2 of 3 21412011 Continued Facility Number: - Date of Inspection: -14. Did the facility fail to calibrate waste application equipment as required by the permit? F ❑ Yes 04 ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes ; _ Y ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes No ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes 0 <NoIC] NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? ❑ Yes �"" ❑ NA ❑ NE ❑ Yes ❑ Yes ❑ Yes (D'�/o ❑ NA ❑ NE [2 No ❑ NA 0 NE No ❑ NA ❑ NE (Comments (refer to question #f): Explain any YES answers and/or any additional recommendations or any other comments. I Use drawings of facilitv to better exulain situations (use additional naves as necessarv). Reviewer/Inspector Name: t .,bA#,J _ 4 Phone: '?3 Reviewer/Inspector Signature: i_4d ,,, , //Wc4&j/j Date: Page 3 of 3 ! 121412011 W-4 Type of Visit: (y7Routine fiance inspection U Operation Review U Structure Evaluation U Technical Assistance Reason for Visit: 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: C6 y Arrival Time: = Departure Time: County: �y ~' Region: Farm Name: Owner Email: Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: �Tiit+l�e: Onsite Representative: ION gal Q& 1 1 r +-�--L'L&' Certified Operator: Back-up Operator: Location of Farm: Phone: integrator: Certification Number: 0?60 !.2.. Certification Number: Latitude: Longitude: Design Current Swine Capacity Pop. Wean to Finish Design Current We# Poultry Capacity Pap. Layer Design Current Cattle Capacity Pop. Dairy Cow Wean to Feeder Non -Layer DairyCalf Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish 5 Design Current Di, P■oul, Ca .act P,o Layers Dairy Heifer Cow Non -Dairy Beef Stocker Gilts Non -Layers Beef Feeder Boars Pullets Beef Brood Cow Qther Other Turkeys ,Turkey Poults 10ther Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? [:]Yes No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NA ❑ NE b. Did the discharge reach waters of the State? (if yes, notify DWQ) ❑ Yes ❑ No ❑ NA ❑ NE c. What is the estimated volume'that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? ❑ Yes [3NA ❑ NE ❑ Yes �zo ❑ NA ❑ NE ❑ Yes ❑ NA ❑ NE Page I of 3 214120II Continued Facility Number; - rilo IDate of Inspection: f D •t Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes a. If yes, is waste level into the structural freeboard? ❑ Yes Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): Structure 1 � Structure 2 j`�� ;) Structure 3 Structure 4 Structure 5 5. Are there any immediate threats to the integrity of any of the structures observed? (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? No ❑ NA ❑ NE ❑ No ❑ NA ❑ NE Structure 6 ❑ Yes No ❑ NA ❑ NE ❑ Yes O/No ❑ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental rest, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes Ej N ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes ErNo ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes o ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes ;2/No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? 15. Does the receiving crop and/or land application site need improvement? 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acres determination? 17. Does the facility lack adequate acreage for land application? 18. Is there a lack of properly operating waste application equipment? Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check the appropriate box. ❑ WUP [:]Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑ Yes EfN ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes 1V o ❑ NA ❑ NE [:]Yes No ❑ NA ❑ NE ❑ Yes IVo ❑ NA ❑ NE ❑ Yes ICJZ ❑ NA [] NE ❑ Yes ❑ NA ❑ NE ❑ Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes Q No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes �o NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes o ❑ NA ❑ NE Page 2 of 3 21412011 Continued Facility Number; I - 7n Date of Inspection: Dga 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ❑ N ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes o ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? [-]Yes KNo ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes gl<o ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes Dee ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: [:]Yes 24'o ❑ NA ❑ NE ❑ Yes To ❑ NA ❑ NE 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ffNo 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes E�< 34. Does the facility require a follow-up visit by the same agency? ❑ Yes Comments (refer to question #): Explain any YES answers and/or any additional recommendationsvr, any other Use` drawines of facility to better explain situations (use additional naves as necessarv). Reviewer/Inspector Name: Reviewer/Inspector Signature: Page 3 of 3 ❑ NA ❑ NE ❑ NA ❑ NE ❑ NA ❑ NE Phone: / — �O Date: 104 214,4011 R Type of Visit: Q CoWpliance Inspection U Operation Review O Structure Evaluation O Technical Assistance Reason for Visit: Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: a q Arrival Time: [! V Departure Time: © County: D14,rl+l Region: Farm Name: Owner Email: Owner Name: Mailing Address: Physical Address: Phone: Facility Contact: Title: Phone: Onsite Representative: J01I1iiia1v 61M'L&7_ Integrator: Certified Operator: Certification Number: 07% Back-up Operator: Location of Farm: Latitude: Certification Number: Longitude: Design Current Design Current Design Current Swine Capacity .Pop. Wet Poultry C►apacity Pop. Cattle Capacity Pop. Wean to Finish La er Dai Cow Wean to Feeder Non -La er Da' Calf Feeder to Finish i7 Sam Da' Heifer Farrow to Wean Design Current Dry Cow Farrow to Feeder D . P,oul , Ca aci P,o , Non -Dairy Farrow to Finish I Layers Beef Stocker Gilts Non -La ers Beef Feeder Boars Pullets Beef Brood Cow Turke s Other Turkey Poults Other Other Dischartres and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: _ a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? [—]Yes LJ No NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA C] NE [—]Yes ❑ NA ❑ NE ❑ Yes jeNg ❑ NA ❑ NE ❑ Yes❑ NA ❑ NE Page I of 3 21412011 Continued Facili Number: 3 - FDate o L Waste Collection & Treatment 4. Js storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: LA>XV%% Spillway?: Designed Freeboard (in): Observed Freeboard (in): Jay 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes M/No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? [—]Yes Elio D NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes E ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require [:]Yes 1:240 ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need [:]Yes P/No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. [:]Yes �No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes [ZNo ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? [:)Yes [3"No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes [211�o ❑ NA ❑ NE acres determination? IT Does the facility lack adequate acreage for land application? 18. Is there a lack of properly operating waste application equipment? ❑ Yes E�Xo ❑ NA ❑ NE [:]Yes C)Ao ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes QrNo ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes [�<o ❑ NA ❑ NE the appropriate box. ❑Wi1P ❑Checklists ❑Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes o ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? [—]Yes �No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes , o ❑ NA ❑ NE Page 2 of 3 2/4/2011 Continued FaciliNumber: - Date of Inspection: 4 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes Ej o ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes �o ❑ NA ❑ NE the appropriate box(cs) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes [ 11go ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes [D No ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes [fNo ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes L2fi7o ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) / 31. Do subsurface the drains exist at the facility? If yes, check the appropriate box below. ❑ Yes Ej<o ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes [] No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes Q N ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes II No ❑ NA ❑ NE Comments (refer to question ft Explain any YES answers and/or any additional recommendations or -any, other comments ,�;��, Use drawings of facility to better explain situations (use additional pages as necessary). Reviewer/Inspector Name: 1010 N.1 rOaL Phone: l V Reviewer/Inspector Signature: Page 3 of 3 Date: I / q 21412011 Drvision of:Water Qua O'bivision "of Faclltty Number 7 __J0 Other Agencyd and Water Conservation �. -, Type of Visit Co pi