Loading...
HomeMy WebLinkAbout20190407 Ver 1_Shoreline Stabilization_20190401C_ State of North Carolina Department of Environment and Natural Resources Division of Water Resources Water Resources 15A NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization ENVIRONMENTAL QUALITY FORM: SSGP 02-2017 Shoreline Stabilization Application Form Three copies of the application (including attachments) and the application fee should be sent to: If sending via US Postal Service If sending via delivery service (UPS, F�IF,�A'1�� Karen Higgins Karen Higgins r DWR — 401 & Buffer Permitting Branch DWR — 401 & Buffer Permitting Brant 1617 Mail Service Center 512 N. Salisbury Street 2 0 Raleigh, NC 27699-1617 Raleigh, NC 27604 9 0 4 07 A. Applicant Information [._5A NCAC 02H .0502(a)] 1. Owner Info Name: Mailing Address: Telephone Number: /t-"% / E-mail Address: 2. Agent/ Contact Person Information Number: a'//you �� •- /,�� A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signed this application form. (A form can be downloaded here: http•//www.saw usace army mil/Portals/59/docs/regulatory/regdocs/Permits/SAMPLE AGENT AUTHORIZ ATION FORM.pdf) Name: Company Affiliation: Mailing Address: Telephone Number: E-mail Address: Fax Number: B. Project Information [15A NCAC Q2H .0502(a) & (b)] 1. Attach a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, buildings, retaining walls, docks, impervious surfaces, rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram provided at the end of this application form. FORM: SSGP 02-2017 Page 1 of 3 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (include a scale of some sort a yard stick, shovel handle, etc.) 4. Location of the property (where work is to be conducted) County: h&4-ovm r. Nearest Town: Lake/ river/ ocean adjacent to property: - 3— f"�-S'�e� Property size (acres): Subdivision name or s (include phase/lot number): L .� Directions to site - please include road a and Im ,landmarks, etc.: Latitude (in decimal Longitude (decimal degrees) • D�Oo� 5. Describe the existing land use or Gondi n of the at�yme of this application (residential, undeveloped, etc.): �S� E'd!r--'g' 6. Describe proposed work (include d' as law ha ni been avoided or why it is rosary) �� �iie-J�7���� 7. Will work be conducted from land? gr--� From water? ❑ 8. Total amount of impacts below the normal pool lake level / Normal Water Level backfill, rip rap, retaining walls, etc.) in square feet: Temporary impad;,ifn square feet: 9. Total amount of impacts above the normal pool lake level / Normal Water Level and 50 feet land -ward Permanent impacts (including back fill, vation, rip rap, retaining walls, etc.) in square feet: Temporary immporary clearing, construction corridor) in square feet: 10. Please describe the vegetation above the normal pool lake level/ Normal Water Level 50 feet landw to be imps d (number of , fo ' nee): G'o 11. Signa er/Agent's Signature (15A NCAC 02H .0502(f)l Date Agent's signature Is valid only if an authorization letter from the owner is provided. FORM: SSCP 02-2017 Page 2 of 4 12. Please approximately sketch the following information on this plan and provide dimensions for each item: a. All proposed vegetation clearing b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation c. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation d. Location of any proposed structures such as buildings, retaining walls, docks, etc. n i nrarinn of anv Pxravation or dredging below the Full Pond/ Normal Water Level elevation Lake (At Full Pond/ Normal Water Level) SIP Gtr � c�l eta Full Pond/ Normal Water Level Shoreline C Plan View FORM: SSGP 02-2017 Lake jAtF P.WNO11' Mm L-9 Existing Dock /30 tt■7ft A 0 MWX P L E Plan View Page 3 of 4 ��f C / l( CO G( (At Full Pond) Normal W er Level a) o s :N - ------------ -- — - - — - C Side View CL U- 3 ft. below full pond water level 4 ft. above full pond water level 2 ft. additional clearing rf necessary Existing bank 10 ft. bank a height COQ L L Q Side View FORM: SSGP 02-2017 Page 4 of 4 .��EE.• `�t, le 19 1 �9 yt$d 6� '100abd0 a41 lX 0Hp +u0il Nmwp� 10Alp _ -` p spuop*uupo p vo PPB p >� WIN" 640p9 . p04viswpw F uapira�u/iq �M Pw! s41 >� cps VOPUWAr= iXX44* M . �u Psl �>a o poo l0 jwom 1. UP air a une� PW co all p ""OXPO* 9L •00 f umwuw n - VWW owl )I.AA n5APr� ' Spa &A &X109 0 L7 on �1 pWmmsm4l SNO .v�oop P of � rig Nuns f�, U"wq lO we a SNm y�,Ll vim► So WRIOP p mn w v0t %W Aq AMM spar pun PM oft dew "a 00POn" PL pe 4sm Yurxwo HIM UP air