Loading...
HomeMy WebLinkAbout820365_INSPECTIONS_20171231NORTH CAROLINA Department of Environmental Qual il I:%, type 01 visit: ScMompliance Inspection V Operation Review U Structure Evaluation U Technical Assistance Reason for Visit: outine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: — —/ Arrival Time: Departure Time: � County: vLRegion: Farm Name: L3 a v, ra Owner Email: Owner Name: wet rr'fa`L,1 r -^TFT �---- Phone: Mailing Address: "- S U-) T, L V � (' ` —� Physical Address: Facility Contact: ,r Title: 6L4 �J rl Onsite Representative: G (�%!�� Integrator: Phone: 9 r� Certified Operator: T Certification Number: Back-up Operator: Location of Farm: Latitude: Certification Number: Longitude: Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) [:]Yes SNo ❑ NA ❑ NE ❑ Yes Design _ Current - ❑ NA Design Current DesignCurrent Swine Capacity Popp Wet Poultry oa grif-VIMPAR. Cattle Capacity Pap. Wean to Finish Layer Dai Cow Wean to Feeder Non -La er I Calf eeder to Finish %/ Dai Heifer Farrow to Wean Design Current Dry Cow Farrow to Feeder r :D . P,oultr Ca aci P,o Non -Dairy Farrow to Finish Layers Beef Stocker Beef Feeder Gilts Non -Layers Boars Pullets Beef Brood Cow - - Turkeys Other , ,F TurkeyPoults Other Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) [:]Yes SNo ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE [:]Yes ❑ No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (if yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes RLNo ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes [ No ❑ NA ❑ NE of the State other than from a discharge? Page I of 3 21412015 Continued . 1«acili Number: - 6_1 Date of Inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes f ,No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): C � Observed Freeboard (in): � (l '7 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes K! No C] NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on-site which are not properly addressed and/or managed through a ❑ Yes 2INo ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes .g No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes ;allo ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No [] NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes] No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes 1,1;�tNo ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus p Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): �z In a j e- /7' v r-'- � 13. Soil Type(s): jyK) A- I 2t 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes 11--1 No ❑ NA [–]NE 15. Does the receiving crop and/or land application site need improvement? [:]Yes g No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes ® No El NA E] NE acres determination? "� 17. Does the facility lack adequate acreage for land application? 18. Is there a lack of properly operating waste application equipment? Required Records & Documents ❑ Yes g No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes +� No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes ® No ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes _qNo ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I " Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes A No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes allo ❑ NA ❑ NE Page 2 of 3 2/4/2015 Continued Facili Number: - 6 I Date of Inspection: ` 24. Did the facility fail to calibrate waste application equipment as required by the permit? [-]Yes O_No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes allo ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non-compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on-site representative? 34. Does the facility require a follow-up visit by the same agency? Reviewer/Inspector Name: Reviewer/Inspector Signator Page 3 of 3 ❑ Yes No ❑ NA 0 NE ❑ Yes No ❑ NA ❑ NE ❑ Yes 2 No ❑ NA ❑ NE ❑ Yes [Q No ❑ NA ❑ NE ❑ Yes JEq No ❑ NA ❑ NE ❑ Yes 4 No ❑ NA ❑ NE [-]Yes Q No ❑ Yes Pq No ❑ Yes LEf-No ❑ NA ❑ NE ❑NA ❑NE ❑NA ❑NE ✓ 4 �QW W'2 j!/� Phone: Dater17 21412015 Type of Visit: ® Compliance Inspection 0 Operation Review O Structure Evaluation Q Technical Assistance Reason for Visit: ® Routine 0 Complaint O Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: ! / Arrival Time: /p ! !S Departure Time: O County: Se,,,4rjn Region: 1a Farm Name: �3TJ��dY S Fa L4- LLQ- _ Owner Email: Owner Name: rr-e j fir• Thi Or n 104 f Phone: Mailing Address: '% OR S w fyj e /"..I7r1 NG aka 8 Physical Address: Facility Contact: Gry ] rn A n Title: Onsite Representative: S a Certified Operator: xl'fer! Back-up Operator: Location of Farm: Latitude: Phone: J Integrator: T/'eSfa-G e Certification Number: ] tip j P1b� Certification Number: Longitude: Discharges and Stream Impacts L Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes. notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? ❑ Yes ❑"No ❑ NA D NE ❑ Yes D No ❑ NA ❑ NE ❑ Yes ❑ No [] NA Design Current +Design Current Design Current Swine F Capacity Pop. s Wet Poultry Capacity Pop. Cattle Capacity Pop. Wean to Finish La er Dai ry Cow Wean to Feeder Non -La er Dairy Calf eeder to Finish Ll o& s` - M Dairy Heifer Farrow to Wean`--' Design Current Dry Cow Farrow to Feeder D , �PLouI _Ca aeity Po , Non -Dairy Farrow to Finish, La ers Beef Stocker Gilts Non -La ers Beef Feeder Beef Brood Cow Boars Pullets Turkeys OtWE- � ��" Turkey Poults _ Other Other Discharges and Stream Impacts L Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes. notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? ❑ Yes ❑"No ❑ NA D NE ❑ Yes D No ❑ NA ❑ NE ❑ Yes ❑ No [] NA ❑ NE d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes ❑ No DNA ❑ NE ?. Is there evidence of a past discharge from any part of the operation? ❑ Yes D -No ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes ❑1No ❑ NA ❑ NE of the State other than from a discharge? Page I of 3 2/4/2015 Continued Facility\amber: g, -z - 3(, 1' Date of Inspection Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes Q No ❑ NA ❑ NE a. if yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: �� a Spillway?: Designed Freeboard (in): Observed Freeboard (in): 7r7 '' 3 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes �o ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on-site which are not properly addressed and/or managed through a ❑ Yes ❑'No ❑ NA ❑ NE waste management or closure plan? ❑ Yes [D -No ❑ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes ED No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes Q o ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) ❑ NE the appropriate box. 9. Does any part of the waste management system other than the waste structures require ❑ Yes []'lQo ❑ NA ❑ NE maintenance or improvement? 21. Does recorrd keeping need improvement'? If yes, check the appropriate box below, Nolr 4od L7 1:1 Yes El No Waste Application ❑ NE u.� 1-2 2 ❑ ❑ ekly FrMbOft.d❑ 1h*-astt? }sis ❑ Soil Analysis ❑ e ran e 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes ❑'No ❑ NA ❑ NE maintenance or improvement? 