Loading...
HomeMy WebLinkAbout310353_HISTORICAL_2017123114 2 ly NUH I H UAHULINA Department of Environmental Qual Type of Visit: ompliance Inspection 0 Operation Review Q Structure Evaluation O Technical Assistance Reason for Visit,$'lroutine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access Date of Visit: (Q 'J Arrival Time: Departure Time: d O County:_ Region: Farm Name: GQYLw Owner Email: Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: Title: Onsite Representative: p r. �v� �n t a Certified Operator: Back-up Operator: Location of Farm: Latitude: Phone: Integrator: Certification Number: ) I U b 3 Certification Number: Longitude: Design Current Design Current Pop. Swine Capacity Pop. Wet Poultry Capacity 114 Wean to Finish Layer 1[!Farrow Cattle DairyCow DairyCalf Dai Heifer Design Current Capacity Pop. can to Feeder Non -La er Feeder to Finish Z't09 to Wean Farrow to Feeder Farrow to Finish Design Current Dr, P,oult, Ca aci P.o , Lavers Dry Cow Non -Dairy Beef Stocker Beef Feeder jBeef Brood Cow Gilts Non -Layers Boars Pullets Other Other Parke s Turkey Poults Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (if yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? ❑ Yes 2rNo ❑ NA ❑ NE ❑ Yes ❑ No ❑ Yes ❑ No ❑ NA ❑ NE ❑ NA ❑ NE ❑ Yes ❑ N NA ❑ NE ❑ Yes WNao"' ❑ NA 0 NE [:]Yes ❑ NA ❑ NE Page I of 3 21412015 Continued Facility, Number: 31 - W3 Date of Inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? [] Yes C �No❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? Structure 1 Structure 2 Structure 3 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in) .39 Structure 4 5. Are there any irrunediate threats to the integrity of any of the structures observed? (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? [:]Yes ❑ No ❑ NA ❑ NE Structure 5 Structure 6 ❑ Yes No ❑ NA ❑ NE [:]Yes No ❑ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes E?rNo NA ❑ NE $. Do any of the structures lack adequate markers as required by the permit? . ❑ Yes No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require [:]Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes 0 No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12, Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑Yes Nc NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes��NoD NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes hio NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes o ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes io❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes o ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑Design ❑Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes 1 o NA ❑ ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code [] Rainfall ❑Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rainfall Inspectio;--No Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ETNow❑ NA ❑ NE Page 2 of 3 21412015 Continued Facility Number: 31- s Date of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes 6<0 ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes ❑'No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes No ❑ NA NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No NA ❑ NE Other Issues rNo[:] 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes a NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 33. Did the Reviewer/inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? ❑ Yes Ej No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes 0 No ❑ NA ❑ NE ❑ Yes ffNo 0 NA ❑ Yes No❑ NA ❑ Yes D-vow❑ NA ❑ NE ❑ NE ❑NE Comments (refer to question ft Explain any YES answers and/or any additional recommendations or any other comments: = Use drawings of facility -to better explain situations (use additional pages as necessary). �9_ a Co n�_ra( Reviewer/Inspector Name: Reviewer/Inspector Signature: Page 3 of 3 ✓ L tlI �p �.�- / 61 Phone: 1(9 71 6 7�s Date: 6 (2 G 4 (' 7 21412015 .,i � Ui`vi"sion of Water Resources Facility Number I� - 3 f ®Division of Soil and Water Conservation © Other Agency type of Visit: Q-Co'mplia a Inspection O Operation Review O Structure Evaluation O Technical Assistance Reason for Visit: outine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access Date of Visit: I / �[U� Arrival Time: Departure Time: County: Region: Farm Name: Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Onsite Representative: e- Certified Operator: Back-up Operator: Location of Farm: Title: Latitude: Phone: Phone: Integrator: Certification Number: ) 14 b 1 Certification Number: Longitude: Design Current Swine Capacity Pop. Wet Poultry Design Current Capacity Pop. Design Cattle Capacity Current Pop. Wean to Finish Layer airy Cow W n to Feeder Nan -La er Dairy Calf eeder to Finish i 4 Dairy Heifer Farrow to Wean Design Current D Cow Farrow to Feeder Farrow to Finish I)r, P,oultr, Layers Ca aci P,o Non -Dairy Beef Stocker Gilts Non -Layers Beef Feeder Boars Pullets Beef Brood Cow Turkeys Othe I ITurkeyPoults Other Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? [:]Yes No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? ❑Yes ❑No ❑NA ONE ❑ Yes 9I� ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE Page I of 3 21412015 Continued Facility Number: `; - '� Date of Ins ection: 2— Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes �o ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5 % 5. Are there any immediate threats to the integrity of any of the structures observed? 0 Yes No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes ]�No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? [:]Yes No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes Ef'No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes E ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12, Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ffNo ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes [3 No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes CDN ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes EI�N o, ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ YesF]-N-o ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes i ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes [� o ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. Yes ❑ No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard Q W ste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I " Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes �o ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes �No ❑ NA ❑ NE Page 2 of 3 21412015 Continued i FaciliNumber: 13- Date of inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ETN­o ❑ NA ❑ NE 25. is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes EjNo ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) ❑ Yes to ❑ NA ❑ NE ❑ Yes ❑ No LJ NA ❑ NE ❑ Yes ErNo ❑ NA ❑ NE ❑ Yes rNo ❑ Yes ErNo ❑ NA ❑ NE ❑NA ❑NE 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ]�No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ,❑7lo ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes No 0 NA ❑ NE Gomm eists.(refer:t©'question.#)::Explain any -YES answers and/or any additional recommendations or any other comments. Use'draivings^of facili0jo4ettkegplain situations (use additional pages,=as.necessary). 2 �u s-<-d L^�o n� 5 Ci^a lGS � S on Sa f �e4.- S r V/0 0/f -- /nr t j 9n C L9PV Reviewer/Inspector Name: oa—'C &, . - Reviewer/Inspector Signature: Page 3 of 3 L"PCfa4z Phone: 19 7t-1 % 3 D Date: �AU 21412015 ' Di'vi-sion of Water Resources C ty Number - S Division of Soil and Water Conservation t� Other Agency Type of Visit: om ' nce Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason4 Viiif:" Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit:/ Arrival Time: Departure Time: i O 30 County: Region: Farm Name: Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Title: Onsite Representative: 00 AA P �� �¢ l n �� u Certified Operator: Back-up Operator: Location of Farm: Latitude: Phone: Phone: Integrator: Certification Number: �G Certification Number: Longitude: Design Current Swine Capacity Pop. Wean to Finish Design Current Wet Poultry Capacity Pop. I I 11-ayer I Design Current Cattle Capacity Pop. DaiEy Cow Wean to Feeder I jNon-Layer I Dairy Calf eeder to Finish Dairy Heifer Farrow to Wean Farrow to Feeder Farrow to Finish Design Current a D F $ouItr, Cacit P■o , Layers Non -Layer D Cow Non -Dairy Beef Stocker Gilts Beef Feeder Boars Pullets Beef Brood Cow Other Other Turkeys Turkey Poults Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? [-]Yes ❑ No ❑ NA ❑ NE ❑ Yes I__I N -❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE Page I of 3 21412015 Continued Facili Number: j - 3 jDate of inspection: tr 2 5 Waste Collection & Treatment � 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes [�No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a [:]Yes No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes ❑ No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ YesFI-No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes ]�No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need [—]Yes 6 No ❑ NA ❑ NE maintenance or improvement? r 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes Cj"No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes E5'No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes NrNo ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable El Yes ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes L'J�N; ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes �fNo ❑ NA ❑ NE the appropriate box. ❑ W UP ❑ Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑ Other: 2l. Does record keeping need improvement? If yes, check t e appropriate box below. Yes ❑ No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes LJ o ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes No ❑ NA ❑ NE Page 2 of 3 21412015 Continued Facili Number: 3 - 31,3Date of Inspection: / 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ❑ NA ❑ NE 25. is the facility out of compliance with permit conditions related to sludge? if yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes U 'moo ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No E NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes Ef No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes Z No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes �No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes Z p7 ❑ NA ❑ NE 33. Did the Reviewer/inspector fail to discuss review/inspection with an on -site representative? ❑Yes L�rNo ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations (use additional pages as necessary). - Fr'e(J.l(7a!( rwd 3 (&.Lz4t)�.sk *70t�k sI'd e 4'0,411 -C_ r•e f ! k,L �6� r\ q J 1 r f/ �i r� sr L✓. h A -.�3 ' 11� �E` d !- fO-C G�f s ,gr.�(ys`s Reviewer/Inspector Name: Reviewer/Inspector Signatw Page 3 of 3 Phone: 1 <I 7 rV 7301� Date: 2 21412015 Type of Visit: I.Jarcompliance Inspection 0 Operation Review Q Structure Evaluation Q Technical Assistance Reason for Visit: I-ergoutine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access Date of Visit: Arrival Time: eparture Time: County Region: �J I Farm Name: Owner Email: Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: Onsite Representative Certified Operator: Back-up Operator: Location of Farm: Alp Title: Phone: Integrator: Certification Number: L9ti(p-s Certification Number: Latitude: Longitude: Design Current Swine Capacity Pop. Wean to Finish Design Current Wet Poultry Capacity Pap. Layer C►attle Dairy Cow Design C*apacity C►urrent Pop. Wean to Feeder I INon-Layer Ell Dairy Calf Feeder to Finish Farrow to Wean Farrow to Feeder Design C►urrent D P,ouI C_a aci P,o P. Daig Heifer Dry Cow Non -Dairy Farrow to Finish ILayers Beef Stocker Gilts Non -Layers Pullets Turkeys Turkey Poults Other Beef Feeder Beef Brood Cow Boars Qther Other - Discharzes and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? r ❑ Yes,.;�No ❑ NA ❑ NE ❑ Yes E�`No ❑ NA ❑ NE ❑ Yes E5No ❑ NA ❑ NE ❑ Yes JEJ'Tlo ❑ Yes f:fNo ❑ Yes -rfNo ❑NA ONE ❑ NA ❑ NE 0 NA 0 NE Page I of 3 21412011 Continued f Facility Number: Date of Ins ection: It Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes Zr No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes �No ❑ NA ❑ NE Struce 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): c2 (� 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes ; 'No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes ;2'Po ❑ NA ❑ NE waste management or closure plan? TT If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes 37No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? D Yes j��No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) T 9. Does any part of the waste management system other than the waste structures require ❑ Yes E2-Wo ❑ NA ❑ NE maintenance or improvement? T Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes 2"No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes '�no ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.)) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window D Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ONo ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ZNo ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable [] Yes �' o ❑ NA ❑ NE acres determination? T 17. Does the facility lack adequate acreage for land application? ❑ Yes %To ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes �No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes XNo ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes VNo ❑ NA ❑ NE the appropriate box. ❑ WUP [:]Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑ Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. [ja Yes JVNo ❑ NA ❑ NE Waste Analysis ElSoil Analysis ❑ Waste Application ❑ Weekly Freeboard tAI' ElWaste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? [:]Yes L?(No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? [—]Yes VNo ❑ NA ❑ NE Page 2 of 3 21412011 Continued IFaciHty Number: 113ate of Inspection: 2 24. Did thefacility fail to calibrate waste application equipment as required by the permi . ❑ Yes L2 No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes O-No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes ,EfNo ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ;]`No ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: ❑ Yes J�5'No ❑ NA ❑ NE ❑ Yes 12!r"No ❑ NA ❑ NE ❑ Yes Jallo ❑ NA ❑ NE ❑ Yes )ZrNo ❑ NA ❑ NE 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes �lo ❑ NA ❑ NE 33. Did the Reviewer/inspector fail to discuss review/inspection with an on -site representative? ❑ Yes 01140 ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes VNo ❑ NA ❑ NE Comments (refer to question ##): Explain any YES answers and/or any additional recommendations or any other comments. Use drawines of facilitv.to better explain situations (use additional uaees as necessarv). q01 //V ,slime. lea_ c9ew Reviewer/Inspector Name: Reviewer/Inspector Signature: Page 3 of 3 U5-e-A ql1q,)(3 CA'Y1aI�)15 foC (narcG� Cv2sle �ffti�f�s�s A C C-d' Phone: ` Date: % //:j 2 41201 Facility0 4- Number: 3 - I� Date of Inspection: O �� 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ❑ No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes ❑ No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes ❑ No 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No Other Issues ❑ NA ❑ NE ❑ NA ❑ NE 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes ❑ No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes ❑ No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ No ❑ NA ❑ NE Comments (refer to question ##): Explain any YES answers anchor any additional recommendations or any other comments.,,.,_;ri ;;...°. Use drawings of facility to better explain situations (use additional pages as necessary).-" Lad K Da° J . ►,Jeed 4'C3 r ao tie )'.5 ' a100it _-T p -Fac ms . �(d11AZ t l�� � ate 1^s1peCA , . Awl DirVb6" 5- 4l is 03� Reviewer/Inspector Name: Reviewer/Inspector Signature: Page 3 of 3 Or ",.j s e-R'z Phone: —7 Date: D 21412011 _ ;. is .P *'.r _.>•.. °�`P w it ivision of Water ua ty ,1 Ea� clllty'Number' J DtvWon of Soil and Water Conservation a w« 'a -Q Otber Agency Type of Visit ompliance Inspection Operation Review Structure Evaluation Technical Assistance Reason for Visit outine 0 Complaint 0 Follow up 0 Referral 0 Emergency 0 Other ❑ Denied Access Date of Visit: Arrival Time: Departure Time: County. Region: Farm Name: X4 Owner Email: Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: Title: Phone No: Onsite Representative: —Zalz,Integrator: � Z!� Certified Operator: Operator Certification Number: Back-up Operator: Back-up Certification Number: Location of Farm: Latitude: e = 6 0 « Longitude: = o = , �.b aDesi u Current Design Current .-� g , 5wme cttyPopulation WetPcsultr� a aci Po ulahon"Cattel C P ty p „-� Capacity o ulation .,�... � _...d - ._.... ....y�:..a ve-.�_�,�.. _. _.�.: ..._ .gip ❑Wean to Finish ❑ Layer ❑ Dairy Cow ❑ Wean to Feeder e ❑ Non -Layer I I ❑ Dairy Calf ❑ Feeder to Finish ;, ❑Dai Heifer El Farrow to Wean I "` 2 El D Cow „ Dry,Poultry �� ❑ Farrow to Feeder "`" " "'"` ❑ Non -Dairy ❑ Farrow to Finish ❑ Layers ❑ Beef Stocker El Gilts ❑Non -La ers ❑ Beef Feeder ❑ ❑ Pullets Boars �. > El Beef Brood Cowl .» ❑ Turke s... El Turkey Poults z ❑ Other El Other Numberotructures� Discharees & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Page 1 of 3 ❑ Yes /No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ NA ❑ NE ❑ Yes No ❑ Yes No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE 12128104 Continued Facuity Number: — Date of Inspection Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ YesNo ❑ NA ElNE a. If yes, is waste level into the structural freeboard? ❑ Yes VNo ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No ❑ NA ❑ NE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes P/No ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes 94o ElNA- ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ElYes 0� o ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) WXo 9. Does any part of the waste management system other than the waste structures require ❑ Yes ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ElYes [:]'No ❑ NA ❑ NE maintenance/improvement? It. Is there evidence of incorrect application? if yes, check the appropriate box below. ❑ Yes P o ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs [:]Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes '�]Ko ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes P10 ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination ? ❑ Yes XNo ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes ZNo ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes V No ❑ NA ❑ NE Comments (refer to question #)• Explain any YES answers and/or any frecom µ 'x 3 mendations or. any oilier comments Use drawings of facility to better explain situations. (use: additional pages as necessary) = ` _ yS�.f _ _ w Reviewer/Inspector Name Phone: Reviewertinspector Signature: Date: ZZZ4:2t Pa e 2 _r3 1 /28/04 Continued 6 Facility Number- Date of Inspection Re uired Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes L2"hTo ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes Po ❑ NA ❑ NE the appropriate box. ❑ W UP ❑ Checklists ❑ Design ❑ Maps ❑ Other 21. Does record keeping need improvement? If yes, check the appropriate box below. Xyes ❑ No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard Vwaste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification Rainfall ❑ Stocking ❑ Crop Yield y120 Minute Inspections ❑ Monthly and 1 ° Rain Inspections Xweather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ❑ No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? 24. id the facility fail to calibrate waste application equipment as required by the permit? 25. Did the facility fail to conduct a sludge survey as required by the permit? 26. Did the facility fail to have an actively certified operator in charge? 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by General Permit? (iel discharge, freeboard problems, over application) 32. Did Reviewerlinspector fail to discuss review/inspection with an on -site representative? 33. Does facility require a follow-up visit by same agency? ❑ Yes ❑ No ❑ NA ❑ NE RYes WKNo ❑ NA ❑ NE /Y' es ❑ No ❑ NA ❑ NE ❑ Yes WNo ❑ NA ❑ NE [:]Yes &No ❑ NA ❑ NE ❑ Yes PNo ❑ NA ❑ NE ❑ Yes VNo ❑ NA ❑ NE ❑ Yes ZNo ❑ NA ❑ NE ❑ Yes ZNo ❑ NA ❑ NE ❑ Yes 4o ❑ NA ❑ NE ❑ Yes PNo ❑ NA ❑ NE Additional Comments and/.or Drawings:. d f �s C� 71 Me,/ 4✓al r /n vech"� A�-W 06FAix1a"? A � H Page 3 of 3 7 7n:ein,r Faciilify Number'- � 'Division of Water Quality Type of Visit J2 Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit Qltoutine 0 Complaint 0 Follow up 0 Referral 0 Emergency 0 Other ❑ Denied Access Date of Visit: Arrival Time: f Departure Time: County: Region: Farm Name: �j Owner Email: Owner Name: Phone: Mailing Address: Phvsical Address: F'aeility Contact: Title: i1� Phone No: Onsite Representative: Integrator: 142711,6 �2y7 Certified Operator: Operator Certification Number: Back-up Operator: Back-up Certification Number: Location of Farm: Latitude: = 6 = 1 =66 Longitude: 0 ° = ' = " Design Current Design �uFfen�411, Desi ti Current Swine" Capacity opulation Wet P©tiltry Capacity Population ; Cattle ..+ Capacci�#y aPopu_lat on ❑ Wean to Finish PEI La er❑Dai Cow ❑Wean to Feeder Non -La er ❑Dai Calf r ❑ Feeder to Finish _ K ❑ DairyHeifer ❑ Farrow to Wean D Poul Y El Dry Cow tw, , _ . ` ❑ Farrow to Feeder ❑ Non -Dairy ❑ Farrow to Finish `. ❑ Layers ❑ Beef Stocker = ❑ Non -Layers ❑Gilts n ❑ Pullets ❑ Beef Feeder ❑ Boars Turkeys ❑ Beef Brood Cowl i ._ . ❑ _ Other.. 4.. FEIOther Turke Poults ❑ Other N r4f b um Structures- Discharp_es & Stream impacts 1. is any discharge observed from any part of the operation? ❑ Yes E2'No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NA ❑ NE b. Did the discharge reach waters of the State? (if yes, notify DWQ) ❑ Yes ❑ No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) ❑ Yes 0N0 ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes eNo ❑ NA ❑ NE 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State ❑ Yes ZNo ❑ NA ❑ NE other than from a discharge? 12128104 Continued Facility Number: — Date of Inspection Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes, ,eNo ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes 6No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes o ❑ NA ❑ NE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes N ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes ❑'No ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes o ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes j_Xo- ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes �J*o ❑ NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes 12N ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) []PAN ❑ PAN > 10% or I0 lbs ❑ Total Phosphorus [:)Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes (6No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes V�No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination ? ❑ Yes 0 No ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE Comments (refer #o question ft Eiplain any YES answers and/or any.recommendations,organy other, coEttments 7 Use drawings of facility to better, explain situations use additional pages as necessary)' it s Reviewer/Inspector Name I- 'I Phone: 7 "11- Reviewer/Inspector Signature: Date: 1248104 Continued F Facility Number: — Date of Inspection Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes No ((([ [INA ElNE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check [IYes No ❑ NA ❑ NE the appropriate box. ❑ WUp ❑ Checklists ❑ Desi gn ❑ Maps p [I Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ' ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes �No ❑ NA ❑ NE - 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes No ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes No ❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes No ❑ NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes No ElNA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes �[J No ❑ NA ❑ NE Other Issues j/jj/ 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes �No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ElYes No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes VNo ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes P�No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes No ❑ NA ❑ NE ,.. ��-ram_ �•r_-�.:.Q.���.,;w=-.:�..� - �-_.,:.,..��h,. .�- � d i�G c ����� Ze e� 12128104 Type of Visit Q Compliance Inspection O Operation Review O Structure Evaluation Q Technical Assistance Reason for Visit O Routine O Complaint O Follow up 0 Referral O Emergency 0 Outer ❑ Denied Access Date of Visit: I &71ol-!6 &'A Arrival Time: Farm Name: Owner Name: Mailing Address: Physical Address: 70—a Departure Time: County: Facility Contact: Title: Onsite Representative Certified Operator: Back-up Operator: Location of Farm: Owner Email: Phone: Phone No: Integrator: � W Operator Certification Number: Back-up Certification Number: Region: Latitude: = o = 6 Longitude: = 0 0 Design Current Design itte Capacity Population Wet Poultry Capacity Current Population Design Current C►attle Capacity Population Wean to Finish rEl ❑ La er ❑ Dai Cow ❑ Dai Calf Wean to Feeder ❑ Non -La er Feeder to Finish ❑ DairyHeifer ❑ Farrow to Wean ❑ Farrow to Feeder El Farrow to Finish ❑ Gilts Dry Poultry ❑ Layers ElNon-Layers ❑ Dry Cow ElNon-Dairy ❑ Beef Stocker ❑Beef Feeder ❑ Pullets ❑ Boars ❑ Turkeys O#her ❑Turkey Pouets ❑ Other ❑ Other ❑ Beef Brood Co Number of Structures: EJ Discharp_es & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes F No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑Yes El No El NA El NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes dt ❑ NA ❑ NE ❑ Yes rNo ❑ NA ❑ NE Page I of 3 12128104 Continued Facility Number: Date of Inspection TWaste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes _'No El NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ?_'No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes RNo ❑ NA ❑ NE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes Z—No ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes KrNo ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes ONo ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ yes dNo ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes fi3No ❑ NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes [/ No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 Ibs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yesj2f�o ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes F.:!f1No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination?❑ Yes 7 No ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes PIVo ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes ZNNo ❑ NA ❑ NE Reviewer/Inspector Name I fjfjt { Phone: Reviewer/Inspector Signature: Date: Page 2 of 3 12128104 Continued Facility Number: , — Date of Inspection Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes (?No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes 1!1"No ❑ NA ❑ NE the appropirate box. ❑ WUP ❑ Checklists ❑ ❑ Maps Design g p El Other 21, Does record keeping need improvement? if yes, check the appropriate box below. ❑ Yes ONo ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and t" Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ZfNo ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes '[XNo ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes WNo ❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes [�No ❑ NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes JRNo ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes ZNo ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes UNo ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes eNo ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes 7No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes P(No ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? El Yes 91 El NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes VNo ❑ NA ❑ NE Additional Comments and/or DrawIngs;.e,_.;:.�, a AL A -If " , Page 3 of 3 12128104 Division of Water Quality 11'acility Number 0 Division of Soil and Water Conservation O Other Agency IType of Visit Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance I Reason for Visit 0 Routine 0 Complaint 0 Follow up 0 Referral 0 Emergency 0 Other ❑ Denied Access Date of Visit: Arrival Time: Departure Time: County: / Region: Farm Name: Owner Name: Mailing Address: Physical Address: i Owner Email: Phone: Facility Contact: Title: Phone No: Onsite Representative: Integrator: "W Certified Operator: Operator Certification Number: Back-up Operator: Location of Farm: Swine ❑ Wean to Finish ❑ Wean to Feeder ❑ Feeder to Finish ❑ Farrow to Wean ❑ Farrow to Feeder ❑ Farrow to Finish ❑ Gilts ❑ Boars Other ❑ Other Back-up Certification Number: Latitude: = o Design Current Design Current Capacity Population Wet Poultry Capacity Population ❑ La er ❑ Non -Layer Dry Poultry ❑ La ers ❑ Non -Layers ❑ Pullets ❑ Turke s ❑ Turkey Poults ❑ Other Discharges & Stream Impacts I . Is any discharge observed from any part of the operation? Discharge originated at; ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? Longitude: = ° = ' 0 Design Current - Cattle Capacity Population ❑ Dairy Cow ❑ Dairy Calf ❑ Dairy Heifer ❑ Dry Cow ❑ Non -Dairy ❑ Beef Stocker ❑ Beef Feeder ❑ Beef Brood Co Number of Structures: b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If ye"s, n4- DWQ) r: 2. Is there evidence of a past discharge from any part of the operation?� 3. Were there any.adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? I ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ NA ❑ NE ❑ Yes ❑ No ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE 12128104 Continued Facility Number: ti —` Date of Inspection13 ;�17 i Waste Collection & Treatment 4. is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a. If yes, is waste level into the structural freeboard? Structure Structure 2 Structure 3 Structure 4 ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes ❑ No ❑ NA ❑ NE (iel large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes ❑ No ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes ❑ No ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes ❑ No ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes ❑ No ❑ NA ❑ NE maintenance or improvement? Waste Apolication 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes ❑ No ❑ NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN [:IPAN > 10% or ] O lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ❑ No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination?❑ Yes ❑ No ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes ❑ No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes ❑ No ❑ NA ❑ NE Use drawings of facility to better explain situations. (use additional pages as necessary): Comments (refer to question #): Explain any YES answers and/or any recommendations or any other co:ments,./ C "7 Reviewer/Inspector Name Phone: Reviewer/Inspector Signature: Date: 12128104 Continued facility Number: — Date of Inspection 7 ✓ Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes ❑ No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ yes ❑ No ❑ NA ❑ NE the appropirate box. ❑ WUP ❑ Checklists ❑ Design El Maps [I Other 21. Does record keeping need improvement? If yes, check the appropriate box below. 0Yes ❑ No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? 24. Did the facility fail to calibrate waste application equipment as required by the permit? 25. Did the facility fail to conduct a sludge survey as required by the permit? 26. Did the facility fail to have an actively certified operator in charge? 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss reviewlinspection with an on -site representative? 33. Does facility require a follow-up visit by same agency? ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE El Yes El No ❑NA [I NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE Additional Comments and/or Drawings: 1 AL 12128104 Type of Visit compliance Inspection O Operation Review O Structure Evaluation O Technical Assistance Reason for Visit 9.Routine 0 Complaint 0 Follow up O Referral O Emergency 0 Other ❑ Denied Access Date of Visit: Arrival Time: yll-lnlDeparture Time: County: Farm Name: Owner Name: Mailing Address: Physical Address: Facility Contact: Title: Onsite Representative: / Certified Operator: Back-up Operator: Location of Farm: Owner Email: Phone: Phone No: Integrator: Operator Certification Number: Back-up Certification Number: Region: L7A J1I`L7 Latitude: = o = 6 = Longitude: [= o = 4 Design C►urrent Design Current Design C►urrent Swine Capacity Population Wet Poultry Capacity Population C*attle C►apacity Population ❑ an to Finish ❑ Layer ❑ DaiEj Cow ❑ an to Feeder ❑Non -La -Layer ElDai Calf Feeder to Finish Dry Poultry ❑ Daia Heifer - ❑ D Cow ❑ Non -Dairy Farrow to Wean ❑ Farrow to Feeder ❑ Farrow to Finish ❑ Layers ❑ Non -Layers ❑ Beef Stocker El Beef Feeder ❑ Gilts ❑ Boars El Pullets ❑ Beef Brood Cowl ❑ turkeys Other ❑ Other ❑ Turkey Poults ❑ Other Number of Structures: Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Page I of 3 ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE El NA ❑NE El Yes El No ❑ Yes ❑ No ❑ NA ❑ NE ❑Yes El No El NA El NE 121128104 Continued Facility Nymber:. - Date of Inspection G Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a. If yes, is waste level into the structural freeboard? Structure 1 Structure 2 Structure 3 Structure 4 ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes ❑ No ❑ NA ❑ NE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes ❑ No ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes ❑ No ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes ❑ No ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require El Yes ❑ No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes ❑ No ❑ NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or l0 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ❑ No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination ? ❑ yes ❑ No ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes ❑ No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes ❑ No ❑ NA ❑ NE Comments (refer to question ##): Explain any YES answers and/or any recommendations or any other comments. Use drawings of facility to better explain situations. (use additional pages as necessary): AL T Reviewer/Inspector Name - - — - — - — — - Phone: [/ Reviewer/Inspector Signature: Date: Page 2 of 3 12128104 Continued Facility Number:l L Date of Inspection i% Reauired Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes ❑ No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes ❑ No ❑ NA ❑ NE the appropriate box. ❑ WUP El Checklists El Design El Maps El Other 21. Does record keeping need improvement? If yes, check the appropriate box below. Yes ❑ No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification 2rRainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ❑ No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ❑ No ❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes ❑ No ❑ NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes ❑ No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes ❑ No ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes ❑ No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes ❑ No ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes ❑ No ❑ NA ❑ NE Additional Comments and/or Drawings: pleo 16W sew4e, rcarkG40 3136ldro ` a S' -�e 12c6o-w s Page 3 of 3 12128104 Type of Visit )Mompliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit eRoutine 0 Complaint 0 Follow up 0 Referral 0 Emergency 0 Other ❑ Denied Access Date of Visit: f Arrival Time: Departure Time: County: Region:!/r- U Farm Name: Owner Email: Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: Title: Onsite Representative: D—cie-A"d F --_ - -___ - ___.0 Certified Operator: Back-up Operator: Phone No: Integrator: Operator Certification Number: Back-up Certification Number: Location of Farm: Latitude: [= o = 6 = u Longitude: = o = I Design Current Design Current Design Current Swine Capra ty Population _. Wet Poultry Opacity P,opula ion. _ Cattl2 ems: C-aapacity Population ❑ Wean to Finish ❑ La er ❑Dai Cow ❑ Wean to Feeder JEJ Non -Layer I Calf 91 Feeder to Finish yon�� ` ❑Dai Heifer ❑ Farrow to Wean Dry Poultry ❑ Dry Cow ❑ Farrow to Feeder ElNon-Dai ❑ Farrow to Finish ❑ Layers ElBeef Stocker ❑ Gilts ❑ Non -Layers ❑ Beef Feeder ❑ Boars Pullets ❑ Beef Brood Cowl ❑ Turkeys Other ❑ Turkey Poults ❑ Other ❑ Other Number of Structures: ED Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes 12No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NA ❑ NE b. Did the discharge reach waters of the State? (if yes, notify DWQ) ❑ Yes ❑ No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) ❑ Yes ❑ No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes ,2Mo ❑ NA ❑ NE 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State ❑ Yes N ❑ NA ❑ NE other than from a discharge? 12128104 Continued FacilityNumber: Date of Inspection 7 / Wagre Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes 2NO ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): � 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ yes , /�No ❑ NA ❑ NE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes ;3"No ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes J2,No ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? El Yes No El NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ yes ,KNo ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes 2No []NA ❑ NE maintenance/improvement? 1 l . Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes Z No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drifl ❑ Application Outside of Area 12. Crop type(s) C4�' o W rl 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes E?No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ONo ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination%❑ Yes ZrNo ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes ;eTNo ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes ;�rNo ❑ NA ❑ NE mments:{refer to question #) Egplam any YESanswers::and/oraanyr�ecommedons or any othermments. ti Usejdrawiags of facility to better eaplam situations {use additional`pagescas��necess Reviewer/Inspector Name Phone: Reviewer/Inspector Signature: Date: 12128104 Continued Facility N!�Tber:S Date of Inspection Re4tired Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes )eNo ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check [:]Yes ZNo ❑ NA ❑ NE the appropirate box. ❑ WUP ❑ Checklists ❑ Design El Maps El Other 21. Does record keeping need improvement? If yes, check the appropriate box below. 9Yes ArNo ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ,Crop Yield Z 120 Minute Inspections 0 Monthly and 1" Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ?TNo ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ;TNo ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ONo ❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes ❑ No ZINA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes ZrNo ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes ❑ No ❑ NA , iE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? �,� ❑ Yes 2 No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes eNo ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes Z/ No ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ,❑ No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes ;3 No ❑ NA ❑ NE Additional'Comments and/oir Drawings:'LO re- cor c-�) qJ eldi A, 17,4) o�_C*,r I" rcoex4:�tl I RYGY, I ftnPe / j , spe s n ooc\ 5 hSQPt �e coo rd,5 Fa 5 12128104 (Type of Visit 2FCompliance Inspection O Operation Review O Lagoon Evaluation Reason for Visit 0 Routine O Complaint O Follow up O Emergency Facility Number 3 mate of Visit: Permitted Ce • ed 0 Condition-dly Certified 0 Registered Farm Name. (;,�WMe74 ✓r���,.5� Owner Name: Mailing Address: O Other r r Time ❑ Denied Access 10 Not Operational O Below Threshold 1 Date -Last Opemjmg�2r Above hold: Phone No: Facility Contact: / ________ Title: Phone No: Oesite Representative: �/Pl��� ._ . .. Integrator: L/Je Certified Operator: _ _�� . _ ....... _ .. Operator Certification umber: Location of Farm: ❑ Swine ❑ Poultry ❑ Cattle ❑ Horse Latitude • 4 " Longitude • 4 Discharges 8 Stream 1. Is any discharge observed from any part of the operation? ❑ Yes IVINo Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? ❑ Yes ❑ No b. If discharge is observed, did it reach Water of the State? (If yes, notify DWQ) ❑ Yes ❑ No c. If discharge is observed, what is the estimated flow in gal/min? d_ Does discharge bypass a lagoon system? (If yes, notify DWQ) ❑ Yes ❑ No 2. Is there evidence of past discharge from any part of the operation? ❑ Yes XNo 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes Q(No Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway ❑ Yes Otto Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: ___ _ Freeboard (inches): 12112103 Continued t Facility Number:. — Date of Inspection S fo 5. Are there any immediate thi-eats to the integrity of any of the structures observed? (ie/ trees, severe erosion, ❑ Yes �No • seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or ❑ Yes ;3NO closure plan? (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? ❑ Yes eNo 8. Does any part of the waste management system other than waste structures require maintenance/improvement? ❑ Yes�'1�10 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level ❑ Yes P No elevation markings? Waste Application 10. Are there any buffers that need maintenance/improvement? ❑ Yes 0*0 11. Is there evidence of over application? If yes, check the appropriate box below. ❑ Yes ANo ❑ Excessive/Pounding ❑ PAN /❑ Hydraulic Overload %❑ Frozen Ground ❑ Copper and/or Zinc 12. Crop type L� bj'Y7 . -5�r. c// -�l��) 13. Do the receiving crops differ4ith those designated in the Certified Animal Waste Management Plan (CAWMP)? ❑ Yes gNo 14. a) Does the facility lack adequate acreage for land application? ❑ Yes ,07No b) Does the facility need a wettable acre determination? ❑ Yes ,Or'No c) This facility is pended for a wettable acre determination? ❑ Yes ETNo 15. Does the receiving crop need improvement? ❑ Yes ,0-90 16. Is there a lack of adequate waste application equipment? ❑ Yes �o Odor Issues a Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge attar below ❑ Yes ,"No liquid Ievel of lagoon or storage pond with no agitation? 