Loading...
HomeMy WebLinkAbout20190414 Ver 1_PCN Form Submission_20190404D1�VR �irlslan af Water Resources Initial Review Pre-Construction Notification (PCN) Form September 29, 2018 Ver 3 Has this project met the requirements for acceptance in to the review process?* F Yes C' No Is this project a public transportation project?" � Yes r No Change only rf needed. BIMS # Assigned * 20190414 Is a payment required for this project?* f• No payment required f Fee received f Fee needed - send electronic notification Select Project Reviewer" Donna Hood:eads\drhood Information for Initial Review 1a. Name of project: Replace Bridge No. 358 on SR 2149 (Buford Short Cut Road). 1a. Who is the PrimaryContact?* Larry Thompson, NCDOT Division 10 1b. PrimaryContact Email:* Ithompson@ncdot.gov Date Submitted 4/4/2019 Nearest Body of Water Adams Branch Basin Yadkin-PeeDee Water Classification WS-IV Site Coordinates Latitude: 34.919038 A. Processing Information County (or Counties) where the project is located: Union Is this project a public transportation project?* r Yes r No Is this a NCDOT Project?* G Yes r No (NCDOT only) T.I.P. or state project number: 17BP.10.R.118 WBS # (�) 17BP.10.R.118 1a. Type(s) of approval sought from the Corps: Ve rsion# * 1 Reviewing Office * Mooresville Regional Office - (704) 663-1699 1c. PrimaryContact Phone:* (704)938-4400 Longitude: -80.555250 :: rJ Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What type(s) of permit(s) do you wish to seek authorization? fJ Nationwide Permit (NWP) r Regional General Permit (RGP) r Standard (IP) 1c. Has the NWP or GP number been verified bythe Corps? C' Yes r No Nationwide Permit (NWP) Number: NWP Numbers (for multiple NWPS): WA 1d. Type(s) of approval sought from the DWR: fJ 401 Water Quality Certification - Regular r' Non-404 Jurisdictional General Permit r Individual Permit 03 - Maintenance 1e. Is this notification solelyfor the record because written approval is not required? Forthe record onlyfor DWR401 Certification: For the record onlyfor Corps Permit: 1f. Is this an after-the-fact permit application?* � Yes r No 1g. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? C' Yes r No 1g. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? � Yes r No Acceptance LetterAttachment 1h. Is the project located in any of NC's twenty coastal counties? C' Yes r No 1j. Is the project located in a designated trout watershed? � Yes r No B. Applicant Information 1d. Who is applying for the permit? fJ Owner r Applicant (other than owner) 1e. Is there an Agent/Consultant for this project? f Yes r No 2. Owner Information 2a. Name(s) on recorded deed: North Carolina Department of Transportation 2b. Deed book and page no.: IWA 2c. Responsible party: fWA 2d. Address Street Address 716 W Main St. Address Line 2 �Y Albemarle Fbstal / Zip Code 28001 2e. Telephone Number: (704)983-4400 2g. Email Address:* r 401 Water Quality Certification - E�ress r Riparian Buffer Authorization State / Aovince I F�gion NC Country Stanly 2f. Fax Number: (704)982-3146 x C' Yes R No C' Yes G No Ithompson@ncdot.gov C. Project Information and Prior Project History " I 1. Project Information 1b. Subdivision name: (if appropriate) WA 1c. Nearest municipalityl town: Monroe 2. Project Identification 2a. Propertyldentification Number: N/A 2c. Project Address Street Address SR 2149 (Buford Short Cut Road) Address Line 2 �Y Monroe Fbstal / Zip Code 28112 3. SurFace Waters 3a. Name of the nearest body of water to proposed project:" Adams Branch 3b. Water Resources Classification of nearest receiving water:* WS-IV 3c. What river basin(s) is your project located in?* Yadkin-PeeDee 3d. Please provide the 12-digit HUC in which the project is located. 030401050504 4. Project Description and History 2b. Property size: 3.4 Stzte / FYovince I Region NC Cauntry Union 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* Land use in the project vicinity consists primarily of agriculture, forests, and single family residential homes. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?* C' Yes r No r Unknown 4d. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) Fig_2_17BP_10_R_118_USGS_topo_map.pdf 263.57KB 4e. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) 17BP.10.R.118 Soil Map.pdf 159.61 KB 4f. List the total estimated acreage of all existing wetlands on the property: 0.02 4g. List the total estimated linear feet of all existing streams on the property: 487 4h. Explain the purpose of the proposed project:" To replace Union County bridge No. 358 on SR 2149 (Buford Short Cut Road) 4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:* The proposed replacement structure is a single span bridge (1 @65') 24" cored slab deck with 4' deep caps. The structure has been designed to minimize environmental impacts by using 2:1 slopes. Standard construction equipment will be used including hucks, bulldozers, and cranes. Stream bank stabilization will be limited to those areas where ewsting bridge headwalls will be removed. 4j. Please upload project drawings for the proposed project. V BP.10.R.11 S_HYD_PRM_WET_SET.pdf 5. Jurisdictional Determinations 1.69 MB Sa. Have the wetlands or streams been delineated on the property or proposed impact areas?" r Yes Comments r No 5b. If the Corps made a jurisdictional determination, what type of determination was made?* C' Preliminary r Approved F Not Verified � Unknown r WA Corps AID Number: Sc. If Sa is yes, who delineated the jurisdictional areas7 Name (if known): Sara Easterly Agency/Consultant Company: HDR Other: Sd1. Jurisdictional determination upload 6. Future Project Plans S. name * 6a. Is this a phased project?