lance Inspection O Operation Review O Structure Evaluation O Technical Assistance Reason for Visit Routine O Complaint O Follow up O Referral Q Emergency 0 Other ❑ Denied Access Date of Visit: Arrival Time: Departure Time: County: DUP U/r1 1 Region: Farm Name: Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Title: Onsite Representative: Certified Operator: 3 Back-up Operator: Location of Farm: Phone: Phone No: Integrator: Operator Certification Number: Back-up Certification Number: Latitude: [= c = ❑ « Longitude: = ° 0 0 Desrg'oCurrenf:-Desigp fi Current �� , Designs Current- Capacity 'Population :Wet Poultry Capacity Population:- CattleCapacity,Populatiori ❑ Wean to Finish i ❑ Wean to Feeder _ Feeder to Finish 6b 16 "' ❑ Farrow to Wean '' ❑ Farrow to Feeder 0 ❑ Farrow to Finish ❑ Gilts " ❑ Boars ❑ Layer ❑ Non -Layer J_jrv`Piiultrv" n, .. k Pullets 1er ,t . ❑ Turkey Poults Other Other Discharses & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? ❑ Dairy Cow ❑ Dairy Calf ❑ Dairy Heifer ❑ Dry Cow ❑ Non -Dairy ❑ Beef Stocker ❑ Beef Feeder ❑ Beef Brood Cowl b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes CZ/No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ NA ❑ NE ❑ Yes ❑ ❑ Yes LYJ o ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE Page 1 of 3 12128104 Continued i Facility Number: S —'�'�6 Date of Inspection 1d IL : Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes 0 No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: LAe--+J Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes L'J No ❑ NA ❑ NE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes [�No ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmentalat, notify DWQ 7. Do any of the structures need maintenance or improvement? ElYes No ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes d No ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes 2No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes �No ❑ NA ❑ NE maintenancelimprovement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes M No ❑ NA ❑ NE ❑ Excessive Pending ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN [:IPAN > 10% or ] 0 Ibs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ❑ N , ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination ? ❑ Yes No ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes " ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE :Comments•(refer toagnestion,#): , Explainany�,YES.answers and/or any recommendations or any,,other coma ;Use drawings of facility to better explain situations. (use additional pages as necessary): Reviewer/Ins ector Name p W Phone _ Reviewer/Inspector Signature: Date: 1 0 ,110 Page 2 of 3 If 12128104 Continued lj�ciiity Number: 11d Date of Inspection Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check the appropriate box. ❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Other _ 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rain Inspections ❑ Weather Code ❑ Yes LINO ❑ NA ❑ NE ❑ Yes I No ❑ NA ❑ NE 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes O No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes �hio [INA ElNE 25. Did the facility fail to conduct a sludge survey as required by the permit? ElYes VNo ❑ NA El NE 26. Did the facility fail to have an actively certified operator in charge? El Yes ❑ NA El NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? El Yes ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes CTNo ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes td'No ❑ NA ❑ NE and report the mortality rates that were higher than normal? � 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes B No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes � No ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes CKO ❑ NA ❑ NE Additional Comments and/or Drawings; Page 3 of 3 12128104 31 H 910 Type of Visitpliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit 4outine 0 Complaint 0 Follow up 0 Referral 0 Emergency 0 Other ❑ Denied Access Date of Visit: Arrival Time: Departure Time: County: 3�'uP UW Region: Farm Name: Owner Email: Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: Title: Onsite Representative: Mat-L- *_ Integrator: Certified Operator: Back-up Operator: Phone No: Operator Certification Number: Back-up Certification Number: Location of Farm: Latitude: = o = ' 0 « Longitude: = ° = 1 = « Design Current Design Current Design Current Swine Capacity Population Wet Poultry Capacity Population Cattle Capacity Population ❑ Wean to Finish ❑ La er ❑ Dai Cow ❑ Wean to Feeder n-La er ❑ Dai Calf ® Feeder to Finish S'76o Dairy Heifer ❑ Farrow to Wean Dry Poultry ❑ Dry Cow ❑ Farrow to Feeder ❑ Non -Dairy El Farrow to Finish El Layers ❑ Beef Stocker Gilts ElNon-Layers [IBeef Feeder Po Boars ❑ Pullets ❑ Beef Brood Co ❑ Turkeys Other ❑ Other ❑ Turkey Poults ❑ Other Number of Structures: Discharees & Stream Imuacts 1. Is any discharge observed from any part of the operation? ❑ Yes No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWQ) ❑ Yes ❑ No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) ❑ Yes El No El NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes iJ No ❑ NA ❑ NE 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State ❑ Yes WNo ❑ NA ❑ NE other than from a discharge? Page 1 of 3 12128104 Continued Facility Number:31— io Date of Inspection"TZ ! Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a. If yes, is waste level into the structural freeboard? Structure I Structure 2 Structure 3 Identifier: L Ct-nr.J Spillway?: Designed Freeboard (in): Observed Freeboard (in): 3 v ^ Structure 4 ❑ Yes Ej`No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE Structure 5 Structure 6 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes [I No ❑ NA ❑ NE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes No ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? Cl Yes ❑ No ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes I[J No ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 4. Does any part of the waste management system other than the waste structures require ❑ Yes 2(No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes dlNo ❑ NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground [:]Heavy Metals (Cu, Zn, etc.) []PAN ❑ PAN > 10% or t0 Ibs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ❑ Yes 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination?❑ Yes 17. Does the facility lack adequate acreage for land application? ❑ Yes 18. Is there a lack of properly operating waste application equipment? ❑ Yes zI, ❑NA ❑ NA 0 ❑ NA ❑ NA No ❑ NA ❑ NE ❑ NE ❑ NE ❑ NE ❑ NE Reviewer/inspector Name j &N t-j 4a/")j Phone: &,' /7G —1 W Reviewer/inspector Signature: Date: y 5 Page 2 of 3 12128104 Continued Facility Number• r= •3 —1"i0 Date of Inspection �to wired Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check the appropriate box. ❑ WUp ❑ Checklists ❑ Design ❑ Maps ❑ Other ❑ Yes ZNo ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? Cl Yes [3'No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? Yes El�J ,dNN El NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes ,L_,/No L( No ❑ NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes [_No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes Ej`No ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document El Yes El Yes , �� �ZNo ❑ NA ❑ NA ❑ NE NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes FfNo ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) ,. ,/ 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? El Yes N ElNA ElNE 33. Does facility require a follow-up visit by same agency? El Yes No ❑ NA ❑ NE 12128104 7-1a Type of Visit Co Hance Inspection Operation Review 0 Structure Evaluation Technical Assistance Reason for Visit Routine O Complaint Q Follow up O Referral O Emergency O Other ❑ Denied Access Date of Visit: `i O Arrival Time: IJ3 Departure Time: County: {,�1A7 Region: Farm Name: Owner Email: Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: Title: Phone No: Onsite Representative: `j�NrAT Nr��YL- Integrator: Certified Operator: Operator Certification Number: Sack -up Operator: Sack -up Certification Number: Location of Farm: Latitude: e = I = Longitude: = ° = 1 Design Current Design Current Design Current Swine Capacity Population Wet Poultry Capacity Population Cattle Capacity Population ❑ Wean to Finish 10 Layer I ❑ Dairy Cow ❑ Wean to Feeder ❑ Non -Layer j ❑ Dairy Calf Feeder to Finish ❑ Dairy Heifer ❑ Farrow to Wean Dry Poultry ❑ Dry Cow ❑ Farrow to Feeder ❑ Non -Dairy ❑ Farrow to Finish ❑ Layers ❑ Beef Stocker ❑ Gilts ❑ Non -Layers El Beef Feeder ❑ Boars ❑ Pullets ❑ Beef Brood Co ❑ Turkeys O#her ❑ Other Q]Turkey Poults ❑ Other Number of Structures: E] Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Page I of 3 ❑ Yes UrNo ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE El NA ❑NE El Yes ❑ KA ❑ Yes C No NA ❑ NE ❑ Yes ❑ o ElNA ❑ NE 12128104 Continued FacWtyNumber: 3 -�%� Date of Inspection i Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes (3 NA El NE (ie/ large trees, severe erosion, seepage, etc.) 7No 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental tthhr at, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes Zo ❑NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑Yes ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require [] yes 0 No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes d /No ❑ NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes 9<0 ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ❑ NA El NE 15. Does the receiving crop and/or land application site need improvement? determination?