18. Are there any dead animals not disposed of properly within 24 hours? ❑ Yes ,0No 19. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, ❑ Yes ;2090 roads, building structure, and/or public property) 20. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional ❑ Yes Eno ` Air Quality representative immediately. Comma a ,(refer to gaeshoa #) Explain any YF3 anxvrers ard/ar anq . _ or az y oth_i Cum=euis. ._ [Jse drawmrgs of ysto betr�sduahuons. {use sdditiot� as wry) �] Field C $, opy ❑Final Notes ow . ',C-k7C7 Reviewer/Lmspector Name ReviewerAnspector Signature: e Date: z- 12112103 /1 Continued Facility Number - Date of Inspection U �' Required Records & Documents 21. Fail to have Certificate of Coverage &. General Permit or other Permit readily available? ❑ Yes,_eNo 22. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (ie/ WUP, checklists, design, maps, etc.) ❑ Yes ,ET110 23. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Waste Application ❑ Freeboard ;24aste Analysis ❑ Soil Sampling 24. Is facility not in compliance with any applicable setback criteria in effect at the time of design? 25. Did the facility fail to have a actively certified operator in charge? 26. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) 27. Did Reviewer/Inspector fail to discuss review/mspection with on -site representative? 28. Does facility require a follow-up visit by same agency? 29. Were any additional problems noted which cause noncompliance of the Certified AWMP? NPDES Permitted Faca3ities 30. Is the facility covered under a NPDES Permit? (If no, skip questions 31-35) 3I. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? 32. Did the facility fail to install and maintain a rain gauge? 33. Did the facility fail to conduct an annual sludge survey? 34. Did the facility fail to calibrate waste application equipment? ,OTes ❑ No ❑ Yes -E'No ❑ Yes ,ONo ❑ Yes 'EMO ❑ Yes .ET14o ❑ Yes j2No ❑ Yes 'E"o ❑ Yes'ONO ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No 35. Does record keeping for NPDES required forms need improvement? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ Stocking Form ❑ Crop Yield Forma ❑ Rainfall ❑ Inspection After I" Rain ❑ 120 Minute Inspections ❑ Annual Certification Form ❑ No violations or deficiencies were noted during this Visit You will receive no further correspondence about this visit 'z 3 o c v��d/dc.� 7-5i- tie s'r�i Q� l y�sJS l 'Ooe Ga"' j L3/aV d� 1�26/ " �u'00�s�- t ahc� ys/s /J, 3,1) 7LqI4�-e. 7,Wa��? Ql7Q''� AA /�dS 121IM3 Facility Number 'l I Date of Visit: Time: E� Not O erational Below Threshold M Permitted C�eJrtified 0 Conditionallv Certified 0 Registered Date Last Operated or Above Threshold: Farm Name: rA��f41/ �•rr Countv: l'o „__, Owner Name: Phone No: Mailing Address: Facility Contact: Title: Phone No: Onsite Representative: Aklh"� Integrator• „///v Certified Operator: Operator Certification Number: Location of Farm: ❑ Swine ❑ Poultry ❑ Cattle ❑ Horse Latitude 0' �• I�u Longitude 0' 01 Svrtne 1�... Ca ac�ty PCurrent' I)esrgrt Current Design : Current n Ga acity: Po Matron Pou o ularioa . .Cattle �...=Ga acitvaPa Mahon ❑ Wean to Feeder Layer a Feeder to Finish ❑ Non -Layer []Non -Dairy -' ❑ Farrow to Wean i ❑ Farrow to Feeder ❑ Other ❑ Farrow to Finish Tot91 Des>ga Ca aci' �❑ ` - Gilts P ❑ Boars i Total SSLW i .. lvuaaber of Lagoons x ❑ Subsurface Drains Present ❑ Lagoon Area ❑ S rav Field Area H�sldm `Ponds i So1id Tra s— g p Q ❑ No Liquid Waste Management System x Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? b. If discharge is observed, did it reach Water of the State? (If yes, notify DWQ) c. if discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? (If ves, notify DWQ) 2. Is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway Structure I Structure 2 Structure 3 Structure 4 Structure 5 Identifier: t Freeboard (inches): 50 ❑ Yes [glgO ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes EJ o ❑ Yes 91-No ❑ Yes M'No Structure 6 05103101 Continued Facility Number: — 3 Date of Inspection 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, El Yes Mlqo seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? El Yes E3-wo (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) ,� 7. Do any of the structures need maintenance/improvement? El Yes Ll ,; o 8. Does any part of the waste management system other than waste structures require maintenance/improvement? ❑ Yes R;iNo 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevationmarkings? El Yes l.._l 'No Waste Application 10. Are there any buffers that need maintenance/improvement? . ❑ Yes 3tN'oo 11_ Is there evidence of over application? ElExcessive Ponding ❑ PAN ❑ Hydraulic Overload ElYes E3110 12. Crop type G 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? ❑ Yes M-No 14. a) Does the facility lack adequate acreage for land application? ❑ Yes 0-56— b) Does the facility need a wettable acre determination? ❑ Yes ❑ No c) This facility is pended for a wettable acre determination? ❑ Yes ❑ No 15. Does the receiving crop need improvement? ❑ Yes ( t]- -90 16. Is there a lack of adequate waste application equipment? ❑ Yes [ -N-0 Renuired Records & Documents 17. Fail to have Certificate of Coverage & General Permit or other Permit readily available? ❑ yes U3'no 18. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (ie/ WUP, checklists, design, maps, etc.) ❑ Yes R'176 19. Does record keeping need improvement? (ie/ irrigation, freeboard, waste analysis & soil sample reports) ❑ Yes ❑_<0 20. Is facility not in compliance with any applicable setback criteria in effect at the time of design? ❑ Yes ❑ No 21_ Did the facility fail to have a actively certified operator in charge? ❑ Yes M-no 22. Fail to notify regional DWQ of emergency situations as required by General Permit? El Yes �} MITo (ie/ discharge, freeboard problems, over application) 23. Did Reviewer/lnspector fail to discuss review/inspection with on -site representative? ❑ Yes E! No 24. Does facility require a follow-up visit by same agency? ❑ Yes C1,lo 25. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes [9-No No violations or deficiencies were noted during this visit. You will receive no further correspondence about this visit. Catrtinents (refer to'question #I) Expiatn airy,,, poswers and/or. any reeomatendstitsrts:or soy other comments, - iise drawings of facal, tty to -better eitpWn sittratzotis: (nse additional pages as necessary) = [j .. _ ; Field Copv ❑ Final Notes e.-o -__K g Z"PV L �O�t Reviewer/Inspector Name Reviewer/InspectorSignature: Date: Z'— O5103101 1 r Continued Facility Dumber: — Date of Inspection /% Z Odor Issues 26. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge atior below liquid level of lagoon or storage pond with no agitation? 27. Are there anv dead animals not disposed of properly within 24 hours? 28. Is there any evidence of wind drift during land application? (Le. residue on neighboring vegetation, asphalt, roads, building structure, and/or public property) 24. Is the land application spray system intake not located near the liquid surface of the lagoon? 30. Were any major maintenance problems with the ventilation fan(s) noted? (i.e. broken fan belts, missing or or broken fan blade(s), inoperable shutters, etc.) 31. Do the animals feed storage bins fail to have appropriate cover? 32. Do the flush tanks lack a submerged fill pipe or a permanent/temporary cover? Additional Corn the n€stand/or=Drawings: _. ❑ Yes 23--na ❑ Yes 9�t°m ❑ Yes 9-Ka ❑ Yes C3yo ❑ Yes 5 o ❑ Yes El -No ❑ Yes 2_. 05103101 $4 C r1 D vision of Water Quality s r rsf{ ODivision of Soil and�Water Conserrration �, !Y". J T,i♦ fbt-. 01Jtl1er Agency r ti_iW qz r Type of Visit Compliance Inspection O Operation Review O Lagoon Evaluation Reason for Visit 0 Routine O Complaint O Follow up O Emergency Notification O Other ❑ Denied Access Date of Visit: 2 2& 1 Tirne: ® Printed on: 7/21/2000 Facility Number � Not O erational 0 Below Tbreshold Permitted 0 Certified © Conditionally Certified (3 Registered Date Last Operated or Above Threshold: ....................... Farm Name: ...... Ko rule cc..... " r �tt............................................... County P u 1r ti ........................................... r............................................ . Owner Name:... ................................. G n T ....�4 rtine r - ��----�-t-�'�.:...................................... Phone No:................................ Facility Contact: .............................................................................. Title: Mailing Address: ................................... Onsite Representative: ,,.2Pn-rKfl.... _ Certified Operator: Location of Farm: Phone No: yrp �J integrator:.......A. ..... ..................... Operator Certification Number:...... A6 swine ❑ Poultry ❑ Cattle ❑ Horse Latitude 0 �� �� Longitude Design Current Design Current Design Current Swine Capacity Population Poultry Capacity Population Cattle Capacity Po elation ❑ Wean to Feeder ❑ Layer ❑ Dairy Feeder to Finish Z Q 0 ❑ Non -Layer ❑Non -Dairy ❑ Farrow to Wean ❑ Farrow to Feeder ❑Other ❑ Farrow to Finish Total Design Capacity ❑ Gilts ❑ Boars Total SSLW Number of Lagoons §gSubsurface Drains Present ❑ Lagn-n Area. Spray Field Area Holding Ponds / Solid Traps FM —No Liquid Waste Management System Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? b. If dischar�=e is observed, did it reach Water of the State? (If yes, notify DWQ) c. if dischar�,c is observed. what is the estirnatcd flaw in gallmin? d. Does discharge bypass a lagoon system'' (If yes, notify DWQ) 2. Is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway StMCtlrrC I Structure 2 Structure Structure 4 Structure 5 Identifier: ............... I................... Freeboard (inches): 2' I 5100 ❑ Yes No ❑ Yes $ No ❑ Yes( No ❑ Yes 99No ❑ Yes tff No ❑ Yes 1P No ❑ Yes fil No Structure 6 Continued on back JlFacility-Rumber:'3 I— 353 Date of Inspection l v Printed on: 1/9/2001 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, ❑ Yes IgNo seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes R No (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? ❑ Yes VNo 8. Does any part of the waste management system other than waste structures require maintenance/improvement? ❑ Yes RNo 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? ❑ Yes J6 No Waste Application 10. Are there any buffers that need maintenance/improvement? ❑ Yes A No 11. Is there evidence of over application? ❑ Excessive Ponding ❑ PAN ❑ Hydraulic Overload ❑ Yes $ No 12. Crop type C p ✓`+n i�1i �l'r .�0 &e.a k1r 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? ❑ Yes 'UNo 14. a) Does the facility lack adequate acreage for land application? ❑ Yes ONO b) Does the facility need a wettable acre determination? ❑ Yes IN No c) This facility is pended for a wettable acre determination? ❑ Yes No 15. Does the receiving crop need improvement? ❑ Yes No 16. Is there a lack of adequate waste application equipment? ❑ Yes No Required Records & Documents 17. Fail to have Certificate of Coverage & General Permit readily available? 18. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (ie/ WUP, checklists, design, maps, etc.) 19. Does record keeping need improvement? (ie/ irrigation, freeboard, waste analysis & soil sample reports) 20. Is facility not in compliance with any applicable setback criteria in effect at the time of design? 21, Did the facility fail to have a actively certified operator in charge? 22. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) 23. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? 24. Does facility require a follow-up visit by same agency? 25. Were any additional problems noted which cause noncompliance of the Certified AWMP? 4-*iO3ati00s.or• ftrcaen' •vt re pbted fi ring �his:visit;- YoU wdi-teceiye 0 fui-th" corres' otideii& about. this 'visit: ❑ Yes -ONO ❑ Yes A No ❑ Yes PNo ❑ Yes ETNo ❑ Yes $No ❑ Yes 'JINo ❑ Yes P No ❑ Yes PfNo ❑ Yes 0 No Comments (refer to question-#)- 'Explain any.YFS answers i or any recom�uki"trons or'an�y nt�rcompateittb. Use drata mpn of facility to better -explain situations (use_additional pages as nece~ssa y) �� 1=�y at'10� reGOrL�S are ive�l I RAvc Wlgj4e P kpi wf� e� bused on irr?�4��'an G�es�'�h/f,RJe AG''e1 Reviewer/Inspector Name g ;s ,y. u ..„�_. y Reviewer/Inspector Signature: Date: Z D Sapp Facffi j Number: j — 3,s3 Date of Inspection ZS 0 Printed on: 1/9/2001 Odor Issues 26. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge atlor below Yes ❑ No liquid level of lagoon or storage pond with no agitation? 27. Are there any dead animals not disposed of properly within 24 hours? ❑ Yes 1$ No 28. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, ❑ Yes Wo roads, building structure, and/or public property) 29. Is the land application spray system intake not located near the liquid surface of the lagoon? ❑ Yes )EJ No 30. Were any major maintenance problems with the ventilation fan(s) noted? (i.e. broken fan belts, missing or or broken fan blade(s), inoperable shutters, etc.) ❑ Yes 0 No 31. Do the animals feed storage bins fail to have appropriate cover? ❑ Yes ONo 32. Do the flush tanks lack a submerged fill pipe or a permanent/temporary cover? ❑ Yes XNo 5100 :- Divrsion of. Svil sail Water' Conservation =Operation RevEew § Y, - O'U�v�ston of $oil an- ter,Qnallty ,COmpllaIICe I115ptCtlOns M r v x a a r O Other=Agency Operation Revrew� URoutine 0 Complaint 0 Follow-up of DWQ inspection 0 Follow-up of DSWC review 0 Other Facility Number 3 Date of Inspection —5— 3 Time of Inspection � 24 hr. (hh:mm) XPermitted 0 Certified 0 Conditionally Certified E3 Registered © Not Operational Date Last Operated: Farm Name: .....j'r! ` .......1.s..................... County:..............t--��t1.. �f ....... ....... .... '.... ............ Owner Name:........... ........... ............ ............. Facility Contact: Title:............. Mailing Address: D ........... Onsite Representative:..... ..................... .'........................................................ Certified Operator: Location of Farm: Phone No:..,,. Phone No: Integrator:.... ............. Operator Certification Number: .......................................... Latitude �� �� �« Longitude =0 =' =« Design', �-Current, Design ` Current" _=Design Current Swine- , C*acity: Pooblation illation Poultry Capacity, Population Cattle . .Ca acity Po` elation ❑ Wean to Feeder ❑ Layer ❑ Dairy Feeder to Finish ❑ Non -Layer I Non -Dairy Farrow to Wean ❑ Farrow to Feeder ❑ Other _ ❑ Farrow to Finish Total -Degign- Capacity, ❑ Gilts ❑Boars =r Total SSLW`= Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes �No Discharge orieinated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made'? ❑ Yes ❑ No b. If discharge is observed, did it reach Water of the State? (If yes, notify DWQ) ❑ Yes ❑ No c. If discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) ❑ Yes ❑ No 2. Is there evidence of past discharge from any part of the operation? ❑ Yes kNo 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes ro Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway ❑ Yes O�No Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: nn Freeboard (inches): ..........3`-' 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, ❑ Yes )No seepage, etc.) 3/23/99 Continued on back Facility Number: 31 — `3 3 Date of Inspection 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? S. Does any part of the waste management system other than waste structures require maintenance/improvement? 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? Waste Application 10. Are there any buffers that need maintenance/improvement? 11. Is there evidence of over application? ❑ Excessive Ponding ❑ PAN 12. Crop type j,a s 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? 14. a) Does the facility lack adequate acreage for land application? b) Does the facility need a wettable acre determination? c) This facility is pended for a wettable acre determination? 15.. Does the receiving crop need improvement? 16. Is there a tack of adequate waste application equipment? Required Records & Documents 17. Fail to have Certificate of Coverage & General Permit readily available? 18. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (ie/ WUP, checklists, design, maps, etc.) 19. Does record keeping need improvement? (ie/ irrigation, freeboard, waste analysis & soil sample reports) 20. Is facility not in compliance with any applicable setback criteria in effect at the time of design? 21. Did the facility fail to have a actively certified operator in charge? 22. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) 23. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? 24. Does facility require a follow-up visit by same agency? 25. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes gNo ❑ Yes Na ElYes No ❑ Yes XNo ❑ Yes XNo ❑ Yes k No ❑ Yes , rNo ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes VNo ❑ Yes 0 No ❑ Yes O(No ❑ Yes k No ❑ Yes VNo ❑ Yes V No ❑ Yes KNo ❑ Yes 1No ❑ Yes V No ❑ Yes kfNo ❑ Yes ONo . ...] .. yi. . .jr. . .deficiencies were n Ced d ring �his'visit:....will i-e. . . . �. Iu... r6rrespondeike. abo' if this visit. C other. tomments:4 Use drawings of:facility. to, better:explaiii situations' (use'additional pages as neeessary) 7 _- 1 AG tomIC-IL,1 Reviewer/Inspector Name _ ' Reviewer/Inspector Signature: N�%Zzz� Date: •� Facility Number: — Date of Inspection Ciu Odor Issues 26. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge at/or below ❑ Yes (rNo liquid level of lagoon or storage pond with no agitation? ' 1 27. Are there any dead animals not disposed of properly within 24 hours? ❑ Yes *No 28_ Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, ❑ Yes �No roads, building structure, and/or public property) 29. Is the land application spray system intake not located near the liquid surface of the lagoon? ❑ Yes �'No 1 30. Were any major maintenance problems with the ventilation fan(s) noted? (i.e. broken fan belts, missing or or broken fan blade(s), inoperable shutters, etc.) ❑ Yes �'No 31. Do the animals feed storage bins fail to have appropriate cover? ❑ Yes O'No 32. Do the flush tanks lack a submerged fill pipe or a permanent/temporary cover? ❑ Yes E�(No Monal Comments -and/or Drawings: a- A6 µ. Q Division of Soil and=Water'Conseivation -Operation Review , z _ Division of Soil and---,WaterrConservation Compliance Inspection 47 Division of Water alp fispection w - Qu ty , Comphance I, i zF El Other Agency Operation Routine 0 Complaint 0 Follow-up of DWO inspection 0 Follow-up of DSWC review 0 Other Facility Number T Date of Inspection _> I J111 Time of Inspection EG G 24 hr. (hh:mm) Permitted 0 Certified Q Conditionally Certified © Registered [3 Not O era€ional Date Last Operated: ....................... Farm Name: ..._. G+��2 YG f .... C.ounty.......... 1 I'1........................................................ ........... ............................... " UU/'/ Owner Name:._ ........................................ Phone No. B Ss .... ...._... FacilityContact:.............................................................................. Title: ................................................................ Phone'No:................................................... �1 MailingAddress: .............................................. ................!. "...................................... Onsite Representative: ........... ................................................ Certified Operator: ...................................... ...................... ............................................................ ..... Integrator:...... `'....'............................. Operator Certification Number:.,., Latitude Longitude • �° � _Design Current :`_ ; _ Design: —Current Design Current - Capacity Population Poultry --Capacity Population '" Cattle Capacity Population--_. ❑ Wean to Feeder Layer -'` ❑ Dairy Weeder to Finish ❑ Non -Layer - ❑ Non -Dairy ❑ Farrow to Wean _ -: ❑ Farrow to Feeder ❑ Other ❑ Farrow to Finish Total Design Capacity ❑ Gilts ❑ Boars Tota1.SSLW ~. �Numberof.Lagoons n, JEISubsurface Drains Present ❑Lagoon Area ❑ Spray Field Area Holding=Ponds / Soii&Traps No Liquid Waste Management System Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made'? b. If discharge is observed, did it reach Water of the State? (If yes, notify DWQ) c. If discharge is observed, what is the estimated flow in gal/min'? d. Does discharge bypass a lagoon system'? (If yes, notify DWQ) 2. Is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway Structure I Structure 2 Structure 3 Structure 4 Structure 5 Identifier: Freeboard (inches): ................................... 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, seepage, etc.) ❑ Yes 4No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes Wo ❑ Yes [YNo ❑ Yes [YNo Structure 6 ❑ Yes E�No Continued on back 3/23/99 Facility Number:'-31 — 3 Date of Inspection 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes O No (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? ❑ Yes _MNo 8. Does any part of the waste management system other than waste structures require maintenarice/improvement? ❑ Yes 9No 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? ❑ Yes 0 No Waste Application 10- Are there any buffers that need maintenance/improvement? ❑ Yes MNo 11. Is there evidence of over application? ❑ Excessive Ponding ❑ PAN ❑ Yes ZNo 12. Crop type 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? ❑ Yes J�fNo 14. a) Does the facility lack adequate acreage for land application? ❑ Yes 4 No b) Does the facility need a wettable acre determination? ❑ Yes O No c) This facility is pended for a wettable acre determination? gr Yes ❑ No 15. Does the receiving crop need improvement? ❑ Yes �No 16. Is there a lack of adequate waste application equipment? ❑ Yes [XNo Required Records & Documents 17. Fail to have Certificate of Coverage & General Permit readily available? ❑ Yes kNo 18. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (ie/ WUP, checklists, design, maps, etc.) ❑ Yes qNo 19. Does record keeping need improvement? (ie/ irrigation, freeboard, waste analysis & soil sample reports) ❑ Yes 21 No 20. Is facility not in compliance with any applicable setback criteria in effect at the time of design? ❑ Yes gNo 21. Did the facility fail to have a actively certified operator in charge? ❑ Yes JkNo 22. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) El Yes Wo 23. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yes XNo 24. Does facility require a follow-up visit by same agency? ❑ Yes APo 25. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes "No 0_ vMaligiis;or defcie;ncies were noted during s;visit: Yoir ;will receive do t'urther icorresponcience. a)baiif this visit.: Comments`(refer to que§ on #},.;Explain':any YES answers andlor:any recommendateons or.any other comments: p_ Use drawings of facility_ to better: explau-situations (nse additional pages as necessary) Cat-.�--•�r�. �e�t--�� �-�. t...�c►--� �-�eY, Reviewer/Inspector Name AL Reviewer/Inspector Signature:, Date: 3/23/99 Facility Number: '� -rZ�3 Date of Inspection r Odor Issues 26. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge at/or below ❑ Yes r ' 40 liquid level of lagoon or storage pond with no agitation? 27. Are there any dead animals not disposed of properly within 24 hours? ❑ Yes XNo 28. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, ❑ Yes O(No roads, building structure, and/or public property) 29. Is the land application spray system intake not located near the liquid surface of the lagoon? El Yes nLNo 30. Were any major maintenance problems with the ventilation fan(s) noted? (i.e. broken fan belts, missing or or broken fan blade(s), inoperable shutters, etc.) ❑ Yes 2fNo 31. Do the animals feed storage bins fail to have appropriate cover? ❑ Yes RNo 32. Do the flush tanks lack a submerged fill pipe or a permanent/temporary cover? Cl Yes XNo tion Comments an or. rawrngsc' >: y s W_ Y_ 3/23/99 13 Division of Soil and Water Conservation ❑ Other Agency ® Division of Water Quality O Routine- •O Com faint O Follow-u 'of DWins action O Follow-up of DSWC review O Other Date of Inspection Facility Number 353 t Time of Inspection to : ct,7_1 24 hr. (hh:mm) 13 Registered E,Certified 0 Applied for Pertnit © Permitted 10 Not Operational Date Last Operated:.. Farm Name: County:...... �t�............................................................... Y-,.t............................................................................ - _ _ OwnerName:.:............................�YLi�jL........1�PXkM�--...................................... Phone No:... ......................................... FacilityContact: ...................................:.......................................... Title:................ ....... Phone No:.................... Mailing Address: .... 320......... {�i! i...... ??!5-....:..:.........................I..................... ............... .......... .......... .2 ........ Onsite Representative:....,.T�Qr...... . t-&r!s.. .............................. Integrator: ......!�.L Certified Operator.........................................................................................................I...... Operator Certification Number;......................................... [vocation of Farm: ..........!� .. :.. c�.c :�............:. a....... Rl...t ?`1. �.......: ..rn i l�� ..... a..: ITS..1 .�a .............................. ............................................................................................................................................................................................................................................................... Latitude Longitude �• �� �" .`. Design., £urrent Design Current Swine ":Gapacity.Population Potiliry Capacity'Population C y ❑ Wean to Feeder Feeder to Finish L ❑ Farrow. to Wean ❑Farrow to Feeder ❑ Farrow to Finish ❑ Gilts a ❑ Boars N ttle Dairy Non-Dair ID Other k Total Design C. Total city. LW , General 1. Are there any buffers that need maintenance/improvement? ❑ Yes No 2. Is any discharge observed from any part of the operation? ❑ Yes No Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? b. If discharge is observed, did it reach Surface Water? (If yes, notify DWQ) c. If discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system'? (If yes, notify DWQ) 3. Is there evidence of past discharge from any part of the operation? 4. Were there any adverse impacts to the waters of the State other than from a discharge? 5. Does any part of the waste management system (other than lagoons/holding ponds) require maintenance/improvement? 5. Is facility not in compliance with any applicable setback criteria in effect at the time of design? 7. Did the facility fail to have a certified operator in responsible charge? 7/25/97 ❑ Yes Ep No ❑ Yes q No ❑ Yes [� No ❑ Yes 1P No ❑ Yes 10 No ❑ Yes M No ❑ Yes 0 No ❑ Yes [P No Continued on back Facility Number: 11 — 351 S. Are there lagoons or storage ponds on site which need to be properly closed? ❑ Yes No 0 C Structures {La tgoons .floldine Ponds, Flush Pits, etc.) 9. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Yes No Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: ....... Freeboard(fl): .......... Z-1 ................ ........... . ....................... ............ ... .................... ................. 1.11111 ............ ............ ....................... ..................................... 10- Is seepage observed from any of the structures'? 0 Yes 0 No I L Is erosion, or any other threats to the integrity of anv of the structures observed'? JA Yes [C No 12. Do any of the structures need maintenance/improvement? [9 Yes El No (if any of questions 9-12 was answered yes, and the situation poses an immediate public r health or environmental threat, notify DWQ) 13. Do any of the structures lack adequate minimum or maximum liquid level markers? ❑ Yes No Waste Application t4. Is there physical evidence of over application? El Yes No (If in excess of WMP, or runoff entering waters of the State. notify DWQ) 15. Crop type .............. .... W,11� ............ sajt�. ... ........................... . ........................................................................................................... 16. Do the receiving crops differ with those designated in the Animal Waste Management Plan (AWMP)? Yes El No 17. Does the facility have a lack of adequate acreage for land application? El Yes IX No 19. Does the receiving crop need improvement? ❑ Yes Q3 No 19. Is there a lack of available waste application equipment? ❑ Yes ONo 20. Does facility require a follow-up visit by same agency? ❑ Yes No 21. - Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? El Yes No 22. Does record keeping need improvement? 129 Yes El No For Certified or Permitted Facilities Only 23. Does the facility fail to have a copy of the Animal Waste Management Plan readily available? El Yes P No 24. Were any additional problems noted which cause noncompliance of the Certified AWMP? E3 Yes ONo 25. Were any additional problems noted which cause noncompliance of the Permit? E3 Yes '_1 No No violation's or'defi'cieincie's w'ere',no'te'd during th is.- visit. X6H.W411 receive no further correspondence about this.Visit.,, c6mftfents�.(i4ier to.que'stion4): Explain any YESanswers and/or any recorrinieiidationsorany,'pih'ercomments Use drawings of.facility to better explain situations `(rise additional pages'as necessary): Crv_StO,, 600 6 e_ AN � aJ ►-"tedd. &_vc opus On li(\Y%, wfdi L"Oor, dkv,(- so,(\ SkOV13 6, ,We�- .1 cor�, /.4�1/ sa/Lea, roi4loo' "3 - W Up C-�(( S 04-r/ SUMW-Qy— a_MML-,V,-k , � 22. mu� (,_�j �O Ic'-st c-0--r,(WktJ/%Oy60,. I-aloom �CSj��- S�JOL//� 642 r •sIs 'Skedo L? L'P JOLkj. 7/25/97 ' ReviewerflnspectorName Reviewer/Inspector Signature- ALI— Date: — z Oj_9 ;i f. s _ DSWC Anginal Feedlot Operatioa Review m..,,$ 'WQ Anial Feedlot Operation Site Inspection ` ® Routine 0 Complaint 0 Follow-uR of DWQ inspection 0 Follow-up of DSWC review 0 Other Date of Inspection Facility Number Time of Inspection NA 24 hr. (hh:mm) Total Time (in fraction of hours Farm Status- ❑ Registered ❑ Applied for Permit (ex:1.25 for 1 hr 15 min)) Spent on Review Certified ❑ Permitted I or Inspection includes travel andprocessing) ❑/ Not Operational Date Last Operated: ...... . ... . ...... . ......... .... . .......... Farm Name: i�� �!^.A y �� �r.� Fr✓. 3... _.... _ ...._ ....... County: .7....._........_..., Land Owner Name: ....... Phone No: Facility Conctact:.... —.... -......... ................. _............. ...... _ ...`. J... Title: ............ ...... ....... Phone No: Mailing Address: Onsite Representative:. Certified Operator: .....,:!°!!+!1.� , E ... l�oYY� Operator Certification Number: q�, . .... Location of Farm: Latitude =• OG i y U u Longitude TVpe of Operation and Design Capacity Design Cu- EN,Design Current r. DesignCurrent Swine Point : Cattle, W; Ca aci , .Po Mahon3'#,. 3 . Ca aci Po ulatioii Ca aciPa Mahon £k ❑ Wean to Feeder �❑ Layer ! ❑ D Feeder to Finish A4# <1 Non a er ❑ Non Dairy EJ Farrow to Wean n a Farrow to Feeder Tatal9DeS19n Capac1r sa Farrow to Finish �SSE ❑ Other. TO U aI�W Number of Lagoons/ Holding Ponds Y Subsurface Drains Present _ ry Him 10 Lagoon Area Spray Field Area General 1. Are there any buffers that need maintenance/improvement? 2. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Spray field ❑ Other a. If discharge is observed, was the conveyance man-made? b. If discharge is observed, did it reach Surface Water? (If yes, notify DWQ) c. If discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) 3. Is there evidence of past discharge from any part of the operation? 4. Were there any adverse impacts to the waters of the State other than from a discharge? 5. Does any part of the waste management system (other than lagoons/holding ponds) require 4/30/97 maintenancelimprovement? ® Yes ❑ No ❑ Yes RNo ❑ Yes E9 No ❑ Yes ® No ❑ Yes & No ❑ Yes ® No ❑ Yes Ej No ❑ Yes ffiNo Continued on back Facility Number:.. a...._. —_ eJ... 6. Is facility not in compliance with any applicable setback criteria in effect at the time of design? 7. Did the facility fail to have a certified operator in responsible charge? 8. Are there lagoons or storage ponds on site which need to be properly closed? Structures (Laggons. and/or Holding nd 9. Is storage capacity (freeboard plus storm storage) less than adequate? Freeboard (ft): Structure 1 Structure 2 Structure 3 Structure 4 10. Is seepage observed from any of the structures? 11. Is erosion, or any other threats to the integrity of any of the structures observed? ❑ Yes 10 No ❑ Yes Qg No ❑ Yes KNo ❑ Yes ® No Structure 5 Structure 6 ❑ Yes 10 No ® Yes ❑ No 12. Do any of the structures need maintenance/improvement? (If any of questions 9-12 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 13. Do any of the structures lack adequate minimum or maximum liquid level markers? Waste Application 14. Is there physical evidence of over application? (If in excess of WMP, or runoff entering waters of the State, notify DWQ) 15. Crop type W»l. �'!7C.. c� y ✓iY x� j r► tr�ar.. fx .r..!!!�! r� �_.........__....� ._.... ...............� .... 16. Do the receiving crops differ with those designated in the Animal Waste Management Plan (AWMP)? 17. Does the facility have a lack of adequate acreage for land application? 91 Yes ❑ No ❑ Yes to No ❑ Yes R No ❑ Yes RtNo ❑ Yes 10 No 18. Does the receiving crop need improvement? ❑ Yes C3No 19. Is there a lack of available waste application equipment? ❑ Yes -0 No 20. Does facility require a follow-up visit by same agency? ❑ Yes El No 21. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yes RNo For Certified Facilities Only 22. Does the facility fail to have a copy of the Animal Waste Management Plan readily available? ❑ Yes ® No 23. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes [H No 24. Does record keeping need improvement? Yes ❑ No Comments {refer to question #l) Explain any YES answers-'and/or;mend ;any recomapons or any other comments Use drav�nngs;of1factliry to,better explain situattons '(use addihonal:pages as necessary} a �- e.o_,L . u E , s a— c e 6 wee.,,. a r e,o ,�, t.�-w� 5,p .. �. 4 a►--d v- o�-side dI L7cL-1. F; 11 aria r enr e�J: g 4 L VJ-e �r o i t o Y. t o �s c v► ; v, v`a.�r- (� a o t3 .� u i 1. e,V �-q e a -r �-a o n , a g a o •rt w a (1 . .1 !V 2-4 • KA{ 0. � e S t] --k C1 -ZA d h v .•.1 �S O to ; Y .r i� Q , �t 0 V e c-O YA s Go "-O-E F n r e,,t h V ,'% b &.- S L N VVid, yl c j r+n �'M E. p 1..&.vn . Reviewer/Inspector Name Reviewer/Inspector Signature: Date: cc: Division of Water Oualitv. Water Oualitv Section. Facility Assessm t Unit 4/30/97 • • -Site Requires Immediate Attention: Facility No. — 3 DIVISION OF ENVIRONMENTAL MANAGEMENT ANIMAL FEEDLOT OPERATIONS SITE VISITATION RECORD DATE: — , 1995 p Time:'3 Farm Name/Owner: Mailing Address: County: _ J Integrator. f �i On Site Representative: _ Physical Address/Location: Type of Operation: Swine t.-/ - Poultry Cattle Design Capacity: Number of Animals on Site: DEM Certifica�i'on Number: ACE A. 6 DEM Certification Number: ACNEW Latitude: ° ' J?, Longitude: �J!j _° t 11Elevation: Feet Circle Yes or No Does the Animal Waste Lagoon have sufficient freeboard of 1 Foot + 25 year 24 hour storm event (approximately 1 Foot + 7 inches) Yoe or No Actual Freeboard: _�' —Ft. Inches Was any seepage observed from the lagoon(s)? Yes o Was any erosion observed? Yes orCO) Is adequate land available for spray? Yes or No Is the cover crop adequate? 'e or No Crop(s) being utilized: Does the facility meet SCS minimum setback criteria? 