HomeMy WebLinkAbout20190366 Ver 1_Email_20190326Strickland, Bev
From: Pullinger, Robert C
Sent: Monday, March 25, 2019 3:53 PM
To: Mairs, Robb L
Subject: FW: [External] Completed BA - 10-2013 for Stephenson Project
Attachments: Scanned Documents.pdf
Hey Robb,
Hope things are going well, and it was good to see you again last week at the 401 meeting! You may have gotten an
application (or at least a Laserfiche notification that one is coming?) for a project in Seagate for a Wain and Marty
Stephenson, where they've got the teeniest corner of a house extending into Zone 2 of the buffer, partly because some
recent bulkhead work cut a corner, and pushed buffers back further into the lot than they used to exist. Just wanted to
let you know if you needed any information, or if it'd be of any benefit or help, Mrs. Stephenson (Wain) had sent me a
preliminary e -copy of her application that I am forwarding along to you. Really, it almost felt like overkill on my part to
make them get the authorization, but they plan to gutter the house and get the collected water diffused outside of the
buffer, and they meet the requirements for it just to be a buffer authorization instead of a variance, so hopefully I didn't
forget to tell them anything they'd need to have a complete application. If there's any other information I can provide
to help, let me know. Thanks!
Chris Pullinger
Environmental Specialist II
Division of Water Resources — Water Quality Regional Operations
North Carolina Department of Environmental Quality
252 948 3922 office
chris.pullinger(cDncdenr.gov
943 Washington Square Mall
Washington, NC 27889
From: Wain Stephenson <stephensonwaint@gmail.com>
Sent: Wednesday, March 20, 2019 2:26 PM
To: Pullinger, Robert C <chris.pullinger@ncdenr.gov>
Subject: [External] Completed BA - 10-2013 for Stephenson Project
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an
attachment to report.spam@nc.gov<mailto:report.spam@nc.gov>
'66;-A hard copy of these documents was sent to Karen Higgins in Raleigh today by UPS. In addition a copy of the map of
the Revised Plan of Sea Gate Development was also sent to her. I had sent you portions of that map before but I will
email you a complete copy that Staples scanned for me following this email. If anything else is needed from me, please
let me know.
Thank you for all of your assistance!
806 Overbrook Drive
27360
Thomasville, NC.
March 20, 2019
Ms. Karen Higgins
NCDWR - 401 & Street Permitting Branch
512 N. Salisbury
Raleigh, NC 27604
Dear Ms. Higgins:
he
Please find enclosed the Riparian Buffer Authorization Fomap, soil map, house
requested attachments (recorded map of the plat, topography
site pians) as well as an aerial photo of the original shore
line
our
lot in the Sea
Gate development in Newport, NC for your consideration our application.
If additional information is needed or if you have questions for me or my husband, we
may be reached at 336-905-0911 (Marty) or at 336-689-0626 (Wain).
Thank you,
Wain Stephenson
State of North Car°ling
Department of Environmental Q.ua1itY
Division of Water Resources
DWR 7 11)(c), .0607 (ea(t )
Ew sion of water Re5ources 0243 (8)(b), .0250 (1 1)(b), .0259 (8)(b), .026 (Buffer AuBA 10_7()l 3
on
15A NCAC 02B .0233 (8)(b), FORMA:
Riparian Buffer Authorization Form
A. Applicant Information
1. project Information
1 }
1�
1a. Name of project:
,r�ere�
1b. County:
�o
1c. Nearest municipality:
G
1 d. Subdivision name: a No
WO
North Carolina's twenty Yes _
of
1e. Is the project located in any �__--.---=
answer 1f below. — NO
counties? If yes,
_,_— ---
NC Division of Coastal Manag ementArea s
1f. Is the project located within a
of Environmental Concern (AEC)?
2. owner Information ��QP _.— hens on, sY • Gu`d
2a. Name on Recordedn
Deed:
(k U) i ^
2b. Deed Book and Page
S 3
No.
2c. Map Book and Page No.
(include a copy of the
recorded map that indicates
when the lot was created):
v� p C -
r SCJ �vQ..� �-
2d. Responsible Party41C
2e. Street address
2f. City, state, zip:�s
tr1� �� NAL -2-13 U — - -
2g. Telephone no.:
-3L' ----
2h. Fax no.:
_ - --- --- - --
2i. Email address:
(�SUr�1�lOQAt.. b m
3. Applicant information (if different from owner)
3a. Applicant is:
Agent Other, specify:
3b. Name:
3c. Business name
(if applicable):
3d. Street address:
3e. City, state, zip:
3f. Telephone no.:
39. Fax no.:
FORM: BA 10-2013 Page 1 of 6
3h_ Email address:if a Iica .