❑ El Yes ,[�]'No L T ElNA [INE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre Yes [I NA ❑ NE 17. Does the facility lack adequate acreage for land application? El F El NA El NE 18. Is there a lack of properly operating waste application equipment? ElYes El ❑ NA ❑ NE Comments {refer tolqueshon. # Explai! a Y sw�er.0iii / s�r o nmendatio-Mo , ny other, comments. Use drawmgs.ofhfacilrty'to better explam sttuahoii (use additional:pages>as.necessary): ..,e� f � Reviewer/Inspector Name _ T 6A %J ���Q/U� ((� Phone: - -73 Reviewer/Inspector Signature: Date: Page 2 of 3 12128104 Continued I Facility Number: 3 ` --na Date of Inspection Rtguired Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes El NA El NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes 7No❑ NA ❑ NE the appropirate box. ❑ WUP ❑ Checklists ❑ Design [3 Maps ❑Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes ,�, La'Na ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rain Inspections Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes d ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ElYes El NA rN ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? El Yes7No ❑ NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes [I NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? El Yes ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ NA X ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ yes No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes2�N NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes No NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes N ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes No ❑ NA ❑ NE Additional Comments and/or Drawings. Page 3 of 3 12128104 Z Division of Water Quality JT77acility Number 3 r]O 0 Division of Soil and Water Conservation 0 Other Agency Type of Visit �Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance ( Reason for Visit �U Routine 0 Complaint 0 Follow up 0 Referral 0 Emergency 0 Other ❑ Denied Access Date of Visit: Arrival Time: l0 3U Departure Time: County: DLAMO Farm Name: Owner Name - Mailing Address: Physical Address: Owner Email: Phone: Facility Contact: Title: Phone No: Onsite Representative: . �a►�ys 11 IA,1 Lam_� Integrator: Certified Operator: Back-up Operator: Location of Farm: Design Current Swine Capacity Population ❑ Wean to Finish ❑ Wean to Feeder ❑x Feeder to Finish 1,516 a S 2� ❑ Farrow to Wean ❑ Farrow to Feeder ❑ Farrow to Finish ❑ Gilts ❑ Boars Other ❑ Other Operator Certification Number: Back-up Certification Number: Region: Latitude: [= o ❑ d = 4f Longitude: = o ❑' 0 Design Current Wet Poultry Capacity Population ❑ Layer ❑ Non -La er IN Dry Poultry ❑ La ers ❑ Non -Layers ❑ Pullets ❑ Turkeys ❑ Turkey Poults ❑ Other Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? Cattle Design Current Capacity Population.. ii ❑ Dairy Cow ❑ Dairy Calf ❑ DailHeifer ❑ Dry Cow ❑ Non -Dairy ❑ Beef Stocker ❑ Beef Feeder ❑ Beef Brood Co M Number of Structures: I b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes IJ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes El No ❑ NA ❑ NE ❑ Yes ld No ❑ NA ❑ NE ❑ Yes [No ❑ NA ❑ NE 12128104 Continued Facility um her: 3 — `]�(} Date of Inspection to Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: J.4sotrtC Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes o ❑ NA ❑ NE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes No ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmentaltheat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes No ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes [ No ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes 'No ❑ NA ❑ NE maintenance or improvement? Waste Aaolication 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes ENo ❑ NA ❑ NE maintenance/improvement? � 11. Is there evidence of incorrect application? If yes, check the appropriate box below. El Yes [Z No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 Ibs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ffNo ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ONo ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination?[:] YesIo ❑ NA ElNE 17. Does the facility lack adequate acreage for land application? ❑ Yes LJ No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes JNo ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any recommendations or any other comments. Use drawings of facility to better explain situations. (use additional pages as necessary): Reviewerllnspector Name �N�i Phone: _ 3 5 Reviewer/Inspector Signature: Date: o -1.5 to 12128104 Continued r Facility Number: — ]p Date of Inspection 10 �5a Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes LQ No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes LY No ❑ NA ❑ NE the appropirate box. ❑ WUP ❑ Checklists ❑ Design ❑Maps ❑Other 21. Does record keeping need improvement? if yes, check the appropriate box below, ❑ Yes 0 No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V Rain Inspections Weather Code 22. Did the facility fail to install and maintain a rain gauge? ElYes , f❑ LEI No El NA ❑ NE 23. If selected, did the facility fail to install and maintain minbreakers on irrigation equipment? El Yes I �J to ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes No d] [I NA El NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes ,�,� ❑ NA El NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes FNo ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes E No ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes LJ N [INA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ElYes No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes LJ No ❑ NA ❑ NE General Permit? (iel discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes CJ N ElNA ElNE 33. Does facility require a follow-up visit by same agency? ElYes No ❑ NA ❑ NE Additional Comments and/or Drawings: 12128104 4' �.0 ivision of Water Quality Facility Number O Division of Soil and Water Conservation J. O Other Agency Type of Visit 9leoompliance Inspection O Operation Review Q Structure Evaluation O Technical Assistance Reason for Visit oRoutine O Complaint 0 Follow up O Referral O Emergency 0 Other ❑ Denied Access Date of Visit: Q Arrival Time: Departure Time: County: � Region: Farm Name: Owner Name: Mailing Address: Physical Address: Facility Contact: Title: Onsite Representative: Certified Operator: Back-up Operator: Location of Farm: D Swine G ❑ Wean to Finish �❑ Wean to Feeder Farrow to Wean Farrow to Feeder Farrow to Finish Owner Email: Phone: Phone No: Integrator: Operator Certification Number: Cm G Back-up Certification Number: Latitude: 0 0 = ' = Longitude: 0 ° = 6 = Sd sign ,.Current Design Current acity� Population Wet Poultry Capacity Population ❑ Layer j . ❑ Non -Layer Dry Poultry IL I Boars I I Other ❑ Other ❑ Layers ❑ Non -Layers ❑ Pullets ❑ Turkeys El Turkey Poults ❑ Other Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? Design Current:--.",-,.. Cattle Capacity, Population ❑ Dairy Cow ❑ Dairy Calf ❑ Dairy Heifer ❑ Dry Cow ❑ Non -Dairy ❑ Beef Stocker ❑ Beef Feeder ❑ Beef Brood Cowl Number. of Structures: W: b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Page I of 3 ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ NA ❑ NE ❑ Yes ❑ No ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE \N 12128104 Continued Facility'Number: — Date of Inspection Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a. If yes, is waste level into the structural freeboard? St7ture 1 Structure 2 Structure 3 Structure 4 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes ❑ No ❑ NA ❑ NE ❑Yes ❑No El NA ❑NE Structure 5 Structure 6 ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes ❑ No ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes ❑ No ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes ❑ No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes ❑ No ❑ NA ❑ NE maintenance/improvement? l L Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop W' dow1_51�� ElEvidenceof Wind Drift El Application Outside of Area type(s) 12. crop type(s) hellnme4t 67l'' . 