Loading...
HomeMy WebLinkAbout310097_HISTORICAL_20171231PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 31-97 County: Du lin Facility Name: Billy Kilpatrick Farm Certified Operator Name: 8I11 11 atrick Operator Number. 19659 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Name/ID: Spillway(Y or N): Level(inches): Lagoon 9 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 n 13 2. Check all applicable items x Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. `Attach a complete schedule with corresponding animal units and dates fro depopulation 'if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 116/2014 I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the Information is accurate and correct. Phone: Fa ility Owner/Ma alter (print) Date: F cility Owner/ Manag signature) 910-290-1983 1/3/2014 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRJ24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: line m = 945.4 lb PAN 2. Structure ID: line m = lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n.lines 1+2+3+4+5+6= 945.41bPAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining IRR 2 PAN balance eWacre) L TOTAL PAN BALANCE FOR FIELo (lbs.) column r x a u. applicatlon window 1 Wheat 5.43 104.00 564.7 2 Small Grain 5.53 96.00 530.9 3 Small Grain 5.63 96.00 540.5 4 Small Grain 4.73 44.00 208.1 5 Small Grain 3.37 44.00 148.3 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 1992.5 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section 11) = 945.4 lb. PAN PoA (30 Day) 2121100 x. Crop's remaining PAN balance (line v from section 111) = 1992.5 lb. PAN y. Overall PAN balance (w - x) = -1047 lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Irrigation onto existing spray fields will continue as weather and field conditions permit. Additional land is available for pumping it needed. Pulls 2 and 3 Small Grain follows Millit and will be removed with haying practices. PoA (30 bay) 2121100 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/identifier (ID): 2. Current liquid volume in 25 yr./24 hr. storm storage 8 structural freeboard a. current liquid level according to marker 13.0 inches b. designed 25 yr./24 hr. storm & structural Freeboard 18.0 Inches c. line b - line a (inches in red zone) = 6.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 67500 ft e. line c/12 x line d x 7.48 gallonstW 252450 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 388800 ft h. current herd # 1400 certified herd # 2880 actual waste produced = current herd # x line g 189000 fe certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + I + j) x 7.48 x 30 daysiline f= 4. Total PAN to be land applied during draw down period 1. current waste analysis dated 6/24/2013 m. ((lines e + k)/1000) x line I REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21/00 39375 ft 284708 gallons 1.76 Ibs/1000 gal. 945.4 lbs. PAN s a Dfl�J ie Nutrient Management Plan For Animal Waste Utilization 04-11-2007 This plan has been prepared for: Billy Kilpatrick Farm 31-97 Billy Kilpatrick PO Box 94 Kenansville, NC 28349 f 910-296-0619 3 J �" This plan has been developed by: Bill Thomas NRCS Kenansville FO PO Box 219 Kenansville, NC 28349 (910) 296-2120 -f J) l Developer Signature Type of Plan: Nutrient Management with Manure Only Owner/Manager/Producer Agreement Y (we) understand and agree to the specifications and the operation and maintenance procedures established in this nutrient management plan which includes an animal waste utilization plan for the farm named above. I have read and understand the Required Specifications concerning animal waste management that are included with this plan. Si ture (owner) Signature (manager or producer) LI-11-011 C i .- APR 0 6 2009 This plan meets the minimum standards and specifications of the U.S. Department of Agriculture - Natural Resources Conservation Service or the standard of practices adopted by the Soil and Water Conservation Commission. Plan Approved By: -P[j ! % Technical Specialist Signature Date IL --------------------------------------------------------------- 234263 Database Version 3.1 --------------------------------------------------------------------------- Date Printed: 04-11-2odKCEIVE Y( L?W9 QQUIFFR'PRC1TFr..Tnm . FCTION MAR 31 2nnq ' 1 Nutrients applied in accordance with this plan will be supplied from the following source(s): Commercial Fertilizer is not included in this plan. S7 Swine Feeder -Finish Lagoon Liquid waste generated 4,004,640 gals/year by a 4,320 animal Swine Finishing Lagoon Liquid operation. This production facility has waste storage capacities of approximately 180 days. Estimated Pounds of Plant Available Nitrogen Generated per Year Broadcast 9224 Incorporated 15 840 Injected 17445 Irrigated 10026 Max. Avail. PAN (lbs) * Actual PAN Applied (lbs) PAN Surplus/ Deficit (lbs) Actual Volume Applied (Gallons) Volume Surplus/ Deficit (Gallons) Year 1 10,026 13542 -3,516 5,409,244 -1,404,604 Year 2 10,026 17842 -7,816 7,126,993 -3,122,353 -----------------------,--S ---- -e-- ans ----sta--nda--rd ---sourc--- --e, ------ me--------s us- er---• de--fi-- --ned--sour------ce. -----------------------------------------•------------------ Note: In source cIDmU an * Max. Available PAN is calculated on the basis of the actual application method(s) identified in the plan for this source. 234263 Database Version 3.1 Date Printed: 04-11-2007 Source Page Page 1 of 1 Narrative Waste Plan is written based on wetted acre footprint. ------------------•------------------------------------------ --------------- - ---- - - - ----- 234263 Database Version 3.1 Date Printed: 04-11-2007 Narrative Page Page 1 of 1 The table shown below provides a summary of the crops or rotations included in this plan for each field. Realistic Yield estimates are also provided for each crop, as well as the crop's P205 Removal Rate. The Leaching Index (LI) and the Phosphorous Loss Assessment Tool (PLAT) Rating are also provided for each field, where available. If a field's PLAT Rating is High, any planned manure application is limited to the phosphorous removal rate of the harvested plant biomass for the crop rotation or multiple years in the crop sequence. Fields with a Very High PLAT Rating should receive no additional applications of manure. Regardless of the PLAT rating, starter fertilizers may be recommended in accordance with North Carolina State University guidelines or recommendations. The quantity of P205 applied to each crop is shown in the following table if the field's PLAT rating is High or Very High. Punned Crops Summary Tract Field Total Acres Useable Acres Plat Rating LI Soil Series Crop Sequence RYE P2O5 Removal (lbs/acre) Applied pbs/acre) 3186 10 6.93 6.93 Medium NIA Autryville Com, Grain 85 bu. 37 NIA Wheat, Grain 45 bu. 23 NIA Soybeans, Manured, Double Crop 25 bu. 20 N/A 3186 11 6.64 6.64 Medium N/A Autryville Corn, Grain 85 bu. 37 NIA Wheat, Grain 45 bu. 23 NIA Soybeans, Manured, Double Crop 25 bu. 20 NIA 3186 12 7.52 7.52 Medium NIA Autryville Corn, Grain 85 bu. 37 NIA Wheat, Grain 45 bu. 23 NIA Soybeans, Manured, Double Crop 25 bu. 20 NIA 3186 13 7.52 7.52 Medium NIA Autryville Corn, Grain 85 bu. 37 NIA Wheat, Grain 45 bu. 23 NIA Soybeans, Manured, Double Crop 25 bu. 20 NIA 3186 14 3.94 3.94 Medium NIA Autryville Corn, Grain 85 bu. 37 NIA Wheat, Grain 45 bu. 23 NIA Soybeans, Manured, Double Crop 25 bu. 20 NIA 3186 15 3.22 3.22 Medium NIA Autryville Corn, Grain 85 bu, 37 NIA Wheat, Grain 45 bu- 23 NIA Soybeans, Manured, Double Crop 25 bu. 20 N/A 3186 16 6.78 6.78 Medium 1 NIA Lynchburg Corn, Grain 125 bu. 55 NIA Wheat, Grain 55 bu. 28 NIA Soybeans, Manured, Double Crop 39 bu. 31 NIA 3186 17 63 6.30 Medium NIA Lynchburg Corn, Grain 125 bu. 55 NIA Wheat, Grain 55 bu. 28 NIA Soybeans, Manured, Double Crop 39 bu. 31 NIA 3186 18 6.30 6,30 Medium NIA Lynchburg Corn, Grain 125 bu. 55 NIA Wheat, Grain 55 bu. 28 NIA Soybeans, Manured, Double Crop 39 bu. 31 NIA 234263 Database Version 3.1 Date Printed 4/11/2007 PCS Page Page i of 3 NOTE: Symbol * means user entered data. I , , Planned Crops Summary Tract Field Total acres Useable Acres Plat Rating LI ' Soil Series Crop Sequence RYE P2O5 Removal (Ibs/acre) Applied (lbslacre) 3186. 19 6.78 6,78 Medium NIA Lynchburg Corn, Grain 125 bu. 55 NIA Wheat, Grain 55 bu. 28 NIA Soybeans, Manured, Double Crop 39 bu. 31 NIA 3829 1 5.43 5.43 Medium NIA Autryville Corn, Grain 85 bu. 37 NIP` Wheat, Crain 45 bu. 23 NIA Soybeans, Manured, Double Crop 25 bu. 20 N/A 3829 2 5.53 5.53 Medium NIA Norfolk Corn, Grain 115 bu. 51 NIA Wheat, Grain 60 bu. 30 NIA Soybeans, Manured, Double Crop 35 bu. 28 NIA 3829 3 5.63 5.63 Medium NIA Norfolk Corn, Grain 115 bu- 51 NIA Wheat, Grain L 60 bu- 30 NIA Soybeans, Manured, Double Crop 1 35 bu. 28 NIA 3829 4 4.73 4.73 Medium NIA Autryville Corn, Crain 85 bu. 37 N/A Wheat, Grain 45 bu. 23 N/A Soybeans, Manured, Double Crop 25 bu. 20 NIA 3829 5 3.37 3.37 Medium NIA Autryville Corn, Grain 85 bu. 37 NIA Wheat, Grain 45 bu. 23 N/A Soybeans, Manured, Double Crop 25 bu. 20 NIA 3829 6 3.86 3.86 Medium NIA Autryville Corn, Grain 85 bu. 37 NIA Wheat, Grain 45 bu. 23 N/A Soybeans, Manured, Double Crop 25 bu. 20 NIA 3829 7 3.04 3.04 Medium NIA Autryville Corn, Grain 85 bu. 37 NIA Wheat, Grain 45 bu. 23 NIA Soybeans, Manured, Double Crop 25 bu. 20 NIA 3629 8 2.10 2.10 Medium NIA Autryville Corn, Grain 85 bu. 37 NIA Wheat, Grain 45 bu. 23 NIA Soybeans, Manured, Double Crop 25 bu. 20 NIA 3829 9 2.43 2.43 Medium NIA Autryville Corn, Grain 85 bu. 37 NIA Wheat, Grain 45 bu. 23 NIA Soybeans, Manured, Double Crop 25 bu. 20 N/A PLAN TOTALS: 98.05 98.05 234263 Database Version 3.1 Date Printed 4/1112007 PCs Page Page 2 of 3 NOTE: Symbol " means user entered data. ;..LI..,...::r Poteiitral Leaching Technical Cniidance, :,r e Low potential to contribute to soluble None < 2 nutrient leaching below the root zone. Moderate potential to contribute to soluble Nutrient Management (590) should be planned. >— 2 & nutrient leaching below the root zone. <= 10 High potential to contribute to soluble Nutrient Management (590) should be planned_ Other conservation practices that improve the soils nutrient leaching below the root zone. available water holding capacity and improve nutrient use efficiency should be considered. Examples > 10 are Cover Crops (340) to scavenge nutrients, Sod -Based Rotations (328), Long -Term No -Till (778), and edge -of -field practices such as Filter Strips (393) and Riparian Forest Buffers (391). PIATln Amen da_ tron 0 - 25 Low No adjustment needed; N based application 25 - 50 Medium No adjustment needed; N based application 51 - 100 High Application limited to crop P removal > 100 Very High Starter P application only 234263 Database Version 3.1 Date Printed 4/11/2007 PCS Page Page 3 of 3 NOTB: Symbol ' means user entered data. The Waste Utilization table shown below summarizes the waste utilization plan for this operation. This plan provides an estimate of the number of acres of cropland needed to use the nutrients being produced. The plan requires consideration of the realistic yields of the crops to be grown, their nutrient requirements, and proper timing of applications to maximize nutrient uptake. This table provides an estimate of the amount of nitrogen required by the crop being grown and an estimate of the nitrogen amount being supplied by manure or other by-products, commercial fertilizer and residual from previous crops. An estimate of the quantity of solid and liquid waste that will be applied on each field in order to supply the indicated quantity of nitrogen from each source is also included. A balance of the total manure produced and the total manure applied is included in the table to ensure that the plan adequately provides for the utilization of the manure generated by the operation. Waste Utilization Table Year 1 'tract Field Source ID Soil Series Total Acres Use. Acres Crap RYE Applic. Period Nitrogen PA Nutrient Req'd (1bs/A) Comm. Fert. Nutrient Applied (lbslA) Res. (lbslA) Applic. Method Manure PA NutrientA pphed (lbs/A) liquid ManutcA pplied (acre) Solid Manure Applied (acre) Liquid Manure Applied (Field) Solid Manure Applied (Field) tons N N N N 1000 gal/A Tons 1000 gals 3186 10 S7 Autryville 6.93 6.93 Corn, Grain 85 bu. 2/15-6/30 104 0 20 lrrig. 84 33.55 0.00 232.52 0.00 3186 10 S7 Autryville 6.93 6.93 Wheat, Grain 45 bu. *911-4130 104 0 0 Irrig. 42 16.62 0.00 115.15 0.00 3186 11 S7 Autryville 6.64 6.64 Corn, Grain 85 bu. 2/15-6/30 104 0 20 Irrig. 84 33.55 0.00 222.79 0.00 3186 11 S7 Autryville 6.64 6.64 Wheat, Grain 45 bu. *911-4130 104 0 0 Irrig. 42 16.62 0.00 110,34 0.00 3186 12 S7 Autryville 7.52 7.52 Com, Grain 85 bu. 2115-6/30 104 0 20 brig. 84 33.55 0.00 252.32 0.00 3186 12 S7 Autryville 7.52 7.52 Wheat, Grain 45 bu. *9/1.4130 104 0 0 Irrig. 42 16.62 0.00 124.96 0.00 3186 13 S7 Autryville 7.52 7.52 Corn, Grain 85 bu. 2/15-6/30 104 0 20 Irrig. 84 33.55 0.00 252.32 0.00 3186 13 S7 Autryville 7.52 7.52 Wheat, Grain 45 bu. *9/1.4/30 104 0 0 Irrig. 42 16.62 0.00 12496 0.00 3186 14 S7 Autryville 3.94 3.94 Corn, Grain 85 bu. 2/15-6130 104 0 20 Irrig. 84 33.55 0.00 13220 0, 3186 14 S7 Autryville 3.94 3.94 Wheat, Grain 45 bu. *9/1-4/30 104 0 0 Irrig. 42 16.62 0.00 65.47 0.00 3186 15 S7 Autryville 3.22 3.22 Corn, Grain 85 bu. 2/15.6/30 104 0 20 Irrig. 84 33.55 0.00 108.04 0.00 3186 15 S7 Autryville 3.22 3.22 Wheat, Grain 45 bu. *9/1-4/30 104 0 0 Irrig. 42 16.62 0.00 53.51 0.00 3186 16 S7 Lynchburg 6.78 6.78 Corn, Grain 125 bu. 2/15-6/30 135 0 20 Irrig. 115 45.94 0.00 311,44 0.00 3186 16 S7 Lynchburg 6,78 6.78 Wheat, Grain 55 bu. *9/1-4/30 106 0 0 Irrig. 42 16.94 0.00 114.83 0.00 3186 17 S7 Lynchburg 6.30 6.30 Corn, Grain 125 bu. 2/15-6/30 135 0 20 Irrig. 115 45.94 0.00 289.40 0.00 3186 17 S7 Lynchburg 6.30 6.30 Wheat, Grain 55 bu. *911-4/30 106 0 0 Irrig. 42 16.94 0.00 106.7D - 0.00 234263 Database Version 3.1 Date Printed: 4/11/2007 WUT Page Page 1 of 5 Waste Utilization Table Year I Tract Field Source ID Soil Series Total Acres Use. Acres Crop RYE Applic. Period Nitrogen PA Nutrient Req'd (lbs/A) Comm. Fert. Nutrient Applied (lbs/A) Res. (lbs/A) Applic. Method Manure PA NutrientA pplied (lbs/A) Liquid ManureA pplied (acre) Solid Manure Applied (acre) Liquid Manure Applied (Field) Solid Manure Applied (Field) N N N N 1000 gal/A Tons 1000 gals tons 3196 18 S7 Lynchburg 6.30 6.30 Corn, Grain 125 bu. 2/15.6/30 135 0 20 brig. 115 45,94 0,00 289.40 0.00 3186 18 S7 Lynchburg 6,30 6.30 Wheat, Grain 55 bu. *911-4130 106 0 0 Irrig. 42 16.94 0.00 106.70 0.00 3186 19 S7 Lynchburg 6.79 6.78 Corn, Grain 125 bu. 2/15-6/30 135 0 20 Irrig. 115 45.94 0.00 311.44 0.00 3196 19 S7 Lynchburg 6.791 6.78 Wheat, Grain 55 bu. *9/1-4/30 106 0 0 Irrig. 42 16.941 0,00 114.83 0100 3829 1 S7 Autryville 5.43 5.43 Corn, Grain 85 bu. 2/15-6/30 104 0 20 Irrig. 84 33.55 0.00 182.19 O.0 3829 1 87 Autryville 5.43 5.43 Wheat, Grain 45 bu. *911-4/30 104 0 0 Irrig. 42 16.62 0.00 90.23 0.00 3829 2 S7 Norfolk 5.53 5,53 Corn, Grain 115 bu. 2/15-6/30 131 0 20 brig, Ill 44.34 0.00 245.14 0.00 3829 2 S7 Norfolk 5.53 5.53 Wheat, Grain 60bu. *9/1-4/30 125 0 0 Irrig. 50 19.97 0.00 110.45 0.00 3829 3 S7 Norfolk 5.63 5.63 Corn, Grain 115 bu. 2/15-6/30 131 D 1 20 Irrig, I Ill 44.34 0.00 249,62 0.00 3829 3 S7 Norfolk 5.63 5.63 Wheat, Grain 60 bu. *9/1-4130 125 0 0 brig. 50 19.97 0.00 112.44 0.00 3829 4 S7 Autryville 4.73 4.73 Corn, Grain 85 bu. 2/15-6/30 104 0 20 Irrig. 84 33.55 0.00 158.71 0.00 3829 4 S7 Autryville 4,73 4.73 Wheat, Grain 45 bu. *9/1-4/30 104 0 0 Irrig. 42 16.62 0,00 78.60 0.00 3829 5 S7 Autryville 3.37 3.37 Corn, Grain 85 bu. 2/15-6/30 104 0 20 Irrig. 84 33.55 0.00 113.07 0.00 3829 5 S7 Autryville 3.37 3.37 Wheat, Grain 45 bu. *9/1-4/30 104 0 0 Irrig. 42 16.62 0,00 56.00 0.00 3829 6 S7 Autryville 3.86 3.86 Corn, Grain 85 bu. 2115-6/30 104 0 20 Irrig. 84 33.55 0.00 129.52 0: 3829 6 S7 Autryville 3.86 3.86 Wheat, Grain 45 bu. *9/1-4130 104 0 0 Irrig. 42 16,62 0.00 64.14 0.00 3829 7 S7 Autryville 3,04 3.04 Com, Grain 85 bu. 2/15-6/30 104 0 20 Irrig. 84 33.55 0.00 102.00 0.00 3829 7 S7 Autryville 3.04 3.04 Wheat, Grain 45 bu. *9/l-4/30 104 0 0 Irrig. 42 16.62 0.00 50.51 0.00 3829 8 S7 Autryville 2,10 2.10 Corn, Grain 85 bu. 2/15-6/30 104 0 20 Irrig. 84 33.55 0.00 70.46 0.00 3829 8 S7 Autryville 2.10 2.10 Wheat, Grain 45 bu, *9/1.4/30 104 0 0 Irrig. 42 16.62 0.00 34.90 0.00 3829 9 S7 Autryville 2.43 2.43 Corn, Grain 85 bu. 2/15-6/30 104 0 20 Irrig. 84 33,55 0.60 81.53 0,00 3829 19 S7 Autryville 2.43 2.43 Wheat, Grain 45 bu, *9/1-4/30 1 104 1 0 1 0 Irrig. 42 16.62 0.00 40.38 0.00 234263 Database Version 3.1 Date Printed: 4/11/2007 WUF Page Page 2 of 5 Waste Utilization Table Year I Nitrogen Comm. Res. Manure Liquid Solid Liquid Solid PA Fert. (lbs/A) PA ManureA Manure Manure Manure Nutrient Req'd Nutrient Applied NutrientA pplied pplied (acre) Applied (acre) Applied (Field) Applied (Field) . (lbs/A) (lbs/A) (lbs/A) Tract Field Source ]A Soil Series Total Acres Use. Acres Crop RYE Applic, Period Applic. Method N N N N 1000 gal/A 'tons 1000 gals tons gallons5,409.24 gallons No 4,004.(;4 gallons -1,404.60 aai, .� ,.. ded, ions H Ii} ily8 0.00 Total Produced, tons SD 0.00 ,.gym Balance, tons °�I_°i't# 0.00 [Motes: 1. In the tract colurrut, — symbol means leased, otherwise, owned. 2. Symbol * means user entered data. 234263 Database Version 3.1 Date Printed: 4/11/2007 WUI' Page Page 3 of 5 Waste Utilization Table Year 2 Tract Field Source ID Soil Series Total Acres Use. Acres Crop RYE Appbe. Period Nitrogen PA Nutrient Req'd (lbslA) Comm. Fert. Nutrient Applied (lbslA) Res. (lbs/A) Applic. Method Manure PA NutrientA pplied (lbs1A) Liquid ManureA pplied (acre) Solid Manure Applied (acre) Liquid Manure Applied (Field) Solid Manure Applied (Field) f N N N N 1000 gal/A Tons 1000 gals tons 3186 10 S7 Autryville 6.93 6.93 Wheat, Grain 45 bu, *911-4/30 104 0 0 Irrig. 62 24.93 0.00 172.73 O.DO 3186 10 S7 Autryville 6.93 6,93 Soybeans, Manured, Double Crop 25 bu, 411-9/15 100 0 0 Irrig. 100 39.94 0,00 276.81 0.00 3186 11 S7 Autryville 6.64 6.64 Wheat, Grain 45 bu. *9/1-4/30 104 0 0 Inig. 62 24.93 0.00 165.50 0.00 3186 11 S7 Autryville 6,64 6.64 Soybeans, Manured, Double Crop 25 bu, 4/1-9115 100 0 0 1 Irrig. 100 39.94 0.00 265.23 0.00 3186 12 S7 Autryville 7.52 7.52 Wheat, Grain 45 bu. *9/1-4130 104 0 0 Irrig. 62 24.93 0.00 197.44 0.0 3196 12 S7 Autryville 7.52 7.52 Soybeans, Manured, Double Crop 25 bu. 4/1-9115 100 0 0 Irrig. 100 39.94 0.00 300.38 0.00 3186 13 S7 Autryville 7.52 7.52 Wheat, Grain 45 bu. *9/1-4/30 104 0 0 brig. 62 24.93 0.00 187.44 0.00 3186 13 S7 Autryville 7,52 7.52 Soybeans, Manured, Double Crop 25 bu. 4/1-9/15 100 0 0 Irrig. 100 39.94 0.00 300,38 0.00 3186 14 S7 Autryville 3.94 3.94 Wheat, Grain 45 bu. *9/1-4/30 104 0 0 Irrig. 62 24.93 0.00 98,21 0.00 3186 14 S7 Autryville 3,94 3.94 Soybeans, Manured, Double Crop 25 bu. 4/1-9/15 100 0 0 Irrig, 100 39.94 0.00 157.38 0.00 3196 15 S7 Autryville 3.22 3.22 Wheat, Grain 45 bu. *9/1-4130 104 0 0 Irrig. 62 24.93 0.00 80.26 0.00 3186 15 S7 Autryville 3.22 3.22 Soybeans, Manured, Double Crop 25 bu. 411-9/15 100 0 0 Irrig. 100 39.94 0.00 128.62 0.00 3186 16 S7 Lynchburg 6,78 6.78 Wheat, Grain 55 bu. *9/1-4130 106 0 0 Irrig. 64 25.40 0.00 172,24 0.00 3186 16 S7 Lynchburg 6,78 6.79 Soybeans, Manured, Double Crop 39 bu. 4/1-9115 151 0 0 Irrig. 151 60,32 0,00 408.94 0.00 3186 17 S7 Lynchburg 6,30 6.30 Wheat, Grain 55 bu. 49/1-4130 106 0 0 Irrig. 64 25,40 0.00 160.05 O.r 3186 17 S7 Lynchburg 6,30 6.30 Soybeans, Manured, Double Crop 39 bu. 4/1-9/15 151 0 0 Irrig. 151 60.32 0.00 379,99 0.00 3186 18 S7 Lynchburg 6.30 6.30 Wheat, Grain 55 bu. *911-4/30 106 0 0 Irrig. 64 25.40 0.00 160.05 0.00 3186 18 S7 Lynchburg 6.30 6.30 Soybeans, Manured, Double Crop 39 bu. 4/1-9/15 151 0 0 Irrig. 151 60,32 0.00 379.99 0.00 3186 19 S7 Lynchburg 6.78 6,78 Wheat, Grain 55 bu. *9/1-4130 106 O 0 Irrig. 64 25.40 0.00 172.24 0.00 3186 19 S7 Lynchburg 6.78 6.78 Soybeans, Manured, Double Crop 39 bu, 4/1-9/15 151 0 0 Irrig. 151 60.32 0.00 408.94 0.00 3829 1 S7 Autryville 5.43 5.43 Wheat, Grain 45 bu. *9/1-4/30 104 0 0 Irrig. 62 24.93 . 0.00 135.34 0.00 [782971 I S7 Autryville 5.43 5.43 Soybeans, Manured, Double Crop 25 bu. 4/1-9/15 100 0 0 Irrig. IOD 39.94 0.00 216.90 0.00 234263 Database Version 3.1 Date Printed: 4/11/2007 WUT Page Page 4 of 5 Waste Utilization Table Year 2 Traci Field Source Ill soil Series Total Acres Use. Acres Crop RYE Applic. Period Nitrogen PA Nutrient Req'd (lbs/A) Comm. Fen. Nutrient Applied (lbs/A) Res. (lbs/A) Applic. Method Manure PA NutrientA pplied (lbs/A) Liquid ManureA pplied (acre) Solid Manure Applied '(acre) Liquid Manure Applied (Field) Solid Manure _ Applied (Field) N N N N 1000 gal/A Tons 1000 gals tuns 3829 2 S7 Norfolk 5.53 5.53 Wheat, Grain 60 bu. *9l1-4/30 125 0 0 Irrig, 75 29.96 0.00 165.67 0.00 3829 2 S7 Norfolk 5,53 5.53 Soybeans, Manured, Double Crop 35 bu. 4/1-9115 137 0 0 Irrig. 1371 54.72 0.00 302.62 0.00 3829 3 S7 Norfolk 5.63 5.63 Wheat, Grain 60 bu. *911-4/30 125 0 0 Irrig: 75 29.96 0.00 168.66 0.00 3829 3 S7 Norfolk 5.63 5.63 Soybeans, Manured, Double Crop 35 bu. 411-9115 137 0 0 Irrig. 137 54.72 0.00 308.09 0.00 3829 4 S7 Autryville 4,73 4.73 Wheat, Grain 45 bu. *9114130 104 0 0 Irrig. 62 24.93 0.00 117.90 0.0 3829 4 S7 Autryville 4.73 4.73 Soybeans, Manured, Double Crop 25 bu. 411-9115 100 0 0 Irrig. 100 39.94 0,00 188.94 0.00 3829 5 S7 Autryville 3.37 3.37 Wheat, Grain 45 bu. *911-4130 104 0 0 Irrig. 62 24.93 0.00 84.00 0,00 3829 5 S7 Autryville 3.37 3.37 Soybeans, Manured, Double Crap 25 bu. 4/1-9115 100 0 0 Irrig. 100 39.94 0.00 134.61 0.00 3829 6 S7 Autryville 3,86 3,86 Wheat, Grain 45 bu. *911-4/30 104 0 0 Irrig. 62 24.93 0.00 96.21 0.00 3829 6 S7 Autryville 3.86 3.86 Soybeans, Manured, Double Crop 25 bu. 4/1-9/15 t00 0 0 Irrig. 100 39.94 0,00 154.18 0.00 3829 7 S7 Auttyville 3.04 3.04 Wheat, Grain 45 bu. *9/1-4/30 104 0 0 Irrig. 62 24.93 0.00 75.77 0.00 3829 7 S7 Autryville 3.04 3.04 Soybeans, Manured, Double Crop 25 bu. 4/1-9/15 100 0 0 Irrig. 100 39.94 0,00 121.43 0.00 3829 8 S7 Autryville 2.10 2.10 Wheat, Grain 45 bu. *9l1-4/30 104 0 0 Irrig. 62 24.93 0.00 52.34 0.00 3829 8 S7 Autryville 2.10 2.10 Soybeans, Manured, Double Crop 25 bu. 411-9115 100 0 0 Irrig. 100 39.94 0.00 83.89 0.00 3829 9 S7 Autryville 2.43 2.43 Wheat, Grain 45 bu. *911-4/30 104 0 0 Irrig, 62 24.93 0.00 60.57 0.{ 3829 9 T-S7 Autryville 2.43 2.43 Soybeans, Manured, Double Crop 25 bu. 4/1-9/15 100 0 0 Irrig. 100 39.94 0.00 97.06 0.00 Total Applied, 1000 gallons 7,126.99 �t r Total Produced, 1000 gallons 4,004.64 =€ E i'.ri.' Balance, 1000 gallons -3,122.35 g b.e e: jai Total Applied, tans €1�$ 0.00 Total Produced, tons �i 0.00 Balance, tons �t'�r}°1 0.00 Notes: 1. In the tract colunm, --• symbol means leased, otherwise, owned. 2. Symbol * means user entered data. 234263 Database Version 3.1 Date Printed: 4/11/2007 WUT Page Page 5 of 5 The Irrigation Application Factors for each field in this plan are shown in the following table. Infiltration rate varies with soils. If applying waste nutrients through an irrigation system, you must apply at a rate that will not result in runoff. This table provides the maximum application rate per hour that may be applied to each field selected to receive wastewater. It also lists the maximum application amount that each field may receive in any one application event. Irrigation Application Factors Tract Field Soil Series Application Rate (inches/hour) Application Amount (inches) 3186 10 Autryville 0.60 1.0 3186 11 jAutryville 0.60 1.0 3186 12 Autryville 0.60 1.0 3186 13 Autrwille 0.60 1.0 3186 14 Autryville 0.60 1.0 3186 15 Autryville 0.60 1.0 3186 16 Lynchburg 0.50 1.0 3186 17 Lynchburg 0.50 1.0 3186 i8 Lynchburg 0.50 1.0 3186 19 Lynchburg 0.50 1.0 3829 1 Autryville 0.60 1.0 3829 2 Norfolk 0.50 1.0 3829 3Nor-folk 0.50 1.0 3829 4 Autryville 0.60 1.0 3829 5 Autryville 0.60 1.0 3829 6 Autryville 0.60 1.0 3829 7 Autryville 0.60 1.0 3829 8 Autryville 0.60 l.0 3829 9 utryville 0.60 1.0 234263 Database Version 3.1 Date Printed 4/11/2007 1AF Page Page I of 1 NOTE: Symbol * means user entered data. The Nutrient Management Recommendations table shown below provides an annual sunumry of the nutrient management plan developed for this operation. This table provides a nutrient balance for the listed fields and crops for each year of the plan. Required nutrients are based on the realistic yields of the crops to be grown, their nutrient requirements and soil test results, The quantity of nutrient supplied by each source is also identified. The total quantity of nitrogen applied to each crop should not exceed the required amount. However, the quantity of other nutrients applied may exceed their required amounts. This most commonly occurs when manure or other byproducts are utilized to meet the nitrogen needs of the crop. Nutrient management plans may require that the application of animal waste be limited so as to prevent over application of phosphorous when excessive levels of this nutrient are detected in a field. In such situations, additional nitrogen applications from nonorganic sources may be required to supply the recommended amounts of nitrogen. Nutrient Management Recommendations Test YEAR 1 N (lbs/A) P205 (lbs/A) K20 (lbs/A) Mg (lbs/A) Mn (lbs/A) Zn (lbs/A) Cu (lbs/A) Lime (tons/A) Tract Field 3196 10 Req'd Nutrients 104 0 0 0 0 0 0 0 Acres App. Period '6.93 •9/1-4/30 Supplied B= CROP Wheat, Grain Starter 0 0 0 0 0 0 0 0 Commercial Fen. 0 0 0 0 0 0 0 0 Soil Series utryville Residual 0 0 0 0 0 0 0 0 RYE I Sample Date 45 bu. 07-14-04 rvlanure 104 57 142 13 1 2 0 0 P Removal Rating 23 lbs/ac. Medium BALANCE 0 571 142 13 1 2 0 0 Tract Field 3186 10 Req'd Nutrients 104 0 0 0 0 0 0 0 ,acres App. Period 6.93 2/15-6/30 Su liedB "''� CROP Corn, Grain Starter 0 0 0 0 0 0 0 0 Commercial Fert. 0 0 0 0 0 0 0 0 Soil Series Autryville Residual 20 0 0 0 0 0 0 0 RYE Sample Date 85 bu. 07-14-04 Manure 84 46 115 10 0 2 0 0 P Removal Rating 37 lbs/ac. Medium BALANCE 0 46 115 10 0 2 01 0 Tract Field 3186 11 Req'd Nutrients 104 0 0 0 0 0 0 0 Acres I App. Period 6.64 •9/1-4130 Supplied By: �_ �.� �=� CROP Wheat, Grain Starter 0 0 0 0 0 0 0 0 Commercial Fen. 0 0 0 0 0 0 0 0 Soil Series Autryville Residual 0 0 0 0 01 0 01 0 RYE I Sample Date 45 bu. 07-14-04 Manure 104 57 142 13 1 2 0 0 P Removal Rating 23 lbs/ac. Medium BALANCE 0 57 142 13 1 2 0 0 Tract Field 3186 11 Req'd Nutrients 104 0 0 0 0 0 0 0 Acres App. Period 6.64 2/15-6/30 Supplied B PP Y� a R- - ' r�"��� - -- �- CROP Com, Grain Starter 0 0 0 0 0 0 0 0 Commercial Fert 0 0 0 0 0 0 0 0 Soil Series Autryville Residual 20 0 0 0 0 0 0 0 RYEJ Sample Date 85bu. 07-14-04 Manure 84 46 115 10 0 2 0 0 P Removal I Rating 1 37 lbs/ac. Medium BALANCE 1 0 461 115 10 0 2 0 0 234263 Database Version 3.1 Date Printed: 4/11/2007 NMR Page Page 1 of 12 Nutrient Management Recommendations Test YEAR 1 N (lbs/A) P205 (lbs/A) K20 (lbslA) Mg (lbs/A) Mn (lbs/A) Zn (lbs/A) Cu (lbs/A) Lime (tons/A) Tract Field 318b 12 Req'd Nutrients 104 0 0 0 0 0 0 0 Acres ?.pp- Period 7.52 y 9/1-4130 Supplied By: »., � �t z- �z� M -_��. R �. 3. -� � - � CROP Wheat, Grain Starter 0 0 0 0 0 0 0 0 Commercial Fert. 0 0 0 0 0 0 0 0 Soil Series Autryville Residual 0 0 0 0 0 0 0 0 ample Date 45 bu. 07-14-04 Manure 104 57 142 13 1 2 00 val Rating 23 lbslac. Medium BALANCE 0 57 142 l3 l 2 0 0 E Field 3186 12 RegdNutrients 104 0 0 0 0 0 0 0 App. Period 7.52 2/15-6/30 Supplied By: Mw IN.W. U—M � 0 31 - . -- . - CROP Corn, Grain Starter 0 0 0 0 0 0 0 0 Commercial Fert. 0 0 0 0 0 0 0 0 Soil Series Autryville Residual 20 0 - 0 0 0 0 0 0 RYE I Sample Date 85 bu. 07-14-04 Manure 84 46 115 10 0 2 0 0 P Removal I Rating 37 lbslac. Medium BALANCE 0 46 115 10 0 2 0 0 Tract Field 3186 13 Req'd Nutrients 104 0 0 0 0 0 0 0 Acres App. Period 7.52 •911-4130 Supplied By:M� CROP Wheat, Grain Starter 0 0 0 0 0 0 0 0 Commercial Fert, 0 0 0 0 0 0 0 0 Soil Series Autryville Residual 0 0 0 0 0 0 0 0 RYE Sample Date 45 bu. 07-14-04 Manure 104 57 142 13 l 2 0 0 P Removal Rating 23 lbslac. Medium BALANCE 0 57 142 13 1 2 0 0 Tract Field 3186 13 Req'd Nutrients 104 0 0 0 0 0 0 0 Acres A Period App. 7.52 2/15-6/30 Supplied B PP Y� _F` �� =mow CROP Corn, Grain Starter 0 0 0 0 0 0 0 0 Commercial Fert. 0 0 0 0 0 0 0 0 Soil Series Autryville Residual 20 0 0 0 0 0 0 0 Sample Date 85 bu. 07-14-04 Manure 84 46 115 10 0 2 0 0 EPR.,-tival Rating 37 lbslac. Medium BALANCE 0 46 1l5 10 0 2 0 0 Field 3186 14 Req'd Nutrients 104 0 60 0 0 0 0 0 App. Period 3.94 2/15-6130 Supplied B -- � _; � ��.a - `' F�...�" -_.`fie'.. a �.r. R: M 0M CROP Corn, Grain Starter 0 0 0 0 0 0 0 0 Commercial Fert. 0 0 0 0 0 0 0 0 Soil Series Autryville Residual 20 0 0 0 0 0 01 0 E Sample Date 85 bu. 07-14-04 Manure 84 46 115 10 0 2 0 0 emoval EP Rating 37 lbslac. Medium BALANCE 0 46 55 10 0 2 0 0 234263 Database Version 3.1 Date Printed: 4/11/2007 NMR Page Page 2 of 12 Nutrient Management Reconnmendations Test YEAR 1 N (lbs/A) P205 (lbs/A) K20 (lbs/A) Mg (lbs/A) Mn (lbs/A) Zn (lbs/A) Cu (lbs/A) Lime (tons/A) Tract Field 3186 14 Req'd Nutrients 104 0 60 0 0 0 0 0 Acres A Period PP• 3.94 * 9/1-4/30 Supplied By: a �win �� �r -t CROP Wheat, Grain Starter 0 0 0 0 0 0 0 0 Commercial Fert. 0 D 0 0 0 0 0 0 Soil Series Autryville Residual 0 0 0 0 0 0 0 0 RYE Sample Date 45 bu. 07-14-04 Manure 104 571 142 131 1 2 0 0 P Removal Rating 23 ibs/ac. Medium BALANCE 0 57 82 13 1 2 0 0 Tract Field 3186 15 Rcq'd Nutrients 104 0 60 0 0 0 0 0 Acres I App. Period 3.22 •9/1-4130 Supplied By:"=- mftl;00 T�j CROP Wheat, Grain Starter 0 0 0 0 0 0 0 0 Commercial Fert. 0 0 0 0 0 0 0 0 Soil Series Autryville Residual 0 0 0 0 0 0 0 0 RYE Sample Date 45 hu. 07-14-04 Manure 104 57 142 13 1 2 01 0 P Removal I Rating 23 lbslac, Medium BALANCE 0 57 82 13 1 2 0 0 Tract Field 3186 15 Req'd Nutrients 104 0 60 0 0 0 0 0 Acres App. Period 3.22 2115-6/30 Supplied By: CROP Corn, Grain Starter 0 0 0 0 0 0 0 0 Commercial Fert. 0 0 0 0 0 0 0 0 Soil Series Auuyville Residual 20 0 0 0 0 0 0 0 RYE Sample Date 85 bu. 07-14-04 Manure 84 46 115 10 0 2 0 0 P Removal Rating 37 lbs/ac• Medium BALANCE 0 46 55 10 0 2 0 0 Tract Field 3186 16 Req'd Nutrients 106 0 50 0 0 0 0 0 Acres I App. Period 6.78 -9/1-413D Supplied By: + Um = . CROP Wheat, Grain Starter 0 0 0 0 0 0 0 0 Commercial Fen. 0 0 0 0 0 0 0 0 Soil Series Lynchburg Residual 0 0 0 0 0 0 0 0 RYE Sample Date 55 bu. 07-14-04 Manure 106 5811 145 13 1 2 0 D P Removal I Rating 28 lbslac. Medium BALANCE 0 58 95 13 1 2 0 0 Tract Field 3186 16 Req'd Nutrients 135 0 50 0 0 0 0 0 Acres I App, Period 6.78 2/15-6/30 Supplied By: X-0-0 A � � WOMEN =441- CROP Corn, Grain Starter 0 0 0 0 0 0 0 0 Commercial Fert. 0 0 0 0 0 0 0 0 Soil Series Lynchburg Residual 2()l 0 0 01 0 0 01 0 RYE Sample Date 125 bu. 1 07-14-04 N11 ure 115 63 157 14 1 1 3 1 0 PRemoval I Rating 55lbslac. edium BALANCE 0 63 ]07 14 1 3 1 0 234263 Database Version 3.1 Date Printed: 4/11/2007 NMR Page Page 3 of 12 Nutrient Management Recommendations Test YEAR 1 N (lbs/A) P205 (lbs/A) K20 (lbs/A) Mg (lbs/A) Mn (lbs/A) Zn (lbs/A) Cu (lbs/A) Lime (tons/A) Tract Field 3 ! 86 17 Req'd Nutrients 106 0 50 0 0 0 0 0 Acres I A PP. Period 6.34 •9/1-4/30 Supplied By: ems.. MS s -`� °��-�: �� �-': � --p �. CROP Wheat, Grain Starter 0 0 0 0 0 0 0 0 Commercial Fert. 0 0 0 0 0 0 0 0 Soil Series Lynchburg Residual 0 0 0 0 0 0 0 0 Sample Date 55 bu. 07-14-04 Manure 106 5$ 145 13 1 2 0 0 oval rAcres Rating 28 lbslac. Medium BALANCE 0 58 95 13 1 2 0 0 Field 3186 17 Req'd Nutrients 135 0 50 0 0 0 0 a App, Period 6.30 2/15-6/30 Supplied By: wa r CROP Corn, Grain Starter 0 0 0 01 0 0 0 0 Commercial Fert. 0 0 0 0 0 0 0 0 Soil Series Lynchburg Residual 20 0 0 0 0 0 0 0 RYE Sample Date 125 bu. 07-14-04 Manure 115 63 157 14 1 3 1 0 P Removal Rating 55 lbslac. Medium BALANCE 0 63 107 14 1 3 1 0 Tract Field 3186 18 Req'd Nutrients 106 0 20 0 0 0 0 0 Acres App. Period 6.30 •9/1-4/30 Supplied By: Fes ' CROP Wheat, Grain Starter 0 0 0 0 0 0 0 0 Commercial Fert. 0 0 0 0 0 0 0 0 Soil Series Lynchburg Residual 0 0 0 0 0 0 0 0 RYE Sample Date 55 bu. 07-14-04 Manure 106 58 145 13 1 2 0 0 P Removal Rating 28 lbslac. Medium BALANCE 0 58 125 13 1 2 0 0 Tract Field 3186 18 Req'd Nutrients 135 0 20 0 0 0 0 0 Acres I App. Period 6-30 2/15-6130 Supplied B x i v `07 -- ze � m w s CROP Corn, Grain Starter 0 0 0 0 0 0 0 0 Commercial Fert- 0 0 0 0 0 0 0 0 Soil Series Lynchburg Residual 20 0 0 0 0 0 0 0 RYE I Sample Date 125 bu. 07-14-04 Manure 115 63 157 14 1 3 1 0 P Removal I Rating 55 lbslac. Medium BALANCE 0 63 137 14 l 3 1 0 Tract Field 3186 19 Req'd Nutrients 106 0 20 0 0 0 0 0 Acres App. Period 6.78 -911-4130 Supplied By: e a Y4N � CROP Wheat, Grain Starter 0 0 0 0 0 0 0 0 Commercial Fert. 6 0 0 0 0 0 0 0 Soil Series Lynchburg Residual 01 0 0 0 0 0 0 0 RYE I Sample Date 55 bu, 07-14-04 Manure 106 58 145 131 1 2 0 0 P Removal I Rating 1 28 lbslac. Imedium BALANCE 1 0 58 125 13 l 2 0 0 234263 Database Version 3.1 Date Printed: 4/11/2007 NMR Page Page 4 of 12 Nutrient Management Recommendations Test YEAR ] N (lbs/A) P2O5 (lbs/A) K2O (lbs/A) Mg (lbs/A) Mn (lbs/A) Zn (lbs/A) Cu (lbs/A) Lime (tons/A) Tract Field 3186 19 Req'd Nutrients 135 0 20 0 0 0 0 0 Acres APp- Period 6.79 2/15-6/30 Supplied B PP Y t p " — - e_=fie : — -- f' � 'i fam '' �.r Mal CROP Corn, Grain Starter 0 0 0 0 0 0 0 0 Commercial Fert. 0 0 0 0 0 0 0 0 Soil Series Lynchburg Residual 20 0 0 0 0 0 0 0 RYE Sample Date 125 bu. 07-14-04 Manure 115 63 157 14 1 3 1 0 P Removal Rating 55 lbslac. Medium BALANCE 0 63 137 14 1 3 1 0 Tract Field 3829 1 Req'd Nutrients 104 0 110 0 0 0 0 1 Acres App. Period 5.43 2/15-6/30 Supplied B I= 24 Oft `0� PW ' -• % N CROP Corn, Grain Starter 0• 0 0 0 0 0 0 0 Commercial Fert. 0 0 0 0 0 0 0 0 Soil Series Autryville Residual 20 0 0 0 0 0 0 0 RYE Sample Date 85 bu. 07-14-04 Manure 84 46 115 10 0 2 0 0 P Removal I Rating 37lbs/ac. Medium BALANCE 0 46 5 .10 0 2 0 -1 Tract Field 3829 1 Req'd Nutrients 104 0 110 0 0 0 0 0 Acres App. Period 5.43 *9/1-4/30 Supplied By: R r- : =YM iE� ma �� CROP Wheat, Grain Starter 0 0 0 0 0 0 0 0 Commercial Fen. D 0 0 0 0 0 0 0 Soil Series Autryville Residual 0: 0 0 0 0 0 0 0 Date 45bu. 07-14-04 Manure 104 57 14213 1 2 0 0 FRYESample oval Rating 23 lbs/ac. Medium BALANCE 0 57 32 13 I 2 0 0 t Field 3829 2 Req'd Nutrients 125 0 0 0 0 0 0 0 App. Period 5.53 *9/1-4/30 Supplied By: � �� " `�- � ~ CROP Wheat, Grain Starter 0 0 0 0 0 0 0 0 Commercial Fert. 0 0 0 01 0 0 0 0 Soil Series Norfolk Residual 0 0 0 0 0 0 0 0 ple Date 60 bu. 07-14-04 Manure 125 68 171 15 1 3 1 0 Rating 30 lbs/ac. Medium BALANCE 0 68 171 15 1 3 1 0 RRemoval Field 3829 2 Req'd Nutrients 131 0 0 0 0 0 0 1 p. Period 5.53 2l15-6130 Supplied By: � CROP Corn, Grain Starter 0 0 0 0 0 0 D 0 Commercial Fert. 0 0 0 0 0 0 0 0 Soil Series Norfolk Residual 20 0 0 0 0 0 0 0 RYE Sample Date 115 bu. 07-14-04 Manure Ill 60 152 14 1 3 0 0 P Removal Rating 51 lbs/ac. Medium I BALANCE 1 0 60 152 14 1 3 0 -1 234263 Database Version 3.1 Date Printed: 4/11/2007 NMR Page Page 5 of 12 Nutrient Management Recommendations Test YEAR j N (lbs/A) P205 (lbs/A) K20 (lbs/A) Mg (lbs/A) Mn (lbs/A) Zn (lbs/A) Cu (lbs/A) Lime (tons/A) Tract Fietd 3829 3 Req'd Nutrients 131 0 0 0 0 0 0 1 Acres I App. Period 5.63 2/15-6/30 Supplied By: MWEREM - 0-M ftlri W. MKQWA Pffi'M CROP Corn, Grain Starter 0 0 0 0 0 0 0 0 Commercial Fert. 0 0 0 0 0 0 0 0 Soil Series Norfolk Residual 20 0 0 0 0 0 0 0 Sample Date 115 bu., 07-14-04 Manure 111 60 152 14 1 3 0 0val Rating 51 lbs/ac. edium BALANCE 0 60 152 14 1 3 0 -1 E Field 3829 3 Req'd Nutrients 125 0 0 0 0 0 0 0 App. Period 5.63 *9/1-4/30 Supplied By: 'NEz N Woia W ` ; � 04 � CROP Wheat, Grain Starter 0 0 0 0 0 0 0 0 Commercial Fert. 0 0 0 0 0 0 0 0 Soil Series Norfolk Residual 0 0 0 0 0 0 0 0 Sample Date 60 bu. 07-14-04 Manure 125 68 171 15 1 3 1 0 val Rating 30 lbs/ac. Medium BALANCE 0 68 171 15 1 3 1 0 EPR.-, Field 3829 4 Req'd Nutrients 104 0 0 0 0 0 0 1 App. Period 4.73 2115-6/30 Supplied By: 'M- � I _:^Y�r CROP Corn, Grain Starter 0 0 0 0 0 0 0 0 Commercial Fert. 0 0 0 0 0 0 0 0 Soil Series Autryville Residual 20 0 0 0 0 0 0 0 Sample Date 85 bu. 07-14-04 Manure 84 46 115 10 0 2 0 0 EPRe-oval Rating 37lbs/ac. Medium BALANCE 0 46 115 10 0 2 0 -1 Field 3829 4 Req'd Nutrients 104 0 00 0 0 0 0 App, Period 4.73 *9/1-4130 Supplied By: MEm MOM- -a CROP Wheat, Grain Starter 0 0 0 0 0 0 0 0 Commercial Fert. 0 0 0 0 0 0 0 0 Soil Series Autryville Residual 0 0 0 0 0 0 0 0 Sample Date 45 bu. 07-14-04 Manure 104 57 142 13 1 2 0 0 EPR.moval Rating 23 lbs/ac. edium BALANCE 0 57 142 13 1 2 0 0 Field 3829 5 Req'd Nutrients 104 0 80 0 0 0 0 0 A Period PP 3.37 *9/1-4130 Su lied B pp y: ^ R ." 7-7-101,251 CROP Wheat, Grain Starter 0 0 0 0 0 0 0 0 Commercial Fert. 0 0 0 0 0 0 0 0 Soil Series Autryville Residual 0 0 0 0 0 0 0 0 RYE I Sampte Date 45 bu. 07-14-04 Manure 104 57 142 13 1 2 0 0 P Removal I Rating 23 ibs/ac. ledium BALANCE 1 01 57 62 13 11 21 01 0 234263 Database Version 3.1 Date Printed: 4/1 t/2007 NMR Page Page 6 of 12 Nutrient Management Recommendations Test YEAR 1 N (lbs/A) P205 (lbs/A) K20 (lbs/A) Mg (lbs/A) Mn (Ibs/A) Zn (lbs/A) Cu (lbs/A) Lime (tons/A) Tract Field 3829 5 Req'd Nutrients 104 0 80 0 0 0 0 1 Acres App. Period 3.37- 2/15-6/30 Supplied By: ON `-- %� "` CROP Corn, Grain Starter 0 0 0 0 0 0 0 0 Commercial Fert. 0 0 0 0 0 0 0 0 Soil Series Autryville Residual 20 0 0 0 0 0 0 0 RYE Sample Date 85 bu. 07-14-04 Manure 84 46 115 10 01 2 01 0 P Removal I Rating 37 lbs/ac. Medium BALANCE 0 46 35 10 0 2 0 -1 Tract Field 3829 6 Req'd Nutrients 104 0 110 0 0 0 0 0 Acres App. Period 3.86 *9/1-4130 Supplied B� CROP Wheat, Grain Starter 0 0 0 0 0 0 0 0 Commercial Fert. 0 0 0 0 0 0 0 0 Soil Series Autryville Residual 0 0 0 0 0 0 0 0 RYE Sample Date 45 bu. 07-14-04 Manure 104 57 142 13 1 2 0 0 P Removal I Rating 23 lbs/ac. Medium BALANCE 0 57 32 13 1 2 0 0 Tract Field 3829 6 Req'd Nutrients 104 0 110 0 ❑ 0 0 1 Acres App. Period 3.86 2/15-6/30 Supplied By: CROP Corn, Grain Starter 0 0 ❑ 0 0 0 0 0 Commercial Fert. 0 0 0 0 0 0 0 0 Soil Series Autryville Residual 20 0 0 0 0 0 0 0 le Date 85 bu. 07-14-04 Manure 84 46 115 10 0 2 0 0 RAppp. Rating 37 lbslac. Medium BALANCE 0 46 5 10 0 2 0 -1 Field 3829 7 Req'd Nutrients 104 0 110 0 0 0 0 0 Period 3.04 *911-4/30 Supplied By: M' � DR - * 2 "_ - 1,9-0- �-: CROP Wheat, Grain Starter 0 0 0 0 0 0 01 0 Commercial Fert. 0 0 0 0 0 0 0 0 Soil Series Autrwille Residual 0 0 0 0 0 0 0 0 mple Date 45 bu- 07-14-04 Manure 104 57 142 13 1 2 0 0l B Rating 23 lbs/ac. Medium BALANCE 0 57 32 13 l 2 0 0 Field 3829 7 Req'd Nutrients 104 0 110 0 0 0 0 1 pp. Period 3.04 2115-6/30 Supplied By: '' CROP Corn, Grain Starter 0 0 0 0 ❑ 0 0 0 Commercial Fert. ()1 0 0 0 0 0 0 0 Soil Series Autryville Residual 20 0 0 0 0 0 0 0 RYE Sample Date 85 bu. 07-14-04 Manure 84 46 115 10 0 2 0 0 P Removal I Rating 37 lbs/ac. edium BALANCE 0 46 5 10 01 2 D -1 234263 Database Version 3.1 Date Printed: 4/1 1/2007 NMR Page Page 7 of 12 Nutrient Management Recommendations Test YEAR ] N (lbs/A) P2O5 (IbsIA) K2O (lbs/A) Mg (lbs/A) Mn (lbs/A) Zn (Ibs/A) Cu (lbs/A) Lime (tons/A) Tract Field 3829 8 Req'd Nutrients 104 0 110 0 0 0 0 1 Acres App. Period 2.10 2/15-6130 Supplied B� PP Y t«.dn�_W._ " WR _s CROP Corn, Grain Starter 0 0 0 0 0 0 0 0 Commercial Fert. 0 0 0 0 0 0 0 0 Soil Series Autryville Residual 20 0 0 0 0 0 0 0 Sample Date 85 bu. 07-14-04 Manure 84 46 115 t0 0 2 0 0val Rating 37 ibs/ac. Medium BALANCE 0 46 5 10 0 2 0 -1 E Field 3829 8 Req'd Nutrients 104 0 110 0 0 0 0 0 App. Period - 2.10 *9/1-4130 Supplied By: A CROP Wheat, Grain Starter 0 0 0 0 '0 0 0 0 Commercial Fert. 0 0 0 0 0 0 0 0 Soil Series Autryville Residual 0 0 0 0 01 0 0 0 Sample Date 45 bu. 07-14-04 Manure 104 57 142 13 1 2 0 0 Rating 23lbs/ac. Medium BALANCE 0 57 32 13 1 2 0 0 EPRcm�val Field 3829 9 Req'd Nutrients 104 0 0 0 0 0 0 0 App. Period 2A3 *911-4/30 Supplied By: -MUe r' _ ` CROP Wheat, Grain Starter 0 0 0 0 0 0 0 0 Commercial Fert, 0 0 0 0 0 0 0 0 Soil Series Auwyville Residual 0 0 0 0 0 0 0 0 RYE Sample Date 45 bu. 07-14-04 Manure 104 57 142 13 1 2 01 0 P Removal I Rating 23 lbs/ac_ Medium BALANCE 0 57 142 13 1 2 0 0 Tract Field 3829 9 Req'd Nutrients 104 0 0 0 0 0 0 0 Acres App. Period 2.43 2/15-6/30 Supplied By: ���: - .��, �� ;;� ' - .� r am= n CROP Corn Grain Starter 01 0 0 0 0 0 0 0 Commercial Fert. 0 0 0 0 0 0 0 0 Soil Series Autryville Residual 20 0 0 0 0 0 0 0 RYE I Sample Date 85 bu. 07-14-04 Manure 84 46 115 10 0 2 0 0 P Removal Rating 37 lbslac. edium BALANCE 01 46 115 10 0 2 4 0 NOTE: Symbol * means user entered data. 234263 Database Version 3.1 Date Primed: 4/11/2007 NMR Page Page 8 of 12 Nutrient Management Recommendations Test YEAR 2 N (lbs/A) P205 (lbs/A) K20 (lbs/A) Mg (lbs/A) Mn (lbs/A) Zn (lbs/A) Cu (lbs/A) Lime (tons/A) Tract Field 318fi 10 Req'd Nutrients 100 0 0 0 0 0 0 0 Acres App. Period 6-93 4/1-9/15 Supplied By: CROP Soybeans, Manured, Double Crop Starter 0 0 0 0 0 0 0 0 Commercial Fert. 0 0 0 0 0 0 0 0 Soil Series Autryville Residual 0 0 0 0 0 0 0 0 RYE I Sample Date 25 bu. 07.14-04 Manure 100 551 137 12 0 2 0 0 P Removal I Rating 20 €bslac. Medium BALANCE 0 55 137 121 0 2 0 0 Tract Field 3186 11 Req'd Nutrients 100 0 0 0 0 0 0 0 Acres I App. Period 6.64 411-9/15 Supplied By: �> �- m CROP Soybeans, Manured, Double Crop Starter 0 0 0 0 0 0 0 0 Commercial Fert. 0 0 0 0 0 0 0 0 Soil Series Autryville Residual 0 0 0 0 0 0 0 0 RYE Sample Date 25 bu. 07-14-04 Manure 10o 55 137 12 0 2 0 0 P Removal Rating 20 lbs/ac. Medium BALANCE 0 55 137 12 0 2 0 0 Tract Field 3196 12 Req'd Nutrients 100 0 0 0 0 0 0 0 Acres APP• Period 7.52 4/1-9/15 Supplied BY -r"5.� r�- .ms .M���»e� CROP Soybeans, Manured, Double Crop Starter 0 0 0 0 0 0 0 0 Commercial Fert. 0 0 0 0 0 0 0 0 Soil Series Auuyville Residual 0 0 0 0 0 0 0 0 RYE Sample Date 25 bu. 07-14-04 Manure 100 55 137 12 0 2 0 0 P Removal Rating 20 lbs/ac. Medium BALANCE 0 55 137 12 0 2 0 0 Tract Field 3186 13 Req'd Nutrients l00 0 0 0 0 0 0 0 Acres A Periodaa App, 7.52 4/1-9/15 Supplied By: ,�, -SEW � s c=r ? r c� , CROP Soybeans, Nianured, Double Crop Starter 0 0 0 O 0 0 0 0 Commercial Fert. 0 0 0 0 0 0 0 0 Soil Series Autryville Residual 0 0 0 0 0 0 0 0 RYE Sample Date 25bu. 07-14-04 Manure ]00 55 137 12 0 2 0 0 P Removal Rating 20 lbs/ac. Medium BALANCE 0 55 137 12 0 2 0 0 Tract Field 3186 14 Req'd Nutrients 100 0 60 0 0 0 0 0 Acres App. Period 3.94 4/1-WO Supplied By: : r _:� �: - z . i ?i � CROP Soybeans, Manured, Double Crop Starter 0 0 0 0 0 0 0 0 Commercial Fen. 0 0 0 0 0 0 0 0 Soil Series Autryville Residual 0 0 0 0 0 0 0 0 RYE I Sample Date 25 bu. 07-14-04 Manure too 55 137 12 0 2 4 0 P Removal Rating 20 lbslac. ledium I BALANCE 0 55 77 12 0 2 0 0 234263 Database Version 3.1 Date Printed: 4/11/2007 NMR Page Page 9 of 12 Nutrient Management Recommendations Test YEAR 2 N (lbs/A) P205 (lbs/A) K20 (lbs/A) Mg (lbs/A) Mn (lbs/A) Zn (lbs/A) Cu (lbs/A) Lime (tons/A) Tract Field 3186 15 Req'd Nutrients 100 0 60 0 0 0 0 0 Acres I App. Period 1 3.22 4/1-9115 Supplied By: SSW _ s ,s_ t n' �r CROP Soybeans, Manured, Double Crop Starter 0 0 0 0 0 0 0 0 Commercial Fert. 0 0 0 0 0 0 0 0 Soil Series Autryville Residual 0 0 0 0 0 0 0 0 RYE I Sample Date 25 bu. 07-14-04 Manure 100 55 137 12 0 2 01 0 P Removal I Rating 20 lbslac. Medium BALANCE 01 55 77 12 0 2 0 0 Tract Field 3186 16 Req'd Nutrients 151 0 50 0 0 0 0 0 Acres "Pp Period 6.78 411-9/15 Supplied By: a .� .__ I "• �� '� � t om ;; CROP Soybeans, Manured, Double Crop Starter 0 0 0 0 0 0 0 0 Commercial Fert. 0 0 0 0 0 0 0 0 Soil Series Lynchburg Residual 0 0 0 0 0 0 0 0 RYE Sample Date 39 bu. 07-14-04 Manure 151 82 207 18 1 3 1 0 P Removal Rating 31 lbslac. Medium BALANCE 0 82 157 18 1 3 1 0 Tract Field 3186 17 Req'd Nutrients 151 0 50 0 0 0 0 0 Acres App. Period 6.30 41i-9115 Supplied By: � .iw P CROP Soybeans, Manured, Double Crop Starter 0 0 0 0 0 0 0 0 Commercial Fert. 0 0 0 0 0 0 0 0 Soil Series Lynchburg Residual 0 0 0 0 0 0 0 0 ample Date 39 bu. 07-14-04 Manure 151 82 207 18 1 3 I 0 val E Rating 31 lbslac. Medium 13ALANCE 0 82 157 18 1 3 1 0 Field 3186 18 Req'd Nutrients 151 0 20 0 0 0 0 0 App. Period 6.30 4/1-9/15 Supplied By: MUM,. CROP Soybeans, Manured, Double Crop Starter 0 0 0 0 0 0 0 0 Commercial Fert. 0 0 0 0 0 0 4 0 Soil Series Lynchburg Residual 0 0 0 0 0 0 0 0 RYE Sample Date 39 bu. 07-14-04 Manure 151 821 207 18 1 3 1 0 P Removal Rating 31 lbslac. Medium BALANCE 0 82 187 18 1 3 1 0 Tract Field 3186 19 Req'd Nutrients 151 0 20 0 0 0 0 0 Acres Period App. Pe 6.78 4/1-9l15 Supplied By: �pr,r,°� � a .: ,� �� � a� �.v �� ��- O w . � CROP Soybeans, Manured, Double Crop Starter 0 0 0 0 0 0 0 0 Commercial Fert. 0 0 0 0 0 0 0 0 Soil Series Lynchburg Residual D 0 0 0 0 01 01 0 RYE I Sample Date 39 bu. 07-14-04 Manure 151 82 207 18 1 3 1 0 P Removal Rating 31 lbslac. edium BALANCE 0 82 187 18 1 3 11 0 234263 Database Version 3.1 Date Printed: 4/11/2007 NMR Page Page 10 of 12 Nutrient Management Recommendations Test YEAR 2 N (lbs/A) P205 (lbs/A) K20 (lbs/A) Mg (lbs/A) Mn (lbs/A) Zn (lbs/A) Cu (lbs/A) Lime (tons/A) Tract FF,eld 3829 l Req'd Nutrients 100 0 110 0 0 0 0 0 Acres App. Period 5.43 411-9I15 Supplied By: W � � W �- � MINE i= CROP Soybeans, Manured, Double Crop Starter 0 0 0 0 0 0 0 0 Commercial Fert. 0 0 0 0 0 0 0 0 Soil Series Autryville Residual 0 0 0 0 0 0 0 0 RYE I Sample Date 25 bu. 07-14-04 Manure 100 155 137 12 0 2 01 0 P Removal I Rating 20 lbs/ac. Medium BALANCE 0 55 27 12 0 2 0 0 Tract Field 3829 2 Req'd Nutrients 137 0 0 0 0 0 0 0 Acres A Period 5.53 411-9/15 Supplied B m 0" ? �MM A&Zv. _mow WW CROP Soybeans, Manured, Double Crop Starter 0 0 0 0 0 0 0 0 Commercial Fert, 0 0 0 0 0 0 0 0 Soil Series Norfolk Residual 0 0 0 0 0 0 0 0 RYE Sample Date 35 bu. 07-14-04 Manure 137 75 188 17 1 3 1 0 P Removal Rating 28 lbs/ac. i tedium BALANCE 0 75 188 17 1 3 1 0 Tract Field 3824 3 Req'd Nutrients 137 0 0 0 0 0 0 0 Acres App. Period 5.63 411-9/15 Supplied B CROP Soybeans, Manured', Double Crop Starter 0 0 0 0 0 0 0 0 Commercial Pert. 01 0 0 0 0 0 0 0 Soil Series Norfolk Residual 0 0 0 0 0 0 0 0 RYE Sample Date 35 bu. 07-14-04 Manure 137 75 188 17 1 3 1 0 P Removal Rating 28 lbs/ac. Medium BALANCE'. 0 75 188 17 1 3 1 0 Tract Field 3829 4 Req'd Nutrients 100 0 0 01 0 0 .0 0 Acres I App. Period 4.73 411-9115 Supplied By: a . 51 _� 0 V� � _ 9= 207`` CROP Soybeans, Manured, Double Crop Starter 0 0 0 0 0 0 0 0 Commercial Fert. 0 0 0 0 0 0 0 0 Soil Series Autryville Residual 0 0 0 0 0 0 0 0 RYE I Sample Date 25 bu. 07-14-04 Manure 100 55 137 12 0 2 0 0 P Removal I Rating 20lbs/ac. Medium BALANCE 0 55 137 12 O 2 0 0 Tract Field 3829 5 Req'd Nutrients 100 0 80 0 0 0 0 0 Acres App. Period 3.37 411-9/15 Supplied By: _ M CROP Soybeans, Manured, Double Crop Starter 0 0 0 0 0 0 ol 0 Commercial Fert_ 0 0 0 0 O 0 0 0 Soil Series Autryville Residual 0 0 0 0 0 0 0 0 RYE Sample Date 25 bu. 07-14-04 Manure 100 55 137 12 O 2 0 0 P Removal I Rating 20 lbs/ac. edium BALANCE 1 0 55 57 12 Q 2 0 0 234263 Database Version 3.1 Date Printed: 4/11/2007 NMR Page Page 11 of 12 Nutrient Management Recommendations Test YEAR 2 N (lbs/A) P205 (lbs/A) K20 (lbs/A) Mg (lbs/A) Mn (1bs/A) Zn (lbs/A) Cu (lbs/A) Lime (tons/A) Tract Field 3829 6 Req'd Nutrients 100 0 110 0 0 0 0 Acres App. Period 3.86 4/1-9115 Supplied B a}�ra. «I» m . .