200 Feet from Dwellings? Y e or No 100 Feet from Wells? Oe or No Is the animal waste stockpiled within 100 Feet of USGS Blue Line Stream? Yes o No Is animal waste land applied or spray irrigated within 25 Feet of a USGS Map Blue Line? Yes or l�a Is animal waste discharged into waters of the state by man-made ditch, flushing system; or other similar man-made devices? Yes or To If Yes, Please Explain. . Does the facilitimaintain adequate waste management records (volumes of manure, land applied, spray. irrigated on specific acreage with cover crop)? Yes orG Additional Comments: Inspector Name Signature cc. Facility Assessrneni Unit _ Use Attachments if Neede(` r NORTH CAROLINA Department of Environmental Qual Water Resources ENVMONMENTAL QUALITY Rebecca H. Ward Homestead Farms, Inc., #2 134 Williams Road Rose Hill, NC 28458 Dear Rebecca H. Ward: PAT MCCRORY '�+OY$Yi Or RECEIVEDINCDENRO DONALD R. VAN DER VAART AUG 10 2016 Secre,arr S. JAY ZIMMERMAN August 8 2016 Water QualityRe tonal %:recor Operations Section l Office Wilmington Reg Subject: Certificate of Coverage No. AWS310355 Homestead Farms, Inc., #2 Swine Waste Collection, Treatment, Storage and Application System Duplin County . In accordance with your Notification of Change of Ownership received July 28, 2016, we are hereby forwarding to you this Certificate of Coverage (COC) issued to Rebecca H. Ward, authorizing the operation of the subject animal waste management system in accordance with General Permit AWG100000. This approval shall consist of the operation of this system including, but not limited to, the management and land application of animal waste as specified in the facility's Certified Animal Waste Management Plan (CAWMP) for Homestead Farms, inc., 42, located in Duplin County, with a swine animal capacity of no greater than the following annual averages: Wean to Finish: Feeder to Finish: 2448 Boar/Stud: Wean to Feeder: Farrow to Wean: Gilts: Farrow to Finish: Farrow to Feeder: Other: If this is a Farrow to Wean or Farrow to Feeder operation, there may be one boar for each 15 sows. Where boars are unnecessary, they may be replaced by an equivalent number of sows. Any of the sows may be replaced by gilts at a rate of 4 gilts for every 3 sows. This COC shall be effective from the date of issuance until September 30, 2019, and shall hereby void Certificate of Coverage Number AWS310355 dated October 1, 2014. Pursuant to this COC, you are authorized and required to operate the system in conformity with the conditions and limitations as specified in the General Permit, the facility's CAWMP, and this COC. An adequate system for collecting and maintaining the required monitoring data and operational information must be established for this facility. Any increase in waste production greater than the certified design capacity Or increase in number of animals authorized by this COC (as provided above) will require a modification to the CAWMP and this COC and must be completed prior to actual increase in either wastewater flow or number of animals. Please read this COC and the enclosed State General Permit carefully. Please pay careful attention to the record keeping and monitoring conditions in this permit. Record keeping forms are unchanged with this General Permit. Please continue to use the same record keeping forms. If your Waste Utilization Plan (WUP) has been developed based on site -specific information, careful evaluation of future samples is necessary. Should your records show that the current WUP is inaccurate you will need to have a new WUP developed. State of North Carolina _ I Fnvironmentat Quality I Water Resources 1636 Mail service Center I Raleigh, North Carolina 27699-1636 oingn?6161 ' The issuance of this COC does not excuse the Permittee from the obligation to comply with all applicable laws, rules, standards, and ordinances, (local, state, and federal), nor does issuance of a COC to operate under this permit convey any property rights in either real or personal property. Per NRCS standards a 100-foot separaiion'shall be maintained between water supply wells and any lagoon, storage pond, or any wetted area of a. spray field. Please be advised that any violation of the terms and conditions specified in this COC, the General Permit or the CAWMP may result in the revocation of this COC, or penalties in accordance with NCGS 143- 215.6A through 143-215.6C including civil penalties, criminal penalties, and injunctive relief. If any parts, requirements, or limitations contained in this COC are unacceptable, you have the right to apply for an individual permit by contacting the Animal Feeding Operations Program for information on this process. Unless such a request is made within 30 days, this COC shall be final and binding. In accordance with Condition 11.22 of the General Permit, waste application shall cease within four (4) hours of the time that the National Weather Service issues a Hurricane Warning, Tropical Storm Warning, or a Flood Watch associated with a tropical system for the county in which the facility is located. You may find detailed watch/warning information for your county by calling the Newport/Morehead City, NC National Weather Service office at (252) 223-5737, or by visiting their website at: ht_tp://www.weather.gov/mhxl This facility is located in a county covered by our Wilmington Regional Office, The Regional Office staff may be reached at 910-796-7215. If you need additional information concerning this COC or the General Permit, please contact the Animal Feeding Operations Program staff at (919) 807-6464. Sincerely, for S. Jay Zimmerman, P.G. Director, Division of Water Resources Enclosure (General Permit AWG100000) cc: (Certificate of Coverage only for all ccs) Wilmington Regional Office, Water Quality Regional Operations Section Duplin County Health Department Duplin County Soil and Water Conservation District WQROS Central Files (Permit No. AWS310355) Smithfield Hog Production Ag7mm NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor Jolanda Lanier Triple J Farms, Inc 1547 Old Camp Rd. Rose Hill, NC 28458 Dear JoIanda Lanier: Division of Water Quality Charles Wakild, P. E. Director March 26, 2013 John E. Skvada, III Secretary Subject: Sludge Survey Testing Dates Certificate of Coverage No. AWS310355 Triple J Farms, Inc Animal Waste Management System Duplin County The Division of Water Quality (Division) received your sludge survey information on March 6, 2013. With the survey results, you requested an extension of the sludge survey requirement for the lagoon at the Triple J Farms, Inc facility. Due to the amount of treatment volume available, the Division agrees that a sludge survey is not needed until December 31, 2016. The next sludge survey for the lagoon at this facility should be performed before December 31, 201.6. Please retain this letter and keep it with your farm records for reference. Thank you for your attention to this matter. Please call me at (919) 807-6340 if you have any questions. Sincerely, Miressa D. Garoma Animal Feeding Operations Unit cc: Wilmington Regional Office, Aquifer Protection Section Permit File AWS310355 AQUIFER PROTECTION SECTION 1636 Mail Service Center, Raleigh, North Carolina 27699-1636 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 91"07-64641 FAX: 919-807-6480TAX: 9IM07-6496 Internet: www.ncwalergual'ft.ora An Equal Opportunity 1 Atfirmative Action Emptoyer NorthCarofina 'Natl�!'til, f Nutrient Management Plan For Animal Waste Utilization 02-05-2007 This plan has been prepared for: Triple JFarms Inc. Jolanda Lanier 1547 Old Camp Rd Rose Hill, NC 28458 910-532-2747 This plan has been developed by: Billy W Houston Duplin Soil & Water Conservation PO Box 219 Kenansville, NC 28349 910-296-2120 Developer Signature Type of Plan: Nutrient Management with Manure Only Owner/Manager/Producer Agreement I (we) understand and agree to the specifications and the operation and maintenance procedures established in this nutrient management plan which includes an animal waste utilization plan for the farm named above. I have read and understand the Required Specifications concerning animal waste ponagement that are included with this plan. Signature (owner) Signature (manager or producer) - J6 7 Date Date This plan meets the minimum standards and specifications of the U.S. Department of Agriculture - Natural Resources Conservation Service or the standard of practices adopted by the Soil and Water Conservation Commission. Plan Approved By: 0 Technical Specialist Signature Date RECEIVED FEB A 7 2007 ------------------------------------------------------------------------------------------------------------------------------------------------- 713734 Database Version 3.1 Date Printed: 02-05-2007 Cover Page 1 Nutrients applied in accordance with this plan will be supplied from the following source(s): Commercial Fertilizer is not included in this plan. S7 Swine Feeder -Finish Lagoon Liquid waste generated 2,269,296 gals/year by a 2,448 animal Swine Finishing Lagoon Liquid operation. This production facility has waste storage capacities of approximately 180 days. Estimated Pounds of Plant Available Nitrogen Generated per Year Broadcast 5227 Incorporated 8976 Injected 9885 Irrigated 5681 Max. Avail. PAN (lbs) * Actual PAN . Applied (lbs) PAN Surplus/ Deficit (lbs) Actual Volume Applied (Gallons) Volume Surplus/ Deficit (Gallons) Year 1 5,681 5800 -119 2,316,6301 -47,334 Noi--------- - -------------------------- - -- -------------------------- ---- ------ -- ------ --- ------------------------------------------------- e: In source ID, S means standard source, U means user defined source. * Max. Available PAN is calculated on the basis of the actual application method(s) identified in the plan for this source. 713734 Database Version 3.1 Date Printed: 02-05-2007 Source Page Page 1 of I Narrative This WUP has been upated using an existing wetted acres plan completed by by Star Jackson. Fields #4 & #5 have been added to allow grazing to be done on this facility. Ms Lanier has access to an AerWay system which will be used to apply the waste on the above listed fields. ------------------------------------------------------------------------------------------------------------------------------------------------------------ 713734 Database Version 3.1 Dace Printed: 02-05-2007 Narrative Page Page 1 of 1 The table shown below provides a summary of the crops or rotations included in this plan for each field. Realistic Yield estimates are also provided for each crop, as well as the crop's P205 Removal Rate. The Leaching Index (LI) and the Phosphorous Loss Assessment Tool (PLAT) Rating are also provided for each field, where available. If a field's PLAT Rating is High, any planned manure application is limited to the phosphorous removal rate of the harvested plant biomass for the crop rotation or multiple years in the crop sequence. Fields with a Very High PLAT Rating should receive no additional applications of manure. Regardless of the PLAT rating, starter fertilizers may be recommended in accordance with North Carolina State University guidelines or recommendations. The quantity of P205 applied to each crop is shown in the following table if the field's PLAT rating is High or Very High. Planned Crops Summary Tract Field Total Acres Useable Acres Plat Rating Ll Soil Series Crop Sequence RYE P205 Removal (lbs/acre) Applied (Ibs/acre) 328 1 4.82 4.82 Low NIA Autryville Small Grain Overseed 1.0 Tons 15 NIA Hybrid Bermudagrass Pasture 5.5 Tons 7 N/A 328 2 8.48 8.48 Low NIA Autryville Small Grain Overseed 1.0 Tons 15 NIA Hybrid Bermudagrass Pasture 5.5 Tons 7 NIA 328 3 3.74 3.74 Low NIA Norfolk Small Grain Overseed 1.0 Tons 15 NIA Hybrid Bermudagrass Pasture 6.5 Tons 8 N/A 328 4 I'M 1.30 Low NIA Autryville Small Grain Overseed 1.0 Tons 15 NIA Hybrid Bermudagrass Pasture 5.5 Tons 7 NIA 328 5 3.76 3.761 Low NIA Autryville Small Grain Overseed 1 1.0 Tons 15 NIA Hybrid Bermudagrass Pasture 1 5.5 Tons 7 N/A PLAN TOTALS: 22.10 22.10 713734 Database Version 3.1 Date Printed 2/5/2007 PCs Page Page 1 of 2 NOTE: Symbol * means user entered data. . _i " �.� , - 4!gyp: -�:- C Low potential to contribute to soluble None < 2 nutrient leaching below the root zone. Moderate potential to contribute to soluble Nutrient Management (590) should be planned. — 2 & nutrient leaching below the root zone. I <= 10 High potential to contribute to soluble Nutrient Management (590) should be planned. Other conservation practices that improve the soils nutrient leaching below the root zone. available water holding capacity and improve nutrient use efficiency should be considered. Examples are Cover Crops (340) to scavenge nutrients, Sod -Based Rotations (328), Long -Term NO -Till (778), > 10 and edge -of -field practices such as Filter Strips (393) and Riparian Forest Buffers (391). a fi ''Rating'- J.- P Ma ageMent.Recommen ation 0-25 Low No adjustment needed; N based application 25-50 Medium No adjustment needed; N based application 51 - 100 High Application limited to crop P removal > 100 Very High Starter P application only 713734 Database Version 3.1 Date Printed 2/5/2007 PCS Page Page 2 of 2 NOTE: Symbol * means user entered data. The Waste Utilization table shown below summarizes the waste utilization plan for this operation. This plan provides an estimate of the number of acres of cropland needed to use the nutrients being produced. The plan requires consideration of the realistic yields of the crops to be grown, their nutrient requirements, and proper tinting of applications to maximize nutrient uptake. This table provides an estimate of the amount of nitrogen required by the crop being grown and an estimate of the nitrogen amount being supplied by manure or other by-products, commercial fertilizer and residual from previous crops. An estimate of the quantity of solid and liquid waste that will be applied on each field in order to supply the indicated quantity of nitrogen from each source is also included. A balance of the total manure produced and the total manure applied is included in the table to ensure that the plan adequately provides for the utilization of the manure generated by the operation. Waste Utilization Table Year 1 'rract field Source ID Soil Series Total Acres Use. Acres Crop RYE Applic, Pcriod Nitrogen PA Nutrient Rcq'd (lbs/A) Comm. Fert. Nutrient Applied (lbs/A) Res. (lbs/A) Applic. Method Manure PA NutrientA pplied (lbs/A) Liquid ManureA pplied (acre) Solid Manure Applied (acre) Liquid Manure Applied 1 (Field) Solid Manure Applied (Field) N N N N 1000 gat/A Tuns 1000 gals tons 328 l S7 Autryville 4,82 4.82 Small Grain Overseed 1.0 Tons 1011-3/31 50 0 0 Irrig. 50 19.97 0.00 96.31 0.00 328 1 S7 Autryville 4.82 4.82 liybrid Bermudagrass Pasture 5.5 Tons V1-9130 *206 0 0 Irrig. 206 82.29 0.00 396.78 0.00 328 2 S7 Autryville 8.48 8.48 Small Grain Overseed 1.0 Tons 10/1-3/31 50 0 0 Irrig. 50 19.97 0.00 169.34 0.00 328 2 S7 Autryville 8.48 8.48 liybrid Bermudagrass Pasture 5.5 Tons M-9/30 •206 0 0 Irrig. 206 82.29 0.00 097.69 0.00 328 3 S7 Norfolk 3.74 3.74 Small Grain Overseed 1.0 Tons 1011-3131 50 0 0 Irrig. 50 19.97 0.00 74.68 0.00 328 3 S7 Norfolk 3,74 3.74 Hybrid Bermudagrass Pasture 6.5'I'ons 3/1-9/30 0244 0 0 Irrig. 244 97.46 0.00 304.42 0.00 328 4 S7 Autryville 1.30 1.30 Small Grain Overseed LO Tons 1011-3131 50 0 0 Irrig. 50 19,97 0,00 25.96 0.00 328 4 S7 Autryville 1.30 1.30 liybrid Bermudagrass Pastore 5.5 Tons 3/1.9/30 •206 0 0 Irrig, 206 82.29 0.00 106.97 0.00 328 5 S7 Autryville 3.76 3.76 Small Grain OVCTSeed 1.07ons 10/1-3131 50 0 0 Irrig. 50 19.97 0.00 75.10 0.00 328 5 S7 Autryville 3.76 3.76 1lybrid Bermudagrass Pasturc 5.5 Tons 3/1-9130 *206 0 ll Irrig. 206 82.29 0.00 309.39 0.00 Total Applied, 1000 gallons 2,316.63 Sam 'total Produced, 1000 gallons 2,269.30 Balance, 1000 gallons 47.33 Total Applied, tons jg. 0.06 Total Produced, tons 0.00 Balance, tons 0.00 Notes: t. In the tract column, symbol means ]cased, otherwise, owned. 2. Symbol * means user entered data. 713734 Database Version 3.1 Date Printed: 2/5/2007 W UT Page Page 1 of 1 The Irrigation Application Factors for each field in this plan are shown in the following table. Infiltration rate varies with soils, If applying waste nutrients through an irrigation system, you must apply at a rate that will not result in runoff. This table provides the maximum application rate per hour that may be applied to each field selected to receive wastewater. It also lists the maximum application amount that each field may receive in any one application event. Irrigation Application Factors Tract Field Soil Series Application Rate (inches/hour) Application Amount (inches) 328 1 Autryville 0.60 1.0 328 2 Autryville 0.60 1.0 328 3 Norfolk 0.50 1.0 328 4 Autryville 0.60 1.0 328 5 AutryvilIe 0.60 1.0 713734 Database Version 3.1 Date Printed 2/5/2007 IAF Page Page I of I NOTE: Symbol * means user entered data. The Nutrient Management Recommendations table shown below provides an annual summary of the nutrient management plan developed for this operation. This table provides a nutrient balance for the listed fields and crops for each year of the plan. Required nutrients are based on the realistic yields of the crops to be grown, their nutrient requirements and soil test results. The quantity of nutrient supplied by each source is also identified. The total quantity of nitrogen applied to each crop should not exceed the required amount_ However, the quantity of other nutrients applied may exceed their required amounts. This most commonly occurs when manure or other byproducts are utilized to meet the nitrogen needs of the crop. Nutrient management plans may require that the application of animal waste be limited so as to prevent over application of phosphorous when excessive levels of this nutrient are detected in a field. In such situations, additional nitrogen applications from nonorganic sources may be required to supply the recommended amounts of nitrogen. Nutrient Management Recommendations Test YEAR Q N (lbs/A) P205 (lbs/A) K20 (lbs/A) Mg (lbs/A) Mn (lbs/A) Zn (lbs/A) Cu (lbs/A) Lime (tons/A) Tract Field 328 1 Req'd Nutrients 50 120 80 0 0 0 2 1 Acres I App. Period 4.82 10/1-3/31 Supplied By. CROP Small Grain Overseed Starter 4 0 0 0 0 0 0 0 Commercial Fert. 0 0 0 0 Oi 0 0 0 Soil Series Autryville Residual 0 0 0 0 0 0 01 0 RYE Sample Date 1.0 Tons 10-03-06 Manure 50 27 68 6 0 1 0 0 P Removal Rating 15 lbs/ac. Low BALANCE 0 -93 -12 6 0 1 -2 -1 Tract Field 328 2 Req'd Nutrients 50 150 110 0 0 0 2 2 Acres App. Period 8.48 10/1-3/31 Supplied By: - ma r sx— y' CROP Small Grain Overseed Starter 0 0 0 0 0 0 0 0 Commercial Fert. 0 0 0 0 0 0 0 0 Soil Series Autryville Residual 0 0 0 0 0 0 0 0 RY@ Sample Date 1.0 Tons 10-03-06 Manure 50 27 68 6 0 1 0 0 P Removal Rating 15 lbslac. Low BALANCE 0 -123 -42 6 0 1 -2 -2 Field ETApp 328 3 Req'd Nutrients 50 150 1I0 0 0 0 2 2 . Period 3.74 10/1 3/31 Supplied By: CROP Small Grain Overseed Starter 0 0 0 0 0 0 0 0 Commercial Fert. 0 0 0 0 0 0 0 0 Soil Series Norfolk Residual 0 0 0 0 0 0 0 0 RYE I Sample Date 1.0 Tons 10-03-06 Manure 50 27 68 61 0 1 0 0 P Removal I Rating 15 lbs/ac. Low BALANCE 0 -123 42 6 0 1 -2 -2 Tract Field 328 4 Req'd Nutrients 50 90 100 0 0 0 2 1 Acres I App. Period 1.30 14/1-3/31 SupP1[ed By e CROP Small Grain Overseed Starter 0 0 0 0 0 0 0 0 Commercial Fert. 0 0 0 01 0 0 0 0 Soil Series Autryville Residual 0 0 0 0 0 0 0 0 RYE I Sample Date 1.0 Tons 10-03-06 Manure 50 27 68 6 0 1 0 0 P Removal jZting 15 Ibs/ac. Low BALANCE 0 -63 -32 6 0 1 -2 -] 713734 Database Version 3.1 Date Printed: 2/5/2007 NM Page Page 1 of 3 Nutrient Management Recommendations Test YEAR N (lbs/A) P2O5 (lbs/A) K20 (lbs/A) Mg (lbs/A) Mn (lbs/A) A (lbs/A) Cu (lbs/A) Lime (tons/A) Tract Field 328 5 Req'd Nutrients 50 90 100 0 0 0 2 I Acres I App. Period 3.76 1011-3/31 Supplied By: q_ = . ' _ smm _ w CROP Small Grain Overseed Starter 0 0 0 0 0 0 0 0 Commercial Fert. 0 0 0 0 0 0 0 0 Soil Series Autryvilie Residual 0 0 0 0 0 0 0 0 RYE Sample Date 1 1.0 Tons 1 10-03-06 Manure 50 27 68 6 01 1 01 p P Removal I Rating 1 15 Ibs/ac. Low BALANCE 1 0 -63 -321 61 0 1 -2 -i NOTE: Symbol * means user entered data. 713734 Database Version 3.1 Date Printed: 2/5/2007 NM Page Page 2 of 3 Nutrient Management Recommendations Test YEAR N (lbs/A) P205 (lbs/A) K20 (lbs/A) Mg (lbs/A) Mn (lbs/A) Zn (lbs/A) Cu (lbs/A) Lime (tons/A) Tract Field 328 1 Req'd Nutrients *206 120 170 0 0 0 0 0 Acres I App. Period 4.82 3/1-9/30 Supplied By:'MM ANWINW,M = " CROP Hybrid Bermudagrass Pasture Starter 0 0 0 0 0 0 0 0 Commercial Fert. 0 0 0 0 0 0 0 0 Soil Series Autryvilte Residual 0 0 0 0 0 0 0 0 RYE I sample Date 5.5 Tons 10-03-06 Manure 206 112 282 251 1 5 1F 0 P Removal Rating 7 lbs/ac. Low BALANCE 0 -8 112 25 1 5 1 0 Tract Field 328 2 Req'd Nutrients *206 150 210 0 0 0 0 0 Acres App. Period 8.4$ 3/1-9/30 Supplied By: � - M�-�"" = � - CROP Hybrid Bermudagrass Pasture Starter 0 0 0 0 0 0 0 0 Commercial Fen. 0 0 0 0 0 0 0 0 Soil Series Autryville Residual 0 0 0 0 0 0 0 0 RYE I Sample Bate 5.5 Tons 10-03-06 Manure 2061 112 282 25 1 5 1 0 P Removal I Rating 7 lbs/ac. Low BALANCE 0 -38 72 25 1 5 1 0 ract F Field 328 3 Req'd Nutrients *244 150 210 0 0 0 0 0 es I App. Period 3.74 3/1-9/30 Supplied By: SWAN � N TW 9 0`i CROP Hybrid Bermudagrass Pasture Starter 0 0 0 0 01 0 0 0 Commercial Fen. 0 0 0 0 0 0 0 0 Soil Series Norfolk Residual 0 0 0 0 0 0 0 0 RYE I Sample Date 6.5 Tons 10-03-06 Manure 244 133 334 30 1 6 1 0 P Removal Rating 8 lbs/ac. Low BALANCE 0 -17 124 30 1 6 1 0 Tract Field 328 4 Req'd Nutrients *206 90 190 4 0 0 0 0 Acres App. Period 1.30 3/1-9/30 Supplied By: fi . E " ._. dz ` 4-4 �. " CROP Hybrid Bermudagrass Pasture Starter 0 0 0 0 0 0 0 0 Commercial Fen. 0 0 0 0 0 0 0 0 Soil Series Autryville Residual 0 0 0 0 0 0 0 0 RYE 'Sample Date 5.5 Tons 10-03-06 Manure 206 112 282 25 1 5 1 0 P Removal I Rating. 7 lbs/ac. Low BALANCE 0 22 92 25 1 5 1 0 Tract Field 328 5 Req'd Nutrients *206 90 190 0 0 0 0 0 Acres App. Period 3.76 3/1-9/30 Supplied By: _� w art$ CROP Hybrid Bermudagrass Pasture Starter 0 0 0 0 0 0 0 0 Commercial Fert. 0 0 0 0 0 0 0 0 Soil Series Autryville Residual 0 0 0 0 0 0 0 0 RYE Sample Date 5.5 Tons 1 10-03-06 Manure 206 112 282 25 1 51 1 0 P Removal Rating 7 lbslac. Low BALANCE 0 22 92 25 l 5 1 0 NOTE: Symbol * means user entered data. 713734 Database Version 3.1 Date Printed: 2/5/2007 NM Page Page 3 of 3 The Required Soil Test Values shown in the following table provide a summary of recommended actions that should be taken if soil tests indicate excessive levels of copper or zinc. Fields that receive manure must have an annual soil analysis for these elements. High levels of zinc and copper can adversely affect plant growth. Alternative crop sites must be used when the concentration of these metals approach excessive levels. Site life can be estimated by dividing the amount of copper and zinc to be applied in lbs/acre by 0.036 and 0.071, respectively and multiplying the result by 0.85. By adding this quantity to the current soil index for copper or zinc, we can predict life of the site for waste disposal. In addition to copper and zinc indices, this table also provides a summary of lime recommendations for each crop based on the most recent soil sample. Application of lime at recommended rates is necessary to maintain soil pl-i in the optimum range for crop production . Required Soil Test Values Tract Field Crop pH Lime Recom. (tonstacre) Cu-t Copper Recommendation Zn-I Zinc Recommendation 328 1 Small Grain Overseed 5.0 1.1 t5 None 20 None 328 l l lybrid Bermudagrass Pasture 5.0 0.0 15 None 20 None 328 2 Small Grain Overseed 4.8 2.3 10 None 25 None 328 2 Hybrid Bermudagrass Pasture 4.8 0.0 10 None 25 None 328 3 Small Grain Overseed 4.8 2.3 10 None 25 None 328 3 hybrid Bermudagrass Pasture 4.8 0.0 to None 25 None 328 4 Small Grain Overseed 4.6 0.8 19 None 40 None 328 4 Hybrid Bermudagrass Pasture 4.6 1 0.01 19 1 None 40 None 328 5 Small Grain Oversecd 4.6 0.8 19 None 40 None 328 5 Flybrid Bermudagrass Pasture 4.6 0.0 19 None 40 None -. -.- ..---- ------ -------- ------------------------------ 713734 Database Version 3.1 Date Printed: 02-05-2007 STV Page Page 1 of I The following Lagoon Sludge Nitrogen Utilization table provides an estimate of the number of acres needed for sludge utilization for the indicated accumulation period. These estimates are based on average nitrogen concentrations for each source, the number of animals in the facility and the plant available nitrogen application rates shown in the second column. Lagoon sludge contains nutrients and organic matter remaining after treatment and application of the effluent. At clean out, this material must be utilized for crop production and applied at agronomic rates. In most cases, the priority nutrient is nitrogen but other nutrients including phosphorous, copper and zinc can also be limiting. Since nutrient levels are generally very high, application of sludge must be carefully applied. Sites must first be evaluated for their suitability for sludge application. Ideally, effluent spray fields should not be used for sludge application. if this is not possible, care should be taken not to load effluent application fields with high amounts of copper and zinc so that additional effluent cannot be applied. On sites vulnerable to surface water moving to streams and lakes, phosphorous is a concern. Soils containing very high phosphorous levels may also be a concern. Lagoon Sludge Nitrogen Utilization Table Crop Maximum PA-N Rate lb/ac Maximum Sludge Application Rate 1000 gal/ac ' Minimum Acres 5 Years Accumulation Minimum Acres 10 Years Accumulation Minimum Acres 15 Years Accumulation Swine Feeder -Finish Lagoon Sludge - Standard Corn 120 bu [so 13.16 30.69 61.38 92.07 Hay 6 ton R.Y.E. 300 26.32 15.34 30.69 46.03 Soybean 40 bu 160 14.04 28.77 57.54 86.31 - - - - - - - - - - - - - - - -- - -- - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - -- - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 713734 Database Version 3.1 Date Printed: 02-05-2007 Sludge Page Page 1 of The Available Waste Storage Capacity table provides an estimate of the number of days of storage capacity available at the end of each month of the plan. Available storage capacity is calculated as the design storage capacity in days minus the number of days of net storage volume accumulated. The start date is a value entered by the user and is defined as the date prior to applying nutrients to the first crop in the plan at which storage volume in the lagoon or holding pond is equal to zero. Available storage capacity should be greater than or equal to zero and less than or equal to the design storage capacity of the facility. If the available storage capacity is greater than'the design storage capacity, this indicates that the plan calls for the application of nutrients that have not yet accumulated. if available storage capacity is negative, the estimated volume of accumulated waste exceeds the design storage volume of the structure. Either of these situations indicates that the planned application interval in the waste utilization plan is inconsistent with the structure's temporary storage capacity. Available Waste Storage Capacity Source Name I Swine Feeder -Finish Lagoon Liquid Design Storage Capacity (Days) Start Date 9/1 180 Plan Year Month Available Storage Capacity (Days) 1 1 70 1 2 56 1 3 100 1 4 130 1 5 159 1 6 159 1 7 158 1 8 157 1 9 157 1 10 133 1 11 114 1 12 94 * Available Storage Capacity is calculated as of the end of each month. ----------------------------------------------------------------------- ------------------------------ - -- • -- - 713734 Database Version 3.1 Date Printed: 02-05-2007 Capacity Page Page 1 of 1 Required Specifications For Animal Waste Management 1. Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste that reaches surface water is prohibited. 2. There must be documentation in the design folder that the producer either owns or has an agreement for use of adequate land on which to properly apply the waste. If the producer does not own adequate land to properly dispose of the waste, he/she shall provide evidence of an agreement with a landowner, who is within a reasonable proximity, allowing him/her the use of the land for waste application. It is the responsibility of the owner of the waste production facility to secure an update of the Nutrient Management Plan when there is a change in the operation, increase in the number of animals, method of application, receiving crop type, or available land. 3. Animal waste shall be applied to meet, but not exceed, the nitrogen needs for realistic crop yields based upon soil type, available moisture, historical data, climatic conditions, and level of management, unless there are regulations that restrict the rate of applications for other nutrients. 4. Animal waste shall be applied to land eroding less than 5 tons per acre per year. Waste may be applied to land eroding at more than 5 tons per acre per year but less than 10 tons per acre per year provided grass filter strips are installed where runoff leaves the field (see USDA, NRCS Field Office Technical Guide Standard 393 - Filter Strips). 5. Odors can be reduced by injecting the waste or by disking after waste application. Waste should not be applied when there is danger of drift from the land application field. 6. When animal waste is to be applied on acres subject to flooding, waste will be soil incorporated on conventionally tilled cropland. When waste is applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding (see "Weather and Climate in North Carolina" for guidance). 7. Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control odor and flies. ---------------------------------------------------------------------- ---- ----- - ----- ------------ 713734 Database Version 3.1 Date Printed: 2/5/2007 Specification Page 1 8. Animal waste shall not be applied to saturated soils, during rainfall events, or when the soil surface is frozen. 9. Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to a depth that would inhibit growth. The potential for salt damage from animal waste should also be considered. 10. Nutrients from waste shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Waste/nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of the crop or forages breaking dormancy. 11. Any new swine facility sited on or after October 1, 1995 shall comply with the following: The outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and canal. Animal waste, other than swine waste from facilities sited on or after October 1, 1995, shall not be applied closer that 25 feet to perennial waters. 12. Animal waste shall not be applied closer than 100 feet to wells. 13. Animal waste shall not be applied closer than 200 feet of dwellings other than those owned by the landowner. 14. Waste shall be applied in a manner not to reach other property and public right-of-ways. 15. Animal waste shall not be discharged into surface waters, drainageways, or wetlands by a discharge or by over -spraying. Animal waste may be applied to prior converted cropland provided the fields have been approved as a land application site by a "technical specialist". Animal waste shall not be applied on grassed waterways that discharge directly into water courses, and on other grassed waterways, waste shall be applied at agronomic rates in a manner that causes no runoff or drift from the site. 16. Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. ------------------------------------------------------------------------------------------------------------------------------------------------------------------- 713734 Database Version 3.1 Date Printed: 2/5/2007 Specification Page 2 17. A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments; berms, pipe runs, etc.). Areas shall be fenced, as necessary; to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc., are limited to areas where considered appropriate. Lagoon areas -should be kept mowed and accessible. Berms and structures should be inspected regularly for evidence of erosion, leakage, or discharge. 18. If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge, pollution, and erosion. 19. Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, leaks, and spills. A regular maintenance checklist should be kept on site. 20. Animal waste can be used in a rotation that includes vegetables and other crops for direct human consumption. However, if animal waste is used on crops for direct human consumption, it should only be applied pre -plant with no further applications of animal waste during the crop season. 21. Highly visible markers shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume for waste storage ponds. 22.1 Waste shall be tested within 60 days of utilization and soil shall be tested at least annually at crop sites where waste products are applied. Nitrogen shall be the rate -determining nutrient, unless other restrictions require waste to be applied based on other nutrients, resulting in a lower application rate than a nitrogen based rate. Zinc and copper levels in the soils shall be monitored and alternative crop sites shall be used when these metals approach excessive levels. pH shall be adjusted and maintained for optimum crop production. Soil and waste analysis records shall be kept for a minimum of five years. Poultry dry waste application records shall be maintained for a minimum of three years. Waste application records for all other waste shall be maintained for five (5) years. 23. Dead animals will be disposed of in a manner that meets North Carolina regulations. -----------------------------------------------------•------- -------------------------------------------------------- p -- 713734 . Database Version 3-1 Date Printed: 2/5/2007 Specification Page 3 Crop Notes The following crop note applies to field(s): 3 Small Grain: CP, Mineral Soil, medium leachable In the Coastal Plain, oats and barley should be planted from October 15-October 30; and rye from October 15-November 20. For barley, plant 22 seed/drill row foot and increase the seeding rate by 5% for each week seeding is delayed beyond the optimum time. See the seeding rates table for applicable seeding rate modifications in the current NCSU "Small Grain Production Guide". Also, increase the initial seeding rate by at least 10% when planting no -till. Oats should be planted at 2 bushels/acre and rye at 1-1 1/2 bushels/acre. Plant all these small grains at 1-1 1/2" deep. Adequate depth control is essential. Review the NCSU Official Variety "green book" and information from private companies to select a high yielding variety with the characteristics needed for your area and conditions. Apply no more than 30 lbs/acre N at planting. Phosphorus and potash recommended by a soil test can also be applied at this time. The remaining N should be applied during the months of February -March. The following crop note applies to field(s): 1, 2, 4, 5 Small Grain: CP, Mineral Soil, medium leachable In the Coastal Plain, oats and barley should be planted from October 15-October 30; and rye from October 15-November 20. For barley, plant 22 seed/drill row foot and increase the seeding rate by 5% for each week seeding is delayed beyond the optimum time. See the seeding rates table for applicable seeding rate modifications in the current NCSU "Small Grain Production Guide". Also, increase the initial seeding rate by at least 10% when planting no -till. Oats should be planted at 2 bushels/acre and rye at 1-1 1/2 bushels/acre. Plant all these small grains at 1-1 1/2" deep. Adequate depth control is essential. Review the NCSU Official Variety "green book" and information from private companies to select a high yielding variety with the characteristics needed for your area and conditions. Apply no more than 30 lbs/acre N at planting. Phosphorus and potash recommended by a soil test can also be applied at this time. The remaining N should be applied during the months of February -March. ------------------------------------------------------------------------------------------------------------------------------------------- ------ 713734 Database Version 3.1 Date Printed: 02-05-2007 Crop Note Page Page i of 2 The following crop note applies to field(s): 3 Bermudagrass: CP, MineraI Soil, Moderately Well Drained. Adaptation: Well -adapted. In the Coastal Plain, hybrid bermudagrass sprigs can be planted Mar. 1 to Mar. 31. Cover sprigs 1" to 3" deep (1.5" optimal). Sprigs should be planted quickly after digging and not allowed to dry in sun and wind. For Coastal and Tifton 78 plant at least 10 bu/ac in 3' rows, spaced 2' to 3' in the row. Generally a rate of 30 bu/ac is satisfactory to produce full groundcover in one or two years under good growing conditions. Tifton 44 spreads slowly, so use at least 40 bu/ac in 1.5' to 2' rows spaced 1' to 1.5' in row. For broadcast/disked-in sprigs use about 60 bu/ac. Soil test for the amounts of lime, phosphorus, potassium and micronutrients to apply preplant and for annual maintenance. Apply 60 to 100 lb/ac N in the establishment year in split applications in April and July. For established stands apply I80 to 240 lb/ac N annually in split applications, usually in April and following the first and second hay cuts. Reduce N rates by 25% for grazing. Refer to NCSU Technical Bulletin 305 Production and Utilization of Pastures and Forages in North Carolina for more information or consult your regional agronomist or extension agent for assistance. The following crop note applies to field(s): 1, 2, 4, 5 Bermudagrass: CP, Mineral Soil, Moderately Well Drained. Adaptation: Well -adapted. In the Coastal Plain, hybrid bermudagrass sprigs can be planted Mar. 1 to Mar. 31. Cover sprigs 1" to 3" deep (1.5" optimal). Sprigs should be planted quickly after digging and not allowed to dry in sun and wind. For Coastal and Tifton 78 plant at least 10 bu/ac in 3' rows, spaced 2' to 3' in the row. Generally a rate of 30 bu/ac is satisfactory to produce full groundcover in one or two years under good growing conditions. Tifton 44 spreads slowly, so use at least 40 bu/ac in 1.5' to 2' rows spaced 1' to 1.5' in row. For broadcast/disked-in sprigs use about 60 bu/ac. Soil test for the amounts of lime, phosphorus, potassium and micronutrients to apply preplant and for annual maintenance. Apply 60 to 100 lb/ac N in the establishment year in split applications in April and July. For established stands apply 180 to 240 lb/ac N annually in split applications, usually in April and following the first and second hay cuts. Reduce N rates by 25% for grazing. Refer to NCSU Technical Bulletin 305 Production and Utilization of Pastures and Forages in North Carolina for more information or consult your regional agronomist or extension agent for assistance. ----------------------------------------------------------------------------------------------------- ---------------------------------------- ------------ 713734 Database Version 3.1 Date Printed: 02-05-2007 Crop Note Page Page 2 of 2 31-355 Nutrient Management Plan For Animal Waste Utilization 02-05-2007 This plan has been prepared for: Triple JFarms Inc. Jolanda Lanier 1547 Old Camp Rd Rose Hill, NC 28458 910-532-2747 This plan has been developed by: Billy W Houston Duplin Soil & Water Conservation PO Box 219 Kenansville, NC 28349 910-295-2120 Developer Signature Type of Plan: Nutrient Management with Manure Only APR v APR � � z0as Owner/Nlanager/Producer Agreement B) I (we) understand and agree to the specifications and the operation and mainten rocedures established in this nutrient management plan which includes an animal waste utilization p a for the farm named above. I have read and understand the Required Specifications concerning animal waste management that are included with this plan. Signature (owner) Signature (manager or producer) j - 5 —6 7 Date Date This plan meets the minimum standards and specifications of the U.S. Department of Agriculture - Natural Resources Conservation Service or the standard of practices adopted by the Soil and Water Conservation Commission. Plan Approved By: 0 Technical Specialist Signature Date -------- - ---- -------------------------------------------- - -- - - - --- -- -- - -- - - - - - ------------------- ---------- - ----- ----- - -- --------------------------- - -- - 713734 Database Version 3.1 Date Printed: 02-05-2007 Cover Page 1 RECEIVED / DENR I DWQ AQIAFFR'PR0Tr-r-n0 N gFCTION APR 0 6 7nnq Nutrients applied in accordance with this plan will be supplied from the following source(s): Commercial Fertilizer is not included in this plan. S7 Swine Feeder -Finish Lagoon Liquid waste generated 2,269,296 gals/year by a 2,448 animal Swine Finishing Lagoon Liquid operation. This production facility has waste storage capacities of approximately 180 days. Estimated Pounds of Plant Available Nitrogen Generated per Year Broadcast 5227 Incorporated 8976 Injected 9885 Irrigated 5681 Max. Avail. PAN (lbs) * Actual PAN Applied (lbs) PAN Surplus/ Deficit (lbs) Actual Volume Applied (Gallons) Volume Surplus/ Deficit (Gallons) Year 1 j 5,681 5800 -119 2,316,630 47,334 Note: ---------- I-n --so -- urce-- ----I-D-, --S -----e--ns --s-- tan -- d- - ard -sour------e-,-- U---m----eans---- u-ser----de---- --ned--sourc--- -- e. ---------------------------------------------------------------- macfi * Max. Available PAN is calculated on the basis of the actual application method(s) identified in the plan for this source. 713734 Database Version 3.1 Date Printed: 02-05-2007 Source Page Page 1 of 1 Narrative This WUP has been upated using an existing wetted acres plan completed by by Star Jackson. Fields #4 & #5 have been added to allow grazing to be done on this facility. Ms Lanier has access to an AerWay system which will be used to apply the waste on the above listed fields- --- ---------------------------- ---- - 713734 Database Version 3.1 Date Printed: 02-05-2007 Narrative Page Page 1 of 1 The table shown below provides a summary of the crops or rotations included in this plan for each field. Realistic Yield estimates are also provided for each crop, as well as the crop's P205 Removal Rate. The Leaching Index (LI) and the Phosphorous Loss Assessment Tool (PLAT) Rating are also provided for each field, where available. If a field's PLAT Rating is High, any planned manure application is limited to the phosphorous removal rate of the harvested plant biomass for the crop rotation or multiple years in the crop sequence. Fields with a Very High PLAT Rating should receive no additional applications of manure. Regardless of the PLAT rating, starter fertilizers may be recommended in accordance with North Carolina State University guidelines or recommendations. The quantity of P205 applied to each crop is shown in the following table if the field's PLAT rating is High or Very High. Planned Crops Summary Pl Total Useable Plat Removal (lbslacre) A Applied (lbs/acre) Tract Field Acres Acres Rating Li Soil Series Crop Sequence RYE 328 1 4.82 4.82 Low N/A Autryville Small Grain Overseed 1.0 Tons 15 NIA Hybrid Bermudagrass Pasture 5.5 Ton 7 NIA 328 2 8.48 8.48 Low NIA Autyville Small Grain Overseed 1.0 Tons 15 NIA Hybrid Bermudagrass Pasture 5.5 Tons 7 N/A 328 3 3.74 3.74 Low NIA Norfolk Small Grain Overseed 1.0 Tons 15 NIA Hybrid Bermudagrass Pasture 6.5 Tons 8 NIA 328 4 1.30 L30 Low NIA Autryville Small Grain Overseed 1.0 Tons 15 NIA Hybrid Bermudagrass Pasture 5.5 Tons 7 NIA 328 5 1 3.71 3.76 Low NIA Autry�'ille jSmall Grain Overseed I 1.0 Tons 15 NIA Hybrid Bermudagrass Pasture 1 5.5 Tons 7 NIA PLAN TOTALS: 22.10 22.10 713734 Database Version 3.1 Date Printed 2/5/2007 PCS Page Page 1 of 2 NOTE: Symbol * means user entered data. r LI B F FatentiaCLeachrng :-4 W'GU_iw " rA4 _ Low potential to contribute to soluble None 2 nutrient leaching below the root zone. Moderate potential to contribute to soluble Nutrient Management (590) should be planned. >_ 2 & nutrient leaching below the root zone. <— 10 High potential to contribute to soluble Nutrient Management (590) should be planned. Other conservation practices that improve the soils nutrient leaching below the root zone. available water holding capacity and.improve nutrient use efficiency should be considered. Examples > 10 are Cover Crops (340) to scavenge nutrients, Sod -Based Rotations (328), Long -Term No -Till (778), and edge -of -field practices such as Filter Strips (393) and Riparian Forest Buffers (391). �� z �:� , PLRT Index �Rattng P Management Recommendation 0 - 25 Low No adjustment needed; N based application 25 - 50 Medium No adjustment needed; N based application 51 - 100 High Application limited to crop P removal > 100 Very High Starter P application only 713734 Database Version 3.1 Date Printed 215l2007 PCS Page Page 2 of 2 NOTE: Symbol * means user entered data. The Waste Utilization table shown below summarizes the waste utilization plan for this operation. This plan provides an estimate of the number of acres of cropland needed to use the nutrients being produced. The plan requires consideration of the realistic yields of the crops to be grown, their nutrient requirements, and proper timing of applications to maximize nutrient uptake. This table provides an estimate of the amount of nitrogen required by the crop being grown and an estimate of the nitrogen amount being supplied by manure or other by-products, commercial fertilizer and residual from previous crops. An estimate of the quantity of solid and liquid waste that will be applied on each field in order to supply the indicated quantity of nitrogen from each source is also included. A balance of the total manure produced and the total manure applied is included in the table to ensure that the plan adequately provides for the utilization of the manure generated by the operation. Waste Utilization Table Year 1 Tract Field Source lU Soil Series Total Acres Use. Acres Crop RYE Applic. Period Nitrogen PA Nutrient Rey'd (lbs/A) Comm. Fert. Nutrient Applied (lbs/A) Res. (lbs/A) Applic. Method Manure PA NutrienrA pplied (lbs/A) Liquid ManureA pplied (acre) Solid Manure Applied (acre) Liquid Manure Applied (Field) Solid Manure Applied (Field) tons N N N N 1000 gal/A Tons 1000 gals 328 1 S7 Autryville 4,82 4.82 Small Grain Overseed 1.0'1'ons 10/1-3/31 50 0 0 Irrig, 50 19.97 0.00 963 11 0.00 328 1 S7 Autryville 4.82 4.82 Hybrid Bermudagrass Pasture 5.5 Tons 311-9/30 *206 0 0 Irrig. 