Loading...
HomeMy WebLinkAbout820090_ENFORCEMENT_20171231NUH I H UAHULINA Department of Environmental Qual 2•V �oF w A rFRQ Michael F. Easley, Governor William G. Ross Jr., Secretary co y North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director -� Division of Water Quality July 18, 2003 CERTIFIED MAIL RETURN RECEIPT REQUESTED Mr. Lew Darden Quarter D Farms, Inc. 25 East Darden Road Faison, NC 28341 Subject. Rescission of Notice of Violation / Issuance of Notice of Deficiency Quarter D Farms, Inc Facility Number 82-90 Sampson County Dear Mr. Darden: Thank you for your recent submittal of the information requested in our letter dated April 15, 2003. We greatly appreciate the effort that you made in compiling this information and sending it to our Fayetteville Regional Office by the date required. We also appreciate the fact that you reported the problem with high freeboard to our staff as required by your permit and worked with our staff to manage the problem once it occurred. Upon review and consideration of the information submitted, the Fayetteville Regional Office has determined that no further compliance/enforcement actions will be taken by the Division for these high freeboards. Also, based on your actions to properly operate your facility, the Division of Water Quality hereby rescinds the Notice of Violation that was issued to you on April 15, 2003, and replaces it with this Notice of Deficiency. In the future, please continue to evaluate ways to maintain freeboard levels in the required range. These methods include, but are not limited to, water conservation practices, adding additional application sites, updating your cropping systems, adding additional and/or more flexible application equipment, and maintaining the lagoon levels at the lowest allowable and appropriate levels throughout the year. Our staff looks forward to continuing to work with you and your Technical Specialist to evaluate and implement any needed changes to your system. NCDERR Customer Service: Mailing Address: Telephone: (919) 733-5083 Location: 1 800 623-7748 1617 Mail Service Center Fax: (9 19) 733-0059 512 N. Salisbury St. Raleigh, NC 27699-1617 State Courier #52-01-01 Raleigh, NC 27699-1617 An Equal Opportunity 1 Affirmative Action Employer 50% recycled 110% post -consumer paper http:ffh2o.enr.state. rnc. us Inadequate Freeboard Page 2 Thank you again for your cooperation. If you have any questions, please do not hesitate to contact the staff of our Fayetteville Regional Office at 910-486-1541. Sincerely, aul E. Rawls Water Quality Regional Supervisor cc: FRO CAFO File: 82-90 Non -Discharge Compliance and Enforcement Unit Central Files CERTIFIED MAIL RETURN RECEIPT REQUESTED Lew Gary Darden 25 East Darden Rd Faison NC 28341 SUBJECT: Notice of Violation Request for Information Inadequate Freeboard Quarter D Farms, Inc. #82-90 Sampson County Dear Sir or Madam: Michael F. Easley Governor William G. Ross Jr., Secretary Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality April 15, 2003 ,r ri - 3 2003 On April 11, 2003, a representative of your animal operation informed the Division of Water Quality (DWQ) that there was inadequate freeboard in the lagoon(s) serving this facility. This lack of adequate freeboard is in non-compliance with the Certificate of Coverage issued to this facility on November 10, 1997. In addition to this Notice of Violation (NOV), this non-compliance is subject to an appropriate enforcement action by DWQ. This action can consist of one or more of the following- a civil or criminal enforcement action; an injunction; and/or a requirement to apply for coverage under an individual permit. The action chosen will be based on complete evaluation of all factors that resulted in the inadequate freeboard; the actions taken to restore the needed freeboard; and the actions being proposed to prevent the problem from reoccurring. To assist us in our review, please provide the Fayetteville Regional Office with an evaluation of the reasons for the freeboard violation(s) and a strategy to prevent future freeboard violation(s)- This evaluation and strategy must include but is not limited to the following: Current Freeboard level(s) Freeboard level records in the lagoon(s) for the past 12 months up to the date of submittal Spraying records for the past 12 months up to the date of submittal NCDENR Customer Service: Mailing Address: Telephone (919) 733-5083 Location: 1-877-623-6748 1617 Mail Service Center Fax (919) 733-0059 512 N. Salisbury St. Raleigh, North Carolina 27699-1617 State Courier 7152-01-01 Raleigh, NC 27699-1617 An Equal Opportunity/Affimnative Action Employer 50% recycled 110% post -consumer paper httpY1h?o. enr. state. nc. us Inadequate Freeboard Page 2 Rainfall records for the past 12 months for this site up to the date of submittal (if available) Cropping system and PAN specified in the CAWMP. If the cropping system was not in compliance