`":� �^. ��?,'G-�";. _" _._... �.. �I-RI �w0} r� - 'C %.riu 1 "— ;.3"� 2. "? CROP Soybeans, Manured, Double Crop Starter 0 0 0 0 0 0 0 0 CommerCial Fert. 0 0 0 0 0 0 0 0 Sail Series Autryville Residual 0 0 0 0 0 0 0 0 le Date 25 bu. 07-14-04 Manure 100 55 137 12 0 2 0 0 DRemoval Rating 20 lbs/ac- tedium BALANCE 0 55 27 12 0 2 0 0 Field 3829 7 Req'd Nutrients 100 0 110 0 0 0 0 0 . Period 3.04 4/1-9115 Supplied By: CROP Soybeans, Manured, Double Crop Starter 0 0 0 0 0 0 0 0 Commercial Fert. 0 0 0 0 0 0 0 0 Sail Series Autryville Residual 0 0 0 0 0 0 0 0 ample Date 25 bu. 07.14-04 Manure 100 55 137 12 0 2 0 0 EPR.,-.val Rating 20 lbs/ac. edium BALANCE 0 55 27 12 0 2 0 0 Field 3829 8 Req'd Nutrients 100 0 110 0 0 0 0 0 App. Period 2.10 4I1-9/15 Supplied B PP Y_" 2 . N _ .... _ `'" ! r" N' _ _ a -'". < - CROP Soybeans, Manured, Double Crop Starter 0 0 0 0 0 0 0 0 Commercial Fett. 0 0 0 0 0 0 0 0 Soil Series Autryville Residual 0 0 0 0 0 0 0 0 ample Date 25 bu. 07-14-04 Manure 100 55 137 12 0 2 0 0 EPR.,mo'wal Rating 201bs/ac. edium BALANCE 0 55 27 12 0 2 0 0 Field 3829 9 Req'dNutrients i00 0 0 0 0 0 0 0 App_ Period 2.43 411-9/15 Supplied By: r - _ � M50UMN, CROP Soybeans, Manured, Double Crop Starter 0 0 0 0 0 0 0 0 Commemiai Fert. 0 0 0 0 0 0 0 0 Soil Series Autryville Residual 0 0 0 0 0 0 0 0 Sample LPR.ernoval Date 25 bu. 07-14-04 Manure 100 55 137 12 0 2 0 0 Rating 20 lbs/ac. iledium BALANCE 0 55 137 12 0 2 0 0 NOTE: Symbol * means user entered data. 234263 Database Version 3.1 Date Printed: 4/11/2007 NMR Page Page 12 of 12 The Required Soil Test Values shown in the following table provide a summary of recommended actions that should be taken if soil tests indicate excessive levels of copper or zinc. Fields that receive manure must have an annual soil analysis for these elements. High levels of zinc and copper can adversely affect plant growth. Alternative crop sites must be used when the concentration of these metals approach excessive levels. Site life can be estimated by dividing the amount of copper and zinc to be applied in lbs/acre by 0.036 and 0.071, respectively and multiplying the result by 0.85. By adding this quantity to the current soil index for copper or zinc, we can predict life of the site for waste disposal In addition to copper and zinc indices, this table also provides a summary of lime recommendations for each crop based on the most recent soil sample. Application of lime at recommended rates is necessary to maintain soil pH in the optimum range for crop production . Required 4nil Test Values Tract Field Crop pH Lime Recom. (tons/acre) Cu-I Copper Recommendation Zn-I Zinc Recommendation 3186 10 Corn, Grain 6.4 0.0 270 None 396 None 3186 10 Wheat, Grain 6.4 0.0 270 None 396 None 3186 10 Soybeans, Manured, Double Crop 1 6,4 0.0 270 None 996 None 3186 11 Com, Grain 6.4 0.0 270 None 396 Nune 3186 11 Wheat, Grain 6,4 0.0 270 None 396 None 3186 11 Soybeans, Manured, Double Crop 6.4 0.0 270 None 396 None 3186 12 Corn, Grain 6.5 0.0 271 None 389 None 3186 12 Wheat, Grain 6.5 0.0 27t None 389 None 3186 12 Soybeans, Manured, Double Crop 6.5 0.0 271 None 389 None 3186 13 Corn, Grain 6.5 0.0 271 None 389 None 3186 13 Wheat, Grain 6.5 0.0 271 None 389 None 3186 13 Soybeans, Manured, Double Crop 6.5 0.0 271 None 389 None 3186 14 Com, Grain 5.9 0.0 333 None 4pg None 3186 14 Wheat, Grain 5.9 0.0 333 None 4()9 None 3196 14 Soybeans, Manured, Double Crop 5.9 0.0 333 None 409 None 3196 15 Cam, Grain 5.9 0.0 333 None 409 None 3186 15 Wheat, Grain 5.9 0.0 333 None 409 None 3196 15 Soybeans, Manured, Double Crop 5.9 0.0 333 None 409 None 3186 16 Com, Grain 5.8 0.4 335 None 417 None 3196 16 Wheat, Grain 5.8 0.0 335 None 417 None 3186 16 Soybeans, Manured, Double Crop 5.8 0.0 335 None 417 None 3186 17 Com, Grain 5.8 0.4 335 None 417 None 3186 17 Wheat, Grain 5.8 0.0 335 None 417 i None ---------------------------------------------------------------------•----------------------------------------------------------------------------------------------------•-------- ------------------------------------------------------------------------- 234263 Database Version 3.1 Date Printed: 04-11-2007 STV Page Page I of Required Soil Test Values Tract Field Crop pR Lime Recom. (tonstacre) Cu-I Copper Recommendation Zn-1 Zinc Recommendation 3186 17 Soybeans, Manured, Double Crop 5,8 0.0 335 None 417 None 3186 18 Corn, Grain 6,0 0.0 339 None 348 None 3186 18 Wheat, Grain 6.0 0.0 339 None 348 None 3186 18 Soybeans, Manured, Double Crop 6.0 0.0 339 None 34g None 3186 19 Corn, Grain 6.0 0.0 339 None 348 None 3186 19 Wheat, Grain 6.0 0.0 339 None 348 None 3186 19 Soybeans, Manured, Double Crop 6.0 1 0.0 339 None 34g None 3829 1 Corn, Grain 5.2 0.9 180 None 172 None 3829 1 Wheat, Grain 5.2 0.0 180 None 172 None 3829 1 Soybeans, Manured, Double Crop 5.2 0.0 180 None 172 None 3829 2 Corn, Grain 5.7 0.7 277 None 330 None 3829 2 Wheat, Grain 5.7 0.0 277 None 330 None 3829 2 Soybeans, Manured, Double Crop 5.7 0.0 277 None 330 None 3829 3 Corn, Grain 5.7 0.7 277 None 330 None 3829 3 Wheat, Grain 5.7 0.0 277 None 330 None 3829 3 Soybeans, Manured, Double Crop 5.7 0.0 277 None 330 None 3829 4 Corn, Grain 5.7 0.7 277 None 330 None 3829 4 Wheat, Grain 5.7 0.0 277 None 330 None 3829 4 Soybeans, Manured, Double Crop 5.7 0.0 277 None 330 None 3829 5 Corn, Grain 5.7 0.5 227 None 237 None 3829 5 Wheat, Grain 5.7 0.0 227 None 237 None 3829 5 Soybeans, Manured, Double Crop 5.7 0.0 227 None 237 None 3829 6 Corn, Grain 5.2 0.9 180 None 172 None 3829 6 Wheat, Grain 5.2 0.0 180 None 172 None 3829 6 Soybeans, Manured, Double Crop 5.2 0.0 180 None 172 None 3829 7 Corn, Grain 5.2 0.9 180 None 172 None 3829 7 Wheat, Grain 5.2 0.0 180 None 172 None 3829 7 Soybeans, Manured, Double Crop 5.2 0.0 180 None 172 None 3829 8 Corn, Grain 5.2 0.9 180 None 172 None 3829 8 Wheat, Grain 5.2 0.0 190 None 177 None ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ ---------------------------------------------------------------------------------- 234263 Database Version 3.1 Date Printed: 04-11-2007 STV Page Page 2 of Required Soil Test Values "tract Field Crop PH Lime Recom. (tonstacre) Cu-t Copper Recommendation Zn-I Zinc Recommendation 3829 8 Soybeans, Manured, Double Crop 5.2 0,0 180 None 172 None 3829 9 Corn, Grain 6.2 0.0 288 None 368 None 3829 9 Wheat, Grain 6.2 0.0 288 None 36g None 3829 9 Soybeans, Manured, Double Crop 1 6.2 0.0 288 None 368 None -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 234263 Database Version 3.1 Date Printed; 04-11-2007 STV Page Page 3 of 3 The following Lagoon Sludge Nitrogen Utilization table provides an estimate of the number of acres needed for sludge utilization for the indicated accumulation period. These estimates are based on average nitrogen concentrations for each source, the number of animals in the facility and the plant available nitrogen application rates shown in the second column. Lagoon sludge contains nutrients and organic matter remaining after treatment and application of the effluent. At clean out, this material must be utilized for crop production and applied at agronomic rates. In most cases, the priority nutrient is nitrogen but other nutrients including phosphorous, copper and zinc can also be limiting. Since nutrient levels are generally very high, application of sludge must be carefully applied. Sites must first be evaluated for their suitability for sludge application. Ideally, effluent spray frelds'should not be used for sludge application. If this is not possible, care should be taken not to load effluent application fields with high amounts of copper and zinc so that additional effluent cannot be applied. On sites vulnerable to surface water moving to streams and lakes, phosphorous is a concern. Soils containing very high phosphorous levels may also be a concern. Lagoon Sludge Nitrogen Utilization Table Crop Maximum PA-N Rate lblac Maximum Sludge Application Rate 1000 gal/ac Minimum Acres 5 Years Accumulation Minimum Acres 10 Years Accumulation Minimum Acres 15 Years Accumulation Swine Feeder -Finish Lagoon Sludge - Standard Com 120 bu 150 '13.16 54.16 108.31 162.47 Hay 6 ton R.Y.E. 300 26.32 27.08 54.16 81.24 Soybean 40 bu 160 14.04 50.77 101.55 15232 ---------------------------------------------------------------------------------------------------------------------------------------------g— ---------------- 234263 Database Version 3.1 Date Printed: 04-11-2007 Sludge Page Page 1 of The Available Waste Storage Capacity table provides an estimate of the number of days of storage capacity available at the end of each month of the plan. Available storage capacity is calculated as the design storage capacity in days minus the number of days of net storage volume accumulated. The start date is a value entered by the user and is defined as the date prior to applying nutrients to the first crop in the plan at which storage volume in the lagoon or holding pond is equal to zero. Available storage capacity should be greater than or equal to zero and less than or equal to the design storage capacity of the facility. If the available storage capacity is greater than the design storage capacity, this indicates that the plan calls for the application of nutrients that have not yet accumulated. If available storage capacity is negative, the estimated volume of accumulated waste exceeds the design storage volume of the structure. Either of these situations indicates that the planned application interval in the waste utilization plan is inconsistent with the structure's temporary storage capacity. Available Waste Storage Capacity Source Name I Swine Feeder -Finish Lagoon Liquid Design Storage Capacity (Days) Start Date 1011 180 Plan Year Month Available Storage Capacity (Days) 1 1 58 1 2 98 1 3 135 1 4 173 1 5 180 1 6 180 1 7 149 l 8 118 1 9 126 1 10 133 1 11 141 1 12 148 2 1 155 2 2 165 2 3 180 2 4 180 2 5 180 2 6 180 2 7 180 2 8 180 2 9 180 2 10 149 2 11 119 2 12 88 * Available Storage Capacity is calculated as of the end of each month. 234263 Database Version 3.1 Date Printed: 04-11-2007 Capacity Page Page 1 of 1 a I . Required Specifications For Animal Waste Management 1. Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste that reaches surface water is prohibited. 2. There must be documentation in the design folder that the producer either owns or has an agreement for use of adequate land on which to properly apply the waste. If the producer does not own adequate land to properly dispose of the waste, he/she shall provide evidence of an agreement with a landowner, who is within a reasonable proximity, allowing him/her the use of the land for waste application. It is the responsibility of the owner of the waste production facility to secure an update of the Nutrient Management Plan when there is a change in the operation, increase in the number of animals, method of application, receiving crop type, or available land. 3. Animal waste shall be applied to meet, but not exceed, the nitrogen needs for realistic crop yields based upon soil type, available moisture, historical data, climatic conditions, and level of management, unless there are regulations that restrict the rate of applications for other nutrients. 4. Animal waste shall be applied to land eroding less than 5 tons per acre per year. Waste may be applied to land eroding at more than 5 tons per acre per year but less than 10 tons per acre per year provided grass filter strips are installed where runoff leaves the field (see USDA, NRCS Field Office Technical Guide Standard 393 - Filter Strips). 5. Odors can be reduced by injecting the waste or by disking after waste application. Waste should not be applied when there is danger of drift from the land application field. 6. When animal waste is to be applied on acres subject to flooding, waste will be soil incorporated on conventionally tilled cropland. When waste is applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding (see "Weather and Climate in North Carolina" for guidance). 7. Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control odor and flies. ---••----------------- ---- 234263 Database Version 3.1 Date Printed: 4/11/2007 Specification Page 1 8. Animal waste shall not be applied to saturated soils, during rainfall events, or when the soil surface is frozen. 9. Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to a depth that would inhibit growth. The potential for salt damage from animal waste should also be considered. 10. Nutrients from waste shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Waste/nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of the crop or forages breaking dormancy. 11. Any new swine facility sited on or after October 19 1995 shall comply with the following: The outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and canal. Animalwaste, other than swine waste from facilities sited on or after October 1, 1995, shall not be applied closer that 25 feet to perennial waters. 12. Animal waste shall not be applied closer than 100 feet to wells. 13. Animal waste shall not be applied closer than 200 feet of dwellings other than those owned by the landowner. 14. Waste shall be applied in a manner not to reach other property and public right-of-ways. 15. Animal waste shall not be discharged into surface waters, drainageways, or wetlands by a discharge or by over -spraying. Animal waste may be applied to prior converted cropland provided the fields have been approved as a land application site by a "technical specialist". Animal waste shall not be applied on grassed waterways that discharge directly into water courses, and on other grassed waterways, waste shall be applied at agronomic rates in a manner that causes no runoff or drift from the site. 16. Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. ------------- ---------------•----------------------------------------------•-•------------------- p --- 234263 Database Version 3.1 Date Printed: 4/11/2007 Specification Page 2 17. A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). Areas shall be fenced, as necessary, to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc., are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Berms and structures should be inspected regularly for evidence of erosion, leakage, or discharge. 18. If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge, pollution, and erosion. 19. Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, leaks, and spills. A regular maintenance checklist should be kept on site. 20. Animal waste can be used in a rotation that includes vegetables and other crops for direct human consumption. However, if animal waste is used on crops for direct human consumption, it should only be applied pre -plant with no further applications of animal waste during the crop season. 21. Highly visible markers shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume for waste storage ponds. 22. Waste shall be tested within 60 days of utilization and soil shall be tested at least annually at crop sites where waste products are applied. Nitrogen shall be the rate -determining nutrient, unless other restrictions require waste to be applied based on other nutrients, resulting in a lower application rate than a nitrogen based rate. Zinc and copper levels in the soils shall be monitoredand alternative crop sites shall be used when these metals approach excessive levels. pH shall be adjusted and maintained for optimum crop production. Soil and waste analysis records shall be kept for a minimum of five years. Poultry dry waste application records shall be maintained for a minimum of three years. Waste application records for all other waste shall be maintained for five (5) years. 23. Dead animals will be disposed of in a manner that meets North Carolina regulations. -------------------------------------------------------------------------------------------------------------------------- ------------------------------ •----- 234263 Database Version 3-1 Date Printed: 4/11/2007 Specification Page 3 Crop Notes The following crop note applies to field(s): 16, 17, 18, 19 Corn 1: CP, Mineral Soil, low -leachable In the Coastal Plain, corn is normally planted when soil temperatures reach 52 to 55 degrees fahrenheit. Review the Official Variety "green book" and information from private companies to select a high yielding variety with the characteristics needed for your area and conditions. Plant 1-2" deep. Plant populations should be determined by the hybrid being planted. Increase the seeding rate by 10% when planting no -till. Phosphorus and potassium recommended by a soil test can be broadcast or banded at planting. When planting early in cool, wet soil, banded phosphorus will be more available to the young plants. An accepted practice is to apply 20-30 lbs/acre N and 20-30 lbs/acre phosphorus banded as a starter and one-half the remaining N behind the planter. The rest of the N should be applied about 30-40 days after emergence. The total amount of N is dependent on soil type. When including a starter in the fertilizer program, the recommended potassium and any additional phosphorus is normally broadcast at planting. Plant samples can be analyzed during the growing season to monitor the overall nutrient status of the corn. Timely management of weeds and insects are essential for corn production. The following crop note applies to field(s): 2, 3 Corn: CP, Mineral Soil, medium leaching In the Coastal Plain, corn is normally planted when soil temperatures reach 52 to 55 degrees fahrenheit. Review the Official Variety "green book" and information from private companies to select a high yielding variety with the characteristics needed for your area and conditions. Plant 1-2" deep. Plant populations should be determined by the hybrid being planted. Increase the seeding rate by 10% when planting no -till. Phosphorus and potassium recommended by a soil test can be broadcast or banded at planting. When planting early in cool, wet soil, banded phosphorus will be more available to the young plants. An accepted practice is to apply 20-30 lbs/acre N and 20-30 lbs/acre phosphorus banded as a starter and one-half the remaining N behind the planter. The rest of the N should be applied about 30-40 days after emergence. The total amount of N is dependent on soil type. When including a starter in the fertilizer program, the recommended potassium and any additional phosphorus is normally broadcast at planting. Plant samples can be analyzed during the growing season to monitor the overall nutrient status of the corn. Timely management of weeds and insects are essential for corn production. ---------------------------------------------------------------------------------------------------------------------------- --•--------------------------- 234263 Database Version 3.1 Date Printed: 04-11-2007 Crop Note Page Page 1 of 4 The following crop note applies to field(s): 1, 10, 11, 12, 13, 14, 15, 4, 5, 6, 7, 8, 9 Corn: CP, Mineral Soil, medium leaching In the Coastal Plain, corn is normally planted when soil temperatures reach 52 to 55 degrees fahrenheit. Review the Official Variety "green book" and information from private companies to select a high yielding variety with the characteristics needed for your area and conditions. Plant 1-2" deep. Plant populations should be determined by the hybrid being planted. Increase the seeding rate by 10% when planting no -till. Phosphorus and potassium recommended by a soil test can be broadcast or banded at planting. When planting early in cool, wet soil, banded phosphorus will be more available to the young plants. An accepted practice is to apply 20-30 lbslacre N and 20-30 lbs/acre phosphorus banded as a starter and one-half the remaining N behind the planter. The rest of the N should be applied about 30-40 days after emergence. The total amount of N is dependent on soil type. When including a starter in the fertilizer program, the recommended potassium and any additional phosphorus is normally broadcast at planting. Plant samples can be analyzed during the growing season to monitor the overall nutrient status of the corn. Timely management of weeds and insects are essential for corn production. The following crop note applies to field(s): 16, 17, 18, 19 Wheat: Coastal Plain, Mineral Soil, low -leachable In the Coastal Plain, wheat should be planted from October 20-November 25. Plant 22 seed/drill row foot at 1-1 1/2" deep and increase the seeding rate by 5% for each week seeding is delayed beyond the optimum time. See the seeding rates table for applicable seeding rate modifications in the current NCSU "Small Grain Production Guide". Also, increase the initial seeding rate by at least 10% when planting no -till. Adequate depth control when planting the wheat is essential. Review the NCSU Official Variety "green book and information from private companies to select a high yielding variety with the characteristics needed for your area and conditions. Apply no more than 30 lbs/acre N at planting. Phosphorus and potash recommended by a soil test can also be applied at this time. The remaining N should be applied during the months of February -March. The total N is dependent on the soil type. Plant samples can be analyzed during the growing season to monitor the nutrient status of the wheat. Timely management of diseases, insects and weeds are essential for profitable wheat production. The following crop note applies to field(s): 2, 3 Wheat: Coastal Plain, Mineral Soil, medium leachable In the Coastal Plain, wheat should be planted from October 20-November 25. Plant 22 seed/drill row foot at 1-1 112" deep and increase the seeding rate by 5% for each week seeding is delayed beyond the optimum time. See the seeding rates table for applicable seeding rate modifications in the current NCSU "Small Grain Production Guide". Also, increase the initial seeding rate by at least 10% when planting no -till. Adequate depth control when planting the wheat is essential. Review the NCSU Official Variety "green book" and information from private companies to select a high yielding variety with the characteristics needed for your area and conditions. Apply no more than 30 lbslacre N at planting. Phosphorus and potash recommended by a soil test report can also be applied at this time. The remaining N should be applied during the months of February -March. The total N is dependent on the soil type. Plant samples can be analyzed during the growing season to monitor the nutrient status of the wheat. Timely management of diseases, insects and weeds are essential for profitable wheat production. -------------------------------------------------------------------------------------------------------------------------------------------- 234263 Database Version 3.1 Date Printed: 04-11-2007 Crop Note Page Page 2 of 4 The following crop note applies to field(s): 1, 10, 11, 12, 13, 14, 15, 4, 5, 6, 7, 8, 9 Wheat: Coastal Plain, Mineral Soil, medium leachable In the Coastal Plain, wheat should be planted from October 20-November 25. Plant 22 seed/drill row foot at 1-1 1/2" deep and increase the seeding rate by 5% for each week seeding is delayed beyond the optimum time. See the seeding rates table for applicable seeding rate modifications in the current NCSU "Small Grain Production Guide". Also, increase the initial seeding rate by at least 10% when planting no -till. Adequate depth control when planting the wheat is essential. Review the NCSU.Official Variety "green book" and information from private companies to select a high yielding variety with the characteristics needed for your area and conditions. Apply no more than 30 lbs/acre N at planting. Phosphorus and potash recommended by a soil test report can also be applied at this time. The remaining N should be applied during the months of February -March. The total N is dependent on the soil type. Plant samples can be analyzed during the growing season to monitor the nutrient status of the wheat. Timely management of diseases, insects and weeds are essential for profitable wheat production. The following crop note applies to field(s): 16, 17, 18, 19 Double -Crop Soybeans, Coastal Plain: Mineral Soil, low -leachable Double -crop soybeans should be planted as early in June as possible with planting completed by July 4th. When no -tilling soybeans in small grain straw, it is essential to manage the straw to achieve adequate plant populations. Review the NCSU Official Variety "green book" and information from private companies to select a high yielding variety with the characteristics needed for your area and conditions. Plant 24 seed/row foot for 7-8" drills; 4-6 seed/row foot for 15" rows; 6-8 seed/row foot for 30" rows and 8-10 seed/row foot for 36" rows. Increase the seeding rate by at least 10% for no -till planting. Seeding depth should be 1-1 1/2" and adequate depth control is essential. Phosphorus and potash recommended for the soybeans can be applied to the wheat in the Fall. Soybeans produce their own nitrogen and are normally grown without additions of nitrogen. However, applications of 20-30 lbs/acre N are sometimes made at planting to promote early growth and vigor. Tissue samples can be analyzed during the growing season to monitor the overall nutrient status of the soybeans. Timely management of weeds and insects is essential for profitable double crop soybean production. The following crop note applies to field(s): 2, 3 Double -Crop Soybeans, Coastal Plain: Mineral soil, medium leachable Double -crop soybeans should be planted as early in June as possible with planting completed by July 4th. When no -tilling soybeans in small grain straw, it is essential to manage the straw to achieve adequate plant populations. Review the NCSU Official Variety "green book" and information from private companies to select a high yielding variety with the characteristics needed for your area and conditions. Plant 2-4 seed/row foot for 7-8" drills; 4-6 seed/row foot for 15" rows; 6-8 seed/row foot for 30" rows and 8-10 seed/row foot for 36" rows. Increase the seeding rate by at least 10% for no -till planting. Seeding depth should be 1-1 1/2" and adequate depth control is essential. Phosphorus and potash recommended for the soybeans can be applied to the wheat in the Fall. Soybeans produce their own nitrogen and are normally grown without additions of nitrogen. However, applications of 20-30 lbslacre N are sometimes made at planting to promote early growth and vigor. Tissue samples can be analyzed during the growing season to monitor the overall nutrient status of the soybeans. Timely management of weeds and insects is essential for profitable double crop soybean production. ----------------------------------------------------------------------------------------------------------------------------------------------------------- 234263 Database Version 3.1 Date Printed: 04-11-2007 Crop Note Page Page 3 of The following crop Mote applies to field(s): 1, 10, 11, 12, 13, 14, 15, 4, 5, 6, 7, 8, 9 Double -Crop Soybeans, Coastal Plain: Mineral soil, medium leachable Double -crop soybeans should be planted as early in June as possible with planting completed by July 4th. When no -tilling soybeans in small grain straw, it is essential to manage the straw to achieve adequate plant populations. Review the NCSU Official Variety "green book" and information from private companies to select a high yielding variety with the characteristics needed for your area and conditions. Plant 2-4 seed/row foot for 7-8" drills; 4-6 seed/row foot for 15" rows; 6-8 seed/row foot for 30" rows and 8-10 seed/row foot for 36" rows. Increase the seeding rate by at least 10% for no -till planting. Seeding depth should be 1-1 1/2" and adequate depth control is essential. Phosphorus and potash recommended for the soybeans can be applied to the wheat in the Fall. Soybeans produce their own nitrogen and are normally grown without additions of nitrogen. However, applications of 20-30 lbslacre N are sometimes made at planting to promote early growth and vigor. Tissue samples can be analyzed during the growing season to monitor the overall nutrient status of the soybeans. Timely management of weeds and insects is essential for profitable double crop soybean production. ---• ------------ ------ ----- --- -- ------ 234263 Database Version 3.1 Date Printed: 04-11-2007 Crop Note Page Page 4 of 4 31- q`1— bf 6k%zVrm q arf& er. ookl4 Si)e of )&swr. Aro^ ru&fv rccyc(k Iu. (eAoU t,.e(s4) Sra v c Se, )\,* StcN be' wt- v- ;.ram At VIIk� ,S4-'1 !—�Ucl��iv� �fnJa..yv.A p0�,.�l�Sl-y'{p�yy` n"�,r� ,�- �- y �� �# a _. ti 31-97-211199-Location of ruptured recycle line and adjacent drainage diversion. 4� m ,� u.t _ �0• `� 31-97-2/1/99-Ruptured wastewater recycle pipe. -W - 31-97-2/l/99-Path of runoff through drainage diversion adjacent to lagoon. 4 -�. -_ , -_,._ ----- .�- .. . n� ��: .ri i 3 �` .. �� �t� IFr_ � �,' '6��' .. . r'l'Ywi" .. 7�' _ .. _ � .: _ 1 ,f '� 31-97-2/1/99-Path of runoff through drainage diversion on northwest side of lagoon. 31-97-2/ 1 /9 led area. 31-97-2/ 1 /- ed area. 31-97-2/1/99-Sample Point #2 in Buckskin Swamp. F-i FA 31-97-2/1/99-Buckskin Swamp downstream of discharge point. Billy Kilpatrick Fw' rms 3,1-97 . C1 876 ft. 5.53 ac (,p2 `o — ... Cl. p6 671ft 3.86 ac. G• p7 510 ft. 3.04 ac. p8 322 tt. 2.10 ac.. Q m ac. p16 ac. p 17 ,0 ac. p18 ►.78 ac. p19 Ni S L r (Mulfiplerwm bheM may be needed) HARD HOSE TRAVELER IRRIGATION SYSTEM �i Hard Hose Traveling Gun System ! 3 F a q COMPUTATIONAL WORKSHEET 1. Farm number (identification) 31 ` 0 9 2 Field number (identification) 2. Irrigation system designation X Existing irrigation system New/expanded irrigation system 3. Number of travel lanes # Interior lanes _� # Exterior lanes i'?S'9 feet] Length of pull(Li) # Interior lanes 2 # Exterior lanes 8 2 & [feet] Length of pull(1.2) # Interior lanes --3_ # Exterior lanes '93 [feet] Length of pull(L3) 4. Wetted diameter �,n [feet] from Field Data Worksheet S. Spacing Hydrant spacing [feet] [as a percentage of wetted diameter] 6. Hydrant layout Multiple hydrants Single hydrant -)L Excessively spaced hydrants 7. Read the irrigated area per travel pull for the given wetted diameter from the appropriate table and column based on pattern, spacing, and travel lane location. Travel lane length (L_) Interior or I Exterior Oane/hydrant) _,1 '�- (a) Acres start end of pull from Table FF 9a Column 77 (b) Acres middle portion of pull (M) {Pull lengthS S�K [feet] X Wetted width [feet]} / 43,560 0 (c) Acres stop end of pull from Table .EE,72 Column c-- !�t' Total acres for travel lane length (1.1) (Sum: a + b + c) Travel lane length (L, _ Interior or 2 Exterior (lane/hydrant) —/z i j (a) Acres start end of pull from Table E F 90 L Column _ (b) Acres middle portion of pull (L2) (Pull length&Wo [feet] X Wetted width [feet]} / 43,560 rJ (c) Acres stop end of pull from Table 0 Column l- Total acres for travel lane length (1-2) (Sum: a + b + c) Travel lane length (L, Interior or Exterior (lane/hydrant) ,/- 41 (a) Acres start end of pull from Table Column 9_ (b) Acres middle portion of pull (L3) [Pull lengthg$ 7 [feet] X Wetted widtlltl.' [feet]} / 43,560 0_ (c) Acres stop end of pull from Table F 7 9 ) Column C. S e is j Total acres for travel lane length (L3) (Sum: a + b + c) 8. Multiply the tabulated irrigated acreage value per travel pull by the number of pulls of each category in the field. Add all of these, and this is the total irrigated acreage for the field. ,z� (a) Acres per travel lane length (Ll) X # Lanes = Acres 1S-2 (b) Acres per travel lane length (1-2) X # Lanes = Acres. ,L 3 (c) Acres per travel lane length (L3) X # Lanes = Acres Total CAWMP wettable acres for field (Sum: 8a + 8b + 8c) Wettable Acre Computational Worksheet Completed by: ` Date: Signature 4 technical specialist }'S (Muldplq worksheets may be needed) r HARD HOSE TRAVELER IRRIGATION SYSTEM WO Hard Hose Traveling Gun System COMPUTATIONAL WORKSHEET 1. Farm number (identification) . Field number (identification) 2. Irrigation system designation Existing irrigation system New/expanded irrigation system 3. Number of travel lanes # Interior lanes # Exterior lanes 7.2 2 feet] Length of pull(B) # Interior lanes �_ # Exterior lanes Gi 0 [feet] Length of pull(1-.2) 2? # Interior lanes _j(p # Exterior lanes ( 7/ [feet] Length of pull(B) 4. Wetted diameter [feet] from Field Data Worksheet S. Spacing Hydrant spacing [feet] 9-D [as a percentage of wetted diameter] 6. Hydrant layout Multiple hydrants Single hydrant -X_- Excessively spaced hydrants 7. Read the irrigated area per travel gulf for the given wetted diameter from the appropriate table and column based on pattern, spacing, and travel lane location. Travel lane length (L-) Interior or - Exterior (lane hydrant) (a) Acres start end of pull from Table E2L Column 4 o (b) Acres middle portion of pull (Li) {Pull length Z [feet] X Wetted widt L3 ~ [feet]) / 43,560 _0 (c) Acres stop end of pull from Table Column C- q._�3 Total acres for travel lane length (U) (Sum: a + b + c) Travel lane length (L, Interior or Exterior (lane/hydrant) .1-12 (a) Acres start end of pull from Table E F 0. Column P_ (b) Acres middle portion of pull (L2) (Pull lengthy [feet] X Wetted width [feet]] / 43,560 0 (c) Acres stop end of pull from Table Et 2 0 Column G Total acres for travel lane length (L2) (Sum: a + b + c) Travel lane length (L_) Interior or Exterior (lane/hydrant) rL (a) Acres start end of pull from Table f S� Column C_ 2. (b) Acres middle portion of pull (L3) {Pull lengthy [feet] X Wetted width,2 � [feet]} / 43,560 0 (c) Acres stop end of pull from Table, Column C F Total acres for travel lane length (1.3) (Sum: a + b + c) 8. Multiply the tabulated irrigated acreage value per travel pull by the number of pulls of each category in the Geld. Add all of these, and this is the total irrigated acreage for the field. LL, ) 3 (a) Acres per travel lane length (Ll) X # Lanes = Acres 2 3 7 (b) Acres per travel lane length (L2) X # Lanes = Acres 3, 8i.p (c) Acres per travel lane length (L3) X # Lanes = Acres IL, 7 (p Total CAWMP wettable acres for field (Sum: 8a + 8b + 80 Wettable Acre Computational Worksheet Completed by: x12, L .-_r Date: Signature € technical specialist rs r (Multiple worksheets may be needed) HARD HOSE TRAVELER IRRIGATION SYSTEM Hard Hose Traveling Gun System COMPUTATIONAL WORKSHEET 1. Farm number (identification) Field number (identification) 2. Irrigation system designation Existing irrigation system New/expanded irrigation system 3. Number of travel lanes_ # Interior lanes # Exterior lanes Sir? feet] Length of pull(Ll) # Interior lanes __ # Exterior lanes 3.2 2 [feet] Length of pull(L2) # Interior lanes �_ # Exterior lanes yl -3 [feet] Length of pull(13) 4. Wetted diameter, Z3L [feet] from Field Data Worksheet 5. Spacing Hydrant spacing [feet] [as a percentage of wetted diameter] 6. Hydrant layout Multiple hydrants Single hydrant Excessively spaced hydrants 7. Read the irrigated area per travel pull for the given wetted diameter from the appropriate table and column based on pattern, spacing, and travel lane location. Travel Mane length (L-) I Interior or Exterior (lane/hydrant) U (a (a) Acres start end of pull from Table FL i Column S8 (b) Acres middle portion of pull (L1) {Pull lengthL/d [feet] X Wetted width 21�0 [feet]} / 43,560 _ 0 (c) Acres stop end of pull from Table EX 50 Column C -3, A Total acres for travel lane length (Ll) (Sum: a + b + c) Travel lane length (L, Interior or Exterior (lane/hydrant) 7 (a) Acres start end of pull from Table - 4;r Column r G a (b) Acres middle portion of pull (1.2) {Pull length3"� [feet] X Wetted widthD [feet]1/43,560. _ 6 (c) Acres stop end of pull from Table Fs Column L a• 10 Total acres for travel lane length (1-2) (Sum: a + b + c) Travel lane length (L_) Interior or 9 Exterior (lane/hydrant) 44 7 (a) Acres start end of pull from Table Er 10 Column ! , ?6 (b) Acres middle portion of pull (L3) (Pull length`t13 [feet] X Wetted width o 7 [feet]} / 43,560 iD(c) Acres stop end of pull from Table.Et 4 b Column G a, q 3 Total acres for travel lane length (L3) (Sum: a + b + c) 8. Multiply the tabulated irrigated acreage value per travel pull by the number of pulls of each category in the field. Add all of these, and this is the total irrigated acreage for the field. n "-(a) Acres per travel lane length (L1) X # Lanes = Acres L D (b) Acres per travel lane length (1.2) X # Lanes = Acres (c) Acres per travel lane length (13) X # Lanes = Acres Total CAW W wettable acres for field (Sum: 8a + 8b + 80 Wettable Acre Computational Worksheet Completed by.., i e -- L. Date: 14,c: Signature 46 technical specialist (Multiple worksheets may be needed) -)i P. HARD HOSE TRAVELER IRRIGATION SYSTEM Hard Hose Traveling Gun System COMPUTATIONAL WORKSHEET 1. Farm number (identification) Field number (identification) 2. Irrigation system designation Existing irrigation system New/expanded irrigation system 3. Number of travel lanes # Interior lanes L— # Exterior lanes !AL& feet] Length of pull(Ll) I # Interior lanes # Exterior lanes / E;L [feet] Length of pull(12) # Interior lanes # Exterior lanes /j 10 [feet] Length of pull(L3) 4. Wetted diameter 22 0 [feet] from Field Data Worksheet 5. Spacing ; `� Hydrant spacing [feet] ��, [as a percentage of wetted diameter] 6. Hydrant layout Multiple hydrants Single hydrant Excessively spaced hydrants 7. head the irrigated area per travel pull for the given wetted diameter from the appropriate table and column based on pattern, spacing, and travel lane location. Travel lane length (L-) Interior or /V Exterior pane/hydrant) r 6 q (a) Acres start end of pull from Tabled Column 6 b, �2 1 (b) Acres middle portion of pull (Ll) {Pull iengthbk ( [feet] X Wetted width 2.S 7 [feet] } / 43,560 6 (c) Acres stop end of pull from Table .EE- 90 Column C- 6, q -� Total acres for travel lane length (L1) (Sum: a + b + c) Travel lane length (L, d Interior or Exterior (lane/hydrant) G (a) Acres start end of pull from Table 0 Column_ (b) Acres middle portion of pull (L2) (Pull lengfh&?;� [feet] X Wetted width-�y0 [€eetl} / 43,560 (c) Acres stop end of pull from Table E Z 7) Column _ C Total acres for travel lane length (L2) (Sum: a + b + c) Travel lane length (L_) Interior or Exterior (lane/hydrant) (g (a) Acres start end of pull from Table )�-t!?2_ Column L l6�( (b) Acres middle portion of pull (L3) {Pull lengthy [feet] X Wetted width 40 [feet]} / 43,560 0 (c) Acres stop end of pull from Table EZ.0 Column C— ], _5 Total acres for travel lane length (L3) (Sum: a + b + c) 8. Multiply the tabulated irrigated acreage value per travel pull by the number of pulls of each category in the field. Add all of these, and this is the total irrigated acreage for the Geld. 61 9 3 (a) Acres per travel Iane length (1-1) X # Lanes = Acres &, ra 1-1. (b) Acres per travel lane length (L2) X # Lanes = Acres -24 s a (c) Acres per travel lane length (1-3) X # Lanes = Acres /, 0 � Total CAWMP wettable acres for field (Sum: 8a + 8b + 8c) Wettable Acre Computational Worksheet Completed by r Date: !u Signature o technical specialist IS ov (Mul fple worksheets may be needed) P 10 HARD HOSE TRAVELER IRRIGATION SYSTEM r! Hard Hose Traveling Gun System COMPUTATIONAL WORKSHEET 1. Farm number (identification) Field number (identification) 2. Irrigation system designation Existing irrigation system New/expanded irrigation system 3_ Number of travel lanes 1,� # Interior lanes # Exterior lanes 1; s V feet] Length of pull(L1) —0 -_ # Interior lanes # Exterior lanes 6 0 Q [feet] Length of pull(L2) # Interior lanes / 57 # Exterior lanes 43 9 [feet] Length of puU(L3) 4. Wetted diameter [feet] from Field Data Worksheet 5, Spacing 2 L_ Hydrant spacing [feet] / g [as a percentage of wetted diameter] 6. Hydrant layout Multiple hydrants Single hydrant Excessively spaced hydrants 7. Read the irrigated area per travel pull for the given wetted diameter from the appropriate table and column based on pattern, spacing, and travel lane location. Travel lane length (L, Interior or Exterior (lane/hydrant) ,1.3 (a) Acres start end of pull from Table T 10 Column Q _ (b) Acres middle portion of pull (M) {Pull lengtYlk2D [feet] X Wetted widths Q D [feet]] / 43,560 mil' (c) Acres stop end of pull from Tablee.1 90 Column C 2L-��-Total acres for travel lane length (L1) (Sum: a + b + c) Travel lane length (L, _1_� Interior or Exterior (lane/hydrant) L (a) Acres start end of pull from Table Column b' .= i (b) Acres middle portion of pull (L2) [Pull lengthk0 0 [feet] X Wetted width 90 [feet]) / 43,560 7 - (c) Acres stop end of pull from Table T,7J Column L 3. tq Total acres for travel lane length (L2) (Sisml: a + b + c) Travel lane length (L, Interior or jU Exterior (lane/hydrant) (a) Acres start end of pull from Table L 4•-1 9 Column _ (b) Acres middle portion of pull (L3) (Pull lengthj3 6 [feet] X Wetted width., [feet]) / 43,560 T r (c) Acres stop end of pull from Table E` 90 Column L a. 7, Total acres for travel lane length (13) (Sum: a + b + c) 8. Multiply the tabulated irrigated acreage value per travel pull by the number of pulls of each category in the field. Add all of these, and this is the total irrigated acreage for the field. Acres per travel lane length (Ll) X #Lanes = Acres (b) Acres per travel lane length (L2) X # Lanes = Acres 3.9,2 (c) Acres per travel lane length (L3) X # Lanes = Acres Total CAWMP wettable acres for field (Sum: 8a + 8b + 8c) Wettable Acre Computational Worksheet Completed by: f Date::: Uh Signature 9f technical specialist �.5 Sall (Multiple w"ksheets may be needed) HARD HOSE TRAVELER IRRIGATION SYSTEM it Hard Hose Traveling Gun System COMPUTATIONAL WORKSHEET 1. Farm number (identification) Field number (identification) 2. Irrigation system designation -X Existing irrigation system New/expanded irrigation system 3. Number of travel lanes # Interior lanes / to # Exterior lanes /2LD feet] Length of pull(Ll) 7 # Interior lanes # Exterior lanes /.;! So [feet] Length of pull(1-2) # Interior lanes # Exterior lanes /..I C-U [feet] Length of pull(B) 4. Wetted diameter 1 � Q- [feet] from Field Data Worksheet 5. Spacing Hydrant spacing [feet] [as a percentage of wetted diameter] 6. Hydrant layout Multiple hydrants Single hydrant Excessively spaced hydrants 7. Read the irrigated area per travel pull for the given wetted diameter from the appropriate table and column based on pattern, spacing, and travel lane location. Travel lane length (L, Interior or ) -_�p Exterior (lane/hydrant) wee I (a) Acres start end of pull from Table LE 7.5JColumn � 7 (b) Acres middle portion of pull (Ll) (Pull lengthDI 4 [feet] X Wetted width-�-� [feet]) / 43,560 O (c) Acres stop end of pull from Table E & i } Column T, 7 S Total acres for travel lane length (U) (Sum: a + b + c) Travel lane length (L, _.L?7 Interior or Exterior (lane/hydrant) Spa (a) Acres start end of pull from Table E. 7: Column 7 � (b) Acres middle portion of pull (L2) {Pull length j. Q [feet] X Wetted width a 0 d [feet]) / 43,560 _D _ (c) Acres stop end of pull from Table EI ' Column LaO Total acres for travel lane length (U) (Sum: a + b + c) Travel lane length (L, 1 7 Interior or Exterior (lane/hydrant) .5 (� (a) Acres start end of pull from Table CI ? "Column A -r 7 ti` (b) Acres middle portion of pull (1-3) {Pull length!; EQ (feet] X Wetted widtt.?D 0 . [feet]( / 43,560 (c) Acres stop end of pull from Table fj 7S Column C, 6.3 Q Total acres for travel lane length (L3) (Sum: a + b + c) 8. Multiply the tabulated irrigated acreage value per travel pull by the number of pulls of each category in the field. Add all of these, and this is the total irrigated acreage for the field. 6. 2 (a) Acres per travel lane length (L1) X # Lanes = Acres G Q (b) Acres per travel lane length (L2) X # Lanes = Acres /.3a (c) Acres per travel lane length (13) X # Lanes = Acres 1 .3 Total CAWMP wettable acres for field (Sum: 8a + 8b + 8c) Wettable Acre Computational Worksheet Completed by: Date: / / D Signature ly technical specialist 15 (Malbple worksheets may be needed) 7• HARD HOSE TRAVELER IRRIGATION SYSTEM Hard Hose Traveling Gun System COMPUTATIONAL WORKSHEET 1. Farm number (identification) . Field number (identification) 2. Irrigation system designation * Existing irrigation system New/expanded irrigation system 3. Number of travel lanes # Interior lanes. /9 # Exterior lanes. /2S0 feet] Length of pull(L1) # Interior lanes # Exterior lanes [feet] Length of pull(L2) # Interior lanes # Exterior lanes [feet] Length of pull(L3) 4. Wetted diameter ''�i [feet] from Field Data Worksheet S. Spacing r3 _Hydrant spacing [feet] ' n [as a percentage of wetted diameter] 6. Hydrant layout Y, Multiple hydrants Single hydrant Excessively spaced hydrants 7. Read the irrigated area per travel pull for the given wetted diameter from the appropriate table and column based on pattern, spacing, and travel lane location. Travel lane length (L, Interior or / cf Exterior (lane/hydrant) f (a) Acres start end of pull from Table f �� Column 6 (b) Acres middle portion of pull (LI) {full length/ [feet]- X Wetted width,2_ [feet]} / 43,560 C (c) Acres stop end of pull from Table El: i L Column �- Total acres for travel lane length (U) (Sum: a + b + c) Travel lane length (L, Interior or Exterior (lane/hydrant) (a) Acres start end of pull from Table Column (b) Acres middle portion of pull (L2) (Pull length [feet] X Wetted width [feet]] / 43,560 (c) Acres stop end of pull from Table Column Total acres for travel lane length (L2) (Sum: a + b + c) Travel lane length (L-) Interior or Exterior (lane/hydrant) (a) Acres start end of pull from Table Column (b) Acres middle portion of pull (L3) {Pull length [feet] X Wetted width ffeet]} / 43,560 (c) Acres stop end of pull from Table Column Total acres for travel lane length (L3) (Sum: a + b + c) 8. Multiply the tabulated irrigated acreage value per travel pull by the number of pulls of each category in the field. Add all of these, and this is the total irrigated acreage for the field. (a) Acres per travel lane length (L1) X #Lanes = Acres (b) Acres per travel lane length (1-2) X # Lanes = Acres (c) Acres per travel lane length (1.3) X # Lanes = Acres Total CAWMP wettable acres for field (Sum: 8a + 8b + 8c) Wettable Acre Computational Worksheet Completed by �� �- -. lr • Date: ! I �, Signature 0f technical specialist C AW \,t? Wcrlbl-- Azrc 7)0 Traveling Gun Field i7-U shed. 1'70197 Hard Hose Traveling Gun System ? a FIELD DATA SHEET ' I . 1�1ake and model number ALr — 1 i Cj 2. Hose length bu [feet] and hose inside diameter (ID)�(inch] 3. Gun make and model number 4. Gun nozzle size [inch], 1 .�v ring orifice, taper bore orifice. 5. Gun arC an`-zle / eq'D- (degees] 5. Travel lane spacing [feet]. Indicate whether utufomt random. Number of exterior hydrants Number of interior hydrants 7. Gun wetted diameter [feet]. measured, based on gun chart. S. Gun pressure A&W`[psi]. UQ observed at working gauge, determined f;om gun charts, calculated (show calculations) * *9. Operating pressure at hose reel [psi]. observed at working gauge, provided by owner. "* 10. Supply line size [inch] (from pump to last hydrant). * 11. Supply line lena-th feet (maximum pumping distance). * * 12 Supply line type PVC, aluminum. * ` 13. Pump rnak-z and model number ;* lY, PElinp (.ap.a.:.iL;, 1115, E=ine make and model number or — l b. Electric rr:ocor hor sepi�•tyer and rprr [hp] Note'. It is sLrcrgly recommended that ope atin� pressure . the reel an -p-.n v--gyred b ' 911-1d dete r Locate „ a each hydrant on a copy of the map. Indicate the start and stop of the sprinkler 7-ir-L for each travel lan;.: and shoe distance tra-..e1td- Shoe the local;•on of tie supply line. Ir iCated acres %z-L", be determined b° c,'ave lane Op --Iona: dal' ra: 'sh where possi- . * * x Info, --,nation Eir-nished by 'L ane�or Sim _ of 01 Fazifh Representativt Signa: re of Techni-cp-1 Specialist Printed Name of0-.,c, or Faziliry Representadv_ Printed rarne ofTe,:1ani:a1 Specialist Date Date ;"* Onh•'Lie person. or persons collecting the data should sign the data sheet. CAWMP We abl: Azrt Traveling Gun Field Dau shcct 1'20/99 Hard Hose Traveling Gun System 70 FIELD DATA SHEET I _ Make and model number__ A(�_ � �'� �,,; u � c> 4 _ 2. Hose length _ � 2 '° —[feet and hose inside diameter (ID) _[inch] 3. Gun make and model number .200- 4. Gun nozzle size ' [inch],(ring orifice, taper bore orifice. 5. Gun arc angle i n.c� [degrees] 6. Travel Iane spacing ?g1 [feet]. Indicate whether uniform, random. Number of exterior hydrants . Number of interior hydrants 7. Gun wetted diameter 'off 9 q [feet]. 13� �j measured, based on gun chart. 