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes E] -<o 11. Is there evidence of incorrect land application? if yes, check the appropriate box below. ❑ Yes �o ❑ NA ❑ NE ❑ NA ❑ NE Page 2 of 3 ❑ P*N ❑ P, ibs_ ❑ T-eta�❑ Fdanure15judgg_Lu1o_13= Sod ❑ ❑E ❑ 11 12. Crop Type(s): CoSlf-a!f d ertn tld& - LLY , S na 1l �r/Ga �'n - He,,. 13. Soil Type(s): IG A , & o 14 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes e -f' o ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes [�No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes [0,No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application'? [:]Yes ❑-No ❑ NA EINE 18. Is there a lack of properly operating waste application equipment? ❑ Yes [D -No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes allo ❑ NA ❑ NE 20. Does the facility fail to tave all components of the CAWMP readily available? If yes, check ❑ Yes ❑ No ❑ NA ❑ NE the appropriate box. OWro UP ❑£4x� [:]Design [] 44atps ❑ ❑Other: 21. Does recorrd keeping need improvement'? If yes, check the appropriate box below, Nolr 4od L7 1:1 Yes El No ❑ NA ❑ NE u.� 1-2 2 ❑ ❑ ekly FrMbOft.d❑ 1h*-astt? }sis ❑ Soil Analysis ❑ e ran e ❑ Weaclser£a ❑ fttUf3+i- ❑ S+M�, ❑ U+)f�-� ❑ - ❑ 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes E] -<o ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes [D'No ❑ NA ❑ NE Page 2 of 3 2/4/2015 Continued Wicifity Number: Y2 - Date of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? Y-30-16 ❑ Yes [✓]'No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes E4ivo ❑ NA ❑ NE the appropriate box(es) below. y_.73 -,s ❑ rvey ❑ ❑ - pian s u List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes [B -No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No ❑ NA � Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes ❑rNo ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes �o ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes 62<o ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below_ ❑ Yes E3 <o ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes Ejj<o ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on-site representative? ❑ Yes [�Ko ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes I5 J o ❑ NA ❑ NE -'70 I0IcpsP t' /r, 14 _I Q>°s'g�► '� /?�4vr� bdof� AU1 C0'ML'e4 rel J -Ds... CrVyOl Ito u ll Cv4II`& k"u1 SAl B 10/0'jetj ''' lmGjr �dO. fGC..I �S c.�J�aJ�•=,9 S4vGv CU>r%rdl- ►n 4 'O/} Reviewer/Inspector Name: A C, P M 61-1 „ R4. Reviewer/Inspector Signature: Page 3 of 3 Phone: `1/v -Y 3 3 -"33op Date: Z! j 2/4/2015 (Type of Visit: QJC�outjne cc Inspection O Operation Review Q Structure Evaluation Q Technical Assistance I Reason for Visit: O Complaint O Follow-up O Referral O Emergency O Other O Denied Access Date of Visit: / Arrival Time:p l7 Departure Time: County: Region: Farm Name: ��ry', A P7#11 Jf-p2�cdlrn % /� Owner Email: Owner Name:/i' /� G'a✓"��r� Phone: Mailing Address: Physical Address: Facility Contact: Phone: Onsite Representative: �itd�r� Integrator: Certified Operator: 1 e/ -r-7 ca f `�%� Certification Number: 4&091 Back-up Operator: Certification Number: Location of Farm: Latitude: Longitude: Swine Wean to Finish Design Curren# Capacity Pop. Wet P.;oultry ` Layer Design -Capacity Current Pap. Design Current Cattle Capacity Pop. Dairy Cow Wean to Feeder Non -Layer Dairy Calf Feeder to Finish Farrow to Wean Farrow to FeederD 7 'i . Poul Design Ca aci Current P,o , Dairy Heifer Dry Cow Non -Dairy Farrow to Finish Layers Beef Stocker Gilts Non -Layers Beef Feeder Boars Pullets Turke Points Other ate.._. . Beef Brood Cow Other Other D_ischarzes and Stream impacts I . Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? [] Yes C3 -No [] NA ❑ NE [:]Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes allo ❑ Yes gEg No ❑ NA ❑ NE ❑ NA ❑ NE ❑ NA ❑ NE ❑ NA ❑ NE ❑NA ❑NE Page I of 3 214/2014 Continued Facility Number: - S Date of inspection: ❑ Yes No ❑ NA ❑ NE Waste Collection & Treatment ❑ Yes No ❑ NA ❑ NE ' 4. is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? Eg Yes ❑ No ❑ NA ❑ NE a. if yes, is waste level into the structural freeboard? ❑ Yes ❑ No E3NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 ❑ NE Identifier: 6 ` k� Spillway?: Designed Freeboard (in): !19, � Observed Freeboard (in): Z�� / b _ 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on-site which are not properly addressed and/or managed through a [] Yes No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR ~ 7. Do any of the structures need maintenance or improvement? ❑.Yes No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes RA No E] NA E] NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes [4 No [] NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes P] No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes allo ❑ NA ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.)) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop/ Window ❑ Evidence 'o-fWind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): ❑ NE i 13. Soil Type(s):' 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes � No ❑ NA E] NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes ® No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes ® No ❑ NA ❑ NE the appropriate box. ❑ WUP [:]Checklists ❑Design [] Maps ❑ Lease Agreements []Other: 21. Does record keeping need improvement? if yes, check the appropriate box below. ❑ Yes ® No ❑ Waste Application ❑ Weekly Freeboard []Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Rainfall ❑Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rainfall Inspections 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes � No 23. if selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? [—]Yes ® No ❑ NA ❑ NE ❑ Weather Code ❑ Sludge Survey ❑ NA ❑ NE ❑ NA ❑ NE Page 2 of 3 2/4/2014 Continued [Facility Number: - Date of Inspection: � l 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes �No 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes E No the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non-compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes EZ No 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes EZNo Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes ® No and report mortality rates that were higher than normal? 24. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes MNo If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes 12 No permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes CONo ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes allo 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on-site representative? ❑ Yes ® No 34. Does the facility require a follow-up visit by the same agency? ❑ Yes gjNo ❑ NA ❑ NE ❑ NA ❑ NE ❑ NA ❑ NE ❑ NA ❑ NE ❑ NA ❑ NE ❑ NA ❑ NE ❑ NA ❑ NE ❑ NA ❑ NE ❑ NA ❑ NE ❑ NA ❑ NE ❑ NA ❑ NE Commen#s .(refer to question ft Explain any YES answers and/or_ any additional recommendations or any other comments: Use drawings of facility to better ex law -situations use additional: pages as necessity).y ° 7�;V_ 1-5 a,;I- 17-z' 39 l /rlauJ !