Agent/Consultant lnformatlon ( pP
4a. Name:
4b. Business name
(if applicable)'
4c. Street address:
4d. City, state, zip:
4e. Telephone no-:
4f. Fax no.:
49- Email address'
FORM: BA 10.2013
Page 2 of b
B. Project Information and Prior Project History
1. Property Identification
1 a. Property identification no. (tax PIN or parcel ID): 3A I
1 b. Site coordinates (in decimal degrees):
Latitude: j 080 Longitude:-
acres 35g
1c. Property size:
2. Surface Waters _ II
2a. Name of nearest body of water to proposed project:
2b. Water Quality Classification of nearest receiving water: S S
2c. River basin:___
3. Project Description -
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the
time of this application:
3b. Attach an 8 '/z x 11 excerpt from the most recent version othe USS topographic map indicating the
location of the site
Map
3c. Attach an 8 1/2 x 11 excerpt from the most recent version of the published County NRCS Soil urvey
depicting the project site ------- . ------ --- ----
3d. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property:
3e. Explain the purpose of the proposed project:
en er
3f. Describe the overall pro
c ect in t�includinge typeof a uipment to be used:
4. Jurisdictional Determinatio
4a. Have jurisdictional wetland or stream determinations by 1 Yes No
the Corps or State been requested or obtained for this Comments:
property/ project (including all prior phases) in the past?
4b. If yes, who delineated the jurisdictional areas? Agency/ Consultant Company:
Name (if known): Other:
risdictional determinations or State determinations and attach
4c. If yes, list the dates of the Corps ju
documentation.
5. Project History
5a. Have permits or certifications been requested or Yes
obtained for this project (including all prior phases) in
the past?
5b. If yes, explain and detail according to "help file" instructions.
6. Future Project Plans
68. Is this a phased project? I Yes
No Unknown
FORM: BA 10-2013 Page 3 of 6
� � t
o.a rr
.-.--riF � .war• .r.,� A
iin;6l EADcm
.�c wr Mna-
.P+ a i !wR Mw Mwli+�
sn�
R
..s •� y�.r..�..+ �c o er 4 b i� _ i•f
am tr:u.n•b..Wr+swRa cur 1»vow iwOi>wa7Pw �
.....r....�.,..��`: S .R.. ..rte �.r..a.. �_.
CAtif,�.11C I
10N
3. c
(»
Gulm 6LLM CILMN
R-§
\
2
(»
Gulm 6LLM CILMN
R-§
2
..
.
�k
)
$
{
��\
\
x
.
2
\
2
$
°
• »
\
7
.
:>
v>\
.
., .. +
1
\$
§ -
■5
eA
&\
e{
k�
r
))
m z
�
.� � ,�
c� i•
�
_
.
,=a_
:
(
�
\
%
sb. � yes. e>�sir►. _ _. —
Imps
Catawba
8~ impacts Tar -Pamlico Goose Creek
basin? ® n
la. Project is in rrtrich protected Randleman J --da
Delo,�r, if any impacts n�V� mM'�' then VW MUST at out section
1 b. !n a!I buffer impacts bel"
Zona Zone 2
D of this form. �e Buffer imQa�
f impad Stream mitigation ! imp � laq tt)
Buffer impsd Reason (Sable able. I required? t�
number— impact'�► jj i
Permanent (P)
or Temporary Yes
61 T
p4tsc-
&bit- Yes No
B2 P T
Yes NO
B3 P T
Yes No
B4 P T
Yes No
B5 P T
Yes No
B6 P T
Total buaW imP*cts
1 c_ comments:
p. Impact Justification and Mitigation
1_ Avoidance and Minimization im cts in designing project.
1a_ Specifically describe measures taken to avoid o - minimize the Propos Pa
ai
5 1 (u id or minimize a proposed
o impacts through construction
1b. Specifically describe measures taken to avo
techniques-
us r -
w a.a
2. BUTMI ,.,`uyo� riparian buffer that
result in an impact within a protected rip f!
2a. VY�II the project
requires buffer mitigation?
fes, then identify the square feet of impact to eachzone of the
table below. riparian buffer that requires mitigation
2b_ I Y uEred m th
and calculate the amount of mitigation req Multiplier Required mitigation
Reason for impact Total impact (square feet)
Zone ', (square feet) -
3 (2 for
- I
Zone 1 Catawba)_ --
i
I 1.5
Zone 2
Pate 4 of 6
FORM: BA 10.2013
Total buffer mitigation required: No
2c. if buffer mjtigation is req
aired, is payment to a mitigation bank or NC DMS Yes
proposed?
nce letter from the mitigation bank or NC DMS.
2d. if yes, attach the accepta
mitigation is proposed.
