HomeMy WebLinkAbout310063_Compliance Inspection_20181026 Division of Water Resources
Facility Number I� - 0 Division of Soil and Water Conservation /
0 Other Agency /
Type of Visit: Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance
Reason for Visit: Wkoutine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other
� 0 Denied Access
Date of Visit:yc4c�
Arrivlal Time rDeparture Timer County: �JL4101 i,� Region:Farm Name: ` af-A �(✓r Owner Email:
Owner Name: Phone:
Mailing Address:
Physical Address:
Facility Contact: ` �•._ Title: Phone:
Onsite Representative: �.6. v`1 Integrator:
Certified Operator: Certification Number:
Back-up Operator: Certification Number:
Location of Farm: Latitude: Longitude:
Design Current Design Current Design Current
Swine Capacity Pop. Wet Poultry Capacity Pop. Cattle Capacity Pop.
Wcan to Finish I 11,ayer I I I Dairy Cow
Wean to Feeder I jNon-La er I I I Dairy Calf
Feeder to Finish 5 32 Dairy Heifer
Farrow to Wean Design Current Dry Cow
Farrow to Feeder Dry Poultry Capacity Pop. Non-Dairy
Farrow to Finish Layers Beef Stocker
Gilts Non-Layers Beef Feeder
Boars Pullets Beef Brood Cow
Turkeys
Other Turkey Pouets
Ocher Other
Discharees and Stream Impacts
1. Is any discharge observed from any part of the operation? ❑ Yes No ❑ NA ❑ NE
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: ���,`"`CCCC
a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NA ❑ NE
b. Did the discharge reach waters of the State?(If yes,notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE
c. What is the estimated volume that reached waters of the State(gallons)?
d. Does the discharge bypass the waste management system?(If yes,notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE
2. Is there evidence of a past discharge from any part of the operation? ❑ Yes No ❑ NA ❑ NE
3.Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes /No ❑ NA ❑ NE
of the State other than from a discharge?
Page 1 of 3 21412015 Continued
Facility Number: jDate of Inspection: lA
Waste Collection&Treatment
4.Is storage capacity(structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes No ❑ NA ❑ NE
a. If yes,is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Identifier: 11 -2—
Spillway?:
Designed Freeboard(in):
Observed Freeboard(in): � 31
5.Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No ❑ NA ❑ NE
(i.e.,large trees,severe erosion,seepage,etc.)
6.Are there structures on-site which are not properly addressed and/or managed through a ❑ Yes [ r No ❑ NA ❑ NE
waste management or closure plan?
If any of questions 4-6 were answered yes,and the situation poses an immediate public health or environment
al threat,notify DW R
7. Do any of the structures need maintenance or improvement? ❑ Yes ❑ NA ❑ NE
8. Do any of the structures lack adequate markers as required by the permit? ❑ Yeso ❑ NA ❑ NE
(not applicable to roofed pits,dry stacks,and/or wet stacks)
9.Does any part of the waste management system other than the waste structures require ❑ Yes h No ❑ NA ❑ NE
maintenance or improvement?
Waste Application
10.Are there any required buffers,setbacks,or compliance alternatives that need ❑ Yes KNo ❑ NA ❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application?If yes,check the appropriate box below. ❑ Yes No ❑ NA ❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals(Cu,Zn,etc.)
❑ PAN ❑ PAN> 10%or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area
12.Crop Type(s):
13.Soil Type(s):
14.Do the receiving crops differ from those designated in the CAWMP? ❑ Yes rNo ❑ NA ❑ NE
15.Does the receiving crop and/or land application site need improvement? ❑ Yes ,KNo ❑ NA ❑ NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes 41No ❑ NA ❑ NE
acres determination? Tom'
17.Does the facility lack adequate acreage for land application? ❑ Yes 9No ❑ NA ❑ NE
18.Is there a lack of properly operating waste application equipment? ❑ Yes IX V No ❑ NA ❑ NE
uired Records& Documents
19. id the facility fail to have the Certificate of Coverage&Permit readily available? Yes ❑ No ❑ NA ❑ NE
20.Does the facility fail to have all components of the CAWMP readily available?If yes,check ❑ Yes P No ❑ NA ❑ NE
the appropriate box.
❑WUP ❑Checklists ❑Design ❑ Maps ❑ Lease Agreements ❑Other.
21.Does record keeping need improvement?If yes,check the appropriate box below. ❑ Yes ONo ❑ NA ❑ NE
❑Waste Application ❑Weekly Freeboard ❑Waste Analysis ❑Soil Analysis ❑Waste Transfers ❑Weather Code
❑Rainfall ❑Stocking ❑Crop Yield ❑120 Minute Inspections ❑Monthly and 1" Rainfall Inspections ❑Sludge Survey
22.Did the facility fail to install and maintain a rain gauge? ❑ Yes No ❑ NA ❑ NE
23.If selected,did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes 11pC�7T1 No ❑ NA ❑ NE
Page 2 of 3 21412015 Continued
Facili Number: - Date of Inspection: ct
A Did the facility fail to calibrate waste application equipment as required by the permit? Yes No ❑ NA ❑ NE
25. Is the facility out of compliance with permit conditions related to sludge? If yes,check ❑ Yes No ❑ NA ❑ NE
the appropriate box(es)below.
❑Failure to complete annual sludge survey [—]Failure to develop a POA for sludge levels
❑Non-compliant sludge levels in any lagoon
List structure(s)and date of first survey indicating non-compliance:
26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes 9No ❑ NA ❑ NE
27. Did the facility fail to secure a phosphorus loss assessments(PLAT)certification? ❑ Yes ❑ No 9NA
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes No ❑ NA ❑ NE
and report mortality rates that were higher than normal? 0
29.At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes K No ❑ NA ❑ NE
If yes,contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes N�No ❑ NA ❑ NE
permit?(i.e.,discharge, freeboard problems,over-application)
31.Do subsurface tile drains exist at the facility?If yes,check the appropriate box below. ❑ Yes ❑ No ❑ NA NE
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32.Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes �No ❑ NA ❑ NE
33.Did the Reviewer/Inspector fail to discuss review/inspection with an on-site representative? ❑ Yes No ❑ NA ❑ NE
34.Does the facility require a follow-up visit by the same agency? ❑ Yes No ❑ NA ❑ NE
Comments(refer to question #): Explain any YES answers and/or any additional recommendations or any other comments.
Use drawings of facility to better explain situations(use additional pages as necessary).
GIs
cN aiV trtv-�� t,�, re earn;,
Reviewer/Inspector Name: Phone:
Reviewer/Inspector Signature: Date:
Page 3 of 3 214120 1 S