-� vim- L�s Reviewer/Inspector Name: Reviewer/Inspector Signature: Page 3 of 3 Phone: E Date: 2/4/2014 Type of Visit: (B'Compliance Inspection O Operation Review O Structure Evaluation O Technical Assistance Reason for Visit: ey, routine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access Date of Visit: LLQ Arrival Time:Q c'� Departure Time:' (� Countyry� Region: > (7 Farm Name: ( rn, A n PL t!D $ Owner Email: Owner Name: �V Phone: Mailing Address: Physical Address: Facility Contact: 7-r-- 1 (�Ge�<•� Title: ✓' Phone: Onsite Representative: 5'e4'e_ Integrator: /` u Certified Operator: - Certification Number: r V00r Back-up Operator: Location of Farm: Latitude: Certification Number: Longitude: Discharees and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes E(No ❑ NA ❑ NE ❑Yes 0 N 0 N 0 N E] Yes 0 N ❑NA 0 N c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? [:]Yes [&No ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters [:]Yes E No ❑ NA ❑ NE of the State other than from a discharge? Page I of 3 2/4/2014 Continued Design Current Design Current Design Current Swine -"Capacity Pop. Wet Poultry Capacity Pop. Cattle Capacity Pop. Wean to Finish La er Dai Cow Wean to Feeder Non -La er Dai Calf Feeder to Finish O� 1 y ........ Da' Heifer Farrow to Wean Design Current D Cow Farrow to Feeder Dr. P,ou1 Ca aci P,o Non -Da' Farrow to Finish Layers Beef Stocker Gilts Non -Layers Beef Feeder Boars Pullets rTBeef Brood Cow Turkeys Qther Turkey Poults Other Other Discharees and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes E(No ❑ NA ❑ NE ❑Yes 0 N 0 N 0 N E] Yes 0 N ❑NA 0 N c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? [:]Yes [&No ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters [:]Yes E No ❑ NA ❑ NE of the State other than from a discharge? Page I of 3 2/4/2014 Continued f FaciliNumber: - Date of inspection: ,090 t 1 Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes a. If yes, is waste level into the structural freeboard? ❑ Yes Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): g L 5. Are there any immediate threats to the integrity of any of the structures observed? (i.e., large trees, severe erosion, seepage, etc.) �No ❑ NA ❑ NE ❑ No ❑ NA ❑ NE Structure 6 ❑ Yes [0 No ❑ NA ❑ NE 6. Are there structures on-site which are not properly addressed and/or managed through a ❑ Yes R No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes [5g No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes [27No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes g] No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need [:]Yes allo ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes P3�.No ❑ NA ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. [] Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window [] Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): /c ��"�� / ❑ NE 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes [,'Z No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? [—]Yes ® No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes [ No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? 18. Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA [] NE ❑ Yes [] No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? [—]Yes ' No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes [g No ❑ NA ❑ NE the appropriate box. ❑ WUP ❑Checklists ❑ Design ❑ Maps [:]Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes ® No ❑ Waste Application ❑ Weekly Frecboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1 " Rainfall Inspections 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes JZNo 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? D Yes 5q No ❑ NA ❑ NE ❑ Weather Code ❑ Sludge Survey ❑ NA ❑ NE ❑ NA ❑ NE Page 2 of 3 2/412014 Continued Facility Number: jDate of Inspection: 1 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels ❑ Non-compliant sludge levels in any lagoon List structure(s) and date of fust survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes ® No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes No ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes ® No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes fSj No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes ® No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 3 L Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. [:]Yes 0 No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted W" cause non-compliance of the permit or CAWMP? 11 ❑ Yes ZL No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on-site representative? ❑ Yes ® No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes g No ❑ NA ❑ NE Comments (refer to question #) Explain any YES: answers,and/or any additional recommendations or any other coinneents Use drawrngs.of facility to better explain situations(use additional pages as necessary). ' `t Reviewer/Inspector Name: Reviewer/Inspector Signature: Page 3 of 3 Phone:�a—"7i -33C'C> Date: 2/4/2014 i iv"ision of Water Quality S --�- FacilityDivision of Sail aad Water Conservation 2M_MU--/3 J Other Agency Type of Visit: Qompliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: e Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: ArrivalTimed Cf.oD 1 Departure Time: County: Farm Name: &n pi 11 e) p 65/'P.* Owner Email: Owner Name:/'r'y /7? Cat- 725- Phone: Mailing Address: Region: Physical Address: �J Facility Contact: d+" �-�i' Title: �u/'hr'� Phone: Onsite Representative: �'� Integrator: Certified Operator: S'ct Certification Number: Back-up Operator: Certification Number: Location of Farm: Latitude: Longitude: Discharges and Stream Impacts 1. is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) ❑ Yes �To ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes [:]No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWQ) ❑ Yes ❑ No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes Callo ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes allo ❑ NA [] NE of the State other than from a discharge? Page 1 of 3 2/4/1011 Continued Design Current Design Current Design Current Swine Capacity' P�o:T Wet PoWtry Capacity Pop. Cattle Capacity Pop. Wean to Finish La er Dairy Cow Wean to Feeder Non -Layer Dairy Calf Feeder to Finish Dairy Heifer Farrow to Wean Design Current_ Dry Cow Farrow to Feeder D . P,oult . Ca aci Po Non -Dairy Farrow to Finish Layers Beef Stocker Gilts Nan -La ers jBeef Feeder Boars jPullets Beef Brood Cow Turkeys Other _ Turkey Poults Other Other Discharges and Stream Impacts 1. is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) ❑ Yes �To ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes [:]No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWQ) ❑ Yes ❑ No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes Callo ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes allo ❑ NA [] NE of the State other than from a discharge? Page 1 of 3 2/4/1011 Continued Facility Number: - Date of Inspection: - ` -- / Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes [g No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: ❑ Yes y No Designed Freeboard (in): / ❑ NE 18. Is there a lack of properly operating waste application equipment? Observed Freeboard (in):_ 3� No ❑ NA 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes Co No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on-site which are not properly addressed and/or managed through a ❑ Yes E[No ❑ NA ❑ NE waste management or closure plan? ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes 23 -No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): / �� 13. Soil Type(s): p - 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes t0, No E] NA F] NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ® No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable [:]Yes E�LNo [DNA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes y No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? [:]Yes [�jkNo ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes rMNo ❑ NA [3NE the appropriate box. ❑WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes F�SLNo ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1 " Rainfall Inspections 22. Did the facility fail to install and maintain a rain gauge? [—]Yes allo 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes & No E] NA ❑NE ❑ Weather Code [-]Sludge Survey ❑ NA ❑ NE C-] NA ❑NE Page 2 of 3 2/4/2011 Continued Facili Number: fr- 6 Date of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes [3 No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes Wo ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non-compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes tj�[ No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ® No ❑ NA ❑ NE Other ]issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes ® No ❑ NA ❑ NE and report mortality rates that were higher than normal? 24. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes 5INo ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes O No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes IM No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CA WMP? ❑ Yes [gNo ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on-site representative? ❑ Yes R No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes [S No ❑ NA ❑ NE Comments (refer to question: Explain any YES answers and/or any additional recommendations or any other,comments:- Use drawings of facilrtyit -better explain situations (use additional pages as necessary). .. Reviewer/Inspector Name: Reviewer/Inspector Signature: Page 3 of 3 Phone: Date: /rte f 2/4/2011 t ■ ype vi visit; vrt-ompuance inspecrnon v vperanon xeview V structure Evamanon V i ecnmcal Assistance Reason for Visit: 04routine O Complaint Q Follow-up () Referral O Emergency O Other O Denied Access Date of Visit:rrival__Time: ;"/s Departure Time: t! County: �cx.�t•— Farm Name_ f. n r► �T77E2U d !� 7—/,-2- Owner Email: Owner Name: // �/"r' y %'yJ G'��.�� Phone: —ems- - Mailing Address: Physical Address: Region: Z[ Facility Contact:, �rYy ��r Title: `1 G!J/r"— Phone: Onsite Representative: Integrator: ll� Certified Operator: _ s Certification Number: �Py 0 Back-up Operator: Certification Number: Location of Farm: Latitude: Longitude: Design Current ❑ No Design Current Design ❑ No ❑ NA Current Swine Capacity Pop. Wet Poultry Capacity Pop. Cattle Capacity Pop. Wean to Finish Layer Dairy Cow Wean to Feeder Non -Layer JDairy Calf eder to Finish Dairy Heifer Farrow to Wean Design Current Cow Farrow to Feeder Dry P,oult , Ca aci P,o P. —Dry Non -Dairy Farrow to Finish Layers Beef Stocker Gilts Non -Layers Beef Feeder Boars Pullets Beef Brood Cow Turkeys Uther Turkey Poults ML_Lther Other ,.: Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? ❑ Yes D?]_No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ Yes] No ❑ Yes ® No ❑ NA ❑ NE ❑ NA ❑ NE ❑ NA ❑ NE Page I of 3 2/4/2011 Continued FaciliNumber: - 3 Date of Inspection: 1 Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes a. If yes, is waste level into the structural freeboard? ❑ Yes Vj, No ❑ NA ❑ NE ❑ No ❑ NA ❑ NE Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: t — . 6-- ' Spillway?: Designed Freeboard (in): — 1 Observed Freeboard (in): .4E ;7-_ 33 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes S No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on-site which are not properly addressed and/or managed through a ❑ Yes ®. No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes ® No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? [:]Yes 0 No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need [:]Yes No ❑ NA ❑ NE maintenance or improvement? 11. is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes Jallo ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(S) Zr%'��.:�Se�s6�� 5 / l�rr`rn wee / D l S r 13. Soil Type(s): W 4 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes E.No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes r,No ❑ NA E] NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes a No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? 18. Is there a lack of properly operating waste application equipment? [—]Yes [0 No Q NA ❑ NE [] Yes ® No ❑ NA ❑ NE _Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes KNo ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check [:]Yes [2!�No ❑ NA ❑ NE the appropriate box. ❑ WUP ❑Checklists 0 Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? if yes, check the appropriate box below. ❑ Yes C.No ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rainfall Inspections 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes U, No 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes Lallo ❑ NA ❑ NE ❑ Weather Code ❑ Sludge Survey ❑NA ONE ❑NA ❑NE Page 2 of 3 21412011 Continued Facili Number: - I I Date of Inspection: " 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes C&No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes C3Yo ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non-compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: _ 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes No ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on-site representative? 34. Does the facility require a follow-up visit by the same agency? ❑ Yes r&No [DNA [:]NE ❑ Yes allo ❑ NA ❑ NE ❑ Yes [� No [DNA [:]NE [:]Yes EgNo ❑ NA ❑ NE ❑ Yes No ❑ Yes No ❑ Yes No ❑ NA ❑ NE ❑NA ❑NE ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any..'other ccommments: Use "drawn of facility to better explain situations (use additional pages as necessary). Reviewer/Inspector Name: Reviewer/Inspector Signature: Page 3 of 3 Phone: g/Q :]�(E-,350� Date:�- 2/4/2011 I. ivis�ankof�Water'Quality � , Facili Number - O Division of Soil and Water Conservation � 3 � - .Q Other'Agen�cy' Type of Visit:() -Compliance Inspection 0 Operation Review O Structure Evaluation 0 Technical Assistance Reason for Visit: outine Q Complaint O Follow-up O Referral O Emergency 0 Other Q Denied Access Date of Visit: -�- //A Arrival Time: p; pa Departure Time: County:.p Farm Name: V z/Yi TT rt r -L }4p t,= Fae,- — 7--I .