Loading...
HomeMy WebLinkAbout20190224 Ver 1_BA 10-2013_Buffer Auth Form- page 3_20190404C. Proposed Impacts Inventory Impact Justification and Mitigation 1. 1. Buffer Impacts 1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Stormwater wetland used to mitigate nutrient loading for nitrogen and phosphorus, preventing eutrophication. 1a. Project is in which protected ® Neuse ❑ Tar -Pamlico ❑ Catawba basin? ❑ Randleman ❑ Jordan ❑ Goose Creek 1 b. Individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. Zone Reason for impact Total impact Multiplier Required mitigation (square feet (square feet Buffer impact Reason for impact Type of impact Stream name Buffer Zone 1 Zone 2 number— If buffer mitigation is required, is payment to a mitigation bank or NC EEP proposed? (exempt, 2d. mitigation impact impact Permanent (P) Comments: allowable, required? (sq ft) (sq ft) or Temporary allowable w/ mitigation) T 131 ® P ❑ T Stormwater outfall allowable Unnamed/ledge ❑ Yes ® No 173 creek B2 ® P ❑ T Rip -Rap pad allowable Unnamed/ledge ❑ Yes ® No 36 creek B3 ❑ P ❑ T ❑ Yes ❑ No B4 ❑ P ❑ T ❑ Yes ❑ No B5 ❑ P ❑ T ❑ Yes ❑ No B6 ❑ P ❑ T ❑ Yes ❑ No Total buffer impacts 1 c. Comments: D. Impact Justification and Mitigation 1. Avoidance and Minimization 1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Stormwater wetland used to mitigate nutrient loading for nitrogen and phosphorus, preventing eutrophication. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Installing a sediment barrier (wattles) to protect stream from erosion and sediments. 2. Buffer Mitigation 2a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes ® No 2b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation and calculate the amount of mitigation required in the table below. Zone Reason for impact Total impact Multiplier Required mitigation (square feet (square feet Zone 1 3 (2 for Catawba) Zone 2 1.5 Total buffer mitigation required: 2c. If buffer mitigation is required, is payment to a mitigation bank or NC EEP proposed? ❑ Yes ❑ No 2d. If yes, attach the acceptance letter from the mitigation bank or NC EEP. 2e. If no, then discuss what type of mitigation is proposed. 2f. Comments: FORM: BA 10-2013 Page 3 of 5