206 82.29 0.00 396.78 0.00 328 2 S7 Autryville 8,48 8.49 Small Grain Overseed 1.0 Tons 1011-3/31 50 0, 0 brig. 50 1997, 0.00 169.34 0.00 328 2 S7 Autryville. 8.48 8.48 Hybrid Bermudagrass Pasture 5.5 'runs 3/1-9/30 *206 0 1 0 h-rig. 206 82.29 0.00 697.69 0,00 328 3 S7 Norfolk 3,74 3.74 Small Grain Overseed 1.0 Tons I Oh-3131 50 0 0 Irrig. 50 19.97 0,00 74.68 0.00 328 3 S7 Norfolk 3,74 3.74 Hybrid Bermudagrass Pasture 6.5 Tons 3l1-9130 *244 0 0 Irrig. 244 97,46 0,00 364.42 0.00 328 4 S7 Autryville 1.30 1.30 Small Grain Overseed 1.0 'rons 1011-3/31 50 0 0 Irrig. 50 19.97 0.00 25.96 0,00 328 4 S7 Autryville 1.30 1.30 Hybrid Bermudagrass Pasture 5.5 Tons 3/1-9130 *206 0 0 Irrig. 206 82.29 0.00 106.97 0,00 328 5 S7 Autryville 3.76 3.76 Small Grain Overseed 1.0 Tons 101[-3131 50 0 0 Irrig. 50 19.97 0.00 75.10 of 328 5 S7 Autryville 3.76 3.76 Hybrid Bermudagrass Pasture 5.5 Tons 3/1.9/30 *206 0 0 1 Irrig. I 206 82.29 OAO 309.39 0.00 Total Applied, 1000 gallons 2,316.63 jA!rr Total Produced, 1000 gallons 2,269.30+� Balance, 1000 gallons -47.33 etiN'i°irk rv?s Total Applied, tarts 0,00 Total Produced, tonsl`t{ 0.00 Balance, tons lP� {, 1,t ail 0.00 Notes: 1. In the tract column, -- symbol means leased, otherwise, owned. 2. Symbol * means user entered data. 713734 Database Version 3.1 Date Printed: 2/5/2007 WUT Page Page 1 of 1 The Irrigation Application Factors for each field in this plan are shown in the following table. Infiltration rate varies with soils. If applying waste nutrients through an irrigation system, you must apply at a rate that will not result in runoff. This table provides the maximum application rate per hour that may be applied to each field selected to receive wastewater. It also lists the maximum application amount that each field may receive in any one application event. Irrigation Application Factors Tract Field Soil Series Application Rate (inches/hour) Application Amount (inches) 328 1 Autryville 0.60 1.0 328 2 Autryville 0.60 1.0 328 3 Norfolk 0.50 1.0 328 4 Autryville 0.60 1.0 328 5 Autryville 0.60 1.0 713734 Database Version 3.1 Date Printed 2/5/2007 IAF Page Page 1 of I NOTE: Symbol " means user entered data. The Nutrient Management Recommendations table shown below provides an annual summary of the nutrient management plan developed for this operation. This table provides a nutrient balance for the listed fields and crops for each year of the plan. Required nutrients are based on the realistic yields of the crops to be grown, their nutrient requirements and soil test results. The quantity of nutrient supplied by each source is also identified. The total quantity of nitrogen applied to each crop should not exceed the required amount. However, the quantity of other nutrients applied may exceed their required amounts. This most commonly occurs when manure or other byproducts are utilized to meet the nitrogen needs of the crop. Nutrient management plans may require that the application of animal waste be limited so as to prevent over application of phosphorous when excessive levels of this nutrient are detected in a field. In such situations, additional nitrogen applications from nonorganic sources may be required to supply the recommended amounts of nitrogen. Nutrient Management Recommendations Test YEAR 0 N (lbs/A) P205 (lbs/A) K20 (lbs/A) Mg (lbs/A) Mn (lbs/A) Zn (lbs/A) Cu (lbs/A) Lime (tons/A) Tract Field 328 1 Req'd Nutrients 50 120 80 0 0 0 2 1 Acres I App, Period 4.82 10/1-3/31 Supplied By: E` R 21M - = ` ;0.._. ,. CROP Small Grain Overseed Starter 0 0 0 0 0 0 0 0 Commercial Fert. 0 0 0 0 0 0 0 0 Soil Series Autryville Residual 0 0 0 0 0 0 0 0 ample Date 1.0 Tons 10-03-06 Manure 50 27 68 6 0 l 0 0 val bating 15 lbs/ac. Low BALANCE 0 -93 -12 6 0 1 -2 -1 E Field 328 2 Req'd Nutrients 50 150 110 0 0 0 2 2 App. Period 9.48 10/1-3/31 Supplied By: ",i � - . ; -1 1. CROP Small Grain Overseed Starter 0 0 0 0 0 0 0 0 Commercial Fert. 0 0 0 0 0 0 0 0 Soil Series Autryville Residual 0 0 0 0 0 0 0 0 RYE Sample Date 1.0 Tons 10-03-06 Manure 50 27 68 6 0 1 0 0 P Removal Rating 15 lbs/ac. Low BALANCE 0 -123 -42 6 0 l -2 -2 Tract Field 328 3 Req'd Nutrients 50 150 110 0 0 0 2 2 Acres App. Period 3.74 1011-3/31 Supplied By: -. A =- CROP Small Grain Overseed Starter 0 0 0 0 0 0 0 0 Commercial Fen. 0 0 0 0 0 0 0 0 Soil Series Norfolk Residual 0 0 0 0 0 0 0 0 RYE Sample Date 1.0 Tons 10-03-06 Manure 50 27 68 6 0 1 0 0 P Removal Rating 15 Ibs/ac. Low BALANCE 0 -123 A2 6 0 l -2 -2 Tract Field 328 4 Req'd Nutrients 50 90 100 0 0 0 2 1 Acres App. Period 1.30 1011-3/31 Supplied By: CROP Small Grain Overseed Starter 0 0 0 0 0 0 0 0 Commercial Fert. 0 0 0 0 0 0 0 0 Soil Series Autryville Residual 0 0 0 0 0 0 0 0 RYE Sample Date 1.0 Tons 10-03-06 Manure 50 27 68 6 01 1 0 14 P Removal Rating 15 lbs/ac. Low BALANCE 0 -63 -32 6 0 1 -2 1 713734 Database Version 3.1 Date Printed: 2/5/2007 NM Page Page 1 of 3 Nutrient Management Reconunendations Test YEAR 0 N (lbs1A) P205 (ibs1A) K20 (Ibs/A) Mg (lbs1A) Mn (lbs/A) Zn (Ibs/A) Cu (lbs/A) Lime (tons/A) Tract Field 328 5 Req'd Nutrients 50 90 100 0 0 0 2 1 Acres App. Period 3.76 1011-3131 Supplied B : _ CROP Small Grain Overseed Starter 0 0 0 0 0 0 0 0 Commercial Fert. 0 0 0 0 0 0 0 0 Soil Series AutDTille Residual 0 0 0 0 0 0 0 0 RYE I Sample Hate 1.0 Tons 10-03-06 Manure 50 27 68 6 0 1 0 0 P Removal Rating 15 lbslac. Low BALANCE 1 0 -63 -321 6 0 1 -2 -1 NOTE: Symbol * means user entered data. 713734 Database Version 3.1 Date Printed: 215l2007 NNIR Page Page 2 of 3 Nutrient Management Recommendations Test YEAR ] N (lbs/A) P205 (lbs/A) K20 (lbs/A) Mg (lbs/A) Mn (lbs/A) Zn (lbs/A) Cu (lbs/A) Lime (tons/A) Tract Field 328 1 Req'd Nutrients *206 120 170 0 0 0 0 0 Acres App. Period 4.82 311-9/30 Supplied By: ;x � too :.- - `' yIAMR CROP Hybrid Bermudagrass Pasture Starter 0 0 0 0 0 0 0 0 Commercial Fert. 0 0 0 0 0 0 0 0 Soil Series utryville Residual 0 0 0 0 0 0 0 0 ample Date 5.5 Tons 10-03-06 Manure 206 112 282 25 1 5 1 0 va]Rating 7 lbs/ac. Low BALANCE 0 -8 112 25 1 5 1 0 E Field 328 2 Req'd Nutrients *206 150 210 0 0 0 0 0 App. Period 8.48 3/1-9130 Supplied By: % M 2- ow CROP Hybrid Bermudagrass Pasture ICommercial Starter 0 0 0 0 0 0 0 0 Fert.1 0 0 0 0 0 0 0 0 Soil Series Autryvilie Residual 0 0 0 0 0 0 0 0 ample Date 5.5 Tons 10-03-06 Manure 206 112 282 25 1 5 1 0 val RAcres Rating 7 lbs/ac. Low BALANCE 0 -38 72 25 1 5 1 0 Field 328 3 Req'd Nutrients *244 150 210 0 0 0 0 0 App. Period 3.74 3/1-9130 Supplied By' NMI— a 0,4 CROP Hybrid Bermudagrass Pasture Starter 0 0 0 0 0 0 0 0 Commercial Fert. 0 0 0 0 0 0 0 0 Soil Series Norfolk Residual 0 0 0 0 0 0 01 0 RYE Sample Date 6.5 Tons 10-03-0-6 Manure 244 133 334 30 1 6 1 0 P Removal I Rating 8 lbs/ac. Low BALANCE 0 -17 124 30 1 6 1 0 Tract Field 328 4 Req'd Nutrients *206 90 190 0 0 0 0 0 Acres Period 1.30 311-9/30 Supplied B -` � �IT� = CROP Hybrid Bermudagrass Pasture Starter 0 0 0 0 0 0 0 0 Commercial Fert. 0 0 0 0 0 0 0 0 Soil Series Autryville Residual 0 0 0 0 0 0 0 0 RYE Sample Date 5.5 Tons 10-03-06 Manure 206 112 282 25 ] 5 1 0 P Removal Rating 7 lbs/ac. Low BALANCE 0 22 92 25 1 5 1 0 Tract Field 328 5 Req'd Nutrients *206 90 190 0 0 0 0 0 Acres A Period App. 3.76 3l1-9/30 Supplied PP y: - UP w tk,.._. ,,. rr -.m :. - -- _M CROP Hybrid Bermudagrass Pasture Starter 0 0 0 0 0 0 0 0 Commercial Fert. 0 0 0 0 0 0 0 0 Soil Series Autryville Residual 0 01 0 0 0 0 0 0 RYE Sample Date 5.5 Tons 10-03-06 Manurel 2061 112 282 25 1 5 1 0 P Removal I Rating 7 lbslac_ Low BALANCE 0 22 92 25 1 5 1 0 NOTE: Symbol * means user entered data. 713734 Database Version 3.1 Date Printed: 2/5/2007 NMR Page Page 3 of 3 The Required Soil Test Values shown in the following table provide a summary of recommended actions that should be taken if soil tests indicate excessive levels of copper or zinc. Fields that receive manure must have an annual soil analysis for these elements. High levels of zinc and copper can adversely affect plant growth. Alternative crop sites must be used when the concentration of these metals approach excessive levels. Site life can be estimated by dividing the amount of copper and zinc to be applied in lbs/acre by 0.036 and 0.071, respectively and multiplying the result by 0.85. By adding this quantity to the current soil index for copper or zinc, we can predict life of the site for waste disposal. In addition to copper and zinc indices, this table also provides a summary of time recommendations for each crap based'on the most recent soil sample. Application of lime at recommended rates is necessary to maintain soil pH in the optimum range for crop production . Required Soil Test Values Tract Field Crop pit Lime Rerom. (tons/acre) Cu-1 Copper Recommendation Znd Zinc Recommendation 328 1 Small Grain Overseed 5.0 1.1 15 None 20 None 328 1 Hybrid Bermudagrass Pasture 5.0 0.0 15 None 20 None 328 2 Small Grain Overseed 4.8 2.3 10 None 25 None 328 2 Hybrid Berntudagrass Pasture 4.8 0.0 to None 25 None 328 3 Small Grain Overseed 4.8 2.3 10 None 25 None 328 3 Hybrid Bermudagrass Pasture 4.8 0.0 10 None 25 None 328 4 Small Grain Overseed 4.6 0.8 19 None 40 None 328 1 4 Hybrid Bermudagrass Pasture 4.6 0.0 19 None 40 7 None 328 5 Small Grain Overseed 4.6 0.8 19 None 40 None 328 1 5 Hybrid Bermudagrass Pasture 4.6 0.0 19 None 40 None ----------------• ---- • ---- ------ ------------------------------ 713734 Database Version 3.1 Date Printed: 02-05-2007 STV Page Page I of 1 The following Lagoon Sludge Nitrogen Utilization table provides an estimate of the number of acres needed for sludge utilization for the indicated accumulation period. These estimates are based on average nitrogen concentrations for each source, the number of animals in the facility and the plant available nitrogen application rates shown in the second column. Lagoon sludge contains nutrients and organic matter remaining after treatment and application of the effluent. At clean out, this material must be utilized for crop production and applied at agronomic rates. In most cases, the priority nutrient is nitrogen but other nutrients including phosphorous, copper and zinc can also be limiting. Since nutrient levels are generally very high, application of sludge must be carefully applied. Sites must first be evaluated for their suitability for sludge application. Ideally, effluent spray fields should not be used for sludge application. If this is not possible, care should be taken not to load effluent application fields with high amounts of copper and zinc so that additional effluent cannot be applied. On sites vulnerable to surface water moving to streams and lakes, phosphorous is a concern. Soils containing very high phosphorous levels may also be a concern. Lagoon Sludge Nitrogen Utilization Table Crop Maximum PA-N Rate lb/ac Maximum Sludge Application Rate 1000 gal/ac Minimum Acres 5 Years Accumulation Minimum Acres 10 Years Accumulation Minimum Acres 15 Years Accumulation Swine Feeder -Finish Lagoon Sludge - Standard Corn 120 bu 150 13.16 30.69 61.38 92.07 Hay 6 ton R.Y.E. 300 26.32 15.34 30.69 46.03 Soybean 40 bu 160 14.04 28.77 57.54 96.31 ------------------------------------------------------------------------------------------------------------------------------------------------------ ------------------------------- 713734 Database Version 3.1 Date Printed: 02-05-2007 Sludge Page Page 1 of The Available Waste Storage Capacity table provides an estimate of the number of days of storage capacity available at the end of each month of the plan. Available storage capacity is calculated as the design storage capacity in days minus the number of days of net storage volume accumulated. The start date is a value entered by the user and is defined as the date prior to applying nutrients to the first crop in the plan at which storage volume in the lagoon or holding pond is equal to zero. Available storage capacity should be greater than or equal to zero and less than or equal to the design storage capacity of the facility. If the available storage capacity is greater than the design storage capacity, this indicates that the plan calls for the application of nutrients that have not yet accumulated. If available storage capacity is negative, the estimated volume of accumulated waste exceeds the design storage volume of the structure. Either of these situations indicates that the planned application interval in the waste utilization plan is inconsistent cAzth the structure's temporary storage capacity. Available Waste Storage Capacity Source Name Swine Feeder -Finish Lagoon Liquid Design Storage Capacity (Days) Start Date 9/1 180 Plan Year Month Available Storage Capacity (Days) 1 1 70 1 2 56 1 3 100 1 4 130 1 5 159 1 6 159 1 7 158 1 8 157 I 9 157 1 10 133 1 11 114 1 1 12 94 * Available Storage Capacity is calculated as of the end of each month. ----------------------------------------------------------------------------------------------------------------------------• -------------------------- 713734 Database Version 3.1 Date Printed: 02-05-2007 Capacity Page Page 1 of I Required Specifications For Animal Waste Management 1. Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste that reaches surface water is prohibited. 2. There must -be documentation in the design folder that the producer either owns or has an agreement for use of adequate land on which to properly apply the waste. If the producer does not own adequate land to properly dispose of the waste, he/she shall provide evidence of an agreement with a landowner, who is within a reasonable proximity, allowing him/her the use of the land for waste application. It is the responsibility of the owner of the waste production facility to secure an update of the Nutrient Management Plan when there is a change in the operation, increase in the number of animals, method of application, receiving crop type, or available land. 3. Animal waste shall be applied to meet, but not exceed, the nitrogen needs for realistic crop yields based upon soil type, available moisture, historical data, climatic conditions, and level of management, unless there are regulations that restrict the rate of applications for other nutrients. 4. Animal waste shall be applied to land eroding less than 5 tons per acre per year. Waste may be applied to land eroding at more than 5 tons per acre per year but less than 10 tons per acre per year provided grass filter strips are installed where runoff leaves the field (see USDA, NRCS Field Office Technical Guide Standard 393 - Filter Strips). 5. Odors can be reduced by injecting the waste or by disking after waste application. Waste should not be applied when there is danger of drift from the land application field. 6. When animal waste is to be applied on acres subject to flooding, waste will be soil incorporated on conventionally tilled cropland. When waste is applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding (see "Weather and Climate in North Carolina" for guidance). 7. Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control odor and flies. --------------------------------- ----------------------------------------------------------------------------------------------------------------------------------- 713734 Database Version 3.1 Date Printed: 2/5/2007 Specification Page 1 8. Animal waste shall not be applied to saturated soils, during rainfall events, or when the soil surface is frozen. 9. Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to a depth that would inhibit growth. The potential for salt damage from animal waste should also be considered. 10. Nutrients from waste shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Waste/nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of the crop or forages breaking dormancy. 11. Any new swine facility sited on or after October 1, 1995 shall comply with the following: The outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and canal. Animal waste, other than swine waste from facilities sited on or after October 11 1995, shall not be applied closer that 25 feet to perennial waters. 12. Animal waste shall not be applied closer than 100 feet to wells. 13. Animal waste shall not be applied closer than 200 feet of dwellings other than those owned by the landowner. 14. Waste shall be applied in a manner not to reach other property and public right-of-ways. 15. Animal waste shall not be discharged into surface waters, drainageways, or wetlands by a discharge or by over -spraying. Animal waste may be applied to prior converted cropland provided the fields have been approved as a land application site by a "technical specialist". Animal waste shall not be applied on grassed waterways that discharge directly into water courses, and on other grassed waterways, waste shall be applied at agronomic rates in a manner that causes no runoff or drift from the site. 16. Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. ------------ --------------------------------------------------------------------------------------------------------------------------------------------------- 713734 Database Version 3.1 Date Printed: 2/5/2007 Specification Page 2 17. A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments; berms, pipe runs, etc.). Areas shall be fenced, as necessary, to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc., are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Berms and structures. should be inspected regularly for evidence of erosion, leakage, or discharge. 18. If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge, pollution, and erosion. 19. Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, leaks, and spills. A regular maintenance checklist should be kept on site. 20. Animal waste can be used in a rotation that includes vegetables and other crops for direct human consumption. However, if animal waste is used on crops for direct human consumption, it should only be applied pre -plant with no further applications of animal waste during the crop season. 21. Highly visible markers shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume for waste storage ponds. 22. Waste shall be tested within 60 days of utilization and soil shall be tested at least annually at crop sites where waste products are applied. Nitrogen shall be the rate -determining nutrient, unless other restrictions require waste to be applied based on other nutrients, resulting in a lower application rate than a nitrogen based rate. Zinc and copper levels in the soils shall be monitored and alternative crop sites shall be used when these metals approach excessive levels. pH shall be adjusted and maintained for optimum crop production. Soil and waste analysis records shall be kept for a minimum of five years. Poultry dry waste application records shall be maintained for a minimum of three years. Waste application records for all other waste shall be maintained for five (5) years. 23. Dead animals will be disposed of in a manner that meets North Carolina regulations. ------------------------------------- ----- ---------------------------------------------------------------------------------------------------------------- 713734 Database Version 3-1 Date Printed: 2/5/2007 Specification Page 3 Crop Notes The following crop note applies to fields): 3 Small Grain: CP, Mineral Soil, medium leachable In the Coastal Plain, oats and barley should be planted from October 15-October 30; and rye from October 15-November 20. For barley, plant 22 seed/drill row foot and increase the seeding rate by 5% for each week seeding is delayed beyond the optimum time. See the seeding rates table for applicable seeding rate modifications in the current NCSU "Small Grain Production Guide". Also, increase the initial seeding rate by at least 10% when planting no -till. Oats should be planted at 2 bushels/acre and rye at 1-1 1/2 bushels/acre. Plant all these small grains at 1-1 1/2" deep. Adequate depth control is essential. Review the NCSU Official Variety "green book" and information from private companies to select a high yielding variety with the characteristics needed for your area and conditions. Apply no more than 30 lbs/acre N at planting. Phosphorus and potash recommended by a soil test can also be applied at this time. The remaining N should be applied during the months of February -March. The following crop note applies to field(s): 1, 2, 4, 5 Small Grain: CP, Mineral Soil; medium leachable In the Coastal Plain, oats and barley should be planted from October 15-October 30; and rye from October 15-November 20. For barley, plant 22 seed/drill row foot and increase the seeding rate by 5% for each week seeding is delayed beyond the optimum time. See the seeding rates table for applicable seeding rate modifications in the current NCSU "Small Grain Production Guide". Also, increase the initial seeding rate by at least 10% when planting no -till. Oats should be planted at 2 bushels/acre and rye at 1-1 112 bushels/acre. Plant all these small grains at 1-1 112" deep. Adequate depth control is essential. Review the NCSU Official Variety "green book" and information from private companies to select a high yielding variety with the characteristics needed for your area and conditions. Apply no more than 30 lbs/acre N at planting. Phosphorus and potash recommended by a soil test can also be applied at this time. The remaining N should be applied during the months of February -March. ----------------------------------------------------------------------------------------------------- ------------------------------------------------------- 713734 Database Version 3.1 Date Printed: 02-05-2007 Crop Note Page Page 1 of 2 The following crop note applies to field(s): 3 Bermudagrass: CP, Mineral Soil, Moderately Well Drained. Adaptation: Well -adapted. In the Coastal Plain, hybrid bermudagrass sprigs can be planted Mar. 1 to Mar. 31. Cover sprigs I" to 3" deep (1.5" optimal). Sprigs should be planted quickly after digging and not allowed to dry in sun and wind. For Coastal and Tifton 78 plant at least 10 bu/ac in 3' rows, spaced 2' to 3' in the row. Generally a rate of 30 bu/ac is satisfactory to produce full groundcover in one or two years under good growing conditions. Tifton 44 spreads slowly, so use at least 40 bu/ac in 1.5' to 2' rows spaced i' to 1.5' in row. For broadcast/disked-in sprigs use about 60 bu/ac. Soil test for the amounts of lime, phosphorus, potassium and micronutrients to apply preplant and for annual maintenance. Apply 60 to 100 lb/ac N in the establishment year in split applications in April and July. For established stands apply 180 to 240 lblac N annually in split applications, usually in April and following the first and second hay cuts. Reduce N rates by 25% for grazing. Refer to NCSU Technical Bulletin 305 Production and Utilization of Pastures and Forages in North Carolina for more information or consult your regional agronomist or extension agent for assistance. The following crop note applies to field(s): 1, 2, 4, 5 Bermudagrass: CP, Mineral Soil, Moderately Well Drained. Adaptation: Well -adapted. In the Coastal Plain, hybrid bermudagrass sprigs can be planted Mar. 1 to Mar. 31. Cover sprigs I" to 3" deep (1.5" optimal): Sprigs should be planted quickly after digging and not allowed to dry in sun and wind. For Coastal and Tifton 78 plant at least 10 bu/ac in 3' rows, spaced 2' to 3' in the row. Generally a rate of 30 bu/ac is satisfactory to produce full groundcover in one or two years under good growing conditions. Tiftori 44 spreads slowly, so use at least 40 bu/ac in 1.5' to 2' rows spaced I' to 1.5' in row. For broadcast/disked-in sprigs use about 60 bu/ac. Soil test for the amounts of lime, phosphorus, potassium and micronutrients to apply preplant and for annual maintenance. Apply 60 to 100 lb/ac N in the establishment year in split applications in April and July. For established stands apply 180 to 240 lblac N annually in split applications, usually in April and following the first and second hay cuts - Reduce N rates by 25% for grazing. Refer to NCSU Technical Bulletin 305 Production and Utilization of Pastures and Forages in North Carolina for more information or consult your regional agronomist or extension agent for assistance. ------------------------------------------------------------------------------------------------------------------------------------------------------------------- 713734 Database Version 3.1 Date Printed: 02-05-2007 Crop Note Page Page 2 of 2 09%06/2006 WED 10:29 FAX 9102933138 WRLNMI ---+ DWQ Wilmington Q 002/005 PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 31-3a5 County: Duplin Facility Name: Triple J Farms Certified Operator Name: Jolanda Lanier Operator Number: 19666 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in -the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Name/ID Spillway(Y or N): Level(inches): Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 1 N 17 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. ' Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 9/7/2006 1 hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Triple J Farms, Inc Phone k Facility Owner/Manager (print) Date: Facility Owner/Manage ignature) 910-532-2747 9/6/2006 09/06/2006 WED 10:29 FAX 9102933138 WRLNK1 4-� DWQ Wilmington Q 003/005 11. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRJ24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Lagoon 1 line m = 337.5 lb PAN 2. Structure ID: line m = lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line rn = lb PAN 6. Structure ID: line m = lb PAN n. lines 1 +2+3+4+5+6= 337.5 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q_ crop r. acres s. remaining 1RR 2 PAN balance (lblacre) t. TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. application window' Lanier 1 Small Grain 4.82 50.00 241.1 Sept -April Lanier 2 Small Grain 8.48 50.00 424.0 Sept -April Lanier 3 Small Grain 3.74 50.00 187.0 Sept -April 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column Q = 852.0 lb. PAN IV_ FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section 11) = 337.5 lb. PAN PoA (30 Day) 2/21 /00 09/06/2006 WED 10:29 FAX 9102933138 WRLNM1 4�-+ DW9 Wilmington 121004/005 x. Crop's remaining PAN balance (line v from section 111) _ y. Overall PAN balance (w - x) _ 852.0 lb. PAN -515 Ib. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the Irrigation onto existing spray fields will continue as weather and field conditions permit. Additional land is available for pumping if needed_ Updated sample is not yet available on the NCDA website. PoA (30 day) 2/21100 09/06/2006 WED 10:29 FAX 9102933138 WRLNMl 4- DWQ Wilmington r Q 005/005 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD 1. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/identifier (ID): La oon 1 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 17.0 inches b. designed 25 yr.124 hr. storm & structural freeboard 19.01 inches c, line b - line a (inches in red zone) =. 2.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 63000 ftZ e. line c/12 x line d x 7.48 gallons/ft3 78540 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 80705 ft3 h. current herd #.F---24-4-81 certified herd # 2448 actual waste produced = current herd # x line g = 80705 ft' certified herd # 1. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 dayslline f= 4. Total PAN to be land applied during draw down period 1. current waste analysis dated 1 6/7/2006 m. ((lines e + k)11000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21 /00 ®ft3 36750 ft3 146427 gallons 1.50 ibs/1000 gal. 337.5 ibs. PAN 11/22/2006 WED 10:38 FAX 9102933138 WRLNMI DWQ Wilmington l5 Mu _ - lyra. .. OW. ]�l� Murpli}r i3iown UC PO Box 856 2922 Hwy 24 West Warsaw, NC 29398 Prone (91.0) 293-3434 Fax (910) 293 -3 13 8 Fax Transmiltai Sheet - u ).\4W% Fax: - --- - — — . Peres. Phone: ate. ❑Urgent. ❑ For Review ❑ Please Comment ❑ Please Reply ❑ Please R.ecycia Z001/005 11/22/2006 WED 10:38 FAX 9102933138 WRLNMI —a DWQ Wilmington Q 002/005 PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 31-355 County: Duplin Facility Name: Triple J Farms Certified Operator Name: Jolanda Lanier Operator Number: 19666 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Lagoon Name/ID: 1 Spillway(Y or N): N Level(inches): 18 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balarice is within acceptable range. Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste to be pumped and hauled Is reflected in section 111 tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. "Attach a complete schedule with corresponding animal units and dates fro depopulation 'if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 11124/2006 hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Triple J Farms, Inc Phone: 910-532-2747 �j Facility Owner/Manager (print) Date: 11/24/2006 Facility Owner/Manager (s ture) c 11/22/2006 WED 10:39 FAX 9102933138 WRLIMl --- DWQ Wilmington Q 003/005 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR.124 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Lagoon 1 line m = 118.8 ib PAN 2. Structure ID: line m = lb PAN 3. Structure 1D: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n. lines +2+3+4+5+6= 118.8 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o, tract # p. field # CI. crop r. acres s. remaining IR t 2 PAN balance (Ib/aare) t. TOTAL PAN BALANCE FOR FIELD (lbs.) column r X s u. application window' Lanier 1 Small Grain 4.82 40.00 192.9 Sept -April Lanier 2 Small Grain 8.48 40.00 339.2 Sept -April Lanier 3 Small Grain 3.74 40.00 149.6 Se t-A ril 'State current crop ending application date or next crop application beginning date for available receiving crops, during 30 day draw down period. v. Total PAN available for all fields (sum of column Q = 681.6 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 118.8 lb. PAN PeA (30 Day) 2/21/00 11/22/2006 WED 10:39 FAA 9102933138 WRLNMI DWQ Wilmington I21004/005 X. Crop's remaining PAN balance (line v from section 111) _ y. Overall PAN balance (w - x) 681.6 lb. PAN -563 lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and Maul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the r-JAKtSAItVt-: Irrigation onto existing spray fields will continue as weather and field conditions permit. Additional land is available for pumping if needed. updated sample is not yet available on the NCDA website. PoA (30 Day) 2/21100 11/22/2006 WED 10:39 FAX 9102933138 WRLNNI DWQ Wilmington IM005/005 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD 1. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/identifier (ID): Lagoon 1 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 18.0 inches b. designed 25 yr.124 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) = 1.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 63000 ft2 e. line c112 x line d x 7.48 gallons/W 39270 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 80705 ft3 In. current herd # F 2-4-4--81 certified herd # 2448 actual waste. produced = current herd # x line g certified herd # i. volume of wash water according to structural design j, excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1 9/25/2006 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) - 80705 W ®ft3 36750 ft3 146427 gallons 0.64 ibs11000 gal. 118.8 lbs. PAN PoA (30 Day) 2121 /00 09/06/2006 WED 10:28 FAX 9102933138 WRLNMi �-- DWQ Wilmington Q 001/005 u 1�:� M n� Ow" LLC y Murphy Brown LLC PO Box 856 2822 Hwy 24 West Warsaw, NC 28398 Phone (910) 293-34344 Fax (910) 293-3138 Fax Transmittal Sheet � 1 G 1 �� :i•0m• 1 YL Fax: - — — — Pages: Phone: Date.• Re: CC ❑ Urgent ❑ For Review ❑ Please Comment ❑ Please Reply ❑ Please Recycle 40 Postal 4 (Domestic Mail tr rrf rr E3 d irr'l Postage ru S Certified Fee r• r79 Ratum Receipt Fee ru (E;d=nt Required) C Restricted Delivery Fee d. (EnClorsement Required] CS Q Total Postage & Feea `A C3 N �teasa Pnnt Clearlj . r3 S 1, 4pt. Pp go O ---� M1 ctye,ZIP+4 , 3f 1 COMPLETE•N COMPLETE THIS SECTIONON DEILIVERY ■ Complete items 1, 2, and 3. Also complete -4:v item 4 if Restricted Delivery is desired. A. Received by Print Clearly) B. Date of Deliv 1 ■ Print your name and address on the reverse C. ig lure so that we can return the card to you. ■ Attach this card to the back of the mailpiece, , x l 1 ❑ Agent or on the front if space permits. v(�(�U ❑ Addressee t' f . Article Addressed to: D. Is ivery address different from item 1? ❑ Yes If YES, enter delivery address below-, ❑ No 3.rveype ❑Express rtified Mail Mail d ❑ Registered ❑ Return Receipt for Merchandise ❑ insured Mail ❑ C-O.D. f 4. Restricted Delivery? (Extra Fee) ❑ Yes 2. Article Number (Copy ham service label) PForm 3811, Juiy, 1999 Domestic Retum Receipt 102595-00-M-0952 State of North Carolina Department of Environment Ir WA and Natural Resources • Wilmington. Regional Office Michael F. Easley, Governor NCDENR Sherri Evans -Stanton, Acting Secretary Kerr T. Stevens, Director NCW rH CAROLINA pEPARrmE: r of EwvmommEKr AND r4.%ru SAL RESoURCES Division of Water Quality January 10, 2001 CERTIFIED MAIL # 7000.0600 0023 4230 0�$.--1— RETURN RECEIPT REQUESTED Ms. Jolanda Lanier Triple J Farms, Inc. 1547 Old Camp Road Rose Hill, NC 28458 Subject: Notice of Deficiency Triple J Farms, Inc. Facility Number. 31-355 Duplin County Dear Ms. Lanier This'ls to notify Ms. Jolanda Lanier, who holds a non -discharge permit for an animal waste disposal system pursuantto 15A NCAC 2H .0200 and North Carolina G.S.143.215.1, of deficiency of Animal Waste Permit AWS 310355. On November 14, 2000, I inspected your animal operation and the animal waste management system serving this operation. The following deficiency was noted during the inspection: 1. Cover Crop Needs Improvement (inadequate Coverage, Weeds) During the.inspection, it was observed that all of your spray fields need extensive weed control and.more adequate coverage of the crops listed in your waste utilization plan. Over -seeding had not been done at the time of inspection, however I did suggest better removal of old crop before over -seeding, allowing healthier growth conditions for the aver -seed. If a majority of your annual cover crop fails or has inadequate coverage, then you must immediately contact a technical specialist for guidance as to your available options including re -planting. If your crop has areas of poor coverage, then waste application should be minimized in these areas. It is recommended that a separate soil sample be taken from this area indicating a problem area on the paperwork fora more thorough soil analysis to be completed to find possible source of a problem. Fields lacking a cover crop for whatever reason should not have waste applied to them until a crop is established. 127 North Cardinal Dr., Wilmington, North Carolina 28WS5 Telephone 9103953900 FAX 910350-2004 An Equal Opportunity Affiimrative Action Employer 50°% recycled110'% post -consumer paper Ms. Jolanda Lanier January 10, 2001 Page 2 For all crops, especially grassed pastures or hay fields, soil pH must be maintained for the proper health of the crop and uptake of nutrients from application. Lime must be applied according to the rate indicated on your annual soil analysis when the amount is equal to or greater than 1.0 ton/acre. In no instance, should more than 1.5 tons/acre be applied during any year. It takes approximately 4-6 months for lime to work throughout the root zone; thus lime should be applied at the appropriate time for it to be available to the next primary summer crop cycle. Grassed fields must be harvested to avoid disease, control weed growth, and remove applied nutrients. Bermuda fields should be cut for hay at a height of 16-20 inches and soil pH maintained at 6-6.5. Pastures may need to be cut for hay periodically if grazing herd cannot keep up with growth or mowed periodically for control of weeds. Herbicide may need to be applied periodically for control of broadleaf weeds or volunteer grasses. Grassed fields may need to be re -sprigged or re -seeded periodically in areas to maintain an adequate cover. To correct these deficiencies, please submit a detailed Plan of Action to the Wilmington Regional Office of the Division of Water Quality that describes the actions to be taken to address these deficiencies of Animal Waste Permit AWS 310355. The proposed written plan of action must be received by this office within fifteen (15) working days of the receipt of this notice. Upon approval and implementation of the plan, you must notify this office when the corrective actions are complete. Contact your Service Company, county Soil & Water district office, or county extension office for any assistance they may be able to provide. . If the deficiencies are not corrected, the Division of Water Quality may issue a Notice of Violation and pursue additional actions including civil penalties, injunctive relief, or revocation of your Animal Waste Permit AWS310355. If you have any questions concerning this matter please do not hesitate to contact either Stonewall Mathis or myself at (910) 395-3900. Sincerely, "/& *W� Greer Moore Environmental Specialist cc: Billy Houston, Duplin County Soil and Water Conservation Star Maready, Duplin County Cooperative Extension Kraig Westerbeek, Murphy Family Farms, Inc. DWQ Non -Discharge Operations Branch File D_WQ- r rrii on:J�imalTtffes,3:1=359 S:IWQSIIanier31-355NOD Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P. E., Director Division of Water Quality May 1, 2003 Jolanda Lanier Triple J Farms, Inc 1547 Old Camp Road Rose Hill NC 28458 Subject: Certificate of Coverage No. AWS310355 Triple J Farms, Inc Swine Waste Collection, Treatment, Storage and Application System Duplin County Dear Jolanda Lanier: On April 28, 2003, the North Carolina General Assembly ratified Senate Bill 733 which directs the Division of Water Quality (Division) to extend the expiration date of the Swine Waste Operation General Permit AWG100000. Therefore, the General Permit has been re -issued by the Division to extend the expiration date to October 1, 2004. During the period of this extension the Division will be working with all interested parties on the development of a new version of the Non -Discharge General Permit. In accordance with your application received on January 30, 2003 and in accordance with the directive of Senate Bill 733, we are hereby forwarding to you this Certificate of Coverage (COC) issued to Jolanda Lanier, authorizing the operation of the subject animal waste collection, treatment, storage and land application system in accordance with General Permit AWG100000. The issuance of this COC supercedes and terminates your previous COC Number AWS310355 which expired on April 30, 2003. This approval shall consist of the operation of this system including, but not limited to, the management of animal waste from the Triple J Farms, Inc, located in Duplin County, with an animal capacity of no greater than an annual average of 2448 Feeder to Finish swine and the application to land as specified in the facility's Certified Animal Waste Management Plan (CAWMP). If this is a Farrow to Wean or Farrow to Feeder operation, there may also be one boar for each 15 sows. Where boars are unneccessary, they may be replaced by an equivalent number of sows. Any of the sows may be replaced by gilts at a rate of 4 gilts for every 3 sows The COC shall be effective from the date of issuance until October 1, 2004. Pursuant to this COC, you are authorized and required to operate the system in conformity with the conditions and limitations as specified in the General Permit, the facility's CAWMP, and this COC. An adequate system for collecting and maintaining the required monitoring data and operational information must be established for this facility. Any increase in waste production greater than the certified design capacity or increase in number of animals authorized by this COC (as provided above) will require a modification to the CAWMP and this COC and must be completed prior to actual increase in either wastewater flow or number of animals. If your Waste Utilization Plan has been developed based on site specific information, careful evaluation of future samples is necessary. Should your records show that the current Waste Utilization Plan is inaccurate you will need to have a new Waste Utilization Plan developed. The issuance of this COC does not excuse the Permittee from the obligation to comply with all applicable laws, rules, standards, and ordinances (local, state, and federal), nor does issuance of a COC to operate under this permit convey any property rights in either real or personal property. M�DENR Non -Discharge Permitting Unit 1617 Mail Service Center, Raleigh, NC 27699-1617 Customer Service Center An Equal Opportunity Action Employer Internet http:/lh2o.enr.state.nc.us/ndpu Telephone (919) 733-5083 Fax (919)715-6048 Telephone 1-877-623-6748 50% recycled/10% post -consumer paper Upon abandonment or depopulation for a period of four years or -more, the Permittee must submit documentation to the Division demonstrating that all current NRCS standards are met prior to restocking of the facility. Per NRCS standards a 100 foot separation shall be maintained between water supply wells and any lagoon or any wetted area of a spray field. Please be advised that any violation of the terms and conditions specified in this COC, the General Permit or the CAWMP may result in the revocation of this COC, or penalties in accordance with NCGS 143- 215.6A through 143-215.6C including civil penalties, criminal penalties, and injunctive relief. If you wish to continue the activity permitted under the General Permit after the expiration date of the General Permit, an application for renewal must be filed at least 180 days prior to expiration. This COC is not automatically transferable. A name/ownership change application must be submitted to the Division prior to a name change or change in ownership. If any parts, requirements, or limitations contained in this COC are unacceptable, you have the right to apply for an individual permit by contacting the staff member listed below for information on this process. Unless such a request is trade within 30 days, this COC shall be final and binding. This facility is located in a county covered by our Wilmington Regional Office. The Regional Office Water Quality Staff may be reached at (910) 395-3900. if you need additional information concerning this COC or the General Permit, please contact Sue Homewood at (919) 733-5083 ext. 502. Sincerely, for Alan W. Klimek, P.E. Enclosures (General Permit AWG100000) cc: (Certificate of Coverage only for all cc's) Wilmington Regional Office, Water Quality Section Duplin County Health Department Duplin County Soil and Water Conservation District Permit File AWS310355 NDPU Files I a ANIMAL WASTE UTILIZATION PLAN Producer: JOLANDA LANIER Location: 1547 OLD CAMP RD ROSE HILL NC 28458 Telephone: 910-532-2747 Type Operation: Existing Feeder to Finish Swine Number of Animals: 2448.00 hogs (Design Capacity) STORAGE STRUCTURE: Anaerobic Waste Treatment Lagoon APPLICATION METHOD: Irrigation The waste from your animal facility must be land applied at a specified rate to prevent pollution of surface water and/or groundwater. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the crops in the fields where the waste is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed before each application cycle. Annual soil tests are strongly encouraged so that all plant nutrients.can be balanced for realistic yields of the crop to be grown. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner: 1. Always apply waste based on the needs of the crop to be grown and the nutrient content of the waste. Do not apply more nitrogen than the crop can utilize. 2. Soil types are important as they have different infiltration rates, leaching potentials, cation exchange capacities, and available water holding capacities. 3. Normally waste shall be applied to land eroding at less than 5 tons per acre per year. Waste may be applied to land eroding at 5 or more tons per acre annually, but less than 10 tons per acre per year providing that adequate filter strips are established. 4. Do not apply waste on -saturated soils, when it is raining, or when the surface is frozen. Either of these conditions may result in runoff to surface waters which is not allowed under DWQ regulations. Page: 1 ANIMAL WASTE UTILIZATION PLAN 5. Wind conditions should also be considered to avoid drift and downwind odor problems. 6. To maximize the value of the nutrients for crop production and to reduce the potential for pollution, the waste should be applied to a growing crop or applied not more than 30 days prior to planting a crop or forages breaking dormancy. Injecting the waste or disking will conserve nutrients and reduce odor problems. This plan is based on the waste application method shown above. If you choose to change methods in the future, you need to revise this plan. Nutrient levels for different application methods are not the same. The estimated acres needed to apply the animal waste is based on typical nutrient content for this type of facility. Acreage requirements should be based on the waste analysis report from your waste management facility. In some cases you may want to have plant analysis made, which could allow additional waste to be applied. Provisions shall be made for the area receiving waste to be flexible so as to accommodate changing waste analysis content and crop type. Lime must.be applied to maintain pH in the optimum range for specific crop production. This waste utilization plan, if carried out, meets the requirements for compliance with 15A NCAC 2H .0217 adopted by the Environmental Management Commission. AMOUNT OF WASTE PRODUCED PER YEAR (gallons, ft3, tons, etc.) 2448 hogs x 1.9 tons waste/hogs/year = 4651.2 tons AMOUNT OF PLANT AVAILABLE NITROGEN (PAN) PRODUCED PER YEAR 2448 hogs x 2.3 lbs PAN/hogs/year = 5630.4 lbs. PAN/year Applying the above amount of waste is a big job. You should plan time and have appropriate equipment to apply the waste in a timely manner. The following acreage will .be needed for waste application based on the crop to be grown, soil type and surface application. Page: 2 ANIMAL WASTE UTILIZATION PLAN TABLE 1: ACRES OWNED BY PRODUCER TRACT FIELD SOIL TYPE & CLASS- CROP YIELD LBS COMM N ** * LBS DETERMINING PHASE CODE AW N PER ACRES AW N PER AC AC USED ---- or ------- APPLY RESID. APPLIC METH N TIME 328 1 AUB BH 5.5 275 4.822 1326.05 I +APR- 328 I�1 1SG 11 150 I 14.822�241.1 APR 328 2 BH 5.5 JAUB I 127S 1 18.47912331.72 +APR- OCT 328 SG 1 �-2 I 150 1 18.4791423.95 +SEP- APR 328 3 BH 6.1 INOA I 1305 13.73911140.39 +APR- OCT 328. SG 1 1-3 1 I 150 13.739�186.95 +SEP- END I TOTALI5650.17 Indicates that this field is being overseeded (i.e. interplanted) or winter annuals follow summer annuals. + - Dates shown reflect optimum uptake periods for nutrients. Waste appilcation may begin up to thirty(30) days prior to planting or green -up of forages, and Extend past optimum dates shown if plant growth, pumping conditions, and PAN loading rates permit. NOTE: The applicator is cautioned that P and K may be over applied while meeting the N requirements. In the future, regulations may Page: 3 ANIMAL WASTE UTILIZATION PLAN require farmers in some parts of North Carolina to have a nutrient management plan that addresses all nutrients. This plan only addresses nitrogen. Page: 4 ANIMAL WASTE UTILIZATION PLAN TABLE 2: ACRES WITH NOTARIZED AGREEMENT OR LONG TERM LEASE (Agreement with adjacent landowners must be attached.) (Required only if operator does not own adequate land. See required specification 2.) TRACT FIELD SOIL TYPE & CLASS- CROP YIELD LBS COMM N ** * LBS DETER-';TTNING PHASE CODE AW N PER ACRES AW N PER AC AC USED ----- or ------- APPLY RESID. APPLIC METH N TIME END TOTAL10 Indicates that this field is being overseeded (i.e. interplanted) or winter annuals follow summer annuals. + - Dates shown reflect optimum uptake periods for nutrients. Waste application may begin up to thirty(30) days prior to planting or green -up of forages, and extend past.optimum dates shown if plant growth, pumping conditions, and PAN loading rates permit. In interplanted fields (i.e. small grain, etc, interseeded in bermudagrass), forage must be removed through grazing, hay and/or silage. Where grazing, plants should be grazed when they reach a height of six to nine inches. Cattle should be removed when plants are grazed to a height of.four inches. In fields where small grain, etc, is to be removed for hay or silage, care should be exercised not to let small grain to reach maturity, especially late in the season (i.e. April or May). Shading may result if small grain gets too high and this will definitely interfere with stand of bermudagrass. This loss of stand will result in reduced yields and less nitrogen being utilized. Rather than cutting small grain for hay or silage just before heading as is the normal situation, you are encouraged to cut the small grain earlier. You may want to consider harvesting hay or silage two to three times during the season, depending on time small grain is planted in the fall. The ideal time to interplant small grain, etc, is late September or early October. Drilling is recommended over broadcasting. Bermudagrass should be grazed or mowed to a height of about two inches before drilling for best. results. Page: 5 ANIMAL WASTE UTILIZATION PLAN �* Acreage figures may exceed total acreage in fields due to overseeding. * lbs AW N (animal waste nitrogen) equals total required nitrogen less any commercial nitrogen (COMM N) supplied. The following legend explains the crop codes used in tables 1 and 2 above: CROP CODE CROP UNITS PER UNIT BH SG HYBRID BERMUDAGRASS-HAY SMALL GRAIN OVERSEEDED TONS AC 50 50 TABLE 1 TABLE 2 TOTAL * w TOTALS FROM TABLES 1 AND 2 WETTABLE _ACRES 17.04 LBS AW N USED 5650.17 0 0 17.04 5650.17 * BALANCE --19.77 *** This number must be less than or equal to 0 in order to fully utilize the animal waste N produced. Page: 6 ANIMAL WASTE UTILIZATION PLAN *** This number must be less than or equal to 0 in order to fully utilize the animal waste N produced. Acres shown in each of the preceding tables are considered to be the usable acres excluding required buffers, filter strips along ditches, odd areas unable to be irrigated, and perimeter areas not receiving full application rates due to equipment limitations. Actual total acres in the fields listed may, and most likely will be, more than the acres shown in the tables. See attached map showing the fields to be used for the utilization of animal waste. SLUDGE APPLICATION: The waste utilization plan must contain provisions for periodic land application of sludge at agronomic rates. The sludge will be nutrient rich and will require precautionary measures to prevent over application of nutrients or other elements. Your production facility will produce approximately 905.76 pounds of plant available nitrogen per year in the sludge. If you remove the sludge every 5 years, you will have approximately 4528.8 pounds of PAN to utilize. Assuming you apply this PAN to hybrid bermudagrass hayland at the rate of 300 pounds of nitrogen per acre, you will need 15.096 acres of land. If you apply the sludge to corn at the rate of 125 pounds of nitrogen per acre, you will need 36.2304 acres of land. Please be aware that these are only estimates of the PAN and land needed. Actual requirements could vary by 2596 depending on your sludge waste analysis, soil types, realistic yields, and application methods. APPLICATION OF WASTE BY IRRIGATION The irrigation application rate should not exceed the intake rate of the soil at the time of irrigation such that runoff or ponding occurs. This rate is limited by initial soil moisture content, soil structure, soil texture, water droplet size, and organic solids. The application amount should not exceed the available water holding capacity of the soil at the time of irrigation nor should the plant available nitrogen applied exceed the nitrogen needs of the crop. If surface irrigation is the method of land application for this plan, it is the responsibility of the producer and irrigation designer to ensure that an irrigation system is installed to properly irrigate the acres shown in Tables 1 and 2. Failure to apply the recommended rates and Page: 7 ANIMAL WASTE UTILIZATION PLAN amounts of nitrogen shown in the tables may make this plan invalid. The following table is provided as a guide for establishing application rates and amounts. T I I Tract Field I Soil Type 1 328 1 1 I AUB 1 328 12 1 AUB 328 328 328 328 NOA I I (Application RatelApplic. Amount crop 1 (in/hr) (inches) ! I I 1 BH .5 1 *1 � I I BH I .5 I *1 i BH I 1 SG I I SG I SG 1 .50 .5 .5 5 * This is the maximum application amount allowed for the soil assuming the amount of nitrogen allowed for the crop is not over applied. In many situations, the application amount shown cannot be applied because of the nitrogen limitation. The maximum application amount shown can be applied under optimum soil conditions. Your facility is designed for 180.00 days of temporary storage and the temporary storage must be removed on the average of once every 6.00 months. In no instance should the volume of the waste be stored Page: 8 ANIMAL WASTE UTILIZATION PLAN in your structure be within the 25 year 24 hour storm storage or one foot of freeboard except in the event of the 25 year 24 hour storm. It is the responsibility of the producer and waste applicator to ensure that the spreader equipment is operated properly to apply the correct rates to the acres shown in Tables 1 and 2. Failure to apply the recommended rates and amounts of nitrogen shown is ti.- tables may make this plan invalid. Call your technical specialist after you receive the waste analysis report for assistance in determining the amount of waste per acre and the proper application rate prior to applying the waste. NARRATIVE OF OPERATION THIS WUP IS WRITTEN BASED ON A WETTED ACRES FOOTPRINT COMPLETED BY STAR MAREADY OF THE EXTENSION SERVICE. Page: 9 WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS 1. Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste which reaches surface water is prohibited. 2. There must be documentation in the design folder that the producer either owns or has an _.se of adequate land on which to properly apply the waste. If the producer does not own adequate land to properly dispose of waste, he/she shall provide a copy of an agreement with a landowner who is within a reasonable proximity, allowing him/her the use of the land for waste application. It is the responsibility of the owner of the facility to secure an update of the Waste Utilization Plan when there is a change in the operation, increase in the number of animals, method of utilization, or available land. 3. Animal waste shall be applied to meet, but not exceed, the nitrogen needs for realistic crop yields based on soil type, available moisture, historical data, climatic conditions, and level of management, unless there are regulations that restrict the rate of application for other nutrients. 4. Animal waste shall be applied to land eroding less than 5 tons per acre per year. Waste may be applied to land that is eroding at 5 or more tons, but less than 10.tons per acre per year providing grass filter strips are installed where runoff leaves the field. (See FOTG Standard 393 -Filter Strip) 5. Odors can be reduced by injecting the waste or disking after waste application. Waste should not be applied when there is danger of drift from the irrigation field. 6. When animal waste is to be applied on acres subject to flooding, it will be soil :incorporated on conventionally tilled cropland. When applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding. (See "Weather and Climate in North Carolina" for guidance.) 7. Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control odor or flies. 8. Animal waste shall not be applied to saturated soils, during rainfall events, or when the surface is frozen. 9. Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to a depth that would inhibit growth. The potential for salt damage from animal waste should also be considered. Page: 10 WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS 10. Waste nutrients shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Waste nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. waste shall not be applied more than 30 days prior to planting of the crop or forages breaking dormancy. 11. Any new swine facility sited on or after Octobe-r 1, 1995 shall comply with the following: The outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and from any perennial stream or river (other than an irrigation ditch or canal. Animal waste other than swine waste from facilities sited on or after October 1, 1995), shall not be applied closer than 25 feet to perennial waters. (See. Standard 393 - Filter Strips). 12. Animal waste shall not be applied closer than 100 feet to wells. 13. Animal waste shall not be applied closer than 200 feet of dwellings other than those owned by the landowner. 14. Waste shall be applied in a manner not to reach other property and public right-of-ways. 15. Animal waste shall not be discharged into surface waters, drainageways, or wetlands.by a discharge or by over -spraying. Animal waste may be applied to prior converted cropland provided they have been approved as a land application site by a "technical specialist". Animal waste shall not be applied on grassed waterways that discharges directly into water courses, and on other grassed waterways, waste shall be applied at agronomic rates in a manner that causes no runoff or drift from the site. 16_ Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. 17. A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). Areas shall be fenced, as necessary, to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc., are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Berms and structures should be inspected regularly for evidence of erosion, leakage or discharge. Page: 11 WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS 18. If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge, pollution and erosion. 19. Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, leak--, and spills. A regular maintenance checklist should be kept on site. 20. Animal waste can be used in a rotation that includes vegetables and other crops for direct human consumption. However, if animal waste is used on crops for direct human consumption it should only be applied preplant with no further applications of animal waste during the crop season. 21. Highly visible markers shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume for waste storage ponds. 22. Waste shall be tested within 60 days of utilization and soil shall be tested at least annually at crop sites where waste products are applied. Nitrogen shall be the rate � determining element. Zinc and copper levels in the soils shall be monitored and alternative crop sites shall be used when these metals approach excessive levels. pH shall be adjusted for optimum crop production and maintained. Soil and waste analysis records shall be kept for five years. Poultry dry waste application records shall be maintained for three (3) years. Waste application records for all other waste shall be maintained for five (5) years. 23. Dead animals will be disposed of in a manner that meets North Carolina regulations. Page: 12 ANIMAL WASTE UTILIZATION PLAN WASTE UTILIZATION PLAN AGREEMENT Name of Farm:TRIPLE J FARMS(31-356) Owner/Manager Agreement I (we) understand and will follow and implement the specifications and the operation and maintenance procedures established in the approved animal waste utilization plan for the farm named above. I (we) know that any expansion to the existing design capacity of the waste treatment and storage system or construction of new facilities will require a new certification to be submitted to the North Carolina Division of Water Quality (NCDWQ) before the new animals are stocked. I (we) also understand that there must be no discharge of animal waste from this system to surface waters of the state from a storm event less severe than the 25-year, 24-hour storm. The approved plan will be filed on -site at the farm office and at the office of the local Soil and Water Conservation District and will be available for review by NCDWQ upon request. Name of Facility Owner: JOLANDA LANIER. (Please print) J Signature: /1 Date: —/` �, Name of Manag. , (If different from owner) : Signature: Date: Name of Person Preparing Plan: (Please print) BILLY W. HOUSTON Affiliation:DUPLIN SOIL AND WATER CONSERVATION DISTRICT Phone No. 910-296-2120 Address (Agency): PO BOX 219 KENANSVILLE NC 28349 Signature: 8 Date: 61 OF Page: 13 State of North Carolina ITO Department of Environment 4, 0 and Natural Resources r_ ;- MAR 0 7 'U" Michael F. Easley, Governor William G. Ross Jr., Secretary - - --=— NCDENR Kerr T. Stevens, Director NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES March 5, 2001 CERTIFIED MAIL RETURN RECEIPT REQUESTED Jolanda Lanier Triple J Farms, Inc 1547 Old Camp Road Rose Hill NC 28458 Subject: Notification for Wettable Acre Determination Animal Waste Management System Triple J Farms, Inc Facility Number 31-355 Duplin County Dear Jolanda Lanier: A letter dated January 15, 1999 was sent to advise you about concerns associated with Certified Animal Waste Management Plans and the method by which the irrigated acres within the plans were calculated. Only the acres that are wetted can be credited in the waste management plan as receiving waste application. Any acreage within the plan that can not be reached by waste application equipment can not be used as part of your plan. An evaluation by Stoney Mathis on l ] /] 7/99 was made to review the actual number of acres at your facility that receive animal waste during land application. The evaluation of your facility has yielded one of the following two results as indicated by the box marked with an "X". Category 1: ❑ The evaluation of your facility could not be completed due to a lack of information. Please contact your Technical Specialist to assist in providing Stoney Mathis the necessary information to potentially exempt your facility from undergoing a complete wettable acre determination. Please submit this information to Stoney Mathis, at 127 Cardinal Drive Extension, Wilmington, NC 28405-3845, within in 90 days of the receipt of this letter. If you have any questions please contact Stoney Mathis at (910) 395-3900. If within 90 days you are unable to provide Stoney Mathis with the information you are automatically required to complete a Wettable Acre Determination as described by Category 2 below, within 180 days of receipt of this letter. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Telephone 919-733-5083 Fax 919-715-6048 An Equal Opportunity Affirmative Action Employer 50%a recycled/10% post -consumer paper Notification for Wettable Acre Determination Animal Waste Management System Page 2 Category 2: Your facility has been identified by the Department of Environment and Natural Resources as a facility that may have overestimated the number of acres actually receiving animal waste. Therefore, some or all of your fields may be exceeding the allowable loading rates set in your Certified Animal Waste Management Plan. In order to resolve this issue, please contact a designated Technical Specialist to have him or her conduct a Wettable Acre Determination for your facility. The Technical Specialist must be one that has been approved by the Soil and Water Conservation Commission to conduct . Wettable Acre Determinations. Many Technical Specialist with the N.C. Cooperative Extension Service, the Soil and Water Conservation Districts, the Natural Resources Conservation Service, and the Division of Soil and Water Conservation have received this special designation. You may also contact a private Technical Specialist who has received this designation, or a Professional Engineer. All needed modifications to your Animal Waste Management System must be made and the Wettable Acres Determination Certification must be returned to DW© within the next 180 days. If the needed modifications are not made and if the form is not returned within the required time, DWQ will be forced to take appropriate enforcement actions to bring this facility into compliance. These actions may include civil penalty assessments, permit revocation, an&or injunctive relief. Once a Wettable Acre Determination has been completed, a copy of the attached Wettable Acre Determination Certification must be submitted to the address listed on the form. Please note that both the owner and the Technical Specialist must sign the certification. A copy of all the Wettable Acre Determination documentation that applies to your Waste Utilization Plan must be kept at your facility. DWQ and the Division of Soil & Water Conservation Staff will review all documentation during their annual visit of your facility. An additional copy must by kept on file at the local Soil & Water Conservation District Office. Please note that if you install or modify your irrigation system, a designated Irrigation Specialist or a Professional Engineer must also sign the Wettable Acre Determination Certification. Please be advised that nothing in this letter should be taken as removing from you the responsibility or liability for failure to comply with any State Rule, State Statute, Local County Ordinance, or permitting requirement. If you have any questions regarding this letter, please do not hesitate to contact Sonya Avant of our Central Office staff at (919) 733-5083 ext. 571. Sincerely, Kerr T. Stevens cc: Wilmington Regional Office Duplin County Soil and Water Conservation District Facility File Murphy Family Farms 3 J -.3!,� RF, EIVED JAN 2 3 2001 MURPHY F A M' 1• L Y" F A R M S lanuary.22, 2001 Greer Moore NCDENR Wilmington Regional Office 127 N. Cardinal Drive Wilmington, NC 28405 Ms. Moore, I am writing this letter on behalf of Ms. 7olanda Lanier, owner of Triple 7 Farms, facility # 31-355, in response to the Notice of Deficiency issued by your office on 1/10/01. In your letter you pointed out that the cover crop needed improvement on this farm. To address this concern, Ms. Lanier has agreed to do the following: 1. Apply lime as soon as possible to the fields indicated as deficient in the most recent round of soil analysis. 2. Begin a regular spraying program for competitive weed growth. The spraying regime will begin after green up of the bermuda crop as needed. 3. Insure timely harvest of bermuda/small grain growth in a manner consistent with the CAWMP for the facility. 1 hope that the measures outlined will correct the deficiencies noted. If there are any questions or concerns, please let me know. Sincerely, Kraig Westerbeek Murphy Farms Post Office Box 759, Rose Hill, North Carolina 28458, (910) 289-2111, FAX (910) 289-6400 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 31 - 355 County: hn , Facility Name: TP)l Dle T raRm S , Certified Operator Name: To LanQR Operator # K1146 Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the fowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Lagoon Name/Identifier (ID): 31-355 Spillway (Yes or No): ND Level (inches): Iq 2. Check all applicable items Liquid level is within the designed structural freeboard elevations _of one or more structures._ Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day q Y Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to pumped and I)auled is reflected in section Ill tables. Included within this plan is a list of the proposed sites with related facility number(s), number acres and receiving .crop information. Contact and secure- approval from the Division of Water Quality prior to transfer of waste to a site not covered in the facility's certified animal waste management plan. Operation will be partially or fully depopulated. - attach a complete schedule with corresponding animal units and dates for depopulation - if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: a , /,/,I/) I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Phone: q 10- 532-a'741-? Fa,qility OwnerlManager (print) . r Date: d'l� ility Owner/M'anak er (signature) PoA CoverPage 2/21/00 IF T PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY (30) DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 31- 355 2. Current liquid volume in 25 yr.124 hr. storm storage & structural freeboard A . current liquid level according to marker I � b. designed 25 yr.124 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) inches 19 inches rJ" inches ri3i-.g.ft2 e. line c x line d x 7.48 gallons = g2569 gallons 12 ft3 -I. q $ = I q ,15 &9 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design I Sy days g. volume of waste produced according to structural design _ Z(Z 18 _ ft3 h. actual waste produced = current herd # x line g = Zb2 8 ft3 certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i +i) x 7.48 x 30days = line f 4. Total PAN to be land applied during draw down period I. current waste analysis dated 5 5 q9 m. (lines e + k) x line I = 1 000 q Z50 -t- 14592(p I Ubo x if.( - REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE N ! A ft3 3to `7 5D ft3 05 7 2 (o gallons a -a Ib11000 gal. 8!LI lb PAN PoA (30 Day) 2/21/00 1 . J II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR.124 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. structure ID: 31' 355 line m = 85q lb PAN 2. structure ID: 3. structure ID: 4. structure ID: 5. structure ID: line m = lb PAN line m = lb PAN line m = line m = lb PAN lb PAN 6. structure ID: line m = lb PAN n. lines l + 2 + 3 + 4 + 5 + 6 Ib PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAYDRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CAN NOT BE APPLIES DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining "IRR-2 PAN balance (lb/acre) l•� t. TOTAL PAN BALANCE FOR FIELD (Ibs.) column r x s s U. application window' a I 3 I o 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day drawn down period v. Total PAN available for all fields (sum of column t) ' Ib. PAN PoA (30 Day) 2/21/00 2 IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section 11) lb. PAN x. Crop's remaining PAN balance (line v from section III) lb. PAN y. Overall PAN balance (w - x) = -- .6 lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: 1 PoA (30 Day) 2/21/00 3 d �v Revised Apri120, 1999 JUSTIFICATION & DOCUMENTATION FOR MANDATORY WA DETERMINATION Facility Number I - Operation is flagged for a wettable Farm Name: acre determination due to failure of On -Site Represent t1ve9 ayi 1-an Part 11 eligibility item(s) F1 F2 F3 F4 InspectorlReviewer's Name: 5�rnrdhts Date of site visit: 1) `t �} lq Date of most recent WUP: 1 Annual farm PAN deficit: Z. so pounds Operation not required to secure WA determination at this time based on exemption - El E2 E3 E4 Operation pended for wettable acre determination based on P1 P2 P3 . Irrigation System(s) - circle #: 1. hard -hose traveler; 2. center -pivot system; 3. linear -move system; 4. stationary sprinkler system wlpermanent pipe; 5. stationary sprinkler system w/portable pipe; 6. stationary gun system w/permanent pipe; 7. stationary gun system w/portable pipe PART 1. WA Determination Exemptions (Eligibility failure, Part 11, overrides Par I exemption-) El Adequate irrigation design, including map depicting wettable acres, is complete and signed by an I or PE. E2 Adequate D, and Dz D3 irrigation operating parameter sheets, including map depicting wettable acres, is complete and sinned by an I or PE. E3 Adequate D, irrigation operating paameter sheet, including map depicting wettable acres, is complete and sinned by a WUP. E='. 75% rule exemption as verified in Part III. (NO T E:75 % exemption cannot be applied to farms that fail the eligibility checklist in Part 11. Complete eligibility checklist, Part 11- F1 F2 F3, before completing computational table in Par lil). PART 11. 75% Rule. Eligibility Checklist and .Documentation of WA Determination Requirements. WA Det-rminaiion.required.because.oper-.bon failsune of fhe.elia_ibility requirements listedhelow: _ Fz Lack.of c.mage_.whichTesultedlnzve-:,--zpplicationmf-vasiew=-ter=(PAN) on:spray- field(s) accordingfoTrm'slasttwo--vewrs 3Di:Tmaabon32--oLde.-. F2 UnclearjIleaible,-or lock of informaaon/map. - F3 Obvious -field -limitations -(numerous" ches;aailure-:Io:deductTequired __ - buiter/setbackmcreage;-.or25%-ofto►al acrraoeadentineddn-LAWMP-:includes small ;-irregulariy-shaped fields - fields-lessthan-5 acres7or.�velers-Dr.iessthan 2 acres7or.'stationarysi3dnklers). F4 WA determination required because CAWMP credits 7iield(s)'s acreage -in excess of 75% of the respective field's total acreage 25 noted in t;mhl= in Mar` 111 Revised April 20, 1999 Facility Number l / - 3�S Part Ill. Field bv Field Determination of 75% Exemption Rule for WA Determination TRACT xumlae a»i �rEro�ia��= COMMENT � T-32g 4«I i5,10 12 �bs S3 Z F;Ree)6 z3 q rl=LiJ NUMIit r_K - nyoram, puu,zone, or:poinr numgerS may oe L'seo in place orneid numoers nependino on CAWMP and .type of irrigation -system.- ]f pulls, etc. crossmoretnan one field, inspectodreviewerwill have to combine fields to calculate 75% field by field determination for exemption; -otherwis_e operation will be subject to WA determination. FIELD NUMHER2 - must be clearly delineated on rnaP. COMMENTS' - back-up fie€ds with CAWMP a' Feamoe:.exceedina75% of its ta',a€_acres and having -received less than 500, of its annual PAN as -documented in the farm's7previous--t+vo years' (1997 & 1998) of irrioaflon-records,-cannot serve -as -the sole basis -for requiring a WADe erminaiion:_Bp-ck-upfrelds-must-be-noted inthe=mme its=riion end rnusibe ac=essib€e by irrigation system_ Part IV. Pending WA Determinations - 9 P1 Plan-lacks.followinainformation; P2 Plan TeVision-may_sabsfy_7S% rule based on adequate ove cif PAN deficit -and by adiastino all field mcreaae#o below 75% use rate F3 Other (iehn process of installing new irricabon system): State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Bill Holman, Secretary Kerr T. Stevens, Director Jolanda Lanier Triple J Farms, Inc 1547 Old Camp Road Rose Hill NC 28458 Dear Jolanda Lanier: T / • W'A NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES December 30, 1999 Subject: Fertilizer Application Recordkeeping Animal Waste Management System Facility Number 31-355 Duplin County This letter is being sent to clarify the recordkeeping requirement for Plant Available Nitrogen (PAN) application on fields that are part of your Certified Animal Waste Management Plan. In order to show that the agronomic loading rates for the crops being grown are not being exceeded, you must keep records of all sources of nitrogen that are being added to these sites. This would include nitrogen from all types of animal waste as well as municipal and industrial sludges/residuals, and commercial fertilizers. Beginning January 1, 2000, all nitrogen sources applied to land receiving animal waste are required to be kept on the appropriate recordkeeping forms (i_e. 1RR1, IRR2, DRY1, DRY2, DRY3, SLUR1, SLUR2, SLD1, and SLD2) and maintained in the facility records for review. The Division of Water Quality (DWQ) compliance inspectors and Division of Soil and Water operation reviewers will review all recordkeeping during routine inspections. Facilities not documenting all sources of nitrogen application will be subject to an appropriate enforcement action. Please be advised that nothing in this letter should be taken as removing from you the responsibility or liability for failure to comply with any State Rule, State Statute, Local County Ordinance, or permitting requirement. If you have any questions regarding this letter, please do not hesitate to contact Ms. Sonya Avant of the DWQ staff at (919) 733-5083 ext. 571. Sincere] X 4 . - Kerr T. Stevens, Direct r Division of Water Quality cc: Wilmington Regional Office Duplin County Soil and Water Conservation District Facility File 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Telephone 919-733-5083 Fax 919-715-6048 An Equal Opportunity Affirmative Action Employer 50% recycled/10% post -consumer paper State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Bill Holman, Secretary Kerr T. Stevens, Director CERTIFIED MAIL RETURN RECEIPT REQUESTED Jolanda Lanier Triple J Farms, Inc 1547 Old Camp Road Rose Hill NC 28458 Dear Jolanda Lanier: 0 • NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES December 8, 1999 Subject: Conditional Approval Animal Waste Management System Facility Number 31-355 Duplin County Our records indicate that your facility was conditionally certified in order to fulfill the requirements of completion of your Certified Animal Waste Management Plan Certification. This letter is to inform you of your unresolved conditional approval status. Any facility receiving a conditional approval must notify Division of Water Quality (DWQ) in writing within 15 days after the date that the work needed to resolve the conditional certification has been completed. Any failure to notify DWQ as required, subjects the owner to an enforcement action. As of December 7, 1999, we have no record of any information from you, advising us of the status of your conditional approval. Therefore, please fill out the attached form and have your technical specialist and landowner sign the form in the appropriate areas. The completed form must be submitted to this office on or before 45 days of receipt of this letter. Please be advised that nothing in this letter should be taken as removing from you the responsibility or liability for failure to provide DWQ with proper notification of your conditional certification status or possible failure to comply with the requirement to develop and implement a certified animal waste management plan by December 31, 1997. If you have any questions regarding this letter, please do not hesitate to contact me at (919) 733-5083 extension 571. Sincerely,Z4% O X. Sonya L. Avant Environmental Engineer cc: Wilmington Regional Office Duplin County Soil and Water Conservation District Facility File 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Telephone 919-733-5083 Fax 919-715-6048 An Equal Opportunity Affirmative Action Employer 50% recycled/10% post -consumer paper State of,North Carolina Department of Environment and Natural Resources Division of Water Quality AUG 2 5 ,fames B. Hunt, Jr., Governor Wayne McDevitt, Secretary A. Preston Howard, Jr., P.E., Director August 21, 1998 CERTIFIED MAIL RE E PT REQUESTED Jool�Lanier Triple J Farms, Inc 1547 Old Camp Rd Rose Hill NC 28458 Farm Number: 31 - 355 Dear Jolanda Lanier: i CDENR NORTH CARouNA DEPARTMENT OF ENVIRONMENT AND N/crURAL RESOURCES You are hereby notified that Triple J Farms, Inc, in accordance with G.S. 143-215.10C, must apply for coverage under an Animal Waste Operation General Permit. Upon receipt of this letter, your farm has sixty (60) days to submit the attached application and all supporting documentation. -In accordance with Chapter 626 of 1995 Session Laws (Regular Session 1996), Section 19(c)(2), any owner or operator who faills to submit an application by the date specified by the Department SHALL NOT OPERATE the animal waste system after the specified date. Your application must be returned within sixty (60) days of receipt of this letter. Failure to submit the application as required may also subject your facility to a civil penalty and other enforcement actions for each day the facility is operated following the due date of the application. The attached application has been partially completed using information listed in your Animal Waste Management Plan Certification Form. If any of the general or operation information listed is incorrect please make corrections as noted on the application before returning the application package. The signed original application, one copy of the signed application, two copies of a general location map, and two copies of the Certified Animal Waste Management Plan must be returned to complete the application package. The completed package should be sent to the following address: North Carolina Division of Water Quality Water Quality Section Non -Discharge Permitting Unit Post Office Box 29535 Raleigh, NC 27626-0535 If you have any questions concerning this letter, please call at (919)733-5083 extension or Dave Holsinger with the Wilmington Regional Office at (910) 395-3900. S ' erely, for A. Preston Howard, Jr., P.E. cc: Permit File (w/o encl.) Wilmington Regional Office (w/o encl.) P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-7015 FAX 919-733-2496 An Equal Opportunity Affirmative Action Employer 50% recycled110% post -consumer paper State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Wayne McDevitt, Secretary A. Preston Howard, Jr., P.E., Director June 23, 1998 CERTIFIED MAIL RETM CEIP REQUESTED Te avis D&D Farms 281 Bumcoat Rd. Pink Hill NC 28572 Farm Number: 31- 335 Dear Jeff Davis: 0FX;W'A / • • NCDENR NORTH C.AROUNA DOW"MENT OF ENVIRONMENT AND N/QuRAL RESOURCES You are hereby notified that D&D Farms, in accordance with G.S. 143-215.1OC, must apply for coverage under an Animal Waste Operation General Permit. Upon receipt of this letter,, your farm has six 60 da s to submit the attached application and all supporting documentation. In accordance with Chap er 626 of 1995 Session Laws (Regular Session 1996), Section 19(c)(2), any owner or operator who fails to submit an application by the date specified by the Department SHALL NOT OPERATE the animal waste system after the specified date. Your application must be returned within sixty (60) days of receipt of this letter. Faihire to submit the application as required may also subject your facility to a civil penalty and other enforcement actions for each day the facility is operated following the due date of the application. The attached application has been partially completed using information listed in your Animal Waste Management Plan Certification Form. If any of the general or operation information listed is incorrect please make corrections as noted on the application before returning the application package. The signed original application, one copy of the signed application, two copies of a general location map, and two copies of the Certified Animal Waste Management Plan must be returned to complete the application package. The completed package should be sent to the following address: North Carolina Division of Water Quality Water Quality Section Non -Discharge Permitting Unit Post Office Box 29535 Raleigh, NC 27626-0535 If you have any questions concerning this letter, please call at (919)733-5083 extension or Dave Holsinger with the Wilmington Regional Office at (910) 395-3900. Sincerely, A. Preston Howard, Jr., P.E. cc: Permit File (w/o encl.) Wilmington Regional Office (w/o encl.) P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-7015 FAX 919-733-2496 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper State of North Carolina Department of, Environment RECEIVED 1 • • and Natural Resources Division of Water Quality JAN 0 5 199$ James B. Hunt, Jr., Governor BY: Wayne McDevitt, Secretary CDENR A. Preston Howard, Jr., P.E., Director NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES December 29, 1998 Jolanda Lanier Triple J Farms, Inc 1547 Old Camp Rd Rose Hill NC 28458 Subject: Certificate of Coverage No. AWS310355 Triple J Farms, Inc Swine Waste Collection, Treatment, Storage and Application System Duplin County, Dear Jolanda Lanier: In accordance with your application received on November 3, 1998, we are forwarding this Certificate of Coverage (COC) issued to Jolanda Lanier, authorizing the operation of the subject animal waste collection, treatment, storage and land application system in accordance with General Permit AWG100000. This approval shall consist of the operation of this system including, but not limited to, the management of animal waste from Triple J Farms, Inc., located in Duplin County, with an animal capacity of no greater than 2448 Feeder to Finish and the application to land as specified in the Certified Animal Waste Management Plan (CAWMP). The COC shall be effective from the date of issuance until April 30, 2003. Pursuant to this COC, you are authorized and required to operate the system in conformity with the conditions and limitations as specified in the General Permit, the facility's CAWMP, and this COC, with no discharge of wastes to surface waters. An adequate system for collecting and maintaining the required monitoring data and operational information must be established for this farm. Any increase in waste production greater than the certified design capacity or increase in number of stocked animals above the number authorized by this COC will require a modification to the CAWMP and this COC and shall be completed prior to actual increase in either wastewater flow or number of animals. Please be advised that any violation of the terms and conditions specified in this COC, the General Permit or the CAWMP may result in the revocation of this COC, or penalties in accordance with NCGS 143-215.6A through 143-215.6C including civil penalties, criminal penalties, and injunctive relief. Upon notification by the Division of this COC's expiration, you shall apply for its renewal. This request shall be made within 30 days of notification by the Division. This COC is not automatically transferable. A name/ownership change application must be submitted to the DWQ prior to a name change or change in ownership. P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-7015 FAX 919-733-2496 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper Certificate of Coverage AWS310355 Triple J Farms, Inc Page 2 If any parts, requirements, -or limitations contained in this COC are unacceptable, you have the right to apply for an individual non -discharge permit by contacting the engineer listed below for information on this process. Unless such a request is made within 30 days, this COC shall be final and binding. The subject farm is located in the Wilmington Regional Office. The Regional Office Water Quality Staff may be reached at (910) 395-3900. If you need additional information concerning this COC or the General Permit, please contact Dianne Thomas at (919) 733-5083 ext. 364. Sincerely, A_ Preston Howard, Jr., P.E. CC' (Certificate of Coverage only for all cc's) Duplin County_ Health Department `Wilmington Regional Office; Water Quality Section Duplin County Soil and Water Conservation District Permit File -- Central Permit File - NDPU � �Yr 5 h'; •! O 4 rl{:?:. DYf� �y 1'.'h 4 — ,} �, _ � e6II rr ��..