8. Gun pressure [psi]. L40 observed at working gauge, determined fiorn gun ci arts, calculated (show calculations) * *9. Operating pressure at hose reel [psi]. observed at working gauge, provided by m&-nlr. "'I` lo. Supply line si?e [inch] (fiom pump to last hydrant). ` * 11. Supply line length feet (;riax murn pumping distance). *" 12. Supply line N-De PIV" C, alurrunum. ` 13. Pump make zlld.model number "* 14. Pump capacit';-, [gip �zj Y ` 17. E:tC:ne rna e and model number or 16. Electric rn ot--r ho.-se;rc.'wcr and rpr, [hp] �[ - p.<<<] Note: It is strcrgiy recornrn4r+d_d that ope'adii, p'zss-ure at the reel any 2,-n w:- tted ' d bP field det:: mur-1, Locate each hydrant on a cc) y of the map. Indicate the start ar., stop of the sprinkler -:irt for each tra-, el la e and shoe distance tra`-e1>d. Sho,ly the locat:-Dln of ta_ suo>1ly line. Irr-i ated acres v;-L be deter mdned b­ ian_ Optional da_ where possible. * * * In o.�ation furnished by o� and- o r Si�atur., of Ot.r._.- agility Represen!a[i•... Printed Name of 0-7= o:: acilin- Represen;a i.•e Date Signa:ure of Technic.,-' Spy ialist Printed rime o`Tecarioal Srxialist Date `*x Onl-, the person or persons collecting the data should sizi the data sheet. --Specifications- 40A PERFORMANCE GUIDE 40A X 1250' WATER -REEL PERFOR14lUCE Inches Depth of Application . Nelson Sprinkler System **Irrigated Travel Speed - Feet Per Hour Degree �9 SR200 Pertormantro Inlet AREA Rate it NOL PSI GPM I DIA PSI Width X Length 40 50 75 100 125 150 25O M 1.29' 50 230 325 78 228 X 1364 2.1 1.7 1.1 0.9 0.7 0.5 0.3 r0.2 0.31 Ring 60 250 340 91 238 X 1369 2.2 1.8 1.2 0.9 0.7 0.6 0.4 0.2 0.36 or 1.W 70 270 355 104 249 X 1374 2.3 1.8 1.2 0.9 0.7 0.5 0.4 0.2 0.36 Taper 80 290 370 117 259 X 1390 2.4 1.9 1.3 0.9 0.8 0.6 0.4 0.2 0.35 90 310 380 131 266 X 1393 2.5 2.0 1.3 1.0 0.8 0.7 0.4 0.2 0.36 1.48" 50 300 355 89 249 X 1374 2.5 2.0 1.4 1.0 0.8 0.7 0.4 0.3 0.40 Ring 60 330 370 105 259 X 1380 2.7 2.1 1.4 1.1 0.9 0.7 0.4 0.3 0.41 or 1.Y 70 355 385 120 270 X 1385 2.8 2.2 1.5 1.1 0.9 0.7 0.4 0.3 0.40 Taper 80 300 400 135 280 X 1390 2.9 2.3 1.5 1.1 0.9 0.8 0.5 0.3 0.40 90 J 405 415 151 291 X ' 1395 2.2 2.3 1.6 1.2 0.9 0.8 0.5 0.3 0.40 1.5r 50 350 370 99 259 X 1380 2.8 2.3 1.5 1.1 0.9 0.8 0.5 0.3 0.43 Ring 66 385 390 116 273 X 1397 3.0 2.4 1.6 1.2 1.0 0.8 0.5 0.3 0.43 or 1.r 70 415 405 133 284 X 1392 3.1 2.5 1.6 1.2 1.0 0.8 0.5 0.3 0.43 Taper 80 445 420 151 294 X 1397 3.2 2.6 1.7 1.3 1.0 0.9 0.5 0.3 0.42 1.6r 50 410 390 112 273 X 1387 3.2 2.5 1.7 1.3 1.0 0.8 0.5 0.3 0.45 Ring 60 445 41D 131 287 X 1394 3.3 2.6 1.7 1.3 1.0 0.9 0.5 0.3 0.45 or 1.V 70 480 425 150 298 X 1399 3.4 2.7 1.8 1.4 1.1 0.9 0.5 0.3 0.45 Taper Hours For 1250 Feet of Travel: 31.3 25.0 16.7 12.5 10.0 8.3 1 5.0 3.1 System Inlet pressure shown above is for Turbine Drives. Engine Drives will be approx 10 PSI lower. •• Area covered may vary depending on wind conditions, field dimensions and use of unspecified sprinklers. The average area covered per run is 9 acres. • The precipitation rate Is In Inches per hour and is based on a sprinkler arc of 320 degrees_ The'System inlet Pressure' is the pressure required at the -traveler inlet. It includes allowances for the traveler plumbing and drive, PE tube and sprinkler pressure. It does not include any pressure allowances for field elevation or mainline pressure loss. IMPORTANT! Turbine drives will have higher pressure losses at higher RPM and are not recommended for travel speeds above 250 feet per hour. For speeds above 250 Ft. per hour use an Engine Drive. Follow the belt pulley selections below. Lowest speed pulleys: Up to 75 feet per hour. Medium speed pulleys: From 75 to 125 feet per hour. Highest speed pulleys: From 125 to 250 feet per hour. NOTE: Specifications are subject to change without notice. Revised 04-16-97 39 Turbine ii L Gearbox Ira+l Sol-OW-0 -Specifications-- 30A PERFORMANCE GUIDE (02) 30A X 1000- WATER -REEL PERFORMANCE Inches Depth of Application 320. Nelson Sprinldar System **Irrigated Travel Speed - Feet Per Hour Ct rs@ SR150 PeAormanse Inlet AREA lMb 40 00 75 100 1 125 150 250 400 d MOZ: PSI GPM DIA PSI Width X Length 1131° .Sr 50 100 250 72 175 X low 1.2 1.0 0.6 0.5 0.4 0.3 0.2 0.1 0.27 Ring 60 110 M 65 186 X 1093 1.2 1.0 0.7 0.5 0.4 0.3 10.2 0.1 0.26 or .T 70 120 256 98 195 X 1098 1.3 1.0 0.7 0.5 0.4 0.3 0.2 0.1 0.26 Taper SO 128 290 1 110 203 X 1102 1.3 1.1 0.7 0.5 0.4 0.4 0.2 9A 0.25 .9T 50 130 270 s0 189 X 1095 1.4 1.2 0.8 0.6 0.5 0.4 0.2 0.1 0.30 Ring 60 143 285 94 20O X 1100 1.5 1.2 0.8 0.6 0.5 0.4 0.2 0.2 0.29 or X 70 155 300 108 210 X 1105 1.6 1.2 0.8 0.6 0.5 0.4 0.2 0.2 0.29 Taper 80 165 310 122 217 X 11109 1.6 1.3 0.9 0.6 0.5 0A 0.3 0.2 0.29 1.W 60 192 300 108 210 X .1105 1.6 1.5 1.0 0.7 0.6 0.5 0.3 0.2 0.34 Ring 70 197 310 124 217 X 1109 1.4 1.5 1.0 0.8 0.5 0.5 0.3 0.2 0.34 or .r 80 210 320 139 224 X 1112 2.0 1.6 1.1 0.8 0.6 0.5 0.3 0.2 0.34 Taper 90 223 330 155 231 X 1116 2.0 1.6 1.1 0.8 0.7 0.5 5.3 0.2 0.34 1.Ir 50 205 300 107 210 X 1105 2.1 1.6 1.1 0.6 0.7 0.5 0.3 0.2 0.36 Ring 60 225 315 126 221 X 1110 2.1 1.7 1.1 0.9 0.7 0.6 0.3 0.2 0.38 or 1.T 70 245 330 145 231 X 1116 2.2 1.8 1.2 0.9 0.7 0.6 0.4 0.2 0.35 Taper 80 2fi0 340 163 230 X 1119 2.3 1.5 1.2 0.9 0.7 0.6 0.4 0.2 0.35 1.2r 50 255 32fl 131 224 X 1112 2.4 1.9 1.3 1.0 0.6 0.6 0.4 0.2 0.42 Ring 60 275 335 M 235 X 1117 2.5 2.0 1.3 1.0 0.8 0.l 0.4 0.2 0.41 or 1.1' Tapes Hours For 1000 Feet of Travel: 25.0 20.0 13.3 10.0 8.0 6.7 4.0 2.5 System inlet pressure shown abbWis for Turbine Drives. Engine Drives will be approx 10 PSI lower. "Area covered may vary depending on wind conditions, field dimensions and use of unspecified sprinklers. The average area covered per nun Is 5 acres. ' The precipitation rate is in Inches per hour and is based on a sprinkler arc of 320 degrees The 'System Inlet Pressure' Is the pressure required at the traveler Inlet. It includes allowances for the traveler plumbing and drive, PE tube and sprinkler pressure. It does not Include any pressure allowances for field elevation or mainline pressure loss. Turbine l Gearbox IMPORTANT! Turbine drives will have higher pressure tosses at higher RPM and are not recommended for travel speeds above 250 feet per hour. For speeds above 250 Ft. per hour use an Engine Drive. Follow the belt pulley selections below. Lowest speed pulleys: Up to 75 feet per hour. Medium speed pulleys: From 75 to 126 feet per hour. Highest speed pulleys: From 125 to 250 feet per hour. NOTE: Specifications are subject to change without notice. 1D2I 597-0135-0 42 IRRIGATION SYSTEM DESIGN PARMATERS and COMPUTATIONAL WORKSHEET SUMMARY Landowner 1 Operator Name Billy Kilpatrick COUNTY Duplin Adress PO Box94 Kenansville NC 28349 DATE 1/14102 Telephone 910-296-0619 Facility # 31-97 TABLE 1 - Field Specifications Tract Number Hydrant or field (1) Number acres start end wetted area acres middle wetted area acres stop end wetted area Approximate Maximun Useable Size of field (2) (acres) Table column Length of pulls in feet Width of pulls in feet Soil Type.(°,6) Slope Crop(s) Maximun Application Rate (3) (inlhr) Maxlumn Application per Irrigation cycle (3) (inches) 3829 1 0.64 4.79 0 5.43 EE90 13,C 858 243 AUB 0-5 corn,wheat,92XIbeans 0.6 1 3829 2 0.64 4.89 0 5.53 EE90 B,C 876 243 NOR 0-5 corn,wheat,soybeans 0.5 1 3829 3 0.64 4.99 0 5.63 EE90 B,C 887 245 NOR 0-5 com,wheat,soybeans 0.5 1 3829 4 0.64 4.09 0 4.73 EE90 B,C 727 245 AUB 0-5 com,wheat,soybeans 0.5 1 3829 5 0.47 2.9 0 3.37 EE90 B,C 610 207 AUB 0-5 corn,wheat,s ns 0.5 1 3829 6 0.47 3.39 0 3.86 EE90 B,C 671 220 AUB 0-5 com,wheal,soybeans 0.5 1 3829 7 0.46 2.58 0 3.04 E190 B,C 510 220 AUB 0-5 corn,wheat,soybeans 0.5 1 3829 8 0.47 1.63 0 2.1 EE90 8,C 322 220 AUB 0-5 corn,wheal,soybeans 0.5 1 3829 9 0.47 1.93 0 2.43 EE90 B,C 413 207 AUB 0-5 corn,wheats ns 0.5 1 1 see attached map. 2 Total field acreage minus required buffer areas, 3 Refer to N,C. Irrigation guide, Field Office Technical Guide, Section II G. Annual application must not exceed the agronomic rates for the soil and crop used. Wettable Acre Computational Worksheet Completed by: Date IRRIGATION SYSTEM DESIGN PARMATERS and COMPUTATIONAL WORKSHEET SUMMARY Landowner/ Operator Name Billy Kilpatrick COUNTY Duplin Adress PO Box94 Kenansville NC 28349 DATE 1114/02 Telephone 910-296-0619 Facility # 31-97 TABLE 1 - Field Specifications Tract Number Hydrant or field (1) Number acres start end wetted area acres middle wetted I area acres stop end wetted area Approximate Maximun Useable Size of field (2) (acres) Table column Length of pulls In feet Width of pulls In feet Soil T Slope (%) Cro (s) Maximun Application Rate (3) (In/hr) Maxlumn Application per Irrigation cycle (3) (Inches) 3186 10 0.64 6.29 0 6.93 EE=90 B,C 1066 257 AUB 0-5 corn,wheat,soybeans 0.5 1 3188 11 0.63 6.01 0 6.64 E190 B,C 1092 240 AUB 0-5 corn,wheat,soybeans 0.5 1 3186 12 0.63 6.89 0 7.52 E190 B,C 1250 240 AUB 0-5 com,wheat,soybeans 0.5 1 3186 13 0.63 6.89 0 7.52 E190 B,C 1250 240 AUB 0-5 corn,whest,s beans 0.5 1 .3186 14 0.63 3.31 0 3.94 E190 B,C 600 240 AUB 0-5 corn,wheat,soybeans 0.5 1 3186 15 0.64 2.58 0 3.22 EE90 B,C 438 257 AUB 0.5 corn,wheat,soybians 0.5 1 3186 16 0.61 6.17 0 6.78 EE75 B,C 1250 215 AUB 0-5 com,wheat,soybeens 0.5 1 3186 17 0.56 5.74 0 6.3 E175 B,C 1250 200 AUB 0-5 corn,wheat,soybeans 0.5 1 3186 18 0.56 5.74 0 6.3 E175 B,C 1250 200 AUB 0-5 corn,wheat,s eans 0.5'. 1 3186 19 0.61 6.17 0 6.78 EE75 B,C 1 1250 215 AUB 0-5 tcorn,wheat,sopeans 0.5 1 1 see attached map. 2 Total field acreage minus required buffer areas. 3 Refer to N.C. Irrigation guide, Field Office Technical Guide, Section II G. Annual application must not exceed the agronomic rates for the soil and crop used. Wettable Acre Computational Worksheet Completed by: lJohnny Lanier Date 1.-14.-02. y Sfate-of North Carolina Department of Environment and Natural Resources RECEIVED Division of Water Quality James B. Hunt, Jr., Governor DEC $ 1998 Wayne McDevitt, Secretary A. Preston Howard, Jr., P.E., December 7, 1998 Billy Kilpatrick Billy Kilpatrick Farm 463 Routledge St. KenansvilIe NC 28349 I ffl?, T 0 NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Subject: Certificate of Coverage No. AWS310097 Billy Kilpatrick Farm Swine Waste Collection, Treatment, Storage and Application System Duplin County Dear Billy Kilpatrick: In accordance with your application received on September 17, 1997, we are forwarding this Certificate of Coverage (COC) issued to Billy Kilpatrick, authorizing the operation of the subject animal waste collection, treatment, storage and land application system in accordance with General Permit AWG100000. This approval shall consist of the operation of this system including, but not limited to, the management of animal. waste from the Billy Kilpatrick Farm, located in Duplin County, with an animal capacity of no greater than 4320 Feeder to Finish and the application to land as specified in the Certified Animal Waste Management Plan (CAWMP). The COC shall be effective from the date of issuance until April 30, 2003. Pursuant to this COC, you are authorized and required to operate the system in conformity with the conditions and limitations as specified in the General Permit, the facility's CAWMP, and this COC, with no discharge of wastes to surface waters. An adequate system for collecting and maintaining the required monitoring data and operational information must be established for this farm. Any increase in waste production greater than the certified design capacity or increase in number of stocked animals above the number authorized by this COC will require a modification to the CAWMP and this COC and shall be completed prior to actual increase in either wastewater flow or number of animals. Please be advised that any violation of the terms and conditions specified in this COC, the General Permit or the CAWMP may result in the revocation of this COC, or penalties in accordance with NCGS 143-215.6A through 143-215.6C including civil penalties, criminal penalties, and injunctive relief. Upon notification by the Division of this COC's expiration, you shall apply for its renewal. This request shall be made within 30 days of notification by the Division. This *COC is not automatically transferable. A name/ownership change application mustibe submitted to the DWQ prior to a name change or change in ownership. If any parts, requirements, or limitations contained in this COC are unacceptable, you have the right to apply for an individual non -discharge permit by contacting the engineer listed below for P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-7015 FAX 919-733-2496 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper Certificate of Coverage AWS310097 Billy Kilpatrick Farm Page 2_ information on this process. Unless such a request is made within 30 days, this COC shall be final and binding. The subject farm is located in the Wilmington Regional Office. The Regional Office Water Quality Staff may be reached at (910) 395-3900. If you need additional information concerning this COC or the General Permit, please contact J R Joshi at (919) 733-5083 ext. 363. Sincerely, A. Preston Howard, Jr., P.E. cc: (Certificate of Coverage only for all cc's) Duplin County Health Department Wilmington Regional Office, Water Quality Section Duplin County Soil and Water Conservation District Permit File -Central Files Permit File-NDPU State of North Carolina Department of Envi;l:anment, Health and Natural Resources Division of Water Quality Non -Discharge Permit Application Form / Survey (THIS FORM MAY BE PHOTOCOPIED FOR USE AS AN ORIGINAL) General Permit - Liquid Animal Waste Operations The following questions have been completed utilizing information on file with the Division. Please review the information for completeness and make any corrections which are appropriate. If a question has not been completed. by the Division, please. complete as best as possible. Do not leave any. question unanswered. Application Date: I. REQUIRED ITEMS CHECKLIST Please indicate that you have included the following required items by signingf� initials�j1` space provided next to each item. Diffi� �jptr A121licants Initials 1. One completed and signed original and one copy of the application for General Permit - Animal Waste Operations; 2. Two copies of a general location map indicating the location of the animal waste facilities and field locations where animal waste is disposed; 3. Two copies of the Certified Animal Waste Management Plan (CAWMP). If the facility does not have a CAWMP, one must be completed prior to submittal of a general permit application for animal waste operations. II. GENERAL INFORMATION: 1. Farm's name: Billy Kilpatrick Farr 2. Print Land Owner's name: Billy at 3. Land Owners Mailing address: PO Bqx 94_ _ City: Kenansville NC Zip: 28349 Telephone Number: 910-296-0619 4. County where farm is located: 5. Farm Location (Directions from nearest major highway. Please include 5R numbers for state roads. Please include a copy of a county road map with the location of the farm identified): Fr_om_Hwy. I LS-tokes-Gooding Rd. 3Miles on right, 6. Print Farm Manager's name (if different from Land Owner): 7. Lessee's / Integrators name (if applicable; please circle which type is listed): Carroll's Foods Inc 31 - 97 FORM: AWO-G-E 2/26/97 Page 1 of 3 III. OPERATION INFORMATION: 1. Faun No.: 31-97 2. Operation Description: SwineoReration Feeder to Finish _- 4320 - Certified Design Capacity Is the above information correct? Ezf yes; Q no. If no, correct below using the design capacity of the facility Tvne of Swine No. of Animals Tvoe of Poultry EQ. of Animals type of Cattle No. of Animals 0 Wean to Feeder 0 Layer 0 Dairy 0 Feeder to Finish 0 Non -Layer 0 Beef 0 Farrow to Wean (# sow) 0 Turkey 0 Farrow to Feeder (# sow) 0 Farrow to Finish (# sow) Other Type of Livestock on the farm: No. of Animals: 3. Acreage cleared and available for application: -29 Required Acreage (as listed in the CAWMP): 80 4. Number of Lagoons: I ; Total Capacity: 1113081 Cubic Feet (ft3) Number of Storage Ponds: 10 ; Total Capacity: Cubic Feet ft3) 5. Is animal waste being applied on any field which has subsurface drains? QLES)or NO (please circle one) 6. Are subsurface drains present in the vicinity of or under the lagoon? YES or NO (please circle one) IV. APPLICANT'Sf//��C��E,,RTIFICATION: (Land Owner's name listed in question 11.2), attest that this application for Y (Farm name listed in question Il.1) x has been reviewed by me and is accdWate and Ymplete to the best of my knowledge. I understand that if all required parts of this application, are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. Signature V . MANAGER',S,CER Date _T2 CATION: (complete only if different from the Land Owner) I, � (Manager's name listed in question H.6), attest that this application for " U (Farm name listed in question 1I.1) has been reviewed by me and is accura and compl to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting information and attachments are not included, this application package will be returned as incomplete. Signature f%�Yj� __... _ Date THE COMPLETED APPLICATION PACKAGE, INCLUDING ALL SUPPORTING INFORMATION AND MATERIALS, SHOULD BE SENT TO THE FOLLOWING ADDRESS: NORTH CAROLINA DIVISION OF WATER QUALITY WATER QUALITY SECTION PERMITS AND ENGINEERING UNIT POST OFFICE BOX 29535 RALEIGH, NORTH CAROLINA 27626-0535 TELEPHONE NUMBER: (919) 733-5083 , FORM: AWO-G-E 2/26/97 Page 2 of 3 RECEIVED WATER QUALITY SECTION OPERATION & MAINTENANCE PLAN nl 0 5 1998 Proper lagoon liquid management should be a year-round priority. It is especia important to manage 1eveIs so that you do not have problems during extended��ai�ny and �,e�l�ng wet periods. Maximum storage capacity should be available in the lagoon for periods when the receiving crop is dormant (such as wintertime for bermudagrass) or when there are extended rainy spells such as the thunderstorm season in the summertime. This means that at the first signs of plant growth in the later winter/early spring, irrigation according to a farm waste management plan should be done whenever the land is dry enough to receive lagoon liquid. This will make storage space available in the lagoon for future wet periods. In the late summer/early fall the lagoon should be pumped down to the low marker (see Figure 2-1) to allow for winter storage. Every effort should be made to maintain the lagoon close to the minimum liquid level as long as the weather and waste utilization plan will allow it. Waiting until the lagoon has reached its maximum storage capacity before starting to irrigate does not leave room for storing excess water during extended wet periods. Overflow from the lagoon for any reason except a 25-year, 24-hour storm is a violation of state law and subject to penalty action. ` The routine maintenance of a lagoon involves the following: Maintenance of a vegetative cover for the dam. Fescue or common bermudagrass are the most common vegetative covers. The vegetation should be fertilized each year, if needed, to maintain a vigorous stand. The amount of fertilizer applied should be based on a soils test, but in the event that it is not practical to obtain a soils test each year, the lagoon embankment and surrounding areas should be fertilized with 800 pounds per acre of 10-10-10, or equivalent. Brush and trees on the embankment must be controlled. This may be done by mowing, spraying, grazing, chopping, or a combination of ___these practices. This should be done at least once a year and possibly twice in years that weather conditions are favorable for heavy vegetative growth. NOTE: If vegetation is controlled by spraying, the herbicide must not be allowed to enter the Iagoon water. Such chemicals could harm the bacteria in the lagoon that are treating the waste. Maintenance inspections of the entire lagoon should be made during the initial filling of the lagoon and at least monthly and after major rainfall and storm events. Items to be checked should include, as a minimum, the following: Waste Inlet Pipes, Recycling Pipes, and Overflow Pipes ---look for: l . separation of joints 2. cracks or breaks 3. accumulation of salts or minerals 4. overall condition of pipes Lagoon surface ---look for: l . undesirable vegetative growth 2. floating or lodged debris Embankment ---look for: I . settlement, cracking, or "jug" holes 2. side slope stability ---slumps or bulges 3. wet or damp areas on the back slope 4. erosion due to lack of vegetation or as a result of wave action 5. rodent damage Larger lagoons may be subject to liner damage due to wave action caused by strong winds. These waves can erode the lagoon sidewalls, thereby weakening the lagoon dam. A good stand of vegetation will reduce the potential damage caused by wave action. If wave action causes serious damage to a lagoon sidewall, baffles in the lagoon may be used to reduce the wave impacts. Any of these features could lead to erosion and weakening of the dam. If your lagoon has any of these features, you should call an appropriate expert familiar with design and construction of waste lagoons. You may need to provide a temporary fix if there is a threat of a waste discharge. However, a permanent solution should be reviewed by the technical expert. Any digging into a lagoon dam with heavy equipment is a serious undertaking with potentially serious consequences and should not be conducted unless recommended by an appropriate technical expert. Transfer Pumps ---check for proper operation_ of- 1 . recycling pumps 2. irrigation pumps Check for leaks, loose fittings, and overall pump operation. An unusually loud or grinding noise, or a large amount of vibration, may indicate that the pump is in need or repair or replacement. NOTE: Pumping systems should be inspected and operated frequently enough so that you are not completely "surprised" by equipment failure. You should perform your pumping system maintenance at a time when your lagoon is at its low level. This will allow some safety time should major repairs be required. Having a nearly full lagoon is not the time to think about switching, repairing , or borrowing pumps. Probably, if your lagoon is full, your neighbor's lagoon is full also. You should consider maintaining an inventory of spare parts or pumps. Surface water diversion features are designed to carry all surface drainage waters (such as rainfall runoff, roof drainage, gutter outlets, and parking lot runoff) away from your lagoon and other waste treatment or storage structures. The only water that should be coming from your lagoon is that which comes from your flushing (washing) system pipes and the rainfall that hits the lagoon directly. You should inspect your diversion system for the following: l . adequate vegetation 2. diversion capacity 3. ridge berm height Identified problems should be corrected promptly. It is advisable to inspect your system during or immediately following a heavy rain. If technical assistance is needed to determine proper solutions, consult with appropriate experts. You should record the level of the lagoon just prior to when rain is predicted, and then record the level again 4 to 6 hours after the rain (assumes there is no pumping). This will give you an idea of how much your lagoon level will rise with a certain rainfall amount (you must also be recording your rainfall for this to work). Knowing this should help in planning irrigation applications and storage. If your lagoon rises excessively, you may have an inflow problem from a surface water diversion or there may be seepage into the lagoon from the surrounding land. Lagoon Operation Startup: Immediately after construction establish a complete sod cover on bare soil surfaces to avoid erosion. 2. Fill new lagoon design treatment volume at least half full of water before waste loading begins, taking care not to erode lining or bank slopes. 3. Drainpipes into the lagoon should have a flexible pipe extender on the end of the pipe to discharge near the bottom of the lagoon during initial filling or another means of slowing the incoming water to avoid erosion of the lining. 4. When possible, begin loading new lagoons in the spring to maximize bacterial establishment (due to warmer weather). 5. It is recommended that a new lagoon be seeded with sludge from a healthy working swine lagoon in the amount of 0.25 percent of the full lagoon Iiquid volume. This seeding should occour at least two weeks prior to the addition of wastewater. 6. Maintain a periodic check on the -lagoon liquid pH. If the pH falls below 7.0, add agricultural lime at the rate of 1 pound per 1000 cubic feet of lagoon liquid volume until the pH rises above 7.0. Optimum lagoon liquid pH is between 7.5 and 8.0. 7. A dark color, lack of bubbling, and excessive odor signals inadequate biological activity. Consultation with a technical specialist is recommended if these conditions occur for prolonged periods, especially during the warm season. Loading: The more frequently and regularly that wastewater is added to a lagoon, the better the lagoon will function. Flush systems that wash waste into the lagoon several times daily are optimum for treatment. Pit recharge systems, in which one or more buildings are drained and -recharged each day, also work well. Practice water conservation ---minimize building water usage and spillage from leaking waterers, broken pipes and washdown through proper maintenance and water conservation. Minimize feed wastage and spillage by keeping feeders adjusted. This will reduce the amount of solids entering the lagoon Management: Maintain lagoon liquid Ievel between the permanent storage level and the full temporary storage level. Place visible markers or stakes on the lagoon bank to show the minimum liquid level and the maximum liquid lever (Figure 2-1). . Start irrigating at the earliest possible date in the spring based on nutrient requirements and soil moisture so that temporary storage will be maximized for the summer thunderstorm season. Similarly, irrigate in the late summer/early fall to provide maximum lagoon storage for the winter. The lagoon liquid level should never be closer than 1 foot to the lowest point of the dam or embankment. Do not pump the lagoon liquid level lower that the permanent storage level unless you are removing sludge. Locate float pump intakes approximately 18 inches underneath the liquid surface and as far away from the drainpipe inlets as possible. Prevent additions of bedding materials, long-stemmed forage or vegetation, molded feed, plastic syringes, or other foreign materials into the lagoon. Frequently remove solids from catch basins at end of confinement houses or wherever they are installed. Maintain strict vegetation, rodent, and varmint control near lagoon edges. Do not allow trees or large bushes to grow on lagoon dam or embankment. Remove sludge from the lagoon either when the sludge storage capacity is full or before it fills 50 percent of the permanent storage volume. If animal production is to be terminated, the owner is responsible for obtaining and implementing a closure plan to eliminate the possibility of a pollutant discharge. Sludge Removal: Rate of lagoon sludge buildup can be reduced by: proper lagoon sizing, mechanical solids separation of flushed waste, gravity settling of flushed waste solids in an appropriately designed basin, or minimizing feed wastage and spillage. Lagoon sludge that is removed annually rather than stored long term will: have more nutrients, have more odor, and require more land to properly use the nutrients. Removal techniques: Hire a custom applicator. Mix the sludge and lagoon liquid with a chopper -agitator impeller pump through large -bore sprinkler irrigation system onto nearby cropland; and soil incorporate. Dewater the upper part of lagoon by irrigation onto nearby cropland or forageland; mix remaining sludge; pump into liquid sludge applicator; haul and spread onto cropland or forageland; and soil incorporate. Dewater the. upper part of lagoon by irrigation onto nearby cropland or forageland; dredge sludge from lagoon with dragline or sludge barge; berm an area beside lagoon to receive the sludge so that liquids can drain back into lagoon; allow sludge to dewater; haul and spread with manure spreader onto cropland or forageland; and soil incorporate. Regardless of the method, you must have the sludge material analyzed for waste constituents just as you would your lagoon water. The sludge will contain different nutrient and metal values from the liquid. The application of the sludge to fields will be limited by these nutrients as well as any previous waste applications to that field and crop requirement. Waste application rates will be discussed in detail in Chapter 3. When removing sludge, you must also pay attention to the liner to prevent damage. Close attention by the pumper or drag -line operator will ensure that the lagoon liner remains intact. If you see soil material or the synthetic liner material being disturbed, you should stop the activity immediately and not resume until you are sure that the sludge can be removed without liner injury. If the liner is damaged it must be repaired as soon as possible. Sludge removed from the lagoon has a much higher phosphorus and heavy metal content than liquid. Because of this it should probably be applied to land with low phosphorus and metal levels, as indicated by a soil test, and -incorporated to reduce the chance of erosion. Note that if the sludge is applied to fields with very high soil -test phosphores, it should be applied only at rates equal to the crop removal of phosphorus. As with other wastes, always have your lagoon sludge analyzed for its nutrient value. The application of sludge will increase the amount of odor at the waste application site. Extra precaution should be used to observe the wind direction and other conditions which could increase the concern of neighbors. Possible Causes of Lagoon Failure Lagoon failures result in the unplanned discharge of wastewater from the structure. Types of failures include leakage through the bottom or sides, overtopping, and breach of the dam. Assuming proper design and construction, the owner has the responsibility for ensuring structure safety. Items which may lead to lagoon failures include: Modification of the lagoon structure ---an example is the placement of a pipe in the dam without proper design and construction. (Consult an expert in lagoon design before placing any pipes in dams.) Lagoon liquid levels ---high levels are a safety risk. Failure to inspect and maintain the dam. Excess surface water flowing into the Iagoon. Liner integrity ---protect from inlet pipe scouring, damage during sludge removal, or rupture from lowering lagoon liquid level below groundwater table. . NOTE: If lagoon water is allowed to overtop the dam, the moving water will soon cause gullies to form in the dam. Once this damage starts, it can quickly cause a large discharge of wastewater and possible darn failure. System Calibration Information presented in manufacturer's charts are based on average operation conditions with relatively new equipment. Discharge rates and application rates change over time as equipment gets older and components wear. In particular, pump wear tends to reduce operating pressure and flow. With continued use, nozzle wear results in an increase in the nozzle opening which will increase the discharge rate while decreasing the wetted diameter. You should be aware that operating the system differently than assumed in the design will alter the application rate, diameter of coverage, and subsequently the application uniformity. For example, operating the system with excessive pressure results in smaller droplets, greater potential for drift, and accelerates wear of the sprinkler nozzle. Clogging of nozzles can result in pressure increase. Plugged intakes or crystallization of mainlines will reduce operating pressure. Operating below design pressure greatly reduces the coverage diameter and application uniformity. For the above reason, you should calibrate your equipment on a regular basis to ensure proper application rates and uniformity. Calibration at least once every three years is recommended. Calibration involves collecting and measuring flow at several locations in the application area. Any number of containers can be used to collect flow and determine the application rate. Rain gauges work best because they already have a graduated scale from which to read theapplication amount without having to perform additional calculations: However, pans, plastic buckets, jars, or anything with a uniform opening and cross-section can be used provided the liquid collected can be easily transferred to a scaled container for measuring. For stationary sprinklers, collection containers should be located randomly throughout the application area at several distances from sprinklers. For traveling guns,:spr+nklers should be located along a transect perpendicular to the direction of pull. -Set out collection containers 25 feet apart along the transect on both, sides of -the gun cart. You should compute the average application rate for all non_uniformity of the application. On a windless day, variation between containers of more -than 30 percent is cause for concern. You should contact your irrigation dealer or technical specialist for assistance. 'Reprinted for Certification Training for Operations of Animal Waste Management Systems Manual MORTALITY MANAGEMENT METHODS (check which method(s) are being implemented) { } ; Burial three feet beneath the surface of the ground within 24 hours after knowledge of the death. The burial be at least 300 feet from any flowing steam "or public body of water. { Rendering at a rendering plant licensed under G. S. 106-168.7 ( } Complete incineration 'In the case of dead poultry only, placing in. a ,disposal pit -of a size and design approved by the Department of -Agriculture. ( ) Any method which in the professional opinion of the State Veterinarian would make possible the salvage of part of a dead animal's value without endangering human or animal health.- (Written approval of the, State Veterinarian must be attached) INSECT CONTROL CHECKLIST FOR ANIMAL OPERATIONS Source Cause BMP's to Minimize Odor Site Specific Practices (Liquid Systems) Flush Gutters Accumulation of solids lush system is designed and operated sufficiently to remove accumulated so s from gutters as designed. emove bridging of accumulated solids at discharge Lagoons and Pits Crusted Solids ( ) Maintain lagoons, settling basins and pits where pest breeding is apparent to minimize the crusting of solids to a depth of no more than 6-8 inches over more than ` 2% of surface. Excessive Vegetative Decaying vegetation kLAaintain vegetative control along banks of Growth lagoons and other impoundments to prevent accumulation of decaying vegetative matter along waters edge on impoundment's perimeter. (Dry Systems) Feeders Feed Spillage f) Design, operate and maintain feed systems (e.g., bunkers and troughs) to minimize the accumulation of decaying wastage. (1 Clean up spillage on a routine basis (e.g. 7-10 day interval during summer; 15-30 day interval during winter). Feed Storage Accumulations of feed residues () Reduce moisture accumulation within and around immediate perimeter of feed storage areas by insuring drainage away from site andlor providing adequate containment (e.g.. covered bin for brewer's grain and similar high moisture grain products). I i Inspect for and remove or break up accumulated solids in filter strips around feed storage as needed. Animal Holding Areas Accumulations of animal wastes and feed wastage AMIC--November 11, 1996 ( ) Eliminate low area that trap moisture along fences and other locations where waste accumulates and and disturbance by animals is minimal. { ) Maintain fence rows and filter strips around animal holding areas to minimize accumulations of wastes (i.e. inspect for and remove or break up accumulated solids as needed). Dry Manure Handling Accumulations of animal wastes f 1 Remove spillage on a routine basis (e.g. 7-10 day Systems interval during summer; 15-30 days interval during winter) where manure is loaded for land application or disposal. (} provide for adequate drainage around manure stockpiles. f } Inspect for and remove or break up accumulated wastes in filter stripes around stockpiles and manure handling areas as needed. The issues checked ( ) pertain to this operation. The landowner/integrator agrees to use sound judgment in applying insect control measures as practical. certify the aforementioned insect control Best Management Practices have been reviewed with me. (Landowner Signature) (Farm Name) (Facility Number) For more information contact the Cooperative Extension Service, Department of Entomology, Box 7613, North Carolina State University, Raleigh, NC 27695-7613. AMIC--November 11, 1996 t SWINE FARM WASTE MANAGEMENT ODOR CONTROL CHECKLIST Source Cause BNIP's to Minimize Odor Site Specific Practices Farmstead Swine production Ve tative or wooded buffers; mmended best management pre ices; { od judgment and common sense Animal body surfaces Dirty manure -covered animals i 1 Dry Poors Floor surfaces Wet manure -covered floors ed floors; terers located over slotted floors; 5rs edat high end of solid floors; { } Scrape manure buildup from floors; {) U 4rfloor ventilation for drying Manure collection pits Urine i equent manure removal by flush,pit recharge,or scrape Parital micorbial decomposition () Und rfloor ventilation Ventilation exhaust fans Volatile gases; f) Fa maintenance; Dust { fi ant air movement Indoor surfaces Dust ashdown between groups of animals i l Feed additives; () Feeder covers; () Feed delivery downspout extenders to feeder covers Flush tanks Agitation of recycled lagoon (I Flush tank covers liquid whites tanks are filling {) Extend fill lines to near bottom of tanks with anti -siphon vents Flush alleys Agitation during wastewater { ) Underfloor flush with underfloor conveyanance ventilation Pit recharge points Agitation of recycled lagoon () Extend rechard lines to near bottom of liquid while pits are filling pits with anti -siphon vents Lift stations Agitation during sump tank filling U Sump tank covers and drawdown Outside drain collection Agitation during wastewater { } Box covers or junction boxes conveyance End of drainpipes at lagoon Agitation during wastewater {) Extend discharge point of pipes underneath lagoon liquid level Lagoon surfaces Volatile gas emissions oper lagoon liquid capacity Biological mixing t4orrect lagoon startup procedures Agitation inimum surface area -to -volume ratio { inimum agitation when pumping f l Mechanical aeration {) Proven biological additives i Irrigation sprinkler nozzles High pressure agitation WWrri ate on dry days with little or no wind Wind draft { irrmum recommended operation pressure ( rnp, intake near lagoon liquid surface ( ) Pump from second -stage lagoon AMOC--November 11, 1996 .. 1. b Storage tank or basin Partial microbial decomposition { 1 Bottom or midlevel loading surface Mixing while filling { j Tank covers Agitation when emptying [ } Basin surface mats of solids [ } Proven biological additives or oxidants Settling basin surface Partial micobial decomposition [ } Extend drainpipe outlets underneath liquid Mixing while filling level Agitation when emptying f 1 Remove settled solids regularly Manure, slurry or sludge Agitation when spreading { j Soil injection of slurry/sludges spreader outlets Volatile gas emissions { } Wash residual manure from spreader after use [ } Proven biological additives or oxidants Uncovered manure, slurry Volatile gas emissions while drying [) Soil infection of slurry/sludges or sludge on field surfaces () Soil incorporation within 48 hours f 1 Spread in thin uniform layers for rapid drying { j Proven biological additives or oxidants Dead animals Carcass decomposition [ } Proper disposition of carcasses Dead animal disposal Carcass decomposition [) Complete covering of carcasses in burial pits pits [) Proper location/construction of disposal pits Incinerators Incomplete combustion f I Secondary stack burners Standing water around Improper drainage I 1 Grade and landscape such that water drains facilities Microbial decomposition of away from facilities organic matter Manure tracked onto public Poorly maintained access roads [ i Farm access road maintenance roads from farm access Additional Information: Available From: Swine Manure Management; 0200 Rule/BMP Packet NCSU-County Extension Center Swine Production Farm Potential Odor Sources and Remedies, EBAE Fact Sheet NCSU-BAE Swine Production Facility Manure Management: Pit Recharge --Lagoon Treatment; EBAE 128-88 NCSU-BAE Swine Production Facility Manure Management: Underfloor Fluse--Lagoon Treatment; EBAE 129-88 NCSU-BAE Lagoon Desig and Management for Livestock Manure Treatment and Storage; EBAE 103-83 NCSU-BA£ Calibration of Manure and Wastewater Application Equipment; EBAE Fact Sheet NCSU-BAE Controlling Odors from Swine Buildings; PIH-33 NCSU-Swine Extension Environmental Assuranc Program: NPPC Manual NC Pork Produces Assoc Options for Managing Odor; a report from the Swine Odor Task Force NCSU Agri Communications Nuisance Concerns in Animal Manure Management: Odors and Flies; PR0107, 1995 Conference Proceedings Florida Cooperative Extension The issues checked Jpertain to this o eration. The landowner/inte rator a rees to use sound 'ud ment in applying P 9 9 judgment odor control measures as practical. I certify the aforementioned odor control Best Managment Practices have been reviewed with me. (Landowner Signature) AMOC--November 11, 1996 r - .15'4'y1i.1X0,h' c y by rF 1 3'1vj 1 4. S3 f�• ��i1 k1) �.Y ,e tip iIr y +i ib da Z.I � CYf ijs q s•a � � 4 'IA .t i � Lrl t'1 to }� � r T --II t• tP ?� Al �Lc.o Vy i •: 1' C' y f .yy� � ` _ titi €:v.L ,., fir: 9 .�' � •� s a L' 2y `i 1.0 sr '=1 .`i's P� � n i e hPaa ,9A ��` ✓'«• PI ock __ it' ,t ;.� Y.f' �-.• ..-.a'r . € �s •t �i�' � � yF. '+ ti4� � �?. � �r'Tr' s t �� � � - � 1 i .�, y,�.� i ^"_°��:�w��.�-.F�R.'ti t, K� .r(l-s � f._ ��,�� � _,�fi Mh Yee •4d- '�'�a...�t'. i .—�':'�7°�. Ani`r, Waste Management Plan Celt, cation ` (Please type or print all information that does not require a signature) Company Name Carrolls stop or New or Expanded {Please Cl one) General Information: Name of Farm: Billy Kilpatrick Farms Facility No: 31-97 Owner(s) Name: William "Billy" Kilpatrick Phone No: 910-296-0619 Mailing Address: PO Box W Kenansville, NC 28349 Farm Location: Fourteen Digit Hydrologic Unit: 03030007030010 Latitude and Longitude: 34- 59' 05" / 77- 57' 20" County: Duplin Please attach a copy of a county road map with location identified and describe below (Be specific: road names, directions, milepost, etc.): On SR 1378 approximately 1/2 mile from intersection with SR 1379. Operation Description: Type of Swine No of Animals 0 Wean to Feeder 0 {) Feeder to Finish 4320 0 Farrow to Wean 0 0 Farrow to Feeder 0 0 Farrow to Finish 0 Type of Poultry ()Layer ()Pullets Other Type of Livestock: No of Animals Type of Cattle No of Animals ()Dairy ()Beef Number of Animals: Acreage Available for Application: 90 Required Acreage: 80 Number of Lagoons/Storage Ponds: 1 Total Capacity: 1,113,081 Cubic Feet (ft3 ) Are subsurface drains present on the farm: YE, or NO (please circle one) Owner/Manager Agreement I(we) verify that all the above information is correct and will be updated upon changing. I (we) understand the operation and maintenance procedures established in the approved animal waste management plan for the faun named above and will implement these procedures. 1 (we) know that any expansion to the existing design capacity of the waste treatment and storage system or construction of new facilities will require a new certification to be submitted to the Division of Environmental Management before the new animals are stocked. I (we) understand that there must be no discharge of animal waste from the storage or application system to surface waters of the state either directly through a man-made conveyance or from a storm event less severe than the 25-year, 24-hour storm and there must not be run-off from the application of animal waste. I (we) understand that run-off of pollutants from lounging and heavy use areas must be minimized using technical standards developed by the Natural Resources Conservation Service. The approved plan will be filed at the farm and at the office of the local Soil and Water Conservation District. 1 (we) know that modification must be approved by a technical specialist and submitted to the Soil and Water Conservation District prior to implementation. A change in land ownership requires written notification to DEM or a new certification (if the approved plan is changed) within 60 days of a title transfer. Name of Land Owner: William Robert "Billy" Kilpatrick Signature: j,,Z Date: / _ �/- 96 _ Name of Manager (if different from a er): Signature: Date: AWC -- April 24, 1996 1 �'echnical Specialist Certify— ion 1. A- " "—mical specialist designated by the North Carolina Soil and Water Conservation Commission pursuant to 15A NCAC 6F .0005, I certify that the animal waste management system for the farm named above has an animal waste management plan that meets or exceeds standards and specifications of the Division of Environmental Management (DEM) as specified in 15A NCAC 214.0217 and the USDA -Natural Resources Conservation Service (NRCS) and/or the North Carolina Soil and Water Conservation Commission pursuant to 15A NCAC 2H.0217 and 15A NCAC 6F .0001-.0005. The following elements are included in the plan as applicable. While each category designates a technical specialist who may sign each certification (SD, SI, WUP, RC,I) the technical specialist should only certify parts for which they are technically competent. II. Certification of Design A) Collection Storage, Treatment System Check the appropriate box 90 Existing facility without retrofit (SD or WUP) Storage volume is adequate for operation capacity; storage capability consistent with waste utilization requirements. { } New, expanded or retrofitted facility (SD) Animal waste storage and treatment structures, such as but not limited to collection systems, lagoons and ponds, have been designed to meet or exceed the minimum standards and specifications. Name of Technical Specialist (Please Print) Michael E. Sugg Affiliation: USDA Natural Resources Conservation Service Address (Agency): P.O. Box 277 Kenansville, NC 28349-0277 Phone No: 910-296-2121 Signature: , �' XW Date: / Z 1996 B) Land Application Site (WUP) The plan provides for minimum separation (buffers); adequate amount of land for waste utilization; chosen crop is suitable for waste management; hydraulic and nutrient loading rates. Name of Technical Specialist (PIease Print): Michael E. Sugg Affiliation: USDA Natural Resources Conservation Service Address (Agency): P.O. Box 277 Kenansville NC 28349-0277 Phone No: 910-296-2121 Signature: S' Date: % 7,1�1 1996 C) Runoff Controls from Exterior Lots Check the appropriate box Facility without exterior lots (SD or WUP or RC) This facility does not contain any exterior lots. O Facility with exterior lots (RC) Methods to minimize the run off of pollutants from Iounging and heavy use areas have been designed in accordance with technical standards developed by NRCS. Name of Technical Specialist (Please Print): Michael E. Sugg Affiliation: USDA Natural Resources Conservation Service Address (Agency): P.O. Box 277 Kenansville, NC 28349-0277 Phone No.: 910-296-2121 Signature: . 