with the facility's CAWMP, provide details of the cropping system in place for the past 12 months. A summary of actions taken to restore the needed freeboard in the lagoon(s) including but not Iimited to removal of animals from the site, delay of restocking of animals, pumping and hauling waste to another site (specify site), securing additional irrigation equipment, and securing additional spray sites. A description of water conservation measures in use at the facility and the date(s) installed. If the lagoon level(s) are still in violation of the facility's CAWMP and Permit, provide an updated Plan of Action as to how the facility will return to compliance. Provide a detailed description of the actions taken or proposed to be taken to insure that there are no further freeboard violations at this facility. This information must be received by the Fayetteville Regional Office at the following address no later than 10 days following receipt of this letter. Division of Water Quality 225 Green Street, Suite 714 Fayetteville, NC 28301-5043 Once this information is received and evaluated by the DWQ staff, a determination will be made as to the appropriate compliance/enforcement actions to be taken. Each case will be evaluated on its own merit. The efforts by the owner/producer to notify DWQ of the problem, efforts made to resolve the problem once identified, and efforts proposed to prevent future problems will be positive factors in this determination. Nothing in this letter should be taken as removing from you either the responsibility or liability for this non-compliance or future cases of non-compliance. If you have any questions regarding this letter, please do not hesitate to contact our Fayetteville Regional Office Staff at (910) 486-1541. Sincerely, Alan W. Klimek Director cc: Fayetteville Regional Office Non -Discharge Compliance/Enforcement Unit Central Files i a April 30, 2003 Mr. John Hasty NC Division of Water Quality 225 Green StreetSuite 714 Fayetteville, NC 28301-5043 Dear John, In regards to a Notice of Violation/Request for Information received from Alan Klimek dated April 16, 2003 concerning Quarter D Farms Inc., permit number AWS820090, I enclose the following items: Irrigation records for the previous twelve months Weekly freeboard levels for the previous twelve months Rainfall records since April 11, 2003 Current lagoon level, according to the lagoon markers is 23" of freeboard in each lagoon. The cropping system is in place as per our waste plan. Millet is ready to be planted next week. Irrigation occurred as soon as weather and soil conditions were favorable for application and in accordance to permit requirements. Aeration was performed to speed soil drying. Watering devices are checked daily and kept in good working order so as to prevent wastage. The lagoon level is not presently in violation of permit requirements. Again, I irrigated only when weather and soil conditions were favorable and so as not to experience run-off or ponding, as per permit requirements. I cannot insure that these lagoons will never experience a freeboard violation in the future. However, you are aware of my management of this farm and realize that I am working, to the best of my ability, to meet and exceed permit -requirements and deal with rainfall and other issues that I have absolutely no control over. If you have any questions, do not hesitate to contact me at 910 564-2139 Si erely� Lew G. Darden President DEN 0 ; ' '1 2003 Ew .. ,r M r" s In regards to a Notice of Violation/Request for Information received from Alan Klimek dated April 16, 2003 concerning Quarter D Farms Inc., permit number AWS820090, I enclose the following items: Irrigation records for the previous twelve months Weekly freeboard levels for the previous twelve months Rainfall records since April 11, 2003 Current lagoon level, according to the lagoon markers is 23" of freeboard in each lagoon. The cropping system is in place as per our waste plan. Millet is ready to be planted next week. Irrigation occurred as soon as weather and soil conditions were favorable for application and in accordance to permit requirements. Aeration was performed to speed soil drying. Watering devices are checked daily and kept in good working order so as to prevent wastage. The lagoon level is not presently in violation of permit requirements. Again, I irrigated only when weather and soil conditions were favorable and so as not to experience run-off or ponding, as per permit requirements. I cannot insure that these lagoons will never experience a freeboard violation in the future. However, you are aware of my management of this farm and realize that I am working, to the best of my ability, to meet and exceed permit -requirements and deal with rainfall and other issues that I have absolutely no control over. If you have any questions, do not hesitate to contact me at 910 564-2139 Si erely� Lew G. Darden President