� �' ' • YS Cs A. t^ W i, �. D, A r.f.�w,,,. •� � ad �. _ ryI f :OO,BL =1', ll'6pr >< ! r! .I ; a. _I-•9 .SO/y •.`� ' .°°o o°SL LLI 16 _ � fir' I6I �� 5� TY`' , , �✓i �� �� `9 f! �'/ t^ •' y 5 a! ` o �' '• '�t ODD v Q �� � •4n � � � o, px jr tv VV � p r L r� J u yI C , ,.�. � �_ � ��•? C �'� _ -_ � '� by �^ � � a. ^� ,� :ti. + , r,/� . State of North Carolina RECEIVED Department of Environment and Natural ResX'i' esuA�11YSEG�ION Division of Water Quality N0q p 31998 Non -Discharge Permit Application Form t (THIS FORM MAYBE PHOTOCOPIED FOR USE AS AN ORIGI L Dischp pslmitung General --Permit - Existing Liquid Animal Waste- W per-atiions- -- -- --.- The following questions have been completed utilizing information on file with the Division. Please review the information for completeness and make any corrections which are appropriate. If a question has not been completed by the Division, please complete as best as possible. Do not leave any question unanswered. 1. GENERAL INFORMATION: I.1 Facility Name: Triple J Farms, Inc 1.2 Print Land Owner's name: Jolanda Lanier 1.3 Mailing address. 1547 Old Camp Rd City, State: Rose Hill NC _ Zip: 28458 Telephone Number (include area code): 910-532-2747 1.4 County where facility is located: 1.5 Facility Location.fDirections from nearest major highway. Please include SR numbers for state roads. Please include a copy of a county road map with the location of the farm identified): On west side of SR 1100, approximately 0.25 miles south of intersection with SR 1003. - 1.6 Print Farm Manager's name (if, different from Land Owner): 1.7 Lessee's / Integrator's name (if applicable; please circle which type is listed): Murphy Family.Farms 1.8 Date Facility Originally Began Operation: 01/01/93 1.9 Date(s) of Facility Expansion(s) (if applicable): 2. OPERATION INFORMATION: 2.1 Facility No.: 31 (county number); 355 (facility number). 2.2 Operation Description: no Swine operation F-e—ed—er to Finish 2448- Certified Design Capacity Is the above information correct? yes; =no. If no, correct below using the design capacity of the facility The "No. of Animals" should be the maximum numb _ecr_for which the waste management structures were designed. Type of Swine No. -of Animals-- - Type'of Poultry No: of Animals Type of Cattle:_ No` of-Ahirials7'_ 0 Wean to Feeder 0 Layer _ 0 Dairy 0 Feeder to Finish 0 Non -Layer ~ 0 Beef 0 Farrow to Wean (# sow) 0 Farrow to Feeder (# sow) 0 Farrow to Finish (# sow) Other Type of Livestock on the farm: 0 Turkey No. of Animals` FORM: AWO-G-E 5/28/98 Page 1 of 4 31 - 355 3. 2.3 Acreage cleared and available for application (excluding all required buffers and areas not covered by the application system): 25.30 Required Acreage (as listed in the AWMP): 21.43 2.4 Number of lagoons/ storage ponds (circle which is applicable): ! 2.5 Are subsurface drains present within 100' of any of the application fields? YES or NO {please circle one) 2.6 Are subsurface drains present in the vicinity or under the lagoon(s)? YES or O please circle one) 2.7 Does this facility meet all applicable siting requirements? (Swine Farm Siting Act, NRCS Standards, etc.) (Swine Only) YES or NO (please circle one) What was the date that this facility's swine houses and lagoon were sited? What was the date that this facility's -land application areas were sited? REQUIRED ITEMS CHECKLIST Please indicate that you have included the following required items by signing your initials in the space provided next to each itam 3.1 One completed and signed original and one copy of the application for General Permit - Animal . Waste Operations;. 3.2 Two copies`of a general location map indicating the location of the animal waste facilities and Feld locations where animal waste is land applied; 3.3 Two copies of the entire Certified Animal Waste Management Plan (CAWMP). If the facility does not have a CAWMP, it must be completed prior to submittal of a general permit application for animal waste operations. The CAWMP must include the following components: r3.3.1 The Waste Utilization Plan (WUP) must include the amount of Plant Available Nitrogen (PAN) produced and utilized by the facility. -3.3.2 The method by which waste is applied to the disposal fields (e.g. irrigation, injection,.etc.) —3.3.3 A map of every field used for land application. —3.3.4 The soil series present on every land application field. 3.3.5 The crops grown on every land application field. —3.3.6 The Realistic Yield Expectation (RYE) for -every crop shown in the WUP. ,3 3.7 The PAN applied to every land application field. 3.3.8 The waste application windows for every crop utilized in the WUP. -3.3.9 The required NRCS Standard specifications. --3:3.-10 A -site schematic. -- - •r3.3.11 Emergency Action Plan., 3.3.12 Insect Control Checklist with chosen best management practices noted. 3.3.1-3'0d6T Control -Clecklist wi►li`chosen best management practices noted. ---3.3.14 Mortality:Control Ch cklist�witli'tliE'selecte`d-method noted. --3.3.15 Lagoon/storage pond capacity documentation (design, calculations, etc.). Please be sure to include any site evaluations, wetland determinations, or hazard classifications that may be applicable to your facility. —3.3.16 Operation and Maintenance Plan. If your CAWMP includes any components not shown on this list, please include the additional components with your submittal. _. _ _. _ . FORM: AWO-G-E 5/28/98 Page 2 of 4 31 - 355 Facility Number: 31 - 355 Facility Name: Triple J Farms, Inc 4. APj C NT' CE FI 1, this applichas been ry me is acc rate an applicatioompleted and that if all package will be u ed to me as i mpiet Signature i��D �N V-01 1 - — 1000\awg��t�9 iN, e10 �. (Land Owner's name listed in question 1.2), attest that >;., (Facility name listed in question 1.1) n to to t1fe b st o m knowledge. 1 understand that if all required parts of this ired supporting information and attachments are not included, this application ru Date / 6 --26 -9 5. MAN4YER'S CERTIFICATION: (complete only if different from the Land Owner) I, (Manager's name listed in question 1.6), attest that this application for _(Facility name listed in question L I ) has been reviewed by:me and is accurate and complete to the best of my kfiowledgc. 1 undctstand that if ali required parts of this application are not completed and that if all required supporting information and attachments are not included, this application package will be returned as incomplete. Signature Date THE COMPLETED APPLICATION PACKAGE, INCLUDING ALL SUPPORTING INFORMATION AND MATERIALS, SHOULD BE SENT TO THE FOLLOWING ADDRESS: NORTH CAROLINA DIVISION OF WATER QUALITY WATER QUALITY SECTION NON -DISCHARGE PERMITTING UNIT POST OFFICE BOX 29535 RALEIGH, NORTH CAROL_ INA 27626-0535 TELEPHONE NUMBER: (919) 733-5083 FAX NUMBER: (919) 733-0719 , FORM: AWO-G-E 5/28/98 Page 3 of 4 31 - 355 ANZAAL WASTE MANAGEMENT PLAN CERTIFICATION FOR EXISTING FEEDLOTS Please return the completed form to the Division of Environmental Management at the address on the reverse side of.this form. Name of faFm-{Plea`se print) Mailing Address: 1_��t7 6Id fin, Vj Re.s e- 4111 N c a q 14 9C - Phone No.: 9i0 - g3 :: " 1'7 Y -7 — County �(of farm): ob 1 t Fargo location: Latitude and Longitude: ya qV 17•�I L o9' a7' {required). Aso, please attach a copy of a county road map with location identified. Type of operation (swine, layer, dairy, etc.) : Sw : n e Design capacity (number of animals) : ;2 q w g -_ Average size of operation (12 month population avg.): 2,44 9 _ Average acreage needed for land application of waste (acres) : 'al, Technical Specialist Certification As a technical specialist designated by the North Carolina Soil and Water Conservation Commission pursuant to 15A NCAC 6F .0005, I certify that the existing animal waste management system for the farm named above has an animal waste management plan that meets the operation and maintenance standards and specifications of the Division of Environmental Management and the USDA - Soil Conservation Service and/or the North Carolina Soil and Water Conservation Commission pursuant to 15A NCAC 2H.0217 and 15A NCAC 6F .0001 - .0005. The following elements and their corresponding minimum criteria have been verified by me or other designated technical specialists and are included in the plan as applicable: minimum separations (buffers); adequate quantity and amount of land for waste.0till zation (or use of third party);_ access or ownership of proper waste application equipment; schedule for timing of applications; application rates; loading rates; and the control of the discharge of pollutants from stormwater runoff events less severe than the 25 - year, 24 - hour ctnrm . _. ✓1 When check BILLY W:`HOUSTON `r'.: itions/exceptions. DUPLIIV.S.& W CONSER. DIST Name of Technical Sped. pO BQ3{-277- KENANSVILLE NG- Affiliation (Agency):.TELEPHONE910-2967 Address (Agency): Phone No.: 910 --.9>3 11_z a Signature: 1,k Date: QI I 1 -7 194 E - 7 Owner/Mariager Agreement I (we), understand the operation and maintenance.procedures- established in .the -.approved animal waste_ management plan-for1the farm named above and -will -implement the- se -procedures:- I :(we) :know{,that-any= s,�-3. -- expansion to the existing design capacity of the waste treatment and storage system. or construction' -of -new" facilities will. re a new. certification [o.be submitted to the Divisiori:of;Envi'rorimental Managements �c.�ta .:�. before;�the,new aniinaisiare;stocked. -I (we) also riderstanditha :there musts:be no,rdischarge.of:ariimalrwaste� from this system to surface waters of the state either directly through a man-made conveyance or through ..1 runoff from a storm event less severe that the 25-year, 24-hour storm. The approved plan will be filed at the farm and:atthe I e. of. the -local •Soil-and-Wate_r;ConservationrDi`strict -- 43 �+ f� +s'S _�. 3:.' :7: __J .��s i..i.;ia �. 'Ca..r :S=i�':.)lF •�:.,.:_ Name of La Owner (Please rint . 3'b ' Signature: Dat6: :1-• �F - g S _ Name of Man r, if differe ram w er (Please print): . Signature: Date:.. Note- A change in land ownership requires notification or a new certification (if the approved plan is changed) to be submitted to the Division of Environmental Management.within 60 days of a title transfer. DEM USE ONLY: ACE# SC h11C■Itll�sle K■■■ �C:PI CNCC CC®SCCCCai Ca ■■ am ��■■H Ion -a0®■e ■®�in ® ®�s �ee®N��Ce■®60 02 ®®: ®�aJ: :® 11®a■A 11C Igo INNER ■■1 neI C IEMMmee� a e©°OWN � :i�i ■1 a�®■■em aCo■IN. ■ ■M■■® ■ee®l®i410M■ 9 W��i EWEIII � _■:C:■C0Me CC:C■ ■r�: ■■- .=e�rsa�a�' E '�a CiC C ■■®■�■ 11011■® no ON NMI w MINSWE Mir C HOW E. MIR r■q�© 1■■�M0: �� o ■ et1■o1 �� 8■ ■ ■ on■■rn S® ■ e ■iC IN Oro ran ®■HIS ■irti�►a C6■■■■■ a 'A C�il e®®■B ■®■■gin No a M oom man ® log C■a man N&I is taw ■ °ee�®�a� eC■�C®'� I��e � ®Is[�I�fll p®Him�!!1� In il a e02%:E,e■®ol 1 ■ « eais�enna�raut �n�arr mm . , eyarm�rner ANIMAL WASTE UTILIZATION PLAN Produder: JOLANDA D. IANIER Location: 1547 OLD CAMP RD ROSE BILL NC 28458 Telephone: 910-532-2757 Type Operation: Existing Feeder to Finish Swine Number of Animals: 2448.00 hogs (Design Capacity) STORAGE STRUCTURE: Anaerobic Waste Treatment Lagoon APPLICATION METHOD: Irrigation The waste from your animal facility must be land applied at a specified rate to prevent pollution of surface water and/or groundwater. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the crops in the fields where the waste is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed before each application cycle. Annual soil tests are strongly encouraged so that all plant nutrients can be balanced for realistic yields of the crop to be grown. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner: 1.- Always apply waste based on the needs of the crop to be grown and the nutrient content of the waste. Do not apply - v more nitrogen than the crop can utilize. 2. Soil types are important as they have different infiltration - rates, leaching potentials, cation exchange capacities, and ' available water holding capacities. 3. Normally waste shall be applied to land eroding at less than 5 tons per acre per year. Waste may be applied to land °-• eroding at- 5 or more tons per acre -annual-ly,---but-hess- than- 14 tons per acre per year providing that adequate filter _ strips are established. 4. Do not apply waste on saturated soils, when it is raining, or when the surface is frozen. Either of these conditions may result in runoff to surface waters which is not allowed under DWQ regulations. Page: 1 ANIMAL WASTE UTILIZATION PLAN 5. Wind conditions should also be considered to avoid drift and -- `downwind odor -problems: - 6. To maximize the value of the nutrients for crop production and to reduce the potential for pollution, the waste should be applied to a growing crop or applied not more than 30 days prior to planting a crop or forages breaking dormancy. Injecting the waste or disking will conserve nutrients and reduce odor problems. This plan is based on the waste application method shown above. If you choose to change methods in the future, you need to revise this plan. Nutrient levels for different application methods are not the same. The estimated acres needed to apply the animal waste is based on typical nutrient content for this type of facility. Acreage requirements should be based on the waste analysis report from your waste management facility. In some cases you may want to have plant analysis made, which could allow additional waste to be applied. Provisions shall be made for the area receiving waste to be flexible so as to accommodate changing waste analysis content and crop type. Lime must be applied to maintain pH in the optimum range for specific crop production. This waste utilization plan, if carried out, meets the requirements for compliance with 15A NCAC 2H .0217 adopted by the Environmental Management Commission. AMOUNT OF WASTE PRODUCED PER YEAR (gallons, ft3, tons, etc.) 2448 hogs x 1.9 tons waste/hogs/year = 4651.2 tons AMOUNT'OF PLANT AVAILABLE NITROGEN (PAN) PRODUCED PER YEAR 2448 hogs x 2.3 lbs PAN/hogs/year = 5630.4 lbs. PAN/year Applying theaboveamount'ofwaste is a big job. You should plan time;_ and have appropriate equipment'to`apply the waste in a timely manner­�,� The following acreage will be needed for waste application based on .--the crop- to- be grown; ---soil type--and--surface--application-. --�-- -- Page: 2 f ANIMAL WASTE IITILIZATION PLAN TABLE 1: ACRES OWNED BY PRODUCER TRACT FIELD SOIL TYPE & CLASS- CROP YIELD LBS COMM N ** * LBS DETERMINING PHASE CODE AW N PER ACRES AW N PER AC AC USED ----- or ------- APPLY RESID. APPLIC METH N TIME 328 1 NOA BH 6.1 305 0 12.6 3843 I APR-SEP 328 �1 I --I 50 � 6 �G I 10 � I 11SEP--NOV 328 2 BNB BH 4.5 0 1 I 1225 I 15.23 11176.75 APR-SEP 328 SG 1 0 1-2 1 I 150 15.23 1261.5 'SEP-NOV END I TOTAL15911.25 - Indicates that this field is being overseeded (i.e. interplanted) or winter annuals follow summer annuals. NOTE: The -applicator is cautioned that P and K may be over applied while meeting the N requirements. In the future, regulations may require farmers in some parts of North Carolina to have a nutrient management plan that addresses all nutrients. This plan.-.. only addresses nitrogen. s Page: 3 ANIMAL WASTE UTILIZATION PLAN TABLE 2: ACRES WITH NOTARIZED AGREEMENT OR LONG TERM LEASE (Agreement with adjacent landowners must be attached.) (Required only if operator does not own adequate land. See required specification 2.) TRACT FIELD SOIL TYPE & CLASS- CROP YIELD LBS COMM N ** * LBS DETERMINING PHASE CODE AW N PER ACRES AW N PER AC AC USED ---- or ------- APPLY RESID. APPLIC METH N TIME END TOTAL10 Indicates that this field is being overseeded (i.e. interplanted) or winter annuals follow summer annuals. In interplanted', fields (i.e. small grain, etc, interseeded in bermudagrass), forage must be removed through grazing, hay and/or silage. Where grazing, plants should be grazed when they reach a height of six to nine inches. Cattle should be removed when plants are grazed to a height of four inches. In fields where small grain, etc, is to be removed for hay or silage, care should be exercised not to let small grain to reach maturity, especially late in the season-(i.e. April or May). Shading may result if small grain gets too high and this will definitely interfere with stand- of.- bermudagrass. This loss of stand will result in reduced yields and less nitrogen being utilized. Rather than cutting small grain for hay or silage just before heading as is.the normal situation, you are encouraged to -cut the small.'-- grain earlier-. You- may want to "consider 'halrvestirig- -hay or silage two to three times during the season, depending on time -small grain is planted in the fall. =;a; The ideal time to interplant small grain, etc, is late September or early October. Drilling is recommended over broadcasting. Bermud'agr'ass show d ~be grazed or 'mowed to a height of about two .inches_ before drilling for .best results. Page: 4 ANIMAL WASTE UTILIZATION PLAN ** Acreage figures may exceed total acreage in fields due to overseeding. * lbs AW N (animal waste nitrogen) equals total required nitrogen less any commercial nitrogen (COMM N) supplied. The following legend explains the crop codes used in tables 1 and 2 above: CROP CODE CROP UNITS PER UNIT BH SG HYBRID BERMUDAGRASS-HAY SMALL GRAIN OVERSEEDED TONS AC 50 50 TABLE 1 TABLE 2 TOTAL ** TOTALS FROM TABLES 1 AND 2 WETTABLE —ACRES 17.83 LBS AW N USED 5911.25 0 0 17.83 5911.25 * BALANCE -280.85 ------------------- *** This number must be less than or equal to 0 in order to fully utilize the animal waste N produced. Page: 5 ANIMAL WASTE UTILIZATION PLAN *** This number must be less than or equal to 0 in order to fully utilize the animal waste N produced. Acres shown in each of the preceding tables are considered to be the usable acres excluding required buffers, filter strips along ditches, odd areas unable to be irrigated, and perimeter areas not receiving full application rates due to equipment limitations. Actual total acres in the fields listed may, and most likely will be, more than the acres shown in the tables. See attached map showing the fields to be used for the utilization of animal waste. SLUDGE APPLICATION: The waste utilization plan must contain provisions for periodic land application of sludge at agronomic rates. The sludge will be nutrient rich and will require precautionary measures to prevent over application of nutrients or other elements. Your production facility will produce approximately 905.76 pounds of plant available nitrogen per year in the sludge. If you remove the sludge every 5 years, you will have approximately 4528.8 pounds of PAN to utilize. Assuming you apply this PAN to hybrid bermudagrass hayland at the rate of 300 pounds of nitrogen per acre, you will need 15.096 acres of land. If you apply the sludge to corn at the rate of 125 pounds of nitrogen per acre, you will need 36.2304 acres of land. Please be aware that these are only estimates of the PAN and land needed. Actual requirements could -vary by 251 depending on your sludge waste analysis, soil types, realistic yields, and application methods. APPLICATION OF WASTE BY IRRIGATION ,-, ' x, P The irrigation application rate should not exceed the intake rate of the soil at the time of irrigation such that runoff or ponding occurs. This rate is limited by initial -soil-moisture...content, soil..structure.,-_soils texture, water droplet size, and organic solids. The application amount should not exceed the available water holding capacity -of the soil at'.the "' time of irrigation nor should the plant avai-lable nitrogen applied exceed — .the nitrogen needs of the crop. If surface irrigation is the method of land application for this plan, it is the responsibility of the producer and irrigation designer to ensure that an irrigation system is installed to properly irrigate the acres shown in Tables 1 and 2. Failure to apply the recommended rates and Page: 6 ANIMAL WASTE 'UTILIZATION PLAN amounts of nitrogen shown in the tables may make this plan invalid. The following table is provided as a guide for establishing application rates and amounts. Tract Field Soil Type Crop Application Rate (in/hr) Applic. Amount (inches) 328 1 NOA BH .50 *1.0 328 2 BNB BH .75 *1.0 328 ` 1 SG .5 *1 328 -2 SG .5 *1 * This is the maximum application amount allowed for the soil assuming the amount of nitrogen allowed for the crop is not over applied. In many situations, the application amount shown cannot be applied because of the nitrogen limitation. The maximum application amount shown can be applied under optimum soil conditions. Your facility is designed for 180.00 days of temporary storage and the temporary storage must be removed on the average of once every 6.00 months. In no instance should the volume of the waste be stored in your structure be within the 25'year 24 hour storm storage or one foot of freeboard_ except in the event of the 25 year 24-hour storm. It is the responsibility of the producer and waste applicator to ensure that the spreader ui eqpment is operated properly to apply the-- _ correct rates to the acres shown in Tables 1 and 2. Failure'to apply : the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. Call your technical specialist after you receive the waste analysis report for assistance in determining the amount of waste per acre and the proper application rate prior to applying the waste. NARRATIVE OF OPERATION -- Page: 7 ANIMAL WASTE UTILIZATION PLAN 31 - 35 S Producer: Location: Telephone: Type Operation: Number of Animals: (Design Capacity) STORAGE STRUCTURE: JOLANDA D . LANIER 1547 OLD CAMP RD ROSE HILL NC 28458 910-532-2757 Existing Feeder -to Finish Swine 2448.00 hogs Anaerobic Waste Treatment Lagoon APPLICATION METHOD: Irrigation AUG 18 1997 --The waste from your animal facility must be land applied at a specified rate to prevent pollution of surface water and/or groundwater. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the crops in the fields where the waste.is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed before each application cycle. Annual soil tests are strongly encouraged so that all plant nutrients can be balanced for realistic yields of the crop to be gown. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner: 1. Always apply waste based on the needs of the crop to be grown and the nutrient content of the waste. Do not apply more nitrogen than the crop can utilize. 2. Soil types are important as they have different infiltration rates, leaching potentials, cation exchange capacities, and available water holding capacities. 3. Normally waste shall be applied to land eroding at less than 5 tons per acre per year. Waste may be applied to land eroding at 5 or more tons per acre annually, but less than 10 tons per acre per year providing that adequate filter strips are established. 4.` Do not -apply waste on saturated soils, when it is raining, or when the surface is frozen. Either of these conditions may result in runoff to surface waters which is not allowed under DWQ regulations. Page: 1 ANIMAL WASTE UTILIZATION PLAN 5. Wind conditions should also be considered to avoid drift and downwind odor problems. 6. To maximize the value of the nutrients for crop production and to reduce the potential for pollution, the waste should be applied to a growing crop or applied not more than 30 days prior to planting a crop or_forages breaking dormancy. Injecting the waste or disking will conserve nutrients and reduce odor problems. This plan is based on the waste application method shown above. If. you choose to change methods in the future, you need to revise this plan. Nutrient levels for different application methods are not the same. The estimated acres needed to apply the animal waste is based on typicalnutrientcontent for this type -of -facility. Acreage -requirements _should .be base_ d on the —waste - analysis -report_ from your _-- - waste management facility. In some cases you may want to have plant analysis made, which could allow additional waste to be applied. Provisions shall be made for the area receiving waste to be flexible so as to accommodate changing waste analysis content and crop type. Lime must be applied to maintain pH in the optimum range for specific crop production. This waste utilization plan, if carried out, meets the requirements for compliance with 15A NCAC 2H .0217 adapted by the Environmental Management Commission. AMOUNT OF WASTE PRODUCED PER YEAR (gallons, ft3, tons, etc.) 2448 hogs x 1.9 tons waste/hags/year = 4651.2 tons AMOUNT OF PLANT AVAILABLE NITROGEN (PAN) PRODUCED PER YEAR 2448 hogs x 2.3 lbs PAN/hogs/year = 5630.4 lbs. PAN/year Applying the above amount of waste is a big job. You should plan time and have appropriate equipment to apply the waste in a timely manner. The following acreage will be needed for waste application based on the crop to be grown, soil type and surface application. Page: 2 •1 ANIMAL WASTE UTILIZATION PLAN TABLE 1: ACRES OWNED BY PRODUCER TRACT FIELD SOIL TYPE & CLASS- CROP YIELD LBS COMM N - ** * LBS DETERMINING PHASE CODE AW N PER ACRES AW N PER AC AC USED. or ------_- APPLY RESID. APPLIC METH N TIME 328 1. NOA BH 6.1 305 0 12.6 3843 I APR-SEP 328 �1 328 12 328 I-2 END SG 1 150 10_ 12.6 630 SEP-NOV BH 4.55 1225-'10--_ 5.23 1-1176-.75 I I APR-SEP II SG 11 150 10 15.23 1261.5 SEP-NOV TOTAL15911.25 - Indicates that this field is being overseeded (i.e. interplanted) or winter annuals follow summer annuals. NOTE: The applicator is cautioned that P and K may be over applied while meeting the N requirements. In the future, regulations may require farmers in some parts of North Carolina to have a nutrient management plan that addresses all nutrients. This plan only addresses nitrogen. Page: 3 ANIMAL WASTE UTILIZATION PLAN TABLE 2: ACRES WITH NOTARIZED AGREEMENT OR LONG TERM LEASE (Agreement with adjacent landowners must be attached.) (Required only if operator does not own adequate land. See required specification 2.)- TRACT FIELD SOIL TYPE & CLASS- CROP YIELD LBS COMM N ** * LBS DETERMINING PHASE CODE AW N PER ACRES AW N PER AC AC USED APPLY RESID.1 APPLIC METH N TIME END TOTAL..O Indicates that this field is being overseeded (i.e. interplanted) or winter annuals follow summer annuals. In interplanted fields (i.e. small grain, etc, interseeded in bermudagrass), forage must be removed through grazing, hay and/or silage. Where grazing, plants should be grazed when they reach a height of six to nine inches. Cattle should be removed when plants are grazed to a height of four inches. In fields where small grain, etc, is to be removed for hay or silage, care should be exercised not to let small grain to reach maturity, especially late in the season (i.e. April or May). Shading may result if small grain gets too high and this will definitely interfere with stand of bermudagrass. This loss of stand will result in reduced yields and less nitrogen being utilized. Rather than cutting small grain for hay or silage just before heading as is the normal situation, you are encouraged to cut the small grain earlier. You may want to consider harvesting hay or silage two to three times during the season, depending on time small grain is planted in the fall.. The ideal time to interplant small grain, etc, is late September or early October. Drilling is recommended over broadcasting. Bermudagrass should be grazed or mowed to a height of about two inches before drilling for best results. Page: 4 ANIMAL WASTE UTILIZATION PLAN ** Acreage figures may exceed total acreage in fields due to overseeding. * lbs AW N (animal waste nitrogen) equals total required nitrogen less any commercial nitrogen (COMM N) supplied. The following legend explains the crop codes used in tables 1 and 2 above: CROP CODE CROP UNITS PER UNIT BH SG HYBRID BERMUDAGRASS-HAY SMALL GRAIN OVERSEEDED TONS AC 50 50 TABLE 1 TABLE 2 TOTAL TOTALS FROM TABLES 1 AND 2 WETTABLE _ACRES 17.83 LBS AW N USED 5911.25 0 0 17.83 5911.25 * BALANCE -280.85 *** This number must be less than or equal to 0 in order to fully utilize the animal waste N produced. Page: 5 ANIMAL WASTE UTILIZATION PLAN *** This number must be less than or equal to 0 in order to fully utilize the animal waste N produced. Acres shown in'each of the preceding tables are considered to be the usable acres excluding required buffers, filter strips along ditches, odd areas unable to be irrigated, and perimeter areas not receiving full application rates due to equipment limitations. Actual total acres in the fields listed may, and most likely will be, more than the acres shown in the tables. See attached map showing the fields to be used for the utilization of animal waste. SLUDGE APPLICATION: The waste utilization plan must contain provisions for -periodic land application of sludge at agronomic rates. The sludge will be nutrient rich and will require precautionary measures to prevent over application of nutrients or other elements. Your production facility will produce approximately 905.76 pounds of plant available nitrogen per year in the sludge. If you remove the sludge every 5 years, you will have approximately 4528.8 pounds of PAN to utilize. Assuming you apply this PAN to hybrid bermudagrass hayland at the rate of 300 pounds of nitrogen per acre, you will need 15.096 acres of land. If you apply the sludge to corn at the rate of 125 pounds of nitrogen per acre, you will need 36.2304 acres of land. Please be aware that these are•only estimates of the PAN and land needed. Actual requirements could vary by 251i.depending on your sludge waste analysis, soil types, realistic yields, and application methods. APPLICATION OF WASTE BY IRRIGATION The irrigation application rate should not exceed the intake rate of the soil at the time of irrigation such that runoff or ponding occurs. This rate is limited by initial soil moisture content, soil structure, soil texture, water droplet size, and organic solids. The application amount should not exceed the available water holding capacity of the soil at the time of irrigation nor should the plant available nitrogen applied exceed the nitrogen needs of the crop. If surface irrigation is the method of land application for this plan, it is the responsibility of the producer and irrigation designer to ensure that an irrigation system is installed to properly irrigate the acres shown in Tables 1 and 2. Failure to apply the recommended rates and Page: 6 ANIMAL WASTE UTILIZATION PLAN amounts of nitrogen shown in the tables may make this plan invalid. The following table is provided as a guide for establishing application rates and amounts. Tract Field Soil Type Crop Application Rate (in/hr) Applic. Amount _ (inches) 328 1 NOA BH .50 *1.0 328 2 BNB BH .75 *1.0 328 1 SG .5 *1 328 -2- - - - SG - .5 * This is the maximum application amount allowed for the soil assuming the amount of nitrogen allowed for the crop is not over applied. In many situations, the application amount shown cannot be applied because of the nitrogen limitation. The maximum application amount shown can be applied under optimum soil conditions. Your facility is designed for 180.00 days of temporary storage and the temporary storage must be removed on the average of once every 6.00 months. In no instance should the volume of the waste be stored in your structure be within the 25 year 24 hour storm storage or one foot of freeboard except in the event of the 25 year 24 hour storm. It is the responsibility of the producer and waste applicator to ensure that the spreader equipment is operated properly to apply the correct rates to the acres shown in Tables 1 and 2. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make -this plan invalid. Call your technical specialist after you receive the waste analysis report for assistance in determining the amount of waste per acre and the proper application rate prior to applying the waste. NARRATIVE OF OPERATION Page: 7 WASTE UTILIZATION PLAN REQUIRED_ SPECIFICATIONS 1. Animal waste shall not reach surface waters of the state by runoff, drift,�manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste which reaches surface water is prohibited. 2. There must be documentation in the design folder that the producer either owns or has an agreement for use of adequate land on which to properly apply the waste. If the producer does not own adequate land to properly dispose of waste, he/she shall provide a copy of an agreement with a.landowner who is within a reasonable proximity, allowing him/her the use of the land for waste application. It is the responsibility of the owner of the facility to secure an update of the Waste Utilization Plan when there is a change in the operation, increase in the number of animals, method of utilization, or available land. 3. Animal waste shall -be applied to meet,. but not -exceed, the nitrogen needs for realistic crop yields based on soil type, available moisture, historical data, climatic conditions, and level of management, unless there are regulations that restrict the rate of application for other nutrients. 4. Animal waste shall be applied to land eroding less than 5 tons per acre per year. Waste may be applied to land that is eroding at 5 or more tons, but less than 10 tons per acre per year providing grass filter strips are installed where runoff leaves the field. (See FOTG Standard 393 -Filter Strip) 5. Odors can be reduced by injecting the waste or disking after waste application. Waste should not be applied when there is danger of drift from the irrigation field. 6. When animal waste is to be applied on acres subject to flooding, it will be soil incorporated on conventionally tilled cropland.' When applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding. (See "Weather and Climate in North Carolina" for guidance.) 7. Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control odor or flies. 8. Animal waste shall not be applied to saturated soils, during rainfall events, or when the surface is frozen. 9. Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to a depth that would inhibit growth. The potential for salt damage from animal waste should also be considered. Page: 8 WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS 10. Waste nutrients shall not be applied in fall or winter for spring planted =ops on soils with a high potential for leaching. Waste nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of the -crap or forages breaking dormancy. 11. Any new swine facility sited on or after October 1, 1995 shall comply with the following: The outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and from any perennial stream or river (other than an irrigation ditch or canal. Animal waste other than swine waste from facilities sited on or. after October 1, 1995), - shal-1 -not be- applied closer. than -25 feet- to _perennial waters. -'-'(See Standard -3'93 - Filter Strips).-. - 12. Animal waste shall not be applied closer than 100 feet to wells. 13. Animal waste shall not be applied closer than 200 feet of dwellings other than those owned by the landowner. 