1. Date:. ( 7-0 / �A-- AWC — ApriI 24, 19Aal 2 D) Application and Nandlin� Eu men Che- k the Appropriate box AA Existing existing waste with existinwaste application equipment (WUP or I) IrvAnimal waste application equipment specified in the plan has been either field calibrated or evaluated in accordance with existing design charts and tables and is able to apply waste as necessary to accommodate the waste management plan: (existing application equipment can cover the area required by the plan at rates not to exceed either the specified hydraulic or nutrient loading rates, a schedule for timing of application has been established; required buffers can be maintained and calibration and adjustment guidance are contained as part of the plan). O New or expanded facilit • or existing facility without existing waste aRplication Nuipment (1) Animal waste application equipment specified in the plan has been designed to apply waste as necessary to accommodate the waste management plan; (proposed application equipment can cover the area required by the plan at rates not to exceed either the specified hydraulic or nutrient loading rates; a schedule for timing of applications has been established; required buffers can be maintained; calibration and adjustment guidance are contained as part of the plan). Name of Technical Specialist (Please Print): Michael E. Sugg Affiliation: USDA Natural Resources Conservation Service Address(Agency): PO Box 277 Kenansville NC 28349-0277 Phone No: 910-296-2121 Signature:' Date: ��1 1996 Ou III. Certification of Installation A) Collection, Storage, Treatment Installation New, expanded or retrofitted facility (SI) Animal waste storage and treatment structures such as but not limited to lagoons and ponds, have been installed in accordance with the approved plan to meat or exceed the minimum standards and specifications. For existing facilities without retrofits, no certification is necessary. Name of Technical Specialist (Please Print): Affiliation: Address(Agency): Phone No.: Signature: Date: AWC -- Aprii 24, 1996 B) Land Application Site (W"UP) Check the appropriate box The cropping system is in place on all land as specified in the animal waste management plan. () Conditional Approval: all required land as specified in the plan is cleared for planting; the cropping system as specified in the waste utilization plan has not been established and the owner has committed to established the vegetation as specified in the plan by (month/day/year); the proposed cover crop is appropriate for compliance with the waste utilization plan. (} Also check this box if appropriate if the cropping system as specified in the plan can not be established on newly cleared Iand within 30 days of this certification, the owner has committed to establish an interim crop for erosion control; Name of Technical Specialist (Please Print): Michael E. Sugg Affiliation: USDA Natural Resources Conservation Service Address(Agency): P.O. Box 277 Kenansville, NC 28349-0277 Phone No.: 910-296-2121 Signature: Date: 7 1996 f This following signature block is only to be used when the box for conditional approval in IIT.B above has been checked. I (we) certify that I(we) have committed to establish the cropping system as specified in my (our) waste utilization plan, and if appropriate to establish the interim crop for erosion control, and will submit to DEM a verification of completion from a Technical Specialist within 15 calendar days following the date specified in the conditional certification. I (we) realize that failure to submit this verification is a violation of the waste management plan and will subject me (us) to an enforcement action from DEM. Name of Land Owner: Signature: Date: Name of Manger (if different from owner): Signature: Date: C) Runoff Controls from Exterior Tots (RC) Facility with exterior lots Methods to minimize the run off of pollutants from lounging and heavy use areas have been installed as specified in the plan. For facilities without exterior lots, no certification is necessary. Name of Technical Specialist (Please Print): Affiliation: Address(Agency): Phone No.: Signature: Date: AWC — April 24, 1996 D) Application and hlandlinL, Eg nent Installation (WUP or 1) Check i'he appropriate block Animal waste application and handling equipment specified in the plan is on site and ready for use; calibration and / 1 adjustment materials have been provided to the owners and are contained as part of the plan. () Animal waste application and handling equipment specified in the plan has not been installed but the owner has proposed leasing or third party application and has provided a signed contract; equipment specified in the contract agrees with the requirements of the plan; required buffers can be maintained, calibration and adjustment guidance have been provided to the owners and are contained as part of the plan. {) Conditional approval: Animal waste application and handling equipment specified in the plan has been purchased and will be on site and installed by (month/day/year); there is adequate storage to hold the waste until the equipment is installed and until the waste can be land applied in accordance with cropping system contained in the plan; and calibration and adjustment guidance have been provided to the owners and are contained as part of the plan. Name of Technical Specialist(Please Print): Michael E. Sugg Affiliation: USDA Natural Resources Conservation Service Address(Agency): PO Box 277 Kenansville NC 28349-0277 Phone No.: 910-296-2121 Signature: �' Date: J 44 1996 The following signature block is only to used when the box for conditional approval in III D above has been checked. I (we) certify that I (we) have committed to purchase the animal waste application and handling equipment as specified in my (our) waste management plan and will submit to DEM a verification of delivery and installation from a Technical Specialist within 15 calendar days following the date specified in the conditional certification. I (we) realize that failure to submit this verification is a violation of the waste management plan and will subject me (us) to an enforcement action from DEM. Name of Land Owner: Signature: Date: Name of Manager(if different from owner): Signature: Date: Please return the completed form to the Division of Environmental Management at the following address: Department of Environment, Health, and Natural Resources Division of Environmental Management Water Quality Section, Compliance Group P.O. BOX 29535 Raleigh, NC 27626-0535 Please also remember to submit a copy of this form along with the complete Animal Waste Management Plan to the local Soil and Water Conservation District Office and to keep a copy in your tiles with your Animal Waste Management Plan. AWC — April 24, 1996 5 WASTE UTILIZATION PLAN March. 15, 1996 PRODUCER: BILLY KILPATRICK LOCATION: PO BOX 723 KENANSVILLE NC 28349 TELEPHONE: 910-296-0619 TYPE OPERATION: Feeder to Finish Swine NUMBER OF ANIMALS: 4320 hogs design capacity PAGE 1 The waste from your animal facility must be land applied at a specified rate to prevent pollution of surface and/or groundwater. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the crops in the fields where waste is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed before each application cycle. Annual soil tests are strongly encouraged so that all plant nutrients can be balanced for realistic yields of the crop to be grown. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner. Always apply waste based on the needs of the crop to be grown and the nutrient content of the waste. Do not apply more nitrogen than the crop can utilize. Soil types are important as they have different infilitration rates, leaching potentials, cation exchange capacities, and available water holding capacities. Normally waste shall not be applied to land eroding at greater than 5 tons per acre per year. With special pre- cautions, waste may be applied to land eroding at up to 10 tons per acre per year. Do not apply waste on saturated soils, when it is raining, or when the surface is frozen. Either of these conditions may result in runoff to surface waters which is not allowed under DEM regulations. Wind conditions should also be considered to avoid drift and downwind odor problems. To maximize the value of the nutrients for crop production and to reduce the potential for pollution, the waste should be applied to a growing crop or applied to bare ground not more than 30 days prior to planting. Injecting the waste or disking will conserve nutrients and reduce odor problems. This plan is based on waste application through irrigation for this is the manner in which you have chosen to apply your waste. If you choose to inject the waste in the future, you need to revise this plan. Nutrient levels for injecting waste and irrigating waste are not 'the same. The estimated acres needed to apply the animal waste is based on typical nutrient content for this type of facility. Acreage require- ments should be based on the waste analysis report from your waste management facility. Attached you will find information on proper sampling techniques, preparation, and transfer of waste samples to the lab for analysis. This waste utilization plan, if carried out, meets the requirements for compliance with 15A NCAC 2H.0217 adopted by the Environmental Management Commission. WASTE UTILIZATION PLAN PAGE 2 AMOUNT OF WASTE PRODUCED PER YEAR (gallons, ft3, tons, etc.) 4320 hogs x 1.9 tons waste/hogs/year = 8208 tons AMOUNT OF PLANT AVAILABLE NITROGEN (PAN) PRODUCED PER YEAR 4320 hogs x 2.3 lbs PAN/hogs/year = 9936 lbs. PAN/year Applying the above amount of waste is a big job. You should plan time and have appropriate equipment to apply the waste in a timely manner. The following acreage will be needed for waste application based on the crop to be grown, soil type and surface application. ram` WASTE UTILIZATION PLAN PAGE 3 TABLE 1: ACRES OWNED BY PRODUCER TRACT FIELD SOIL TYPE & CLASS- CROP YIELD LBS COMM N ** * LBS DETERMINING PHASE CODE AW N PER ACRES AW N PER AC AC USED APPLIC.' TIME 479.375 3186 4 AUB C 75 73.75 20 6.5 MAR-JUN 3186 1-4 JAUB JW 145 190 1 16*5 1585 FEB-MAR 3186 6 JAUB IC 175 173.75 120 136 12655 MAR-JUN 3186 1-6 JAUB JW 145 190 1 136 13240 FEB-MAR 3186 10 AUB I C 175 173.75 120 12.�7 1199.125 MAR-JUN 3186 -10 JAUB JW 145 190 12.7 1243 FEB-MAR 3186 5 JAUB DSB 118 172 1 16.6 1475.2 JUN-SEPT 3186 7 NOB DSB 138 1152 1 16.6 11003.2 JUN-SEPT 3186 8 JAUB DSB 118 172 1 117.5 11260 JUN-SEPT 3186 9 JAUB DSB 118 1.72 1 113.8 1993.6 JUN-SEPT TOTAL 11133.5 Indicates that this field is being overseeded (i.e. interplanted) or winter annuals follow summer annuals. NOTE: The applicator is cautioned that P and K may be over applied while meeting the N requirments. Beginning in 1996 the Coastal zone Management Act will require farmers in some eastern counties of NC to have a nutrient management plan that addresses all nutrients. This plan only addresses Nitrogen. WASTE UTILIZATION PLAN PAGE 4 TABLE 2: ACRES WITH AGREEMENT OR LONG TERM LEASE (Agreement with adjacent landowners must be attached.) (Required only if operator does not own adequate land. See required specification 2.) TRACT FIELD SOIL TYPE & CLASS- CROP YIELD LBS COMM N ** * LBS DETERMINING PHASE CODE AW N PER ACRES AW N PER AC AC USED APPLIC. TIME END TOTAL 10 Indicates that this field is being overseeded (i.e. interplanted) or winter annuals follow summer annuals. ** Acreage figures may exceed total acreage in fields due to overseeding. * lbs AW N (animal waste nitrogen) equals total required nitrogen less any commercial nitrogen (COMM N) supplied. The following legend explains the crop codes used in tables 1 and 2 above: LBS N CROP CODE CROP UNITS PER UNIT C CORN BUSHELS 1.25 DSB DOUBLE CROPPED SOYBEANS BUSHELS 4 W WHEAT BUSHELS 2 WASTE UTILIZATION PLAN PAGE 5 TOTALS FROM TABLES 1 AND 2 TABLE 1 1 89.7 1 11133.5 TABLE 2 I 0 TOTAL JI 89.7 AMOUNT *** BALANCE 1 11133.5 9936 -1197.5 *** This number must be less than or equal to 0 in order to fully utilize the animal waste N produced. Acres shown in each of the preceding tables are considered to be the usable acres excluding required buffers, filter strips along ditches, odd areas unable to be irrigated, pnd perimeter areas not receiving full application rates due to equipment limitations. Actual total acres in the fields listed may, and most likely will be, more than the acres shown in the tables. NOTE. The Waste Utilization Plan must contain provisions for periodic land application of sludge at agronomic rates. The sludge will be nutrient rich and will require precautionary measures to prevent over application of nutrients or other elements. Your production facility will produce approximately 1598.4 pounds of plant available nitrogen (PAN)'per year in the sludge that will need to be removed on a periodic basis. This figure is PAN when broadcasting the sludge. Please be aware that additional acres of land, as well special equipment, may be needed when you remove this sludge. See attached map showing the fields to be used for the utilization of waste water. APPLICATION OF WASTE BY IRRIGATION The irrigation application rate should not exceed the intake rate of the soil at the time of irrigation such that runoff or ponding occurs. This rate is limited by initial soil moisture content, soil structure, soil texture, water droplet size, and organic solids. The application amount should not exceed the available water holding capacity of the soil at the time of irrigation nor should the plant available nitrogen applied exceed the nitrogen needs of the crop. Your facility is designed for 210 days of temporary storage and the temporary storage must be removed on the average of once every 7 months. In no instance should the volume of waste being stored in your structure be within 1.7 feet of the top of the dike. WASTE UTILIZATION PLAN PAGE 6 If surface irrigation is the method of land application for this plan, it is the responsibility of the producer and irrigation designer to ensure that an irrigation system is installed to properly irrigate the acres shown in Tables 1 and 2. Failure to apply the recommended rates and amounts of Nitrogen shown in the tables may make this plan invalid. Call your technical specialist after you receive the waste analysis report for assistance in determining the amount of waste per acre and the proper application rate prior to applying the waste. NARRATIVES OF OPERATION : ke- Z 4 i gas Co►� r�- ou) 4" 1e 1 1S (l0� SC C.amme('craL `� L[i' ThL7 L3 +N 7T `� e. S,)-f ern 1` Sc k" S '' I i - (L P j � l e- h <jkjsP )• W t d Sd ..PP .,-- n r su-&4 Ike l,/ w6,f vm�+- 1r\C l� mac' C&.k'� J 'V i` E r r11e `N"C,} 4PP P6f- Cw-,V-<`e L 33. 04 Aov,:� C'br-e) It"s 4 tA& S 1) WASTE UTILIZATION PLAN PAGE 7 Plans and Specifications 1. Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste which reaches surface water is prohibited. Illegal discharges are subject to assessment of civil penalties of $10,000 per day by the Division of Environmental Management for every day the discharge continues. 2. The Field Office must have documentation in the design folder that the producer either has owns or has long term access to adequate land to properly dispose of waste. If the producer does not own adequate land to properly dispose of waste, he shall provide NRCS with a copy of a written agreement with a landowner who is within a reasonable proximity, allowing him/her the use of the land for waste application for the life expectancy of the production facility. It is the responsibility of the owner of the facility to secure an update of the Waste Utilization Plan when there is a change in the operation, increase in the number of animals, method of utilization, or available land. 3. Animal waste shall be applied to meet, but not exceed, the Nitrogen needs for realistic crop yields based on soil type, available moisture, historical data, climate conditions, and level of management, unless there are regulations that restrict the rate of application for other nutrients. 4. Animal waste may be applied to land that has a Resource Management System (RMS) or an Alternative Conservation System (ACS). If an ACS,is used the soil loss shall be no greater than 10 tons per acre per year and appropriate filter strips will be used where runoff leaves the field. These filter strips will be in addition to "Buffers" required by DEM. (See FOTG Standard 393 - Filter Strips and Standard 390 Interim Riparian Forest Buffers). 5. Odors can be reduced by injecting the waste or disking after waste application. Waste should not be applied when the wind is blowing. 5. When animal waste is to be applied on acres subject to flooding, it will be soil incorporated on conventionally tilled cropland. When applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding. (See "Weather and Climate in North Carolina" in the NRCS Technical Reference - Environment file for guidance 7. Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control conditions conducive to odor or flies and to provide uniformity of application. 8. Animal waste shall not be applied to saturated soils, during rainfall events, or when the surface is frozen. 9. Animal waste shall be applied on actively growing crops in such a manner that no more than 20 to 25 percent of the leaf area is covered. WASTE UTILIZATION PLAN PAGE 8 10. Waste nutrients shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Waste nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of a crop on bare soil. 11. Animal waste shall not be applied closer than 25 feet to surface water. This distance may be reduced for waters that are not perennial provided adequate vegetative filter strips are present. (See Standard 393 - Filter Strips) 12. Animal waste shall not be applied closer than 100 feet to wells. 13. Animal waste shall not be applied closer than 200 feet of dwellings other than -those owned by the landowner. 14. Waste shall be applied in a manner not to reach other property and public right -of ways. 15. Animal waste shall not be discharged into surface wasters, drainageways, or wetlands by discharge or by over -spraying. Animal waste may be applied to prior converted wetlands provided they have been approved as a land application site by a "technical specialist". Animal waste should not be applied on grassed waterways that discharge into water courses, except when applied at agronomic rates and the application causes no runoff or drift from the site. 16. Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. 17. Lagoons and other uncovered waste containment structures must maintain a maximum operating level to provide adequate storage for a 25-year, 24-hour storm event in addition to one (1) foot mandatory freeboard. 18. A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). If needed, special vegetation shall be provided for these areas and shall be fenced, as necessary, to protect the vegetation. vegetation such as trees, shrubs, and other woody species, etc. are limited to areas where considered appropriate. Lagoon areas should be kept mowed and.accessible. Lagoon berms and structures should be -inspected regularly for evidence of erosion, leakage or discharge. 19. If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and imple- menting a "closure plan" which will eliminate the possibility of an illegal discharge, pollution and erosion. 20. Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, leaks, and spills. A regular maintenance checklist should be kept on site. WASTE UTILIZATION PLAN PAGE 9 NAME OF FARM: OWNER / MANAGER AGREEMENT I (we) understand and will follow and implement the specifications and the operation and maintenance procedures established in the ap- proved animal waste utilization plan for the farm named above. I (we) know that any expansion to the existing design capacity of the waste treatment and storage system or construction of new facilities will require a new certification to be submitted to the Division of Environmental•Management (DEM) before the new animals are stocked. I (we) also understand that there must be no discharge of animal waste from this system to surface waters of the state from a storm event less severe than the 25 year, 24 hour storm. The approved plan will be filed on -site at the farm office and at the office of the local Soil and Water Conservation District and will be available for review by DEM upon request. I (we) understand that I must own or have access to equipment, primarily irrigation equipment, to land apply the animal waste described in this waste utilization plan. This equipment must be available at the appropriate pumping time such that no discharge occurs from the lagoon in a 25-year 1-day storm event. I also cer- tify that the waste will be applied on the land according to this plan at the appropriate times and at rates that no runoff occurs. NAME OF FACILITY OWNER: BILLY KILPATRICK SIGNATURE: %{,Q, /,{,r1L„�J s„(,z{;,, DATE: 5--1- 7 C NAME OF MANAGER (if different from owner): please print SIGNATURE: DATE: NAME OF TECHNICAL SPECIALIST: Michael E. Sugg AFFILIATION: USDA Natural Resources Conservation service ADDRESS (AGENCY): P. O. Box 277 Kenansville NC 28349 SIGNATURE: J DATE: �7 6 Fig-•�; United States soil P. O. Box 277 Department of Conservation I[T�, �E;Itansville, NC 28349 Agriculture Service Telephone 919-296-2121 WASTE MANAGEMENT FACILITY SITE EVALUATION GENERAL INFORMATION NAME Mr, raj t q C�,• 1_. r+r it,k. P.O. 60-t w Ke.ta,,,s, J I T(. 'U_3 4a LOCATION �or�k a Ke�n�•s.. ►�1 � TELEPHONE q 1G,7A — b 6 f 9 %�& �, SIZE OF OPERATION i9 G1s T l L11 AA _ ! A _ +► e LOCATION DATA DISTANCE FROM NEAREST RESIDENCE NOT OWNED BY PRODUCER NUMBER OF HOUSES WITHIN 2000 FEET OF SITE IS SITE WITHIN 100 YEAR FLOOD PLAIN? YES NO ✓ IS SITE AT LEAST 100 FEET FROM A "BLUE LINE" PERENNIAL STREAM? YES ✓ NO IS SITE WITHIN 1 MILE ZONING JURISDICTION OF A MUNICIPALITY? YES NO ✓ if yes, landowner should consult with local zoning board about required permits �— WETLAN``DS - WILL SITE INVOLVE CLEARING WOODLAND OR ANY NON CROPLAND ? YES INTO ✓ IF YES, HAS PRODUCER COMPLETED AN AD-1026 FORM? YES NO DOES NON WETLAND NEED TO BE MEASURED BY REGISTERED SURVEYOR PRIOR TO APPROVING WASTE MANAGEMENT PLAN YES NO ✓ IF WETLANDS ARE INVOLVED, IT IS THE RESPONSIBILITY OF THE PRODUCER TO CONTACT THE US ARMY CORP-OF ENGINEERS AND THE NC DIVISION'OF ENVIRONMENTAL MANAGEMENT TO DETERMINE IF ADDITIONAL PERMITS ARE REQUIRED. NO WETLANDS SHOULD BE ALTERED UNTIL PRODUCER RECEIVES WRITTEN APPROVAL FROM SCS, US ARMY CORP OF ENGINEERS AND NC DIVISION OF ENVIRONMENTAL MANAGEMENT. IVASTE NIANAGEMENT -- VALID ONLY IF WASTE MANAGEMENT PLAN ATTACHED DOES PRODUCER OWN ENOUGH LAND TO PROPERLY LAND APPLY WASTE? YES ✓ NO IF NO, DOES PRODUCER HAVE ACCESS TO MORE LAND? YES NO SEE ATTACHED PLAN FOR SPECIFIC RECOMMENDATIONS SOIL INVESTIGATION -- VALID ONLY IF SOIL INVESTIGATION -SHEET ATTACHED IS SOIL SUITABLE FOR LAGOON? IS A CLAY LINER REQUIRED? IF YES, IS CLAY AVAILABLE ONSTTE? IS A CORE TRENCH REQUIRED? YES ✓ NO YES NO ✓ YES NO QUESTIONABLE YES—,�' NO SITE APPROVED YES ✓ NO:- CONDITIONAL COMMENTS rc v -f 0 US Department of Agriculture Soil Conservation Service NC -CPA 16 4-92 ENVIRONMENTAL EVALUATION Land User/Owner (ji 11N, k iCounty 0"v); , I pp Location/Tract & Field Number a� �-,8 Acreage_. 131-1 Prepared by Brief Description of Planned Practice/RMS/Project Measure: Environmental Factors and Resources to Identify and Evaluate I/ 1. Is wetland included in the planning area: (References: NCPM; 190-GM 410..26; Hydric soils list; Classification of Wetlands and Deepwater_Kabitats_of the U.S._; National Wetlands Inventory Maps;. NFSAM. ✓ No Yes - if yes, -- identify types present -- Attach environmental evaluation showing what effect __planned assistance will have on wetland and how this assistance is within policy --- Have needed permits (CAMA, DEM, Corps, etc.) been obtained by the landuser? -- Make sure no planned practices will put the landowner in violation of Swampbuster 2:- Endangered— and/or -threatened species: (Re ferences:--.--19.0.--GM'h:r;._._�;.__,�,._.,.�..: 410.22; Technical Guide -Section I-i(13) and Section I-vii No Yes -- Identify species"whose range and habitat needs indicate .they might.occur in planning -area -- Identify on map any designated- critical habitat I 3:. Is a designated- natural or scenic area included in. the planning area.- or will planned actions impact. *on an, adjacent- natural. or scenic area? (References: 190-GM,410.23 and ..24) ✓- No Yes- If yes., encourage landuser to, consult with concerned agencies.,, societies,, and- indi.viduals.- to, arrive. at mutuallym satisfactory land. useand, treatment:., - 4. Does -the- -plannlng, &r�ea, jnc-llude: the- plal-n>­ (Ref erences-_­ MCPMi19;Q,-GM;410-.25J#-,- HTJD-. Flood Plain, maps): No Yes: ­ If. yes:,, Is-. the, as.slst-.ed.- actdon.. likely..- to.. have: significant adverse• effects: on; existing: natural and: beneficial. v.a-lues: in; -the, fIckpd-, pla�in?., Is. there, a. practical, alternative: outside. the flood�. plain- -- Has: the- flq.od,,. pain, been-. used - for agricultural - product: on,, for- at - least,. I of; the -last. 5.. years?-` 5.. Is. an: a--rchaeoloqi�cal- or historical..site, located: in• the• planning: area?, (References:- NCPM,,*., 420-GM 401;. National Register-' o.f Historic: Places),. No Yes- -- It, yes,, have. steps. been- taken, to ensure. the. protection: of, this areal-1- Are, there: any; prime-, unique, orlocally important farmlands in the operating: iinit?-, (,References: 3-10-GM,): No, Yes ­ If yes. -I ...... *Identify- on:. a., soils map. or- legend. T. Wi.1-3--.- the"- action-.. xesu t. in, sodbusting7✓ - No. Yes. 0.. Will. the- action- result in. swampbusting?.. No Yes: v 9-. Is there- a- potential f or- c.ontroversy?.'; From. whom?r MI&L,; No.: LZ yes! 10. Are permits required?/_Should.the person contact permit agencies? No ✓ Yes When an environmental factor or resource is identified on the site, the user will refer to the appropriate reference for policy and document the appropriate action in the notes portion of this form. /� NOTES, DOCUMENTATION, FOLLOW-UP ORM RC5-i k."+l04 40 7 I'M 43 1 Milk 'I All -4 b rn lZI tin An f Cv✓' `J �. ,r- � '�� lL }I u 4 • �Y �i _-� I a \, '. __a �J R /•". .!2u NJ 1 � I/r c •s{": 1 \ � 'r:Q I li "I�,, `�C.`o� row lfUlf. �_. � �y`J--. II} Il' 11 701 Al. 5i 11,4' 4�:* �. .�»_ �� e� '�� ` �:/ : p'� t � +r��� ~1 {� x��� 'jj'f. cc% ` �' Y� � � \e' 1 1 •• r � ll� ��:t f � 1 .,l 1 ft;-R WA NVI 02Z SCS-ENG-S38 U. S. DEPARTMENT OF AGRICULTURE Rev. 5-70 C� Ir t SOIL CONSERVATION SERVICE SOIL INVESTIGATION TO DETERMINE SU[TABILiTY OF PROPOSED POND SITE FARMER'S NAME A '01- DISTRICT r. • I • • SHEET NO. WORK CROPLAND—ACRESWATERSHED AREA MEASUREMENTS ACRES TOTAL —ACRES POND CLASS i WORK UNIT CONSERVATIONIST —WOODLAND— -SKETCH OF PROPOSED POND SHOWING WHERE BORINGS. WERE MADE .(Approx. scale I" feet), L.ocata reference point in center line of dam and identify on sketch, ■■■■■■■®®®®® ®■■■■.■■■■■■■■ ■■■■■■■■■■■■N■■■■■E■NNNE■ ■ ■ ■NNE■■■■■MMEMI®N■■■NN■■ ■■■■■■■■■E■■ ■■■■■■■INN■■■ ■■■■■■ N■W■i■ ■■M■■■■ENSN■■ ■■■N■■■ ■N■■■■■■■■■■■■ ■■■■■MINEMEE■■■NNEE■NNN■■■■■■ ■■■■■NEE■ ■E■■NE■■■MI■■■■■■NM MENNESSOMME INNEEMENEEMEME • �I����I®��31®I®I®�ml®IQ���I�I®I01� ��!■i■f■�■t®lr�fi■ ®i■!■�e�i■I■10t®i■i®�■1si■i■i■ ��NINI■i■I■ICI ®�■�■I�[■INlI■,■I■I■i■I■I■I■IN ®!■■f■fNi�■fl.�I� ■I■i■!!!lf■I■l®I■I■INi■f ■I■I■I■ ®■!i■!EI■ ■I■fl.�f■ !�!i■ af■f■!■!■ ■I■i■ Nf ■ ■i■I■ ®�I■�■I■i■I�!■i■ ■I■i1Nl■�■I■f ■�I■i■I■�■I■I■I■[■ �i�!�!!�1NI■1Ni�i■■I■i■I�i■I®!®i■!■[■i■�■ i■l■f■' I■�■l'�■I�■�■i■I■I■ ■i■�■I�P,���1■i■i■�®i®'■I■�.■[■�■� ��' I�1■I■itl�il�!�l�■I■i(l�II■'.■I■I■I■1■■I■I■1■!■ ®mil f�l■I■1■!�1 ■ ■i■�■�®�■ ■I■!■I■1■!■I■!■ ■I CERTIFICATION CPTT;CKLIST �.v u r7, T 0-T.XT[;'17'AT' ThTFl117ANATTnW � Farm Name/Owner: R r it,, Address: U 6,y(~ 9'� f+]PkaV1Sr»l!-t Telephone: t S- 0 6 I Type/Size Operation: V3 Z0- �46dJ' 2. STORAGE AND TREATMENT Storage Structure Capacity? 3 Permanent Storage $ �3�2 U Temporary Storage i Is there at least 60 days temporary storage, Pius 24 hour, 25 year storm storage and I foot of freeboard? . YES NO Is temporary storage above seasonal high water table? YES NO Is permanent storage at least 6 feet deep? `ES NO Is structure a lagoon or holding pond ( )? Is surface water diverted from structure? YES NO Js erosion control adequate? YES Is dam free of all dam safety issues? YES NO Dike Top Width? -— feet Is all vegetation (trees) on dikes less than 2" in diameter? YES NO Assess Seepage Potential of Existing Waste Storage Stricture SP type soils -- High seepage potential y SM type soils -- Med. Seepage potential )<1 SC type soils -- Low Seepage Potential CUCH type soils -- Very Low Seep. Pot Where seepage is a high or medium risk, NRCS will advise landowner of potential seepage and recommend and offer a more detailed investigation at the landowner's re<luest. Does structure appear to be sealed and free from leaks? YES NO TECH SPEC' '-A IST ��-4 DATE ` 3. COLLECTION Number of houses 61 -2 f Are houses adequately sealed, without leaks and able to convey waste to storage area? � NO 4. APPLICATION AND MANAGEMENT Does producer have access to adequate irrigation equipment? YE NO Type !'S D T C-,wJy-, Available from: Ad Ljn Total acres available for land application of waste Inv acres Type of crop to be grown C-&n 1� Has crop actually been planted now? NO Are minimum required separation buffers from perennial streams, houses, wells, etc.properly addressed? Describe NO Describe Can an approved waste plan be written for this operation? Q<n NO - CERTIFICATION DECISION If any questions in blocks 2, 3 or 4 above are answered "NO", then certification cannot proceed until these issues are resolved; otherwise, proceed with certification. Can certification proceed for this operation with the present existing onsite conditions? YES If NO, describe needed measures kL,� ` d "� ' Operator:===_________ __________________====>Billy Kilpatrick County:========__________________________===>Duplin Date:==========___________________________==>03/15/96 Dist. to nearest residence(other than owner): ft. sows (farrow to finish):____________ ___ ___> sows (farrow to feeder):,____________________> head (finishing only):______________________> 4320 sows (farrow to wean):===-_===--T___=_____-_> head (wean to feeder):______________________> Ave. Live Weight for other operations(lbs.):> Storage volume for sludge accum. (cu. ft.):=> 0 Treatment Volume (min. 1 cu. ft./lb.):==_-__> 1.0 25 Year - 24 Hour Rainfall (in.):==__-______> 7.5 Rainfall in excess of evaporation (in.)===__> 7.0 Drainage area of buildings & lots (sq. ft.):> Volume of wash water (gallons/day)====______> Temporary storage period (days):===_________> 180 Freeboard(ft.):===___--------------- ___-___> 1 Side slopes (inside lagoon):________________> 3 1 Inside top length (ft.):___________________> 456.5 Inside top width (ft.):==___________________> 280.5 Top of dike elevation (ft.):________________> 50 Bottom of lagoon elevation (ft.):==_________> 38 Seasonal high water table(SHWT) elev.(ft.):=> 44 Total required volume:_____________> 880346 cu. ft. Actual design volumet=====__=__====>1113081.8 cu. ft. Stop pumping el. (> or = to 44.0 ft SHWT> 44.3 ft. (> or = to 44.0 ft Min) Required minimum treatment volume: 583200 cu. ft. Volume at stop pumping elevation: 578669 cu. ft. Start pumping elev.:_______________________> 48.3 ft. Volume at start pumping elevation: 1027580 cu. ft. Actual volume less 25yr-24hr rain: 1033052 cu. ft. NOTE: Verify that temp. storage is adequate: Req. volume to be pumped:====> 217116 cu. ft. Actual volume to be pumped:==> 448911 cu. ft. Operator:====___ __ ___________====>Billy Kilpatrick County:===______________________________====>Duplin Date:====_________________________,_____====>3/15/96 Dist. to nearest residence(other than owner): ft. sows (farrow to finish):====_--_-----_______> sows (farrow to feeder):____________________> head (finishing only):===______________ =___> 4320 sows (farrow to wean):=========_____________> head (wean to feeder):===__--_______===-____> Ave. Live Weight for other operations(lbs.):> Storage volume for sludge accum. (cu. ft.):=> 0 Treatment Volume (min. 1 cu. ft./lb.):==____> 1.0 25 Year - 24 Hour Rainfall (in.):==_=____-__> 7.5 Rainfall in excess of evaporation (in.)===__> 7.0 Drainage area of buildings & lots (sq. ft.):> Volume of wash water (gallons/day)====______> 3888 Temporary storage period (days):===_________> 270 Freeboard(ft.):__________________R-=-=-____> 1 Side slopes (inside lagoon):===_____________> 3 1 Inside top length {ft.):==________-______=__> 456.5 Inside top width (ft.):_____________________> 280.5 Top of dike elevation (ft.):==___=_________=> 50 Bottom of lagoon elevation (ft.):==__=______> 38 Seasonal high water table(SHWT) elev.(ft.):=> 44 Total required volume:====__=======> 1091899 cu. ft. Actual design volume:====______====>1113081.8 cu. ft. Stop pumping el. (> or = to 44.0 ft SHWT> ft. (> or = to 44.0 ft Min) Required minimum treatment volume: 583200 cu. ft. Volume at stop pumping elevation:-1135982 cu. ft. Start pumping elev.:W=====__________________> ft. Volume at start pumping elevation:-1135982 cu. ft. Actual volume less 25yr-24hr rain: 1033052 cu. ft. NOTE: Verify that temp. storage is adequate: Req. volume to be pumped:====> 428669 cu. ft. Actual volume to be pumped:==> 0 cu. ft. I-- INLOf (Ij � _? - - �f 1 r ; r ': ';r `.•i _ �� E�J.ri�F / �.I � I Y5. SfI rL y� '� r`•1 "s, Ij J r'r -1� �r •t. } f � t i ->;;! ., 7f'i4':- l rf •'^�+'•1 r t, - ?L r � 1 w !• •i n. s ;`!v t.A r 1. f,4 �t l y�� 4 S c •r, .�1., I+-[r ti Y� r f, r f r 1 d �' a I il. 1 '�" •r i, r T .r5 '}'t`S�f I.1S,.:�. �,•;i Sr.' ; _• t k}rT: t 1.•� ; _ .1� -�.•r'Y+L+',.Y -' � h 3 i 1 .� fl y Y! ;1 �5-. j l r. f.. . XN wA, a ��{ , h 'S 6r..'i F r - 5. 1.'•'' r ' Y 3 '' ,.hr r <' J � P r ; r' r' '; x4S'4 ! •''r ^Ir . C F L F S t < ' •.� •i. 4 � � 1 � R t p�; ,fir -.f r.-jl> i t•. y� y.: �• `-•"'``.. ..?', `' ':1 sr, . •,fitr; r {� ' �};i :,11'1"��.'"j'ta'" , r7 `L r 5 ,�-'''.;l} J �, x. _�1 �?i%g if 'r 5qt>y y a'� 1 4 r-' 4s•- �, .• �,. ^' R tr x� Sr7 F y I , s -, s. y � �'"i 'r"S4Si 1''°f.��: i��',i.°�! x�ii�lrrlr' .x St ,� .; srr' S �r ... ,.-ti.• •1 S.t ..a. t_ � a :v, _- ., _� � .. * �'..- .t, l.' Operator: BILLY KILPATRICK County: DUPLIN Distance to nearest residence (other than owner): 1. STEADY STATE LIVE WEIGHT 4 Date: 08/27/91 2500.0 feet 0 sows (farrow to finish) x 1417 lbs. _ 0 sows (farrow to feeder) x 522 lbs. _ 2880 head (finishing only) x 135 lbs, — 0 sows (farrow to wean) x 433 lbs. _ 0 head (wean to feeder) x 30 lbs. _ TOTAL STEADY STATE LIVE WEIGHT (SSLW) _ 2. MINIMUM REQUIRED TREATMENT VOLUME OF LAGOON Volume = 388800 lbs. SSLW x Treatment Volume(CF)/lb. SSLW r Treatment Volume(CF)/Ib. SSLW= 1 CF/lb. SSLW Volume = 388800 cubic feet 3. STORAGE VOLUME FOR SLUDGE ACCUMULATION 0 lbs 0 lbs 388800 lbs 0 lbs 0 Ibs 388800 lbs Volume 0.0 cubic feet ; "Owner requests no sludge storage. Sludge will be removed as needed." 4. TOTAL DESIGN VOLUME Inside top length 300.0 feet ; Inside top width 225.0 feet Top of dike at elevation 45.4 feet Freeboard 1.0 feet; Side slopes 2.5 : 1 (Inside lagoon) Total design lagoon liquid level at elevation 44.4 feet Bottom of lagoon elevation 33.4 feet Seasonal high water table elevation 0.0 feet Total design volume using prismoidal formula SSIENDI SSIEND2 SSISIDEI SS/SIDE2 LENGTH WIDTH DEPTH 2.5 2.5 2.5 2.5 295.0 220.0 11.0 AREA OF TOP LENGTH " WIDTH = 295.0 - 220.0 AREA OF BOTTOM LENGTH " WIDTH 240.0 165.0 64900.0 (AREA OF TOP) 39600.0 (AREA OF BOTTOM) AREA OF MIDSECTION LENGTH ` WIDTH ` 4 267.5 192.5 205975.0 - (AREA OF MIDSECTION ` 4) CU. FT. = [AREA TOP + (4 *AREA MIDSECTION) + AREA BOTTOM] ' DEPTH/6 64900.0 205975.0 39600.0 1.8 VOLUME OF LAGOON AT TOTAL DESIGN LIQUID LEVEL = 569204 CU. FT. 5. TEMPORARY STORAGE REQUIRED DRAINAGE AREA: ` Lagoon (top of dike) Length • Width = 300.0 225.0 67500.0 square feet Buildings (roof and lot water) Length " Width = 0.0 0.0 0.0 square feet TOTAL DA 67500.0 square feet Design temporary storage period t riod to b e 180 days. 5A. Volume of waste produced Approximate daily production of manure in OF/LB SSLW 0.00136 Volume = 388800 Lbs. SSLW ` CIF of Waste/Lb.tDay ` 180 days Volume = 94947 cubic feet 5B. Volume of wash water This is the amount of fresh water used for washing floors or volume of fresh water used for a flush system. Flush systems that recirculate the lagoon water are accounted for in 5A. Volume = 0.0 gallons/day Volume = 0.0 cubic feet 180 days storage17.48 gallons per CF / 5C. Volume of rainfall in excess of evaporation Use period of time when rainfall exceeds evaporation by largest amount. 180 days excess rainfall Volume = 7.0 in " DA / 12 inches per foot Volume = 39375.0 cubic feet 5D. Volume of 25 year - 24 hour storm Volume = 7.5 inches / 12 inches per foot " DA Volume = 42187.5 cubic feet TOTAL`REQUIRED TEMPORARY STORAGE 5A. 5B. 5C. 5D. TOTAL 6. SUMMARY Total required volume 94947 cubic feet 0 cubic feet 39375 cubic feet 42188 cubic feet 176510 cubic feet 565310 cubic feet Total design volume avail. 569204 cubic feet Min. req, treatment volume plus sl plus sludg ge accumulation 7.0 inches 388800 cubic feet At elev. 41.4 feet; Volume is 385867 cubic feet (t (end pumping) Total design volume less 25yr-24hr storm is 527017 cubic feet At elev. 43.7 feet; Volume is 524402 cubic feet (start pumping) Seasonal high water table elevation 0.0 feet OPPROVED 7. DESIGNED v� DATE: DATE:/�` J OPERATION AND MAINTENANCE PLAN ------------------------------ This lagoon is designed for waste treatment with minimum odor control. The time required for the planned fluid level to be reached may vary due to soil conditions,flushing operations, and the amount of fresh water added to the system. Land application of waste water is recognized as an acceptable method of disposal. Methods of application include solid set, center pivot, guns, and traveling gun irrigation. Care should be taken when applying waste to prevent runoff from the field or damage to crops. The following items. are to be carried out: 1. It is strongly recommended that the treatment lagoon be pre - charged to-1/2 its capacity to prevent excessive odors during start-up. Pre -charging reduces the concentration of the initial waste entering the lagoon thereby reducing odors. Solids should be covered with effluent at all times. 2. The attached waste utilization plan shall be followed. This plan recommends sampling and testing of waste (see Attachment B) before land application. 3. Begin pump -out of the lagoon when fluid level reaches eleva- tion 44.3 as marked by permanent markers. Stop pump -out when the fluid level reaches elevation 42.1 or before fluid depth is less than 6 feet deep (this prevents the loss of favorable bacteria) . 4.- The recommended maximum amount to apply per irrigation is one (1) inch and the recommended maximum application rate is 0.4 inch per hour. 5. Keep vegetation on the embankment and areas adjacent to the lagoon mowed annually. Vegetation should be fertilized as needed ,to maintain a vigorous stand. 6. Repair any eroded areas or areas damaged by rodents and establish in vegetation. 7. All surface runoff is to be diverted from the lagoon to stable outlets. B. The Clean Water Act of 1977 prohibits the discharge of pollutants into waters of the United States. The Department of Environment, Health, and Natural Resources, Division of Environ- mental Management, has the responsibility for enforcing this law. SEEDING RECOMMENDATIONS ----------------------- AREA TO BE SEEDED: 2.5 ACRES USE THE SEED MIXTURE INDICATED: i50 LBS. FESCUE GRASS @ 60 LBS./ACRE (BEST SUITED ON CLAYEY OR WET SOIL CONDITIONS) SEEDING DATES: SEPTEMBER 15 TO NOVEMBER 30 0 LBS. 'PENSACOLA' BAHIA GRASS @ 60 LBS./ACRE. (SEE FOOTNOTE NO. 1) SEEDING DATES: MARCH 15 TO JUNE 30 --26 LBS. HULLED BERMUDA GRASS @ 8 LBS./AC. (SUITED FOR MOST SOIL CONDITIONS) SEEDING DATES: APRIL I TO JULY 31 7i.LBS. RYE GRAIN @ 30 LBS./ACRE (NURSERY FOR FESCUE) 0 LBS. RYE GRASS @ 40'LBS./ACRE (TEMPORARY VEGETATION) SEEDING DATES: DECEMBER 1 TO MARCH 30 LBS. APPLY THE FOLLOWING: 2500 LBS. OF 10-10-10 FERTILIZER (1000 LBS./ACRE) 5 TONS OF DOLOMITIC LIME (2 TONS/ACRE) 250 BALES OF SMALL GRAIN STRAW (100 BALES/ACRE) ALL SURFACE DRAINS SHOULD BE INSTALLED PRIOR TO SEEDING. SHAPE ALL DISTURBED AREA IMMEDIATELY AFTER EARTH MOVING IS COMPLETED. APPLY LIME AND FERTILIZER THEN DISK TO PREPARE A 3 TO 4 INCH SMOOTH SEEDBED. APPLY SEED AND FIRM SEEDBED WITH A CULTIPACKER OR SIMILAR EQUIPMENT. APPLY MULCH AND SECURE WITH A MULCH ANCHORING TOOL OR NETTING. 1. PENSACOLA BAHIAGRASS IS SLOWER TO ESTABLISH THAN COMMON BERMUDA GRASS. WHEN USING BAHIA, IT IS RECOMMENDED THAT 8 LBS./ACRE OF COMMON BERMUDA BE INCLUDED TO PROVIDE COVER UNTIL BAHIAGRASS IS ESTABLISHED. WASTE UTILIZATION PLAN ---------------------- Owners name -=:BILLY KILPATRICK County:DUPLIN Mail Address-: 0 Type of production unit----:FEED-FIN Type of waste facility ----- :Anaerobic Lagoon Your animal waste management facility has been designed for a. given storage capacity. When the waste reaches the designed level, it must be land applied at a specified rate to prevent pollution of surface and/or ground water. The plant nutrients in the -animal waste should be used to reduce the amount of j commercial fertilizer required for the crops on the fields where the waste is to be applied. This waste utilization plan uses -nitrogen as the limiting nutrient. Waste should be analyzed before each application cycle and annual soil tests j are encouraged so that all plant nutrients can be balanced for I realistic yields of the crop to be grown. Several factors are important in implementing your waste -• t i utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner. Always apply waste based on the needs of the crop to be grown and the nutrient content of the waste. Do not apply more nitrogen than the crop can utilize. Soil types are important as they have different infiltration rates and leaching potential. Waste shall not be applied to land eroding at greater than 5 tons per acre per year. Do not apply waste on saturated soils or on land when the surface is frozen. Either of these conditions may result in runoff to surface waters. Wind conditions should also be considered to avoid drift and downwind odor problems. To maximize the value of nutrients for crop production and to reduce the potential for pollution, the waste should be applied to a growing crop or not more than 30 days prior to planting. Injecting the waste or disking will conserve nutrients and reduce odor problems. The acres needed to apply the animal waste is based on typical nutrient content for this type of facility. Acreage requirements may be more or less based on the waste analysis report from your waste management facility. The design of your waste management facility is based on the following: ` Amount of Waste Produced Per Year: ---------------------------------- 2880 animals x 1.9 tons waste/animal/yr= 5472 tons total waste Page 2 Amount of Plant Available Nitrogen Produced Per Year: ----------------------------------------------------- 2880 animals x 2.30 lbs. N/animal/year = 6624 lbs./yr Available N Applying the above amount of waste is a big job. You should plan time and have appropriate equipment to apply the waste in a timely manner. Your facility is designed for 180 days of storage. Therefgre, it will need to be pumped every 6 months. - Tract Field Soil Crop Yield Lbs. N Acres Lbs. N Month to No. No. Type Code Per Ac. Used Apply 7590 11 AuB 6 7 Tons 400 51.2 20480 MAR-AUG ----- ------ ----- ----- ----- ----- ----- ----- ------ Total 51.2 20480 Available Nitrogen 6624 Surplus Or Deficit -13856 Crop codes: 1=Cereal grain; 2=Corn; 3=Fescue; 4=Range Gr. Bermuda 5=Control Grazed Bermuda; 6=Hayland Bermuda Narrative of Operation: ------------------------ Call the Soil and Water Conservation District Office after you receive waste analysis report to obtain the amount per acre to apply and the irrigation application rate prior to applying waste. �- Prepared by: L L1� 1c��L' n t�GtA Name Title Date .Concurred in by: � JO -91 Producer Date (Copy to producer and copy to case file) SPECIFICATIONS FOR CONSTRUCTION OF WASTE TREATMENT LAGOONS ------------------------------------------------------------ Clearing: All trees and brush shall be removed from the construction area before any excavating or fill is started. Stumps will be removed within the area of the foundation of the embankment and fill areas and all excavated areas. All stumps and roots exceeding one (1) inch in diameter shall be removed to a minimum depth of one (1) foot. Satisfactory disposition will be made of all debris. The foundation area shall be loosened thoroughly before placement of embankment material. • Cut-off Trench: A cut-off trench (when specified) shall be installed as shown in the plans. Construction: ------------- Construction of excavated and earthfill areas shall be performed to the neat lines and grades as planned. Deviations from this will require prior approval of the SCS. Earthfill shall not be placed in standing water and reasonable compaction of the fills shall be performed by the construction equipment or sheeps-foot roller during placement. The embankment of the lagoon shall be installed using the more impervious materials. Construction of fill heights shall include ten (10) percent for settlement. To protect against seepage, when areas of unsuitable material are encountered, they will need to be excavated a minimum of one (1) foot below grade and backfilled and compacted with a suitable material (ie-CL,SC,CH). Refer to the soils investigation information in the plans for special considerations. Precautions should be taken during construction to prevent excessive erosion and sedimentation. � �t� vJ E :c �� C" n't&� . Vegetation: All exposed embankment and other bare constructed areas shall be seeded to the planned type of vegetation as soon as possible after construction. Fill shrink/swell percent: 1.20 Cut shrink/swell percent: 1.00 Iterating to balancing within 10.0 cubic yards... delta Cut Fill CUT - FILL 0.00 12367.33 12367.49 -•0.16 -0.00 10959.14 14537.91 -3578.76 0.00 10959.08 14538.02 -3578.94 -0.55 12262.1.6 12519.00 -256.84 -0.59 12367.40 12367.41 -0.01 Lower "Proposed" by 0.59 feet. Project: SILLY KILPATRICK Drawing: SHT1 Number: Location: Bid Date: Engineer: Owner: Estimator: Prepared by: using Sitework DaWlioht ........... I ........... ............ ...... ............... ............................... ................................ .............................. L A ...................................... ...... �1415-;-4-1 .................. .................................. ........ �.41&;.4-1 .............................................................. Plot of all data for the surface: Balanced Project: . BILLY KILPATRICK Drawing: 5HTI Number: Location: Sid Cate: Engineer: Owner: Eatimator: Prepared bW: using Sitswork 34, Gi 45,11, 21 06,12 Oriantation: -46.0 Z Magnification: 11.7 Inclination: 20.0 60. a 46.0 46.0 44.0 42.0 40.0 35. 9 36.0 34.0 5 Lower Loft S I 30 Mesh Surface Existing Project: BILLY KILPATRICK Drawing: SHT1 Number: Location: Bid Date: Engineer: Owner: Estimator: Prepared bW: using Sitswork 3D Moeh 5urfaca Orientation: -46.0 Z Magnification: 10.9 Inclination: 20.0 Lower Left 3D Mesh Surface 3D Mesh Surface Balanced Project: BILLY KILPATRICK Drawing: SHT1 Number: Location: Bid Date: Engineer: Owner: Estimator: Prepared bV: using Sitework 0" asp .......... Plot of the contour data for the surface: Balanced Project: BILLY KILPATRICK Drawing'. SHT1 Number: Location: Sid Date: Engineer: Owner: lEstimator: IPrepared bW: using Sitewark Crmt- amem-C Vm.of t- of �Yo -TYPICAL. VE7--ItiV ap A oN � Fron+ TI ,,4d�,41 INV52f4;5 F 4� t7i k,fi L. EI.