Loading...
HomeMy WebLinkAbout820398_ENFORCEMENT_20171231NORTH CAROLINA Department of Environmental Qual II 4 ` NCDENR North Carolina Department of Environment and Natural Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Governor Director AQUIFER PROTECTION SECTION September 8, 2010 CERTIFIED MAIL RETURN RECEIPT REQUESTED Ralph E. Piercy 4301 Union School Rd. Clinton NC 28328 Subject: NOTICE OF DEFICIENCY / NOD -2010 -PC -0999 R&VFarms AWS820398 Sampson County Incident No. 201000969 Dear Mr. Piercy: 1// Resources Dee Freeman Secretary On February 26, 2010; staff of the NC Division of Water Quality (DWQ), Aquifer Protection Section (APS) were notified by Ralph Piercy of a high freeboard level in the lagoon 1. We wish to thank Mr. Piercy for notifying DWQ of this incident. As a result of this incident, you are hereby notified that, having been permitted to have a non -discharge permit for the subject animal waste disposal system pursuant to 15A NCAC 2T Section .1300, you have been found to be in violation of your Certified Animal Waste Management Plan and the Swine Waste System General Permit No. AWG 100000 that you are covered to operate under, as follows: Deficiency 1: Failure to maintain waste levels in your lagoon/storage ponds in accordance with the facility's Certified Animal Waste Management Plan in accordance with Condition V. 2. of Swine Waste System General Permit No. AWG 100000. On February 26, 2010 a lagoonJstorage pond level was documented at 17.00 inches in lagoon 1. A level of 19 inches is the maximum level allowed by your permit and Certified Animal Waste Management Plan. North Carolina Division of Water Quality Intemet: www.newatercluality.org 225 Green St., Ste. 714 Phone: 910-433-3300 Fayetteville, NC 28301 FAX 910-486-0707 An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper No hCarolina ;Vaturall# Mr. Piercy September 8, 2010 Page 2 Required Corrective Action for Deficiency 1: DWQ has received a copy of your 30 Day Plan of Action (POA) for the high freeboard occurrence. Take all necessary additional steps to insure lagoon levels remain in compliance with Section 2 of your permit. A compliance inspection was done 08/30/2010 and all records were reviewed and the date and time lagoon 1 was returned to compliance on 03/01/2010 If you have any questions concerning this notice, please contact me at (910)-433-3300. Sincerely, Steve Guyton Environmental Specialist Fayetteville Regional Office cc: Keith Larick, CAFO Unit Sampson Soil and Water Conservation District NCDSWC-FRO FRO Compliance Animal Files Prestage Farms 02/28/2010 02:57 Fax 19105965799 PRESTAGE A To: Ricky Revels From' Glenn Clifton Fac Pages: 4 Phone: 91096-5749 Date: 2126110 Re: 30 dayPOA cc: Q Urgent X For Review O Please Comment ❑ Please Reply ❑ Please Recycle e Conumnts: Mr. Piercy's 30 days ends 3/1 OM10 PAGE 01 C12/28/2010 02:57 19105965799 PRESTAGE A PAGE 02 PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 82-398 Facility Name; R & V 1&2 Certified Operator Name- Ralph Piercy County: Sampson Operator Number 17885 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoon9 with" spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Lagoon Name/ID: 1 Spillway(Y or N); N Level(inches): 16 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to be pumped and hauled is reflected in section III tables, Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWO prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. 'Attach a complete schedule with corresponding animal units and dates fro depopulation `if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: I hereby certify that 1 have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and abiliry, the information is accurate and correct Phone: 910 - 592 4;04 - Facility Owner/Ma ager (prin G� Date. Z 1_4 1Ia Facility Owner ager (signature 0212812019 02:57 19105965799 PRESTAGE A PAGE 03 . .l II. TOTAL. POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD ANDIOR 25 YR.124 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY q. crop 1. Structure ID: 1 line m = 1182.9 Ib PAN 2. Structure ID: line m = Ib PAN 3, Structure ID: line m = Ib PAN 4. Structure ID: line m = Ib PAN 5. Structure ID; line m = Ib PAN 6. Structure ID: line m = Ib PAN n. Gnes1+2+3+4+b+g- 1182.9 Ib PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING TRIS 30 DAY PERIOD. o. tract # p, field # q. crop r. acres c remaining IRR L TOTAL PAF! 2 PAN balance BALANCE FOR (Ibrarxe) FIELD (Ibg_) aolurm r x s u. appligati0n window' 9779 1 SG -OS 4.84 50.00 242.0 OCT -MAR 9776 4 SG -OS 2.61 45.00 117.5 OCT -MAR 9775 7 SG -OS 1.86 50.00 93.0 OCT -MAR 9776 8 SG -OS 1.32 50.00 66.0 OCT -MAR 9776 1 CS -Graze 4,84 161.00 779.2 MAR-OCT15 9776 4 CB -Graze 2.61 161.00 420.2 MAR-OCT15 9776 7 CB -Graze 1.B6 161.00 299_5 MAR-OCT15 9776 8 CB -Graze 1.32 161.00 212,5 MAR-OCT15 v. I vial rAn avallauie Tor all TIe30$ joum OT Column q = IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) _ x. Crop's remaining PAN balance (line v from section Ill) _ Y. Overall PAN balance (w - x) 2�zy.J 10. PAN 1182.9 Ib_ PAN 2229.9 Ib. PAN -1047 Ib. PAN 02!28/2010 02:57 19105965799 PRESTAGE A 30 DAY DRAW DOWN PERIOD I, TOTAL. PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Namelldentdier (ID): 1 2, Current liquid volume In 25 yr.124 hr. storm storage & structural freeboard a. current liquid level according to marker 96.0 inches „;. b._designed 25 yr./24 hr. storm & structural freeboard 19.0 inches `6. line b - line a (inches in red zone) = 3.0 inches i r i t80' ,4dike surfam area according to design d. (area at below structural freeboard elevation) 302427 fe IV -i (Pi line c/12 x line d x 7.48 gallonslft' b65538 gallens 3_ Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 1 BO days g. volume of waste produced according to structural design F 44 772 ftp h. current herd *7-1-33-51 certified herd # 1355 actual waste produced = current herd # x line g - 44672 ft' certified herd # I, volume of wash water according to structural design ®fi' j. excess rainfall over evaporation according to design 28817 fo k. (lines h + i + j) x 7.48 x 30 daystline f= 91616 gallons 4. Total PAN to be land applied during draw down period I. rurtent waste analysis dated 02/17/2010 1.80 rn. ((lines e + k)11400) x line I = 1183 lbs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PAGE 04 r� i r i N C V