14. Waste shall be applied in a manner not to reach other property and public right-of-ways. 15. Animal waste shall not be discharged into surface waters, drainageways, or wetlands by a discharge or by over -spraying. Animal waste may be applied to prior converted cropland provided they have been approved as a land application site by a "technical specialist". Animal waste shall not be applied on grassed waterways that discharges directly into water courses, and on other grassed waterways, waste shall be applied at agronomic rates in a manner that causes no runoff or drift from the site. 16. Domestic and industrial waste from washdown-facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. 17. A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). Areas shall be fenced, as necessary, to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc., are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Berms and structures should be inspected regularly for evidence of erosion, leakage.or discharge. Page: 9 WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS 18. If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge, pollution and erosion. 19. Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, leaks, and spills. A regular maintenance checklist should be kept on site. 20. Animal waste can be used in a rotation that includes vegetables and other crops for direct human consumption. However, if animal waste is used on crops for direct human consumption it should only be applied preplant with no further applications of animal waste during the crop season. 21. Highly visible -markers shall- be installed. to mark -the--top and bottom elevations of -the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume for waste storage ponds. 22. Waste shall be tested within 60 days of utilization and soil shall be tested at least annually at crop sites where waste products are applied. Nitrogen shall be the rate - determining element. Zinc and copper levels in the soils shall be monitored and alternative crop sites shall be used when these metals approach excessive levels. pH shall be adjusted for optimum crop production and maintained. Soil and waste analysis records shall be kept for five years. Poultry dry waste application records shall be maintained for three (3) years. Waste application records.for all other waste shall be maintained for five (5) years. 23. Dead animals will be disposed of in a manner that meets North Carolina regulations. Page: 10 ANIMAL WASTE UTILIZATION PLAN WASTE UTILIZATION PLAN AGREEMENT Name of Farm:TRIPLE J. FARMS INC. Owner/Manager. Agreement I (we)'understand and will follow and implement the specifications and the operation and maintenance procedures established in the approved animal waste utilization plan for the'farm named above. I (we) know that any expansion to the existing design capacity of the waste treatment and storage system or construction of new facilities will require anew certification, to be submitted to the -North Carolina.Division-of Water Quality (NCDWQ) before the new animals are -stocked. I (we) also understand that there must be no discharge -of animal waste from this system to surface waters of the state from a storm event less severe than the 25-year, 24-hour storm. The approved plan will be filed on -site at the farm office and at the office of the local Soil and Water Conservation District and will be available for review by NCDWQ upon request. Name of Faeilit Owner: JOLANDA D. LANIER (Please print) Signature: Date: YZ y Z `! 7 Name of Mandg#r(If different from owner) : Signature: Date: Name of Person Preparing Plan: (Please print)JOHNNY L. LANIER Affiliation:DUPLIN SOIL AND WATER CONSERVATION DISTRICT Phone No. 910-296-2120 Address (Agency): PO BOX 277 KENANSVILLE NC 28349 Signature: ` Date: Page: 11 M State of North Carolina Department of Environment, Health and Natural Resources James B.-Hunt, Jr., Governor Jonathan B. Howes, Secretary November 13, 1996 Joseph Lanier Triple J Farms, Inc 1547 Old Camp Rd Rose Hill NC 28458 SUBJECT: Operator In Charge Designation Facility: Triple J Farms, Inc Facility ID#: 31-355 Duplin County Dear Mr. Lanier: Senate Bill 1217, An Act to Implement Recommendations of the Blue Ribbon Study Commission on Agricultural Waste, enacted by the 1996 North Carolina General Assembly, requires a certified operator for each animal waste management system that serves 250 or more swine by January 1, 1997. The owner of each animal waste management system must submit a designation form to the Technical Assistance and Certification Group which designates an Operator in Charge and is countersigned by the certified operator. The enclosed form must be submitted by January 1, 1997 for all facilities in operation as of that date. Failure to designate a certified operator for your animal waste management system is a violation of 15A NCAC 2H .0224 and may result in the assessment of a civil penalty. If you have questions concerning operator training or examinations for certification, please contact your local North Carolina Cooperative Extension Service agent or our office. Examinations have been offered on an on -going basis in many counties throughout the state for the past several months and will continue to be offered through December 31, 1996. Thank you for your cooperation. If you have any questions concerning this requirement please call Beth Buffington or Barry Huneycutt of our staff at 919/733-0026. Sincerely, A. Preston Howard, Jr., ireetor Division of Water Quality Enclosure cc: Wilmington Regional Office Water Quality Files P.O. Box 27687, 1�y� Raleigh, North Carolina 2761 1-7687 N)Nf An Equal Opportunity/Affirmative Action Employer Voice 919-715-4100 - 50% recycled/ 10% post -consumer paper ftEGISZRATION- FORM- FOR ANIMAL FEEDLT OPERAT fNS Department of Environment, Health and Natural Resour6es Division of Environmental Management Water Quality Section if the animal waste management system for your feedlot operation -is designed to serve more than or equal to 100 head of cattle, 75 horses, 250 swine, 1,000 sheep, or 30,000 birds that are served by a liquid waste system, then this form must be filled out and mailed by December 31, 1993 pursuant to 15A NCAC 2H. 0217 (c) in order to be deemed permitted by DEM. Please print clearly.IL Farm Name: y Mailing Adress: County- Owner(s) Name: Manager(s) Name: Lessee Name. Farm as sped as possible: road am , direction, milepost, etc.): Latitude/Longitude if Known: Design capacity of animal waste mana ementXsstem (Number and type of confined animal(s)): gy � x �p S Average animal population on the farm (Number and type of.animal(s) raised)-- �3� Year Production Began: ASCS Tract No.: Type of Waste Management System Used: r4j L n A&es Available for Land App Owner(s) Signature(s): 31--35(D Zia DATE. �Icte cl- Nlcr;h Ccrciirc Deper; ment cf '-nvircrlment, �eciih cnc ,Ncturci t,esourc�ss Civisicn cf E-vircrurenici i'vicncl-erneni Jones S. runt, Jr., Goverr ier Jcnci,ncn 8, HicwCs Cecretcry A. Pres;cn howcrc, Jr., P.E., Dir2c;or January 21, 1994 Joseph Lanier Rt. 1 Box 321-F Rose Hill NC 28458 Dear Mr. Lanier: This is to inform you that your completed registration form required by the recently modified nondischarge. rule has been received by the Division of Environmental Management (DEM), Water Quality Section, On December 10, 1992 the Environmental Management Commission adopted a water quality rule which governs animal waste management systems. The goal of the rule is for animal operations to be managed such that animal waste is not discharged to surface waters of the state. The rule allows animal waste systems to be "deemed permitted" if certain minimum criteria.are met (15A NCAC 2H .0217). By submitting this registration you have met one of the criteria for being deemed permitted. We would like to remind you that existing feedlots which meet the size thresholds listed in the rule, and any new or expanded feedlots constructed between February 1, 1993' and December 31; 1993 must submit a signed certification form to DEM by December_•31 1997. New or expanded feedlots constructed after December 31, 1993 must obtain signed certification before animals are stocked on the farm. Certification of an approved animal waste management plan can be obtained after the Soil and Water Conservation Commission adopts rules later this year. .We appreciate you providing us with this information. If you have any question about the new nondischarge rule, please contact David Harding at (919) 733-5083. Sincerely, P.O. Box 29535, Rdeigh, North Carolina 27626-M35 Telephone 419-733-7015' FAX 919-733-2496 An Fqucl oppatm1h/Afriurnawe Action Employer ffl%recycled/ 10% past -consumer paper _ REGISTRATION FORM FOR AJI` AL FEEDLOT 5 . Department of Environment, Health and Natural Resoutp_hs Division of Environmental Management" Water Quality Section T '= if the animal waste management system for your feedlot operation is designed to serve more than or equal to 100 head of cattle;'` horses, 250 swine, 1, C00 sheep, or 301000 Mils that are Gervef? by a liquid waste system, then this form must be filled out and mailed by December 31, 1993 pursuant to '_SA'NCAC 2H.0217 (c) in order to be deemed permitted by DEM. Please print clearly. Farm Name: u U Mailing Address, County Owners) Name: Manager (s) Name: Lessee Name: Phone No. Farm Location (Be as specific as possible: road names, direction, milepost, etc .) : Q; A of Sew-'poa4- /od3 - --on : zc — Paz Poo- — Latitude/Longitude if known: Design capacity of animal waste maq,agment•system (Number and type of confined animal (s)) : fQ �i' (��Sky aloyey5 Average animal population on" the farm .(Number and type of animal (s) raised) §1 1 g Tom LQaS A�MJ& f 6:/71s 7 0 .. " "„" 3Z Year Production Began: /99 3_ ASCS Tract No,n Type of waste Management System i3sed: Acres Available for La Owner (s) Signature (s) : �� 15116 1 State of North Carolina Department of Environment, Health and Natural Resources 4 • • Division of Environmental Management James B. Hunt, Jr., Governor ry ID EE" Jonathan B. Howes, Secretary A. Preston Howard, Jr., P.E., Director October 22, 1993 6,,erA) Joey Lanier Rt. 1 Box 321-F Rose Hill, NC 28458 Dear Mr. Lanier, This is to inform you that your completed registration form required by the recently modified nondischarge rule has been received by the Division of Environmental Management (DEW, Water Quality Section. On December 10, 1992 the Environmental Management Commission adopted a water quality rule which governs animal waste management systems. The goal of the rule is for animal operations to be managed such that animal waste is not discharged to surface waters of the state. The rule allows animal waste systems to be "deemed permitted" if certain minimum criteria are met (15A NCAC 2H .0217). By submitting this registration you have met one of the criteria for being deemed permitted .We would like to remind you that existing feedlots which meet the size thresholds listed in the rule, and any new or expanded feedlots constructed between February -1, 1993 and December 31, 1993 must submit a signed certification form to DEM by December 31, 1997. New or expanded feedlots constructed after December 31, 1993 must obtain signed certification before animals are stocked on the farm. Certification of an approved animal waste management --plan can be obtained after the Soil and Water Conservation Commission adopts rules later this year. We appreciate you providing us with this information, if you have any question about the new nondischarge rule, please contact David Harding at (919) 733-5083. Sincerely, /c Steve Tedder, Chief Water Quality Section P.O. Box 29535, Raleigh, North CaroBna 27626-0535 Telephone 919-733-7015 FAX 919-733-2496 An Equal Opportunity Affirmative Action Employer 50%recycled/ 10% post -cons Qner paper Site Requires Immediate Attention: )a(S Facility No. 31 DIVISION OF ENVIRONMENTAL MANAGEMENT ANIMAL FEEDLOT OPERATIONS SITE VISITATION RECORD DATE: � ! , 1995 Time: Farm Name/Owner: __4O r i Mailing Address: 01 `72d . c'3 CS y _`6 County: - Integrator: Phone: On Site Representative: Phone: 3 d - D T'� Physical Address/Location: mac- I I Q ,) bg Co ,,ec,, Swine Type of Operation: Poultry J'att�e�" Design Capacity: a`( ``f Number of Animals on Site: Z (14'B DEM Certification Number: ACE DEM Certification Number: ACNEW Latitude: Longitude: Elevation: Feet Circle Yes or No Does the Animal Waste Lagoon ufficient freeboard of 1 Foot + 25 year 24 hour storm event (approximately 1 Foot + 7 inches) Ye or No Actual Freeboard: Ft. Inches • Was any seepage observed from th>es s)? Yes or� Was any erosion ob ed?. Yes or No Is adequate land available for sprallo Is the cover crop adequate. Yes or No Crop(s) being utilized:5� Does the facility meet SCS minimum setback criteria? 200 Feet from Dwellings? Y�e or No of �� .0 100 Feet from Wells? es or No Ye )or the animal waste stockpiled within 100 Feet of USGS Blue Line Stream? or No �',�°9 animal waste Iand applied or spray irrigated within 25 Feet of a USGS Map Blue Line? Yes or No Is animal waste discharged into waters of the state by man-made ditch,,flushing system, or other similar man-made devices? Yes or Go If Yes, Please Explain. Does the facility maintain adequate waste management records (volumes of manure, land applied, spray irrigated on specific acreage with c ver crop)? Yes Additional Comments: K-A _S 4\ , c W P• s n �`+' �� ^ r ...� Inspector Name cc: Facility Assessment Unit Signature Use Attachments if Needed. TEMPORARY STORAGE REQUIRED DRAINAGE AREA: Lagoon (top of dike) Length * Width == 315.0 200.0 63000.0 square feet Buildings (roof and lot water) Length * Width = 0.0 0.0 0.0 square feet TOTAL DA 63000.0 square feet Design temporary storage period to be 180 days. :jjj. Volume of waste produced Approximate daily production of manure in CF/LB SSLW 0.00156 Volume = 330480 Lbs. SSLW * CF of Waste/Lb./Day 180 days Volume = 80705 cubic feet 5P. Volume of wash water This is the amount of fresh water used for washing floors or volume of fresh water used for a flesh system. Flush systems that recirculate the lagoon water are accounted for in 5A. Volume = 0.0 gallons/day * 180 days storage/7.48 gallons - - - - - - - per^ CF Volume = 0.0 cubic feet 5C. Volume of rainfall in excess of evaporation. Use period of time when rainfall exceeds evaporation by largest amount. 180 days excess rainfall = 7.0 inches --'- Volume = 7.0 in * 'DA %T1��'inches per' foot Volume = 36750.0 cubic feet 5D. Volume of 25 year — 84 hour storm Volume = 7.5 inches l 1E inches per foot DA Volume = 39375.0 cubic feet TOTAL REDUIRED TEMPORARY STORAGE 5A. 80705 cubic feet 50. 0 cubic feet 5C. 36750 cubic feet 5D. 39375 cubic- feet TOTAL 156830 cl-ibic feet 6. SUMMARY Total r-egUir'ed volume 487310 cubic- feet Total design volume avail. 49L:789 cubic feet Min. req. treatment volUme plus sludge accumulation 330480 cubic fe et - At elev. 44.6 feet ; Volume is 331344 cubic feet (end pumping) Total design volume less 25yr-24hr storm is 453414 cubic feet At eiev. 46.8 feet ; Volume is 451562 cubic feet (start pumping) Seasonal high water- table elevation 4Z.0 &-e feet 7. -DESIGNED BY: � APPROVED BY: DATE: g12gf9Z DATE: NOTE: SEE ATTACHED WASTE UTILIZATION PLAN OPERATION AND MAINTENANCE FLAN ------------------------------ This lagoon is designed for waste treatment with minimum odor, control. The time reguir,ed for the planned fluid level to be r eached may var-v due to soil conditions, flushing oiler atien , �►id the amount of fresh water added to the system. Land application of waste water, is recognized as an acceptable method of disposal. Methods of application include solid set, center~ pivot, guns, and traveling gun irrigation. Care should be taken when applying waste to prevent runoff from the field or damage to crops. The following items are to be cE-Lrr-ied aut: 1. It is strongly recommended that the treatment lagoon be pre — charged to 1>2' its capacity to prevent excessive odors during start —up. Fire —charging reduces the concentration of the initial waste entering the lagoon thereby reducing odors. Solids should be covered with effluent. at all times. 2. The attached waste utilization plan shall be followed. This plan recommends sampling and testing of waste (see Attachment B) before land application. 3. Begin PUMP --out of the lagoon when fluid level reaches eleva— tion 46.8 as marked by permanent markers. Stop pump —out when the fluid level reaches elevation 44.6 or before fluid depth is less than 6 feet deep (this prevents the loss of favorable bacteria) . 4. The recommended maximum amount to apply per irrigation is one (1)'inch and the recommended maximum application rate is 0.4 inch per hour. 5. Keep vegetation on the embankment and areas adjacent to the lagoon mowed annually. Vegetation -should be fertilized as -needed to maintain a vigorous stand. 6. Repair any eroded.areas or areas damaged by rodents and establish in vegetation. 7. - All ---surface runoff i's` to' be' -diverted from the lagoon to 'stabl-e-•- - - ­ outlets. D. The Clean Water Act of 1977 prohibits the discharge of pollutants into waters of the United States. The Department of Environment, Health, and Natural Resources, Division of Environ•-- mental.Management, has the responsibility for enforcing this law. l 1 1 = SPECIFICATIONS FOR CONSTRUCTION OF WASTE TREATMENT LAGOONS ---------------------------------------------------------- Clenring: All trees and brush shall be removed from the construction area before any excavating or fill is started. Stumps will be removed within the area of the foundation of the embankment and fill areas and all excavated areas. All stumps and roots exceeding one (1) inch in diameter shall be removed to a minimum depth of one (1) foot. Satisfactory disposition will be made of all debris. The foundation area shall be loosened thoroughly before placement of embankment material. Cut-off Trench: A out -off trench (when specified) shall be installed as shown in the plans. Con st react i on: ------------- Construction of excavated and earthfill areas shall be performed to - the neat lines and grades as planned. Deviations from this will require prior, approval of the SCS. Earthfill shall not be placed in standing water and reasonable compaction of the fills shall be performed by the construction equipment or sheeps-foot roller during placement. The embankment of the lagoon shall be installed using the more impervious materials. Construction of fill heights shall include ten (10) percent for settlement. To protect against seepage, when areas -of -unsuitable- matortal-areencounteried,, they -will need-t-o be excavated a minimum of one (1) foot below grade and backfilled and compacted with a suitable material (ie-CL,SC,CH).- Refer to the soils investigati-an information Tn-the--plans for special considerations." Precautions should be taken during construction to prevent excessive erosion and'sedimentation. -;Iy- JHG >=1g,5T L4-S r►r1 1 - To gE p�r�RGl3 T S'4C�G��t ED WITH 6t)i-rAgLE 6C MATE►211%• �E7 PBoTToM_ off- TH& L_,1Gc�oN Vegetation: ON THE .N0PTk .,51DE- WILL ALSO -KAEUD 1`0---SE 0,JEP,,caT d- 8AC_K.F 1L_LGD WITH 6c All exposed embankment and other bare constructed areas shall -be seeded to the planned type of vegetation as soon as possible after const ruct i on. GELDING RECOMMENI:iAT IONS ----------------------- AREA TO BE SEEDED: 4.0 ACRES USE THE SEED MIXTURE INDICATED: 0 LBS. FESCUE GRASS @ 60 LBS./ACRE (BEST SUITED ON CLAYEY OR WET SOIL CONDITIONS) SEEDING DATES: SEPTEMBER I'll TO NOVEMBER 30 0 LBS. ' PENSACOLA' BAHIA GRASS @ 60 LBS. /ACRE (SEE FOOTNOTE NO. 1) SELDING DATES: MARC'r•l 15 TO TUNE 30 YZ LBS. HULLED BERMUDA GRASS 1I1 8 LBS. /AC.-*PF-FH�kijF�'r (SUITED FOR MOST SOIL CONDITIONS) V EG0TATIVE GpVE{�,' SEEDING DATES: APRIL 1 TO 3ULY 31 0 LBS. RYE GRAIN @ 30 LBS./ACRE (NURSERY FOR FESCUE) 160 LSS. RYE%GRASS @ 40 LBS./ACRE (TEMPORARY VEGETATION) SEEDING DATES: DECEMBER 1 TO MARCH 30 LBS. APPLY THE FOLLOWING: 4000 LBS. OF 10-10-10 FERTILIZER (1000 LBS./ACRE) 8 TONS OF DOLOMITIC LIME (2 TONS/ACRE) 400 PALES OF SMALL GRAIN STRAW (100 BALES/ACRE) ALL SURFACE DRAINS SHOULD BE INSTALLED PRIOR TO SEEDING. SHAPE ALL DISTURBED AREA IMMEDIATELY AFTER EARTH MOVING IS COMPLETED. - APPLY LIME ,AND'FERTILIZER THEN DISK TOIPREPARE A 3 TO 4 INCH SMOOTH SEEDBED. APPLY SEED AND FIRM SEEDBED WITH A CULTIPACKER OR SIMILAR EQUIPMENT. APPLY MULCH AND SECURE WITH A MULCH ANCHORING TOOL` OR NETTING. 1. PENSACOLA BAHIAGRASS-IS SLOWER TO ESTABLISH THAN COMMON BERMUDA GRASS. WHEN USING BAHIA, IT IS RECOMMENDED THAT 8 LBS./ACRE OF COMMON BERMUDA BE INCLUDED TO PROVIDE COVER UNTIL BAHIAGRASS IS ESTABLISHED. WASTE UTILIZATION PLAN ---------------------- Owner~s na+ne--:Joseph Lanier Mail flddress-: Rose Hsi 11. NC Type of produc:ction t-knit-----:Topping COOAli U y : 1JUpl iTi Type of waste facility ----- :Anaerobic Lagoon Yol_ir animal waste management facility has been designed for a given storage capacity. When the waste reaches the designed level, it must be land applied at a specified -rate to prevent pollution of surface and/or ground water. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the crops on the`fields where the waste is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed before each application cycle and annual soil tests ane encouraged so that all plant nutrients can be balanced for realistic yields of -the crop to be grown. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner. Always apply waste based on the needs of the crop to be grown and the nutrient content of the waste. Do not apply more nitrogen than the crop can utilize. Soil types are important as they have different infiltration rates -and leaching potential. Waste shall not be applied to - _ - ---land -eroding--at -greater than- 5- t-ons-per-acre per- year.- Do not -- apply waste on saturated sails or on land when the surface is frozen. Either of these conditions may result in runoff to _. surface waters__ Wind. conditions_ should -also be considered to avoid drift and downwind odor problems. To maximize the value of nutrients for crap production and to reduce the potential for pollution, the waste should 'be'applied to a growing crop or not more than .30 days prior to planting. Injecting the waste or disking will conserve nutrients and reduce odor problems. The acres needed to apply the animal waste is based on typical nutrient content for this type of facility. Acreage requirements may be more or less based an the waste analysis report from your waste management facility. The design of your waste management facility is based on the following: Amount of Waste Prod�_cced Per Year: ---------------------------------- c446 animals x 1.9 tons wastetanimal/yr= 4651 tons total waste Page =Amount -o'f Pl-ant- Av'a`3=lable Nitrogen- Pr--oduced Per Yea=r,-:- ----------------------------------------------------- `448 animals x 3. 3;0 l bs. Nyan i mallyear = 5630 lbs. i yr Available N Applying the above amount of waste is a big job. You should plan time and have approp-riate egl_;ipment to apply the waste in a timely manner. Your facility is designed for 180 days of storage. Therefore, it will need to be pumped every 6 months. Tract Field Soil Crop Yield Lbs. N Acres Lbs. N Month to No. No. Type Code Per Ac. Used Apply 328 L BnS 6 7 Tons 400 14.7 5872 MAR-AUG 3�8 ;i BT)B 6 7 Tons 400 4.3 1704 MAR-AUG 328 4 BnB 6 7 Tons `400 2.3 920 MAR-AUG 328 3 AuB 6 7 Tons 400 1.0 400 FEAR-AUG 328 1 NoA 6 7 Tons 400 3.0 1212 MAR-AUG Total 25.3 10108 Available Nitrogen 5630 Surplus Or Deficit -4478 Crop codes: 1=Cereal grain; `-Corn; 3=Fescue; 4=Range Gr. Bermuda 5=Control Grazed Bermuda; 6=Hayland Bermuda Narrative of Operation: ----------------------- Seed A permanent grass filter strip along all ditches that -receive- animal-wast-e--_ _ Call the Soil and Water Conservation District Office after you receive waste analysis report to obtain.the amount per acr-e to apply and the irrigation application rate prior to applying _ waste. Prepared by:MJ { Iame� Title Date Concurred in by: Prdducer Date (Copy to producer and copy to case file) sly Iv - v-4 AST•" "Now Iva 1 IL NOR C, ovrr ' a, STAIN wo my 53 N 'A�k V, :% I 1`4_ fit nQ ♦ TVAN, Z 1`1 MCI Cr �f�"4L k4li 3• low. mi 00 M4 4 coal RAW V >I, _. Q ................... .................. yr Z.4tr F,ii f 4VT r1r) 41: vuva Mir Air, T Je A .7 %ck, N, up 4a Aw lots, -.1 4 1 �.A 1, ply fwltl 111v 1_1�1'1 wm`_;wlilol� I -I. CIO -, 171A 'I kZ, ;it U. S. Department of Agr `lture Soil Conservation Servicz HAZARD CLASSIFICATION DATA SHEET FOR DAMS NC-ENG-34 September I980 File Code: 210 - Landowner- 4un Coty. D I IRL IK -� — Community or Group No. R-1 q Conservation' Plan No.� Estimated Depth .of Water to Top of. Dam . I-L,' Ft. Length of Flood Pool Ft. Date of Field Hazard Investigation ._. Evaluation by -reach of flood plain downstream to the point of estimated minor effect . from sudden' dam fa 1 ure.- ^ Est. -.El ev: :Est... evation . , Kind of : Improvements : � of :Breach Reach: Length: Width: Slope: ., Land Use','':'- - Improvements' Above' f:Floodwater::�Above flood Plain: ,"F.lood Plain Ft: Ft. Ft. Ft. 2 3. . Describe potential for loss,of life and damlge'3to existing or probable -futurer downstream improvements from a sudden'�breach I�olyE -�� AFMpX'1 MA`ML'�l Goo`- F90m j-�e Iloo. APMM' t 000" �' FRDM LITTLE RF_#VF_'R D Hazard Classification of'Dam b, c) (see NEM-Part 520.21) L.A600N = Dam Classification {L, II, Ii IV, V} Dy—fsa� "'—'��/�-{-ti SL -- Date_ gI2 42 Date t,>T S SCS-ENG-538 _ U_ S. O&ARTMENT OF AGRICULTURE Rcv. S-70 SOIL CONSERVATION SERVICE SOIL INVESTIGATION TO DETERMINE SUITABILITY OF PROPOSED POND SITE FAF-XiER'S NAME ` COUNTY — DATE q/7-9lqZ PHOTO SHEET NO. WORK CROPL.AND-ACRFS PASTURE ACRES •as • •s s•COONIST OF •e•• • •• :s• ,. . MEMO■■■■■■MINE■■■MEMO MEN®■ ■■■■■■■■■■■■■ ■■■■■■■■■■■■■■ ■■NEO■E■■■■■■■■■■■■■■■■■■■ q■■■■■■■■■■■■■■■■■■■MINIM ■ ■■■■■ ■■■EE■■■E■MENEME® ARE ..!■!Oi®iM ■ice c�!!■!®1El■!a!®1®!®:®�®!®!®�® �■®,®i®1■i■;■ ! • �I®i01®1OlM!®!®I®I®®I®I®i®[® 1�©;■i■I■■i■�!� �I■i®IEIEI■!®I■I®!®COI®I■!®1® �®!®i■!■I■i■'�■I�I�!'�i®f ®I®i■I®i®[®I®!®1®I®1®!® VVIr ��. ��` d s/~i f I a is t.,vFa..'✓ , �Q. 1 I � `_ I \ :` , `1S1 r���e�Y f+s • .1 �1� 7 � �� 1 Iln t�� . � •. 'btr�C + (• @@�' ,' �A"�� ! «F.: J., \ '.> •`� .•✓'� � S. i ! : '� !..'. N \. .•r �� ��� ! J �O$.�"tt! � '�ly� �..� - n , a' <+lf i-,+ ,-� 4r N_ r: `i 1 }}// f'/ - i )5 l.L. \y' `w'r.// '�t�'* :1 r a: t3 I, ' u. �/.' -'T i 1 .c'y. s s' �}y..r '.s;. �S �R drn i •�z '(si•.s:. �:t. ;w-�•_&• ` r �.:. '� r, r, '� ,a�.• yr ��i` >jV'/ � k r � ';,; ,4 #'� �:x 'w F7 -�'._.: rd. r�ir.�y„ r S �h •s., {, '� � ,{,. �s d, tf 1�z .vs 7 i•!Zs :. rf'��• y Y,A ,'. 3'r,-'u }i :r°� _ y Ww^•A.'l'r. �' � �� e� =.4 ,� `�+iLKi �,� � t�3, .w• r ;�.�` :G rx� S�S',I::�'� s 4 ^ \ y }t,� "" ,d-^ '� - •�� ,,}. � � l.. • C"'-Ji '�} \f ! ,-z�! �, V1f,. _a �7nf '� +: ` a, i-e3 . L � - r I i I r { ) / •6 1 q = \ f 6..f� �d� _ r-� t, ^1-�: 11 '[ r i .: `;i a vp s. 1, +^:-!�,•�;� .�.,, � '� `' � Lr' Ab Fv ..K' ri'S (.. p. 4 v^fc_ rr R', q - �r .i x 3,rr�lr .�: , ,, '-e �': `�, rJ'�1 n�„ky, V "y,�� :.J;,.a,� 'd,�^".S' :;L'�'t" ^"^ ir_ T_i:. .. '3•:'�i : �;t..: ';;t , `.�.+ -.� ' \ `� ' �� ��'�4r'V - � � I. k .�^''+! I � i . >< -tf',:'eY �..� r n i. q .,'iris r' ''ti' S •t � 1_�+': �, a: � � a �'Ji' '� \ %� i ' µ 5 . j \ ;7 ;;;3"v .R.' j,' i •' `h .r .,"ya`<t'!.. ✓r. A;' '. '1� tk.l "' --.7 - ;'Y.. ♦ i-- r. r:[ /• 4 ,� ` / ?��: - '1 } rd s i' S l R ,E, J i _'i :.I� yK.+ �x°.• r i4•(-:ir 1.. _� jJ}!(( ..r 1-�f7S,y''�"�` � �>"79+ .•S W". ; n:S: a1a�e_ ..1 F 'ill ��I:�.t'i -;` `rJ�' I, " s :: �"`' I � f a �..'yr1}N �, \ . 1.5 3jr j �. Y y�.. :a. -.; ' •i:t�.� .S% i•'�'.m _ :I r � _ ,,��'x,. 4 ,'�� c. �ll.'1'. :. - .V.l � '1 .ate rj �a=;� •�_\l r.x- =-'3. rs � +'� ! .rye i.0 .t'r '�"r' �}:Y1r.. �� is, �.r,�._ :'s-� _•iU ':�"sav�a 'q '+ - =Se.. ' :r'v. \,\ 1, . tt--- ,. U : Ir ,.r,l Er ��' r': :;' K � 3 _ !`- I !M ::1 S'S, >,�i', `w�'•'-�''. Y,} �`. x-se: � �J - t .a .4 -r n - '.J'.R. 8 ,':�, x., _ \• . _ '\ I I i', .-` 1;r.,, 1V_.y -.�� 'r°J'� '� ! +�, // —.// � ` ! s a � µ�� I•�•f J y f�'' Y =R 4:'Y a _� _ i/l(Ij� `..t .' li ,j 5\ � 1 \ � 1 _ �i' �f 1 S �, :, ,r rll ~� � ^�`` F • F �., r,••�lN\S \�_ '`�`/ � c:.. 11 � 4� �'f� 4 ! y� Y r 1, "! Jy�' 1y�.`. �' � }i\I.4 r '�� \���.-.: '-4`i� •1[;,.. -0 - d�:�5 :-[� �.Y - J, 3'� .0 `•- - �7 ri,; wsl4� t a. l!.'' i. J,5 �� l �5 // �' 'f / ` ,.' � / ' (J J ,lam '!� _� ._-. li.. 4":5' l �� 1 •'" c--•_,.�:� .� 4( J C - /�� .mil .�•• �"c' ` -,5 A .' _��.��f ` �. �!•.v •.r a �S ' r J - ! ' n t ryr. r.., q �:�.f.� J tr', `x ! c*`tiy�1� ',y'- 9�Rtl 'Itt { i.-=' J '-3 �� 4 y4 L -F ' !• •ih.. 17�. IA- I .1 •' • f��J I- !~ // i., lr rl /! Y -C'� I r f ��, - • `), - �,� ' is � � ,'_� - ' �\.'�� >v i'1 ',\\"-.r/` �'�•- � L`�---"_"1� % � ��� • C'I J' .'' r�' �>% .a. �i � ,li� >i- ` _".�<� \\.i'_:_'" f � \ _ 1 f��� ; � •••���TTT ��; C y f ��• � ; � �=_ =1 ' i `,- �S � � � ; f •, � :,` I, //j �1 .:1,' , -- JI � -V � � � - •f� � \.:/ � 4 F l I , $y } f �4,� � � `� l � _.✓ li��_-_ _ �'\ � �_ @`: .� l' i r @� "1r �, r! "+` l�+� • e� //- �, � t d j,`� 4 1�1 r � r � �_ � �\ :� `i/f',l '� �'-��j;,( a�/ ��@r. '-. \ \ `J'a�_:'��. -'4\ 'J � `",.'• '�-_� -- ' ,r.'. � �•'� IlJ � 4y'.'L'"ty I .� �� `_ ! f 1 -�� �" i i i i '. r I� Vim! :.�.y-':I �� .�..\, r. \_.._ IV�� rk,, 'j� 'S r' " '- m _ `1 I FJ'' n�'i� U..� 4 1 Y 4�.: C!'%� s E -� � -�?^,-�.r -�.1 � S � � .. fA, 1� - •\.I. , \1 ` \� t; } t_ -1 ? ~�(i�'1 ✓` p\✓ ! �•�, �. ( // / .I I�JV �` �\ % � s ��,- f I 4 �' / '\�_ � - eft ! i \ } _ j' i`i �` �t,.-,,�'•� °� - ��� ' . �ti � !' ^,� �,� ," r.?;';Jt r h` �. �, s\ y.'Al ��J .�`��� �/r`ti - >✓. ♦ r yI 9 ysY•�.T•I', J1 _ { j �'.���-N. ��,., ~� ,' :ti' /i '.�,.E'.,;`� �' 1 ��;.1\, IV r' � � 3r]''"�F ' '�'-/ -}. .i I r, ~'! jt'o`�'•� +; /h J {�I - ! ); f - 11 4; I,luz ,,' ' •k Lam./';�. ;,., �_ � `� /�- \ � � , �/ • ' -1. r 'Y� r ' �• y I �. I�•—• � _ -' �y T � I s, �'�' Nk 111 --�'1� 1 �� j rl�r ��s r '"'„/�� 1`F\ r. r \ \, I T5 \ .. 1' \ \ ttJ � ,;5x".,4 • r.: �\!J �� �r t l/ �s �� i// �~,. '.i_.. 1.. a� w, ,�' L'• •„��rr'l +yin! - J - !`� s ri !�, } .� . .1 .l s rD' �\. \ ! 1�\I� s„a J •: , rr �» .A��r'-'��^'t �} �I �n\� 1 - jl j � .•, �, ;• 1 i It �-!1. ��l •'if I �, � \' �' '•4f � J ' g i ��'.'� { �f. rt`'I D1A�fsCS•,1n +Y,F �7a F� -.:_ rr•�:r5 w �y. � o ', s "l.�i dP:;l, �' .,'/ .i .ii `• , �o��' 1 � fir` _ r jjj n - � • .. rr s ♦ s P T .: � e . � u i 1'- � , YYS� �, �+SL r� � ! �•' �_>_GY l � it � ry.'l• u. r -' N. /;, e k. 1 +� t .� r;; € a\} , ! r � I 5 .s t.T� �5,` y \ � -� 17- . k'. 1 s;�..:T -';Y-'-. _W�� f �.is �\ f5t L.;'Mf >Pt '� i ,I� C'•'.; \\I 55 ' it r.t t J{1 (r_r-• �!'.`! r: � y .. 3 is n,'"3. �•1`1 t,'.�'"�,5;" M4 ; -�P% �.-.e,' -�' �ur7� �i•i:.n"^*r' '�'''-J , S,, .':+• '={�. i:' _, 1. ".-?"s�'-r.''�, >a 1 � �; . - _ �_ Cp" - I - f �,I/ r.. ...P' �^Ix 6� ,I .� ,� '» I- 4- a�� rl, ;.. •J 4 ./� J�v'((��+�'.[,��:� , ()/- '\ I Iq ( p•c 'J 9 .r\ ��-�'/ 2`,IJ �1 ( } �7 � � +� I r V r 'r`%.. ♦ "'f"y:-T� "�'+ ar'' ":,�.:. o •,5 'u - - `4C"!t'•.r1H'F°- .Ia p7- 2 N ap ,`Mw1 ,, $}�; nr :r t :s� t � -'+r'• 1 S.~ t •�, e:,- i � �_j •�':.f[.� ;( `l'.d.� ` �! ,f "I!\`. —.` I {`,y` Jrl! �\ '"� f `�' r\)_ \ l4,ri: � - f / V i 'i 1` �Vt ' � `, I u, "� '" t �-�' ,z �: ',�{� t- c� +n'Es" Y _ � e r.3.ti vS%�l°,.R.? �°.1, } �+ - r �`c t �'s•1�,,,�� :< ,{ �k n •.5 e"V \ �r�•r`E.SJ _T '•s '`�+,. { 1 t,s .,vs ` �, A, ,5 i � \ fk' ���C]1.;I'^�' '�'w^. \�5��1� J -�... ' ml �} (lam'" j �-;,J';- ` jI,f� \ �� _- L��.( rM1i�`' (. f i ,.-� 5 a ^d _ \ � }11�, m � `�j J `Ir�4i�� i 1 ! L:. ���. } •'"'� C � 4 .• 't••.i �J r i 'r, ( I! � ` rr..', �(y C,, : 5 ' United States Soil Department of Conservation P. 0. BOX 277 Agriculture Service KENANSVILLE, NC 28349 TELEPHONE 919-296-2121 TO: WASTE MANAGEMENT FACILITY SITE EVALUATION AND MANAGEMENT PLAN PRODUCER Mr. cTofr ah_ N_ . cyg ej_ LOCATION OF SITE Oq ,SR /L00 )MIJIt Sw dl—_ 1044nnji111 SIZE OF PROPOSED OPERATION IS SOIL SUITABLE FOR LAGOON? YES ✓ N0 SOIL CLASS. & B DISTANCE FROM THE LAGOON SITE TO NEAREST RESIDENCE OTHER THAN LANDOWNER OR HIS TENANT Aauiiuj _0) .rr_,:led on Eaaf hsor �►►�y�opNxiwa�►jy /Odo' NUMBER OF HOUSES WITHIN 2000 FEET OF LAGOON SITE �- ACREAGE/CROP REQUIRED PTO PUMP EFFLUENT 11f & 1 Gcw-ht! DOES LANDOWNER HAVE ENOUGH ACREAGE YES ✓ NO IF NO, DOES LANDOWNER HAVE ACCESS TO MORE ACREAGE? YES NO WILL FACILITY INVOLVE ALTERING WETLANDS? YES NO IF THE ABOVE QUESTION CONCERNING -WETLANDS IS -CHECKED "YES-, THE LANDOWNER IS HEREBY ADVISED THAT THIS CONSTRUCTION MAY REQUIRE PERMITS. FROM THE ARMY-CORP OF ENGINEERS. " IT IS THE -LANDOWNERS RESPONSIBILITY TO DETERMINE IF -.-PERMITSARE"'' NECESSARY AND TO. OBTAfiN-THE- REQUIRED -PERMITS� THE -ARMY- CORP -REPRESENTATIVE--FOR--- DUPLIN COUNTY IS: -- - -.---JEFF...RICHTER,- -- US --ARMY-; CORP 0F_-ENGI;NEERS - -- - - - _ P. 0. '•BOX 1890 - ' -WILMIHGTON, � NC 28402- TELEPHONE.919-251-4636_. _ - -- LANDOWNER IS RESPONSIBLE TO DETERMINE IF ANY -LOCAL OR STATE ZONING ORDINANCES . AFFECT" THE LOCATION -OF - THIS "FACILITY:` FACILITY.- -- DOES ., DOES SITE MEET SCS CRITERIA "FOR WASTE- TREATMENT' FACILITIES? ''YES ✓ HO ADDITIONAL COMMENTS .14360101 w►vij' % no closer +An—lajft- 10'. ar owwrd Mr. �,anier, raa3tir o�sotncb b� erPnbltJkcl. �0.•roiOwNtr Y I3t rb .. a rk a ' :� r o co,vr+'�'r� w i o o+'^ r►�rou� o0e►t�Y+y. No visible, s�gNs o. c.v1+vra1 Pesovrbcj p. apt b4 t1+i� ,s� • THIS APPROVAL IS VALID FOR 60 DAYS FROM THE DATE SIGNED. IF DESIGN HAS NOT BEEN COMPLETED WITHIN THIS PERIOD SITE WILL BE RE-EVALUATED AT THE TIME OF DESIGN TO ASSURE COMPLIANCE WITH SCS STANDARDS. LAGOON WILL HAVE TO BE 750 FEET FROM ANY RESIDENCE OTHER THAN APPLICANT'S AT TIME OF DESIGN. The Sol Conservation Service VIs an agency of the Department of ApricuRure SIGNATURE Q DATE 4--Ir-'q 9— US Department of Agriculture NC -CPA 16 -Soil -Conservation -Service- — _= - _ - - - _ = 4-92--- - ENVIRONMENTAL EVALUATION Land User/owner JC6FPN LAN I E:F, _ County All P U k I Location/Tract & Field_ NumberT32.8 1=� z_ Acreage 19-�1 Prepared by L1V 1 A W Aj?,jQ0E-S -- C()QPT__g Date -1 /ZQ 1 QZ Brief Description of Planned Practice/RMS/Project Measure: LA&oofA, cRiTICAI_ AREA _-5Fj=_Dad -�L PA61DEE PLAMT1Nib Environmental Factors and Resources to Identify :and Evaluate J 1. Is wetland included in the planning area: (References: NCPM; 190=GM 410.26; Hydric soils list; Classification of Wetlands and Deepwater Habitats of the U.S.; National Wetlands Inventory. Maps; N%FSAM. V No }1 `S - Yes - If. yes, -- Identify types present -- Attach environmental evaluation showing what effect _ planned assistance will have on r�retl"and and how this assistance is within policy --- Have needed permits (CAMA, DEM, Corps, etc.) been obtained by the landuser? _ - _ -- Make -sll :pufit;the landowner violation of Swampbuster' 2•. Endangered and/or threatened species: (References:-190.-GM 410.22; Technical Guide Section I--i_(13)" and' Section I-vii No Yes -- Identify species whoserange and habitat needs indicate they might occur in planning area -- Identify on map any designated critical habitat " 3. Is a'designated natural or scenic area included 'in the planning. - urea or will planned act o ss ii`pact _ on an adj C,enit natural or scenic area? (References: 190-GM 410.23 and .24) J No .Yes - If yes, encourage landuser to corisult with concerned agencies, societies, and individuals ;to Art Ve.:at . mutually satisfactory land, iise afi$ tred tinerit'"`" 4 . Does -the :planning area include the 100-year fio6d pl-aih. (References: NCPM; 190-GM 410.25; HUD Flood plain inapi�t) No Yes - If yes, -- Is the assisted action likely to have sign-fidant adverse effects on existingnaturAl and bene-ficiai values in the flood plain! ` -- Is there a practical alternative 6-uts de- the ,fid6d• Plain? -- Has the flood plain been. iUscd for a1ricultut-di production.. -for at least .3 of tie last :jieairs:?,_ 5.. 'Is. an arcbxaeological or historical rl. site, ldc-atein -tie p afro ig area:? (References:. NCPM; 420-GM' 40'1; -Xat onail; Register 61- Historic Places) Yes: - If yes,. have- steps been taken to- ei M&d the` protection of this area?` - - 6-- .- Are. there -any -pr- me-,. unique,--dr locally.= xmpoZ'l-rarit farmland's- in - the. operating unit? (Referelices--:' SI -M` x - - '. y • . gn$i.Aa Yes - If.�yes,,- identify _'o6 a:- s"oi3s map: or 1ec e11 . T .. Will, the,. action -resu 't ' in= srig? • - • - - No:. - --- - -- - -•Yes°� -- .. .. � - _.. _ _,..,._� --• -- - - ..._... _. - - 8'k Ws11 thee- action-`resu-It ri swampbusting?: - . Yes= 9=.1 Is'. there- a; potential! for.- caner-oversy?-' Flom' whbi?'AbJO j M I W 'LAM'D. No: Y�es� r'. — 10 - Are- permits-required?/Shoul-d'-the_person contact -permit --agencies?- -- V/No Yes} When an- environmental factor or resource is identified on the site, the user will refer to the appropriate reference for policy and document the. appropriate action in the notes portion of this form. NOTES, DOCUMENTATION, FOLLOW—UP �i R 11nure from Pits PSWCD 1 LIVESTOCK WASTE SAMPLING, ANALYSIS, AND CALCULATION OF LAND APPLICATION RATES • I. SAMPLE COLLECTION A. Liquid Manure Slurry - -- - _- -- - - -- - I. Under -slotted -floor pit a. Use a length of 1/2" conduit open on one end and that can be easily sealed on the other end (e.g., by placing one's thumb over the end of the conduit). b. With both ends of the conduit open, extend it into the manure to the pit floor. c. Seal the upper end of the conduit trapping the manure that has entered the lower end, remove and empty into a bucket or container. c. Collect samples from at least 5 locations or at least enough for a total of 1 quart of slurry. e. Thoroughly mix this slurry and empty approximately 1/2 pint into sample container. 2. Exterior storage basin or tank a. Make .sure the manure has been welt mixed or homogenized with a liquid manure chopper -agitator pump or propeller agitator. b. Take samples from approximately 5 locations in the pit, from the agitator pump, or from the manure spreader and place.in a bucket. C. Thoroughly mix and empty l/2 pint into sample container. II. SAMPLE PREPARATION AND TRANSFER - A. Place the sample .for analysis into a-fleA ble or expandable container that can be sealed.- The container should. -be -rinsed- clean with- water - and- free -- of any residues but should not•be chlorinated or treated in any other way. Dry litter may also be placed. in a sealed plastic bag such -as a_-freezer_.bag,...- -S_ The sample should be refrigerated-,• iced` or cooled; if possible, or trans .fermd 'to the lab�immedlateiy _ C. Hand -delivery is the.most reliable way of.sample`transfer, but - it can also.' be ma lad. D. If mailed, sample container -should first, be protected with a. packing•,mater�i,al _ such as newspaper,`then'.boxed or packaged with wrapping paper and taped':'` E. The NCDA Plant Analysis Lab -provides this service for a nominal fee of $4 per sample which should be.forwarded-along -with the sample. PSWCD 1 1. Address: N. C. Department of Agriculture Plant Analysis Lab —Agronomic Div-ision �---- - � — Slue Ridge Road Center Raleigh, NC 27611 Ph: (919) 733-2655 Attn: Dr. Ray Campbell F. Request that as a minimum the following analyses be performed: 1. Total nitrogen (TKN) 2. Ammonia nitrogen (NFI N) 3. Total phosphorus (TP 4. Potassium .(K) 5. Dry litter samples should also include a total solids (TS) analysis. G. Other analyses performed at no extra cost by NCDA include trace minerals. PSWCD 2 I. SAMPLE COLLECTION B. Lagoon Liquid 1. Ceihect approximately 1%2 pint of recycled lagoon liquid from the inflow pipe to the flush tanks. 2. From lagoon a. Place a small bottle (1/2 pint or Iess) on the end of a 10-15 foot long pole. b. Extend 'the bottle 10-15 feet away from the bank edge. c. Brush away any floating scum or debris so it is not collected with sample. d. Submerge the bottle within 1 foot of the liquid surface. e. Repeat at approximately 5 locations around the lagoon, place into a bucket, thoroughly mix, and empty 1 pint into sample container. 3. From a multi --stage lagoon system collect sample from lagoon that is going to be irrigated from. _ II. SAMPLE PREPARATION AND TRANSFER A. Place the sample for analysis into a flexible or expandable container that can be sealed. The container'. should -be rinsed clean -with water and free of any residues but should no� be chlorinated or treated -in any other way. Dry litter may also be placed �i6. a sealed plastic bag such as a freezer bag. B. The sample should be refrigerated; iced 'or coaled, if'possible, or trans- ferred -to the lab immediately. -Cl.- -Hand--delivery is" the most reliable way. of -'sample -transfer, but it can also - -- - be -mailed-: - D. If.. -mailed, sample container, should .firs,t,be protected with a-packing_material sack as. news Paper, then bpxe&or.pacicaged-with,wrappi��9 paper an taped. = E: The:NCQA= Plant Analysis -Lab provides`°this°ser:v.ice ,for;a. nominal fee of ;$4'per sample which should be, forwarded-along.with- the -sample. 1. Address: N. C. Department of Agriculture Plant-;.Analysis�-Lab�_. Agronomic Division , Blue Ridge Road .dike_ - - Raleigh; NC- 27611 713 .".ttn:- ,Qr., ;°ay. CampbeI l - PSWCD 2 F. Request that as a minimum the following analyses be performed 1. Total nitrogen (TKH) -2.--_:Ammonia=-ni°trogen---Wt-! 