Loading...
HomeMy WebLinkAbout310064_Structure Evaluation_20181023 (OrDivision of Water Resources Facility Number � - O Division of Soil and Water Conservation V/ O Other Agency Type of Visit: O Compliance Inspection 0 Operation Review Structure Evaluation p Technical Assistance Reason for Visit: O Routine O Complaint CN"Follow-up O Referral 0 Emergency O Other 0 Denied Access Date of Visit: jp(_� 5� Arrival Time: Departure Time: 3.00 County: Region: Farm Name: IJIZjj� ��rjk5cw) V:aL P� \ Owner Email: Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: Title: Phone: Onsite Representative: Integrator: Certified Operator: Certification Number: Back-up Operator: Certification Number: Location of Farm: Latitude: Longitude: Design Current Design Current Design Current Swine Capacity Pop. Wet Poultry Capacity Pop. Cattle Capacity Pop. Wean to Finish I<ncr Dairy Cow Wean to Feeder Non-1 aver Dairy Calf Feeder to Finish Dairy Heifer Farrow to Wean Design Current Dry Cow Farrow to Feeder Dry Poultry Capacity Pop. Non-Dairy Farrow to Finish Layers Beef Stocker Gilts Non-Layers Beef Feeder Boars Pullets Beef Brood Coxa Turkeys Other Turkey Poults Othcr Other Discharees and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes 1xNo ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NA ❑ NE b. Did the discharge reach waters of the State?(If yes,notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State(gallons)? d. Does the discharge bypass the waste management system?(If yes,notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE 2.Is there evidence of a past discharge from any part of the operation? ❑ Yes ® No ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes No ❑ NA ❑ NE of the State other than from a discharge? Page I of 3 21412015 Continued Facility Number: 31 - Date of Inspection: O-1 Waste Collection&Treatment 4. Is storage capacity(structural plus storm storage plus heavy rainfall)less than adequate? ❑ Yes 'rVF H^ No ❑ NA ❑ NE a. If yes,is waste level into the structural freeboard? ❑ Yes 'r❑- No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: 3 Spillway?: Designed Freeboard(in): Observed Freeboard(in): 3 1 3_2 33 5.Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes [F/f No ❑ NA ❑ NE (i.e.,large trees,severe erosion,seepage,etc.) 6.Are there structures on-site which are not properly addressed and/or managed through a ❑ Yes Qj No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes,and the situation poses an immediate public health or environmental threat,notify DWR 7.Do any of the structures need maintenance or improvement? ❑ Yes 0 No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes W No ❑ NA ❑ NE (not applicable to roofed pits,dry stacks,and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers,setbacks,or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application?If yes,check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Pending ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals(Cu,Zn,etc.) ❑ PAN ❑ PAN> 10%or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12.Crop Type(s): 13.Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ❑ No ❑ NA NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ❑ No ❑ NA NE 16.Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes ❑ No ❑ NA NE acres determination? 17.Does the facility lack adequate acreage for land application? ❑ Yes ❑ No ❑ NA [10 NE 18.Is there a lack of properly operating waste application equipment? ❑ Yes ❑ No ❑ NA M NE Required Records& Documents 19. Did the facility fail to have the Certificate of Coverage& Permit readily available? ❑ Yes ❑ No ❑ NA [4 NE 20.Does the facility fail to have all components of the CAWMP readily available? If yes,check ❑ Yes ❑ No ❑ NA ® NE the appropriate box. ❑WUP []Checklists ❑Design ❑Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement?If yes,check the appropriate box below. ❑ Yes ❑ No ❑ NA ® NE ❑Waste Application ❑Weekly Freeboard ❑Waste Analysis ❑Soil Analysis ❑Waste Transfers ❑Weather Code ❑Rainfall ❑Stocking ❑Crop Yield ❑120 Minute Inspections ❑Monthly and 1" Rainfall Inspections ❑Sludge Survey 22.Did the facility fail to install and maintain a rain gauge? ❑ Yes ❑ No ❑ NA [g NE 23. If selected,did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NA [P NE Page 2 of 3 21412015 Continued Facility Number: Date of Inspection: 24.Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ❑ No ❑ NA [V NE 25.Is the facility out of compliance with permit conditions related to sludge? If yes,check ❑ Yes ❑ No ❑ NA C� NE the appropriate box(es)below. ❑Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels ❑Non-compliant sludge levels in any lagoon List structure(s)and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes ❑ No ❑ NA ONE 27. Did the facility fail to secure a phosphorus loss assessments(PLAT)certification? ❑ Yes ❑ No ❑ NA M NE Other Issues 28.Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes ❑ No ❑ NA [] NE and report mortality rates that were higher than normal? 29.At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA M NE If yes,contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the C Yes ❑ No ❑ NA ❑ NE permit?(i.e.,discharge,freeboard problems,over-application) �'" 31. Do subsurface tile drains exist at the facility?If yes,check the appropriate box below. ❑ Yes ❑ No ❑ NA M NE ❑ Application Field ❑ Lagoon/storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA [A NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on-site representative? ❑ Yes �0 No ❑ NA ❑ NE 34.Does the facility require a follow-up visit by the same agency? ❑ Yes ® No ❑ NA ❑ NE Comments(refer to question#): Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations(use additional pages as necessary). Loon L I - 31 " �9 -32 3- 3 3 0'46 4 n-o+\s D W K ah-et- S4-oriw, ay i� 5� fii 4evos Gd 3 - , , �,9�� F� s -lam abler �b ��5&d 4b Reviewer/Inspector Name: I V L fig(�/ Phone: 1D 7C16—73 Reviewer/Inspector Signature: ��/'d_— Date: Page 3 of 3 21412015