�✓A'r7�f�l -41 -07ML M91644 erpzMae ta,.fv, 44-41 '1'aP IV I PrI4 e.:POTTL S P i-ropjaL*v_a'ri44.J AEAt 1 sau oszr , 7QEATMO PIPE- PwTwa I �i U. S" Department of Agriculture Soil Conservation Service NC-ENG--34 - - September 1980 File Code: 210 HAZARD CLASSIFICATION DATA SHEET FOR DAMS Landowner ! I a G C-� County LC P� 1. A-1 Community or. Group No. Conservation Plan No. Estimated Depth of Water to Top of Dam Ft. Length of Flood Pool Ft. Date of Field Hazard Investigation Evaluation by reach of flood plain downstream to the point of estimated minor effect from sudden dam failure. Est. Elev.:Est. Elevation Kind of :Improvements: of Breach Reach: Length: Width: Slope: Land Use Improvements Above :Floodwater Above Flood Plain: Flood Plain Ft. Ft. Ft. Ft. 3 Describe potential for loss of life and damage to existing or probable future downstream improvements from a sudden breach o S In /^ downstream, 3::�o +7ee`j- Woo CZDCLn rvue, G ` VV 1I� IN b tZxl e. �o n c n v-f- t o C- aid i h --o Hazard Classification of Dam a, b, c).(see NEM-Part 520.21) Dam Classificationa, II, 1II, IV, V) � � q-� ive By 6 Date 'I-- name title Concurred By name title NOTE: 1. Instructions on reverse side. 2. Attach additional sheets as needed. Date } lY r'k e � I�� dui' ,�T 4 � - `r .ta '� ,��. �: *• y�°` 4 Fig.{:"{' r 3f' y 044 e E ,tNi; ` � ^ UNIllED STATEB DEF`ARTME�T OF AGRl�i Lll1RE �ugust 6, 1991 EOIL POST �FFICE BUX Z77 COJSERVA�IQN KENA�SV%LLE, �C 2334� �ICE 919-296-212l MrBillKi y 1patrick Po�t �ffi�� 8ox 94 Kenanaville, North �arolina �8349 Dear Billv: The sjte, Iucatsd BtaLe Rua� 137S, has been approved for a 4 X 720 hog operatioe havanot�er Iist c�f person� that have site approval and are awajting a desig� from our of�ics. Names are a�de� t� t�at list as peopIe notify us �hat they have all details set�led aod are ready tu b�i�6. Please motif',uhen you have all of your 1.1etailc settlsd suCh as fim�ncio, |and acquisiti�n, etc. so that we mav ad� yuur name to the list of persons ready for Sinrerely, She�la Y. Jnhnson ' SoiI ConservaonisL epc/os"re P. O. BOX 277 s- t United States Soil Department of Conservation KEHANSVILLE, NC 28349 Agricufture Service TELEPHONE 919-29G-1958 ----------------------------------------------------------------- WASTE MANAGEMENT FACILITY SITE EVALUATION AND MANAGEMENT PLAN TO: S LOCATION OF SITE PRODUCER__/// C 4ij.rvi//e C LAI) �SR 3 .-27ile.r �fl` �C' KeAmnJvIlle SIZE OF PROPOSED OPERATION IS SOIL SUITABLE FOR LAGOON? YES NO SOIL CLASS. /A/aAL- DISTANCE FROM THE LAGOON SITE TO NEAREST RESIDENCE OTHER THAN LANDOWNER OR HIS TENANT 009� 2—z ,n . NUMBER OF HOUSES WITHIN 2000 FEET OF LAGOON SITE ACREAGE/CROP REQUIRED TO PUMP EFFLUENT 1,1 fG DOES LANDOWNER HAVE ENOUGH ACREAGE YES =ff�M NO IF NO, DOES LANDOWNER HAVE ACCESS TO MORE ACREAGE? YES NO WILL FACILITY INVOLVE ALTERING WETLANDS? YES NO , IF THE ABOVE QUESTION CONCERNING WETLANDS IS CHECKED "YES", THE LANDOWNER IS HEREBY ADVISED THAT THIS CONSTRUCTION MAY REQUIRE PERMITS FROM THE ARMY CORP OF ENGINEERS. IT IS THE LANDOWNERS RESPONSIBILITY TO DETERMINE.IF.PERMITS..ARE NECESSARY AND TO OBTAIN THE REQUIRED PERMITS. THE ARMY CORP REPRESENTATIVE FOR DUPLIH COUNTY IS: JEFF RICHTER, US ARMY CORP OF ENGINEERS P. O. BOX 1890 WILMINGTON, NC 28402 TELEPHONE 919-251-4G36 DOES SITE MEET SCS CRITERIA FOR WASTE TREATMENT FACILITIES? YES / NO ADDITIONAL COMMENTS lcte� .03 SIGNATURE 40 &-, retm, E O The Sol Consmvatlon Service Is an agency of the . Department of Agriculture I SCS-ENG-538 U. S. DEPARTMENT OF AGRICULTURE Rev. 5-70 SOIL CONSERVATION SERVICE SOIL INVESTIGATION TO DETERMINE SUITABILITY OF PROPOSED POND SITE Eel • . .• CROPLAND-ACRESWATERSHED AREA MEA.SUREMENTS WOODLAND -ACRES WORK SKETCH OF ••.•sSED *POND SHOWINGBORINGS WERE MADE.. . Locate petercnce point 'm center line of dam and Identify on sketch. ■■■■■■■■■■■■ ■■■■■■■■■■■■■ ■ ■ ■■■■■■■■■■■■■■■■■■■■■■ ■■■ ONE ■■■■ ■EM■■■■■■■■■■ ME ■■■■■■■■■■■■■■■■■■■■■■■■ ■ ■■■■■ ■■■ ■■■■■■■■■■■■■■ ■■■Mons ■■ ■■■■■■■■■MINIM■■ ■■■■■■■■ ■■■■■■■■■■■■MINIM■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■M■■■■■■■■■■■■■■INN ■■■■■■■■■■■■■■■■■■■■■■■■■■ MEW�■���'��'���:�iml!!I■I®1®!m!■Im!mI01®IDi© ®�IMld��l■I■ICE■■I■���.�1■IMIMI■I■I■!■!■1■I■f■ i®���I■ice!■I®Ir�TI, ■I■i�('L�l■I■I■I■I■I■I■I■IMI■1■ ®�!■I■i3�i�l■l�l,�■I■ICfiIT�s�JI■I■I■I■I■1■1■1■I■I■ ®�I�1QI�iti� ■ �I� ■ ■ �IHRI4�■�■ ■I■E■ ■I■�■1■IM Lam!©I■I■III!■!©,'�i■■i■I�,�l■I■I■1®1■f■I■f f■i■f■ F��I■I■!�!�I■l�I�:?�!■'�l�h�l■1■1■1■I■I■I�f ■I■I■ ��I i■�!■ Imi.�1i�.■1■I�3ii►�L:i01■i■i■I■I■I■�■�■f■i■ ItI■I■I■I�i�l■1■IlC�iIN1l I■I■I■I■I■!■ ■ ■I ■ ■ �I■f ■IE�I■1■I�i�1': !■I■I■I■I■I■I■I■I I I I ' � I■ICI■1■I�+!!� IMI■!yJl■'■i■I■f■!■!■1■i■I■1■ Sea s u n z 1 W I�-Zo I a bL 5 b`t I C'.�mS�v d RECEIVED VATIER QUAU p(SECT10N EMERGENCY ACTION PLAN - 998 PHONE NUMBERS Now Pn9 DIVISION OF WATER QUALITY (DWQ) (910)395-3900 EMERGENCY MANAGEMNET SERVICES (EMS) (910)296-2160 SOiL AND WATER CONSERVATION DISTRICT (SWCD) (910)296-2120 NATURAL RESOURCES CONSERVATION SERVICE (NRCS) (910)296-2121 COOPERATIVE EXTERSiON SERVICE (CES) (910)296-2143 This plan will be implemented in the event that wastes from your operation are leaking, overflowing or running off site. You should not wait until wastes reach surface waters or leave you property to consider that you have a problem. You should make every effort to ensure that this does not happen. This plan should be posted in an accessible location for all employees at the facility. The following are some action items you should take. Stop the release of wastes. Depending on the situation, this may ore may not be possible. Suggested responses to some possible problems are listed belwo. A. Lagoon overflow -possible solutions are: a. Add soil to berm to increase elevation of dam. b. Pump wastes to fields at an acceptable rate. c. Stop all flows to the lagoon immediately. d. Call a pumping contractor. e. Make sure no surface water is entering lagoon. B. Runoff from waste application field -actions include: a. Immediately stop waste application. b. Create a temporary diversion to contain waste. c. Incorporate waste to reduce runoff. d. Evaluate and eliminate the reason(s) that cause the runoff. e. Evaluate the application rates for the fields where runoff occurred. C. Leakage from the waste pipes and sprinklers -action include: a. Stop recycle pump. b. Stop irrigation pump. c. Close valves to eliminate further discharge. d. Repair all leaks prior to restarting pumps. D. Leakage from flush systems, houses, solid separators -action include: a. Stop recycle pump. b. Stop irrigation pump. c. Make sure siphon occurs. d. Stop all flows in the house, flush systems, or solid separators. E. Leakage from base or sidewall of lagoon. Often this is seepage as opposed to flowing leaks -possible action: a. Dig a small sump or ditch from the embankment to catch all seepage, put in a submersible pump, and pump back to lagoon. b. if holes are caused by burrowing animals, trap or remove animals and fill holes and compact with a clay type soil. c. Have a professional evaluate the condition of the side wails and lagoon bottom as soon as possible. 2. Assess the extent of the spill and note any obvious damages. a. Did the waste reach any surface waters? b. Approximately how much was released and for what duration? c. Any damage notes, such as employee injury, fish kills, or property damage? d. Did the spill leave the property? e. Does the spill have the potential to reach surface waters? f. Could a future rain event cause the spill to reach surface waters? g. Are potable water wells in danger (either on or off the property)? h. How much reached surface waters? 3. Contact appropriate agencies. a. During normal business hours call your DWQ regional office; Phone - -. After hours, emergency number: 919-733-3942. Your phone call should include: your name, facility number, telephone number, the details of the incident from item 2 above, the exact location of the facility, the location or direction of movement of the spill, weather and wind conditions. The corrective measures that have been under taken, and the seriousness of the sitution. b. If spill leaves property or enters surface waters, call local EMS phone number. c. Instruct EMS to contact local Helath Department. ' d. Contact CEs, phone number - , local SWCD office phone number - -, and local NRCS office for advice/technical assistance phone number - 4. If none of the above works call 911 or the Sheriff's Department and explain you problem to them and ask the person to contact the proper agencies for you. 5. Contact the contractor of your choice to begin repair or problem to minimize off - site damage. a. Contractors Name: b. Contractors Addres,< c. Contractors Phone: 6. Contact the technical specialist who certified the lagoon (MRCS, Consulting Engineer, etc.) a. Name: AlP_e-5 b. Phone: 910- au,- z12,1 7. Implement procedures as advised by DWQ and technical assistance agencies to rectify the damage, repair the system, and reassess the waste managment plan to keep problems with release of wastes from happening again. 2 .f . . . . . . . . . . . . 3l-�'% State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office James B. Hunt, Jr., Governor Wayne McDevitt, Secretary March 8, 1999 MEMORANDUM TO: Dennis Ramsey, Environmental Supervisor Water Quality, Non -discharge Branch INCEM'A IT . a NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES FROM: Rick Shiver, Water Quality Regional Supervisor Wilmington Regional Office SUBJECT: Enforcement Report William R. Kilpatrick Billy Kilpatrick Farm Facility Number: 31-97 Duplin County Attached please find the subject enforcement report which was prepared by Mr. Brian Wrenn of the Wilmington Regional Office. The report concludes that William R. Kilpatrick violated Title 15A NCAC 2H .0217 and G.S. 143-215.1, by making an outlet to waters of the State without the appropriate permit. It is recommended that appropriate civil penalties be assessed in accordance with NCGS 143-215.6A (a)(6). If you have any further questions, please contact me at 910-395-3900. ATTACHMENTS blw :31-97.mem cc: Wilmington Regional Office 127 North Cardinal Dr., Wilmington, North Carolina 28405 Telephone 910-395-3900 FAX 910-350-2004 An Equal Opportunity Affirmative Action Employer 50% recycled/10% post -consumer paper State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office James B. Hunt, Jr., Governor Wayne McDevitt, Secretary CERTIFIED MAIL Z 418 220 475 RETURN RECEIPT REQUESTED Mr. William R. Kilpatrick Billy Kilpatrick Farm 463 Routledge Street Kenansville, NC 28349 S ubj ect: Dear Mr. Kilpatrick: 0 OL NCDENR NORTH CARO!_INA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES February 24, 1999 NOTICE OF RECOMMENDATION FOR ENFORCEMENT Billy Kilpatrick Farm Kenansville, NC Duplin County =- This letter is to notify you that the Wilmington Regional Office of the Division of Water Quality is considering submittal of a recommendation for enforcement action to the Director of the Division of Water Quality. The recommendation concerns the violation of Title 15A oftheNorth Carolina Administrative Code, Chapter 2, Subchapter 2H, Section .0217(d). On February 1, 1999, in response to regional office notification, Mr. Brian Wrenn from the Wilmington Regional Office of the Division of Water Quality inspected your animal operation and the lagoon(s) serving this operation. It was observed that a recycle wastewater line had ruptured and leaked animal waste into an adjacent storm water diversion. The waste traveled along the diversion and discharged to Buckskin Swamp. Buckskin Swamp are class "C-Swamp" waters of the State in the Northeast Cape Fear River Basin. If you have an explanation for this violation that you wish to present, please respond in writing to me within ten (10) days after receipt of this Notice. Your explanation will be reviewed and if an enforcement action is still deemed appropriate, your explanation will be forwarded to the Director with the enforcement package for his consideration. If you have any questions concerning this matter, -please contact Mr. Brian L. Wrenn, or myself at the Wilmington Regional Office at (910) 395-3900. Sincerely, 1 Rick Shiver Water Quality Regional Supervisor cc: Compliance Section Wilmington Files S:\WQS\BRIANW\ENF99\31-97.ROE 127 North Cardinal Dr., Wilmington, North Carolina 28405 Telephone 910-395-3900 FAX 9I0-350-2004 An Equal Opportunity Affirmative Action Employer 50% recycled110% post -consumer paper State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office James B. Hunt, Jr., Governor Wayne McDevitt, Secretary February 10, 1999 CERTIFIED MAIL 4 Z 418 220 474 RETURN RECEIPT REQUESTED Mr. William R. Kilpatrick Billy Kilpatrick Farm 463 Routledge Street Kenansville, NC 28349 � Mko.,WA i NCDENR ENVIRONMENT AND NATURAL RESOURCES Subject: ]notice of Violation Billy Kilpatrick Farm Farm Number: 31-97 Duplin County Dear Mr. Kilpatrick: You are hereby notified that Billy Kilpatrick Farm, which has been permitted to have a nondischarge permit for an animal waste disposal system pursuant to 1 SA NCAC 2H .0217 and G.S 14).215, 1, has been found to be in violation of its Animal Waste Permit AWS310097. On February 1, 1999, in response to regional office notification, Mr. Brian Wrenn from the Wilmington Regional Office of the Division of Water Quality inspected your animal operation and the ]agoon(s) serving this operation. It was observed that a recycle wastewater line had ruptured and leaked animal waste into an adjacent storm water diversion. The waste traveled along the diversion and discharged to Buckskin Swamp. Buckskin Swamp are class "C-Swamp" waters of the State.in the Northeast Cape Fear River Basin. This is a violation of Part I. Performance Standards, Section 1 and Part II. Operation and Maintenance Requirements, Section 1 of the Animal Waste Permit AWS310097. The Division of Water Quality may proceed to revoke Billy Kilpatrick Farm permit unless the following conditions are completed: 1. Immediate]y eliminate the discharge of wastewater and/or list actions to correct the noted violation. 2. Make any and all modifications needed to ensure there will be no future discharges. 127 North Cardinal Dr., Wilmington, North Carolina 28405 Telephone 910-39i-3900 FAX 910-350-2004 An Equal Opportunity Affirmative Action Employer 50% recycled/10% post -consumer paper Mr. \ illiam R. Kilpatrick February 10. 1999 Page 2 To remain a permitted facility, you must notify this office in writing within seven (7) days of the receipt of this notice, what actions will be taken to comply with your waste management plan. Failure to comply with the above conditions will cause the existing animal waste management system serving your animal operation to be considered in operation without a permit as required by North Carolina General Statute 143-215.1. Please be advised that this assessment does not prevent the Division of Water Quality from taking enforcement actions for this violation or any past or future violations. When all required corrective actions are complete, please notify this office in writing. If you have any questions concerning this matter please do not hesitate to contact either Mr. Brian L. Wrenn, of our Wilmington Office at (910)-395-;900 or Mr. Shannon Langley at (919) 733-5083, ext. 581. Sincerely, Rick Shiver Water Quality Regional Supervisor cc: -Harold Jones, Duplin County Soil and Water Conservation Kenneth Best, Duplin County Health Department Don Butler, Carroll's Foods, Inc. DWQ Operations Branch File Wilmington Files S:IWQSIBRIANW\ENF99131-97.N0V STATE OF NORTH CAROLINA COUNTY OF DUPLIN IN THE MATTER OF WILLIAM R. KILPATRICK FOR VIOLATIONS OF PERMIT 15A NCAC 2H .0217 NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION File No. DD FINDINGS AND DECISION AND ASSESSMENT OF CIVIL PENALTIES Acting pursuant to North Carolina General Statute (G.S.) 143-215.6A, I, A. Preston Howard, Jr., P.E., Director of the Division of Water Quality (DWQ), make the following: I. FINDINGS OF FACT: A. William R. Kilpatrick owns and operates the Billy Kilpatrick Farm, a swine animal operation along SR 1378 in Duplin County. B. Billy Kilpatrick Farm was permitted as a nondischarge facility on December 7, 1998 in accordance with 15A NCAC 2H .0217. C. On February 1, 1999, in response to regional office notification, Mr. Brian Wrenn observed that a recycle wastewater line had ruptured and leaked animal waste into an adjacent storm water diversion. The waste traveled along the diversion and discharged to Buckskin Swamp. Buckskin Swamp is class "C-Swamp" waters of the State in the Northeast Cape Fear River Basin. D. William R. Kilpatrick had no valid permit for the above described activity. E. The cost to the State of the enforcement procedures in this matter totaled $520.69. Based upon the above Findings of Fact, I make the following: 11. CONCLUSIONS OF LAW: A. William R. Kilpatrick is a "person" within the meaning of G.S. 143-215.6A pursuant to G.S. 143-212(4). B. A permit for this animal waste management system is required in accordance with 15A NCAC 2H .0217 and G.S. 143-215.1. C. Buckskin Swamp within the Northeast Cape Fear River Basin constitutes waters of the State within the meaning of G.S. 143-215.1 pursuant to G.S. 143-212(6). D. The above -cited discharge is a violation of the nondischarge permit. E. William R. Kilpatrick may be assessed civil penalties in this matter pursuant to G.S. 143-215.6A(a)(2), which provides that a civil penalty of not more than ten thousand dollars ($10,000.00) per violation may be assessed against a person for failing to act in accordance with the terms, conditions or requirement of a permit required by G.S. 143-215.1. F. The State's enforcement costs in this matter may be assessed against Wiiliam R. Kilpatrick pursuant to G.S. 143-215.3(a)(9) and G.S. 143B-282.1(b)(8). G. Pursuant to N.C. Gen. Stat. § 143-215.6A, the Secretary of the Department of Environment and Natural Resources has the authority to issue civil penalties in this matter. The Secretary has delegated this authority to the Director of DWQ pursuant to N.C. Gen. Stat. § 14313-10. Based upon the above Findings of Fact and Conclusions of Law, I make the following: III. DECISION: Accordingly, William R. Kilpatrick is hereby assessed a civil penalty of: for discharging waste to the waters of the State in violation of 15A NCAC 2H .0217. $ TOTAL CIVIL PENALTY, which is percent of the maximum penalty authorized by G.S. 143-215.6A. $ 520.69 Enforcement costs $ TOTAL AMOUNT DUE As required by G.S. 143-215.6A(c), in determining the amount of the penalty I have considered the factors listed in G.S. 143B-282. 1 (b), which are: (1) The degree and extent of harm to the natural resources of the State, to the public health, or to private property resulting from the violation; (2) The duration and gravity of the violation; (3) The effect on ground or surface water quantity or quality or on air quality; (4) The cost of rectifying the damage; (5) The amount of money saved by noncompliance; (6) Whether the violation was committed willfully or intentionally; (7) The prior record of the violator in complying or failing to comply with programs over which the Environmental Management Commission has regulatory authority; and (8) The cost to the State of the enforcement procedures. (Date) A. Preston Howard, Jr., P.E., Director Division of Water Quality STATE OF NORTH CAROLINA COUNTY OF DUPLIN IN THE MATTER OF WILLIAM R. KILPATRICK NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION FOR VIOLATIONS OF CONDITION OF ANIMAL WASTE PERMIT NO. AWS310097 BY FAILING TO PREVENT THE DISCHARGE OF ANIMAL WASTE TO WATERS OF THE STATE File No. PC FINDINGS AND DECISION AND ASSESSMENT OF CIVIL PENALTIES Acting pursuant to North Carolina General Statute (G.S.) 143-21 5.6A, I, A. Preston Howard, Jr., P.E., Director of the Division of Water Quality (DWQ), make the following: L FINDINGS OF FACT: A. William R. Kilpatrick owns and operates the Billy Kilpatrick Farm, a swine operation along NCSR 1378 in Duplin County. B. William R. Kilpatrick was issued Animal Waste Permit No. AWS310097 on December 7, 1998, effective on that date, with an expiration date of April 30, 2003. C. Condition No. 1 of the "Performance Standards" of the issued permit requires "The animal waste collection, treatment, storage and transmission system permitted under this permit shall be effectively maintained and operated as a non -discharge system to prevent the discharge of pollutants to surface waters, wetlands, or ditches." Condition No. 1 of the "Operation and Maintenance Requirements" requires "The collection, treatment, and storage facilities, and land application equipment and sites shall be properly maintained and operated at all times." D. On February 1, 1999, in response to regional office notification, Mr. Brian Wrenn inspected the Billy Kilpatrick Farm. It was observed that a recycle wastewater line had ruptured and leaked animal waste into an adjacent storm water diversion. The waste traveled along the diversion and discharged to Buckskin Swamp. Buckskin Swamp is class "C-Swamp" waters of the State in the Northeast Cape Fear River Basin. F. The costs to the State of the enforcement procedures in this matter totaled $100.00. Based upon the above Findings of Fact, I make the following: IL CONCLUSIONS OF LAW: A. William R. Kilpatrick is a "person" within the meaning of G.S. 143-215.6A pursuant to G.S. 143-212(4). B. Animal Waste Permit No. AWS310097 is required by G.S. 143-215.1. C. William R. Kilpatrick violated condition No. 1 of the "Performance Standards" and condition No. 1 of the "Operation and Maintenance Requirements" of Animal Waste Permit No. AWS310097. D. William R. Kilpatrick may be assessed civil penalties pursuant to G.S. 143- 215.6A(a)(2) which provides that a civil penalty of not more than ten thousand dollars per violation may be assessed against a person who violates or fails to act in accordance with the terms, conditions, or requirements of a permit required by G.S. 143-215.1. E. The State's enforcement costs in this matter may be assessed against William R. Kilpatrick pursuant to G.S. 143-215.3(a)(9) and G.S. 143B-282.I(b)(8). F. Pursuant to N.C. Gen. Stat. § 143-215.6A, the Secretary of the Department of Environment and Natural Resources has the authority to issue civil penalties in this matter. The Secretary has delegated this authority to the Director of DWQ pursuant to N.C. Gen. Stat. § 14313-10. Based upon the above Findings of Fact and Conclusions of Law, I make the following: III. DECISION: William R. Kilpatrick is hereby assessed a civil penalty of: $ for violating condition No. 1 of the "Performance Standards" and condition No. 1 of the "Operation and Maintenance Requirements" of Animal Waste Permit No. AWS310097 by discharging animal waste to waters of the State. $ TOTAL CIVIL PENALTY, which is percent of the maximum penalty authorized by G.S. 143-215.6A. $ 100.00 Enforcement costs $ TOTAL AMOUNT DUE As required by G.S. 143-215.6A(c), in determining the amount of the penalty I considered the factors listed in G.S. 14313-282.1(b), which are: (1) The degree and extent of harm to the natural resources of the State, to the public health, or to private property resulting from the violation; (2) The duration and gravity of the violation; (3) The effect on ground or surface water quantity or quality or on air quality; (4) The cost of rectifying the damage; (5) The amount of money saved by noncompliance; (6) Whether the violation was committed willfully or intentionally; (7) The prior record of the violator in complying or failing to comply with programs over which the Environmental Management Commission has regulatory authority; and (8) The cost to the State of the enforcement procedures. (Date) A. Preston Howard, Jr., P.E. Director Division of Water Quality DIVISION OF WATER QUALITY ANIMAL OPERATIONS ENFORCEMENT CASE REPORT Violator: William R. Kilpatrick Contact Person: Same Address: 463 Routledge Street, Kenansville, NC 28349 Facility Name: Billy Kilpatrick Farm Facility #: 31-97 Receiving Stream and Classification: Buckskin Swamp of the Northeast Cape Fear River Basin, Class "C- Swamp" waters Regional Office: Wilmington Inspector / Report Prepared By: Brian Wrenn Registered Agent: (if applicable) Address: (if applicable) Case Narrative: On February 1, 1999, in response to regional office notification, Mr. Brian Wrenn inspected the referenced facility. It was observed that a wastewater recycle line had ruptured and leaked animal waste into an adjacent storm water diversion. The waste traveled along the diversion and discharged to Buckskin Swamp. Buckskin Swamp is class "C-Swamp" waters of the State in the Northeast Cape Fear River Basin. When Mr. Kilpatrick left the farm at approximately 5:00 pm on Saturday, January 30, 1999, the recycle system was operating properly. Mr. Kilpatrick discovered the discharge at approximately 8:30 am on Sunday, January 31, 1999. He notified the Wilmington Regional office of the Division of Water Quality of the discharge that same day. Evidence indicates excessive salt build-up in the recycle line caused an elevated pressure level which exploited a weak point in the pipe causing it to rupture. Mr. Kilpatrick indicated that his recycle pump operated at a flow rate of 5,000 gallons per hour, and the pump ran for 7 hour shifts with 5 hour breaks. The waste traveled along a storm water diversion on the northwest side of the lagoon. This diversion runs southwest through a small wooded area and enters into Buckskin Swamp. Waste was observed puddled in the diversion and in Buckskin Swamp. Mr. Kilpatrick had dug pits to collect the runoff. Waste in these collection pits was pumped back into the lagoon. Mr. Kilpatrick was advised to continue the clean up procedures. Water quality samples were taken from the diversion area and from Buckskin Swamp (see attachments)_ Mr. Wrenn returned to the farm on February 3, 1999 to monitor the clean up procedures. Mr_ Kilpatrick was continuing to pump out the collection pits. Mr. Kilpatrick had discussed plans to construct a grassed waterway adjacent to the lagoon with a Carroll's Foods representative. Farm and/or Company Compliance History: Include a covy of CAFO Designation lettersprevious NOV=s NOD=s, previous civil assessments, etc, The referenced facility was issued a Notice of Deficiency on September 15, 1997 for erosion on the lagoon dike wall. On June 3, 1998, the referenced facility was issued a Second Notice of Deficiency for erosion of the lagoon dike wall. Amount of Waste Discharged (If applicable). If amount cannot be estimated,_ what is the rate of flow reaching surface water: The discharge began sometime after 5:00 pm on Saturday, January 30, 1999 and was discovered at approximately 8:30 am on Sunday, January 31, 1999. The recycle pump refills 6 flush tanks at a rate of 5,000 gallons per hour. The recycle system is regulated by a timer that operates the pump for a 7 hour shift and then turns off for a 5 hour break. The pump could have operated for a maximum of approximately 10.5 hours between January 30 and January 31. This would result in a total discharge of 52,500 gallons_ Sample Results (If applicable) with locations of samples taken noted in relation to discharge point: The results from the two samples taken on February 1, 1999 at the Billy Kilpatrick Farm are as follows (see attachments): Fecal Col iform Ammonia Nitrogen, NH3-N TKN NO3 + NO2 Total P Sample Point #1 200,000 col./IOOmL 275 mg/L 339 mg/L L95 mg/L 51.1 mg/L Sample Point #2 2,200 col./100mL 6.18 mg/L 8.05 mg/L 0.48 mg/L 0.78 mg/L Violator's degree of cooperation (including efforts to prevent or restore) recalcitrance: Mr. Kilpatrick reported the spill to the Wilmington Regional Office within the time frame required by his General Permit. He ceased the discharge upon discovery and began repairs and clean up of the discharge immediately. Repairs on the recycle line were completed at the time of the inspection. Clean up was ongoing as of February 3, 1999. Fish kill observed? YIN If yes, include report from WRC: No fish kill was observed at the time of the inspection. Mitigating Circumstances: The discharge was a result of a mechanical failure in the recycle system. Recommendation: The Wilmington Regional Office of the Division of Water Quality is recommending assessment of a civil penalty to the Director of the Division of Water Quality, pursuant to G.S. 143-215.6A. Include a copy of the previously completed Animal Operations Inspection Form, pictures and site sketch of waste flow if waste is discharged to surface waters. Also include violator's response to Notice of Recommendation for enforcement. Ifeiting certified plan or permit condition violations, include copies ofpermil or plan. Assessment Factors required to be considered by C. S. 143B-282.1(b): 1. The degree and extent of harm to the natural resources of the State, to the public health, or to private property resulting from the violation: Water Quality samples taken immediately downstream from the discharge point in the Buckskin Swamp displayed fecal coliform bacteria levels of up to 2,200 colonies per 100 mL. This represents levels of I 1 times the assigned stream standard. Levels of other constituents found were as follows: Sample Point 41 Sample Point 92 Ammonia Nitrogen, NH3-N 275 mg/L _ 6.18 mg/L TKN 339 mg/L 8.05 mg/L NO3 + NO2 1.95 mg/L 0.48 mg/L Total P 51.1 mg/L 0.78 mg/L 2. The duration and gravity of the violation: The discharge began sometime after 5:00 pm on Saturday, January 30, 1999 and was discovered at approximately 8:30 am on Sunday, January 31, 1999. The recycle pump refills 6 flush tanks at a rate of 5,000 gallons per hour. The recycle system is regulated by a timer that operates the pump for a 7 hour shift and then turns off for a 5 hour break. The pump could have operated for a maximum of approximately 10.5 hours between January 30 and January 31. This would result in a total discharge of 52,500 gal tons. 3. The effect on ground or surface water quantity or quality: The effects to groundwater and air were not documented. Water quality was impacted as determined by water quality analysis. 4. The cost of rectifying the damage: The cost to rectify the environmental damage cannot be easily estimated. The surface waters of Buckskin Swamp are classified as Class "C-Swamp" waters of the State. Animal waste discharged into a receiving stream will degrade water quality due to very high levels of pathogens (IE. fecal coliform bacteria), ammonia, nutrients and other dissolved oxygen reducing constituents. S. The amount of money saved by noncompliance: The amount of money saved by noncompliance is not known. 6. Whether the violation was committed willfully or intentionally: In the opinion of the inspector, the discharge was not willful or intentional. 7. The prior record of the violator in complying or failing to comply with programs over which the Environmental Management Commission has regulatory authority: The referenced facility was issued a Notice of Deficiency on September 15, 1997 for erosion on the lagoon dike wall. On June 3, 1998, the referenced facility was issued a Second Notice of Deficiency for erosion of the lagoon dike wall. S. The cost to the State of the enforcement procedures: The State's enforcement costs totaled $620.69, as follows: Staff Wrenn, 13.0 ltrs. $242.97 Mileage (240 miles @ $0.31 per mile) $ 74.40 Photography (film & Development) $ 7.32 Laboratory costs $196.00 Administrative costs $100,00 sZ� Doom f : 1 i zB }} r 229 57130" •a r i -1 \ / I e ra�mmenuna t,nt/aonl-r,ww, .41.0 P B Railo ,Airport I Z. I iR ziol1 \ Ch 3s 0eama ' 410 t � � , � � �_�� '•�� % i _ ,�o . r j r r 1� � � �� 40.5 �� � 7S0 .Jorgensen l � J i %f �./ I r { 1/' JiIJ' ,,./ 1.'1, ,.� i',,� •o {1. �.-f �-- '3 /lCem j 4 Billy Kilp ( trick Fartq ; I Facility 4� 1-97 1 u •R Cem �r 'p Duplin County i11 O Trailer Lacoe \ „Cem -1 1377gx Park yi\ ti ra M V, 30 45 _ ,�_'"\ f' � ��i \ � �• �u. n • !fj � -ram -� ,r- ,� ? -+w ...y- -. ,y„� -+` a ./•+. �./ .r. —__ .,w= -•"� :y._ - "� — -_ -.Iw. ."- y,,. - .... 1 �, ,•.Grp I � � 1 _- s'ek'"-" �.,,.. �- " -� �" .� i.l I % t •ur- — _ - .� � "'r --1 .'y�' - ye- � ,. - � �.w; �,��i'y � �. �. � __ nw_ l� ! 1301 y ,•�`9_�' -Y - - `'r�-�)`'1�1 /J I fe� I -'�•S 'I -N s l �� 1° a' •; 11`` PitalM?� y •, . am R +- ��i , i . �� .,ly,! ?7.0 __ ... t, tl:J��,•t • -_ _ - 39.5 =1,! 1 l / Ce I i; r rt cruse�r� (n'lf ' �•• �..�' : i - li U ��.'• `�C !f /� n \\ BM + 'u?� 1• �_ii i u• 27.2 31 f 0.8' •,'Radio•. BM. 3. __ _, - ��; '.2.1 ti• ) it Stnsth i .•.�• '. WT • 4 • �a.11 I 1��• �i E .\ { • I ! 7p Jr Sigk�Sch: •l\',: . • -- m IGwer :,3. v x _ -�I ��'i•`• ��. K -ins en, ville, �` •� IBM 38,8f � -f� , B 1 � ��'ll• (. �1•CEvtc ti ' �.. ' •'�',�.: � , ' �.'�� __4! 1� fir, I ! 1 r � � _\ „. ice— �.. i y � �!'• �' � r it_ 1 er,l --� ! 'i_ Lq+T`tiu - - B.-�._ Tumor atRt4 Pony a 1 Cf-S F�� _ nth �' I nrt lEE p P - :•�� - Nav r1.�-� pc 5 "Da IG CanR,po . - -\ 't ' \c '•' .'• t , 11horrKgw PmE Hai KC5L'�.. Ay� °° _ - 1 f - ! _ 903 Lt°ui _ Pink Hil r .� � ... •• � - T � T - /pa �--n• 1 iui / 241 �O ` � � Ara -U F ~ Jf l� � � 1 py �'_ f •�` �^ .•N, — N E 1,0 �4o Aa / N. 6E57 RD 1 $ f S . I' 11 I \ ` —ram CL -' �Eyp `Io 35.00° Airport r°r I — sEar f J dal \_ r . ^� w cea y KEMnt°r t Bpi ly K-p'atpick/Fa �-.� `_' , �'' b ` FI c i 1 it: # 31,= Wp..G tt \ .1 d �'_ ll l_C runty r�`7rN.E.Cape f fae~ VIC 1''ttt _ eGk� 4b tD 1Lenansuilk �f cE~OtD 50 cc stefaa q 903 i R.ft 24 arc ' rf tiv 1 tE B } a Dom- t ¢� ' 1 ` ! 241 41 ST 24 34 (50 34.92° ' e s�7r' /°o ` •~1 osr S 1f p e i \`"+'. &-qr�\Y l fop Creek papEt4-)� - u .� 1 i 1 �Ratlq 1 IN `L No �ack—aS mnft Star eP�'en RIF I i t J - eat L 1,4 1 A ---_1j, ii \, \ 0 C y I M xWell ::! 41 e _JOE � / _ f °"Ea 1>kv�' •` q0 \ _ 1 txo _ ' \ 11 1 40 R1 y WE AD 34.83 !, Chirquapm '� ` }o 7L8 ��” f 5 •Alt t 1 �r-� f _ v �xy SrpK � .`�' - ti. � - - OWES RD Jt510pE _ O�pRICE"+ sT0 I � - f / - . ,. �+ � ' . RAV _ E►tH�A'_ 80 ff� fAAvpky L - - - �JJ i' ` V Clrin9uaWn s� 41 Lookout ?" • b!t afl' � ;�, �\� mton e..`.. ., �P.+-'o r ss Broken Wastewater Recycle Line Storm V ater Diversion Sample Point #1 Fu�jdle1-3"Na ste f x Buckskin Swamp Sample Paint #2 Hog Houses Billy Kilpatrick Farm Facility # 31-9 r Duplin County Not to scale N.C. DIVISION OF ENVIRONMENTAL MANAGEMENT COMPLAINT/EMERGENCY REPORT FORM WILMINGTON REGIONAL OFFICE Received by: rih L _ Wmyw, hate/Tame: Q I /qTq 7saempe rjr: Complaint: County: t Report Received Fir=-- AJencY= PhonE MO.—�2-14 - 107$ CClpla;,,ant: Address: Fh= No. L► ti � iL���► Y . t' ► r_' 1. � . L � Time and Date Occ-=ed: _ _ 1.1311ci - - Location of Area Affected: Surface Waters I.avolved: ✓ Groundwater Involved: Otter: Other Agencies/SeC=ians Notified: �JQVY�,�11g iJfA•C� I Investigator:.R(l)>LA L . 1A)WArk ti �11.1 EPA. Region IV (404947-4062 Perri -des 1-33-3SS6 'Enurgrney Mar=grment 733-3867--We's�:'r Resevrees 733-729I SoUd and Hazardous Wmu 733-2178 MarME Fshrrers 726-7021 Waur Supply Branch 733-2321 U.S. C—: G„=,Y 3lSD 3434881 IZ7 Cardinal Drive Extension. Wilminnton. N.C. 2$405-3845 • T'eiephone 910-395-3900 • FaxV- An Equal Opportunity Affirmative Action Employer E3 Division of Soil and Water Conservation - Operation Review 0 Division of Soil and Water Conservation - Compliance Inspection Division of Water Quality - Compliance Inspection © Other Agency - Operation Review 10 Routine 0 Complaint Q Follo►y-iit) i)f I)NN'Q 331SpeCti[)n 0 Follo%%--up of DS% C revie%V 00ther I acility "unifier 3 Dslt:e of Inspection �,_ I'inie �)!' lnsficction 23 fir. (hh:mm) Permitted �j Certified ❑ Conditti"onaliv }C-ertified ❑ Registered 0 Not O erational Date Last Operuted: Farm Name: tl�y......-k:.:As.�z.,.4:�L......l�r fr................••--......•---................_.. Co[inty:..... L� 1i#....... ....... ....-......... ........... Owner Name: �CFS.K.........-..._.........-.......... Phone No:...� Facility Contact: ....... .I..... 'hitle: Mailing ,address : ................. Onsite Representative: ...............``.Ij.1Q,...... 11..?L^f�1Cf�.� ................... Certified Operator:.. ............. W.iv. ibxcl ..... ...... Location of Farm: Phone No: ............................................ 4.1... Integrator: .........Cr<s.". .L1 ,�............I.... ................ Operator Certification \lumber-11.4$5......................... r--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------� . LatitudeI..ongitude 'Z-7 • S� ®" r Design Current Design Current Design Current Swine Capacity Population Poultry Capacity Population Cattle Capacity Population ❑ Wean to Feeder ❑ Layer ❑ Dairy Feeder to Finish u 3 ❑ Non -Layer ❑ Non -Dairy ❑ Farrow to Wean ❑ Farrow to Feeder ❑Other ❑ Farrow to Finish Total Design Capacity 43" ❑ Gilts ❑ Soars - Total SSLW Number of Lagoons ❑ Subsurface Drains Present ❑ Lagoon Area I0 Spray Field Area Holding Ponds / Solid Traps ❑ No Liquid Waste Management System Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation (If yes, notify DWQ)? Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made'.' h. If discharge is observed. did it reach: ❑ Surface Waters ❑ Waters of the State c. If dischan:e is observed. what is the estimated flow in «al/thin'? d. Does discharge bypass a lagoon system? 2. Is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts to the waters of the State other than from a discharge? Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? Structure I Structure 2 Identifier: Freeboard (inches): ............ Z.]................. Structur: 3 Structure 4 ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No V1 Yes ❑ No ❑ Yes ❑ No ❑ Yes P No Structure 5 Structure 6 116199 C'mitinried nli honk runiher: �� - y-I 1). of inspection there any, immediate threats to the integrity of any of the structures observed'? (ie/ trees, severe erosion, seepage, etc.) %rc there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? S. Does any pact of the waste management system other than waste structures require maintenance/improvement? 9. Do any stuctures lack adequate. gauged markers with required top of dike. maximum and minimum liquid level elevation markings? Waste application 10. Are there any buffers that need maintenance/impro.'cmcnt? 11. Is there evidence of over application'? ❑ Ponding ❑ Nitrogen 12. Crop type ....................... `_t_ ❑ Yes ❑ No 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? 13. Does the facility lack wettable acreage for land application? (footprint) 15. Does the receiving crop need improvement? 16. Is there a lack of adequate waste application equipment? Required Records & Documents 17. Fail to have Certificate of Coverage & General Permit readily available? 18. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (ie/ WUP, checklists, design, maps, etc.) 19. Does record keeping need improvement? Oe/ irrigation, freeboard, waste analysis & soil sample reports) 20. Is facility not in compliance with any applicable setback criteria in effect at the time of design? 21. Did the facility fail to have a certified operator in responsible charge? 22, Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) 23. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? 24, Does facility require a follow-up visit by same agency? ..... . l.. ...o. deficiencies :were . . . during :this. visit:: YoU �viil:reeeive nor ftirttier :::: eorresWHideitce:about:this visit.: •' :::: ::..:: :.:.:: .:. ::: : ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No Comments (refer to question #): Explain any YES answers and/or any recommendations or any other comments: _1 :.� Use drawings of facility to better explain situations. (use additional pages as necessary):-_ Z- �4.-C[.VLLil �..��1(�t G:� i-iirr� ��I�-�.i�-. Mr_ 1L:1��.�riCT� [�L i� 1tiYYh Grp '�1ti.�: t f ih.� y�,!_S C�2►/b�'('IW� � �.-'iCP4.1-IM `+-1� �:�cb'u:-�� bic�� ��tisccv�.',`(.tJ Stlt•�, i�vt-:3% rr� �,n.;� a:`,,2 �� �� av�+, y,,�� J Mks tt(!1n C � jL{w�� i� [(x��Cr. 1W� d Mkr t_O V_ 31Jtriit3tti i4 Atli_% i. , �',�••et'K, -yc.l� dutr�� e s w� a c . t�� c e S r�G(. Il.a. lU�r. K:1 �vt`LK h\6-r�t-c3 �EaG ct— �ci1. (tt i�ltx:�� p�a�t•. en r� wv�vrii �. kAt1C,iiT',4- C�ccIUb kit, 6Lcckz� [ p C ��q �\ ���st cvil�rvro ti,c�� cc hfS WVIL � u,�` i�A�k +�.�w, Lam. , Reviewer/Inspector Name Reviewer/Inspector Signature:!j� _ Date: Z�Ii'g� 11/6/99 © Division of Soil and Water Conservation - Operation Review . . © Division of Soil and Water Conservation - Compliance Inspection (j Division of Water Quality - Compliance Inspection © Other Agency - Operation Review Q Routine Q Complaint 10 Follow-up of DWQ inspection Q Follow-up of DSWC review Q Other a <l ecioo �- Facility Number Time oltns)eCtion 24 hr. (hh:mm) M Permitted P Certified © Conditionally Certified © Registered I (] Not O perational Date Last Operated: Farm Name: h.:�.ks� �L�� , ~4.� 1-fart1........................................'... Cuimtv:...-b4..'."<.......................... . ................. OwnerName: ......................... NA �L1�a:1(.\C Phone No:.......---............................................................................. Facility Contact: J.....1..............3..............-..-...'1'itic:..........................---......,......_...................... PhoneNo:...........-....................................... �lailinrt address: .�.3....... 4�....`.................................... .........Y }iflI1�,Y..��[ c................................. ..?U.{q........ Onsite Representative: Kk.ls ....... ......................... Integrator: ........ hC�.L���...................................................... Certified Operator:..................ALiktti....................... `1..,'?h .................. Operator -Certification Number: ...... Ohsl .................... Location of Farm: .......... ......-Ox. ....4Vt... S�7—G......ezl.... .....!l�r........4.....5-K.1014...--.............................................................................. i..; r..................................................................................................................................................................................................................................................................... .....i . . Latitude 0 • ®' D� Longitude Z �� • S� ®°� Design Current Swine Capacity Population ❑ Wean to Feeder Feeder to Finish 3 ) ❑ Farrow to Wean ❑ Farrow to Feeder ❑ Farrow to Finish ❑ Gilts ❑ Boars - ...... .... .. Design Current Design Current Poultry Capacity Population Cattle Capacity Population ❑ Layer ❑ Dairy ❑ Non -Layer I I❑ Non -Dairy ❑ Other Total Design Capacity 14 -�� Total SSLW Number of Lagoons ❑ Subsurface Drains Present ❑ Lagoon Area 10 Spray Field Area Holding Ponds I Solid Traps I❑ No Liquid Waste Management System Discharites & Stream Impacts 1. Is any discharge observed from any part of the operation (If yes, notify DWQ)? Discharge originatcd at: ❑ Lagoon ❑ Spray Field ❑ Other a: If discharge is observed, was the conveyance man-made'! h. if discharge is observed. did it reach: ❑ Surface Waters ❑ Waters of the State c. If dischar-e is observed. what is the estimated flow in ealhnin? d. Dues discharge bypass a lagUon system? 2. Is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts to the waters of the State other than from a discharge? Waste Collection & 'Treatment 4. is storage capacity (freeboard plus storm storage) less than adequate? Structure. I Identifier: I:rceboard (inches): Structure 2 Structure 3 Structure 4 Structure 5 ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No Structure 6 1/6/99 Continued ore back ,.,Amber: — 0{-� Date of Inspection Are there any immediate threats to the integrity of any of the structures observed? (ic/ trees, severe erosion, ❑ Yes ❑ No seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes ❑ No (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? ❑ Yes ❑ No 8. Does any pact of the waste management system other than waste structures require maintenance/improvement? ❑ Yes ❑ No 9. Do any stuctures lack adequate. gauged markers with required top of dike, maximum and minimum liquid level elevation markings? ❑ Yes ❑ No l aste Apalication 10. Are there any buffers that need trtaintenance/improvement? ❑ Yes ❑ No 11. Is there evidence of over application'? ❑ Ponding ❑ Nitrogen ❑ Yes ❑ No 12. Crop type .., 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? []Yes [-]No 14. Does the facility lack wettable acreage for land application? (footprint) ❑ Yes ❑ No 15. Does the receiving crop need improvement? 16. Is there a lack of adequate waste application equipment? Required Records & Documents 17. Fail to have Certificate of Coverage & General Permit readily available? 18. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (ie/ WUP, checklists, design, maps, etc.) 19. Does record keeping need improvement? (ie/ irrigation, freeboard, waste analysis & soil sample reports) 20. Is facility not in compliance with any applicable setback criteria in effect at the time of design? 21. Did the facility fail to have a certified operator in responsible charge? 22. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/discharge, freeboard problems, over application) 23, Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? 24. Does facility require a follow-up visit by same a4gency? 0_ NQ AWaitioits or dercien.'de's .were bolted. during 11iis:iisit:. Ytiti wvilfret:eive.'nl]r ftirtiieI. r -.. corresporideike: about: this visit.. •. •. •....:.:.:. •. •. •. •. -. :::. :. . ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes []No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No Comments (refer to question #): Explain any YES answers and/or any recommendations or any.otbei comments. - Use drawings of facility to better explain situations. (use additional pages as necessary):;-_ �dycsej� l�►�Y. \L�j�a iik toil_;KVQ� Un CofLI-L o d \,e t: Reviewer/Inspector Name Reviewer/Inspector Signature: An; Date: -2-11 )1 1116/99 f 7-77 Environmental Chemists, Inc. ® MAILING ADDRESS: TELEPHONE: SHIPPING ADDRESS: P.O. Box 1037 (910) 2W3934 (Office) 6602 Windmill Way Wrightsville Beach, (9I0) 392-0223 (Lab) Wilmington, CONSULTING North Carolina 28480 (910) 392- 424 (Fax) North Carolina 28405 CHEMISTS NCDEHNR: DWQ CERTIFICATE #94, DiS CERTIFICATE #37729 Customer: NCDEHNR-DWQ RECEIVED Date of Report : February 9, 1999 127 N. Cardinal Drive Ext. Wilmington, NC 28405 FEB 16 1999 Purchase Order #: Attn: Rick Shiver Brian Wrenn BY: Report Number: 9-0319 Date Sampled: Sampled By: STREAM: 31-97 02/01 /99 Brian Wrenn REPORT OF ANALYSIS Report To: Copy To: Rick Shiver Brian Wrenn PARAMETER Sample ID 31-97 31-97 Lab ID # 0716 A-B # 0717 A-B Fecal Coliform, colonies/100ml 200,000 2200 Nitrate + Nitrite Nitrogen, NO3 + NO2 - N mg/L 1.95 0.48 Ammonia Nitrogen, NH3-N, mg/L 275 6.18 Total Kejeldahl Nitrogen, TKN mg/L 339 8.05 Total Phosphorus, P mg/L 51.1 0.78 Reviewed b and approved for release to the client. Lenvirochem ENVIRONMENTAL CHEMISTS, INC Sample Collection and Chain of Custody, 6602 Windmill Way Wilmington, NC 28405 Phone: (910) 392-0223 FAX: (910) 392-4424 Collected BY: S x, ,r, L- E hr.' _ _ _- Report No: Nam le'l' e: Intluent Effluent Well Str oil Uther: SAMPLE IDENTIFICATION COLLECTION Camp Grab CI= mg1L LAB ID PRESERVATION ANALYSIS REQUESTED DATE TIME TEMP NONE I[CI ][,so, IINO, Na011 TII10 OTITER C 7IG4 t/ ire r 1 NU 31-97 '/�� ('�� 3 F Z Ni, _ z(� �'�=�0 C)'717 5 C G C G C G C G C G C G NOTICE — DECHLORINATION : Sampes for Ammonia, TKN, Cyanide, Phenol, and Bacteria must be dechlorinated (0.2 ppm or less) in the field at the time of collection. See reverse side for instructions. Temperature whenReceived: s-C GL Accepted: t/ Delivered By: Received Comments: By: Resampl equested. Date: Time: 463 Routledge St. Kenansville, NC 28349 February 15, 1999 Mr. Rick Shiver Water Quality Regional Supervisor NCDENR Division of Water Quality 127 North Cardinal Dr. Wilmington, NC 28405 Dear Mr. Shiver, RECEIVED FEB 18 1999 BY: The following actions were taken to comply with my waste management plan as a result of the recent accident at my farm. Upon immediate discovery of the ruptured recycle wastewater line, the pump was turned off to stop the flow of wastewater. The discharge was blocked and pits were dug to catch any runoff. All water captured was pumped back into the lagoon. Pine straw was placed in areas along the drainage diversion to soak up excess wastewater. The broken pipe was repaired. A grass waterway was constructed to avoid further erosion. In order to prevent future discharges, recycle line, pumps, and surrounding ground areas will continue to be monitored daily. It will be necessary to keep heavy equipment from traveling along the top of the dike directly behind the houses to avoid crushing underground lines. Enclosed you will find a letter from my integrator, Carroll's Foods of Warsaw, that includes their observations when they inspected the site. Sincerely, Bill 1patrick r. CARROLUS FOODS, INC. P. O. Drawer 856 WARSAW, NORTH CAFIOLINA 28398 (910) 293-3434 February 12, 1999 Mr. William R. Kilpatrick 463 Routledge Street Kenansville, NC 28349 Subject: NOV For Farm 31-97 Dated 2/10/99 Dear Billy, Our office received a copy of the above notice Wednesday of this week. Based upon the visit to your farm on February 1, 1999,1 will make the following observations: 1. It appears that you followed your Emergency Action Plan" as intended. DWO was notified along with Carroll' Foods, Inc. 2. Your first action was to stop all pumping and flushing. 