Loading...
HomeMy WebLinkAbout310066_Compliance Inspection_20180413 Division of Water Resources / =Facilityr - Division of Soil and Water Conservation V 0 Other Agency Type of Visit: TCompliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: 0 Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 00ther 0 Denied Access Date of Visit: Arrival Time: Departuref� A� �pTime:r t5-� County: I I Region: Farm Name: Lao-L Owner Email: Owner Name: iuus EAyya-85 Phone: Mailing Address: Physical Address: Facility Contact: r Title: Phone: OnsiteRepresentative: � I(A�'n FG�1W0"(j Integrator: Certified Operator: Certification Number: Back-up Operator: Certification Number: Location of Farm: Latitude: Longitude: Design Current Design Current Design Current Swine Capacity Pop. Wet Poultry Capacity Pop. Cattle Capacity Pop. \V'can to Finish La er Dairy Cow Wean to Feeder Non-Layer Dairy Calf Feeder to Finish Dairy Heifer Farrow to Wean Design Current Dry Cow Farrow to Feeder Dry Poultry Capacity Pop. Non-Dairy Farrow to Finish Layers Beef Stocker Gilts Non-Layers Beef Feeder Boars Pullets Beef Brood Cow Turke s Other Turke Poults Other Other Discharges and Stream Impacts 1.Is any discharge observed from any part of the operation? ❑ Yes No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NA ❑ NE b. Did the discharge reach waters of the State?(If yes,notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State(gallons)? d. Does the discharge bypass the waste management system?(If yes,notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE 2.Is there evidence of a past discharge from any part of the operation? ❑ Yes No ❑ NA ❑ NE 3.Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes ] No ❑ NA ❑ NE of the State other than from a discharge? Page I of 21412015 Continued Facili Number: i - 13 U jDate of inspection: Waste Collection&Treatment 4. Is storage capacity(structural plus storm storage plus heavy rainfall)less than adequate? [—] Yes 6 No ❑ NA ❑ NE a. If yes,is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure u/ 221 0tructure 3 Structure 4 Structure 5 Structure 6 Identifier: 6:6 - Spillway?: Designed Freeboard(in): Observed Freeboard(in): — 5.Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No ❑ NA ❑ NE (i.e., large trees,severe erosion, seepage,etc.) 6.Are there structures on-site which are not properly addressed and/or managed through a ❑ Yes ® No ❑ NA ❑ NE waste management or closure plan? !� If any of questions 4-6 were answered yes,and the situation poses an immediate public health or environmental threat,notify DWR 7.Do any of the structures need maintenance or improvement? ❑ Yes ❑ No ❑ NA NE 8.Do any of the structures lack adequate markers as required by the permit? ❑ Yes ❑ No ❑ NA NE (not applicable to roofed pits,dry stacks,and/or wet stacks) 9.Does any part of the waste management system other than the waste structures require ❑ Yes ❑ No ❑ NA NE maintenance or improvement? Waste Application 10.Are there any required buffers, setbacks,or compliance alternatives that need ❑ Yes ❑ No ❑ NA NE maintenance or improvement? 11. Is there evidence of incorrect land application?If yes,check the appropriate box below. ❑ Yes ❑ No ❑ NA [%NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals(Cu,Zn,etc.) TT ❑ PAN ❑ PAN> 10%or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12.Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ❑ No ❑ NA NE 15.Does the receiving crop and/or land application site need improvement? ❑ Yes ❑ No ❑ NA "N�CCC NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes ❑ No ❑ NA [(NE acres determination? 17.Does the facility lack adequate acreage for land application? ❑ Yes ❑ No ❑ NA ��/NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes ❑ No ❑ NA I X NE Reauired Records&Documents 7 19.Did the facility fail to have the Certificate of Coverage&Permit readily available? ❑ Yes ❑ No ❑ NA NE 20.Does the facility fail to have all components of the CAWMP readily available?If yes,check ❑ Yes ❑ No ❑ NA NE the appropriate box. ❑WUP ❑Checklists ❑Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement?If yes,check the appropriate box below. ❑ Yes ❑ No ❑ NA NE ❑Waste Application ❑Weekly Freeboard ❑Waste Analysis ❑Soil Analysis ❑Waste Transfers ❑Weat er Code ❑Rainfall O Stocking ❑Crop Yield ❑120 Minute Inspections ❑Monthly and 1" Rainfall Inspections ❑Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ❑ No ❑ NA JZ NE 23.If selected,did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NA ly NE Page 2 of 3 214120I5 Continued F;cil ity Number: jDate of Inspection:— 24.Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ❑ No ❑ NA NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes,check ❑ Yes ❑ No ❑ NA E the appropriate box(es)below. ❑Failure to complete annual sludge survey [—]Failure to develop a POA for sludge levels ❑Non-compliant sludge levels in any lagoon List structure(s)and date of first survey indicating non-compliance: 26.Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes ❑ No ❑ NA E 27. Did the facility fail to secure a phosphorus loss assessments(PLAT)certification? ❑ Yes ❑ No ❑ NA tNE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes ❑ No ❑ NA NE and report mortality rates that were higher than normal? 29.At the time of the inspection did the facility pose an odor or air quality concern? Yes ❑ No ❑ NA If yes,contact a regional Air Quality representative immediately. 30.Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes ❑ No ❑ NA X NE permit?(i.e.,discharge, freeboard problems,over-application) 31. Do subsurface tile drains exist at the facility?If yes,check the appropriate box below. ❑ Yes ❑ No ❑ NA 0 NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA XNE 33.Did the Reviewer/Inspector fail to discuss review/inspection with an on-site representative? ❑ Yes .,nj No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes 10 No ❑ NA ❑ NE Comments(refer to question#):Explain any YES answers and/or any additional recommendations or any other comments. Use drawings off facility to betterexplain situations(use additional pages as necessary). A (Ai4 �1�(,fY ' �l �I 1�LIc'� L( �n � Yl � ��V�S�e GM Sep ►ill r✓fi wl^ � t- rr II GE I C Elm wcis b-eA � �, r�-ed fir �uVl fna , � ka LR ) Reviewer/Inspector Name: r� I I v�^ 14 V t Phone: Reviewer/Inspector Signature: Date: Page 3 of 3 2 /2015