* C' Yes r No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activit�/? WA D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): r Wetlands II� Streams-tributaries r Open Waters Ir Pond Construction 3. Stream Impacts � 3a. Reason for impact (:�i 3b.lmpact type * 3c. Type of impact* g� Excavation Permanent Stabiliration gy Dewatering for construction Temporary Dewatering C' Unknown r Buffers 3e. Stream Type * 3f. Type of (?) �Jurisdiction* Branch Perennial Branch Perennial 3i. Total jurisdictional ditch impact in square feet: 0 3i. Total permanent stream impacts: 3i. Total temporary stream impacts: 37 117 3i. Total stream and ditch impacts: 154 3j. Comments: Permanent existing channel impacts at Site 1(Adams Branch) are expected to be 37 feet, with 117 feet of temporary impacts. Site 1(Adams Branch) is the only stream onsite with impacts. E. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: The project has been designed to minimize stream impacts by utiliang 2:1 slopes. Channel improvements were made for the proposed bridge design, the excavation associated with Ihe channel improvements was kept to a minimum to reduce stream impacts. Three ditches are proposed on the site, all of the ditches are to be rip-rapped lined at the outlets to prevent channel/bank erosion. 1b. Specificallydescribe measures taken to avoid or minimize the proposed impacts through construction techniques: NCDOT Best Management Practices for bridge replacement projects will be followed as well as Sedimentation and Erosion Control measures. �3g. S. width* 3h. Impact length * 1� 37 Average (feet) Qinear feet) 15 1117 Average (feet) � pinear feet) � 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? � Yes r No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: Impacts are belowthe NW 3 threshold. F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? � Yes r No If no, explain why: The project is in the Yadkin-Pee Dee River basin. No buffer rules exist for this river basin. 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* r Yes r No Comments: See attached to permit drawings. G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federallstate) land?* r Yes r No �, 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental PolicyAct (NEPAISEPA)?" � Yes r No Comme nts: * An environmental document was not required for this project. 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15ANCAC 2B .0200)? * C' Yes r No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality?" � Yes r No 3b. If you answered "no," provide a short narrative description. This is a bridge replacement project. No additional development will result from this bridge replacement. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* C' Yes r No C' fWA 5. Endangered Species and Designated Critical Habitat (Corps Requirement) Sa. Will this project occur in or near an area with federally protected species or habitat?* � Yes r No Sb. Have you checked with the USFWS concerning Endangered Species Act impacts?" � Yes r No Sc. If yes, indicate the USFWS Field Office you have contacted. Asheville Sd. Is another Federal agency involved?" � Yes r No � Unknown Se. Is this a DOT project located within Division's 1-8? C' Yes r No 5f. Will you cut any trees in order to conduct the work in waters of the U.S.? r Yes �' No Sg. Does this project involve bridge maintenance or removal? � Yes r No Sg(1). If yes, have you inspected the bridge for signs of bat use such as staining, guano, bats, etc.7 C' Yes r No If you answered "Yes" to 5g(1), did you discover any signs of bat use? C' Yes r No � Unknown Sh. Does this project involve the construction/installation of a wind turbine(s)?* C' Yes r No Si. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? � Yes r No If yes, please provide details to include type of percussive activity, purpose, duration, and specific location of this activity on the property. Sj. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat7 USFWS IPAC Consultation Documentation Upload 17BP.10.R.118_NHP Report.pdf 17 BP.10. R.118_Self_Certification_Packag e_032819. pdf 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat? * f Yes r No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat? * National Marine Fisheries Service (NMFS) Mapper 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 761.42KB 1.16MB 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?* C' Yes r No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* The State Historic Preservation Office (SHPO) 7c. Historic or Prehistoric Information Upload 18-12-0026_NoSurvey.pdf 3.68M6 R.118 No Archaeological Survey Required Form Br No 358 SR 2149 Buford Shortcut Rd Union.pdf 2.45MB 8. Flood Zone Designation (Corps Requirement) Sa. Will this project occur in a FEMA-designated 100-year floodplain?* � Yes r No Sb. If yes, explain how project meets FEMA requirements: The project is meeting FEMA requirements by lowering the 100-YR (Base Flood Elevation) 0.6 feet. Sc. What source(s) did you use to make the floodplain determination?* NC Floodplain Mapping Miscellaneous Comments Please note NLEB is not listed for Union County per the USFWS county list last updated on June 27, 2018. Also, the field visit for 17BP.10.R.118 was conducted on November 1, 2018, just one day outside of the optimal survey window of October 31 for Schweinitzs sunflower (Helianthus schweinitii) and Michau�fs sumac (Rhus michauxii). Per the NCNHP report there were no known occurrences of Schweinitzs sunflower or Michauxs sumac within a one mile radius of Ihe project site. Surveys for Carolina heelsplitter (Lasmigona decorata) have been requested; however, may be deemed unnecessary for the project. Miscellaneous attachments not previouslyrequested. Signature * rJ By checking the box and signing below, I certify that: • I have given true., accurate, and complete information on this form; • I agree that submission of this PCN form is a"transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AcY'); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); . n� . I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the PCN form. Full Name: Larry Thompson Signature r�l� f �i.'f (-'//�Cf9��Ch�-dR! Date 4/4/2019