3. Using your farm equipment, you constructed swales and check dams at several locations to impede any surface runoff. 4. The ruptured pipe was repaired, backfilled and packed to prevent erosion of the slope. 5. Straw was placed at strategic locations to filter any remaining drainage and to soak up small pool areas. 6. It appeared that you were in the process of constructing a grassed waterway or drainage way along the toe of the dam. This area may need some reshaping and reseeding. 7. We discussed the environmental advantages of the wetland down from the farm. You agreed not to disturb the pool area but to continue to monitor the beavers to prevent clogging the culverts and washing out the road. You may have taken additional measures to the ones I have listed above, Regarding future discharges of this type, you mentioned closer monitoring of all pipes and pumps. Additional measures may be possible and I will not try to address this area. It is very important that you follow the conditions stated in the DWO letter and respond within the seven (7) day period. Carroll's Foods greatly regrets that accidents of this type occur. Some things are easy to prevent while other are difficult to predict or prevent. Carroll's appreciates your quick response to this matter and recommends that you work closely with DWQ. Please feel free to include this letter with your response to DWQ. Sincerely, Howard L. Hobson, Technical Specialist Carroll's Foods, Inc. cc: Deader Edwards Bob McLeod State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office James B. Hunt, Jr., Governor Wayne McDevitt, Secretary March 11, 1999 MEMORANDUM TO: Dennis Ramsey, Environmental Supervisor Water Quality, Non -discharge Branch FROM: Brian L. Wrenn, Water Quality, $j' Wilmington Regional Office SUBJECT: Enforcement Report William R. Kilpatrick Billy Kilpatrick Farm Facility Number: 31-97 Duplin County NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Attached please find the response letter to the Notice of Recommendation for Enforcement. Mr. Kilpatrick explains the discharge as being the result of a truck damaging the recycle line. As detailed in the Enforcement Case Report, at the time of the inspection, Mr.. Kilpatrick cited salt build-up in the recycle line as the reason for the ruptured pipe. If you have any further questions, please contact me at 910-395-3900. ATTACHMENTS blw :31-97.mem cc: Wilmington Regional Office 127 North Cardinal Dr., Wilmington, North Carolina 28405 Telephone 910-395-3900 FAX 910-350-2004 An Equal Opportunity Affirmative Action Employer 50% recycled/10% post -consumer paper kSh w a-o. J- La & n-- -L4 I State of North Carolina Department of Environment, Health, and Natural Resources Wilmington Regional Office James B. Hunt, Jr. Division of Water Quality Wayne McDevitt Governor i Secretary September 15, 1997 Billy Kilpatrick Billy Kilpartck Farm PO Box 94 Kenansville, NC 28349 Subject: NOTICE OF DEFICIENCY Billy Kilpatrick Farm Facility Number: 31-97 Duplin County Dear Mr. Kilpatrick: On September 12, 1997 Staff from the Wilmington Regional Office of the Division of Water Quality, inspected your animal operation and the lagoon(s) serving this operation. It was observed that some erosion of the clay liner has occurred on the lagoon. Large cuts were observed in various sections of the inner dike wall of the lagoon around the inlet pipes. It is our concern that some of these gullies may become deep enough to cut through the liner material and sacrifice the integrity of the structure. No irrigation records were on site at the time of the inspection. As was discussed at the time of the inspection, the cuts should be filled with a suitable clay material, compacted and reseeded with an appropriate vegetative cover. Irrigation records should be on site at all times. In addition, the inlet pipes should be extended further into the lagoon and the eroded areas backfilled with clay and reseeded, and the rodent holes should be filled and reseeded. We suggest that you contact your service company, local MRCS or Soil and Water District office for any assistance they may be able to provide to correct the situation. To remain a deemed permitted facility, you must notify this office in writing within fourteen (14) days of the receipt of this notice, what actions will be taken to comply with your waste management plan. Failure to do so may result in the facility losing it's deemed permitted status, requiring it to obtain an individual non discharge permit. 127 Carding! Drive Extension, VrArningtan, N.C. 2M5-3945 0 Telephone 910-395-3900 + Fax 910-350-2004 An Equal Opportunity Affirmative Action Employer Billy Kilpatrick Farm September 15, 1997 Page 2. Please be aware it is a violation of North Carolina General Statutes and Rules to discharge wastewater to the surface waters of the State without a permit and/or to fail to follow a certified waste management plan. The Department of Environment, Health and Natural Resources has the authority to levy a civil penalty of not more than $10,000 per day per violation. When the required corrective actions are complete, please notify this office in writing at the address below. If you have any questions concerning this matter, please call David Holsinger, Andy Heminger or Brian Wrenn at 910-395-3900. ; I Sincerely, Brian L. Wrenn Environmental Specialist cc: Billy Houston, County Soil and Water Conservation Sandra Weitzel, NC Division of Soil and Water Conservation Don Butler, Carroll's Foods Operations Branch Wilmington Files M RECEIYE9 SEP 2 9 1991 September 25, 1997 Mr. Brian Wrenn Environmental Specialist State of North Carolina Dept. of Environment, Health, and Natural Resources 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 Dear Mr. Wrenn: 1 have received the notice of deficiency from your office concerning my inspection on September 12, 1997. Please allow me 45 days to rake the recommended repairs to comply with my waste management plan. Thank you, x / Billy Kilpatrick 3+-G-7 !� ��E n Cc w i+Y State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office James B. Hunt, Jr., Governor Wayne McDevitt, Secretary Division of Water Quality June 3, 1998 Certified Mail # Z 312 646 438 Return Receipt Requested Mr. Billy Kilpatrick Billy Kilpatrick Farm PO Box 723 Kenansville, NC 28349 / foll • NCDENR NORTM CokRouNA DEPARTMENT OF ENVIRONMENT AND NAxuRAL RESOURCES Subject: SECOND NOTICE OF DEFICIENCY Billy Kilpatrick ` Facility Number: 31-97 Duplin County Dear Mr. Kilpatrick: On May 29, 1998, staff from the Wilmington Regional Office of the Division of Water Quality inspected your animal operation and the lagoon(s) serving this operation. It was observed that erosion cuts on the inner dike wall of the lagoon could threaten the integrity of the structure. A previous Notice of Deficiency was issued on September 15, 1997, based on a September 12, 1997 inspection by DWQ staff. At this time, it was observed that there were erosion cuts on the inner dike wall of the lagoon. - Erosion on the dike wall of the lagoon is a violation of your Certified Animal Waste Management Plan, and subsequent infractions may result in a Notice of Violation and include a civil penalty. The erosion cuts on the lagoon dike wall should be filled with a suitable clay material and revegetated with an appropriate cover. In addition, the grassed waterway by the farm road should be graded and revegetated to ensure no ponding or runoff occurs during waste application. Erosion in the storm water diversion adjacent to the lagoon should be repaired. We suggest that you contact your service company, local NRCS office, or Soil and Water District office for any assistance they may be able to provide to correct these situations. To remain a deemed permitted facility, you must notify this office in writing within seven (7) days of the receipt of this notice, what actions will be taken to comply with your waste management plan_ Failure to do so may result in the facility losing it's deemed permitted status, requiring it to obtain an individual non discharge permit. 127 North Cardinal Dr., Wilmington, North Carolina 28405 Telephone 910-395-3900 FAX 910-350-2004 An Equal Opportunity Affirmative Action Employer 50% recycled/10% post -consumer paper Mr. Billy Kilpatrick June 3, 1998 Page 2 Please be aware it is a violation of North Carolina General Statutes to discharge wastewater to the surface waters of the State without a permit. The Department of Environment, Health and Natural Resources has the authority to levy a civil penalty of not more than $10,000 per day per violation. When the required corrective actions are complete, you must notify this off -ice in writing at the address below. If you have any questions concerning this matter, please call David Holsinger or Brian Wrenn at 910-395-3900. Sincerely, Brian L. Wrenn Environmental Specialist cc: Harold Jones, County Soil and Water Conservation Sandra Weitzel, NC Division of Soil and Water Conservation - Don Butler, Carroll's Foods, Inc. Operations Branch Wilmington Files S. IWQSIBRUATADEF981D UPLIN13l-97-2.DEF RECE� D JUN1 0 1988 6-6-98 Brian Wrenn Environmental Specialist NCDept. Environment and Natural Resources 127 Cardinal Drive Wilmington, NC 28405 Dear Mr. Wrenn, I received your letter concerning my inspection on 5-29-98. Please allow me 6-8 weeks to make the necessary repairs to the lagoon dike, grass waterways, and storm drains. Thank you very much. Sincerely, Billy Kilpatri Facility Num r:31-97 Duplin County 200"4j03 09:30 BILLY KILPATRICK 9102961026 >> 9103502004 P vi JL r, FCWM CROP-1 CROP YIELD RECORD 0 0 N O Ln m m cn w N m w m N O .c Y U_ OC r d a Y r cI1 N 01• O m v o. C6 0 0 N Farm Owne . e FadAty Number- Opomtor Date mmddMeg FleldlPug IQ Crap Yield of Bushels Sale Size Icable FlakWul Sine ed =051 'Yield per Acre or Bwh UAc GprN 89 • (ofil .. y9� 3 7Srb`� a09 �� rr era 3a4P f9gLow a� ! 3, ! 309►� ,�� (3) Y[eld/Aa a = (1) Yield divided by (2) Flei&ghA Siva. (3)-(1 u(2} 20M04-G3 0921 BILLY KILPATRICK 9102961826 >> 9103502004 P 2/3 Appendix 1. Lagoon Sludge Survey Form A. Farm Permit or DWQ Identification Number J 3 f1 ` '? J7 S. Lagoon Identification % --CIA C. Pertton(s) Taking Measurements Ll �'/%' . t f{f ' D. Date of Meancernents 10 �� ^4P F.. Methods/Devices Used for Meanto meat of 4. Distartee from the lagoon liquid surface to the top of the sludge layer: A tiVIftN 5 1 4 L A .- G-r&n b. Distance from the lagoon liquid surface to the bottom c. Thickness of the sludge layer if snaking a diroot mcasuromen with "core sampler": r J Ad F. Lagoon Surface Area (using dimensions at inside top of bank): acres) (Draw a sketch of the lagoon on a separate sheet, list dimensions, and calculate surface area.) 0. Estimate number of sampling points: a. Less than 1.33 acres: Use 8 is b. if more than 1.33 acres, acres x 6 with maximum of 24. (Using sketch and dinwrisions, develap a unifotnr Vid that has the same number of intersections as the estimated number of samptin points heeded Number the itdermet6n points oo tde lagoon grid so that data rt corded at each can be easily matched,) H. Conduct sludge survey and record data on "Sludge Survey Data Sheet" (Appendix 2). I. At the time of the sludge survey, also measure tho distance from the Maximum Liquid Level �� to the Present Liquid Level (measure at the lagoon gauge pole); _ • i. Determine the distance from the Maximum Liquid Level to the \iinitnum Liquid Level ' (use lagoon management plan or other lagoon records): K. Calculate the distance from the present liquid surface level to the Minimum Liquid Level � t ([tent 1 minus Item 1, assuming the prrseat liquid level is below the Maximum Liquid Level): L. Record firm die Sludge Survey Data Sheet the distance from the present liquid surface level to the lagoon bottom (average for all the measurement points : +03 M. Record from the Sludge Survey Data Sheet the distance from the present liquid surface level to the top of the sludge layer (average for all the tnca5urentent points): N. Record f m the Sludge Survey Data Sheet the average thickness of the sludge layer: Jff 0. Calculate the thickness of the existing Liquid Treaimcnt Zone (Item M minus heist 1Q: 4 (Note: If Item 0 is less than 4 feet, a sludge rernml one ut hadon plan may be required by N.C. DWQ. Set: yaw specific permit or contact ntu'D for more information.) P. Proceed to the Sludge Volume Worksheet if you desire to calculate sludge volume for a recungular- shaped lagoon with urdform side slopes. Completed by ,: Date: 10•,2� - D 1% Print Name icnature 14 2008 &04-W 09:21 BILLY KILPATRICK 9102961026 >> 9103502004 p 3/3 Appendix Z. Sludge Survey Data Sheet* Lagoon Idenfiftation: ' Q Sludge Survey Data Sheet , � 7 Completed by: , Date: 10 —ZG 427 Print Name Signature • } r • r' •• layer ®� O • d r cbm�urj mial bgdg—wAga a Amh aftacliedt shik{,$1my Dow Sheet See Apper dh 4 for conversion from Inch¢a !a twiths ot'a foou 15 . P. 01 TRANSACTION REPORT APR-03-2008 THU 09:13 AM FOR: NCDENR 9103502004 �c RECEIVE DATE START SENDER RX TIME PAGES TYPE NOTE M# DP APR-03 09:12 AM BILLY KILPATRICK 37" 3 FAX RX OK � �c Michael F. Easley, Governor o� O`aWA rFRQG William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleen H. Sullins, Director Division of Water Quality July 1, 2007 William R Kilpatrick "�CEIVEb Billy Kilpatrick Farm 463 Routledge St SUN 2 Z007 Kenansville, NC 28349 Y•: Subject: Certificate of Coverage No. AWS310097 Billy Kilpatrick Farm Animal Waste Management System Duplin County Dear William R Kilpatrick: In accordance with your application• received on 20-Feb-07, we are hereby forwarding to you this Certificate of Coverage (COC) issued to William R Kilpatrick, authorizing the operation of the subject animal waste management system in accordance with General Permit AWG100000. This approval shall consist of the operation of this system including, but not limited to, the management and land application of animal waste as specified in the facility's Certified Animal Waste Management Plan (CAWMP) for the Billy Kilpatrick Farm, located in Duplin County, with an animal capacity of no greater than the following swine annual averages: Wean to Finish: 0 Feeder to Finish: 4320 Boar/Stud: 0 Wean to Feeder: 0 Farrow to Wean: 0 Gilts: 0 Farrow to Finish: 0 Farrow to Feeder: 0 If this is a Farrow to Wean or Farrow to Feeder operation, there may also be one boar for each 15 sows. Where boars are unneccessary, they may be replaced by an equivalent number of sows. Any of the sows may be replaced by gilts at a rate of 4 gilts for every 3 sows The COC shall be effective from the date of issuance until September 30, 2009 and replaces the NPDES COC issued to this facility with an expiration date of July 1, 2007. You are required to continue conducting annual surveys of sludge accumulation in all lagoons at your facility; the one-year extension in Condition III.19 does not apply. Pursuant to this COC, you are authorized and required to operate the system in conformity with the conditions and limitations as specified in the General Permit, the facility's CAWMP, and this COC. An adequate system for collecting and maintaining the required monitoring data and operational information must be established for this facility. Any increase in waste production greater than the certified design capacity or increase in number of animals authorized by this COC (as provided above) will require a modification to the CAWMP and this COC and must be completed prior to actual increase in either wastewater flow or number of animals. Please carefully read this COC and the enclosed State General Permit. Enclosed for your convenience is a package containing the new and revised forms used for record keeping and reporting. Please pay careful attention to the record kegping and monitoring conditions in this permit. Aquifer Protection Section 1636 Mail Service Center Internet: wwwmcwateroualitv.om Location: 2728 Capital Boulevard An Equal Opportunity/Affirmative Action Employer— 50% Recyded110% Post Consumer Paper I'NAhCarolina atura!!rf Raleigh, NC 27699-1636 Telephone: (919) 733-3221 Raleigh, NC 27604 Fax 1: (919) 715-0588 Fax 2: (919)715-6048 Customer Service: (877) 623-6748 If your Waste Utilization Plan has been developed based on site -specific information, careful evaluation of future samples is necessary. Should your records show that the current Waste Utilization Plan is inaccurate you will need to have a new Waste Utilization Plan developed. r The issuance of this COC does not excuse the Permittee from the obligation to comply with all applicable laws, rules, standards, and ordinances (local, state, and federal), nor does issuance of a COC to operate under this permit convey any property rights in either real or personal property. Upon, abandonment or depopulation for a period of four years or more, the Permittee must submit documentation to the Division demonstrating that all current NRCS standards are met prior to restocking of the facility. Per 15A NCAC 02T .011-1(c) a compliance boundary is provided for the facility and no new water supply wells shall be constructed within the compliance boundary. Per NRCS standards a 100-foot separation shall be maintained between water supply wells and any lagoon, storage pond, or any wetted area of a spray field. Per 15A NCAC 02T .1306, any containment basin, such as a lagoon or waste storage structure, shall continue to be subject to the conditions and requirements of the facility's permit until closed to NRCS standards and the permit is rescinded by the Division. Please be advised that any violation of the terms and conditions specified in this COC, the General Permit or the CAWMP may result in the revocation of this COC, or penalties in accordance with NCGS 143- 215.6A through 143-215.6C including civil penalties, criminal penalties, and injunctive relief. If you wish to continue the activity permitted under the General Permit after the expiration date of the General Permit, an application for renewal must be filed at least 180 days prior to expiration. This COC is not automatically transferable. A name/ownership change application must be submitted to the Division prior to a name change or change in ownership. If any parts, requirements, or limitations contained in this COC are unacceptable, you have the right to apply for an individual permit by contacting the staff member listed below for information on this process. Unless such a request is made within 30 days, this COC shall be final and binding. This facility is located in a county covered by our Wilmington Regional Office. The Regional Office Aquifer Protection staff may be reached at 910-395-3900. If you need additional information concerning this COC or the General Permit, please contact the Animal Feeding Operations Unit staff at (919) 733- 3221. Sincerely, for Coleen H. Sullins Enclosures (General Permit AWG100000, Record Keeping and Reporting Package) cc: (Certificate of Coverage only for all cc's) Duplin County Health Department Duplin County Soil and Water Conservation District Wilmington Regional Office, Aquifer Protection Section AFO Unit Central Files Permit File AW S310097 Division of Water Quality Facility Number 3 + Q Division of Soil and Water Conservation -- - - - O Other Agency t0000� Type of Visit )e) Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit 0 Routine 0 Complaint 0 Follow up 0 Referral 0 Emergency 0 Other ❑ Denied Access Date of Visit: Arrival Time: ; l0 Departure Time: 'Q ounty: �C/��L Region: Farm Name: ��Lt/ 7� �P��Z�h _i�Lr>� Owner Email: Owner Name: �2�L �r _ L-_z- Loa zgzg4 Phone: Mailing Address: Physical Address: Facility Contact: Title: Phone No: Onsite Representative: ,��y L4O?Rra7�- Integrator: _ �( l/ - 64Wc-4,J Certified Operator: Back-up Operator: Operator Certification Number: Back-up Certification Number: Location of Farm: Latitude: = 0 = f = Longitude: = ° = 4 = Ai Swine Design Current Design Current Capacity Population Wet Poultry Capacity Population i ❑ Layer ❑ Non -Layer - ❑ Wean to Finish ❑ Wean to Feeder Feeder to Finish ZO El Farrow to Wean ❑ Farrow to Feeder ❑ Farrow to Finish ❑ Gilts ❑ Boars Other ❑ Other Dry Poultry ❑ Layers ❑ Non -Layers ❑ Pullets ❑ Turkeys ❑ Turkey Poults ❑ Other Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? Design Current Cattle Capacity Population ❑ Dairy Cow ❑ Dairy Calf 1 ❑ Dairy Heifer E3Dry Cow 1 ❑ Non-Dairy1 3 ❑ Beef Stocker ❑ Beef Feeder ❑ Beef Brood Cowl Plumber of Structures: IT b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Page 1 of 3 El Yes '0 No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑NA [I NE [I Yes [I No ❑ Yes�No El NA El NE ElYes No ❑ NA ❑ NE 12128104 Continued Facility Number: Date of Inspection 4 Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a. If yes, is waste level into the structural freeboard? ❑ NA ❑ NE ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: #/ Spillway?: NO Designed Freeboard (in): Observed Freeboard (in): :50 ❑ Yes )6No ❑ Yes ❑ No 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes XNo ❑ NA Cl NE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes VNo ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? Yes ❑ No ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes �No ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Ann ication 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes y No ❑ NA ElNE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s)- 13. Soil type(s) �� /✓p - - 14. Do the receiving crops differ from those designated in the CAWMP? Yes ❑ No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination ? ❑ Yes e No ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes 0 No ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any recommendations or any other comments. Use drawings of facility to better explain situations. (use additional pages as necessary): 2J ._/tJfA0 5 7P7C�, -7N4.. yF -02 /57&m - Akfo o 0--54 1 pplZ0a 77<C - �. Reviewer/Inspector Name f. Phone:01 Reviewer/Inspector Signature: Date: Page 2 of 3 12.08/ 4 Continued Facility Number: 3 Date of Inspection Required Records _&_Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes XNo ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check 0yes ❑ No ❑ NA ❑ NE the appropriate box. ❑ WUP El Checklists 2'6esign El Maps ❑Other 21. Does record keeping need improvement? If yes, check the appropriate box below, Oyes ❑ No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ,Stocking Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ANo ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ,2TNo ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ,0Yes ❑ No ❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes )KNo ❑ NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes RTNo ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes ❑ No ❑ NA PrNE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes XNo ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes VNo ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? Yes Nob NA ❑ NE Additional D`rraawings:/f jComments �and/or � /[Tit / "[ivs4^% '1 /� ��J it��n% Q% hyV L/t/ /O �/✓' z���� �dry�/] 2f,f) Now A( S G,09-7� Page 3 of 3 12128104 Division of Water Quality 11 Facility Number Q Division of Soil and Water Conservation __ _ _ i___ O Other Agency L.O� Type of Visit f D Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit X Routine 0 Complaint 0 Follow up 0 Referral 0 Emergency 0 Other ❑ Denied Access Date of Visit: /O�j Arrival Time: �` p Departure Time: /,' /IQ County: �" Region: L Farm Name: LG `L fjZ4�A7/1 Zef:lz !�_ Owner Email: Owner Name: AZZ�✓ l 1 ZL77�K Phone: Mailing Address: Physical Address: Facility Contact: / Title: Phone No: Onsite Representative: z�L1 ZGP�4i�ZC' K Integrator: , ,/" —6,eca � Certified Operator: Back-up Operator: Location of Farm: Swine Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Boars Other ❑ Other Operator Certification Number: Back-up Certification Number: Latitude: 0 c=` = i4 Longitude: 0 o a S= 64 Design Current Design Current Capacity Population Wet Poultry Capacity Population ❑ Layer ❑ Non -La er Dry Poultry ❑ Layers ❑ Non -Layers ❑ Pullets ❑ Turkeys ❑ Turkey Poults ❑ Other Dischary-es & Stream impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) Design Current Cattle Capacity Population ❑ Dairy Cow ❑ Dairy Calf ❑ Dairy Heifer ❑ Dry Cow ❑ Non -Dairy ❑ Beef Stocker ❑ Beef Feeder ❑ Beef Brood Cowl c. What is the estimated volume that reached waters of the State (gallons)? Number of Structures: d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes /No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes A No ❑ NA ❑ NE ❑ Yes /ZNo ❑ NA ❑ NE Page I of 3 12128104 Continued Facility Number• — 4 . Date of Inspection I O Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a. If yes, is waste level into the structural freeboard? ❑ NA ❑ NE ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: AJO Designed Freeboard (in): Observed Freeboard (in): Z� ❑ Yes No ❑ Yes No 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes j[J No ElNA ❑ NE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes XNo ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes � No ❑ NA El NE 8. Do any of the stuctures lack adequate markers as required by the permit? El Yes �No ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need El Yes ,�/ ld No El NA El NE maintenance/improvement? T 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes [9'No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ FAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) , l�r H86*J5 13. Soil type(s) r1 14. Do the receiving crops differ from those designated in the CAWMP? No ❑ Yes pr ElNA [-INE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes �No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination ? ❑ Yes No ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes XNo ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes /EfNo ❑ NA ❑ NE Comments (refer to question ft Explain any YES answers and/or any recommendations or any other comments. Use drawings of facility to better explain situations. (use additional pages as necessary): �o� rii,a L�r�FzCrLzsts �rrr� n0205, • 23) i4RzG-/cti -rr,n.j iota/nP � s R�n1 �F„p , �cJiv4lZ 05 C2f cd'+JG'��C-- lG �rn 6u;P&i;, C&Z6,eA-7z6,-) W- C 95 yyOn1F //O - CO2A a�'= Reviewer/Inspector Name Idf j- rf i Phone: y10 - qq& -'7Z6µ Reviewer/Inspector Signature: 11101'4— Date: _V/ LO�O tP Page 2 of 12/28/04 Continued Facility Number: Date of Inspection Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes ZNo ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ZYes ❑ No ❑ NA ❑ NE the appropriate box. ❑ WUP Checklists ❑Design El Maps El Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes JKNo ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes /No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? 9Yes ❑ No ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? �z Yes ❑ No ❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes ZNo ❑ NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes gNo ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes ❑ No ❑ NA ONE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes IZJ No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes No ❑ NA ❑ NE and report the mortality rates that were higher than normal? io 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes No El NA El NE If yes, contact a regional Air Quality representative immediately ///X 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes No ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes �No ❑ NA ❑ NE Additional Comments and/or Drawings: T Page 3 of 3 12128104 Certificate of Coverage or Permit Number `7 ' i County 1 J &%7l I �. Facility Nam .(as,shawn on Certificate of Coverage or Permit) = j • fp.P+_c-k Opmwr-in Charge for this. Facility _ $� Cemfica on # % 9Ga5 Laud appIk ation of animal waste as allowed by the above permit occtsrrod during the past cWeadar year ✓� YES NO. If NO,, skip Pat# -I and Part 11 and proceed to the certification. Also, if animal waste was � but not land applied, please allwb an explanation on how the animal waste was handled. ��' ��' Ij%�' � i ManagwncW Part I : Fscrtit`► Ini"or,�nation•.. - � .MAR 0 2 LU�� 1. Toted nwaber ofapplication Fields. ❑ or Pulls R please oracle the appnpriate box�).in the Certified Animal ane Plan (CAWMP): I Tc%W Useable Acres spptov Y� t .�tli�y�r� .�� � '•_ �=Talst'A"aes its �as� was app%d , k.-�. 3. Total pexutds of Plant Available Nitrogen (PAN) applied during the year for all application sites: 4. Total pounds of Plant Available Nitrogen (PAN)_ allowed to be land applied annually by the CAWMP and the p-=& = 5. Estimated'amount of total umurre,-litter and process-wastewaW sold or given to other persons and taken off site r " *c year l7 ions ❑ or gallons 0 (please check the appropriate box) b. Annual average nundw of animals by type at this facility during the previous year: 9. Largast and snmallew nw nber of anmWs by type at this facility at any one time during the previous year: Smallest In #'d' ("these numbers are for informational purposes only since the only permit limit on the number of animals at the P�IIt _Fasiti��s= IF TME MY SIAXEMPIT BELOW IS 'NO". PLEASE MOM2E N &U�QN M 10 MM THE FA I T MP A ,MffLN IANCE" EXPLAIMCgUEUM AMM JAMN QR PROPOSED TO BE TAKEN TO I . Only animal waste Sawrated at tills facility was applied to the permitted sites durirng U-Tes ❑ No tine past calendar year. 2. The facility`was-operated in such away that there was no direct runoff ofwaste from @-Yes © Nc the f>;ci�liiy'(�iuding the houses, lagoons/storage ponds and'ft application sites) dungg.dw past calendar year. AFACF 3-14-03 Year ''ire iiw- no ftedwird•violabon inlagoons or storage ponds 4 this'f Wili3y dur* ©. Yes �Io the'past�r�l�ar-year. , " {lam y . 5. TheFe Was aa"PAN 1i�ation to an fields or at this than the = ; 8! Y�,sJ ❑. No app . y, craps facility ll�r . kvds s ificd:ia hds facility's CAWN P,during the past calendar year^ _ 5.:. All.land:applicatian egai .was calibrated at least once during the past calendar year. [ Yes ❑ No 7 .. Sludge acc tmufation4n all'lagoons did not,6wwd the vohme for v hWch the =v6 VYes No iiesRgnWor,r�s;edh lagoons mininnurin��t volume to less th hlume for wlache lagoon was designed. tr �aPY�.af tl���Annua#�Siudge Survey Form #or -this facility is attached to this C�a�fi�atmn �es`� �� F. No = i.. -,i � � s.:.�-C��' ���'=���-rif'� ' -`.�'` •s - "'�rtA`iS :a..' '�''� "�5i.� {'c;, �a���"�.'mot .+. tic .Q A .�! laQ .rr.r,.l.;..rfinesaw�'i,n:oarli �i�ri'r�rrivino l�cbryetrrrlryrmc tlu. .. - _ fYrV�e t"is Nis 10- Snd pH was maintained as specified in the permit during the past calendar Year? Q' Yes ❑ No 11. All requiredam"oonpand*itorij* an�r�erporptging was perforn� in accordance with the facility's Vies -,.❑ No in -the were lied with IfYes - C3:c No _ .i2..:All-�operatioas-and tceancerequs pemut� oomp during the past r ;year or; su file sass of ar;deviatiori, prior su#horization was received V ; frorhtlin� of Water. Quahiy. 13 Craps as speed m theCAWMP were maintained during the past calendar, year on all .r Yes I7 No sites" raceiveng.aairirai Waste ark the corps gnrvvn were rernaval in accordance with - the, Ipernut. - 14. -All-buffer require ne s as specified'on the permit,and the CAWW for this facility _were .❑ "No maiuziained daring each application of animal waste during file past calendar year. y "I fy uatler,pezty of law that ydns doc�unt.: and all;attadunertts were Preparedeuzder my drron o; supervision in �3`'F`s�r`�__��-=rL._-�`�► �`_`--:�,.... �:J:i�''�.......:�.d rt..r?.:• ...1.i'.a.i'_��.......sl�� - e..1�-.:...�1.�.�..3:..ti..l....a..'�L...:-+/'-' or Arm Wei � yIry d gudp bW direct. a�x+e s+r�pier': pnimm mmb&N ibe.._ ` be low . a'.FfalO{._ +%r Fri' i y.-•4.., � - €: do gfmbmne fmm the ._ eE t" i '- `�" si. sSTiY - —. _` � s t • rm, r- : 71� �P. � Ef}. 4-..y Litt. �.f ! '17�M�3 `- `` .- . M:`ii■�tt'�iir��tvey� � - -7- dit n a titclus iise_se P. Pwaed to d1e UaCkyo Volume WmkshW if fw a TO - :,�' 9 AMN . _ Jc Y •�` 11. fie- i V VY _ i' 4 - ..ii � - ' A �i r r ,.L:�1 " r --i- of x, Eh2� ZT :� `�3'=.�.'� �..• � a5.`.zm , sicW��. Liiy past 4a ,wr L/1RF,CE1VF,D S E P 13 2004 PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES BY: Facility Number: [L:l-97 County: Duplin Facility Name: Billy Kilpatrick Farm Certified Operator Name: Billy Kilpatrick Operator Number: 19659 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Name/ID: Spillway(Y or N): Level(inches): Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 1 N 12.5 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Boiume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWO prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 0911012004 I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Phone: 910-296-0619 Date: 09/10/2004 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Kil atrick 2. Current liquid volume in 25 yr.124 hr. storm storage & structural freeboard a. current liquid level according to marker 12.51 inches b. designed 25 yr.124 hr. storm & structural freeboard 19.5 inches c. line b - line a (inches in red zone) = 7.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 128048.25 ft2 e. line c/12 x line d x 7.48 gallons/ft3 558717 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180days g. volume of waste produced according to structural design 583200 ft3 h. current herd # 3fi00 certified herd # 4320 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 daystline f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 07/13/2004 m. ((fines e + k)11000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 486000 ft' 0 ft3 1033052 ft3 1893751 gallons 2.20 Ibs/1000 gal. 5395.4 lbs. PAN PoA (30 Day) 2121100 Ill. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Kilpatrick line m = 5395.4 lb PAN 2. Structure ID: line m = lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure 1D: line m = lb PAN 6. Structure ID: line m = lb PAN n. lines 1 +2+3+4+5+6= 6395.4 lb PAN Ill. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining IRR 2 PAN balance (Ib/acre) t. TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s lu. application window' 3186 10 Wheat 6.93 104.00 720.7 Sept - April 3186 11 Wheat 6.64 104.00 690.6 Sept - April 3186 12 Wheat 7.52 104.00 782.1 Sept -April 3186 13 Wheat 7.52 104.00 782.1 Sept -April 3186 14 Wheat 3.94 104.00 409.8 Sept - April 3186 15 Wheat 3.22 104.00 334.9 Sept - ril 3186 16 Wheat 6.78 106.00 718.7 Sept - ril 3186 17 Wheat 6.30 106.00 667.8 Sept -April 3186 18 Wheat 6.30 106.00 667.8 Sept - ril 3186 19 Wheat 6.78 106.00 718.7 Sept -April 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column Q = 6493.0 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 5395.4 lb. PAN PoA (30 Day) 2/21/00 x. Crop's remaining PAN balance (line v from section Ill) = 6493.0 lb. PAN y. Overall PAN balance (w - x) _ -1098 lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc_ For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Irrigation onto existing spray fields will continue as weather and field conditions permit. Additional land is available for pumping if needed. PoA (30 Day) 2/21100 Facility Number j Date of Visit: Tune: Q Not Operational Q Below Threshold 01permitted dCerfified 0 Conditionally Certified ❑ Registered Date Last Operated or Above Threshold: Farm Name: gLw. �C �-� ._ �► • _ county: D () �_...._............_ ..�.... Owner Name: .._ _ .. .._ .__ .._... 'Phone No: _Mailing Address:..__ Facility Contact: --- --Title: _.. Phone No: . • � _,_ , Onsite Representative: _ .'! Z *� iU -- - - -•• Integrator. Certified Operator: Location of Farm: Operator Certification Number: ❑ Swine ❑ Poultry ❑ Cattle ❑ Horse Latitude • " Longitude • 4 �u Swine Y , .Cattle ` Wtan to Feeder Layer Feeder to Finish , Non -Layer Farrow to Wean Farrow to Feeder Farrow to Finish 1; + y - Togo 7 Gilts Boars t_ IME`.1'T�1�r�trl -- F.r✓_ w Z A x_ Number a[.istgoons �.• ;� �= �� Discharges & Stream Impacts - 1. Is any discharge observed from any part of the operation? ❑ Yes ❑ No Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? ❑ Yes ❑ No b. If discharge is observed, did it reach Water of the State? (If yes, notify DWQ) []Yes ❑ No c. If discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) ❑ Yes ❑ No 2. Is there evidence of past discharge from any part of the operation? ❑ Yes ❑ No 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes ❑ No Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage). less than adequate? ❑ Spillway ❑ Yes ❑ No Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Freeboard (inches): D 12112103 Conrnued FacilityNumber: ME 9=-j Date of Inspection •5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maimtenance/improvement? 8. Does any part of the waste management system other than waste structures require maintenancefunprovement? 9. Do any strictures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? Waste Application 10. Are there any buffers that need maintenance/unprovement? 11. Is there evidence of over application? If yes, check the appropriate box below. ❑ Excessive Ponding ❑ PAN ❑ Hydraulic Overload [IFrozen Ground ElCopper and/or Zinc ap 12. Crop type CiSW ❑ Yes ❑ No ❑ Yes ❑ No VYe s ❑No s ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? ❑ Yes ❑ No 14. a) Does the facility lack adequate acreage for land application? ❑ Yes ❑ No b) Does the facility need a wettable acre determination? ❑ Yes ❑ No c) This facility is pended for a wettable acre determination? ❑ Yes ❑ No 15. Does the receiving crop need improvement? ❑ Yes ❑ No 16. Is there a lack of adequate waste application equipment? ❑ Yes ❑ No Odor Issues 17. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge at/or below ❑ Yes ❑ No liquid level of lagoon or storage pond with no agitation? 18. Are there any dead animals not disposed of properly within 24 hours? ❑ Yes ❑ No 19. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, ❑ Yes ❑ No roads, building structure, and/or public property) 20. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional ❑ Yes ❑ No Air Quality representative immediately. 7, Yf.Lu s E 3 Ha G ID AM) mope- kJ<-E pS 35,) 1 " R.A4M*:Ac 1. s►.15p 6C�-Z o,J >u tr � j sD et b6,J(---. ❑ Feld Copy ❑ Final Notes g,)oN 9/3l09 (.,EUEt. WA5 2-q ipcf s ac.c.e"x@J& -Pv 6t_t� SGtrIPG , o- A -PRY -T(_ 4� S!l cc'.. oIJ 11%bla c tAmc Our stlb ek-Sle'T' mpnAvER ry 41004e5 ,o -NAi Q_Aomo& 5lizsraC-fl k'", ?UV-,A9S:0a Eu6n1TS s+j 4 f to t g f 1%, gitit) 9jtt..! ANr) -tjn'aq Ta GE-t- �a 21" Atc6t�.o G '1`a NEW SE'TR'�U� i Et,N PEG Co,/tb '6UT ANp FrL c-P-ur se i�1�G-► ASAP, (bsk64_9 W LOW ?ar,a`c df Ds.'V Ot"At_ girt + 4�� fbr%- TOTAL of G.y-coicMdS. FAewr ,&(L RAS 3' S ORJ 5a`�E3EA�3 Ssa�,�c Gi31e,1 . NoTz(l VWQ 1JHEr' i�6A11 t�UE-� GAvGy; =►s, �cily� 3a5 3°1a Za z Tv t,�„ v►t= aLyr A>Jli �fE�fi�'; T Reviewer/inspector Name Reviewer/Inspector Signature: Date: `31 0 Continued A"A.&/w Facility Number: 31— Date of Inspection t3 ' Required Records & Documents 21. Fail to have Certificate of Coverage & General Permit or other Permit readily available? 22. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? Oe/ WUP, checklists, design, maps, etc.) 23. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Waste Application ❑ Freeboard ❑ Waste Analysis ❑ Soil Sampling 24. Is facility not in compliance with any applicable setback criteria in effect at the time of design? 25. Did the facility fail to have a actively certified operator in charge? 26. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) 27. Did Reviewer/Inspector fail to discuss reviewf inspection with on -sire representative? 28. Does facility require a follow-up visit by same agency? 29. Were any additional problems noted which cause noncompliance of the Certified AWMP? NPDES Permitted Facilities 30. Is the facility covered under a NPDES Permit? (If no, skip questions 31-35) 31. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? 32. Did the facility fail to install and maintain a rain gauge? 33. Did the facility fail to conduct an annual sludge survey? 34. Did the facility fail to calibrate waste application equipment? 35. Does record keeping for NPDES required forms need im vement? If yes, check the appropriate box below ❑ Stocking Form [I Crop Yield Form ❑Rainfall Inspection After 1" Rain ❑ 120 Minute Inspections ❑ Annual Certification Form ❑ Yes ❑ No ❑ Yes- ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes [) No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No [l`Yes ❑ No 12112103 Type of Visit AOompliance inspection O Operation Review O Lagoon Evaluation Reason for Visit WRoutine O Complaint O Follow up O Emergency Notification O Other ❑ Denied Access Facility Number Date of Visit: T'une: I--0 Q Not Operational Q Below Threshold PermittedCertified [3 Conditionally Certified 0 Registered Date Last Operated or Above Threshold: ._.____._...,..... Farm Name: ..... __.Bau::.` ........K ?A 1.. Qk.......f:�amq.--------•-- County:......_ 5.�'p ..... ___ . ... . _.... Owner Name: __ ._ ...... -Phone No: .... ............. ... . ................ .....— MadingAddress:.. . ...... ................ ....................... ...... ..................... ............... ...... _. _. _._ __...._ .... ._.. ....... ...... Facility Contact: .................... ,.... ........ Title:._..... - ---- .............. Phone No: Onsite Representative:... t' 1.. ........Integrator:--.-.--C101 ....................................... Certified Operator:... _._ ....._....._._ .....__...... ......................... Operator Certification Number:........... . Location of Farm: ❑ Swine ❑ Poultry ❑ Cattle ❑ Horse Latitude ' 4 " Longitude • 4 't Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes 2jeNo Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? ❑ Yes' ❑ No b. If discharge is observed, did it reach Water of the State? (If yes, notify DWQ) c. If discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) 2. Is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Identifier:.......... J... _............ ........................... ....................... Freeboard (inches): ;Z' ❑ Yes ❑ No ❑ Yes ❑ Yes ❑ Yes ❑ No No To ❑ Yes �Fo Structure 6 12112103 Continued Facility Number: 3 1 — Z9 Date of inspection 5 f Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, ❑ Yes No seepage, etc.)' 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or ❑ Yes No closure plan? (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? ❑ Yes No 8. Does any part of the waste management system other than waste structures require maintenancerimprovement? ❑ Yes ! N 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level ❑ Yes No elevation markings? Waste Application 10. Are there any buffers that need maintenance/improvement? ❑ Yes VN 11. Is there evidence of over application? If yes, check the appropriate box below. ❑ Yes191 ❑ Excessive Ponding ❑ PAN ❑ Hydraulic Overload ❑ Frozen Ground ❑ Copper and/or Zinc 12. Crop type C150 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? ❑ Yes 14. a) Does the facility lack adequate acreage for land application? ❑ Yes b) Does the facility need a wettable acre determination? ❑ Yes Z c) This facility is pended for a wettable acre determination? ❑ Yes 15. Does the receiving crop need improvement? ❑ Yes No 16. Is there a lack of adequate waste application equipment? ❑ Yes No Odor Ivsues 17. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge at/or below ❑ Yes 040" liquid level of lagoon or storage pond with no agitation? / 18. Are there any dead animals not disposed of properly within 24 hours? ❑ Yes d 19. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, El Yes yNo roads, building structure, and/or public property) 20. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional ❑ Yes No Air Quality representative immediately. ECommentsro answers der-o.0and/or any ecom endattons or any rither comments. _ x=: (gse se dlra nf fairiltty to better expElam s*b"i!on {use'addmona! pages as necessary) Field Copy O Final Notes m (RfcESo Aft K4+5 REet-� ?.ECoti PE 9 �R a�EfZL-`4'. ]'TWV:3.06, (-CLM NEcvS �d KEPT drzzN �CCoRDS. C_R0f> `lrC-t.o �OM AS OCt i) TO fit= kjPD0\ [<J , Tos pecTrIdtJ P F-rE�. 1 I.�CEOS to T _:""�'�_.,.,.'E,',,,,, Reviewer/Inspector Name...�- Reviewer/Inspector Signature: Date: d5' Oq 12112103 1 Continued Facility Number. _ Date of .Inspection r' Required Records & Documents 21. Fail to have Certificate of Coverage & General Permit or other Permit readily available? ❑ Yes 2rNo 22. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? / (ie/ WUP, checklists, design, maps, etc.) ❑ Yes �No 23. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes ❑ Waste Application ❑ Freeboard ❑ Waste Analysis ❑ Soil Sampling 24. Is facility not in compliance with any applicable setback criteria in effect at the time of design? ❑ Yes 2 No 25. Did the facility fail to have a actively certified operator in charge? ❑ Yes 26. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) ❑ Yes No/ 27. Did Reviewer/Inspector fail to discuss reviewlinspection with on -site representative? ❑yes ❑o 28. Does facility require a follow-up visit by same agency? ❑ Yes No 29. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes 0 Rio N'PDES Permitted Facilities 30. Is the facility covered under a NPDF_S Permit? (If no, skip questions 31-35) 94res ❑ No 31. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes Rj`No 32. Did the facility fail to install and maintain a rain gauge? ❑ Yes 33. Did the facility fail to conduct an annual sludge survey? ❑ Yes 7No 34. Did the facility fail to calibrate waste application equipment? E❑ Yeses El No 35. Does record keeping for NPDES required forms need improvement? If yes, check the appropriate box below. es ❑ No ❑ Stocking Form ❑ Crop Yield Form ❑ Rainfall EJ mspection After 1" Rain ❑ 120 Minute Inspections ❑ Annual Certification Form 12112103 Michael F. to„Gy, William G. Ross Jr., Secre •y North Carolina Department of Environment and Natural Resou Alan W. Klimek, P.E. mire Division of Water Qu August 25, 2003 Billy Kilpatrick_ 463 Routledgi St. ,Kenansville, NC 28349 Subject. Rescission of Notice of Violation I Issuance of Notice of Deficiency Billy Kilpatrick Farm Facility # 31-97 Duplin County Dear Billy Ki trick: Thank you for your recent submittal of the information requested in our letter dated April 15, 2003. We grpatly appreciate the effort that you made in compiling this information and sending it to our Wilrimington Regional Office by the date required. We also appreciate the fact that you reported the p�pblern with high freeboard to our staff as required by your permit and worked with our staff to niarl ge the problem once it occurred. Upon review and consideration 'of the information submitted, the Wilmington Regional Office has determined that rio further compliance/enforcement actions will be taken by the Division for Oiesq high freebpards. Also; "based on your actions to properly operate your facility, the Division of Water Quality hereby'rescinds-the Notice of Violation that was issued to you on April 15, 2003 and replaces it with this Notice of Deficiency. In the'future;'please continue to evaluate ways to maintain freeboard levels in the required range.. These methods include, but are not limited to, water conservation practices, adding additional application sits, updating your cropping systems, adding additional and/or more flexible application equipment, and maintaining the lagoon levels at the lowest allowable and appropriate levels.through64t the year. Our staff looks forward to continuing to work with you and your . Technical Specialist to evaluate and implement any needed changes to your system. Customer Servfce: Mailing Address: Telephone: (919) 733-5083 Location: 1 80062377748 1617 Mail Service Center Fax, (919) 733-0059 512 N. S-' Raleigh, NC 27699-1617 State Courier #52-01-01 Raleir, ' An Equal Opportunity 1 Affirmative Action Employer 50% recycled 1 10% post -consumer paper http:Nh2o.enr.s1tate, nc. us Inadequate Freeboard Billy Kilpatrick August 25, 2003 Page 2 Thank you again for your cooperation. If you have any questions, please do not hesitate to contact=the staff of our Wilmington Regional Office at 910-395-3900. Sincerely, Rick Shiver Water Quality Regional Supervisor CC: Kraig Westerbeek, Murphy -Brown, LLC Billy Houston, Duplin County Soil and Water Conservation District Patrick Fussell, DS WC V mingto Files 3gF•RA Central Firs o�aF wa rFR pG Michael F. Easley Governor April 16, 2003 CERTIFIED MAIL RETURN RECEIPT REQUESTED Billy Kilpatrick 463 Routledge St. Kenansville NC 28349 SUBJECT: Notice of Violation Request for Information Inadequate Freeboard Billy Kilpatrick Farm #31-97 Duplin County Dear Sir or Madam: William G. Ross Jr., Secretary Department of Environment and Natural Resources Alan W. Klimek. P.E. Director Division of Water Quality On March 21, 2003, a representative of your animal operation informed the Division of Water Quality (DWQ) that there was inadequate freeboard in the lagoon(s) serving this facility. This lack of adequate freeboard is in non-compliance with the Certificate of Coverage issued to this facility on December 7, 1998. In addition to this Notice of Violation (NOV), this non-compliance is subject to an appropriate enforcement action by DWQ. This action can consist of one or more of the following: a civil or criminal enforcement action; an injunction; and/or a requirement to apply for coverage under an individual permit. The action chosen will be based on complete evaluation of all factors that resulted in the inadequate freeboard; the actions taken to restore the needed freeboard; and the actions being proposed to prevent the problem from reoccurring. To assist us in our review, please provide the Wilmington Regional Office with an evaluation of the reasons for the freeboard violation(s) and a strategy to prevent future freeboard violation(s). This evaluation and strategy must include but is not limited to the following: Current Freeboard level(s) Freeboard level records in the lagoon(s) for the past 12 months up to the date of submittal Spraying records for the past.12 months up to the date of submittal NCDENR Customer Service. Mailing Address: Telephone (919) 733 5083 Location: 1-877-623-6748 1617 Mail Service Center Fax (919) 733-0059 512 N. Salisbury St. Raleigh, North Carolina 27699-1617 State Courier #52-01-01 Raleigh, NC 27699-1617 An Equal Opportunity/Affirmative Action Employer 50% recycled / 1006 past -consumer paper ht1p✓/h2o.enr.state.nc. us Inadequate Freeboard Page 2 Rainfall records for the past 12 months for this site up to the date of submittal (if available) Cropping system and PAN specified in the CAWMP. If the cropping system was not in compliance with the facility's CAWMP, provide details of the cropping system in place for the past 12 months. A summary of actions taken to restore the needed freeboard in the lagoon(s) including but not limited to removal of animals from the site, delay of restocking of animals, pumping and hauling waste to another site (specify site), securing additional irrigation equipment, and securing additional spray sites. A description of water conservation measures in use at the facility and the date(s) installed. If the lagoon level(s) are still in violation of the facility's CAWMP and Permit, provide an updated Plan of Action as to how the facility will return to compliance. Provide a detailed description of the actions taken or proposed to be taken to insure that there are no further freeboard violations at this facility. This information must be received by the Wilmington Regional Office at the following address no later than 10 days following receipt of this letter. Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405-2845 Once this information is received and evaluated by the DWQ staff, a determination will be made as to the appropriate compliance/enforcement actions to be taken. Each case will be evaluated on its own merit. The efforts by the owner/producer to notify DWQ of the problem,. efforts made to resolve the problem once identified, and efforts proposed to prevent future problems will be positive factors in this determination. Nothing in this letter should be taken as removing from you either the responsibility or liability for this non-compliance or future cases of non-compliance. If you have any questions regarding this letter, please do not hesitate to contact our Wilmington Regional Office Staff at (910) 395-3900. Sincerely, /Alan. Klimek, .E. cc: Wilmington Regional Office Non -Discharge Compliance/Enforcement Unit Central Files Type of Visit P Compliance Inspection 0 Operation Review 0 Lagoon Evaluation Reason for Visit j6Routine 0 Complaint 0 Follow up 0 Emergency Notification 0 Other ❑ Denied Access Facilitv Number [late of Visit: VPermitted © Certified © Conditionally Certified 0 Registered Farm Name: ZLL%LPRTQ�� K ��Riy� Owner Name: Mailing Address: Facility Contact: Title: OnsitevRepresentative: J�� t zl-pfET K Time: Date Last Operated or Above Threshold: County: Phone No: I ntegrator: Phone No. - Certified Operator: Operator Certification Number: Location of Farm: swine ❑ Poultry ❑ Cattle ❑ Horse Latitude ' 0' C K Longitude a . 0 Number of Lagoons ❑Subsurface Drain Holding on f Sohd Traps '.W" E3 No Liquid Waste Discharges & Stream impacts I. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? b. If discharge is observed, did it reach Water of the State? (If yes, notify DWQ) c. If discharge is observed. what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) 2. Is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway Structure I Structure 2 Structure 3 Structure 4 Structure 5 Identifier: Freeboard (inches): 05103101 } Spray Field Area ❑ Yes No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ONO ❑ Yes 9fNo ❑ Yes ONO Structure 6 Continued Z 312 634 930 US Postal Service Receipt for Certified Mail No Insurance Coverage Provided. Do not use for International Mail See reverse Sent to. V & Kum P Oloo, State, & ZIP Postage $ �. Certified Fee Special Delivery Fee Restricted Delivery Fee u) rn Retum R to R �42 Address T FOk P r Date a Facility Number- —q Date of Inspection 5. Are there anv immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, ❑Yes �No seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes No (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? ❑ Yes No 8.: Does any part of the waste management system other than waste structures require maintenance/improvement? ❑ Yes No 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? ❑ Yes No Waste Analication 10. Are there any buffers that need maintenance/improvement? ❑ Yes X,No 11. Is there evidence of over application El Excessive Ponding El PAN ElHvdraulic Overload El Yes XNo 12. Crop type I�OK �� ��_LJ S WHEAT 13, Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? 14. a) Does the facility lack adequate acreage for land application? b) Does the facility need a wettable acre determination? c) This facility is pended for a wettable acre determination? 15. Does the receiving crop need improvement? 16. Is there a lack of adequate waste application equipment? Required Records & Documents 17- Fail to have Certificate of Coverage & General Permit or other Permit readily available? 18. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (ie/ WUP, checklists, design, maps, etc.) 19_ Does record keeping need improvement? (ie/ irrigation, freeboard, waste analysis & soil sample reports) 20. Is facility not in compliance with any applicable setback criteria in effect at the time of design? 21, Did the facility fail to have a actively certified operator in charge? 22. Fail to,notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) 23. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? 24. Does facility require a follow-up visit by same agency? 25. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes L�' No ❑ Yes �gNo _ El Yes No ❑ Yes No ❑ Yes X No ❑ Yes I No ❑ Yes 0 No ❑ Yes ❑ Yes ❑ Yes ❑ Yes ❑ Yes ❑ Yes ❑ Yes ❑ Yes A No VNo X. �No No No �No XNo XNo 0 No violations or deficiencies were noted during this visit. You will receive no further correspondence about this visit. _. rt Comments (refer to questiosi #) Esphiin airy YES;answers arxdlor any ieiontmendahons or anv:other comments: Use drawings of 1261 y to better explain sltuattvns ruse additional. pages as necessary) Field Copv��❑ Final Notes ) _ Reviewer/Inspector Name _ 7 Reviewer/Inspector Signature: Date: 05103101 Continued Facility Number: — Date of Inspection Odor Issues 26. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge at/or below liquid level of lagoon or storage pond with no agitation? 27. Are there any dead animals not disposed of properly within 24 hours? 28. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, roads, building structure, and/or public property) 29. Is the land application spray system intake not located near the liquid surface of the lagoon? 30. Were any major maintenance problems with the ventilation fan(s) noted? (i.e. broken fan belts, missing or or broken fan blade(s), inoperable shutters, etc.) 31. Do the animals feed storage bins fail to have appropriate cover? 32. Do the flush tanks lack a submerged fill pipe or a permanent/temporary cover? ❑ Yes ❑ No ❑ Yes No ❑ Yes In No ❑ Yes )z No ❑ Yes Yf'No ❑ Yes gNo ❑ Yes ❑ No glAddltion-alCommentsr8nd/6r`Drawln's.:_.- Re-Mm(*"1EOO �EEV�iJG �RF S NRa��D ��RRNrs OVF t 5�pR�� Fo(C,rP--r fo0- �bTe- -T-0 :SF Au,), Pumip LF 52- 1-/0 mGa, PPi2a� 05103101 State of North Carolina Department of Environment and Natural Resources Division of Water Quality Michael F. Easley, Governor William G. Ross Jr., Secretary Gregory J. Thorpe, Ph.D., Acting CERTIFIED MAIL RETURN RECEIPT REQUESTED BILLY KILPAMCK PO Box 94 KENANSVILLE NC 28349 Dear Billy Kilpatrick: DlI VLAUI is; A NCDENR NORTH CAROLINA DEPARTMENT of ENVIRONMENT AND NAxuRAL RESOURCES March 5, 2002 Subject: Notice of Violation and Revocation for Nonpayment Billy Kilpatrick Farm Permit Number: AWS310097 Duplin County In accordance with North Carolina General Statute 143-215.10G, all anima] operations who receive an animal waste management system permit will be charged in each year of the term an annual permit fee. Annual permit fees are billed following the issuance of the permit and then annually thereafter on the anniversary of that date. Your animal waste management system permit was issued on 12/711998. Your annual permit fee for the period of 12/7/2001 - 12/6/2002 is $150.00. Your payment was due 2/14/2002. Because this fee was not fully paid within 30 days after being billed, this letter initiates action to revoke the subject permit, pursuant to 15 NCAC 2H .0205 (c) (4). and G.S. 143-215.1 (b) (3). Effective 60 days from receipt of this notice, the subject permit is hereby revoked unless the required Annual Animal Waste Management System Permit fee for your animal operation is received within that time. Operation of an animal waste management system without a valid permit is a violation of North Carolina General Statute 143-215. I and is subject to the assessment of a civil penalty of up to $10,000 per day. Your payment should be sent to: N.C. Department of Environment and Natural Resources Division of Water Quality Budget Office 1617 Mail Service Center Raleigh, North Carolina 27699-1617 If you have any questions, please contact Fran McPherson at (919) 733-7015 ext. 210. cc: Non -Discharge Branch Compliance/Enforcement Unit Wilmington Regional Office Duplin County Health Department Permit File 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Telephone 919-733-5083 FAX 919-733-9919 An Equal Opportunity Affirmative Action Employer 50% recycled / 10% post -consumer paper JU4 T iFiCA i ION & DOCUMENTATION FDn/MANDA i DRY VVA DET_RIAINA }pN 4 S T_ V O e G tl c :!illy NUr;l)ar��� = S�t p flop 15 fiag7es'7 Tt)r z V:�ecLcl.?ie Fa; �;s Name:_ �,�� �� -��--; �_� acre netermination due tD iaifur a o; pri-Site r epresenthtive: C h ;-.� - Part If eligibility items)r1 : ? r`-3 c Insoector[Reviewerls Name: Date of site visit- ____= Operation not. required fo secure WA determination a# this time based on exemption E1 E2 :_3 E4 Date of most recent WUf : Opar3fiOn peoded for wet able acre - - — determination based on F'1 p2 :3 Annual ;arm SPAN CiefiCit �:� `t' i?DUnt'� ,1.cr.,�3 �tr� �, IPA Ii rc igation sys ern(S) - Circle 1 haTd-hose Ubev ho I CaiT PI&OL System; I 11nea.='DVn Sy5L= I, 117 4. SttionaTy Spnnk-)er system wlpecicaneni pipe; o_ stationary spr7nkJer system wiportaDia pipe; D. staI ovary gun system wipermanett pip--; /. 5-1=1Dr-ary gun Sv-ste-m wipoilabi DID W '-A -. ; i I. WA Determination Exemptiorm (IiicibiiihLy iaBure, Ya; i 11, .overrides Par: I exemption-) i "�d�nlinie Iri gabon design, including map depiudng wetable aCi--S, is CWT' Di to and signed by an l or PE_ E92 Adequate D, and 7jD, irrigation operating parameter sheets, inciuciin❑ map c_piciing wetable.a :res, is complete and signed by an for PE_ =3 Adequate D, 7mgabon.DDaiffiJng paiaTnetEr sneer, induding neap DeDlcunq Wave amen is complete and signed by a WUF:I. -. 75°a Wile exemption as verified in Part W. (ND 7 a °b exemption cannot be apniied iD :aTms that til the eiigibiiiiy.:i-iezdsi -in ?art.11. Complete -:�iiaibiiity t:�ecitiist,�ar II- � � ;? ; 3,.beior= ctampiezinD cprrtpl��iionai:;..abi= in mar lil).. '�r;� i` "if - % b,: tiule : =iijLb-ifet' CilaMstand.a =urner tafici 1 &, .WA e'ieiinir, bor, Jet' ~�.� d a e`c i a �: R quir rn nts. WA-� rknedlRn:regll[Te, b ..a s�-Dp..r3tion'eai.sr�n�n;�trl. iitiibiiiiy repotmerrs itstedifeiorv: - - - aT7�n�Y- 7fYlL�is�3�::.�7rCIIrIC ?o.;3iTI7':V 1a�1WG 1Ta3.*"a2I:.'ffTi�^�7r��]L`'=s_ lincf a:,ll?i7dCi�,-Dr i3i.1K {Ji "Ii1TDiliia`ils7i71ci�a*J_ � DbviDLs�feld-iimi�iiDr:s�(nuTr�mps�aitLi�.�Ilur�=psi=IIu� L}I1TrerlSetGi3,.it�%i�no=,T..}r �:.°n�-�"3taf�C.rS3�.3'.��T'IiiTf-_�-,�T1I1 �✓.'�'1�iiti�� =tn :lllDTaS�' _ ' 5c`FiCll, 1Trapliiaril'�icczT�'��Dmods�`�fafos:I��SZT'caTi���,F?j TC3i33Vai�T".��i_1� Zl�arl ! Mpninkiers) Wk Drequired Lie: a'.� _CAW e�ILSTf?it ;5?'S _Creme -in eXCess c /5ic Di"Ina res?eC:'IIV_ ?al�f'] iuwi ..CcvaCly as nQ%ed In.iabie in , i i M. Division of Water Qnahty .Division of Soil and Water Conservation P 0 Other Agency [Type of Visit X} Compliance Inspection O Operation Review O Lagoon Evaluation Reason for Visit '0 Routine O Complaint O Follow up O Emergency Notification Q Other ❑ Denied Access Facility Number Bate of Visit *Permitted 13 Certified Q Conditionally Certified 0 Registered ll � Farm Name: .............� I..r�.GF.................................................. Owner Name: Facility Contact: ..... Mailing Address: Onsite Representative: ,1r!�-.Q„y ,. Title: —a� Tine: 00O Printed on: 10/26/2000 NNot Operational Q Below Threshold Date Last Operated or Above Threshold:D. County: \� h ......... Phone No:....................................................................................... Phone No: .................................................................................... .......................... Integrator:.....1 Certified Operator: ................................................... ......................................... ................... Operator Certification Number:.......................................... Location of Farm: T ❑ Swine ❑ Poultry ❑ Cattle ❑ Horse Latitude Longitude �• �� ��� Design Current Design Current Design Current Swine Capacity Population Poultry Capacity Population Cattle Capacity Population ❑ Wean to Feeder ❑ Layer I 1 ❑ Dairy Feeder to Finish �LG JE1 Non -Layer ❑ Non -Dairy ❑ Farrow to Wean ❑ Farrow to Feeder ❑ Other ❑ Farrow to Finish Total Design Capacity ❑ Gilts 1EE ❑ Boars ATotal SSLW Number of Lagoons ❑Subsurface Drains Present ❑ Lagoon Area I0 Spray Field Area Holding Ponds / Solid Traps ❑ No Liquid Waste Management System Discharges & Stream I_mpacty 1. Is any discharge observed from any part of the operation? ❑ Yes WNo Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance ratan -made? ❑ Yes ❑ No b. if discharge is observed, did it reach Water of the State? (If yes, notify DWQ) ❑ Yes ❑ No c. if discharge is observed. what is the estimated now in gal/min? d. Does discharge bypass a lagoon system'? (If yes, notify DWQ) ❑ Yes ❑ No 2. Is there evidence of past discharge from any part of the operation? ❑ Yes ZNo 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes W No Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway ❑ Yes J6No Structure I Structure 2 Structure ; Structure 4 Structure 5 Structure 6 Identifier:................................................................................................................................................................... Freeboard (inches): 04 1 5/00 Continued on back Facility Number: Date of Inspection 5_ Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? 8. Does any part of the waste management system other than waste structures require maintenance/improvement? 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? Waste Application 10. Are there any buffers that need maintenance/improvement? 11. Is there evidence of over application? %6'4 xcessive Ponding ❑ PAN ❑ Hydraulic Overload 12. Crop type �' UY h f t..�h� uC_i,_V 13, Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? 14. a) Does the facility lack adequate acreage for land application? b) Does the facility need a wettable acre determination? c) This facility is pended for a wettable acre determination? 15. Does the receiving crop need improvement? 16. Is there a lack of adequate waste application equipment? ReQuired Records & Documents 17. Fail to have Certificate of Coverage & General Permit readily available? 18. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (ie/ WUP, checklists, design, maps, etc.) 19. Does record keeping need improvement? (ie/ irrigation, freeboard, waste analysis & soil sample reports) 20. Is facility not in compliance with any applicable setback criteria in effect at the time of design? 21. Did the facility fail to have a actively certified operator in charge? 22. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) 23. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? 24. Does facility require a follow-up visit by same agency? ❑ Yes JKNo ❑ Yes )�No KYes ❑ No ❑ Yes ❑ No J XYes ❑ No ❑ Yes [�fNo ❑ Yes 16 No ❑ Yes f 'No . ❑ Yes R(No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes XNo Yes ❑ No ❑ Yes O No ❑ Yes ❑ No ❑ Yes V No ❑ Yes No ❑ Yes No ❑ Yes )J No ❑ Yes Z No ❑ Yes 9No 25. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes fii"No 10 yiolal�itjris:ei- il�fcienr`ies wgre !nQ#ed al>triOg this:vpsitt • Yoit ViOtee0iye 06 €pttb . . cories deice about thhs visit' W . Comments (refer to question #)Explati aay YES answers and/or any recommendations or aay other commeuta=, Use davvigs of faicility to Better explaw sitnations. (else additional. pages as` necessy} Y;H` '= _ — .. - - ' s ape i4. t. `1 0�� �5 %.a�,xe.r �-• t%r �-, r�e �a� t-.. ` 5�cde, s�� I l�^••� ECG �'3�-�es� a�►.--s�r� M�riT2� � -�- s�-+-�..� tvit�-� U�tZ�T . "�5 Reviewer/Inspector Name Reviewer/Inspector Signature: Date: — �,0— G" 5/00 Facility Number: 1 Date of Inspection Q Odor Issues 26. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge at/or below ❑ Yes XNo liquid level of lagoon or storage pond with no agitation? 27. Are there any dead animals not disposed of properly within 24 hours? ❑ Yes 4 No 28. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, ❑ Yes No roads, building structure, and/or public property) 29. Is the land application spray system intake not located near the liquid surface of the lagoon? ,KYes NA�k— 30. Were any major maintenance problems with the ventilation fan(s) noted? (i.e. broken fan belts, missing or or broken fan blade(s), inoperable shutters, etc.) ❑ Yes No 31. Do the animals feed storage bins fail to have appropriate cover? ❑ Yes KNo 32. Do the flush tanks lack a submerged fill pipe or a permanent/temporary cover? XYes ❑ No lAdditionaMominents an or rawrngs: J 5/00 _ r] Division of Soil and=Water Conservatton Operation Review _r = E. E.Division of Soil and WaternConservanon;� Cpinplfance Itispeetion w _ t Division of Water-Qualtty TCompliance inspection -, ClOther Agency - Uperaon=Review , - Y r Routine O Complaint O Follow-up of DWO i I Facility Number r] 'T" I Follow-t►o of DSWC review O Other Date of Inspection Time of Inspection 24 hr. (hh:mm) [Permitted © Certified E] Conditionally Certified [3 Registered JE3 Not Operational Date Last Operated: ..........•,. Farm Name: J �/ ...... l..f Y` County .,....... _ -. LI.jj- p... I L ..... - tIA n........................... OwnerName:............... ....� .�.......-_...........-. Phone No:.............................---......--............................................... FacilityContact:....................................../...-........................-_.......... Title:...I1.h!.!. I......-..........-_....... ................. Phone No:....--....... --................................... MailingAddress: ....................................................................................................................................._................... .......... I........ ........ I........ Onsite Representative:.... SAi .Zl .� rr ..... Integrator: .......... ef/t'>'�� f ........... Certified Operator- ----------- ------ ---. . ................./ .. Operator Certification Number:,,,,,.,,.,,,, Location of Farm: Latitude Longitude �• �° 0°L Design Current - . Design , , Current- Design Cii. refit , 'Swine Capacity Population Poultry _ .Capacity -.Population Cattle Capacity Population ❑ Wean to Feeder Feeder to Finish ❑ Farrow to Wean ❑ Farrow to Feeder ❑ Farrow to Finish ❑ Gilts, ❑ Boars �Number'o€,Lagoons © ❑ Subsurface Drains Present ❑Lagoon Area ❑Spray F�etd Ares Holdtng;Ponds / Solid Traps ❑ No Liquid Waste Management System Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made'? h. If discharge is ohserved, did it reach Water Of the State? (If yes, notify DWQ) c. If discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system'? (If yes, notify DWQ) 2. Is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway Structure I Structure 2 Structure 3 Structure 4 Structure 5 Identifier: �rt Freeboard (inches): .............. 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, seepage, etc.) ❑ Yes KNo ❑ Yes ❑ No ❑ Yes ❑ No -71ZA ❑ Yes ❑ No ❑ Yes j . ❑ Yes KNo ❑ Yes No Structure 6 ❑ Yes KNo Continued on back 3/23/99 Facility Number: ?J I — G� Date of Inspection 6. Are there structures on -site which are not property addressed and/or managed through a waste management or closure plan? (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? 8. Does any part of the waste management system other than waste structures require maintenance/improvement? 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum Iiquid level elevation markings? Waste Application 10. Are there any buffers that need maintenance/improvement? 11. Is there evidence of over application? ❑ Excessive Ponding ❑ PAN I2. Crop type 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? 14. a) Does the facility lack adequate acreage for land application? b) Does the facility need a wettable acre determination? c) This facility is pended for a wettable acre determination? 15. Does the receiving crop need improvement? 16. Is there a lack of adequate waste application equipment? Required Records & Documents 17. Fail to have Certificate of Coverage & General Permit readily available? 18. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (ie/ WUP, checklists, design, maps, etc.) 19. Does record keeping need improvement? (ie/ irrigation, freeboard, waste analysis & soil sample reports) 20. Is facility not in compliance with any applicable setback criteria in effect at the time of design? 21. Did the facility fail to have a actively certified operator in charge? 22. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) 23. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? 24. Does facility require a follow-up visit by same agency? 25. Were any additional problems noted which cause noncompliance of the Certified AWMP? 0: 10 yiQlatioris or d�#icie di ,9 •were itgted OXW ig �bis:visit; • ;Y:oii ;wiil•t&4eiye iit? furtht • : - corresporideii& ab' 'f this visit: ::: ' tts'(refer'to•question'#) Explaiirairy'YES answers O'Yes ❑ No ❑ Yes *0 ❑ Yes XNo ❑ Yes XNo ❑ Yes 7 N ❑ Yes No ❑ Yes o ❑ Yes O ❑ Yes f�N10 ❑ Yes j�'No El Yes 'JKN` o ❑ Yes %No KYes ❑ No []Yes RNo ❑ Yes RNo ❑ Yes XNo ❑ Yes CirNo -% ❑ Yes XNo ❑ Yes ;<No ❑ Yes tINo r J 'r i5 wei-ki W;,7w ` st t, Di s4v al' Fi) I y tnS�rL v: IAA r/ N.D_y%\1 1i�' A 1A l!A Aft12,1 44-. J- 1A/, AO. I Reviewer/Inspector Name 0 Y Reviewer/Inspector Signature: A-4— A A ,1�� Date: �' 2062--) Facility Number: 7J — G� Date of Itrspection 'Odor Issues 26. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge at/or below [:]Yes [�No liquid level of lagoon or storage pond with no agitation? ' \ 27. Are there any dead animals not disposed of properly within 24 hours? ❑ Yes KNo 28. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, ❑ Yes )b No roads, building structure, and/or public property) 29. Is the land application spray system intake not located near the liquid surface of the lagoon? ❑ Yes N0 30. Were any major maintenance problems with the ventilation fan(s) noted? (i.e. broken fan belts, missing or or broken fan blade(s), inoperable shutters, etc.) ❑ Yes kNo 31. Do the animals feed storage bins fail to have appropriate cover? ❑ Yes krNo 32. Do the flush tanks lack a submerged fill pipe or a permanent/temporary cover? ❑ Yes .JRNo Additional Comments an.. , or e• >rarvtngs:,, l K-�f.� ems' - &1- �- 4,4 YkIr. 4l�. Oor'� �e . 4s- r - ,.... '0 '' a-F rs l-s+ o J P. Ovrtas Of ,sue; ;&t 11 .�- '►+ � w.o (� 'tea- �- copvr 541 Revised April 20, 1999 4 JUSTIFICATION & DOCUMENTATION FOR MANDATORY WA DETERMINATION Facility Number 9 r - " - Farm Name: s rWt_. On -Site Representative: &t_N Inspector/Reviewer's Name: > rau�r- Date of site visit: R�16 9a Date of most recent WUP: Annual farm PAN deficit: 1) 7 pounds Operation is flagged for a wettable acre determination due to failure of Part // eligibility item(s) . F1 F2 F3 F4 Operation not required to secure WA determination at this time bas on -exemption E1 E2 E3 E4 Operation pended for we acre determination based on P1 P2 P3 Irrigation System(s) - circle hard -hose traveler; 2.'center-pivot system; 3. linear -move system; 4. stationary sprinkler system wlpermanent pipe; 5. stationary sprinkler system w/portable pipe; 6. stationary -gun system,wlpermanent pipe;, 7. stationary gun system w/portable pipe PART 1. WA Determination Exemptions (Eligibility failure, Part 11, overrides Part I exemption.) E1 Adequate irrigation design, including map depicting wettable acres, is complete and signed by an I or PE. E2 Adequate D, and D21D3 irrigation operating parameter sheets, including map depicting wettable acres,. is complete and signed by an. I or PE. E3 Adequate D, irrigation operating parameter sheet, including map depicting wettable acres, is complete and signed by a WUP. Z75% rule exemption as verified in Part 111. (NOTE: 75 % exemption cannot be applied to farms that fail the eligibility checklist in Part 11. Complete eligibility checklist, Part 11 - F1 F2 F3, before completing computational table in Part 111). PART 11. 75% Rule Eligibility Checklist and Documentation of WA Determination Requirements. WA Determination required because operation fails -one of thezligibility requirements listed below: F1 Lack of acreage which resulted in overapplication of wastewater (PAN) on spray field(s) according to farm's last two years Hof irrigation-Tecords. . F2 . Unclear, illegible, or lack of information/map. F3 Obvious field limitations (numerous ditches; failure to -deduct required buffer/setback acreage; or.25% of total acreage identified -in CAWMP includes small, irregularly shaped fields - fields less than 5 acres fortravelersvr less than 2 acres for stationary sprinklers). F4 WA determination required because CAWMP credits field(s)'s acreage in excess of 75% of the respective field's total acreage as noted in table in Part III. Revised April 20, 1999 Facility Number 31 -L7--- Part III. Field by Field Determination of 75% Exemption Rule for WA Determination TRACT NUMBER FIELD NUMBER'.2 TYPE OF IRRIGATION SYSTEM TOTAL ACRES CAWMP ACRES ' FIELD % COMMENTS' •53 ia -4� I I r 3.8 `E4 1 P -J dr IS i FIELD NUMBER' - hydrant, pull, zone, or point numbers may be used in place of field numbers depending on CAWMP and type of irrigation system. If pulls, etc. cross more than one field, inspector/reviewer will have to combine fields to calculate 75% field by field determination for exemption; otherwise operation will be subject to WA determination. FIELD NUMBERS - must be clearly delineated on map. COMMENTS'- back-up fields with CAWMP acreage exceeding 75% of its total acres -and having received less than 50% of its annual PAN as documented in the farm's previous two years' (1997 & .1998) of irrigation records,cannot serve as the sole basis for requiring a WA Determination. Back-up fields must be noted in -the comment section and must be -accessible by irrigation system. Part IV. Pending WA Determinations P1 Plan lacks following information: P2 Plan revision may satisfy 75% rule.based on adequate overall PAN deficit and by adjusting all field acreage to below 75% use rate P3 Other (ielin process of installing new irrigation system): Identifier: Freeboard(inches): ..........a...'................ ............. ....................... ................................... ................................... .. S. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, seepage, etc.) 3/23/99 E3 Division of Soil and Water Conservation Operation Review _. .. 13Division of Soil and,Water Conservation �Compliaace Inspection s nof aterQty` ecoaisioWm Other Agency ; Opei ation-Revie�y Routine 0 Complaint 0 Follow-up of DWQ inspection 0 Follow -tip of DSWC review 0 Other Facility Number Date of Inspection B 6 Time of Inspection / : 24 hr. (hh:mm) Permitted Xcertified [3 Conditionally Certified © Registered Q Not O erational Date Last Operated: Farm Name: i�.y---..-!!G� L..P/dl�r�t1C.. ?/dzd. County: t7v.P {!!f.......-•.................................... Owner Name: ..... Phone No:................--........--.--......----........................ FacilityContact: .............................................................................. Title: ................................................................ Phone No: Mailing Address:... ................ ..... Onsite Representative:... ...... rr_,..Le.A1f AC__C_ Integrator:.... C. k-31-y�..................... ................................................. ...... Certified Operator:................................................................................................................ Operator Certification Number:..................... Location of Farm: A ......................................................................................................................................................................................................................................................................... . Latitude ' 9 �Longitude • 4 " Design Current. "' _ -= 'Design- Current Design Current Swine Capacity Population Poultry- = . Ca achy Population Cattle - Capacity Population r: ❑ Wean to Feeder _. ❑ Layer - ❑ Dairy Feeder to Finish 3 :;. ❑ Non -Layer ❑ Non -Dairy ❑ Farrow to Wean ElFarrow to Feeder ❑Other Elarrow to Finish ,_. Total Design Capacity - ❑ Gilts ❑Boars `Total<SSLW 9, �Niimber',of`Lagoons ❑ Subsurface Drains Present 110 Lagoon Area 10Spray Field Area ,Holdink,Ponds / Solid -Traps ., m ❑ No Liquid Waste Management System Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: []Lagoon ❑ Spray Field []Other a. If discharge is observed, was the conveyance man-made? b. If discharge is observed, did it reach Water of the State'? (If yes, notify DWQ) c. If discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system'? (If yes, notify DWQ) 2. Is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway ❑ Yes VrNo Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 ❑ Yes Continued ❑ Yes )dNo ❑ Yes )?fNo ❑ Yes ONo ❑ Yes No ❑ Yes 7Io ❑ Yes .I— Facility Number: — Date of lrispection 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? 8. Does any part of the waste management system other than waste structures require maintenance/improvement? 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? Waste Application 10. Are there any buffers that need maintenance/improvement? 11. Is there evidence of over aomlication? ❑ Excessive Ponding ❑ PAN 12. Crop type sa 13. Do the receiving Pe s differ with'those designated in the Certified Animal Waste Management Plan (CAWMP)? 14. a) Does the facility lack adequate acreage for land application? b) Does the facility need a wettable acre determination? c) This facility is pended for a wettable acre determination? t5. Does the receiving crop need improvement? 16. Is there a lack of adequate waste application equipment? Required Records & Documents IT. Fail to have Certificate of Coverage & General Permit readily available? B. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (ie/ WUP, checklists, design, maps, etc.) 19. Does record keeping need improvement? (ie/ irri tion, free rd, wast�'analysis & soil sole reports) 20. -Is facility not in compliance with any applicable setback cri eria in effect at the time of design? 21. Did the facility fail to have a actively certified operator in charge? 22- Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) 23. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? 24- Does facility require a follow-up visit by same agency? 25. Were any additional problems noted which cause noncompliance of the Certified AWMP? o yiol""atfic}ris:or defciertc>i.. mere . 4 ect- ilirkring this.visit'. • Y:oit :Wiii-rebeiye lid fuith.. . rorres�onc�ence. abaut this visit~ . . . ....... ... . ❑ Yes XNo ❑ Yes No ❑ Yes ,No ❑ Yes 0 No ❑ Yes /NO ❑ Yes XNo ❑ Yes /No ❑ Yes AO ❑ Yes E ❑ Yes XNo ❑ Yes '�dNo ❑ Yes 'ZINo ❑ Yes J�rNo ❑ Yes ;i No 01"Yes ❑ No ❑ Yes ZNo ❑ Yes �No ❑ Yes ) NO ❑ Yes elffNo ❑ Yes ,�No ❑ Yes Aleo Corninents(refer toryquestion #) - Explain..any YES answers andlar any recommendations orany;other comments Use drawings of facility to better explain situations (use additional -pages as:necessa"ry) - 1°�eM�f"r�y ��+U`t_t f"�Es P'�£ �C.Qv�'�'-EJJ �� A�P��J'�4rr.I iA c••l��`j � LtiG _ 14 r —F, Vt%. wCT- Ag-9—AS ^Ji)PCA-PrCP —FZ� GOD cti�(4fJk�c. w Reviewer inspector Name Reviewer/Inspector Signature: G r S _ �^ Date: 3/23/99 Facility Number: 31 — (3 Z. Date of inspection Odor Issues 26. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge at/or below ❑ Yes 0No liquid level of lagoon or storage pond with no agitation? 27. Are there any dead animals not disposed of properly within 24 hours? ❑ Yes RfNo 28. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, (-]Yes ;dNo roads, building structure, and/or public property) 29. Is the land application spray system intake not located near the liquid surface of the lagoon? ❑ Yes /No 30. Were any major maintenance problems with the ventilation fan(s) noted? (i.e. broken fan belts, missing or or broken fan blade(s), inoperable shutters, etc.) ❑ Yes A� No 3 L Do the animals feed storage bins fail to have appropriate cover? ❑ Yes INO 32. Do the flush tanks lack a submerged fill pipe or a permanent/temporary cover? Yes ❑ No AAditional ComTgn4,an or- Pswings::'. A, 32l �D., C-e-R— (.� �`a SEE . �aT ,Rr�� �rJt�T, AZ'S �£c.Yci.- / M PJ- A 4C- 0 Li 3/23/99 Division of Soilar arid. Conservation . Operation=Review D.Division of Soil and Water Conservation ;CompUance 7irspection c _':. `- x Division of Water Quality Compliance hlspectigti , y, 0 Other Agency Opeirahon.Revie'w ;_, - - _ Q Routine XComplaint Q Frollow-up of DWQ inspection Q Follow -tip of DSWC review Q Other Facility Number j Date of Inspection Time of Inspection M 24 hr. (hh:mm) 0 Permitted 0 Certified 0 Conditionally Certified 0 Registered JE3 Not Opera Date Last Operated: Farm Name:............ . .. $ Lt'. A 9-r or— County: Owner Name: ............................................. . Phone No:............... . k FacilityContact : ....................................... ............................................. Title :................................................................ . Phone No: ................................................... N'lailing Address: ............. Onsite Representative:....; Ll.........'./�F?~�2irG.r.................................. Integrator: ....... 4Gp.1,.� .... Certified Operator: -------------------- ................. ............................................................. Operator Certification Number :.......................................... Location of Farm: ......................................................................................................................................................................................................................................................................... Latitude Longitude Design Current =' ° ' n : ' Design =: Current Design Current Swine _ _ Capacity Population ;_Poultry , .:Capacity"Population CaEtle_ Capacity Population ❑ Wean to Feeder ❑ Layer ❑ Dairy - ❑ Feeder to Finish Non -Layer Non -Dairy ❑ ❑ Farrow to Wean ❑ Farrow to Feeder ' ❑ Other ❑ Farrow to Finish _ Total Design Capacity ❑ Gilts _ - = ❑ Boars '-_Total SSLW Number of Lagoons - ❑ Subsurface Drains Present ❑Lagoon Area ❑Spray Fietd Area Holding'.Ponds /Solid Traps ❑ No Liquid Waste Management System m Discharges & Stream Impacts I. Is any discharge observed from any part of the operation? ❑ Yes [2 No Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made'? ❑ Yes ❑ No h. If discharge is ohserved, did it reach Water of the State? (If yes, norify DWQ) ❑ Yes ❑ No c. If discharge is observed, what is the estimated flow in gal/min? d. Dees discharge bypass a lagoon system'? (If yes, notify DWQ) ❑ Yes ❑ No 2. Is there evidence of past discharge from any part of the operation? ❑ Yes PrNo 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes ❑ No Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway ❑ Yes PINo Structure 1 Structure 2 Structure 3 Structure 4 Structure Structure 6 Identifier: Freeboard (inches): ......................... ............................................................................................................................................. ...... 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, seepage, etc.) ❑ Yes ❑ No Continued on back 3/23/99 10 Routine-0 Complaint 0 Follow-up of DWQ inspection _0 Follow-up of DSWC review 0 Other Facility Number 31 97 Date of Inspection 8/16/99 Time of Inspection 11:45 24 hr. (hh:mm} ® Permitted M Certified 0 Conditionally Certified 0 Registered 10 Not O erational Date Last Operated: .»._.- Farm Name: Billy Usiatrick Enum County: Owner Name: Dom_ KI'Ra—___ -___ Phone No: 41i6226A6 Facility Contact: Title:.-......-- .»».......---»..»».».».-- Phone No:._.» .......»» ..... ........ ..... ..»... -. Mailing Address: P.l, n%14 . » - . Kenawxltle..SIC....».............---------- 283.19 __... Onsite Representative: .KxtR zL&----------- Integrator: CarxW..a.Ff&d9.J=....... .... _...........-.... .-- Certified Operator. ,$William R Kilpatmkk-_» _... Operator Certification Number .12652 _•......... __ Location of Farm: ------------ _--------------- . _______ ____ _______ __ ________ _....._. .... -.. _. n�aarLaide�f Slid,37BJAmile&u9x th of 1372 I& ..................... W Latitude ®• 59 i 05 Longitude 77 • 57 20 Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes No Discharge originated at ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? ❑ Yes ® No b. If discharge is observed, did it reach Water of the State? (If yes, notify DWQ) ❑ Yes ® No c. If discharge is observed, what is the estimated flow in gallmin? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) ❑ Yes ® No 2. Is there evidence of past discharge from any part of the operation? ❑ Yes H No 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes No Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway ❑ Yes No Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: .-..------------ • .-»........ »...».»»»».» .»...».....»... Freeboard(inches):-----34 --.. -- M...W».....».. --... -- . ... . ».._ .............................................................. 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, ❑ Yes CR No seepage, etc.) 3/23/99 Continued on back State of North -Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Bill Holman, Secretary Kerr T. Stevens, Director Billy Kilpatrick Billy Kilpatrick Farm PO Box 94 Kenansville NC 28349 Dear Billy Kilpatrick: 4 0 • NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES December 30, 1999 Subject: Fertilizer Application Recordkeeping Animal Waste Management System Facility Number 31-97 Duplin County This letter is being sent to clarify the recordkeeping requirement for Plant Available Nitrogen (PAN) application on fields that are part of your Certified Animal Waste Management Plan. In order to show that the agronomic loading rates for the crops being grown are not being exceeded, you must keep records of all sources of nitrogen that are being added to these sites. This would include nitrogen from all types of animal waste as well as municipal and industrial sludges/residuals, and commercial fertilizers. Beginning January 1, 2000, all nitrogen sources applied to land receiving animal waste are required to be kept on the appropriate recordkeeping forms (i.e. IRR1, IRR2, DRY1, DRY2, DRY3, SLUR], SLUR2, SLD1, and SLD2) and maintained in the facility records for review. The Division of Water Quality (DWQ) compliance inspectors and Division of Soil and Water operation reviewers will review all recordkeeping during routine inspections. Facilities not documenting all sources of nitrogen application will be subject to an appropriate enforcement action. Please be advised that nothing in this letter should be taken as removing from you the. responsibility or liability for failure to comply with any State Rule, State Statute, Local County Ordinance, or permitting requirement. If you have any questions regarding this letter, please do not hesitate to contact Ms. Sonya Avant of the DWQ staff at (919) 733-5083 ext. 571. Sin 4� /t7 Kerr T. Stevens, Director Division of Water Quality cc: Wilmington Regional Office Duplin County Soil and Water Conservation District Facility File 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Telephone 919-733-5083 Fax 919-715-6048 An Equal Opportunity Affirmative Action Employer 50% recycled/10% post -consumer paper Facility Number. 31-97 Date of Inspection 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ' (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenancerimprovement? 8. Does any part of the waste management system other than waste structures require maintenanceJimprovement? 9. Do any stuctti = lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? Waste AvIftation 10. Are there any buffers that need maintenance/improvement? 11. Is there evidence of over application? ❑ Excessive Ponding ❑ PAN 12. Crop type Corn, Soybeans, Wheat 8/16/99 ❑ Yes No ❑ Yes No ❑ Yes O No ❑ Yes ® No ❑ Yes ®No ❑ Yes [9 No 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? ❑ Yes H No 14. a) Does the facility lack adequate acreage for land application? ❑ Yes N No b) Does the facility need a wettable acre determination? ❑ Yes 0 No c) This facility is pended for a wettable acre determination? ❑ Yes El No 15. Does the receiving crop need improvement? 16. Is there a lack of adequate waste application equipment? Reuuired Records & Documents 17. Fail to have Certificate of Coverage & General Permit readily available? 18. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (ie/ WUP, checklists, design, maps, etc.) 19. Does record keeping need improvement? (W irrigation, freeboard, waste analysis & soil sample reports) 20. Is facility not in compliance with any applicable setback criteria in effect at the time of design? 21. Did the facility fail to have a actively certified operator in charge? 22. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) 23. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? 24. Does facility require a follow-up visit by same agency? 25. Were any additional problems noted which cause noncompliance of the Certified AWMP? :A -N& 'Waiiiiii ar:deUielicies•;were' aoie:d:dn'ring ifiii'vWL' Vvtu -iv1flCrerteiV'r ab hirtiiei' : t�tirr'efiairi>a ili�at�i+'st M1rit 1kBit. in'�itt. . . . . . . . . . . . . . . . . . . . . . . . . . 9) Permitted facilities are required to maintain a weekly freeboard log. 15) Considerable weeds in some fields; some wet areas not planted to good coverage. ❑ Yes ® No ❑ Yes ® No ❑ Yes 9 No ❑ Yes H No ® Yes ❑ No ❑ Yes 0 No ❑ Yes 19 No ❑ Yes 9 No ❑ Yes 0 No ❑ Yes H No ❑ Yes ® No Name Reviewer/Inspector Signature: Date: State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office James B. Hunt, Jr., Governor Wayne McDevitt, Secretary Division of Water Quality April 20, 1999 MEMORANDUM To: Note to File From: Brian L. Wrenn 0 IRA `•• Ad 111111� NCDENR NORTH CAROLINA DEPARTMENT OF ENviRoNMENT AND NATURAL RESOURCES RE:William Kilpatrick, Billy Kilpatrick Farm, 31-97, discharge to Buckskin Swamp, 2/1/99 Because the discharge was accidental, not the result of a management problem, and the operator initiated the proper notification and clean-up procedures, Rick Shiver, Water Quality Regional Supervisor, opted not to pursue enforcement and assessment of a civil penalty. 127 North Cardinal Dr., Wilmington, North Carolina 28405 Telephone 910-395-3900 FAX 910-350-2004 An Equal Opportunity Affirmative Action Employer 50% recycled/10% post -consumer paper Division of Soil and Water`Conservation Operation Review Q Division of Soil acid Water"Conservation_'- Corriplian'ce Inspection Drv�sion of Water Quality , Compliance,Inspection [3 Other_'Agency'- Operation Review.