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ❑ No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination ? ❑ Yes ❑ No ❑ NA ❑ NE l7. Does the facility lack adequate acreage for land application? ❑ Yes ❑ No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes ❑ No ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any recommendations or any other comnnents ' Use drawings of facility to better explain situations. (use additional pages as. necessary): .. r C� 5,-7 S P'"' �� �3 za �J FV Reviewer/Inspector Name Phone: Reviewer/Inspector Signature: Date: d� pnan 7 of 3 1 . .R/Od ('n�linued Facility Number: Date of Inspection 8 Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes ❑ No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes ❑ No ❑ NA ❑ NE the appropriate box. ❑ VrUp ❑ Checklists ❑ Design ❑ Maps ❑ Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ❑ No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ❑ No ❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes ❑ No ❑ NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes ❑ No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes ❑ No ❑ NA ❑ NE Other issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes ❑ No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes ❑ No ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes ❑ No ❑ NA ❑ NE Additional Comments and/or Drawings: 4 ` Page 3 of 3 12128104 31 M. -ra r pecf Visit Co pliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistanceason for Visit Routine 0 Complaint 0 Follow up 0 Referral 0 Emergency 0 Other ❑ Denied Access Date of Visit: [� Arrival Time: Departure Time: ® County: Farm Name: Owner Email: Owner Name: Mailing Address: Physical Address: Phone: Facility Contact: Title: Phone No: Onsite Representative: Ck, k_ew )} Integrator: Certified Operator: gLR rkoL b S M�7m _ Operator Certification lumber: Back-up Operator: Back-up Certification Number: Region: Location of Farm: Latitude: = c = ; = u Longitude: ❑ ° = 4 = Li Design latm,tDesign Current Design Current Swine �mwC�aptykttQ° x'PO°I� . Capa E4pulat�op: CattlCapty4Populatioa AM ❑ Wean to Finish ❑ Dairy Cow ❑ Wean to Feeder ILI Non -La et ❑ Dairy Calf ® Feeder to Finish 5 ]6o - ❑ Dairy Heifej ❑ Farrow to Wean Ury Plry r ❑ Dry Cow ❑ Farrow to Feeder ElNon-Dairy ❑ Farrow to Finish ❑ Layers El Beef Stocker El Gilts ❑Nan -La Non -Layers ❑ Beef Feeder ❑ Boars ❑ Pullets ❑ Beef Brood CouA = ❑ Turkeys Other LJ Turkey Poults z ❑ Other ❑Other Number�of Structures Discharges & Stream Impacts /No 1. Is any discharge observed from any part of the operation? ❑ Yes ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWQ) ❑ Yes ❑ No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) ❑ Yes N'o ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes EI IJ N ❑ NA ❑ NE 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State El Yes No ❑ NA ❑ NE other than from a discharge'? 12128104 Continued Facility Number: — {j Date of Inspection K o5 Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a. If yes, is waste level into the structural freeboard? Structue 1 Structure 2 Structure 3 Structure 4 Identifier: (;tom i Spillway?: Designed Freeboard (in): i Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ large trees, severe erosion, seepage, etc_) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes �No ❑ NA, ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE Structure 5 Structure 6 ❑ Yes [(No ❑ NA ❑ NE ❑ Yes 2 No ❑ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ElYes No ❑ NA ❑ NE 8. Do any oft he stuctures lack adequate markers as required by the permit? ❑ Yes dNo ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require [] Yes D No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes ❑ NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Wind/ow ❑ Evidence of Wind Drift El Application Outside of Area (k•r 12. Crop type(s) y►ltVA C u S& o fv5t-,j 13. Soil type(s) Kumkof-0 11 t S_t-J1_/ 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes m No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes PfNo ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination' ❑ Yes o ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes o ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any recommendations or any other comments. Use drawings oflfaclity�to better explain situations. {use,add.itionalE pages as necessary}: � � 1 Phon !11 Reviewer/Inspector Name � �, x e.. r- Reviewer/Inspector Signature: Date: os 12128104 Continued Facility Number: 31 —7'70 Date of Inspection d. Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes �% 1 No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes IQ No ❑ NA ❑ NE the appropirate box. ❑ WUP ❑Checklists ❑Design ❑Maps ❑Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes /Wo❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute inspections ❑ Monthly and 1" Rain Inspectionss El Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes Vi No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes L7 No ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes CkPo ❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes 7 ` ❑ NA ❑ NE 26, Did the facility fail to have an actively certified operator in charge? ❑ Yes [�N ❑ NA ❑ NE 2T Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes ❑ No 2NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ZN ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes El"No ElNA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes 0 No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes No ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes No ❑ NA ❑ NE Additional.Comments and/or Drawings: 12128104 ate of Visit: 3 Tune: Facility Number / ��0 CQC o O Not O erational Q Below Threshold ® Permitted ® Certified 13 Condi tionally Certified© Registered Date Last Operated or Ab9yIe Threshold: ... .......... Farm Name: ----- - County: OwnerName: ....... .... ...... ............ ............ .......... .... _.... _ _ ..� ....... Phone No:....................................................................................... MailingAddress: .................... ........................................... .................... ..... Facility Contact: ...................-- Tide:.. -- -- - - — - - ---..._.. Phone No: .... ...... __ �� ......... Onsite Representative:.._._ C�O�� .I E'�(% _ ��---� Integrator: ­ &Anl�,,..----�,.......__..---__ �_ .... Certified Operator: Location of Farm: Operator Certification Number: ❑ Swine ❑ Poultry ❑ Cattle ❑ Horse Latitude ' 9 16 Longitude • 6 « Design Cureent ? _ ;Design Current Design , w Curreiut Swine = Ca `a Po ulafiori'PoWtry �. ns_ �Ca ci Po alabori._`iCa actpon�w Ca 60 - - F .. , Wean to Feeder Layer ❑ Dairy Feeder to Finish-- ❑ Non -Layer ❑ Non -Dairy 'Farrow to Wean Other E Farrow to Feeder _, . ,'u ,1 P s .s f Farrow to Finish`' x Totat Des Capacl<ty _ Gilts ❑Boars: _ cTotal"SSLW` f .� � � ��Nuutber of Lagoons a � - is Y - Po A'..ry •� Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made'? b. If discharge is observed, did it reach Water of the State? (If yes, notify DWQ) c. If discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) 2. Is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway Structure I Structure 2 Structure 3 Structure 4 Structure 5 Identifier. ............ ..y.... ......................................... ....-_... .----.......................-----------•----.........._........... •---............................... Freeboard (inches): 'i✓ ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No Structure 6 12112103 Continued Facility amber: Date of Inspection I I, /Z 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do -any of the structures need maintenance/improvement? 8. Does any part of the waste management system other than waste structures require maintenancelimprovement? 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? Waste Amlication 10. Are there any buffers that need maintenanceJimprovement? 11. Is there evidence of over application? If yes, check the appropriate box below. ❑ Excessive Ponding ❑ PAN ❑ Hydraulic Overload ❑ Frozen Ground ❑ Copper and/or Zinc 12. Crop type Z4,4 z / -- — 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? 14. a) Does the facility lack adequate acreage for land application? b) Does the facility need a wettable acre determination? c) This facility is pended for a wettable acre determination? 