HomeMy WebLinkAbout20190224 Ver 1_BA 10-2013_Buffer Auth Form- page 3_20190404C. Proposed Impacts Inventory
Impact Justification and Mitigation
1.
1. Buffer Impacts
1 a.
Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
Stormwater wetland used to mitigate nutrient loading for nitrogen and phosphorus, preventing eutrophication.
1a. Project is in which protected
® Neuse
❑ Tar -Pamlico ❑ Catawba
basin?
❑ Randleman
❑ Jordan ❑ Goose Creek
1 b. Individually list all buffer impacts below. If any impacts
require mitigation, then you MUST fill out Section D of
this form.
Zone
Reason for impact Total impact Multiplier Required mitigation
(square feet (square feet
Buffer impact
Reason for impact
Type of impact
Stream name
Buffer
Zone 1
Zone 2
number—
If buffer mitigation is required, is payment to a
mitigation bank or NC EEP proposed?
(exempt,
2d.
mitigation
impact
impact
Permanent (P)
Comments:
allowable,
required?
(sq ft)
(sq ft)
or Temporary
allowable w/
mitigation)
T
131 ® P ❑ T
Stormwater outfall
allowable
Unnamed/ledge
❑ Yes ® No
173
creek
B2 ® P ❑ T
Rip -Rap pad
allowable
Unnamed/ledge
❑ Yes ® No
36
creek
B3 ❑ P ❑ T
❑ Yes ❑ No
B4 ❑ P ❑ T
❑ Yes ❑ No
B5 ❑ P ❑ T
❑ Yes ❑ No
B6 ❑ P ❑ T
❑ Yes ❑ No
Total
buffer impacts
1 c. Comments:
D.
Impact Justification and Mitigation
1.
Avoidance and Minimization
1 a.
Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
Stormwater wetland used to mitigate nutrient loading for nitrogen and phosphorus, preventing eutrophication.
1 b.
Specifically describe measures taken to avoid or minimize the proposed impacts through construction
techniques. Installing a sediment barrier (wattles) to protect stream from erosion and sediments.
2.
Buffer Mitigation
2a.
Will the project result in an impact within a protected riparian buffer that requires buffer
mitigation?
❑ Yes ® No
2b.
If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation and
calculate the amount of mitigation required in the table below.
Zone
Reason for impact Total impact Multiplier Required mitigation
(square feet (square feet
Zone 1
3 (2 for Catawba)
Zone 2
1.5
Total buffer mitigation required:
2c.
If buffer mitigation is required, is payment to a
mitigation bank or NC EEP proposed?
❑ Yes ❑ No
2d.
If yes, attach the acceptance letter from the mitigation bank or NC EEP.
2e.
If no, then discuss what type of mitigation is proposed.
2f.
Comments:
FORM: BA 10-2013 Page 3 of 5