3 W°) 3. Total phosphorus 4. Potassium (K) 5. Dry litter samples should also include a total solids (TS) analysis. G. Other analyses performed at no extra cost by NCDA include trace minerals. '. . •iPl-Mt-FOyXsI01D I INCH „1 O7H IINE HEAVV, ter/ % I .. ■ ■ ■ ■■aa®� ■■■.■Ws■■■M®® ■®av� ®�aa � � as ■ aaa.®.®®®®®®■■■a �..�.�!®�I■�I®®®iA®®®®■■ a aaaa��a®S00®a®®®da®a ■■® ®®. ®■■®■■®_ON PIN B a e■a■■■■aa1®®a®aa■f■ ■■XH■■■e■■®■a■E■%�ea ■■ seas'..■®®����� ®■ Name ME ®■mom1� M ® .. a!!IEEE ■■ s■ ■■ ■a a■ ■ n .. ■� a �_g ■ ii■■�■�®®®ia®■® ■� �I'r ®■ I a o■° a _��NEW .■®a. as �:®®C:S� as ■a ®■� ■■ ■®tea ., ■ ■■ aslow1010 ON a a �' �® aaa■m■■■■.� INN ■ _ ■� _ ■ ■ "aiaa� m WE a WIMMM ■ mom aC C _ all ea® sRN PUNEMS1 ■■®®C .. ram® aasso MMaao o � .laa ■:�■ru..�■��11rr:_>�fs,!�r»r:r�.�.n��p S m "�"■ SWINE FARM WASTE MANAGEMENT ODOR CONTROL CHECKLIST Source Cause BMP's to Minimize Odor Site Specific Practices Farmstead Swine production egetative or wooded buffers; eecmmended best management practi s; od judgment and common sense Animal body surfaces Dirty manure -covered animals (} Dry.floors ff , Floor surfaces Wet manure covered floors floors; (' /Igsted { aterers located over slotted floors;- { seders at high and of solid floors; {seer a a manure buildup from floors; ( derfloor ventilation for drying Manure -collection pits Urine (,kllraquent manure removal by flush;pit r harge,or scrape Parital micorbial decom osition. _ Un erfloor_ventilation Ventilationexhaust fans Volatile gases; t Fan iritenance; Dust ( ficien movement Indoor surfaces Dust (ashdown between groups of animals { } Feed additives; [ } Feeder covers; () Feed delivery downspout extenders to feeder covers Flush tanks Agitation of recycled lagoon ( ) Flush tank covers liquid whiles tanks are filling f ) Extend fill lines to near bottom of tanks wi anti -siphon vents , Flush alleys Agitation during wastewater (nderfloor flush with underfloor conveyanance ventilation ' Pit recharge points Agitation of recycled lagoon { ) Extend rechard lines.to near bottom of liquid while pits are filling pits with anti,siphon vents Lift stations Agitation during sump tank filling () Sump tank covers and drawdown Outside drain collection Agitation during wastewater { } Box covers or junction boxes conveyance End of drainpipes at lagoon Agitation during wastewater (► Extend discharge point of pipes undefneath lagoon liquid level Lagoon surfaces Volatile gas emissions j }dsro r lagoon liquid capacity Biological mixing ( ct lagoon startup procedures Agitation {)�Zinim surface area -to -volume ratio ) agitation when pumping ( ) Mechanical aeration [ I Proven biological additives Irrigation sprinkler nozzles High pressure agitation Wrrn a on dry days with little or no wind Wind draft { in um recommended operation pressure { ump intake near lagoon liquid surface ( ) Pump from second -stage lagoon AMOC--November 11, 1996 - Storage tank or basin Partial microbial decomposition I } Bottom or midlevel loading surface Mixing while filling { } Tank covers Agitation when emptying f } Basin surface mats of solids (} Proven biological additives or oxidants - N —Settling basin surface Partial micobial decomposition O Extend drainpipe outlets underneath liquid . Mixing while filling level j ` g' A station when emptying (}.Rem va settled solids regularly Manure, slurry or sludge Agitation,wheri spreading ( ,' njection of slurry/sludges ::-spreader outlets Volatile gas emissions ash residual manure from spreader after use .{) Proven biological additives or oxidants -Uncovered manure, slurry ,, Volatile.gas_emissions while drying { o' fection of slurry/sludges or sludge on field surfaces ;a Soil' orporation within 48 hours," Dread in thin uniform layers for rapid drying - (} Prove,�>ological additives or oxidants Dead animals Dead animal disposal pits Carcass decomposition ( _ oper disposition of carcasses Carcass decomposition () Complete covering of carcasses in burial pits. (► Proper location/construction of disposal pits Incinerators Incomplete combustion (} Second slack burners ..Standing water around Improper drainage U,2Y*._de and landscape such that water drains facilities Microbial decomposition of away fr facilities organic matter Manure tracked onto public Poorly maintained access roads ( arm access road maintenance roads from farm access Additional Information: Available From: Swine Manure Management; 0200, Rule/BMP Packet NCSU-County Extension Center Swine Production Farm Potential Odor Sources -and Remedies, EBAE Fact Sheet NCSU-BAE Swine Production Facility Manure Management: Pit Recharge --Lagoon Treatment; EBAE 128-88 NCSU-BAE ' Swine Production Facility Manure Management: Underfloor Fiuse-Lagoon Treatment; EBAE 129-88 NCSU-BAE Lagoon Desig and Management for Livestock Manure Treatment and Storage; EBAE 103-83 NCSU-BAE Calibration of Manure and Wastewater Application Equipment; EBAE Fact Sheet NCSU-BAE Controlling Odors from Swine Buildings; -PIH-33 NCSU-Swine Extension Environmental Assuranc Program: NPPC Manual NC Pork Produces Assoc Options for Managing Odor; a report from the Swine Odor -Task Force NCSU Agri Communications Nuisance Concerns in Animal Manure Management: Odors and Flies; PRO107, 1995 Conference Proceedings Florida Cooperative Extension The issues checked ( ) pertain to this operation. The landowner/integrator agrees to use sound judgment in applying odor control measures as practical. I certify the aforementioned odor control Best Managment Pr; AMOC--November 11, 1996 INSECT CONTROL CHECKLIST FOR ANIMAL OPERATIONS Source Cause SMP's to Minimize Odor Site Specific Practices (Liqui�stems) ' Flush Gutters Accumulation of solids lush system is designed and operated sufficiently to remove accumulated salds om putters as designed. ave bridging of accumulated solids at discharge' Lagoons and flits Crusted Solids ( aintain lagoons, settling basins and N pits where pest breeding is apparent to minimize the crusting of solids to adepth of no rri" a than 6-8 inches over more than . 30 f surface. Excessive Vegetative Decaying vegetation EWaintain vegetative control along banks of Growth lagoons and other impoundments to prevent - accumulation of decaying vegetative matter along water's edge on impoundment's perimeter. (Dry Systems) Feeders Feed Spillage {) Design, operate and maintain feed systems (e.g., bunkers and troughs) to minimize the accumulation of decaying wastage. O Clean up spillage on a routine basis (e.g. 7-10 day interval during summer; 15-30 day interval during winter). Feed Storage Accumulations of feed residues Animal Holding Areas Accumulations of animal wastes and feed wastage AMIC--November 11, 1996 () Reduce moisture accumulation within and around immediate perimeter of feed storage areas by insuring drainage away from site and/or providing adequate containment (e.g., covered bin for brewer's grain and similar high moisture grain products). (} Inspect for and remove or break up accumulated solids in filter strips around feed storage as needed. () Eliminate low area that trap moisture along fences and other locations where waste accumulates and and disturbance by animals is minimal. ' O Maintain fence rows and filter strips around animal holding areas to minimize accumulations of wastes (i.e. inspect for and remove or break up accumulated solids as needed). Dry Manure Handling Accumulations of animal wastes { } Remove spillage on a routine basis (e.g. 7-10 day Systems interval during summer; 15-30 days interval during winter) where manure is loaded for land application or disposal. ( ) Provide for adequate drainage around manure stockpiles. ( ) inspect for and remove or break-up accumulated wastes in filter -stripes around stockpiles and manure handling areas. as.needed. - .... _ .., . _... _ .. _ Theiissi.ies`UF ricked'{ ):pertain -to this operation. The landvnerlintegrator agrees to. use sound judgment in applying insect control measures as practical. certify the aforementioned insect control Best Management Practices have been reviewed with me. (Landowner Signalbre) ` &C'G� 7'C (Farm Name) (Facility Number) For more information contact the Cooperative Extension Service, Department of Entomology, Box 7fi13,.North Carolina -State University, Raleigh,.NC 27695-7613. AMIC—November 11, 1996 MORTALITY MANAGEMENT METHODS (check which method(s) are being implemented) { a Burial three _feet beneath the surface of the ground within 24 hours .-after knowledge of the _death. The burial beat least 300 feet from any -flowing steam or=.public body of water. (LT Rendering at a rendering.plant licensed under G. S: 106-168.7 (. y Complete incineration { ) In the case of dead poultry only, placing in a disposal pit of a size and design approved by the Department of Agriculture. ( y Any method which in the professional opinion of the State Veterinarian would make possible the salvage of part of a dead animal's value without endangering human or animal health.' (Written approval of the State Veterinarian must be attached) • ' EMERGENCY ACTION PLAN PHONE NUMBERS DIVISION OF WATER QUALITY (DWQ) EMERGENCY MANAGEMNET SERVICES (EMS) SOIL AND WATER CONSERVATION DISTRICT (SWCD) NATURAL RESOURCES CONSERVATION SERVICE (NRCS) COOPERATIVE EXTERSION SERVICE (CES) (910)395-3900 (910)296-2160 (910)296-2120 (910)296-2121 (910)296-2143 This plan will be implemented in the event that wastes from your operation are leaking, overflowing or running off site. You should not wait until wastes reach surface waters or leave you property to consider that you have a problem. You should make every effort to ensure that this does not happen. This plan should be posted in an accessible location for all employees at the facility. The following are some action items you should take. 1. Stop the release of wastes. Depending on the situation, this may ore may not be possible. Suggested responses to some possible problems are listed belwo. A. Lagoon overflow -possible solutions are: a. Add soil to berm to increase elevation of dam. b. Pump wastes to fields at an acceptable rate. c. Stop all flows to the lagoon immediately. d. Call a pumping contractor. e. Make sure no surface water is entering lagoon. B. Runoff from waste application field -actions include: a. Immediately stop waste application. b. Create a temporary diversion to contain waste. c. Incorporate waste to reduce runoff. d. Evaluate and eliminate the reason(s) that cause the runoff. e. Evaluate the application rates for the fields where runoff occurred. C. Leakage from the waste pipes and sprinklers -action include: a. Stop recycle pump. b. Stop irrigation pump. c. Close valves to eliminate further discharge. d. Repair all leaks prior to restarting pumps. D. Leakage from flush systems, houses, solid separators -action include: a. Stop recycle pump. b. Stop irrigation pump. c. Make sure siphon occurs. d. Stop all flows in the house, flush systems, or solid separators. E. Leakage from base or sidewall of lagoon. Often this is seepage as opposed to flowing leaks -possible action: a. Dig a small sump or ditch from the embankment to catch all seepage, put in a submersible pump, and pump back to lagoon. b. -If holes are caused by burrowing animals, trap or remove animals and fill ' holes and compact with a clay type soil. c. Have a professional evaluate the condition of the side walls and lagoon bottom as soon as possible. 1 2. Assess the extent of the spill and note any obvious damages. a. Did the waste reach any surface waters? b. Approximately how much was released and for what duration? c. Any damage notes, such as employee injury, fish kills, or property damage? d. Did the spill leave the property? e. Does the spill have the potential to reach surface waters? f. Could a future rain event cause the spill to reach surface waters? g. Are potable water wells in danger (either on or off the property)? h. How much reached surface waters? 3. Contact appropriate agencies. a. During normal business hours call your DWQ regional office; Phone - -. After hours, emergency number: 919-733-3942. Your phone call should include: your name, facility number, telephone number, the details of the incident from item 2 above, the exact location of the facility, the location or direction of movement of the spill, weather and wind conditions. The corrective measures that have been under taken, and the seriousness of the sitution. b. If spill leaves property or enters surface waters, call local EMS phone number. c. -Instruct EMS to contact local Helath Department. d. Contact CEs, phone number - , local SWCD office phone number - -, and local NRCS office for advice/technical assistance phone number - -. 4. If none of the above works call 911 or the Sheriff's Department and explain you problem to them and ask the person to contact the proper agencies for you. 5. Contact the contractor of your choice to begin repair or problem to minimize off - site damage. a. b. C. Contractors Name: Contractors Address: Contractors Phone: 6. Contact the technical specialist who certified the lagoon (NRCS, Consulting Engineer, etc.) a. Name: b. Phone: 7. Implement procedures as advised by DWQ and technical assistance agencies to rectify the damage, repair the system, and, reassess the waste managment plan to keep problems with release of wastes from happening again. 2 OPERATION & MAINTENANCE PLAN Proper lagoon liquid management should be a year-round priority. It is especially important to manage levels so that you do not have problems during extended rainy and wet periods. Maximum storage capacity should be available in the Iagoon for periods when the receiving crop is dormant (such as wintertime for bermudagrass) or when there are extended rainy spells such as the thunderstorm season in the summertime. This means that at the first signs of plant growth in the later winter/early spring, irrigation according to a farm waste management plan should be done whenever the land is dry enough to receive lagoon liquid. This will make storage space available in the lagoon for future wet periods. In the late summer/early fall the lagoon should be pumped down to the low marker (see Figure 2-1) to allow for winter storage. Every effort should be made to maintain the lagoon close to the minimum liquid level as long as the weather and waste utilization plan will allow it. Waiting until the lagoon has reached its maximum storage capacity before starting to irrigate does not leave room for storing excess water during extended wet periods. Overflow from the lagoon for any reason except a 25-year, 24-hour storm is a violation of state law and subject to penalty action. ` The routine maintenance of a lagoon involves the following: Maintenance of a vegetative cover for the dam. Fescue or common bermudagrass are the most common vegetative covers. The vegetation should be fertilized each year, if needed, to maintain a vigorous stand. The amount of fertilizer applied should be based on a soils test, but in the event that it is not practical to obtain a soils test each year, the lagoon embankment and surrounding areas should be fertilized with 800 pounds per acre of 10-10-10, or equivalent. Brush and trees on the embankment must be controlled. This may be done by mowing, spraying, grazing, chopping, or a combination of these practices. This should be done at least once a year and possibly twice in years that weather conditions are favorable for heavy vegetative growth. NOTE: If vegetation is controlled by spraying, the herbicide must not be allowed to enter the lagoon water. Such chemicals could harm the bacteria in the lagoon that are treating the waste. Maintenance inspections of the entire lagoon should be made during the initial filling of the lagoon and at least monthly and after major rainfall and storm events. Items to be checked should include, as a minimum, the following: Waste Inlet Pipes, Recycling Pipes, and Overflow Pipes ---Nook for: I . separation of joints 2. cracks or breaks 3. accumulation of salts or minerals 4. overall condition of pipes Lagoon surface ---look for: 1, undesirable vegetative growth 2. floating or lodged debris Embankment ---look for: 1. settlement, cracking, or "jug" holes 2. side slope stability ---slumps or bulges 3. wet or damp areas on the back slope 4. erosion due to lack of vegetation or as a result of wave action 5. rodent damage Larger lagoons may be subject to liner damage due to wave action caused by strong winds. These waves can erode the lagoon sidewalls, thereby weakening the lagoon dam. A good stand of vegetation will reduce the potential damage caused by wave action. If wave action causes serious damage to a lagoon sidewall, baffles in the lagoon may be used to reduce the wave impacts. Any of these features could lead to erosion and weakening of the dam. If your lagoon has any of these features, you should call an appropriate expert familiar with design and construction of waste lagoons. You may need to provide a temporary fix if there is a threat of a waste discharge. However, a permanent solution should be reviewed by the technical expert. Any digging into a lagoon dam with heavy equipment is a serious undertaking with potentially serious consequences and should not be conducted unless recommended by an appropriate technical expert. Transfer Pumps ---check for proper operation of: 1. recycling pumps 2. irrigation pumps Check for leaks, loose fittings, and overall pump operation. An unusually loud or grinding noise, or a large amount of vibration, may indicate that the pump is in need or repair or replacement. NOTE: Pumping systems should be inspected and operated frequently enough so that you are not completely "surprised" by equipment failure. You should perform your pumping system maintenance at a time when your lagoon is at its low level. This will allow some safety time should major repairs be required. Having a nearly full lagoon is not the time to think about switching, repairing , or borrowing pumps. Probably, if your lagoon is full, your neighbor's lagoon is full also. You should consider maintaining an inventory of spare parts or pumps. Surface water diversion features are designed to carry all surface drainage waters (such as rainfall runoff, roof drainage, gutter outlets, aE►u parking lot runoff) away from your lagoon and other waste treatment or storage structures. The only water that should be coming from your lagoon is that which comes from your flushing (washing) system pipes and the rainfall that hits the lagoon directly. You should inspect your diversion system for the following: 1. adequate vegetation 2. diversion capacity 3. ridge berm height Identified problems should be corrected promptly. It is advisable to inspect your system during or immediately following a heavy rain. If technical assistance is needed to determine proper solutions, consult with appropriate experts. You should record the level of the lagoon just prior to when rain is predicted, and then record the level again 4 to 6 hours after the rain (assumes there is no pumping). This will give you an idea of how much your lagoon level will rise with a certain rainfall amount (you must also be recording your rainfall for this to work). Knowing this should help in planning irrigation applications and storage. If your lagoon rises excessively, you may have an inflow problem from a surface water diversion or there may be seepage into the lagoon from the surrounding land. Lagoon Operation Startup: Immediately after construction establish a complete sod cover on bare soil surfaces to avoid erosion. 2. Fill new lagoon design treatment volume at least half full of water before `waste loading begins, taking care not to erode lining or bank slopes. 3. Drainpipes into the lagoon should have a flexible pipe extender on the end of the pipe to discharge near the bottom of the lagoon during initial filling or another means of slowing the incoming water to avoid erosion of the lining. 4. When possible, begin loading new lagoons in the spring to maximize bacterial establishment (due to warmer weather). 5. It is recommended that a new lagoon be seeded with sludge from a healthy working swine lagoon in the amount of 0.25 percent of the full lagoon liquid volume. This seeding should occour at least two weeks prior to the addition of wastewater. 6. Maintain a periodic check on the lagoon liquid pH. If the pH falls below 7.0, add agricultural lime at the rate of 1 pound per 1000 cubic feet of lagoon liquid volume until the pH rises above 7.0. Optimum lagoon liquid PH is between 7.5 and 8.0. 7. A dark color, lack of bubbling, and excessive odor signals inadequate biological activity. Consultation with a technical specialist is recommended if these conditions occur for prolonged periods, especially during the warm season. Loading: The more frequently and regularly that wastewater is added to a lagoon,. the better the lagoon will function. Flush systems that wash waste into the lagoon several times daily are optimum for treatment. Pit recharge systems, in which one or more buildings are drained and recharged each day, also work well. • Practice water conservation ---minimize building water usage and spillage from leaking waterers, broken pipes and washdown_ through proper maintenance and water conservation. Management: Minimize feed wastage and spillage by keeping feeders adjusted. This will reduce the amount of solids entering the lagoon Maintain lagoon liquid level between the permanent storage level and the full temporary storage level. Place visible markers or stakes on the lagoon bank to show the minimum liquid level and the maximum liquid lever (Figure 2-1). Start irrigating at the earliest possible date in the spring based on nutrient requirements and soil moisture so that temporary storage will be maximized for the summer thunderstorm season. Similarly, irrigate in the late summer/early fall to provide maximum lagoon storage for the winter. The lagoon liquid level. should never be closer than 1 foot to the lowest point of the dam or embankment. Do not pump the Iagoon liquid level lower that the permanent storage level unless you are removing sludge. Locate float pump intakes approximately 18 inches underneath the liquid surface and as far away from the drainpipe inlets as possible. Prevent additions of bedding materials, long-stemmed forage or vegetation, molded feed, plastic syringes, or other foreign materials into the lagoon. Frequently remove solids from catch basins at end of confinement houses or wherever they are installed. Maintain strict vegetation, rodent, and varmint control near lagoon edges. Do not allow trees or large bushes to grow on lagoon dam or embankment. Remove sludgd from the lagoon either when the sludge storage capacity is full or before it fills 50 percent of the permanent storage volume. If animal production is co be terminated, the,owner is responsible for - - obtaining and -implementing a closure plan �6-eliminate�the possibility pollutant discharge. Sludge Removal: Rate of Neon sludge buildup can be reduced by: proper lagoon sizing, mechanical solids=separation of flushed waste, gravity settling of flushed waste solids in an appropriately designed basin, or minimizing feed wastage and spillage. Lagoon sludge that is removed annually rather than stored long term will: have more nutrients, have more odor, and require more land to properly use the nutrients. Removal techniques: Hire a custom applicator. Mix the sludge and lagoon liquid with a chopper -agitator impeller pump through large -bore sprinkler irrigation system onto nearby cropland; and soil incorporate. Dewater the upper part of lagoon by irrigation onto nearby cropland ot- forageland; mix remaining sludge; pump into liquid sludge applicator; haul and spread onto cropland or forageland; and soil incorporate. Dewater the upper part of lagoon by irrigation onto nearby cropland or forageland; dredge sludge from lagoon with dragline or sludge barge; berm an area beside lagoon to receive the sludge so that liquids can drain back into lagoon; allow sludge to dewater; haul and spread. with manure spreader onto cropland or forageland; and soil incorporate. Regardless of the method, you must have the sludge material analyzed for waste constituents gust as you would your lagoon water. - The sludge will contain different nutrient and metal values from the liquid. The application of the sludge to fields will be limited by these nutrients as well as any previous waste applications to that field and crop requirement. Waste application rates will be discussed in detail in Chapter 3. When removing sludge, you must also pay attention to the liner to prevent damage. Close attention by the pumper or drag -line operator will ensure that the lagoon liner remains intact. If you see soil material or the synthetic liner material being disturbed,.you should stop the activity immediately and not resume until you are sure.that the sludge can be removed without liner injury. If the liner is damaged it must be repaired as soon as possible. Sludge removed from the lagoon has a much higher phosphorus and heavy metal content than liquid. Because of this it should probably be applied to.land with low. phosphorus • - and metal levels, as indicated by a soil test, and incorporated to reduce the chance of erosion. Note that if the sludge is applied to fields with very high soil -test phosphorus, it should be applied only at rates equal to the crop removal of phosphorus. As. with other wastes, always have your lagoon sludge analyzed -for its nutrient value. The application .of sludge will increase the amount of odor at the waste application site. Extra precaution should be used to observe the wind direction and other conditions which could increase the concern of neighbors. r Possible Causes of Lagoon Failure Lagoon failures result in the unplanned discharge of wastewater from the structure. Types of failures include leakage through the bottom or sides, overtopping, and breach of the dam. Assuming proper design and construction, the owner has the responsibility for ensuring structure safety. Items which may lead to lagoon failures include: Modification of the lagoon structure ---an example is the placement of a pipe in the dam without proper design and construction. (Consult an expert in lagoon design before placing any pipes in dams.) Lagoon liquid levels ---high levels are a safety risk. Failure to inspect and maintain the dam. Excess surface water flowing into the lagoon. Liner integrity ---protect from inlet pipe scouring, damage during sludge removal, or rupture from lowering lagoon liquid level below groundwater table. ` NOTE: If lagoon water is allowed to overtop the dam, the moving water will soon cause gullies to form in the dam. Once this damage starts, it can quickly cause a large discharge of wastewater and possible dam failure. r System Calibration Information presented in manufacturer's charts are based on average operation conditions with relatively new equipment. Discharge rates and application rates change over time as equipment gets older and components wear. In particular, pump wear tends to reduce operating pressure and flow. With continued use, nozzle wear results in an increase in the nozzle opening which will increase the discharge rate while decreasing the wetted diameter. You should be aware that operating the system differently than assumed in the design will alter the application rate, diameter of coverage, and subsequently the application uniformity. For example, operating the system with excessive pressure results in smaller droplets, greater potential for drift, and accelerates wear of the sprinkler nozzle. Clogging of nozzles can result in pressure increase. Plugged intakes or crystallization of mainlines will reduce operating pressure. Operating below design pressure greatly reduces the coverage diameter and application uniformity. For the above reason, you should calibrate your equipment on a regular basis to ensure proper application rates and uniformity. Calibration at least once every three years is recommended. Calibration involves collecting and measuring flow at several locations in the application area. Any number of containers can be used to collect flow and determine the application rate. Rain gauges work best because they already have a graduated scale from which to read the application amount without having to perform additional calculations. However, pans, plastic buckets, jars, or anything with a uniform opening and cross-section can be used provided the liquid collected can be easily transferred to a scaled container for measuring. For stationary sprinklers, collection containers should be located randomly throughout the application area at several distances from sprinklers. For traveling guns, sprinklers should be located along a transect perpendicular to the direction of pull. Set out collection containers 25 feet apart along the transect on both sides of the gun cart. You should compute the average application rate for all nonuniformity of the application. On a windless day, variation between containers of more than 30 percent is cause for concern. You should contact your irrigation dealer or technical specialist for assistance. `Reprinted for Certification Training for Operations of Animal Waste Management Systems Manual WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS 1.y Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste which reaches surface water is prohibited. 2. There must be documentation in the design folder that the producer either owns or has an agreement for use of adequate land on which to properly apply the waste. If the producer does not own adequate land to properly dispose of waste, he/she shall provide a copy of an agreement with a landowner who is within a reasonable proximity, allowing him/her the use of the land for waste application. It is the responsibility of the owner of the facility to secure an update of the Waste Utilization Plan when there is a change in the operation, increase in the number of animals, method of utilization, or available land. 3. Animal waste shall be applied to meet, but not exceed, the nitrogen needs for realistic crop yields based on soil type, - available moisture, historical data, climatic conditions, and level of management, unless there are regulations that restrict the rate of application for other nutrients. 4. Animal waste shall be applied to land eroding less than 5 tons per acre per year. Waste may be applied to land that is eroding at 5 or more tons, but less than 10 tons per acre per year providing grass filter strips are installed where runoff leaves the field. (See FOTG Standard 393 -Filter Strip) 5. Odors can be reduced by injecting the waste or disking after waste application. Waste should not be applied when there is danger of drift from the irrigation field. 6. When, animal waste is to be applied on .acres subject to - flooding, it will be soil incorporated on conventionally tilled cropland. When applied to conservation tilled crops or grasslairid,'the-waste may be broadcast provided the application does not occur during a season prone to flooding. (See "Weather' and Climate in North Carolina" for guidance.) 7. Liquid waste shall be applied at rates not°to exceed -the soil, infiltration rate such that runoff does not occur offsite or to surface waters _g and in a method which ,does ,nat _cause drift -from- ..- theTsite durinapplication. No ponding should occur in order to control odor or flies 8. Animal waste shall not be applied to saturated soils, during rainfall events, or when the surface is frozen. 9.'Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to a depth that would inhibit growth. The potential for salt damage from animal waste should also be considered. Page: 8 WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS 10. Waste nutrients shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Waste nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of the crop or forages breaking dormancy. 11. Any new swine facility sited on or after October 1, 1995 shall comply with the following: The outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and from any perennial stream or river (other than an irrigation ditch or canal. Animal waste other than swine waste from facilities sited on or after October 1, 1995), shall not be applied closer than 25 feet to perennial waters. (See Standard 393 - Filter Strips). 12. Animal waste shall not be applied closer than 100 feet to wells. 13. Animal waste shall not be applied closer than 200 feet of dwellings other than those owned by the landowner. 14. Waste shall be applied in a manner not to reach other property and public right-of-ways. 15. Animal waste shall not be discharged into surface waters, drainageways, or wetlands by a discharge or by over -spraying. Animal waste may be applied to prior converted cropland provided they have been approved as a land application site by a "technical specialist". Animal waste shall not be applied on grassed waterways -that discharges directly into water -courses,____ and on other grassed waterways, waste shall be applied at agronomic rates in a manner that causes no runoff or drift from the site. - 16. Domestic and industrial waste -from washdown-.facilities, showers, toilets, sinks, etc.,'shall not be discharged into the animal waste management system. 17. A protective cover_ of _appropriate vegetation .will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). Areas shall be fenced, as necessary, to protect the vegetation. Vegetation such as trees, shrubs, and. other woody species, etc., are limited to areas where considered . appropriate. Lagoon areas should be kept mowed and accessible. Berms and structures should be inspected regularly for evidence of erosion,'leakage or discharge. Page: 9 r WASTE TTTILIZATION 'PLAN REQUIRED SPECIFICATIONS 18.'If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge, pollution and erosion. 19. Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, leaks, and spills. A regular maintenance checklist should be kept on site. 20. Animal waste can be used in a rotation that includes vegetables and other crops for direct human consumption. However, if animal waste is used on crops for direct human consumption it should only be applied preplant with no further applications of animal waste during the crop season. 21. Highly visible markers shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume) of, _ all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume for waste storage ponds. 22. Waste shall be tested within 60 days of utilization and soil shall be tested at least annually at crop sites where waste products are applied. Nitrogen shall be the rate - determining element. Zinc and copper levels in the soils shall be monitored and alternative crop sites shall be used when these metals approach excessive levels. pH shall be adjusted for optimum crop production and maintained. Soil and waste analysis records shall be kept for five years. Poultry dry waste application records shall be maintained for three -(3) __years. Waste application_ records for .all.- other- waste shall be maintained for five (5) years. 23. Dead animals will be disposed of in a manner that meets North Carolina regulations. - Page: 10 ANIMAL WASTE UTILIZATION PLAN WASTE UTILIZATION PLAN AGREEMENT Name,of Farm:TRIPLE J. FARMS INC. Owner/Manager Agreement I (we) understand and will follow and implement the specifications and the operation and maintenance procedures established in the approved animal waste utilization plan for the farm named above. I (we) know that any expansion to the existing design capacity of the waste treatment and storage system or construction of new facilities will require a new certification to be submitted to the North Carolina Division of Water Quality (NCDWQ) before the new animals are stocked. I (we) also understand that there must be no discharge of animal waste from this system to surface waters of the state from a storm event less severe than the 25-year, 24-hour storm. The approved plan will be filed on -site at the farm office and at the office of the local Soil and Water Conservation District and will be available for review by NCDWQ upon request. Name of Facilit Owner: JOLANDA D. LANIER (Please print) Q I� Signature: Name of Mangq¢r (If different from owner) Signature:. Date: Name of Person Preparing Plan: (please print)JOHNNY L. LANIER Af£iliation:DUPLIN SOIL AND WATER CONSERVATION DISTRICT Phone No, 910-295-2120 " Address .(Agency): PO BOX 277 KENANSVILLE NC 28349 Signature: �� ` Date: Page: 11 a N r �.r:ryrt a AF22 • �` �'' FCed1FA,,r j READY AA AS Ac AD AE AF AG AH 9Head (wean to feeder)====_______=__-===µ-==} \pd 10Storage volume for sludge acc3_tm. (cu.'i-t. >_- > 0 11-lr,eatmerit Volume (min. 1 cu. ft. per 1b. )===> 1 TO CLEAR DESIGN: 121nside top length===========================> 204 \cd 131n5ide tap width===______________ __________> 317 14Top of dike at elevation==--=--=--=====-===-) 48- 60 TO QUIT W/O SAVE: \q 16Side Slopes====_____________________________) 2.8 1725 year- - 24 hour rairrfai1===----====-==-=--) 7.5 TO GOTO SEEDING: 18Bottom of lagoon at elevation===============> 36-20 \sr 19Total regUir-ed volume==============) 48933.0 4OTotal design volume available======) 5312696 TO PRINT SPECS: 21Design end pumping elevation================> 44.60 \pC- 22Min. required treatment volume=====> 330480 23Tr-•mt. vol. at end Pumping avail. === > .360370 TO PRINT O & M: 24Design start pumping elev.==================) 46.80 \po S'5Min. required perm. + temp. volume=> 49 2'378 �6Design vol. at start pumping avail.> 484302 TO GOTO WASTE U: SPREADSHEET I No mail 1 111:36am Tue May 4 F1-=Quit FE =Help F3=Menu F4=Cancel F5=Edit F6=Macro F7=Goto A bv i f f c ons f G k S l�fg3 . �a�goaH faokr J°�d, S►•►a(�_ ar�4- oK_ _N_W 4arMc� ofdrJrG - ACd1 f° fit rCJ 11aytd fa �CtGP Jvr�A4v Wa-�[r o✓�' d� ati.k��- lagooln. /jlir �..Q.l�cr _ _ ---. - -- -'- $0.10� /1L W1D�/� torFPl67c datOs ��� a��•�P` GDA�'rgafor . coyI.,+t! 7'3arJh lead;" Shl 13 r-� United States Sail _ Department of Conservation ` Agriculture Service OPERATOR: _ QQ� J.AKJ1PlZ Please review the attached plan and specifications carefully. Retain this plan for your use and records. It is strongly recommended that you, your contractor, -and Soil Conservation Service personnel are in agreement as to how the waste lagoon is to be constructed. The Soil Conservation Service personnel will meet with ail concerned parties and walk over the site to explain all flags and markings. It is important that everyone understand what is expected so that final construction meets plans and specification and the job can be certified for payment (if cost -sharing is involved). The pad dimensions and grades are the best estimate_ The BUILDER or CONTRACTOR is RESPONSIBLE for final layout and design of the pads. The Soii Conservation Service personnel will assist 7n a limited capacity, as its major concern is the proper design and construction of the waste treatment lagoon. a The actual. amount of material required for pads and'dam may vary from the estimates. The design will attempt to balance cuts and fills as close as possible. If additional material is required after construction is complete on the lagoon, the -contractor and owner will negotiate on the price and location of borrow area. } cu.ft. cu. ds. NOTE: Design Requirement: yg2189 = 113Z��Y Estimate of Excavation: cu.ft. = .lje.SGq cu.yds. Estimate of Pad E Dike: cu.ft. = - I IL#g2cu yds. y+ :J.p Ration 'Job_ Class Date' Designed By 64f US NaaVe Des i gti-Approval_ Name Date O The Soo Conservation Service is an agency at the Qevaninent of Agriculture Operator:Wayne\Joseph LanieCoLinty: Duplin Date: 09/2--0 32 Distance to nearest residence (ether-- than owner) 1000.17' feet 1. Sl-EAD'`r- S HTE LIFE WEIGHT * sows (farrow to finish) x 1417 lbs. = 0 1bs * sc.ws t a-r-r-ow to 'Feeder) x �_� 1b5. -- 17 lbs E448 head (finishing only) x 1ST lbs. - � 0480 lbs O sows (farrow to wean) x 433 lbs. = 0 lbs O head (wean to feeder,) x 30 lbs. = 0 1bs TOTAL STEADY SI-AI-E LIVE WEIGHT (SSLW) 330480 l bs 2. MINIMUM REQUIRED TREATMENT VOLUME OF LAGOON Volume = 330460 lbs. SSLW x Treatment Volume (CF) / lb. SSLW Treatment Volume (CF) /lb. SSLI�= 1 CF/lb. SSLW Volume = 3,,0480 cubic feet 3. STORAGE VOLUME FOR SLUDGE ACCUMULATION Volume = 0.0 `cubic feet Not computed at landowner's request Sludge will be removed as needed. 4. TOTAL DESIGN VOLUME Inside top length 315.0 feet ; Inside top width 200.0 feet Top of dike at elevation 48.5 feet Freeboard 1.0 feet ; Side slopes 3.0 : 1 (Inside lagoon) Total design lagoon liquid level at elevation 47.5 feet Bottom of lagoon elevation 36.5 feet Seasonal high water table elevation 0.0 feet Total design' volume usingSramoidal formula SS/END1 SS/END2 SS/SIDE1 SS/SIDES LENGTH WIDTH DEPTH _ 3.0 3.0 3.0 '3.0 309-0 - 194.0 11.0 - AREA OF TOP LENGTH * WIDTH = 309.0 194.0 59946.0 (AREA OF. TOR), . AREA OF BOTTOM LENGTH * WIDTH = 243.0 128.0 31104.0 (AREA OF BOTTOM) AREA OF MIDSECTION LENGTH WIDTH * 4 276. 0 161.0 177744.0 ( AREA OF MIDSECTION * 4 ) CU. FT. = [AREA TOP + (4*AREA MIDSECTION) + AREA BOTTOM] DEPTH/6 59946. 0 177744.0 31104.0 1.8 VOLUME OF LAGOON AT TOTAL DESIGN LIQUID LEVEL = 492789 CU. FT.