Loading...
HomeMy WebLinkAboutWq0004240_Compliance Evaluation Inspection_20190321 Compliance Inspection Report Permit: WQ0004240 Effective: 12/17/14 Expiration: 07/31/19 Owner: US MCAS Cherry Point SOC: Effective: Expiration: Facility: Bogue Airfield WWTF County: Carteret NC Hwy 24 Region: Wilmington Cape Carteret NC 28584 Contact Person: Timothy Lawrence Title: Phone: 252-466-2754 Directions to Facility: Southside of NC Highway 24. approximately 1.5 miles east of the intersection with NC highway 58 System Classifications: SI, Primary ORC: Jeffrey A Clayton Certification: 998515 Phone: 910-358-4916 Secondary ORC(s): On-Site Representative(s): Related Permits: Inspection Date: 03/13/2019 Entry Time: 01:15PM Exit Time: 02:30PM Primary Inspector: Robb Mairs Phone: 910-796-7423 Secondary Inspector(s): Chad Coburn Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Wastewater Irrigation Facility Status: Compliant ❑ Not Compliant Question Areas: Treatment Flow Measurement-Effluent Treatment Flow Measurement-Influent Miscellaneous Questions Treatment Flow Measurement-Water Treatment Lagoons End Use-Irrigation Use Records Treatment Influent Pump Station Treatment Disinfection Treatment Flow Measurement Treatment Return pumps Standby Power (See attachment summary) Page 1 of 5 Permit: WQ0004240 Owner-Facility:US MCAS Cherry Point Inspection Date: 03/13/2019 Inspection Type:Compliance Evaluation Reason for Visit: Routine Inspection Summary: The compliance inspection was conducted on March 13, 2019,with the assistance of ORC Mr.Jeffrey Clayton and Mr. Timothy Lawrence with MCAS Cherry Point as part of the permit renewal review. Both Jeff and Timothy were very helpful. Overall,the treatment facility appeared to be operated well and in good condition. We started the inspection at each deemed permitted pump station (8029, 8105,8199 and 8106).The ORC indicated that all generators with each associated pump stations are inspected monthly by a separate work group and were last inspected on 3/13/2019. The following is a summary for each pump station and associated lagoons and spray fields. Pump stations: -8029: Electrical panel has shorted due to rain,so the ORC was not able to set the high water emergency alarm. There was not an emergency contact information sign posted. ORC indicated a work order has been placed to repair panel and posting of sign. Standing water within well pump. -8105: High water emergency alarm not operating. Emergency contact information sign not posted. Standing water within well pump.Work order has been placed to repair alarm, post sign, and pump water within well. The ORC indicated that it is being inspected twice a day in the meantime. -8119: New pump station within the airfield to service the fuel distribution building,which was constructed withing the last 3 years. There was not an emergency contact information sign posted. High water alarms were operable. -8106: High water alarms were operable. No emergency contact information sign posted. Well pump had standing water within. ORC indicated a work order placed to post sign and drain water. The appearance of the wastewater sprayfield distribution equipment and grass crop looked good and no signs of localized ponding. Groundwater monitoring wells are installed and we inspected MW#1, but was difficult to access due to overgrown vegetation. ORC indicated it will be maintained for easier access and visualbility. Permit was last modified to allow for expansion Irrigation Field#3,which has not been constructed. However,the ORC indicated that construction should begin late this spring. Freeboards for the treatment lagoon was 4 feet and the polishing lagoon was 3.5 feet. Liners for each lagoon appeared to be in good shape, however,the ORC indicated they will be replaced late this spring at the same time sprayfield#3 is to be constructed. The ORC indicted the sludge will be hauled off to Cherry Point Base in Havelock, as per the permit for this location. Mr. Lawrence indicated that he will provide through email the annual calibration information and soil analysis report. Based on the site inspection,the ORC indicated the pump stations with existing issues will be addressed through work orders, and will be inspected twice daily until corrected,which appears to be consistent with 15A NCAC 02T.0403 DEEMED PERMITTING BY REGULATION. This office recommends