- Q Routine Q Complaint 10 Follow-up of DWQ inspection Q Follow-up of DSl4'C review Q Other Facility Number 3 hate of Inspection Z- 3 1'intc or Inspection F1 .0O 24 hr. (hh:mm) Permitted )9 Certified 0 Conditionally Certified © Registered 10 Not Operational Date Last Operated: Farmdame: ..... „.F-... .County....��s. ......................................................................................................... OwnerName: ..............................bl�.........5iC,.....---...........-................. Phone i\b:......................................-................................................ Facility Contact: .................... ...:.......... Title: -....---....... Phone No: ...... ............................................................. Mailing Address: ....... q&.3........ `'OvMdy....... sk,........................... ......................................1!�'l'SLi1�.Y.1.�L[.�.�................................. ... M4.1........ Onsite Representative: .................. a�� ......V_-J�Fkn Lr............... __ ................ Integrator: ,....-..0.5 ...................................................... Certified Operator: ...................%fturr, 11l.................. Operator Certification Number: ...... 1.{�.�}................ ..... Location of Farm: Latitude I =, Longitude Z'? 'F $-7 ` ®" Design Current Design Current Design Current Swine Capacity Population Poultry Capacity Population Cattle Capacity Population ❑ Wean to Feeder JE3 Layer I I Dairy Feeder to Finish 1E1 Non -Layer ❑ Non -Dairy Farrow to Wean ❑ Farrow to Feeder Other ❑ Farrow to Finish Total Design Capacity ❑ Gilts ❑ Boars Total SSLW o Number of Lagoons ❑ Subsurface Drains Present ❑ Lagoon Area JEI Spray Field Area Holding Ponds / Solid Traps JEI No Liquid Waste Management System Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation (If yes, notify DWQ)? Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a: If discharge is observed, was the conveyance man-made? h. II' discharge is observed. did it reach: ❑ Surface Waters []Waters of the State c. if discharLe is observed. what is the estimated flow in !cal/min'? d. Does discharge bypass a lagoon system? 2. Is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts to the waters of the State other than from a discharge? Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? Structure I Structure 2 Structure 3 Structure 4 Structure 5 Identifier ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No [] Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No Structure 6 Freeboard (inches): ................................... 1/6/99 Continued on back F.ikility. Nkimber: Date of Inspection 5. Are there any immediate threats to the integrity of any of the structures observed? (iel trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need main ten ancelimprovement? 8. Does any pant of the waste management system other than waste structures require maintenancelimprovement? 9. Do any stuctures lack adequate, gauged markers with required top of dike, maximum and minimum liquid level elevation markings? Waste_ Application 10. Are there any buffers that need maintenance/improvement? 11. Is there evidence of over application? ❑ Ponding ❑ Nitrogen 12. Crop type.................................................................:................................................................................................................................................ 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? 14. Does the facility lack wettable acreage for land application? (footprint) 15. Does the receiving crop need improvement? 16. Is there a lack of adequate waste application equipment? Required Records & Documents 17. Fail to have Certificate of Coverage & General Permit readily available? 18. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (iel WUP, checklists, design, maps, etc.) 19. Does record keeping need improvement? (ie/ irrigation, freeboard, waste analysis & soil sample reports) 20. Is facility not in compliance with any applicable setback criteria in effect at the time of design? 21. Did the facility fail to have a certified operator in responsible charge? 22. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/discharge, freeboard problems, over application) ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No .......................... ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No 23. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yes ❑ No 24. Does facility require a follow-up visit by same agTency? ❑ Yes ❑ No 1p; No.vialutior�s •or. deficiencies .were noted...... this;visit:. You will.. eu . ive no further . ;. •. correspoiidei�ce; about; this visit ; :: : ...................... Comments (refer to question #):" Explain any YES answers and/or any recommendations or any other, comments., Use drawings of facility to better explain situations. (use additional, pages as, necessary) s AagkS,c Akv-_ 1L=.1�P{�ie4L COj,_;hve_ �Jmtj �arg 40 CahSA U&✓ - a orsset} uso�� l oj;\�, to �kg130N. •J Reviewer/Inspector Name0. Reviewer/lnspector Signature: Date: 1 /6199 State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Bill Holman, Secretary Kerr T. Stevens, Director Billy Kilpatrick Billy Kilpatrick Farm PO Box 94 Kenansville NC 28349 Dear Billy Kilpatrick: IT1 �601WA • NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCE5 December 30, 1999 Subject: Fertilizer Application Recordkeeping Animal Waste Management System Facility Number 31-97 Duplin County This letter is being sent to clarify the recordkeeping requirement for Plant Available Nitrogen (PAN) application on fields that are part of your Certified Animal Waste Management Plan. In order to show that the agronomic loading rates for the crops being grown are not being exceeded, you must keep records of all sources of nitrogen that are being added to these sites. This would include nitrogen from all types of animal waste as well as municipal and industrial sludges/residuals, and commercial fertilizers. Beginning January 1, 2000, all nitrogen sources applied to land receiving animal waste are required to be kept on the appropriate recordkeeping forms (i.e. IRRI, IRR2, DRYI, DRY2, DRY3, SLURI, SLUR2, SLDI, and SLD2) and maintained in the facility records for review. The Division of Water Quality (DWQ) compliance inspectors and Division of Soil and Water operation reviewers will review all recordkeeping during routine inspections. Facilities not documenting all sources of nitrogen application will be subject to an appropriate enforcement action. Please be advised that nothing in this letter should be taken as removing from you the responsibility or liability for failure to comply with any State Rule, State Statute, Local County Ordinance, or permitting requirement. If you have any questions regarding this letter, please do not hesitate to contact Ms. Sonya Avant of the DWQ staff at (919) 733-5083 ext. 571. cc: , Wilmington Regional Office Duplin County Soil and Water Conservation District Facility File Sincerel Kerr T. Stevens, Director Division of Water Ouality 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 An Equal Opportunity Affirmative Action Employer Telephone 919-733-5083 Fax 919-715-6048 50% recycled/10% post -consumer paper State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office James B. Hunt, Jr., Governor Wayne McDevitt, Secretary February 24, 1999 CERTIFIED MAIL Z 418 220 475 RETURN. RECEIPT REQUESTED Mr. William R. Kilpatrick Billy Kilpatrick Farm 463 Routledge Street Kenansville, NC 28349 39 NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT ANC) NATURAL REsOuRCEs Subject: NOTICE OF RECOMMENDATION FOR ENFORCEMENT Billy Kilpatrick Farm Kenansville, NC Duplin County Dear Mr. Kilpatrick: We This letter is to notify you that the Wilmington Regional Office of the Division of Water Quality is considering submittal of a recommendation for enforcement action to the Director of the Division of Water Quality. The recommendation concerns the violation of Title 15A of the North Carolina Administrative Code, Chapter 2, Subchapter 2H, Section .0217(d). On February 1, 1999, in response to regional office notification, Mr. Brian Wrenn from the Wilmington Regional Office of the Division of Water Quality inspected your animal operation and the lagoon(s) serving this operation. It was observed that a recycle wastewater line had ruptured and leaked animal waste into an adjacent stone water diversion. The waste traveled along the diversion and discharged to Buckskin Swamp. Buckskin Swamp are class "C-Swamp" waters of the State in the Northeast Cape Fear River Basin. If you have an explanation for this violation that you wish to present, please respond in writing to me within ten (10) days after receipt of this Notice. Your explanation will be reviewed and if an enforcement action is still deemed appropriate, your explanation will be forwarded to the Director with the enforcement package for his consideration. If you have any questions concerning this matter, please contact Mr. Brian L. Wrenn, or myself at the Wilmington Regional Office at (910) 395-3900. Sincerely, _� Rick Shiver Water Quality Regional Supervisor cc: Compliance Section -Wili2l ngtonFiIEs�n S:1 WQSIBRIAN W1ENF99131-97.ROE 127 North Cardinal Dr., Wilmington, North Carolina 28405 Telephone 910-395-3900 FAX 910-350-2004 An Equal Opportunity Affirmative Action Employer 50% recycled110% post -consumer paper wQ Z. 418. 220 475 $� l US Postal Service Receipt for Certified Mail No Insurance Coverage Provided. Do not use for International Mail See reverse sent t I t3 tnrr, Aar rr Postage $ Certified Fee ' . qn Spedal Delivery Fee r r Restricted Delivery Fee h r Return VSPO LL n State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office James B. Hunt, Jr., Governor Wayne McDevitt, Secretary February 10, 1999 CERTIFIED MAIL 4 Z 418 220 474 RETURN RECEIPT REQUESTED Mr. William R. Kilpatrick Billy Kilpatrick Farm 463 Routledge Street Kenansville, NC 28349 NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Subject: Notice of Violation Billy Kilpatrick Farm Farm Number: 31-97 Duplin County Dear Mr. Kilpatrick: You are hereby notified that Billy Kilpatrick Farm, which has been permitted to have a nondischarge permit for an animal waste disposal system pursuant to 15A NCAC 2H .0217 and G.S 143.215.1, has been found to be in violation of its Animal Waste Permit AWS310097. On February 1, 1999, in response to regional office notification, Mr. Brian Wrenn from the Wilmington Regional Office of the Division of Water Quality inspected your animal operation and the lagoon(s) serving this operation. It was observed that a recycle wastewater line had ruptured and leaked animal waste into an adjacent storm water diversion. The waste traveled along the diversion and discharged to Buckskin Swamp. Buckskin Swamp are class "C-Swamp" waters of the State in the Northeast Cape Fear River Basin. This is a violation of Part I. Performance Standards, Section 1 and Part II. Operation and Maintenance Requirements, Section 1 of the Animal Waste Permit AWS310097. The Division of Water Quality may proceed to revoke Billy Kilpatrick Farm permit unless the following conditions are completed: 1. Immediately eliminate the discharge of wastewater and/or list actions to correct the noted violation. 2. Make any and all modifications needed to ensure there will be no future discharges. 127 North Cardinal Dr., Wilmington, North Carolina 28405 Telephone 910-395-3900 FAX 910-350-2004 An Equal Opportunity Affirmative Action Employer 50% recycled110% post -consumer paper 1 m SPENDER: I also wish to receive the 9 cc ■ Complete items 1 and/or 2 for additional services. ■ Complete items 3, 4a, and 4b. following services ( for an + j m ■ Print your name and address on the reverse of this form so that we can return this extra fee): a; m card to you. ■ Attach this form to the front of the mailpiece, or on the back if space does not 1. ❑ Addressee's Address Ij{ ' rmi ■ W et"Return Receipt Requested'on the mailpiece below the article number. 2. ❑ Restricted Delivery N t ,+ t ■ dThe Return Receipt will show to whom the article was delivered and the date gd Consult postmaster for fee. a o 3. Aicle Addressed to: ' 4a. Article Number a 7 2e m a t/{�W 4b. Service Type I n L ❑ Registered ❑ Certified p� Express Mail ❑ Insured t f [ ❑ Return Receipt for Merchandise ❑ COD � 7. Date of Delivery o I } _ —' qq a a�I 5. Received By: (Pant Name) B. Addressee's Address (Only if requested Y and fee is paid) �j 6. Signature: (Address a or Agent) °b PS F rm 8 , December 1994 tozs9s 9s$-0zz9 Domestic Return Receipt' Mr. William R. Kilpatrick February 10, 1999 Page 2 To remain a permitted facility, you must notify this office in writing within seven (7) days of the receipt of this notice, what actions will be taken to comply with your waste management plan. Failure to comply with the above conditions will cause the existing animal waste management system serving your animal operation to be considered in operation without a permit as required by North Carolina General Statute 143-215.1. Please be advised that this assessment does not prevent the Division of Water Quality from taking enforcement actions for this violation or any past or future violations. When all required corrective actions are complete, please notify this office in writing. if you have any questions concerning this matter please do not hesitate to contact either Mr. Brian L. Wrenn, of our Wilmington Office at (910)-395-3900 or Mr. Shannon Langley at (919) 733-5083, ext. 581. Sincerely, Rick Shiver Water Quality Regional Supervisor cc: Harold Jones, Duplin County Soil and Water Conservation Kenneth Best, Duplin County Health Department Don Butler, Carroll's Foods, Inc. DWQ Operations Branch File Wilmington Files SAWQS\BRIAN W\ENF99\31-97.NOV Z"�418 220 474 w� US Postal Service Receipt for Certified Mail No Insurance Coverage Provided. uo not use for International Mail See reverse ntt �. rer mNu i P 5tale, 6 ZIP C a Postage 3 Certifi`ed Fee Spada] Delivery Fee r Restdcted Delivery Fee ai Return Receipt Showing to Whom ✓!< Date Delivered Date, ft s Address q9 0 TOTAL Postage 6 Fees6 t= r Postrnark or Date LL 1C��t0 film �SyS rA a •�� ' III _ +1 + _ 4+ � � ;1 _y, 1 f r .k• r + * k £' i '. °i1' 'r} { ti? g - N i11Tu A, y� 1F�r17.1'Y. 1 P r E s�''� : {,k' 1 � .��- 1 , i --� U i G7 rt I j+F�{. r ! �3 fi' �k' l�iE '� l • th� rti/.ij': 1' �.. '- ry1:4 '�1��'' � -ii' a 'r"x, (. f . .. _. � J�sII #`'.- - j '' 5':. r•1` 1 'S ,. ,`1t},+',A;; r i b.. s �E' ti '+y . k.� F' Y{. J , , .' + f�' - " .... e,.• .. . ��. 1 i�{, t .- k ,r.! .i - 1 s t ,4 8 Ri- Yid i''�' Y ,•�, ��, , ,. .. 1•,� ',j. ir'�.y {• r�! ... `t°f { L,- t�.'1 4i p..r..,.'S r ,�3�% i' �!€-.}, I •, .s - 'i t i - '. 1. � .j. '• ''. . .. - 1, ' {. t 31-97-2/l/99-Path of runoff through drainage diversion adjacent to lagoon. =31-97-2/l/99-Buckskin Swamp immediately downstream of discharge point. ;31-97-2/l/99-Sample Point 92 in Buckskin Swamp immediately downstream of discharge point. r Lenvi7roehem I ENVIRONMENTAL CHEMISTS, INC Sample Collection and Chain of Custody i 6602 Windmill Way Wilmington, NC 28405 Phone: (910) 392-0223 FAX: (910) 392-4424 Sam le T e: Influent Effluent Well k St oil other: SAMPLE IDENTIFICATION COLLECTION Comp or Gab CIZ mga' LAB ID PRESERVATION ANALYSIS REQUESTED DATE TIME TEMP NONE IICI I12SO4 SNO, NeO11 TRIO OTHER e -�1 Z�t =3� !/ iCc r NU 31-91 ��`% 14= C 1V 3 -a-r Zl,� l :qd C 1 fpcj Z NU z1, 14 = qo C Iv s C i G C i G C G C FG C G LL NOTICE — DECHLORINATION : Samples for Ammonia, TKN, Cyanide, Phenol, and Bacteria must be dechlorinated (0.2 ppm or less) in the field at the time of collection. See reverse side for instructions. Temperature when errived: Accepted:' Delivered By: Received By:. Continents: 61, Resampl equested: Date: Time: 1 .r i State of North Carolina 'Department of Environment and Natural Resources Wilmington Regional Office James B. Hunt, Jr., Governor Wayne McDevitt, Secretary February 10, 1999 CERTIFIED MAIL # Z 418 220 474 RETURN RECEIPT REQUESTED Mr. William R. Kilpatrick Billy Kilpatrick Farm 463 Routledge Street Kenansville, NC 28349 / � s NCDENFZ NORTH CAROLINA DEPARTMENT OF ENVIRONMENT ANi) NATURAL RESOURCES Subject: Notice of Violation Billy Kilpatrick Farm Farm Number: 31-97 Duplin County Dear Mr. Kilpatrick: This is to notify William R. Kilpatrick, who holds a nondischarge permit for an animal waste disposal system pursuant to 15A NCAC 2H .0217 and G.S 143.215.1, of violations of Animal Waste Permit AWS310097. In response to your phone call, on February 1, 1999 Mr. Brian Wrenn from the Wilmington Regional Office of the Division of Water Quality inspected your animal operation and the lagoon serving this operation. It was observed that a recycle wastewater line had ruptured and leaked animal waste into an adjacent storm water diversion. The waste traveled along the diversion and discharged to Buckskin Swamp. Buckskin Swamp are class "C-Swamp" waters of the State in the Northeast Cape Fear River Basin. This is a violation of Part 1. Performance Standards, Section I of AWS310097 which prohibits the discharge of waste from the animal waste management system. The incident also violates Part II.Operation and Maintenance Requirements, Section 1 of AWS310097 which requires proper maintenance and operation of the animal waste management system. To correct these violations, please submit a Plan of Action to the Wilmington Regional Office of the Division of Water Quality that describes the actions to be taken to comply with Animal Waste Permit AWS310097. The plan should include the following: 1. The procedures followed to immediately eliminate the discharge of wastewater. 127 North Cardinal Dr., Wilmington, North Carolina 28405 Telephone 910-395-3900 FAX 910-350-2004 An Equal Opportunity Affirmative Action Employer 50% recycled/10% post -consumer paper 'Mr. William R. Kilpatrick February 10, 1999 Page 2 2. A list of any and all modifications needed to ensure there will be no future discharges along with a timetable for the completion of the modifications. The proposed plan of action must be received by this office in writing within fifteen (15) working days of the receipt of this notice. Upon approval and implementation of the plan, you must notify this office when the corrective actions are complete. If the violations are not corrected, the Division of Water Quality may pursue additional civil penalties, injunctive relief, or permit revocation. If you have any questions concerning this matter please do not hesitate to contact either Mr. Brian L. Wrenn, of our Wilmington Office at (910)-395-3900 or Mr. Shannon Langley at (919) 733-5083, ext. 581. Sincerely, Rick Shiver Water Quality Regional Supervisor cc: Harold Jones, Duplin County Soil and Water Conservation Kenneth Best, Duplin County Health Department Don Butler, Carroll's Foods, Inc. DWQ Operations Branch File Wilmington Files SAWQS\BR1AN W\ENF991SHELL.NOV .« qmi MAR 0 9 1999 is cam___._ _ _ c_u�►�,-,_, 10 Hog Houses Broken Wastewater Recycle Line Storm Water Diversion Lagoon Sample Point #1 Puddled Waste Sample Point #2 Buckskin Swamp Billy Kilpatrick Farm Facility # 31-97 Duplin County Not to scale 05 : 24A Env i r-ochem 910 392 4424 P.01 l` �,.'s:, CONSULTING CHEMISTS Date C Fax Environmental Chemists, Inc. 6602 WindmiLL Way Wilmington, NC 28405 FAX TRANSMITTAL 910-392-0223 Phone 910-392-4424 Fax Company: �� -)D( �jl 12 - DW No. of Pages to Fallow: @ ENVIROCHEM A/IrLk-IC'IS -fie 31-C)�T rn web--n3-99 08:24A Envirochem 910 392 4424 P.02 CONSULTNG CH_WSTS C�stUlr9cr: Nt DEH,NR-DWQ 47 N Cardinal Drive Ext. W`Jminoon, NC 2W5 At#n: Rick Shiver Brian Wrenn P?te Sarri*A: S,impled By: STRE, hl: 31-97 02/01 /99 Brian Wrenn Environmental Chemists, Inc. IMAILLNG ADDRESS: TELEPHONE: SHIPPING ADDRESS: P.O. Box 1037 (910) 256-3934 (Office) 6602 Windmill Vac• Wrightsville Beach, (910) 392-0223 (Lab) Wilmington, North Carolina 28480 (930) 392-4-124 (Fax) North tarn?irna 28435 NCDEHNR: DWQ CERTIFICATE #94, DLS CERTIFICATE 437729 REPORT OF ANALYSIS Date of Report : Fcbruan- 3s- 1999 CFe.«.1 (�e*sLt k a,�1y Purchase Order A - Report Number: 9-0319 Report To: Rick Shier Copy To: Brian Wrenn PARAMETER Sample ID 31-97 31-97 Lab ID 9 0716 A-B K 0717 A-B Colircrm, coloniesl100ml 200,000 2200 ,° ;tr c + Mtrite Mtrogen, NO, + NOi - N mgfL r'�rnw-)r6a lt�trogen, NH,-N, mglL opi kejeldahl Nitrogen, TKN mg1L � Tots; Phosphorus, P mglL k e , cviewed b and approved for release to the client. I N N m 0 E QI i U 0 c w vil ENVIRONMENTAL CHEMISTS, INC Sample Collection and Chain of Custody 6602 Windmill way Wilmington, NC 28405 Phone: (910) 392-0223 FAX: (910) 392-4424 Client: Collected 13 L- Report No: D 3 r7 Sam tle 1 e: Influent Effluent Well Str 'oil Other: SAMPLE IDENTIFICATION ' .. �: _� �—_ �yf '_�.i-.--- COLLECTION cramp ter Grab .._. �---••- cl, mg/L -------- LAB ID PRESERVATION ANALYSIS REQUESTED DATE TIME TEMP NONE, 11C:1 "'%0' u-No, Na(111 1'3110 OTTER � I -;2'S~ ------- 1/ •--I�' C t-, y ,'__ _..�QLk�+sty O717 07,7� ZNvI� / .1 �f4,y0 G f� c NOTICE -- DEC1HLOR➢NATION : Samples for Ammonia, `l'KN, Cyanide, Phenol, and Bacteria.must be dechlorinated (0.2 ppm or less) in the field at the time of collection. See reverse side for instructions. f r Refinouislied 13y;"Time Received Bye Date/Time -Yran _ 2 Temperature evhen eceived: S G p�- Accepted: �/ lte' cted Resampl f equested: ° c:livcrerl 113 _ =`�� _- _�_� . Ra.crive€1 ley: _ � � y'----d,� /____ date Comments: Feb-.09-99 03:44P Envirochem 910 392 4424 P_01 a100 (a CONSULTING CHEMISTS Environmental Chemists, Inc. 6602 Windmill Way Wilmington, NC 28405 FAX TRANSMITTAL Date z Ici 1qC1 To: Fax From: 910-392-0223 Phone 910-392-4424 Fax Company: E CDC Me - DV\/Q No, of Pages to FotLoN' @ ENVIROCHEN Message: 4o-o-l-os(z) 1 \ e, u 1 7 S Kp aor � q 0310 Feb-09-99 03:44P Envirochem 910 392 4424 P-02 Environmental Chemists, Inc. envirochem Al MAILING ADDRESS: TELEPHONE: SHIPPING ADDRESS: P.O. Box t037 (9t0) 256-3934 (Office) 6602 Windmill Way Wrightsville Beach, (910) 392-0223 (Lab) Wilmington, CONSULTING Forth Carolina 28480 (910) 3924424 (Fax) North Carolina 28405 CHEMISTS NCDEHNR: DWQ CERTIFICATE #94, DLS CERTIFICATE #37729 Customer: NCDEHNR-DWQ 127 N. Cardinal Drive Ext_ Wilmington, NC 2W Attn: Rick Shiver Brian Wrenn Date Sampled: Sampled By: STREAM: 31-97 02101 /99 Brian Wrenn REPORT OF ANALYSIS Date of Report : February 9, 1999 Purchase Order #: Report Number: 9-0319 Report To: Rica: Sbiver Copy To: Brian Wrenn PARAMETER Sample ID 31-97 31-97 Lab 11D # 0716 A-B # 0717 A-B Fecal Coiiform, colonies/100m1 200,000 2200 Nitrate + Nitrite Nitrogen, NO, + NOs - N mg/L 195 0.49 Ammonia Nitrogen, NH,-N, mg/L 275 6.18 Total Kejeldahl Nitrogen, TKN mg/L 339 8.05 Total Phosphorus, P mg/L 51.1 0.78 Reviewed b and approved for release to the client_ rirochDem E t U 0 •r W a Ln m O rn rn rn O a� U. ENVIRONMENTAL CHEMISTS, INC Sample Collection and Chain of Custody 6602 Windmill Way Wilmington, NC 28405 Phone: (910) 392-0223 FAX: (910) 392-4424 Collected By: Sxi a-, _ ! (nktn r.' - - Report No: y - © 3 If Sam le'U e: Inlhient 1':11luent Well 5tr oil other : SAMPLE IDENTIFICATION COLLECTION Comp or Grab CII m �' LAB ID PRESERVATION ANALYSIS REQUESTED DATE TIME TEMP NONEitCl u,Su, ttNo, Nsl)tl T1110 OTHER Z(� ti :ice r. 0 7164 69 A a 9 :46 o a 7, u-- I — �tf ,r C — C G G G LG NOTICE — DECHLORINATION : Samples for Ammonia, TKN, Cyanide, Phenol, and Bacteria must be dechlorinated (0.2 ppm or less) in the field at the time of collection. See reverse side for instructions. Transfer Temperature whe euived: s• L Accepted: t/ Delivered By: eceived By; Comments: l Resampl equested: .17 Date: i Time: 71 Hog Houses Broken Wastewater Recycle Line Storm Water Diversion Sample Point #1 Lagoon Waste iple Point #2 Billy Kilpatrick Farm Facility # 31-97 Duplin County Not to scale En envirochem ® MAILINGIN P.O. BWrightsviCONSULTING North CarCHEMISTS RECTviro 77 ?k� Chemists, Inc. VF I PHONE: SHIPPING ADDRESS: 137 (910) 256-3934 (Office) 6602 Windmill Way —b%F E B 14 1999 (91 392-0223 (Lab) Wilmington, 28480 (91 392-4424 (Fax) North Carolina 28405 TE #94, DLS CERTIFICATE #37729 Customer: NCDEHNR DWQ Date of Report : February 9, 1999 127 N. Cardinal Drive Ext. Wilmington, NC 28405 Purchase Order #: Attn: Rick Shiver Brian Wrenn Report Number: 9-0319 Date Sampled: Sampled By: STREAM: 31-97 02/01/99 Brian Wrenn REPORT OF ANALYSIS Report To: Rick Shiver Copy To: Brian Wrenn PARAMETER Sample ID 31-97 31-97 Lab ID # 0716 A-B # 0717 A-B Fecal Coliform, colonies/100ml 200,000 2200 Nitrate + Nitrite Nitrogen, NO3 + N% - N mg/L 1.95 0.48 Ammonia Nitrogen, N113-N, mg/L 275 6.18 Total Kejeldahl Nitrogen, TKN mg/L 339 8.05 Total Phosphorus, P mg/L 51.1 0.78 Reviewed b 5 and approved for release to the client. :envirochemn. ENVIRONMENTAL CHEMISTS, INC Sample Collection and Chain of Custody 6602 Windmill Way Wilmington, NC 28405 Phone: (910) 392-0223 FAX: (9I0) 392-4424 Collected By: Skmr, I-- Fnkn r%' Report No: D 3 OF Sam le 7' e: Intluent Effluent, Well `St 'oil Other: SAMPLE IDENTIFICATION COLLECTION Comp or Grab C12 m� LAB ID PRESERVATION ANALYSIS REQUESTED DATE TIME TEMP NONE xc[ x,so, [[No, Nao[[ Tx[o OTHER NU C C 717 .4 V CGS W+ zf i 1 r��d C C G C G C G C G C G C G NOTICE — DECHLORINATION : Samples for Ammonia, TKN, Cyanide, Phenol, and Bacteria must be dechlorinated (0.2 ppm or less) in the field at the time of collection. See reverse side for instructions. Temperature when ec$ived: r-6 QC-.- Accepted: t/ Re' cted: Resampl equested: Delivered By: eceived By: Date: Time: Comments: 71 II rORTANT NOTICE North Carolina Division of Water Quality (DWQ) is strictly enforcing EPA regulations for sample collection and preservation. Client Must Provide the Following Information 1. SAMPLE IDENTIFICATION (Container Associated with requested testing) 2. SAMPLE TYPE (Composite, Grab, Water, Soil, etc.) 3. DATE COLLECTED 4. TIME COLLECTED 5.'SAMPLE COLLECTOR 6. PRESERVATION (Including Temperature and pH ) Teraperat➢ir_ _Samples MUST be refrigeratr,; or aece.r'ed on ice bet vreen 2 and 6° C. Samples received within two (2) hours of collection must show a downward trend. Therefore, please record temperature at collection in space provided on collection sheet. pH : _A two (2) hour limit to chemically preserve samples by pH adjustment is allowed, except for metals samples reported to the Groundwater Section which must be acidified at the time of collection. DECHLORINATION INSTRUCTIONS CAUTION: DO NOT Mix thiosulfate with acid in bottle before collecting sample as a violent reaction will occur. Dechlorinating Sam les that Require Acid Preservation 1. Add 4-5 granules of thiosulfate to a bottle with no acid preservative ( unpreserved BOD/TSS bottle). 2. After mixing to diss:Iove the thiosulfate, pour half of the sample into a bottie containing acid as a preservative ( AmmoniwTICN) 3. Then completely fill both battles with fresh sample. The Laboratory will verify and document the above requested information. ref. NCAC 211.0805 a) (7) (M) " At anytime a laboratory receives samples which do not meet sample collection, holding time, or preservation requirements, the labora-tory must notify the sample collector or client and secure another sample if possible. If another sample cannot boe secured, the original sample may be analyzed, but the results reported must be qualified with the nature of the infraction(s). And the laboratory must notify the State Laboratory about the infraction(s). The notification must include a statement indicating corrective actions taken to prevent the problem for future same-les. — ref. NCAC 2H.0805 (a) (7) M. " r PI-SLnuEfa ■Complete :.erns 3 ardor 2 for additional services. I also wish to receive the do ■Complete Items 3, 4a, and 4b. Jollowing services (for an +Print your name and address on the reverse of this form so that we can return this ext�'fee): card to you. ■Attach this form to the front of the mallplece, or on the back If space does not .•: 1;,�7,Addressee's Address ` ■ Write'Retum Receipt Requested' on the mailpiece below the article number. 2, ❑ Restricted Delivery ■The Return Receipt will show to whom the article was delivered and the date c delWared• Consult postmaster for fee. 3. Article Addressed o: / 4a. Article Number 4b. Service Type $ ❑ Registered ertiflet .W3 p IPdr ❑ Express Mail ❑ Insured ❑ Retum Receipt for Mer0tartdkse ❑ COD 7. pate of Delivery 5. and fee Is paid) 6. Signature: Addressee or X " n PS Forth 381ember 994 102595.97•B-0179 UNITED STATES POSTAL SERVICE PM Y- • Print your name, at�dre �n 21P Code Tn tFlls borw•�""'-- r ,� - _ Environment, Health & � �.. �-,�aurces 127 Cardinal Cr. U1. Wilmington, IBC 28405 State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office James B. Hunt, Jr., Governor Wayne McDevitt, Secretary Division of Water Quality June 3, 1998 'fi MV Z 312 646 438 Return Receipt Requested Mr. Billy Kilpatrick Billy Kilpatrick Farm PO Box 723 Kenansville, NC 28349 1 • • F4CDENR NORTH GRoLmA DEPARTMENT OF ENVIRONMENT ANP NAcruRAL RESOURCES Subject: SECOND NOTICE OF DEFICIENCY Billy Kilpatrick Facility Number: 31-97 Duplin County Dear Mr. Kilpatrick: On May 29, 1998, staff from the Wilmington Regional Office of the Division of Water Quality inspected your animal operation and the lagoon(s) serving this operation. It was observed that erosion cuts on the inner dike wall of the lagoon could threaten the integrity of the structure. A previous Notice of Deficiency was issued on September 15, 1997, based on a September 12, 1997 inspection by DWQ staff. At this time, it was observed that there were erosion cuts on. the inner dike wall of the lagoon. - Erosion on the dike wall of the lagoon is a violation of your Certified Animal Waste Management Plan, and subsequent infractions may result in a Notice of Violation and include a civil penalty. The erosion cuts on the lagoon dike wall should be filled with a suitable clay material and revegetated with an appropriate cover. In addition, the grassed waterway by the farm road should be graded and revegetated to ensure no ponding or runoff occurs during waste application. Erosion in the storm water diversion adjacent to the lagoon should be repaired. We suggest that you contact your service company, local MRCS office, or Soil and Water District office for any assistance they may be able to provide to correct these situations. To remain a deemed permitted facility, you must notify this office in writing within seven (7) days of the receipt of this notice, what actions will be taken to comply with your waste management plan. Failure to do so may result in the facility losing it's deemed permitted status, requiring it to obtain an individual non discharge permit. 127 North Cardinal Dr., Wilmington, North Carolina 28405 Telephone 910-395-3900 FAX 910-350-2004 An Equal Opportunity Affirmative Action Employer 50% recycled110% post -consumer paper _-, A ,tZ 312 646 438 W9 US Postal Service , Receipt for Certified Mail No Insurance Coverage Provided. Do not use for Intemadonal Mail (See revetse) ♦f ZIP Code r Postage $ �J Certified Fee Ys Spedial Delivery Fee Restricted Delivery Fee uO rn Retum Receipt Showing to Whom h Date Delivered r Retum Receipt Date, d Addressee' dresel� Ir ! 0 TOTAL P ge ee Postmark Del 4 0. Mr. Billy Kilpatrick June 3, 1998 Page 2 Please be aware it is a violation of North Carolina General Statutes to discharge wastewater to the surface waters of the State without a permit. The Department of Environment, Health and Natural Resources has the authority to levy a civil penalty of not more than $10,000 per day per violation. When the required corrective actions are complete, you must notify this office in writing at the address below. If you have any questions concerning this matter, please call David Holsinger or Brian Wrenn at 910-395-3900. Sincerely,. Brian L. Wrenn Environmental Specialist cc: Harold Jones, County Soil and Water Conservation Sandra Weitzel, NC Division of Soil and Water Conservation Don Butler, Carroll's Foods, Inc. Operations Branch Wilmington Files S.IWQS1BRb NWIDEF981DUPLIM3l-97-2.DEF State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor LL Wayne McDevitt, Secretary A. Preston Howard, Jr., P.E., Director October 22, 1998 CERTIFIED MAIL RE —TURN RECEIPT REQUESTED Billy Kilpatrick Billy Kilpatrick Farm 463 Routledge St_ KenansviIle NC 28349 Dear Billy Kilpatrick: ECET CF E OCT 2 71998 NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Subject: Application No. 31-0097 Additional Information Request Billy Kilpatrick Farm Animal Waste Operation Duplin County The Non -Discharge Permitting Unit has completed a preliminary engineering review of the subject application. Additional information is required before we can continue our review. Please address and submit the following information by November 21, 1998: 1. The site map provided with your application package does not show field numbers 8, and 10 of Tract number 3186 as listed on Table 1 of your waste utilization plan. Please provide a clearer field map identifying all tract numbers, field numbers, and acreage listed on your waste utilization plan. 2: The Emergency Action Plan for your farm is missing. It should he submitted as part of the certified waste management plan. Please note that all revisions or amendments made to the waste utilization plan (WUP) or a portion thereof are required to be signed and dated by both the landowner and the Technical Specialist before they are submitted for review. Please reference the subject permit application number when providing the requested information. All information should be signed, sealed, and submitted in duplicate to my attention at the address below. The information requested by this letter must be submitted on or before November 21, 1998 or the Division will return your application as incomplete in accordance with 15A N.C.A.C. 2H _0200 and your facility will be considered to be operating without a permit_ Please be advised that operation of the subject animal waste management system without a valid permit is a violation of North Carolina General Statute 143-215.1 and will subject you to the enforcement authority of the Environmental Management Commission. If you have any questions regarding this request, please call me at (919) 733-5083, extension 363. Sincerely, ]R" Joshil Soil Scientist Non -Discharge Permitting Unit cc: Wilmington Regional Office, Water Quality Permit File P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-5083 FAX 919-733-0719 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper State of North Carolina Department of Environment, Health and Natural Resour Division of Water Quality James B. Hunt, Jr., Governor Wayne McDevitt, Secretary A. Preston Howard, Jr., P.E., Billy Kilpatrick Billy Kilpatrick Farm PO Box 94 Kenansville, NC 28349 Dear Mr. Kilpatrick: OCT 3 a 1997 October 28, 1997 Subject: Application No. 31-097 Additional Information Request Billy Kilpatrick Farm Animal Waste Operation Duplin County The Non -Discharge Permitting Unit has completed a preliminary engineering review of the subject application. Additional information is required before we can continue our review. Please address the following by November 27, 1997: 1) As required by item I.3 of the General Permit for Liquid Animal Waste Operations Application Form, please submit two copies of the Certified Animal Waste Management Plan (CAWMP). 2) As required by item I.2 of the General Permit for Liquid Animal Waste Operations Application Form, please submit two copies of a general location map indicating the location of the animal waste facilities and field locations where animal waste is disposed. Please reference the subject permit application number when providing the requested information. All information should be signed, sealed, and submitted in duplicate to my attention at the address below. The information requested by this letter, must be submitted on or before November 27, 1997, or the Division will return your application as incomplete in accordance with 15A N.C.A.C. 2H .0200 and your facility will be considered to be operating without a permit. PIease be advised that operation of the subject animal waste management system without a valid permit is a violation of North Carolina General Statute 143-215.1 and will subject you to the enforcement authority of the Environmental Management Commission. If you have any, questions regarding this request, please call me at (919) 733-5083, extension 362. M Si r Michael T. Lewandowski Environmental Engineer Non -Discharge Permitting Unit cc: Wilmington Regional Office, Water Quality Michael Sugg, USDA-NRCS Permit File P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-5083 FAX 919-733-0719 An Equal opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper RECEIVED SEP 2 9 1991 September 25, 1997 Mr. Brian Wrenn Environmental Specialist State of North Carolina Dept. of Environment, Health, and Natural Resources 127 Cardinal Drive Ext. Wilmington, NC 28405--3845 Dear Mr. Wrenn: I have received the notice of deficiency from your office concerning my inspection on September 12, 1997. Please allow me 45 days to make the recommended repairs to comply with my waste management plan. Thank you, Billy Kilpatrick 5c (� O IPON- 4c.- Farr Fo- tzu� * 31-9-7 1) kptf r, Ca " I"W" State of North Carolina Department of Environment, Health, and Natural Resources Wilmington Regional Office James B. Hunt, Jr. Division of Water Quality Wayne McDevitt Governor Secretary September 15, 1997 PNzX4 4 1] AIR-Ok &:. ;&N i I *)a-. No. P, - M. Billy Kilpatrick Billy Kilpartick Farm PO Box 94 Kenansville, NC 28349 Subject: NOTICE OF DEFICIENCY Billy Kilpatrick Farm Facility Number: 31-97 Duplin County Dear Mr. Kilpatrick: On September 12, 1997 Staff from the Wilmington Regional Office of the Division of Water Quality, inspected your animal operation and the lagoon(s) serving this operation. It was observed that some erosion of the clay liner has occurred on the lagoon. Large cuts were observed in various sections of the inner dike wall of the lagoon around the inlet pipes. It is our concern that some of these gullies may become deep enough to cut through the liner material and sacrifice the integrity of the structure. No irrigation records were on site at the time of the inspection. As was discussed at the time of the inspection, the cuts should be filled with a suitable clay material, compacted and reseeded with an appropriate vegetative cover. Irrigation records should be on site at all times. In addition, the inlet pipes should be extended further into the lagoon and the eroded areas bacld-illed with clay and reseeded, and the rodent holes should be filled and reseeded. We suggest that you contact your service company, local NRCS or Soil and Water District office for any assistance they may be able to provide to correct the situation. To remain a deemed permitted facility, you must notify this office in writing within fourteen (14) days of the receipt of this notice, what actions will be taken to comply with your waste management plan. Failure to do so may result in the facility losing it's deemed permitted status, requiring it to obtain an individual non discharge permit. 127 Cardinal Drive Extension, Wilmington, N.C. 29405-3945 0 Telephone 910-395-3900 0 Fax 910-350-2004 An Equal Opportunity Aff—tive Action Employer r +r Billy Kilpatrick Farm September 15, 1997 Page 2. Please be aware it is a violation of North Carolina General Statutes and Rules to discbarge wastewater to the surface waters of the State without a permit and/or to fail to follow a certified waste management plan. The Department of Environment, Health and Natural Resources has the authority to levy a civil penalty of not more than $10,000 per day per violation. When the required corrective actions are complete, please notify this office in writing at the address below. If you have any questions concerning this _matter, please call David Holsinger, Andy Helminger or Brian Wrenn at 910-395-3900. t, Sincerely, Brian L. Wrenn Environmental Specialist cc: Billy Houston, County Soil and Water Conservation Sandra Weitzel, NC Division of Soil and Water Conservation Don Butler, Carroll's Foods Operations Branch Wilmington Files 9 State of North Carolina "WED Department of Environment,' '' Health and Natural ResourcesL13 SEp 15 1991 Division of Water Quality r, James B. Hunt, Jr., Governor Wayne McDevitt, Secretary A. Preston Howard, Jr., P.E., Director September 11, 1997 CERTIFIED MAIL RETURN RECEIPT REQUESTED Billy Kilpatrick Billy Kilpatrick Farm PO Box 94 Kenansville NC 28349 Farm Number: 31-97 Dear Billy Kilpatrick: A4�JR C)EHNR You are hereby notified that Billy Kilpatrick Farm, in accordance with G.S. 143-215.1OC, must apply for coverage under an Animal Waste Operation General Permit. Upon receipt of this letter, your farm has thirty 30 da s to submit the attached application and all supporting documentation. -In accordance with Chapter 626 of 1995 Session Laws (Regular Session 1996), Section 19(c)(2), any owner or operator who fails to submit an application by the date specified by the Department SHALL NOT OPERATE the animal waste system after the specified date. Your application must be returned within thirty (30) days of receipt of this letter. Failure to submit the application as required may also subject your facility to a civil penalty and other enforcement actions for each day the facility is operated following the due date of the application. The attached application has been partially completed using information listed in your Animal Waste Management Plan Certification Form. If any of the general or operation information listed is incorrect please make corrections as noted on the application before returning the application package. The signed original application, one copy of the signed application, two copies of a general location reap, and two copies of the Certified Animal Waste Management Plan must be returned to complete the application package. The completed package should be sent to the following address: North Carolina Division of Water Quality Water Quality Section Permits and Engineering Unit Post Office Box 29535 Raleigh, NC 27626-0535 If you have any question concerning this letter, please call J R Joshi at (919) 733'5083 extension 363 or Dave Holsinger with the Wilmington Regional Office at (910) 395-3900. Sincerely, VA. Preston Howard, Jr., P.E. cc: Permit File (w/o encl.) Wilmington Regional Office (w/o encl.) P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-5083 FAX 919-733-0719 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper State of North Carolina Department of Environment, Health and Natural Resources James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary November 13, 1996 William Kilpatrick William Robert Kilpatrick Farm PO Box 94 Rutledge Rd Kenansville NC 28349 SUBJECT: Operator In Charge Designation . Facility: William Robert Kilpatrick Farm Facility ID#: 31-97 Duplin County Dear Mr. Kilpatrick: Senate Bill 1217, An Act to Implement Recommendations of the Blue Ribbon Study Commission on Agricultural Waste, enacted by the 1996 North Carolina General Assembly, requires a certified operator for each animal waste management system that serves 250 or more swine by January 1, 1997. The owner of each animal waste management system must submit a designation form to the Technical Assistance and Certification Group which designates an Operator in Charge and is countersigned by the certified operator. The enclosed form must be submitted by January 1, 1997 for all facilities in operation as of that date. Failure to designate a certified operator for your animal waste management system is a violation of 15A NCAC 2H .0224 and may result in the assessment of a civil penalty. If you have questions concerning operator training or examinations for certification, please contact your local North Carolina Cooperative Extension Service agent or our office. Examinations have been offered on an on -going basis in many counties throughout the state for the past several months and will continue to be offered through December 31, 1996. Thank you for your cooperation. If you have any questions concerning this requirement please call Beth Buffington or Barry Huneycutt of our staff at 919/733-0026. Sincerely; A: Preston Howard, Jr., P.E., erector Division of Water Quality Enclosure cc: Wilmington Regional Office Water Quality Files P.O. Box 27687, WAW� Raleigh, North Carolina 27611-7687 N'Vf An Equal Opportunity/AffirrmaWe Action Employer Voice 919-715-4100 50% recycled/100% post -consumer paper REGISTRATION FORM FOR ANIMAL FEEDLOT OPERAT 4S Department of Environment, Health and Natural . 0u27eoz Division of Environmental Management :`. Water'Quality Section j N 'VA rER QUA) ITY If the animal waste management system for your feedlot ation-ia• designed to serve more than or equal to 100 head of•75 horses, 250 swine, 1,000 sheep, or 30,000 birds that are served by a liquid waste system, then this form must be filled out and mailed by December 31, 1993 pursuant to'-15A.NCAC 2H.0217 (c) in order. to be deemed -permitted by DEM. Please print clearly. Farm Name:, !r illicalm T�nKr� !�-n+-Y-,'ck_) Mailing Address7->n77--cV. CI _T-;LL4-1 County: I in Phone No. Owner (s) Name: Coi I i l'arn C r4- K; 7c-fr;ck- Manager (s) Name: Lessee Name: Farm Location (Be as specific as possible: road names, direction, milepost; etc.) f'rnrr, _�4wv, It Latitude/Longitude if known: Design capacity of animal waste management system -(Number and type of confined animal (s) ) : -.... 4320n'i5h hon1&. Average anima. population_ on the farm (Number and type "of animal (s) raised) _�.20 :qo., . .t_ Year-Production'Began:.igq ASCS .Tract No. r7� Type of : Waste Management System _Used: Lo_qoori`- irx'rJ.A- Gib Acres -Available foi: ,Land Application of ~Waste_ : - L�0- Owner (s) -LSignature'(s.)��- )i DATE 1'11/2-Q DATE, State of Noah Carolina Department of Environment, Heclth and Natural Resources Division of Environmental Management James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary A. Preston Howard, Jr., P.E., Director February 17, 1994 William Kilpatrick P.O. Box 94 Rutledge Road Kenansville NC 28349 Dear Mr. Kilpatrick: This is to inform you that your completed registration form required by the recently modified nondischarge rule has been received by the Division of Environmental Management (DEM), Water Quality Section. On December 10, 1992 the Environmental Management Commission adopted a water quality rule which governs animal waste management systems. The goal of the rule is for animal operations to be managed such that animal waste is not discharged to surface waters of the state. The rule allows animal waste systems to be "deemed permitted" if certain minimum criteria are met (15A NCAC 2H .0217). By submitting this registration you have met one of the criteria for being deemed permitted. We would like to remind you that existing feedlots which meet the size thresholds listed in the rule, and any new or expanded feedlots constructed between February 1, 1993 and December 31, 1993 must submit a signed certification form (copy enclosed) to DEM by December 31, 1997. New or expanded feedlots constructed after December 31, 1993 must obtain signed certification before animals are stocked on the farm. Certification of an approved animal waste management plan can be obtained after the Soil and Water Conservation Commission adopts rules later this year. We appreciate you providing us with this information. if you have any question about the new nondischarge rule, please contact David Harding at (919) 733-5083. Sincerely, Steve Tedder, Chief enc:. Water Quality Section _ P.O. Box 29535. Rdeigh, Norm Caroflnc 2762643535 Telephone 919-733-7015 FAX 919-733-2496 An Equal opportunity Affirmative Action Employer .50% recycled/ 10% post -consumer paper