�— Owner Email: Owner Name: V /' •L, ��Cf 'r/ Phone: Mailing Address: Physical Address: Region: ,l7 Facility Contact: Er -Lr y fir/ f `r�,� Title: agI4 Phone: Onsite Representative: '�-- -- Integrator: �/' Certified Operator: Certification Number: �D 08fi• Back-up Operator: Certification Number: Location of Farm: Latitude: Longitude: Discharzes and Stream Impacts I. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? [:]Yes Eg-.No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE d. Does the discharge bypass the waste management system? (If yes, notify DWQ) ❑ Yes ❑ No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? []Yes ® No ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes ® No ❑ NA ❑ NE of the State other than from a discharge? Page 1 of 3 2/4/2011 Continued $Design Current Design -Current Design Current Swine Capacrty Pop. Wet Poultry "!Capacity Pop Cat#le Capacity Ppp. Finish Layer Dai Cow Feeder Non -Layer Dai Calf Feedero Finish p 3 �, `` Dai Heifer o Wean EFarrow DesignnCurrent D Cow o Feeder D , Poultry 5* Ca acltv�,kiry Non -Da o Finish La ers Beef Stocker Non -La ers Beef Feeder Puliets Beef Brood Cow Turkeys OtherITurkey ?:vs Poults Other LjOther Discharzes and Stream Impacts I. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? [:]Yes Eg-.No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE d. Does the discharge bypass the waste management system? (If yes, notify DWQ) ❑ Yes ❑ No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? []Yes ® No ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes ® No ❑ NA ❑ NE of the State other than from a discharge? Page 1 of 3 2/4/2011 Continued Facility Number: jr6, Date of Inspection: ❑ Yes [0 No ❑ NA ❑ NE Waste Collection & Treatment ❑ Yes ❑ No ❑ NA ❑ NE 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes 2 No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 ❑ NA Identifier: the appropriate box. Spillway?: Designed Freeboard (in): Observed Freeboard (in): ` .3-o 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes El No ❑ NA ❑ N1✓ (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on-site which are not properly addressed and/or managed through a ❑ Yes [N No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? 0 Yes ❑ No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes ® No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes ® No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes ® No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes R] No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): /)o �f � } 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes allo ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes [ No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes [0 No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes ❑ No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes ® No ❑ NA [] NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes ® No ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. [:)Yes allo ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rainfall Inspections 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes Q No 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes Ej?[No ❑ NA ❑ NE ❑ Weather Code ❑ Sludge Survey ❑ NA ❑ NE ❑NA ❑NE Page 2 of 3 2/4/2011 Continued Facifity Number: - b Date of Inspection: / 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes 1 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes the appropriate box(es) below. I❑ Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels ® No DNA ❑ NE [g No ❑ NA ❑ NE ❑ Non-compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes ® No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes No ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes [Z No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes 10 No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes CK No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface file drains exist at the facility? if yes, check the appropriate box below. ❑ Yes ®,No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes UgNo ❑ NA ❑ NE 33. Did the Reviewer/inspector fail to discuss review/inspection with an on-site representative? ❑ Yes [a No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes F2�[No ❑ NA ❑ NE Reviewer/inspector Name: Reviewer/Inspector Signature: Page 3 of 3 Phone: 9VVi- / _T-- - T2pC> Date: 2/4/2011 rype of Visit Q Compliance Inspection Q Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit 0 Routine 0 Complaint 0 Follow up 0 Referral 0 Emergency 0 Other ❑ Denied Access Date of Visit: / /D Arrival Time: fJ Departure Time: jw County: R - L_ Region: Farm Name: Vaj�lei s 1 n 41)", Owner Email: Owner Name: _ (�� ✓ r 'f >�C f�`c✓- Phone: Mailing Address: Physical Address: Facility Contact: _T�'/y Title: /�.�+� Phone No: Onsite Representative: Integrator: Certified Operator: Operator Certification Number: Back-up Operator: Back-up Certification Number: Location of Farm: Latitude: =0 ❑ I =44 Longitude: =0=. e❑. 0 tl Design Current Design Current Design Current Swine Capacity Population . Wet Poultry Capacity Poplahon Cattle Capacity PopulafI tion ❑Wean to Finish ❑ Layer ❑ Dairy Cow ❑ Yes ❑ Wean to Feeder 10 Non -Layer I ❑ Dairy Calf b. Did the discharge reach waters of the State? (If yes, notify DWQ) Feeder to Finish o L - ❑ Dairy Heifer ❑ NE ❑ Farrow to Wean Dry.Poultry . ❑ Dry Cow ❑ Farrow to Feeder d. Does discharge bypass the waste management system? (If yes, notify DWQ) ❑ Non -Dairy ❑ No ❑ Farrow to Finish ❑ Layers ❑ Beef Stocker ❑ Yes ❑ Gilts ❑ Non -Layers El Beef Feeder ❑ Boars El Pullets ❑ Beef Brood Cowl ❑ NA ❑ Turkeys other than from a discharge? Other ❑ Turkey Poults ❑ Other 10 Other Number of Structures: Continued Discharees & Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes NA NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWQ) ❑ Yes ❑ No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) ❑ Yes ❑ No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes ®.No ❑ NA ❑ NE 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State ❑ Yes 91No ❑ NA EINE other than from a discharge? 12/28104 Continued Facility Number: Date of Inspection L Waste Collection & Treatment 13. Soil type(s) h p/* 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes 9,No ❑ NA EINE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination ? ❑ Yes Spillway?: ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? Designed Freeboard (in): J _ g No ❑ NA ❑ NE Observed Freeboard (in): _ Z9 3 '36, ❑ Yes ANo 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes (9 No ❑ NA EINE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on-site which are not properly addressed and/or managed ❑ Yes RNo ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? J4 Yes ❑ No ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes RNo [:INA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes 21No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes D,No ❑ NA ❑ NE maintenance/improvement? 1. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes O -No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s)ki r JCY 13. Soil type(s) h p/* 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes R No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes IM No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination ? ❑ Yes [, No ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes g No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes ANo ❑ NA ❑ NE MFUR- Comments (refer #o questeoda#) =Explain any YES answers andVor any recommendations or any other camments. Use. drawing of facilityEolb'etter-explain situations `(use: addtional;pag s asgecessaty) Reviewer/Inspector Name} ' '` = Phone: 9'7O Reviewer/Inspector Signature: Date: Page 2 of 3 12/28/04 Continued Facility Number: — Date of Inspection Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check the appropriate box. ❑ WUP ❑Checklists ❑Design ❑Maps El other ❑ Yes S -No ❑ NA ❑ NE ❑ Yes RNo ❑ NA ❑ NE 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes E -No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield [:1120 Minute Inspections ❑ Monthly and I" Rain inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? 23. if selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? 24. Did the facility fail to calibrate waste application equipment as required by the permit? 25. Did the facility fail to conduct a sludge survey as required by the permit? 26. Did the facility fail to have an actively certified operator in charge? 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on-site representative? 33. Does facility require a follow-up visit by same agency? ❑ Yes 9LNo ❑ NA ❑ NE ❑ Yes ERNo ❑ NA ❑ NE ❑ Yes L'No ❑ NA ❑ NE ❑ Yes JgNo ❑ NA ❑ NE ❑ Yes allo ❑ NA ❑ NE ❑ Yes C -No ❑ NA ❑ NE ❑ Yes (-No ❑ NA ❑ NE ❑ Yes allo ❑ NA ❑ NE ❑ Yes allo ❑ NA ❑ NE ❑ Yes [3No ❑ NA ❑ NE ❑ Yes UE�No ❑ NA ❑ NE ❑ Yes KNo ❑ NA ❑ NE 12/28/04 IF f L Type of Visit G'Gomplia ce Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit Routine 0 Complaint 0 Follow up 0 Referral 0 Emergency 0 Other ❑ Denied Access Date of Visit:;2-i Arrival Time: . �Dl� Departure Time: D - County: Tom" Region: Farm Name: I/:- i ,?ff11 _ Djt �dr�i 7 Owner Email: Owner Name: IraPhone: Mailing Address: Physical Address: Facility Contact:� -COLYb— Title: 67G161,2 if Phone No: Onsite Representative: 5== Integrator: at� Certified Operator: a`' -Q— Operator Certification Number: qzCd>b Back-up Operator: Back-up Certification Number: Location of Farm: Latitude: = o =I =" Longitude: = ° = I ❑ u Dischh es & Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes allo Design Current Design Current Design Current Swine Capacity Population V4'et Poultry C+opacity Population Cattle Capacity Population ❑ Wean to Finish ❑ Layer ❑ Dai Cow ❑ Wean to Feeder ❑ Non -Layer ❑ Dai Calf 19 Feeder to Finish D (v j ❑ Yes ❑ Dai Heifer ❑ Farrow to Wean Dry Poultry ❑ D Cow ❑ Farrow to Feeder ❑ Non -Dairy ❑ Farrow to Finish ❑ Layers El Beef Stocker ❑ Gilts El Non -Layers El Beef Feeder ❑ Boars 1:1 Pullets ❑ Beef Brood Cowl I ❑ NA ❑ Turkeys 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State Other ❑ Other ❑ Turkey Pouits IQ Other Number of Structures: ❑ NE L Dischh es & Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes allo ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWQ) ❑ Yes ❑ No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) ❑ Yes ❑ No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation'? ❑ Yes R No ❑ NA ❑ NE 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State ❑ Yes Z No ❑ NA ❑ NE other than from a discharge? 12/28/04 Continued Facility Number: — 34Sr Date of Inspection 4 Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes P5No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): /Z Observed Freeboard (in): ,7/ ,,K 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ large trees, severe erosion, seepage, etc.) ❑Yes �No [I NA El NE 6. Are there structures on-site which are not properly addressed and/or managed ❑ Yes ® No ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes ® No ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes ® No ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes ® No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes ® No ❑ NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes SNo ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) 13. Soil type(s) NQ k / C5-6 14. Do the receiving crops differ from those designated in the CA WMP? ❑ Yes �&NO ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement'? ❑ Yes J3No ❑ NA ❑ NE 16_ Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination ? ❑ Yes ® No ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes ® No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes O -No ❑ NA EINE ( ,. as in endabons or anyofhe m p Comments refer:to uestion Eit lain anv YES anst►ers and/or any recomm Wer."co Use draydngs of facility to better explain situations. (use additional pagesBess j � r ram &'3' lVew Reviewer/Inspector Name %��u Phone: Reviewer/inspector Signature: Date: 971 - 12/2$/04 Continued Facility Number: - Date of inspection g 4 Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes [Z No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes allo ❑ NA ❑ NE the appropriate box. ❑ WUP ❑ Checklists ❑Design [I Maps ❑Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes ® No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes UNo ❑ NA ❑ NE -23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ® No ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ® No ❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes ® No ❑ NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes CaNO ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes [allo ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes 29 No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes 9No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ERNo ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes [3 No ❑ NA ❑ NE General Pemtit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/inspector fail to discuss review/inspection with an on-site representative? ❑ Yes UNo ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes C -No ❑ NA ❑ NE 12%28/04 0 Type of VisitCoe Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit �outaine 0 Complaint 0 Follow up 0 Referral 0 Emergency 0 Other ❑ Denied Access Date of Visit: Arrival Time: Departure Time: ,� County: Region:. l Farm Name: rz n Hy Fa '-Pym 7 --Id2 Owner Email: Owner Name: 7-e- rr Y� �� r r'� Phone: Mailing Address: Physical Address: _ Facility Contact: fir` y r� Title: Onsite Representative: Certified Operator: Back-up Operator: Location of Farm: Phone No: Integrator: Operator Certification Number. Back-up Certification Number: Latitude: =0 = c= 6 0« Longitude: 0°= i it -11 I Design Cprreflt _ Design Current Design Current ❑ NE Capacity P,opulan W P� ry Capacity Population Cattle Capacity Population to Finishto 7�ean a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NA ❑ NE Feeder ❑ Yes ❑ Non -Layer ❑Dai Calf ❑ NE Feeder to Finish Iii- � Dry Pv_ultrT ❑ Dai Heifer ❑ D Cow ❑ Farrow to Wean ❑ Yes ❑ Farrow to Feeder ❑ NA -`�` ❑ Non -Dairy ❑Beef Stocker ❑ Beef Feeder ❑ Beef Brood Co ❑ Yes ❑ Farrow to Finish ❑ NA ❑ Gilts ❑ Boars ❑ Yes JSNo ❑ NA ❑ NE Other r ❑ Other h. 12/28/04 Number of Structures: Discharges & Stream Impacts ❑ Layers ❑ Non -La ers ❑ Pullets Turkeys s ❑Turke Points El Other 1. Is any discharge observed from any part of the operation? ❑ Yes ANo ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWQ) ❑ Yes ❑ No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) ❑ Yes ❑ No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes �o ❑ NA ❑ NE 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State ❑ Yes JSNo ❑ NA ❑ NE other than from a discharge? Page 1 of 3 12/28/04 Continued Facility Number: 96;1--13 Date of Inspection 1 Waste Collection & Treatment 4_ Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes 10 No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): / 9 Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes RNo ❑ NA ❑ NE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on-site which are not properly addressed and/or managed ❑ Yes ® No ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? gYes []No ❑NA [:INE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes ® No ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes ® No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes RNo ❑ NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes ® No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) 9 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ® No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement'? ❑ Yes ERNo ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination?[] Yes ® No ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes tR No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes Jallo ❑ NA ❑ NE enr7'in v , GSD r f<► 69v'-, bW, �/x-� �u� 470_111� . Reviewer/Inspector Name j Phone:/D3 nr--> Reviewer/Inspector Signature: Date: / ...b- . __,. , ' Facility Number: 3 Date of [aspectioa ° Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes ONo ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes ® No ❑ NA ❑ NE the appropirate box. ❑ WUp ❑ Checklists ❑ Design El Maps El Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes C&'No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ® No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ®,No ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes 5 No ❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes ® No ❑ NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes KNo ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes [Z No ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ® No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes 91 No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes [Z No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes C,No ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on-site representative? ❑ Yes CKNo ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes ® No ❑ NA ❑ NE Additional Comments and/or Drawmgs . Sw Page 3 of 3 12/28/04 Page 3 of 3 12/28/04 ivision of Water Quality Facility Number 3GSr O Division of Soil and Water Conservation UZI O Other Agency Type of Visit �mpliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit outine 0 Complaint 0 Follow up 0 Referral 0 Emergency 0 Other ❑ Denied Access Date of Visit: C_?SAF�9;7 ❑ No Arrival Time: ,'DCS Departure Time: 1% SDA County: Region: I�K a Farm Name: -9e-1-1 ; e1+nrl. f{y ,faun 7Owner Email: ❑ NE Owner Name: _r/' sz rtcl Phone: ❑ NA ❑ NE Mailing Address: Physical Address: 1 Facility Contact: Title: Phone No: Onsite Representative: Sass-�- _ __ Integrator: AV Certified Operator: Operator Certification Number: r�+�ae Back-up Operator: Location of Farm: Swine Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feede, Farrow to Finish Boars Other ❑ Other Back-up Certification Number: Latitude: =0 0' = Longitude: =o =]' = Design Current Design Current Capacity Population Wet Poultry Capacity Population ❑ La er �:: 1 4=��] ❑ Non -Laver Dry Poultry ❑ La ers ❑ Non -Layers ❑ Pullets ❑ Turkeys ❑ Turkey Poults ❑ Other Discharges & Stream Impacts I. is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? Design Current Cattle Capacity Population ❑ Dairy Cow ❑ Dairy Calf ❑ Dairy Heifer ❑ Dry Cow ❑ Non -Dai ❑ Beef Stockci ❑ Beef Feeder ❑ Beef Brood Cowl Number of Structures: ®I b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes ® No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ NA ❑ NE ❑ Yes ❑ No ❑ Yes ;@ No ❑ NA ❑ NE ❑ Yes ® No ❑ NA ❑ NE 12/28/04 Continued Facility Number: Date of Inspection 0 No ❑ NA Waste Collection & Treatment 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination?❑ Yes IN No 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes ® No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): 147 Observed Freeboard (in): Y3 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes ® No ❑ NA ❑ NE (iel large trees, severe erosion, seepage, etc.) 6. Are there structures on-site which are not properly addressed and/or managed ❑ Yes KNo ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes [3 No ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ yes ® No ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes D§ No ❑ NA ❑ NE maintenance or improvement? Waste Application 10_ Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes N No ❑ NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes 9 No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs []Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of/WindDrift ❑ Application Outside of Area 12. Crop type(s) 13. Soil type(s) /yp7f 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes M No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes 0 No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination?❑ Yes IN No ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes C,NO ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment'? ❑ Yes IN No ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any recommendations or any other comments. Use drawings of facility to better explain situations. (use additional pages as necessary): R All d0 'S 1 Reviewerllnspector Name Phone:/1a—y.33-33D0 Reviewer/Inspector Signature: Date:� v?D�7 12/28/04 Continued Facility Number: S — Date of Inspection 7 Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? D,Yes *No Ll NA EINE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes fgNo ❑ NA ❑ NE the appropirate box. ❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Other 21. Does record keeping need improvement? if yes, check the appropriate box below. Yes ❑ No ❑ NA ❑ NE M -Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes 2,No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes [XNo ❑ NA ❑ NE 24_ Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes IR No ❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes D(No ❑ NA ❑ NE 2& Did the facility fail to have an actively certified operator in charge? ❑ Yes RNo ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes R,No ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ERNo ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes ®No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes &No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31 _ Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes [gNo ❑ NA ❑ NE General Permit? (ic/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on-site representative? ❑ Yes ® No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes 9LNo ❑ NA ❑ NE Additional Comments and/or Drawings: 12/28/04 f Type of Visit O Compliance Inspection O Operation Review O Lagoon Evaluation iReason for Visit O Routine O Complaint O Follow up O Emergency Notification O Other ❑ Denied Access Date of Visit: ��?4�b Time: Facility Number $a .' (o S Q Not Operational Q Below Threshold }� Permitted (p Certified © Conditionally Certified © Registered Date Last Operated or Above Threshold: ..------� --• •••• Farm Name: ...: r. ±" i __. „........ N.4 �.�– �� •• w, -........................... County:.........5 �..,. �hP.� ........ 1.12 ° .. Owner Name:.. _ q nt C.'_-�'__' _ ...... Phone No: Mailing Address: arr .( i J s~ JIL_ – = - -- - — &/' l r! 4M .! �._. _ _ . _ .. .a &'f'i Facility Contact: _ __._._. _..... �.� Title:.. _.. .. �— Phone No: .......___...-- - Onsite Representative:... c i..... G,G.�r� _ _ Integrator: �r s� 4F �: w, Certified Operator: S,e;r *•, .............. - ,_........... __.......... .._ Operator Certification Number: •° �� Location of Farm: 0 Swine ❑ Poultry ❑ Cattle ❑ Horse Latitude • 6 'GL Longitude • 6 " . _ Desegn Swine Wean to Feeder Feeder to Finish L4 D 6 S Farrow to Wean Farrow to Feeder Farrow to Finish Gilts IFI Boars .. Number °!.Lego g- Non -Layer Other E J j[] Non -Dairy = TotaLSSLW Disclimes & Stream I_ mpacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? b. If discharge is observed, did it reach Water of the State? (If yes, notify DWQ) c. If discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) ❑ Yes Cj No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No 2. Is there evidence of past discharge from any part of the operation? ❑ Yes [g No 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes] No Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway ❑ Yes] No Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier �_.__ ... ................ _._ ... Freeboard (inches): 3 (o 12112103 Continued �Facilio Number: &.2 -- 3 a S - Date of Inspection 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, seepage, etc.) 6. Are there structures on-site which are not properly addressed and/or managed through a waste management or closure plan? (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenancetimprovement? 8. Does any part of the waste management system other than waste structures require maintenancelimprovement? 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? Waste Anolication ❑ Yes ® No ❑ Yes ® No ❑ Yes ® No ❑ Yes ® No ❑ Yes No 10. Are there any buffers that need maintenancelimprovement? ❑ Yes ® No 11- Is there evidence of over application? If yes, check the appropriate box below. ❑ Yes ® No ❑ Excessive Ponding ❑ PAN ❑ Hydraulic Overload ❑ Frozen Ground ❑ Copper and/or Zinc 12. Crop type ea S C3 ZaSrn S D ✓ 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? ❑ Yes No 14. a) Does the facility lack adequate acreage for land application? ❑ Yes No b) Does the facility need a wettable acre determination? ❑ Yes [jj No c) This facility is pended for a wettable acre determination? ❑ Yes P No 15. Does the receiving crop need improvement? ❑ Yes ❑( No 16. Is there a lack of adequate waste application equipment? [:]Yes A] No Odor Issues 17. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge attor below ❑ Yes ❑ No liquid level of lagoon or storage pond with no agitation? 18. Are there any dead animals not disposed of properly within 24 hours? ❑ Yes No 19. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, ❑ Yes No roads, building structure, and/or public property) 20. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional ❑ Yes ONo Air Quality representative immediately. Comments (refer toguestwn ) EzpIatn any i ES answers and/or any.reconuneada#:oas or•any offer comments _ � ys.�-• � t,".Y. `�' � C .._ �'.`r i`] ��+�F,�„ - - �.." x.215• -'Y, -.. �y ,�.-....rte .i^ ' -� ,Use drav of fact7ily to liettei ezglarn s tuatra : (dsehanatpages as necessary) m Wield Copy ❑ Final Notes 7;y Re viewer/inspector Name'r. Reviewer/Inspector Signature: Date: yrs p� 12112103 U r ✓ Continued Faciliiy Number: ga —30,',S -j Date of .Inspection �%a'i Required Records & Document~ 21. Fail to have Certificate of Coverage & General Permit or other Permit readily available? ❑ Yes ® No 22. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (ie/ WUP, checklists, design, maps, etc.) ❑ Yes ® No 23. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes (j No ❑ Waste Application ❑ Freeboard ❑ Waste Analysis ❑ Soil Sampling 24. Is facility not in compliance with any applicable setback criteria in effect at the time of design? ❑ Yes P No 25. Did the facility fail to have a actively certified operator in charge? ❑ Yes ® No 26. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) ❑ Yes No 27. Did Reviewer/Inspector fail to discuss review/inspection with on-site representative? ❑ Yes No 28. Does facility require a follow-up visit by same agency? ❑ Yes PJ No 29. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes EffNo NPDES Permitted Facilities 30. Is the facility covered under a NPDES Permit? (If no, skip questions 31-35) "Yes ❑ No 3I . If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes 0 No 32. Did the facility fail to install and maintain a rain gauge? ❑ Yes M No 33. Did the facility fail to conduct an annual sludge survey? ❑ Yes ® No 34. Did the facility fail to calibrate waste application equipment? ❑ Yes ® No 35. Does record keeping for NPDES required forms need improvement? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ Stocking Farm [gCrop Yield Form ❑ Rainfall ❑ Inspection After V Rain [� 120 Minute Inspections ❑ Annual Certification Form Q No violations or deficiencies were noted during this visit. You will receive no further correspondence about this visit ddlttORal Comment5`andlor Dravving5 _ = ` _ T �.a"�-. �;--�-. _=..a�.. 5.Z;2,_rte m r_ �� � �cw n eCc�s Cn w -P lc� c �. � 0 10 i i �� ► ►1-� � r•-.�.�-, o .. �. � A p� ppr-TCr C C.toC"-, a. �� � tJA.. ra }' � 4 t -.t C, � 'y �- � � . �.[* � � Q P � 'fin , L � G tv..� +.�..� 4 S' ►�i N � 1� Tr* r 1. �.,� •--r c a1.e A- e- c_1% PCA V\. s A- w v .'F C 0, w- 'C 4-A kL— cZj YA \-D r 12112103