2e. If no, then discuss what type of miti 9
2f. comments:
E. Diffuse Flow Plan —�-`
All buffer impacts and high ground impacts require diffuse flow or other form of
stormwater treatment. Include a plan that fully documents how diffuse flow supple
Form.maintained. If a Level Spreader is proposed, attach a Level Spreader Supp
Form. lease
If due to site constraints, a BMP other than a level spreader is proposed, p
t as
er
Storm waterprovide a l BMP Manual and attach a outlined
BMP SupP ement Form.g of the NG
Diffuse flow ✓
Other BMP 'f `
�({ Aara(
9� o
to r c►ari' 6t `�1'lt i'Tr.
rE
ementary Information
nmental Documentation No
es the project involve an expenditure of public (tederallstateflocal)funds or the Yes of public (federal/state) land? No
u answered "yes" to the above, does the project require preparation of anYesironmental document pursuant to the requirements of the National or State
rth Carolina) Environmental Policy Act (NEPAlSEPA)?
1c. If you answered "yes" to the above, has the document been finalized by the State ,Yes
No
Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) i
Comments:
2. Violations
2a. is the site in violation of DWR Wetland Rules (15A NCAC 02H .0500), isolated Yes
Wetland Rules (15A NCAC 02H. 1300), DWR Surface Water or Wetland
Standards, or Riparian Buffer Rules (15A NCAC 02B.0200)?
2b. Is this an after -the -fact permit application?
=s"N
2cif you answered "yes" to one or both of the above questions, provide an explanation of the violatjon(s): i
� n j -Z
�O�tol
( v air �' ik• j 14 Z� fi-r^--[''�
I i
Applicant/Agent's Printed Name I Applicant/Agent's Signature Date
(Agent's signature is valid only if an authorization letter from the applicant is
provided.)
FORM: BA 10.2013 Page 5 of 6
I;
�=
o F
G
2
r
Tg�
i
S y
� �
i a• •+
O a• v� e
I;
lii nH H.Fn ANY w itV1If11lTy"=dd'Nil`R MIF WP 371108001M (VAAGM) Mb
)AY
ONCRETE MONUMENT (CP)
PRELIMINARY PLAT
PIPE (2" DEEP)
s NOT FOR RECORDATION, CONVEYANCES,
BAR (2' DEEP)
4 SALES OR FINAL DESIGN.
+�
THIS DRA IS AN LONLYN I C FILE
;FLUSH)
* FIONG
R V
K 4 Pvio[ aCA-aco
BLOCK I, LOT 85
SURVEY FOR -
LINE
O
BENJAMIN MARTIN STEPHENSON, JR.
and HELL IPAINWRIGHT T. STEPHENSON
0.3.1"8 Acre
s,.-„ w. 7,._
a. a w. r. sc.W,,,,.a,ER956 Sen Gnte Drlve(232)
NAV OPUS DERIVED AND
946-3169 New ort NC4'ashingi—' Nc Lic.me No,� C- 0232) 229-0072
Bern, NC
MAYO AND
a1' W COCRIANAM
ASSOCIATES, p No
10181 US HVY 17 SoLth LAND SURVEYING
40 60
CAC UWNO Ro "
PRUJECTi 2019-024
STATE NC COUNTY+ CARTERET
2S' MOL
TWPI HARLOWE
AM LIN
g
44RZQNE„_ PE (BFE 8')
ln�![ /SeilY�pW![xJ
I
��'N _ b0' RIPARYW BUFFER
�s.e l _.
xun
n.c
PROPOSED
o
N
HOUSE
N
to
I
r �w
I
�
c
5.1PUMP
g
TANS
ea m
s
I
SEP'n
TANKN
MICHAEL KELLER
D.B. 1588, PG. 88
d,
DRNEWAY
EXISTING j
NO PIN NO.: 649103212582(
x to.o DRAIN FIELD
v20'
'v
MSL
x so.•
)/H- NH- 0/H- g/
),0
s.e_ 1
N 4'09'50 W 95.07'
7.0
NAIL
ONCRETE MONUMENT (CP)
PIPE (2" DEEP)
REVISION,
BAR (2' DEEP)
;FLUSH)
SHEET TITLE, 0TE 1 A PLAN
SPA lmrjN
12' WOOD BULKHEAD
BLOCK I, LOT 85
SURVEY FOR -
LINE
BENJAMIN MARTIN STEPHENSON, JR.
and HELL IPAINWRIGHT T. STEPHENSON
s,.-„ w. 7,._
a. a w. r. sc.W,,,,.a,ER956 Sen Gnte Drlve(232)
NAV OPUS DERIVED AND
946-3169 New ort NC4'ashingi—' Nc Lic.me No,� C- 0232) 229-0072
Bern, NC
MAYO AND
ASSOCIATES, p No
10181 US HVY 17 SoLth LAND SURVEYING
40 60
DATEi 3/4/2019 vANCEamm, Ne2ese6
SCALE 1'20'
PRUJECTi 2019-024
STATE NC COUNTY+ CARTERET
TWPI HARLOWE
�jQ -glVE) V3S
p
k
20, front setback
' CAMA AEC
50' Neuse buf e �` '