15. Does the receiving crop need improvement? 16. Is there a lack of adequate waste application equipment? Odor Issues 17. Does the discharge pipe from the confinement building -to the storage pond or lagoon fail to discharge at/or below liquid level of lagoon or storage pond with no agitation? 18. Are there any dead animals not disposed of properly within 24 hours? 19. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, roads, building structure, and/or public property) 20. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. ❑ Yes ❑ No ❑ Yes ❑ No ayes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No . ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No :Comments (ref r t€► quesiYon #) �Eipl�sur any YES ns eis�and/or any iernmm_endatioss or�othcr�comments. � : se- 7 /fle A 6 4rxi,h w x rI PW 14 f Ac*oc3P, Reviewer/Inspector Name Reviewer/Inspector Signature: Date: 12112103 Continued 1;acility%Number: 3 _ 77 Date of Inspection Required Records & Documents 21. Fail to have Certificate of Coverage & General Permit or other Permit readily available? ❑ Yes ❑ No 22. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (ie/ WUP, checklists, design, maps, etc.) ❑ Yes ❑ No 23. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ Waste Application ❑ Freeboard ❑ Waste Analysis ❑ Soil Sampling 24. Is facility not in compliance with any applicable setback criteria in effect at the time of design? ❑ Yes ❑ No 25. Did the facility fail to have a actively certified operator in charge? ❑ Yes ❑ No 26. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) ❑ Yes ❑ No 27. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yes ❑ No 28. Does facility require a follow-up visit by same agency? ❑ Yes ❑ No 29. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes ❑ No NPDES Permitted Facilities 30. Is the facility covered under a NPDES Permit? (If no, skip questions 31-35) ❑ Yes ❑ No 31. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No 32. Did the facility fail to install and maintain a rain gauge? ❑ Yes ❑ No 33. Did the facility fail to conduct an annual sludge survey? ❑ Yes ❑ No 34. Did the facility fail to calibrate waste application equipment? ❑ Yes ❑ No 35. Does record keeping for NPDES required forms need improvement? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ Stocking Form ❑ Crop Yield Form ❑ Rainfall ❑ Inspection After V Rain ❑ 120 Minute Inspections ❑ Annual Certification Form 12112103 Facility Number Date of Visit:_56 Time: Not O erational 0 Below Threshold -Permitted 13 Certified 0 Conditionally Certified [3 Registered Date Last Operated or Above Threshold: Farm Name: B �� County: , u.d/r�"1 Owner Name: Phone No: Mailing Address: Facility Contact: Title: Phone No: Onsite Representative: det, Z Integrator:.0 3 Certified Operator: Location of Farm: Operator Certification Number: ❑ Swine ❑ Poultry []Cattle ❑Horse Latitude 0' 06 44 Longitude 0' & Du Design Current Design Current Design Current Swine Ga aci Population Poultry Ca aci Po ulation Cattle Ga aci P,a ulation El Wean to Feeder ❑ La er ❑ Dalry ❑ Feeder to Finish I0 Non -Layer I I ILI Non -Dairy] ❑ Farrow to Wean ❑ Farrow to Feeder ❑ Other Total Design Capacity ❑ Farrow to Finish ❑ Gilts ❑ Boars Total SSLW Number of Lagoons ME]Subsurface Drains Present ❑ Lagoon Area ❑ Spray Field Area ❑ No Liquid Waste Management Sy stem Bolding Ponds !Solid Traps Discharges & Stream Impacts 1. is any discharge observed from any part of the operation? ❑ Yes Rfj�o Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? ❑ Yes ❑ No b. If discharge is observed, did it reach Water of the State? (If yes, notify DWQ) ❑ Yes ❑ No c. If discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) ❑ Yes ❑ No 2. Is there evidence of past discharge from any part of the operation? ❑ Yes KNo 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes 16No Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway ❑ Yes fl-No Structure I Structure 2 Structure 3 Structure 4 Structure S Structure b Identifier: Freeboard (inches): 05103101 Continued Facility Number: 3 — 770 1 Date of inspection 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? 8. Does any part of the waste management system other than waste structures require maintenance/improvement? 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? Waste Application, 10. Are there any buffers that need maintenance/improvement? 11. Is there evidence of over application? ❑ Excessive Ponding ❑ PAN �❑ Hydraulic Overload 12. Crop type C-leum �/l 0752�1" c4r_ elwyr4 ( 61W 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? 14. a) Does the facility lack adequate acreage for land application? b) Does the facility need a wettable acre determination? c) This facility is pended for a wettable acre determination? 15. Does the receiving crop need improvement? 16. Is there a lack of adequate waste application equipment? Required Records & Documents 17. Fail to have Certificate of Coverage & General Permit or other Permit readily available? 18. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (ie/ WUP, checklists, design, maps, etc.) 19. Does record keeping need improvement? (ie/ irrigation, freeboard, waste analysis & soil sample reports) 20. Is facility not in compliance with any applicable setback criteria in effect at the time of design? 21. Did the facility fail to have a actively certified operator in charge? 22. Fail to notify regional DWQ of emergency situations as required by General Permit? ❑ Yes 10 No ❑ Yes t.No ❑ Yes (-No ❑ Yes RNo ❑ Yes kNo ❑ Yes &o ❑ Yes MNo CI Yes d!J No ❑ Yes OSNo ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes KVo ❑ Yes JoNo ❑ Yes P$wo ❑ Yes 4kNo ❑ Yes JNo ❑ Yes IQNo ❑ Yes Mo (ie/ discharge, freeboard problems, over application) ❑ Yes ZNo 23. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yes 'MNo 24. Does facility require a follow-up visit by same agency? [:]Yes 15JNo 25. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes 9No No violations or deficiencies were noted during this visit. You will receive no further correspondence about this visit. Facility Number: 71 —77dl Date of Inspection DZ Odor Issues 26. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge at/or below liquid level of lagoon or storage pond with no agitation? 27. Are there any dead animals not disposed of properly within 24 hours? 28. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, roads, building structure, and/or public property) 29. Is the land application spray system intake not located near the liquid surface of the lagoon? 30. Were any major maintenance problems with the ventilation fan(s) noted? (i.e. broken fan belts, missing or or broken fan blade(s), inoperable shutters, etc.) 31. Do the animals feed storage bins fail to have appropriate cover? 32. Do the flush tanks lack a submerged fill pipe or a permanent/temporary cover? ❑ Yes Klo ❑ Yes $9-No ❑ Yes MO ❑ Yes &No ❑ Yes �-No ❑ Yes KNo ❑ Yes K—NO Additional Comments and/or Drawings: r 05103101 Type of Visit O Compliance Inspection O Operation Review O Lagoon Evaluation Reason for Visit O Routine O Complaint O Follow up O Emergency Notification O Other ❑ Denied Access Facility Number 31 770 Date of Visit: 2R1R001 Tie: 14:00 O Not Operational 0 Below Threshold M Permitted ® Certified (3 Conditionally Certfied 13 Registered Date Last Operated or Above Threshold: ......................... Farm Name: lffltl3 County: 11u OwnerName: HatuldJ................................ Smith........................................................... Phone No: 9.19=5(4- 7..39.......................................................... Mailing Address: Ct�.7.. ..1 A �................................................. . pjmkjm.N.C.......................................................... 28572 .............. FacilityContact:...............................................................................Title:...............................................•............... Phone No:.................................................... Onsite Representative: Br=t.Mi chelll.HawardSmkk........................................ Integrator: Giddabaro.Hag. jaw......................................•. Certified Operator:........................................................................................................... . Operator Certification Number:.................. Location of Farm: Cast of Leon & Hwy 111. On North side of SR 1704 approx. 