renewal of Permit No.W00004240. Page 2 of 5 Permit: WQ0004240 Owner-Facility:US MCAS Cherry Point Inspection Date: 03/13/2019 Inspection Type:Compliance Evaluation Reason for Visit: Routine Type Yes No NA NE Single Family Spray, LR ❑ Activated Sludge Spray, LR ❑ Activated Sludge Spray, HR ❑ Activated Sludge Drip,LR ❑ Reuse(Quality) ❑ Infiltration System ❑ Recycle/Reuse ❑ Single Family Drip ❑ Lagoon Spray, LR Treatment Influent Pump Station Yes No NA NE Is the pump station free of bypass lines or structures? ❑ ❑ ❑ Is the general housekeeping acceptable? ❑ ❑ 0 ❑ Are all pumps present? ❑ ❑ ❑ Are all pumps operable? ❑ ❑ ❑ Are floats/controls operable? ❑ ❑ ❑ Are audio and visual alarms available? ❑ ❑ ❑ Are audio and visual alarms operational? ❑ ❑ ❑ #Are SCADA/Telemetry alarms required? ❑ ❑ ❑ Are SCADA/Telemetry available? ❑ ❑ ❑ Are SCADA/Telemetry operational? ❑ ❑ 0 ❑ Comment: See summary for description of each deemed permitted pump station inspected: #8029, #8105, #8199, and #8106. Treatment Flow Measurement-Influent Yes No NA NE Is flowmeter calibrated annually? ❑ ❑ ❑ Is flowmeter operating properly? ❑ ❑ ❑ Does flowmeter monitor continuously? ❑ ❑ ❑ Does flowmeter record flow? ❑ ❑ ❑ Does flowmeter appear to monitor accurately? 0 ❑ ❑ ❑ Comment: Treatment Flow Measurement-Water Use Records Yes No NA NE Is water use metered? 0 ❑ ❑ ❑ Are the daily average values properly calculated? 0 ❑ ❑ ❑ Comment: Page 3 of 5 Permit: WQ0004240 Owner-Facility:US MCAS Cherry Point Inspection Date: 03/13/2019 Inspection Type:Compliance Evaluation Reason for Visit: Routine Treatment Flow Measurement-Effluent Yes No NA NE Is flowmeter calibrated annually? ❑ ❑ ❑ Is flowmeter operating properly? ❑ ❑ ❑ Does flowmeter monitor continuously? ❑ ❑ ❑ Does flowmeter record flow? 0 ❑ ❑ ❑ Does flowmeter appear to monitor accurately? ❑ ❑ ❑ Comment: Standby Power Yes No NA NE Is automatically activated standby power available? ❑ ❑ ❑ Is generator tested weekly by interrupting primary power source? ❑ ❑ ❑ Is generator operable? ❑ ❑ ❑ Does generator have adequate fuel? ❑ ❑ 0 ❑ Comment: See summary for description of each deemed permitted pump station:#8029, #8105, #8199, and #8106. Treatment Return pumps Yes No NA NE Are they in place? ❑ ❑ ❑ Are they operational? ❑ ❑ ❑ Comment: Treatment Disinfection Yes No NA NE Is the system working? ❑ ❑ ❑ Do the fecal coliform results indicate proper disinfection? ❑ ❑ ❑ Is there adequate detention time(-30 minutes)? ❑ ❑ ❑ Is the system properly maintained? ❑ ❑ ❑ If gas,does the cylinder storage appear safe? ❑ ❑ ❑ Is the fan in the chlorine feed room and storage area operable? ❑ ❑ ❑ Is the chlorinator accessible? ❑ ❑ ❑ If tablets,are tablets present? ❑ ❑ ❑ Are the tablets the proper size and type? ❑ ❑ ❑ Is contact chamber free of sludge,solids,and growth? ❑ ❑ ❑ If UV,are extra UV bulbs available? ❑ ❑ ❑ If UV, is the UV intensity adequate? ❑ ❑ ❑ #Is it a dual feed system? ❑ ❑ ❑ Does the Stationary Source have more than 2500 Ibs of Chlorine(CAS No.7782-50-5)? ❑ ❑ ❑ If yes,then is there a Risk Management Plan on site? ❑ ❑ ❑ If yes,then what is the EPA twelve digit ID Number?(1000- ) If yes,then when was the RMP last updated? Page 4 of 5 Permit: WQ0004240 Owner-Facility:US MCAS Cherry Point Inspection Date: 03/13/2019 Inspection Type:Compliance Evaluation Reason for Visit: Routine Comment: End Use-Irriqation Yes No NA NE Are buffers adequate? ❑ ❑ ❑ Is the cover crop type specified in permit? ❑ ❑ ❑ Is the crop cover acceptable? ❑ ❑ ❑ Is the site condition adequate? 0 ❑ ❑ ❑ Is the site free of runoff/ponding? ❑ ❑ ❑ Is the acreage specified in the permit being utilized? ❑ ❑ ❑ Is the application equipment present? ❑ ❑ ❑ Is the application equipment operational? ❑ ❑ ❑ Is the disposal field free of limiting slopes? ❑ ❑ ❑ Is access restricted and/or signs posted during active site use? ❑ ❑ ❑ Are any supply wells within the CB? ❑ ❑ ❑ Are any supply wells within 250' of the CB? ❑ ❑ ❑ How close is the closest water supply well? ❑ ❑ ❑ Is municipal water available in the area? ❑ ❑ ❑ #Info only: Does the permit call for monitoring wells? ❑ ❑ ❑ Are GW monitoring wells located properly w/respect to RB and CB? ❑ ❑ ❑ Are GW monitoring wells properly constructed,including screened interval? ❑ ❑ ❑ Are monitoring wells damaged? ❑ 0 ❑ ❑ Comment: Only MW#1 was inspected due to accessibility limited to overgrown vegetation. Page 5 of 5