0.3 mile Northest of SR 1705. ® Swine ❑ Poultry ❑ Cattle ❑ Horse Latitude 35 ' 01 43 a Longitude 77 • 47 30 u Nirttber ofilet�iara 1 ❑ Subsurface Drains Present ❑Lagoon Area ❑Spray Field Area ... . ...... ....... .... ......... .. ......... .. .. .. .. .. ......... "m$ Paada l l'rasNoJE Na Liquid Waste Management System Discharees & Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes 0 No Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? ❑ Yes ❑ No b. If discharge is observed, did it reach Water of the State? (If yes, notify DWQ) ❑ Yes ❑ No a If discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? (if yes, notify DWQ) ❑ Yes ❑ No 2. Is there evidence of past discharge from any part of the operation? ❑ Yes 10 No 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? 0 Yes N No Facilitg Nuni►er: 31— 770 Date of Inspection 2/21/2001 Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway ❑ Yes [K No Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier:................................................................................................................................................................................................................... Freeboard(inches): ............... 28............... .................................... ................................... .................................... .................... 5. Are there any immediate threats to the integrity of any of the structures observed? (ief trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? 8. Does any part of the waste management system other than waste structures require maintenancefunprovement? 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? Waste Application 10. Are there any buffers that need maintenancelfmprovement? 11. Is there evidence of over application? ❑ Excessive Ponding ❑ PAN ❑ Hydraulic Overload 12. Crop type ❑ Yes ( No ❑ Yes No ❑ Yes No ❑ Yes No ❑ Yes IN No ❑ Yes N No ❑ Yes N No 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? ❑ Yes M No 14. a) Does the facility lack adequate acreage for land application? ❑ Yes 0 No b) Does the facility need a wettable acre determination? ❑ Yes No c) This facility is pended for a wettable acre determination? ❑ Yes ® No 15. Does the receiving crop need improvement? ❑ Yes 09 No 16. Is there a lack of adequate waste application equipment? ❑ Yes No 17. Are rock outcrops present?. ❑ Yes ❑ No 18. Is there a water supply well within 250 feet of the sprayfield boundary? ❑ Unknown ❑ Yes ❑ No ❑ On -site ❑ Off -site Required Records & Documents 19. Fail to have Certificate of Coverage & General Permit or other Permit readily available? ❑ Yes X No 20. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (ie/ WUP, checklists, design, maps, etc.) ❑ Yes M No 21. Does record keeping need improvement? (ie/ irrigation, freeboard, waste analysis & soil sample reports) ❑ Yes X No 22. Is facility not in compliance with any applicable setback criteria in effect at the time of design? ❑ Yes N No 23. Did the facility fail to have a actively certified operator in charge? ❑ Yes N No 24. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) ❑ Yes No 25. Did Reviewer/]nspector fail to discuss reviewfmspection with on -site representative? ❑ Yes No 26. Does facility require a follow-up visit by same agency? 0 Yes M No 27. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes N No Odor Issues 28- Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge attor below ❑ Yes N No liquid level of lagoon or storage pond with no agitation? 29. Are there any dead animals not disposed of properly within 24 hours? ❑ Yes ® No Facility Number: 31-770 Date of Inspection 2/21/2001 Printed on: 3/7/2001 30. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, roads, building structure, and/or public property) 31. Is the land application spray system intake not located near the liquid surface of the lagoon? 32. Were any major maintenance problems with the ventilation fan(s) noted? (i.e. broken fan belts, missing or or broken fan blade(s), inoperable shutters, etc.) 33. Do the animals feed storage bins fail to have appropriate cover? 34. Do the flush tanks lack a submerged fill pipe or a permanent/temporary cover? ❑ Yes 10 No ❑ Yes IR No ❑ Yes [K No [] Yes IR No ❑ Yes W No �] No violations or deficiencies were noted during this visit. You will receive no further correspondence about this visit. Reviewer/Ins ector Name P ReviewerlInspector Signature. Date: Division of Water Quality p Division of Soil and Water Conservation Q Other; Agency Type of Visit ACompliance Inspection O Operation Review Q Lagoon Evaluation Reason for Visit o Routine O Complaint O Follow up Q Emergency Notification O Other ❑ Denied Access Facility Number Date of Visit: me: Printed can: 7/21/2000 74e`171 Nut O erational Q Below Threshold )(Permitted Certified ©Con i 'ovally Certified ©Registered Date Last Operated r Above Threshold: .......... . .Farm Name: �.i County......._. „................................... Owner Name:.. ................... !rlf. ........0 �7�f'�.1`�L.�/................... Phone No:....................................................................................... Facility Contact: .....�r'r�..........L!.. .......'Title:...... ........ �Phone No: ................................................... MailingAddress: ............................................................................... .......................... Onsite Representative:..... 7LI'1!/ ... ... ........._fib ,Into ��,....���.. / �' g 7 Certified Operator:,, Operator Certification Number;,,,,,,,,,,,,,,,,,„ Location of Farm: J ` Swine ❑ Poultry ❑ Cattle ❑ Horse Latitude �* �� �=° Longitude �• �� �« Design Current Design Current Design Current Swine Capacity Population Poultry Capacity Population Cattle Capacity Population ❑ Wean to Feeder ❑ Layer ❑ Dairy eeder to Finish �76gq ,g,&r0 ❑ Non -Layer ❑ Non -Dairy ❑ Farrow to Wean ❑ Farrow to Feeder ❑ Other ❑ Farrow to Finish Total Design Capacity ❑ Gilts ❑ Boars Total SSLW Number of Lagoons ❑Subsurface Drains Present ❑ Lag -In Area 10 Spray Field Area Holding Ponds / Solid Traps ❑ No Liquid Waste Management System Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes )No Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made:' ❑ Yes ❑ No b. If discharge is observed. did it reach Water of the State? (If yes, notify DWQ) [] yes ❑ No c, if discharge is observed. what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) ❑ Yes ❑ No 2. is there evidence of past discharge from any part of the operation? ❑ Yes krNo 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes [�(No Waste Collection & Treatment 4_ Is storage capacity (Freeboard plus storm storage) less than adequate? ❑ Spillway ❑ Yes KNO Strut�u ` IStructure 2 Structure 3 Structure 4 Structure 5 Structure b Identifier: ..........t_.1._._�.................................................... ......................................................................... ............ ........................ ........... ........ ................. Freeboard (inches): 5100 Continued on back Facility Number: — Date of inspection Printed on: 7/21/2000 5. Are there any immediate threats to the integrity of any of the structures o erve ? (ie/ trees, severe erosion, ❑ Yes KNO seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑Yes KNO (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? ❑ Yes JXNo 8. Does any part of the waste management system other than waste structures require maintenance/improvement? ❑ Yes �<No 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? ❑ Yes �No Waste Application 10. Are there any buffers that need maintenance/improvement? ❑ Yes �Vo 11. is there evidence of 9°er application? ❑ Excessive Ponding ❑ PAN ❑ Hydraulic Overload El Yes , o 12. Crop type I,MJ__). 4',V-fi C'\(-,7 A / 1 13. Do the receiving crops differ with those designated in4he Certified Animal -*ante Management Plan (CAWMP)? ElYes %No 14. a) Does the facility lack adequate acreage for land application? ❑ Yes XNo b) Does the facility need a wettable acre determination? ❑ Yes NNo c) This facility is pended for a wettable acre determination? ❑ Yes 5<No I5. Does the receiving crop need improvement? ❑ Yes CNo 16. Is there a lack of adequate waste application equipment? ❑ Yes SrNo Required Records & Documents 17. Fail to have Certificate of Coverage & General Permit readily available? ❑ Yes ;(No 18. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (ie/ WUP, checklists, design, maps, etc_) ❑ Yes *0 19. Does record keeping need improvement? (ie/ irrigation, freeboard, waste analysis & soil sample reports) ❑ Yes IZNo 20. Is facility not in compliance with any applicable setback criteria in effect at the time of design? ❑ Yes KN0 21. Did the facility fail to have a actively certified operator in charge? ❑ Yes UNo 22. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) ❑ Yes [XNo 23. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yes /0 24. Does facility require a follow-up visit by same agency'? El Yes QXN� o 25. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes A No �'Vo yiolatioris;or ilefcier�cies were poled d&iftgthis*visit. • :Y;oir will-i•eceiye iid fukth& corres' oridence. about this .visit. . ............ . Comments (refer to question #): Explain any YES answers and/or any recommendations or any other comments. Use drawings of facility to better explain situations. (use additional pages as necessary): Reviewer/Inspector Name rkill Y se Reviewer/Inspector Signature: ,94 go/) I/X71 _ Date: 100 Facility#Number: FQ — Date of Inspection Odor Issue's 26. Does the'discharge pipe from the confinement building to the storage pond or lagoon fail to discharge atlor below ❑ Yes (No liquid level of lagoon or storage pond with no agitation? � K 27. Are there any dead animals not disposed of properly within 24 hours? ❑ Yes �No 28. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, ❑ Yes $�No roads, building structure, andlor public property) 29. is the land application spray system intake not located near the liquid surface of the lagoon? ❑ Yes �1 No 30. Were any major maintenance problems with the ventilation fan(s) noted? (i.e. broken fan belts, missing or or broken fan blade(s), inoperable shutters, etc.) ❑ Yes No 31. Do the animals feed storage bins fail to have appropriate cover? ❑ Yes No 32. Do the flush tanks lack a submerged fill pipe or a permanent/temporary cover? ❑ Yes XNo 3123/99 O'Division of Soil and Water Conservation Operation Review T W = ©'Division of Soil and Water Conservation - Compliance Inspection Division bf-Water Quality - Compliance Inspection (] Other Agency - Operation Review 10 Routine O Complaint Q Follow-up of DWQ inspection Q Follow-up of DS«-C review Q Other Facility Number Date of Inspection 1571d JCN Time of Inspection G d 24 hr. (hh.mm) Permitted ©Certified 0 Conditionally Certified © Registered 0 Not Operational Date Last Operated: .......................... 0 Farm Name: V,_ G$ . �!r..-..... ... County :........ ..... �C_Vlkl�..tfx ................................ ....................... .. fL..... Owner Name :.---•.- • �I `t Phone No: Facility Contact: ................................ .................... Title: ---..---....... .. Phone No:.................................... MailingAddress: .................................../. c............................................................................... Onsite Representative:.�JL..Integrator: ..... .............. Certified Operator: ................................................... ............................................................. Operator Certification Number:.......................................... Location of Farm: Latitude �•�� �" Longitude �• �` �" Swine Capacity Population ❑ Wean to Feeder IR Feeder to Finish ❑ Farrow to Wean ❑ Farrow to Feeder ❑ Farrow to Finish ❑ Gilts ❑ Boars Design Current Design Current Poultry Capacity Population Cattle Capacity Population ❑ Layer ❑ Dairy ❑ Non -Layer ❑ Non -Dairy ❑ Other Total Design Capacity Total SSLW Number of Lagoons JE1 Subsurface Drains Present 110 Lagoon Area ❑ Spray Field Area Holding Ponds I Solid Traps 1E1 No Liquid Waste Management System . Dischari,es & Stream Impac 1. Is any discharge observed from any part of the operation (If yes, notify DWQ)? Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. if discharge is observed, was the conveyance man-made'! b. If discharge is observed, did it reach: ❑ Surface Waters ❑ Waters of the State c. If dischar,,e is observed. what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? 2: Is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts to the waters of the State other than from a discharge? Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Yes kNo ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes gNo ❑ Yes gNo [:]Yes XNo Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Freeboard(inches): ......... g................................................................................................................................................................................................ 1/6/99 Continued on back Facility Number: —�'"�� Date of Inspection 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, El Yes ONO seepage, etc_) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes No (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? ❑ Yes No 8. Does any part of the waste management system other than waste structures require maintenance/improvement? ❑ Yes No 9. Do any stuctures lack adequate, gauged markers with required top of dike, maximum and minimum y tiquid level elevation markings? ❑ Yes No Waste Application 10. Are there any buffers that need maintenance/improvement? ❑ Yes No 11. Is there evidence of over application? ❑ Ponding ❑ Nitrogen ❑ Yes No 12. Crop type ,_-...5 ....�_.._Cf"?.� ............................................................................................................................................................................ 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? ❑ Yes VNo 14. Does the facility lack wettable acreage for land application'? (footprint) ❑ Yes �No 15. Does the receiving crop need improvement'? ❑ Yes NfNo lb. Is there a lack of adequate waste application equipment? ❑ Yes �][No Required Records & Documents 17. Fail to have Certificate of Coverage & General Permit readily available? ❑ Yes No 18. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (ie/ WUP, checklists, design, maps, etc.) ❑ Yes RfNo 19. Does record keeping need improvement? (ie/ irrigation, freeboard, waste analysis & soil sample reports) ❑ Yes %No 20. Is facility not in compliance with any applicable setback criteria in effect at the time of design? ❑ Yes No 21. Did the facility fail to have a certified operator in responsible charge? ❑ Yes C91No 22. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) ❑ Yes CKNo 23. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yes [�(No 24. Does facility require a follow-up visit by same agency? ❑ Yes RNo ND vio)ation' s or. deficiencies .were noted. dta;ring.tItis:visit. . You will. receive nc' further .:. eorrespbridence;about:thisvisit.: •.•.•.•.•:•.•.•.•.•.• .•.•.•.•.•.•.•. .•. Comments (refer to question #): Exp!ain any YES answers and/or any recommendations or any other comments:= Use drawings (if: facility to better explain situations. (use additional pages as necessary) _ WAD Reviewer/inspector Name Reviewer/Inspector Signature: Date: h/6/99 13 Division of Soil and Water Conservation (] Other Agency Division of Water Quality 10 Routine O Complaint O Follow-up of DWO inspection O Follow-up of DSWC review O Other Facility Number G ©Registered O Certified E3 Applied for Permit O Permitted Farm Name:...... Y.i..... . ......................... OwnerName:................. .� .... ........... ..........1. Date of Inspection Time of Inspection ; Qa 24 hr. (hh:mm) © Not O erational I Date Last Operated: .................... County:..........................ti......................... I........................ Phone No:....-�v..1 .. 4.:. 3 23..1...................... FacilityContact: .............................................................................. Title Phone No:.................................................. Mailing Address:... ..... L:...1....... .. .0..Y1. ....�1 ...1 `..�\ \�.� �? ....�`..---'--•-'----'........ ......................... �........... ..... l........................:.......... Onsite Representative:.`"a..4-.l,.s��y ............. .. ..Integrator.................... .... .. ......................... Certified Operator................................................."............................. ............................... Operator Certification Number:...... _r V_ l�tll.d Llllll Lll 1' �1 lll. k.,....... ... 1f:7.... .. t!'4 4A...................................................... .w .....03...z rn�`4 .. S3.ti a ....... : ......................................................................................................._................._...................-....................... � Latitude • 6 0" Longitude • C " General 1. Are there any buffers that need maintenancelimprovement? ❑ Yes 14No 2. Is any discharge observed from any part of the operation? ❑ Yes Pff No Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? ❑ Yes No b. If discharge is observed, did it reach Surface Water? (If yes, notify DWQ) ❑Yes No c. If discharge is observed, what is the estimated flow in gal/min? R d. Does discharge bypass a lagoon system? (If yes, notify DWQ) ❑ Yes No 3. Is there evidence of past discharge from any part of the operation? ❑ Yes No 4. Were there any adverse impacts to the waters of the State other than from a discharge? ❑ Yes 61 No 5. Does any part of the waste management system (other than lagoons/holding ponds) require ❑ Yes E'No maintenance/improvement? C. Is facility not in compliance with any applicable setback criteria in effect at the time of design? ❑ Yes 4No 7. Did the facility fail to have a certified operator in responsible charge? ❑ Yes kNo 7125/97 Facility Number: 8. Are there lagoons or storage ponds on site which need to be properly closed? ❑ Yes KNo Structures (Lagoon0folding Ponds Flush Pits etc. 9. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Yes 'S'No Structure l Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: ,- Freeboard(ft):...........�.:...1....................................................................................................................................................... ................................. 10. Is seepage observed from any of the structures? ❑ Yes 54 No 11. Is erosion, or any other threats to the integrity of any of the structures observed? Yes ❑ No 12. Do any of the structures need maintenance/improvement? ❑ Yes CKNo (If any of questions 9-12 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 13. Do any of the structures lack adequate minimum or maximum liquid level markers? ❑ Yes ® No Waste Application 14. Is there physical evidence of over application? ❑ Yes [XNo (If in excess of WMP, or runoff entering waters of the State, notify DWQ) 15 Crop type S9 CI 1-115G ... ..... f............. ............................................................................................................................................................................. ...... ... 16. Do the receiving crops differ with those designated in the Animal Waste Management Plan (AWMP)? 17. Does the facility have a lack of adequate acreage for land application? 18. Does the receiving crop need improvement? 19. Is there a lack of available waste application equipment? 20. Does facility require a follow-up visit by same agency? 21. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? 22. Does record keeping need improvement? For Certified or Permitted Facilities Only 23. Does the facility fail to have a copy of the Animal Waste Management Plan readily available? 24. Were any additional problems noted which cause noncompliance of the Certified AWMP? 25. Were any additional problems noted which cause noncompliance of the Permit? No.violationsor derciencies:were' noted -during' this'.visit.-Yo'114 l receive-ito-fiirtlier-:. c4rr6OOAdehce dliout this:visit:• : ❑ Yes g4 No ❑ Yes O No 0 Yes ❑ No ❑ Yes [9No ❑ Yes O No ❑ Yes [a No 01Yes ❑ No ❑ Yes C�No ❑ Yes Ef No ❑ Yes f,No I t) .,e,.e. e.►{s ����p ��.-� � � I ��- {-.�+��eq ��(}- -��[/ ,ems a-�t-� � `,� tiO_ oV- 2. ^c��►-4� t - ""„ `lL"o�► Gv EG1T �CCI�r id . 7125I97 Reviewer/Inspector Name Reviewer/Inspector Signature: Date: <5Tt I S MAD DSWC Animal Feedlot Operation Review bs ® DWQ Animal Feedlot Operation Site Inspection _ As w. 10 Routine 0 Complaint 0 Folks -up of DWQ inspection 0 Follow-up cif DSWC review 0 Other Date of inspection Facility' Number '3 "] 70 Time of Inspection / b 2.4 hr. (hh:mm) 0 Registered Certified © Applied for Permit 0 Permitted [3 Not Operational Date Last Operated:.......................... Farm Name• ��;.Hy Nzec.V—Y..........rQ+"tx.................. county: ........ lbvp ! ........ ........I........ Owner Name:......4......tn!'�11,...................... aZaY.-..3.73°..................................... Facility Contact: �•r A .......... Sj ..9. Title: ............ .................................. Phone No: �91-���8-�734 L MailingAddress:.... `1�..... L.... 1�.......... iiST............................................ .......... .i.c,................................... z. . -- Onsite Representative: ...... kwcao........ :5o.1'i.AV........................................................ Integrator :...... C2. 0.US. ..... .......... .................................. ..-.- Certified Operator ;......... rite[nl[1--------- .......&i.......................... Operator Certification Number:--.-.7� ............. Location of Farm: a�.....QQ3 ..t�Cr�n........:P.tvl ��4hA r��Yi.��1t.,....1 Urn.. r car... .I AR4 ...hut �r...�Q......�,�... .i7QL�..`T�r..n............ 4......... ...... r� An ...... 1^11-.^..^ry.N�1s�- ...T� ...r' ...An.gKA- s..'.-Tur.�n...ie.�. ...�r ....SCR..17.o.4,. x,xM...... '.--1.^.[dj: 3x�4itts...on. ......... . f - --1 .. 1 7C 1a rt 1 1 iF L-3 i -. ._.]- 7 'l. 0 ,I 1 r I[ f 1, nai� y.+4J1 Si �- +e 'F saruua•- I / 1 L.. -V.1 ! 1 1-3 ! a....a1 aa++•. a, L-- ! 1 1 1 T 1 1 E I Design Current Design Current Design. Current Swine Capacity Population Poultry Capacity Population Cattle Capacity -:Population ` ❑ Wean to Feeder JEI Layer ❑ Dairy Feeder to Finish JE1 Non -layer ❑ Non -Dairy El Farrow to Wean ❑ Farrow to Feeder ❑ Other ❑ Farrow to Finish Total Design Capacity S -7& ❑ Gilts Total SSLW 77 (900 ❑ Boars Number of Lagoons/ Holding Ponds JE1 Subsurface Drains Present ❑ Lagoon Area I0 Spray Field Area ❑ No Liquid Waste Management System General 1. Are there any buffers that need maintenance/improvement? Cl Yes [9No 2. Is any discharge observed from any part of the operation? ❑ Yes No Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? ❑ Yes No b. If discharge is observed, dill it reach Surface Water`? (If yes, notily DWQ) ❑ Yes No c. If discharge is observed. what is the estimated flow in w--al/min? N d. Does discharge bypass a lagoon system? (If yes, notify DWQ) ❑ Yes No 3. is there evidence of past discharge from any part of the operation? ❑ Yes UNo 4.' Were there any adverse impacts to the waters of the State other than from a discharge? ❑ Yes [PNo 5. Does any part of the waste management system (other than lagoons/holding ponds)'require ❑ Yes No maintenance/improvement'? 6. Is facility not in compliance with any applicable setback criteria in effect at the time of design? ❑ Yes No 7. Did the facility fail to have a certified operator in responsible charge? ❑ Yes No 7/25/97 Continued on back r Facility Number: 31 —1-10 8. Are there lagoons or storage ponds on site which need to be properly closed`? ❑ Yes JA No Structures (Lat=oons,fioldint' Ponds, Flush fits, ete,) 9. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Yes No Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 0 Identifier: Freeboard (ft): ...........A :.�.............................................. 10. Is seepage observed from any of the structures? ❑ Yes No 11. Is erosion, or any other threats to the integrity of any of the structures observed? ❑ Yes No 12. Do any of the structures need maintenance/improvement? (P Yes ❑ No (If any of questions 9-12 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 13. Do any of the structures lack adequate minimum or maximum liquid level markers? Waste Application 14. Is there physical evidence of over application? (If in excess of WMP, or runoff entering waters of the State, notify DWQ) 15. Crop type ...... �.Xr.!1k1.L.......... ...... !1�.�1�W�'....------ G r*f........... L l"i............................................................ 16. Do the receiving crops differ with those designated in the Animal Waste Management Plan (AWMP)? 17. Does the facility have a lack of adequate acreage for land application? 18. Does the receiving crop need improvement? 19. Is there a lack of available waste application equipment? 20. Does facility require a follow-up visit by same agency? 21. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? 22. Does record keeping need improvement? For Certified or Permitted Facilities Only 23. Does the facility fail to have a copy of the Animal Waste Management Plan readily available? 24. Were any additional problems noted which cause noncompliance of the Certified AWMP? 25. Were any additional problems noted which cause noncompliance of the Permit'? No.violations-or deficiencies. were noted during this-visit..You4411 receive no further correspondence about this:visit:• ; - ❑ Yes RNo ❑ Yes ® No ❑ Yes ®iNo ❑ Yes ( No PYes ❑ No ❑ Yes 1� No ❑ Yes Pd No ❑ Yes No 'jX Yes ❑ No ❑ Yes No ❑ Yes No ❑ Yes 14 No Comments (refer to question #():. Explain any YES answers and/or any recommendations or and other comments. x Use drawings of faelt#y to better explain situations (use addttt©naI pages as necessary) r ..., _ 12. s ors {moan wa,lj shojj 6L rese4j• lR+6 1f, 00r.'�4 5�a�is y ZZ. S raxhr g skoJf a 6e- 14,�k b, svo�nl guns a+,c Ne-1J 1nv�tbV1%. U�MJ OAS4 a^A(Vsis Si,o�1�� fie, in '�- (',e►-'�i �i e� ��An. ff 7/25/97 Reviewer/Inspector Name�� W��n Reviewer/Inspector Signature: _Z�� XL _ Date: