Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
780041_INSPECTIONS_20171231
NORTH CAROLINA Department of Environmental Qual Division of Water Resources ❑ Division of Soil and Water Conservation ❑ Outer Agency Faclitty Number: 780041 Facility Status: Active Permit. AWS78OD41 Inpsection Type. Compliance Inspection Inactive Or Closed Dale: Reason for visit: Routine County. Robeson Region: Date of visit: 02/13/2017 Entry Time: 08:00 am Exit Time: 9:00 am Farm Name: Farm 7690 & 7691 Owner. Murphy -Brown LLC Mailing Address: PO Box 487 Physical Address: 1088 Ballance Farm Rd Incident 0 Owner Email: Phone: Warsaw NC 28398 Saint Pauls NC 28384 ❑ Denied Access Fayetteville 910-296-1800 Facility Status: ■ Compliant ❑ Not Compliant Integrator: Murphy -Brown LLC Location of Farm: Latitude: 34` 50' 09" Longitude: 78° 55' 05" On the northeast side of SR 1906 approx. one mile north of its intersection with SR 1907, northeast of St. Pauls, NC. Question Areas: E Dischrge & Stream impacts M Waste Col, Slor, & Treat M Waste Application M Records and Documents M Other Issues Certified Operator: James Brian McGugan Operator Certification Number: 986752 Secondary OIC(s): On -Site Representative(s): Name Title Phone 24 hour contact name Mike Cudd Phone On -site representative Mike Cudd Phone Primary Inspector. Robert Marble Phone: Inspector Signature: Date: Secondary Inspector(s): Inspection Summary: page: 1 Permit: AWS780041 Owner - Facility : Murphy -Brown LLC Facility Number: 780041 Inspection Date: 02/13/17 Inppection Type: Compliance Inspection Reason for Visit: Routine Regulated Operations Design Capacity Current promotions Swine ❑ Swine - Farrow to Wean 4,411 Total Design Capacity: 4,411 Total SSLW: 1,909,963 Waste Structures Observed Disignated Type identifier Closed Date Start Date Freeboard Freeboard Lagoon 3121 19.50 Lagoon 3726 19.50 Lagoon 7690 27.00 Lagoon 7690-1 20.00 43.00 Lagoon 7691 19.50 Lagoon 7691-1 20.00 38.00 page: 2 Permit: AWS780041 Owner- Facility: Murphy -Brown LLC Facility Number: 780D41 Inspection Date: 02/13/17 Inpsection Type: Compliance Inspection Reason for Visit: Routine Discharges & Stream impacts Yes No Na No 1. Is any discharge observed from any part of the operation? ❑ M ❑ ❑ Discharge originated at: Structure ❑ Application Field ❑ Other ❑ a. Was conveyance man-made? ❑ ❑ 0 ❑ b. Did discharge reach Water; of the State? (if yes, notify DWQ) ❑ ❑ [] c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (if yes, notify DWQ) ❑ ❑ 0 ❑ 2. Is there evidence of a past discharge from any part of the operation? ❑ M ❑ ❑ 3. Were there any observable adverse impacts or potential adverse impacts to Waters of the ❑ 01111 State other than from a discharge? Waste Collection. Storage & Treatment Yes No Na Ne 4. Is storage capacity less than adequate? ❑ 0 ❑ ❑ If yes, is waste level into structural freeboard? ❑ 5. Are there any immediate threats to the integrity of any of the structures observed (I.e./ large ❑ ❑ ❑ trees, severe erosion, seepage, etc.)? 6. Are there structures on -site that are not properly addressed and/or managed through a ❑ M ❑ ❑ waste management or closure plan? 7. Do any of the structures need maintenance or improvement? ❑ ❑ ❑ 8. Do any of the structures lack adequate markers as required by the permit? (Not applicable ❑ 0 ❑ ❑ to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ 0 ❑ ❑ maintenance or improvement? Waste Application Yes No Na Me 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ 0 ❑ ❑ maintenance or improvement? 11. Is there evidence of incorrect application? ❑ 0 ❑ ❑ If yes, check the appropriate box below. Excessive Ponding? ❑ Hydraulic Overload? ❑ Frozen Ground? ❑ Heavy metals (Cu, Zn, etc)? ❑ PAN? ❑ Is PAN > 100/6/10 lbs.? ❑ Total Phosphorus? ❑ Failure to incorporate manure/sludge into bare soil? ❑ Outside of acceptable crop window? ❑ Evidence of wind drift? ❑ Application outside of application area? ❑ page: 3 Permit: AWS780041 Owner - Facility : Murphy -Brown LLC Facility Number: 780041 Inspection Date: 02/13/17 Inssection Type: Compliance Inspection Reason for Visit: Routine Waste Application Yes No Na N2 Crop Type 1 Coastal Bermuda Gress (Hay, Pasture) Crop Type 2 Small Grain Overseed Crop Type 3 Crop Type 4 Crop Type 5 Crop Type 6 Soil Type 1 Norfolk loamy sand, 0 to 2% slopes Soil Type 2 Soil Type 3 Soil Type 4 Soil Type 5 Soil Type 6 14. Do the receiving crops differ from those designated in the Certified Animal Waste ❑0 ❑ ❑ Management Plan(CAWMP)? 15. Does the receiving crop and/or land application site need improvement? ❑ E ❑ ❑ 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre ❑ 01111 determination? 17. Does the facility lack adequate acreage for land application? ❑ 0 ❑ ❑ 18. Is there a lack of properly operating waste application equipment? ❑ 0 ❑ ❑ Records and Documents Yes No Na No 19. Did the facility fail to have Certificate of Coverage and Permit readily available? ❑ 0 ❑ ❑ 20. Does the facility fail to have all components of the CAWMP readily available? ❑ 0 ❑ ❑ If yes, check the appropriate box below. WUP? ❑ Checklists? ❑ Design? ❑ Maps? ❑ Lease Agreements? ❑ Other? ❑ If Other, please specify 21. Does record keeping need improvement? ❑ ■ ❑ ❑ If yes, check the appropriate box below. Waste Application? ❑ Weekly Freeboard? ❑ Waste Analysis? ❑ Soil analysis? ❑ Waste Transfers? ❑ Weather code? ❑ Rainfall? ❑ page: 4 Permit: AWS780041 Owner - Facility : Murphy -Brown LLC Facility Number. 780041 Inspection Date: 02/13/17 Inpsection Type: Compliance Inspection Reason for Visit: Routine Records and Documents Yes No Na Ne Stocking? ❑ Crop yields? ❑ 120 Minute inspections? ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey ❑ 22. Did the facility fail to install and maintain a rain gauge? ❑ 0 ❑ ❑ 23. If selected, did the facility fail to install and maintain a rainbreaker on irrigation equipment ❑ ❑ ❑ (NPDES only)? 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ 0 ❑ ❑ 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check the ❑ 0 ❑ ❑ appropriate box(es) below. Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon ❑ List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ 0 ❑ ❑ 27, Did the facility fail to secure a phosphorous loss assessment (PLAT) certification? ❑ 0 ❑ ❑ Other issues Yes No Na Me 28, Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ 0 ❑ ❑ and report mortality rates that exceed normal rates? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, ❑ 0 ❑ ❑ contact a regional Air Quality representative immediately. 30. Did the facility fail to notify regional DWQ of emergency situations as required by Permit? ❑ 0 ❑ ❑ (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? ❑ 0 ❑ ❑ If yes, check the appropriate box below. Application Field ❑ Lagoon / Storage Pond ❑ Other ❑ If Other, please specify 32. Were any additional problems noted which cause non-compliance of the Permit or ❑ E ❑ ❑ CAWM P? 33. Did the Reviewer/Inspector fail to discuss reviewfinspection with on -site representative? ❑0 ❑ ❑ 34. Does the facility require a follow-up visit by same agency? ❑ 0 ❑ ❑ page: 5 Division of Wafer Resources Division of Soil and Water Conservation ❑ Other Agency Facility Number. 780041 Facility Status: Active Permit: AWS780041 Inpsection Type: Compliance Inspection Inactive Or Closed Date: Reason for Visit: Routine County: Robeson Region: Date of Visit: 03/10/2015 Entry Time: 08:00 am Exit Time: 9:00 am Incident # Farm Name: Farm 7690 & 7691 Owner Email: Owner: Murphy -Brown LLC Phone: Mailing Address: PO Box 487 Warsaw NC 28398 Physical Address: 1088 Ballance Farm Rd Saint Pauls NC 28384 Facility Status: Compliant ❑ Not Compliant Integrator: Murphy -Brown LLC Location of Farm: Latitude: 34° 50' 09" Longitude: 78° 55' 05" On the northeast side of SR 1906 approx. one mile north of its intersection with SR 1907, northeast of St. Pauls, NC. Question Areas: Dischrge & Stream Impacts Records and Documents Waste Col. Stor, & Treat Waste Application Other Issues ❑ Denied Access Fayetteville 910-296-1800 Certified Operator: James Brian McGugan Operator Certification Number: 986752 Secondary OIC(s): On -Site Representative(s): Name Title Phone 24 hour contact name Mike Cudd Phone: On -site representative Mike Cudd Phone: Primary Inspector: Robert Marble Phone: Inspector Signature: Date: Secondary Inspector(s): Inspection Summary: page: 1 Permit: AWS780041 Owner - Facility : Murphy -Brown LLC Facility Number: 780041 Inspection Date: 03/10/15 Inppection Type: Compliance Inspection Reason for Visit: Routine Regulated Operations Design Capacity Current promotions Swine El Swine - Farrow to Wean 4,411 Total Design Capacity: 4,411 Total SSLW: 1,909,963 Waste Structures Disignated Observed Type Identifier Closed Date Start Date Freeboard Freeboard Lagoon 3121 19.50 Lagoon 3726 19.50 Lagoon 7690 27.00 Lagoon 7690-1 20.00 35.00 Lagoon 7691 19.50 Lagoon 7691-1 20.00 35.00 page: 2 Permit: AWS780041 Owner - Facility : Murphy -Brown LLC Facility Number: 780041 Inspection Date: 03/10/15 Inppection Type: Compliance Inspection Reason for Visit: Routine Discharges & Stream Impacts Yos No Na No 1. Is any discharge observed from any part of the operation? ❑ M ❑ ❑ Discharge originated at: Structure ❑ Application Field ❑ Other ❑ a. Was conveyance man-made? ❑ ❑ M ❑ b. Did discharge reach Waters of the State? (if yes, notify DWQ) ❑ 11011 c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (if yes, notify DWQ) ❑ ❑ ■ ❑ 2. Is there evidence of a past discharge from any part of the operation? ❑ M ❑ ❑ 3. Were there any observable adverse impacts or potential adverse impacts to Waters of the ❑ 0 ❑ ❑ State other than from a discharge? Waste Collection Storage & Treatment Yes No Na Me 4. Is storage capacity less than adequate? ❑ 0 ❑ ❑ If yes, is waste level into structural freeboard? ❑ 5. Are there any immediate threats to the integrity of any of the structures observed (Led large ❑ M ❑ ❑ trees, severe erosion, seepage, etc.)? 6. Are there structures on -site that are not properly addressed and/or managed through a ❑ 0 ❑ ❑ waste management or closure plan? 7. Do any of the structures need maintenance or improvement? ❑ 01111 8. Do any of the structures lack adequate markers as required by the permit? (Not applicable ❑ ❑ ❑ to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ 0 ❑ ❑ maintenance or improvement? Waste Application Yes No Na NB 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ 0 ❑ ❑ maintenance or improvement? 11. Is there evidence of incorrect application? ❑ 0 ❑ ❑ If yes, check the appropriate box below. Excessive Ponding? ❑ Hydraulic Overload? ❑ Frozen Ground? ❑ Heavy metals (Cu, Zn, etc)? ❑ PAN? ❑ Is PAN > 10%110 lbs.? ❑ Total Phosphorus? ❑ Failure to incorporate manure/sludge into bare soil? ❑ Outside of acceptable crop window? ❑ Evidence of wind drift? ❑ Application outside of application area? ❑ page: 3 Permit: AWS780041 Owner - Facility : Murphy -Brown LLC Facility Number: 780041 Inspection Date: 03/10/15 Inpsection Type: Compliance Inspection Reason for Visit: Routine Waste Application Yes No No No Crop Type 1 Coastal Bermuda Grass (Hay, Pasture) Crop Type 2 Small Grain Overseed Crop Type 3 Crop Type 4 Crop Type 5 Crop Type 6 Soil Type 1 Norfolk Soil Type 2 Soil Type 3 Soil Type 4 Soil Type 5 Soil Type 6 14. Do the receiving crops differ from those designated in the Certified Animal Waste ❑ 0 ❑ ❑ Management Plan(CAWMP)? 15. Does the receiving crop and/or land application site need improvement? ❑ 0 ❑ ❑ 16, Did the facility fail to secure and/or operate per the irrigation design or wettable acre ❑ 0 ❑ ❑ determination? 17. Does the facility lack adequate acreage for land application? ❑ 0 ❑ ❑ 18. Is there a lack of properly operating waste application equipment? ❑ 0 ❑ ❑ Records and Documents Yes No Na No 19. Did the facility fail to have Certificate of Coverage and Permit readily available? ❑ 0 ❑ ❑ 20. Does the facility fail to have all components of the CAWMP readily available? ❑ 0 ❑ ❑ If yes, check the appropriate box below. WUP? ❑ Checklists? ❑ Design? ❑ Maps? ❑ Lease Agreements? ❑ Other? ❑ If Other, please specify 21. Does record keeping need improvement? ❑ 0 ❑ ❑ If yes, check the appropriate box below. Waste Application? ❑ Weekly Freeboard? ❑ Waste Analysis? ❑ Soil analysis? ❑ Waste Transfers? [] Weather code? ❑ Rainfall? ❑ Stocking? ❑ page: 4 Permit: AWS780041 Owner - Facility : Murphy -Brown LLC Facility Number: 780041 Inspection Date: 03/10/15 Inpsection Type: Compliance Inspection Reason for Visit: Routine Records and Documents Yes No Na No Crop yields? ❑ 120 Minute inspections? ❑ Monthly and V Rainfall Inspections ❑ Sludge Survey ❑ 22. Did the facility fail to install and maintain a rain gauge? ❑ 0 ❑ ❑ 23. If selected, did the facility fail to install and maintain a rainbreaker on irrigation equipment ❑ 0 ❑ ❑ (NPDES only)? 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑0 ❑ ❑ 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check the ❑ N ❑ ❑ appropriate box(es) below: Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon ❑ List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ ❑ ❑ 27. Did the facility fail to secure a phosphorous loss assessment (PLAT) certification? ❑ 0 ❑ ❑ Other Issues Yes No Na No 28. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ E ❑ ❑ and report mortality rates that exceed normal rates? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, ❑ 0 ❑ ❑ contact a regional Air Quality representative immediately. 30. Did the facility fail to notify regional DWQ of emergency situations as required by Permit? ❑ 0 ❑ ❑ (i.e., discharge, freeboard problems, over -application) 31'. Do subsurface tile drains exist at the facility? ❑ E ❑ ❑ If yes, check the appropriate box below. Application Field ❑ Lagoon / Storage Pond ❑ Other ❑ If Other, please specify 32. Were any additional problems noted which cause non-compliance of the Permit or ❑ N ❑ ❑ CAWMP? 33. Did the Reviewer/inspector fail to discuss review/inspection with on -site representative? ❑ 0 ❑ ❑ 34. Does the facility require a follow-up visit by same agency? ❑ ■ ❑ ❑ page: 5 M Division of Water Resources ❑ Division of Soil and Water Conservation ❑ Other Agency Facility Number. 760041 Facility Status: Active Permit: AWS780041 Inpsection Type: Compliance Inspection Inactive Or Closed Date: Reason for visit: Routine County: Robeson Region: Date of Visit: 03/18/2014 Entry Time: M30 pm Exit Time: 3:30 pm Incident # Farm Name: Farm 7690 & 7691 Owner Email: Owner: Murphy -Brown LLC Phone: ❑ Denied Access Fayetteville 910-296-1600 Mailing Address: PO Sox 487 Warsaw NC 28398 Physical Address: 1088 Ballance Farm Rd Saint Pauls NC 28384 Facility Status: Compliant ❑ Not Compliant Integrator: Murphy -Brown LLC Location of Farm: Latitude: 34' 50' 09" Longitude: 78" 55' 05" On the northeast side of SR 1906 approx. one mile north of its intersection with SR 1907, northeast of St. Pauls, NC. Question Areas: Dischrge & Stream Impacts Records and Documents Waste Cal, Stor, & Treat Waste Application Otherissues Certified Operator: Operator Certification Number: Secondary OIC(s): On -Site Representative(s): 24 hour contact name On -site representative Primary Inspector: Inspector Signature: Secondary Inspector(s)- Inspection Summary: Lagoon levels: 76901 = 35" 76911 = 30" Records reviewed 2126/14. Site visit 3/18114. Name Mike Cudd Mike Cudd Title Phone : Phone : Phone Robert Marble Phone: Date: page: 1 Permit: AWS780041 Owner - Facility : Murphy -Brown LLC Facility Number: 780041 Inspection pate: 03/18/14 Inpsection Type: Compliance Inspection Reason for Visit: Routine Regulated Operations Design Capacity Current promotions Swine =,vine arrow to Wean Total Design Capacity: Total SSLW: Waste Structures Disignated Observed Type Identifier Closed Date Start Date Freeboard Freeboard Lagoon 3121 19.50 Lagoon 3726 19.50 Lagoon 7690 27.00 Lagoon 7690-1 20.00 Lagoon 7691 19.50 Lagoon 7691-1 20.00 page: 2 Permit: AWS780041 Owner - Facility : Murphy -Brown LLC Facility Number: 780041 Inspection Date: 03/18/14 Inpsection Type: Compliance Inspection Reason for Visit: Routine Discharges & Stream Impacts Yes No Na Ne 1. is any discharge observed from any part of the operation? ❑ 0 ❑ ❑ Discharge originated at: Structure ❑ Application Field ❑ Other ❑ a. Was conveyance man-made? ❑ 110 ❑ b. Did discharge reach Waters of the State? (if yes, notify DWQ) ❑ ❑ M ❑ c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (if yes, notify DWQ) ❑ ❑ M ❑ 2. Is there evidence of a past discharge from any part of the operation? ❑ ■ ❑ ❑ 3. Were there any observable adverse impacts or potential adverse impacts to Waters of the ❑ ■ ❑ ❑ State other than from a discharge? Waste Collection Storage S Treatment Yes No Na Ne 4. Is storage capacity less than adequate? ❑ 0 ❑ ❑ If yes, is waste level into structural freeboard? ❑ 5. Are there any immediate threats to the integrity of any of the structures observed (I.e./ large ❑ 0 ❑ ❑ trees, severe erosion, seepage, etc.)? 6. Are there structures on -site that are not properly addressed and/or managed through a ❑ E ❑ ❑ waste management or closure plan? 7. Do any of the structures need maintenance or improvement? ❑ ❑ ❑ 8. Do any of the structures lack adequate markers as required by the permit? (Not applicable ❑ M ❑ ❑ to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ ■ ❑ ❑ maintenance or improvement? Waste Application Yes No Na No 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ 0 ❑ ❑ maintenance or improvement? 11. Is there evidence of incorrect application? ❑ e ❑ ❑ If yes, check the appropriate box below. Excessive Ponding? ❑ Hydraulic Overload? ❑ Frozen Ground? ❑ Heavy metals (Cu, Zn, etc)? ❑ PAN? ❑ Is PAN > 10%110 lbs.? ❑ Total Phosphorus? ❑ Failure to incorporate manurelsludge into bare soil? ❑ Outside of acceptable crop window? ❑ Evidence of wind drift? ❑ Application outside of application area? ❑ page: 3 Permit: AWS780041 Owner - Facility : Murphy -Brown LLC Facility Number: 780041 Inspection Date: 03/18/14 Inppection Type: Compliance Inspection Reason for Visit: Routine Waste Application Yes No Na No Crop Type 1 Coastal Bermuda Grass (Hay, Pasture) Crop Type 2 Small Grain Overseed Crop Type 3 Crop Type 4 Crop Type 5 Crop Type 6 Soil Type 1 Norfolk Soil Type 2 Soil Type 3 Soil Type 4 Soil Type 5 Soil Type 6 14. Do the receiving crops differ from those designated in the Certified Animal Waste ❑ 0 ❑ ❑ Management Plan(CAWMP)? 15. Does the receiving crop and/or land application site need improvement? ❑ E ❑ ❑ 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre ❑ M ❑ ❑ determination? 17. Does the facility lack adequate acreage for land application? ❑ 0 ❑ ❑ 18. Is there a lack of properly operating waste application equipment? ❑ 0 ❑ ❑ Records and Documents Yes No No Ne 19. Did the facility fail to have Certificate of Coverage and Permit readily available? ❑ ■ ❑ ❑ 20. Does the facility fail to have all components of the CAWMP readily available? ❑ M ❑ ❑ If yes, check the appropriate box below. WUP? ❑ Checklists? ❑ Design? ❑ Maps? ❑ Lease Agreements? ❑ Other? ❑ If Other, please specify 21. Does record keeping need improvement? ❑E ❑ ❑ If yes, check the appropriate box below. Waste Application? ❑ Weekly Freeboard? ❑ Waste Analysis? ❑ Soil analysis? ❑ Waste Transfers? ❑ Weather code? ❑ Rainfall? ❑ Stocking? ❑ page: 4 Permit: AWS780041 Owner- Facility : Murphy -Brown LLC Facility Number: 780041 Inspection Date: 03/18/14 Inpsection Type: Compliance Inspection Reason for Visit: Routine Records and Documents Yes No Na No Crop yields? ❑ 120 Minute inspections? ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey ❑ 22, Did the facility fail to install and maintain a rain gauge? ❑ 0 ❑ ❑ 23. If selected, did the facility fail to install and maintain a rainbreaker on irrigation equipment ❑ M ❑ ❑ (NPDES only)? 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ ■ ❑ ❑ 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check the ❑ M ❑ ❑ appropriate box(es) below: Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon ❑ List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ 0 ❑ ❑ 27. Did the facility fail to secure a phosphorous loss assessment (PLAT) certification? ❑ 0 ❑ ❑ Other Issues Yes No Na No 28. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ 0 ❑ ❑ and report mortality rates that exceed normal rates? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, ❑ ❑ ❑ contact a regional Air Quality representative immediately. 30, Did the facility fail to notify regional DWQ of emergency situations as required by Permit? ❑ ❑ ❑ (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? ❑ M ❑ ❑ If yes, check the appropriate box below. Application Field ❑ Lagoon / Storage Pond ❑ Other ❑ If Other, please specify 32, Were any additional problems noted which cause non-compliance of the Permit or ❑ 0 ❑ ❑ CAWMP? 33. Did the Reviewer/Inspector fail to discuss reviewlinspection with on -site representative? ❑ 0 ❑ ❑ 34, Does the facility require a follow-up visit by same agency? ❑ 0 ❑ ❑ page: 5 M Division of Water Resources ❑ Division of Soil and Water Conservation ❑ Other Agency Facility Number. 780041 Facility Status: Active permit: AWS780041 ❑ Denied Access Inpsection Type: Compliance Inspection Inactive Or Closed Date: Reason for visit: Routine County: Robeson Region: Fayetteville Date of Visit: 02/26/2013 Entry Time: 09:00 am Exit Time: 9:30 am incident # Farm Name: Farm 7690 & 7691 Owner Email: Owner: Murphy -Brown LLC Phone: 910-296-1800 Mailing Address: PO Box 487 Warsaw NC 28398 Physical Address: 1088 Ballance Farm Rd Saint Pauls NC 28384 Facility Status: Compliant ❑ Not Compliant Integrator Murphy -Brown LLC Location of Farm: Latitude: 340 50' 09" Longitude: 78' 55' 05" On the northeast side of SR 1906 approx. one mile north of its intersection with SR 1907, northeast of St. Paul$, NC. Question Areas: Dischrge & Stream Impacts Waste Col, Stor, & Treat Waste Application Records and Documents Other Issues Certified Operator: John S Cain Operator Certification Number: 23570 Secondary OIC(s): On -Site Representative(s): Name Title Phone 24 hour contact name Mike Cudd Phone: On -site representative Mike Cudd Phone: Primary Inspector: Robert Marble Phone: Inspector Signature: Date: Secondary Inspector(s): Inspection Summary: Records reviewed 216113 Site visit 2126113 page: 1 Permit: AWS780041 Owner- Facility : Murphy -Brown LLC Facility Number: 780041 Inspection Date: 02/26/13 Inpsection Type: Compliance Inspection Reason for Visit: Routine Regulated Operations Design Capacity Current promotions Swine 10 Swine - Farrow to Wean 4,411 Total Design Capacity: Total SSLW: Waste Structures Disignated Observed Type Identifier Closed Date Start Date Freeboard Freeboard Lagoon 3121 19.50 Lagoon 3726 19.50 Lagoon 7690 27,00 Lagoon 769D-1 20,00 Lagoon 7691 19.50 Lagoon 7691-1 20.00 page: 2 Permit: AWS780041 Owner - Facility : Murphy -Brown LLC Facility Number. 780041 Inspection Date: 02/26/13 Inpseclion Type: Compliance Inspection Reason for Visit: Routine DischaTRes & Stream Impacts Yes No Na No 1. Is any discharge observed from any part of the operation? ❑0 ❑ ❑ Discharge originated at: Structure ❑ Application Field ❑ Other ❑ a. Was conveyance man-made? ❑ ❑ ❑ b. Did discharge reach Waters of the State? (if yes, notify DWQ) ❑ Elm ❑ c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (if yes, notify DWQ) ❑ ❑ M ❑ 2. Is there evidence of a past discharge from any part of the operation? 0 M ❑ ❑ 3. Were there any observable adverse impacts or potential adverse impacts to Waters of the ❑ M ❑ ❑ State other than from a discharge? Waste Collection, Storage & Treatment Yes No Na No 4. Is storage capacity less than adequate? ❑ M ❑ ❑ If yes, is waste level into structural freeboard? ❑ 5. Are there any immediate threats to the integrity of any of the structures observed (Led large ❑ M ❑ ❑ trees, severe erosion, seepage, etc.)? 6. Are there structures on -site that are not properly addressed and/or managed through a ❑ ❑ ❑ waste management or closure plan? 7. Do any of the structures need maintenance or improvement? ❑ M ❑ ❑ 8. Do any of the structures lack adequate markers as required by the permit? (Not applicable ❑ 0 ❑ ❑ to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ e ❑ ❑ maintenance or improvement? Waste Application Yes No Na Ne 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ M ❑ ❑ maintenance or improvement? 11. Is there evidence of incorrect application? ❑ N ❑ ❑ If yes, check the appropriate box below. Excessive Ponding? ❑ Hydraulic Overload? ❑ Frozen Ground? ❑ Heavy metals (Cu, Zn, etc)? ❑ PAN? ❑ Is PAN > 10%/10 lbs.? ❑ Total Phosphorus? ❑ Failure to incorporate manure/sludge into bare soil? ❑ Outside of acceptable crop window? ❑ Evidence of wind drift? ❑ Application outside of application area? ❑ page: 3 Permit: AWS780041 Owner - Facility : Murphy -Brown LLC Facility Number: 780041 Inspection Date: 02/26/13 Inpsection Type: Compliance Inspection Reason for Visit: Routine Waste Application Yes No Na No Crop Type 1 Coastal Bermuda Grass (Hay, Pasture) Crop Type 2 small Grain Overseed Crop Type 3 Crop Type 4 Crop Type 5 Crop Type 6 Soil Type 1 Norfolk Soil Type 2 Soil Type 3 Soil Type 4 Soil Type 5 Soil Type 6 14. Do the receiving crops differ from those designated in the Certified Animal Waste ❑ 0 ❑ ❑ Management Plan(CAWMP)? 15. Does the receiving crop and/or land application site need improvement? ❑ 0 ❑ ❑ 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre ❑ 0 ❑ ❑ determination? 17. Does the facility lack adequate acreage for land application? ❑ E ❑ ❑ 18. Is there a lack of properly operating waste application equipment? ❑ ❑ ❑ Records and Documents Yes No Na No 19. Did the facility fail to have Certificate of Coverage and Permit readily available? ❑ 0 ❑ ❑ 20. Does the facility fail to have all components of the CAWMP readily available? ❑ 0 ❑ ❑ If yes, check the appropriate box below, WU P? ❑ Checklists? ❑ Design? ❑ Maps? ❑ Lease Agreements? ❑ Other? ❑ If Other, please specify 21. Does record keeping need improvement? ❑ 0 ❑ ❑ If yes, check the appropriate box below. Waste Application? ❑ Weekly Freeboard? ❑ Waste Analysis? ❑ Soil analysis? ❑ Waste Transfers? ❑ Weather code? ❑ Rainfall? ❑ Stocking? ❑ page: 4 Permit: AWS780041 Owner - Facility : Murphy -Brown LLC Facility Number: 780041 Inspection Date: 02/26/13 Inpsection Type: Compliance Inspection Reason for Visit: Routine Records and Documents Crop yields? 120 Minute inspections? Monthly and 1" Rainfall Inspections Sludge Survey 22, Did the facility fail to install and maintain a rain gauge? 23. If selected, did the facility fail to install and maintain a rainbreaker on irrigation equipment (NPDES only)? 24. Did the facility fail to calibrate waste application equipment as required by the permit? 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check the appropriate box(es) below: Failure to complete annual sludge survey Failure to develop a POA for sludge levels Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? 27. Did the facility fail to secure a phosphorous loss assessment (PEAT) certification? Other Issues 28. Did the facility fail to properly dispose of dead animals within 24 hours and/or document and report mortality rates that exceed normal rates? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify regional DWO of emergency situations as required by Permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. Application Field Lagoon 1 Storage Pond Other If Other, please specify 32. Were any additional problems noted which cause non-compliance of the Permit or CAWMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with on -site representative? 34. Does the facility require a follow-up visit by same agency? Yes No No No ❑ M ❑ ❑ ❑■❑❑ ❑ M ❑ ❑ ❑ M ❑ ❑ ❑ N ❑ ❑ ❑■❑❑ Yes No No No ❑■❑❑ ❑ IN ❑ ❑ ❑ ME] ❑ ❑■❑❑ I■■ NONE ❑■❑[ ❑ M ❑ page: 1 � t Type of Visit: * Compliance Inspection 0 Operation Review O Structure Evaluation O Technical Assistance Reason for Visit: 0 Routine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access Date of Visit: Arrival Time: Departure Time:County:�i�f Farm Name: `j6gQ j ,(j j j6 aLLIn 7-1 _�rii ��`vner—�Em'ail� Owner Name: M LlWOL4-4_—JQJV0r..J ti , LLC Phone: Mailing Address: Physical Address: Facility Contact: Aev-� M oy,5 Title: Onsite Representative: 11 Certified Operator: 3_0h G1. Back-up Operator: A" k ice+ woo S Location of Farm: Region: �D Phone: Integrator: uc Certification Number: A 3.27D Certification Number: Latitude: Longitude: Design Current Design Current Design Current Swine ity Pop. Wet4Poultry7. Capacity Pop. Cattle Capacity Pap. Wean to Finish Wean to Feeder Feeder to Finish_ La er Non -La er s _ Dai Cow Dai Calf DairyHeifer Farrow to Wean LIL111 Design Current Dry Cow Farrow to Feeder Farrow to Finish Gilts iD Poult `Ca paci_t7y=P,o Layers Non -Layers Non -Dairy Beef Stocker Beef Feeder Boars Pullets Turkeys I 113eef Brood Cow Other Turkey Pouets Other Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWQ) 2_ Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? ❑ Yes RD No ❑ NA ❑ NE ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes [� No [:]Yes [ No NA ❑ NE NA ❑ NE NA ❑ NE ❑NA ❑NE ❑ NA ❑ NE Page 1 of 3 21412011 Continued i 1 jFacWty Number: - Date of Inspection: L Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No Od NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: 1690 Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes 1 No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? [:]Yes ® No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 7� 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes �j No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes [P No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.)) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of AcceptableCropWindow __++ ❑/jEvidence of Wind Drift jj❑ Application Outside of Approved Area 12. Crop Type(s): ZA ` rt'htIK.tLl L7rz�SS l �lah r f�5 T��P : JA+. O'Wh DG V/' 13. Soil Type(s): -/ti 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes [n No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? [:)Yes [�g No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes ® No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? 18. Is there a lack of properly operating waste application equipment? ❑ Yes P No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box. ❑ WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. [:]Yes [P No ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes No 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes No ❑ NA ❑ NE ❑ Weather Code ❑ Sludge Survey ❑ NA ❑ NE ❑NA ❑NE Page 2 of 3 21412011 Continued � . L Facility Number: jDate of Inspection:141151(4 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes 1# No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes M No ❑ NA ❑ NE the appropriate box(es) below. LPU ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of fast survey indicating non-compliance: 25. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes No ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes] No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes 91 No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface file drains exist at the facility? If yes, check the appropriate box below. ❑ Yes 0 No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? [:]Yes No ❑ NA ❑ NE Reviewer/inspector Name: Reviewer/inspector Signature: Page 3 of 3 Phone: 10-4133-3-2cc) Date: 7711 21412011 3 /z-7 (Type of Visit: ® Compliance Inspection O Operation Review O Structure Evaluation O Technical Assistance I Reason for Visit: 4D Routine O Complaint O Follow-up O Referral O Emergency O Other Q Denied Access Date of Visit: / Arrival Time: i Departure Time: County Farm Name: - 1 00 A I llll"1 1 — j Owner Email: Owner Name: — G f ` f) Phone: Mailing Address: Physical Address: Region: Facility Contact: MA2 &Idd' Title: Phone: t Onsite Representative: iIntegrator: fJV Ltd n _r- Certified Operator: �Q� o Ln Certification Number: Back-up Operator: Certification Number: Location of Farm: Latitude: Longitude: Design Swine Capacity Wean to Finish Current Pop. Wet Poultry La er Dee gn Cap cityCattle i Current .. gn Current EKC±cityPop. Da' Cow Wean to Feeder Non -La er Da' Calf Feeder to Finish "'` DairyHeifer Farrow to Wean Design Current Cow Farrow to Feeder Dr. P.ouIt . Ca aci P,o Non -Daily Farrow to Finish Layers Beef Stocker Gilts Non -Layers Beef Feeder Boars Pullets Beef Brood Cow Turke s Other J Turkey Points 01 Other Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: ❑ Yes [XNo ❑ NA ❑ NE a. Was the conveyance man-made? ❑ Yes ❑ No [M NA [] NE b. Did the discharge reach waters of the State? (If yes, notify DWQ) ❑ Yes ❑ No ONA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWQ) [:]Yes [:]No [RNA [] NE 2. Is there evidence of a past discharge from any part of the operation? [:]Yes Cg No ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters [:]Yes [@ No ❑ NA ❑ NE of the State other than from a discharge? Page I of 3 21412011 Continued Facili Number: - Zy Date of Inspection: - L -13 Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes rL-,-U* No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No 14 NA ❑ NE Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes �] No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes PNo ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes Z] No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes f No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes �No ❑ NA ❑ NE maintenance or improvement? TT I I _ Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes to No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window n Evidence of Wind Drift n Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes Wo ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes ® No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes Q5 No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes P No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? if yes, check ❑ Yes ® No ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes ® No ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Rainfall ❑Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections 22. Did the facility fail to install and maintain a rain gauge? [:]Yes 2!yNo 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes �] No ❑ NA ❑ NE ❑ Weather Code ❑ Sludge Survey ❑NA ❑NE ❑ NA ❑ NE Page 2 of 3 21412011 Continued Facility Number: tj S - Date of Inspection: (, / 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes [)q No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes W No ❑ NA ❑ NE + the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? [:]Yes ;B No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No J!�p NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fait to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface the drains exist at the facility? If yes, check the appropriate box below ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: ❑ Yes 0 No ❑ NA ❑ NE ❑ Yes 8 No ❑ NA ❑ NE [—]Yes %�j No ❑ NA ❑ NE ❑ Yes n No ❑ NA ❑ NE 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes (2 No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes] No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ® No ❑ NA ❑ NE Comments (refer to question # : Explain any YES answers:.and/or=any additional recommendations or,any other comments: Use drawings of facility to better explain;situations:(nse additio>Ral:pages as necessary). ' , _ �`°`; „ '. M j � s 4%j< C-tXC' z f&�(3 qL ReviewerAnspector Name: Reviewer/Inspector Signature: Page 3 of 3 Phone: 4 1 `r -33 3-3 00 Date:113 21412011 a ype ui v Isir: p %-ompuance inspeenon l.! Vperanon xevtew U Ntructure t:vamanon U I ecttnical Assistance I Reason for Visit: S Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency _0 Other 0 Denied Access Date of Visit: z. Arrival Time: Departure Time: }� County: &DB Region: Farm Name:' 14C " 1A 1-4 Owner Email: Owner Name: i y0 Phone: Mailing Address: Physical Address: Facility Contact: MI ke t� Title: Onsite Representative: ' Certified Operator: jo— kA- Back-up Operator: Phone: Integrator: 1•' I 6Otort Certification Number: 17-55,70 Certification Number: Location of Farm: Latitude: Longitude: Swine can to Finish Design Capacity GCurrenE V Pap �,t`"Wet Poultry Layer Design t Current ' °r t .. Design C•urrenE Capacity' P,iip Cattle Capacity Pop. Dairy Cow can to Feeder Feeder to Finish Non -La er Dairy Calf Dairy Heifer Farrow to Wean Design Current " Cow D Farrow to Feeder D . aPmoult , Ca ace_iNon-Dairy Farrow to Finish La ers Beef Stocker Gilts Non -La ers Beef Feeder Boars FdiPullets '- Beef Brood Cow .. Turkeys Othe Turkey Poults ¢� ° Other Other Discharges and Stream Impacts l . Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes P No ❑ NA ❑ NE ❑ Yes ❑ No �p NA ❑ NE b. Did the discharge reach waters of the State? (if yes, notify DWQ) ❑ Yes ❑ No [T NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? ❑ Yes ❑ No ❑ Yes qNo ❑ Yes No NA ❑ NE ❑ NA ❑ NE ❑ NA ❑ NE Page 1 of 3 21417011 Continued Faeili Number: -I Date of Inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes [�] No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ® NA ❑ NE Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: 700 7b2� Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes No ❑ NA ❑ NE waste management or closure plan? If any of questions 46 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes No [DNA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. [] Yes ® No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window,w //��❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 6q5 �lYw94 au.55 -rl' t,�71 �. 5ft ��, Ott Pe u&f 13. Soil Type(s): LYl— 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes rp No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes Ea No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes % No ❑ NA ❑ NE ` acres determination? T 13 17. Does the facility lack adequate acreage for land application? ❑ Yes No ❑ NA ❑ NE 18. is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes ®No T� ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? if yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes IQ No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes No ❑ NA ❑ NE Page 2 of 3 21412011 Continued Facili Number: - Date of Ins ection: 3�L /' 2 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box(es) below. Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? [:]Yes No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes No ❑ NA ❑ NE and report mortality rates that were higher than normal? 1T 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 3 L Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. El Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? ❑ Yes � No ❑ Yes No ❑ Yes No ❑ NA ❑ NE ❑ NA ❑ NE ❑ NA ❑ NE ❑ Yes 11 No TT ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes rM No ❑ NA ❑ NE lUse Comments facilftyeto! belt r expta n situations (use additional pages'asers and/or tneces- �� mendations or any other comments. �- I V'f cej 44' Ste �r`�r� � If�l12r Reviewer/Inspector Name: Reviewer/Inspector Signature: Page 3 of 3 Phone: q10-4433 -33tV Date: ?I t 2:1,Z- 21412011 Type of Visit • Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit 0 Routine 0 Complaint 0 Fallow up 0 Referral 0 Emergency 0 Other ❑ Denied Access Date of Visit: Arrive[ Time: � Departure Time: County: Region: H r Farm Name: Oo r /-G� t"l4V #* Owner Email: Owner Name: UL _ Phone: Mailing Address: Physical Address: Facility Contact: 1 ► X-C -I- Title: Phone No: Onsite Representativ u Integrator: 49��9Certified Operator �� n 2,36p��Stor Certification Number: Back-up Operator: 1�400,.�c Back-up Certification Number: r 03N? Location of Farm: Latitude: = o = I = « Longitude: E=1 o ❑ i = " Design Current Swine Capacity Population ❑ an to Finish ❑ an to Feeder _ � -xx?ca, w ;DDesign Current Wet Poultry 4Capacty Population ❑ Layer ❑ Non -Layer Design Current C►attle Capacity Population ❑Dai Cow ❑Dai Calf ❑ Feeder to Finish., ❑Dairy Heifer Farrow to Wean 1 Discharges & Stream Impacts l . Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Page I of 3 ❑ Yes 0 No ❑ NA ❑ NE ❑ Yes ❑ No r NA ❑ NE ❑ Yes ❑ No 1p NA ❑ NE PPNA ❑ NE ❑ Yes ❑ No ❑ Yes [P No ❑ NA ❑ NE ❑ Yes IVNo ❑ NA ❑ NE 12128104 Continued Date of Inspection O Facility Number: — Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes No ElNA ❑ NE a. If yes, is waste level into the structural freeboard? []Yes No ONA ❑ NE Sr tcture I Structure 2 Structure 3 Structure 4 tI 6 V Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes �No El NA [I NE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes No ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes No ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes No ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes PNo ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) i ❑ PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Croptype(s) P,&" A17 I 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes V No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes �*o ❑ NA ❑ NE I& Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination ? ❑ Yes P No ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application'? ❑ Yes RNo ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes V No ❑ NA ❑ NE Comrtzents (re..fer to question: Explain any YES.answers and/or any recommendations,or,�any other comments.>, Use drawings of facility to better. ezplatn situations. (use additional pages as necessary). Reviewer/Inspector Namep ,«wc Phone: Reviewer/Inspector Signature: Date: [� n. 17 -r2 1 Facility Number: Date of Inspection lO Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box. ❑ WUP [3 Checklists El Design El Maps El Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections [:]Monthly and V Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes No ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes No ❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes f 5 No ❑ NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes 1� No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes No ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes No ❑ NA ❑ NE General Permit? (ic/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes No ❑ NA ❑ NE Page 3 of 3 1212&04 J Type of Visit 0 Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit *,Routine 0 Complaint 0 Follow up 0 Referral 0 Emergency 0 Other ❑ Denied Access Date of Visit: I S 1 Farm Name: Owner Name: Mailing Address: Physical Address: Arrival Time: Q�:AOQw• Departure Time: 07" County: qbk"� " Region: EeK 26 Owner Email: W Phone: Facility Contact: '' r,"-jW �^/y rnblt� Title: Phone No: Onsite Representative: — -^ 14 Integrator: Certified Operator:yy'S'i �p�/ Operator Certification Number: Back-up Operator: Back-up Certification Number: Location of Farm: Latitude: [= e 0 l =di Longitude: = ° [--] f = " Design Current:; . x Design Current - Design Current Swine Capacity Population" 3 ?�'et Pou ltry ,Cap ty Population ,Cattle ea aci Po ulation ❑ Wean to Finish ❑ La er El Dairy Cow ❑ Wean to Feeder ❑ Non -La er ❑ Dairy Calf ❑ Feeder to Finish A Yli, ❑Dairy Heifer arrow to Wean Dry Poultry ❑ D Cow El Farrow to Feederon- ❑ Layers airy ❑ Farrow to Finish ❑ Beef Stocker ❑ Gilts ElNon-La Non -Layers El Beef Feeder ❑ Boars El s ❑ Beef Brood Co Other El Turkeys ❑ Turkey Poults _ ❑ Other V, ❑ Other 1' Num#�erof'Struetures:Cst Dischames & Stream Imoacts 1. Is any discharge observed from any part of the operation? ❑ Yes No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? ❑ Yes ❑ No 11PNA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWQ) ❑ Yes ❑ No tpNA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) ❑ Yes ❑ No A [:1NE 1 Is there evidence of a past discharge from any part of the operation? ElYes (1No tNA ❑ NE 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State ❑ Yes 16No ❑ NA ❑ NE other than from a discharge? Page I of 3 12128104 Continued Facility Number: — Date of Inspection Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes ❑NA ElNE a. If yes, is waste level into the structural freeboard? ElYesrNo No [ INA El NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: 7� -C'7 6 ttu . Spillway?: Designed Freeboard (in): Observed Freeboard (in): 33 36 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes &No ❑ NA ❑ NE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes No ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environments at, notify DWQ 7. Do any of the structures need maintenance or improvement? ,Yes ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes No ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) T 4. Does any part of the waste management system other than the waste structures require 0 Yes U§No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes A No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) []PAN ❑ PAN > 10% or 10 lbs [:]Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes o ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination?❑ yes No ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes No ❑ NA ❑ NE 18, Is there a lack of properly operating waste application equipment? ❑ Yes lNo ❑ NA ❑ NE 3':answers and/or any recommendations 1. tJ&.f � "c- aelea'c o tt b4 l4S00 r S - Reviewer/Inspector Name 1 / l Phone• 91PS7 Reviewer/inspector Signature: Date: 5 Page 2 of 3 12129104 Continued Facility Number: Date of Inspection Re wired Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes P No ❑ NA ElNE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes MNo ❑ NA [I NE the appropriate box. ElWUP El Checklists El Design ❑ Maps ❑ Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes F No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes No ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes No ❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes No ❑ NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes P No ❑ NA ❑ NE 27. Did the facility fail to se re a phosphorus loss assessment (PLAT) certification? ❑ Yes lNo ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes VpNo ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes rNo ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes No ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes No ❑ NA ❑ NE Page 3 of 3 12128104 Type of Visit (3rtompliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit routine 0 Complaint 0 Follow up 0 Referral 0 Emergency 0 Other ❑ Denied Access Date of Visit: 3-�%-D Arrival Time: irz%�S Departure Time: /Z: 3S County: Region: " u r Farm Name: 7l4 /� 7621 Owner Email: Owner Name: i �� �lt�Ll IJ Phone: Mailing Address: Physical Address: Facility Contact: Re� 1 p 'Title: Onsite Representative: Certified Operator: Back-up Operator: Phone No: p Integrator: rzrU Af Operator Certification Number: Back-up Certification Number: Location of Farm: Latitude. • = 0 0 ` =" Longitude: = ° ❑ ` ❑ " Lon Design Current De°sign Current Design Current Swine Capacity Population Wet Poultry Caacity Population C►tittle Capacity Population ❑ Wean to Finish ❑ Layer ❑ Dairy Cow ❑ Wean to Feeder ❑ Non -Laver ❑Dairy Calf ❑ Feeder to Finish F: ❑ Dairy Heifer Farrow to Wean ZDDO Dry Poultry El Dry Cow ❑ Non -Dairy El Farrow to Finish ❑ ❑ Beef Stocker Non-LayersEl ❑ Beef Feeder ElPullets ❑ Beef Brood Cow --: Other s� ❑ Turkeys ❑ TurkeyPoults ❑ Other ❑Other Number of Structures: ® Farrow to Feeder D D � ❑ Gilts ❑ Boars Dischar:?es &Stream Impacts 1. Is any discharge observed from any part of the operation? Dyes i No ❑ NA ❑ NE Discharge originated at_ ❑Structure El Application Field El Other a. Was the conveyance man-made? El Yes ®No ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWQ) ❑Yes ®No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (Ifyes, notify DWQ) ❑yes [n No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? El Yes ®No ❑ NA ❑ NE 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State ❑Yes [4 No ❑ NA ❑ NE other than from a discharge? Page 1 of 3 12/28/04 Continued Facility Number:-7 $� [�L� Date of Inspection Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ® No ❑ NA ❑ NE Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: g/ Spillway?: Designed Freeboard (in): 7 Observed Freeboard (in): 32 Ar 32 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes V No ❑ NA ❑ NE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes ® No ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes [?fNo ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes EN No ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes �fl No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes ® No ❑ NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes M No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) []PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop ❑ Evidence of Wind Drift ❑ Application Outside ofArea /Window 12. Crop type(s) S"_AtKd G t' � . Mom/ j 13. Soil type(s) ^IO/-i 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes n No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes [ifl No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination'? ❑ Yes [jfl No ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes A No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes )9 No ❑ NA ❑ NE Comments refer to question #) Ex lain any YES:answers and/or an recommendations o%an other comments ( q P Y Y Use drawings of facility to better explain- situations. (use additional pages as necessary) .. _ham; LZe"vii'ewerlinspector er/Inspector Name �7_ Q�Q �� Phone: �y/4 . �3� - j3y� Signature: Date: 3`3j— Zt�4g Page l of f 12128104 Lanrrnuea Ar I I Facility Number: 7 — Date of Inspection Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes 19No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes IF No ❑ NA ❑ NE the appropriate box. ❑ WUP Cl Checklists ❑ Design El Maps El Other 21, Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes T No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stacking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes `f' No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes No ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes [� No ❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes No ❑ NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes P No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes [P No ❑ NA ❑ NE Other lssues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ® No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes 0 No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes [3 No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes No ❑ NA ❑ NE General Permit? (ic/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes ❑ No ❑ NA ❑ NE Additional Comments and/or Drawings -... - x Page 3 of 3 12128104 Type of Visit • ® Compliance Inspection O Operation Review O Structure Evaluation O Technical Assistance Reason for Visit 4 Routine O Complaint O Follow up O Referral O Emergency O Other ❑ Denied Access Date of Visit: -I �-4�] Arrival Time: -%:00 Departure Time: 7, Op County: Region: Farm Name: / Owner Email: Owner Name: ///ao 14V�Al Phone: Mailing Address: Physical Address: Facility Contact: Q Title: Onsite Representative: �a� B+•_.�ri�/�✓ Certified Operator: Back-up Operator: Phone No: p Integrator: wA,'O" Operator Certification Number: Back-up Certification Number: Location of Farm: Latitude: = 0 0 I =" Longitude: E] o E__1 ` = " Design Current MAMMOMMOM Design Current Design Current Swine Capacity Population Wet Poultry Capacity Population Cattle Capacity Population ❑ Wean to Finish ❑ Layer ❑ DairyCow ❑ Wean to Feeder ❑ Non -Layer ❑ DairyCalf Feeder to Finish ;� . ❑ Dairy Heifer 91 Farrow to Wean 7�OOD�,r Dry Poultry - ❑ Cow DO Farrow to Feeder �Z> ❑ Non -Dairy ❑ Farrow to Finish ❑ La ers ❑ Beef Stocker ❑ Gilts ❑ Non -Layers El Beef Feeder ❑ Boars El Pullets ❑ Beef Brood Co ❑ Turkeys Other ❑ Other ❑ Turkey Poults 10 Other Number of Structures: 1 Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes [A No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? ❑ Yes No ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWQ) ❑ Yes [ No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) ❑ Yes [ No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes No ❑ NA ❑ NE 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State ❑ Yes INo ❑ NA ❑ NE other than from a discharge? Page 1 of 3 12128104 Continued r Date of Inspection Z wp Facility Number:'"? - Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes 0 No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes P9 No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure S Structure 6 Identifier: - t'O 9 0 Spillway? - Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No ❑ NA ❑ NE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes 14 No ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes No ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes No ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes [ No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 Ibs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) ge.#_UA . j4(1t__ 6 k �G�a�� �... /��a. : w/ �"OY+.j,-S-e_� 13. Soil type(s) z\ o A 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination ? ❑ Yes No ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes [?RNo ❑ NA ❑ NE Comments (refer to question fl: Explain any YES answers andlor any recommendations or any ,(uother�comments Use drawings of facility to better explain situations se additional pages as necessary) Reviewer/Inspector Name ILy ',1 Phone: 910 V33, 33310 Reviewer/inspector Signature: Date: Z _/�f Page 2 01 3 12128104 Continued Facility Number: 743— Date of inspection Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes { No ❑ NA ❑ NE the appropriate box. ❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes V No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes 1P No ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes No ❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes No ❑ NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes No ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ® No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes MNo ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes JA No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes 1� No ❑ NA ❑ NE General Permit? (iel discharge, freeboard problems, over application) 32, Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes &No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes PNo ❑ NA ❑ NE Page 3 of 3 12128104 El Type of Visit ®Compliance Inspection Q Operation Review Q Structure Evaluation Q Technical Assistance Reason for Visit 4P Routine Q Complaint Q Follow up Q Referral Q Emergency Q Other ❑Denied Access Date of Visit: Arrival Time: Di 3t7 . Departure Time: O: County: Region: /ERK Farm Name: # ea 90 ' 1 7 (091 ' Owner Email: Owner Name: A& k4k &Yo C f Phone: Mailing Address: Physical Address: Facility Contact: !! pp Title Onsite Representative: l+�crru d E> Certified Operator: Back-up Operator: �yJPhone /No: Integrator: 12.4-a&Jn/ _ Operator Certification Number: Back-up Certification Number: Location of Farm: Latitude: = e 0 I ET Longitude: =° 0 I= u Design Current Design Current Design Current Swine Capacity Population Wet Poaltry Capaac�ity opuration Cattle Capacity Population ❑ Layer ❑ DairyCow ❑ Non -Layer ❑Dai Calf ❑ DairyHeifer Dry Poultry: `. `-:. ❑ D Cow ❑ Layers ❑ Non -Dairy ❑ Beef Stocker ❑ Non -La ers ❑ Beef Feeder ❑ Pullets ❑ Beef Brood Cow ❑ Turkeys Other ❑ TurkeyPoults ❑ Other ❑ Other Number of Structures: ❑ Wean #o Finish Feeder Finish Wean ObD Feeder, � DOD Finish Discharges &Stream Impacts I. Is any discharge observed from any part of the operation? ❑Yes CRNo ❑ NA ❑ NE Discharge originated at: El Structure El Application Field ❑Other a. Was the conveyance man-made? El Yes ®No ❑ NA ❑ NE b. Did the discharge reach waters of the State? {If yes, notify DWQ} El Yes A] No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State {gallons}? d. Does discharge bypass the waste management system? (If yes, notify DWQ) El Yes ®No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? El Yes ®No ❑ NA ❑ NE 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State El Yes JU No ❑ NA ❑ NE other than from a discharge? Page I of 3 12128104 Continued 4 Facility Number: 7 - ! Date of Inspection Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes L,&No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ® No ❑ NA ❑ NE , 7L9/-/ Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: 7 & %D — I 71&9h - I Spillway?: Designed Freeboard (in): ZO 4 Observed Freeboard (in): (p 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes 2( No ❑ NA ❑ NE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes P No ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes [ No ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes �i No ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes [7No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes [? No ❑ NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes [2fNo ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 Ibs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift El Application Outside of Area 12_ Crop type(s) i3e `kd �cd ( fire.,, l9 Yr � _ k�eti / S _au' J l Q V ueSt C-40( J 13. Soil type(s) �p 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes [VNo ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination ? ❑ Yes 17. Does the facility lack adequate acreage for land application? ❑ Yes 18. Is there a lack of properly operating waste application equipment? ❑ Yes IN No ElNA ElNE Im No ❑ NA ❑ NE la No ❑ NA ❑ NE [4No El NA El NE Comments (refer -to question #): Explain any YES`'MiOi s and/or any recommendations or an o her com ents Use'drawffigs,6f facility to better explain situations" (use a`ddrhonal pages as necessary): Reviewer/Inspector Name i RL�j. S —_____ --- Phone: (910) Reviewer/Inspector Signature: RAA Rea_ Date: 4,-OJ-Z©Q Page 2 of 3 12128104 Continued Facility Number: -7 Date of Inspection -W Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes Dg No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes ® No ❑ NA ❑ NE the appropriate box. ❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes E4 No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes (A No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes Q§ No ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes No ❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes No ❑ NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes 1% No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes M No ❑ NA El NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes TP No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes W No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes 1P No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes No ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes [� No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes No ❑ NA ❑ NE Additional :Comments and/or Drawings: Page 3 of 3 12128104 .04 Type of Visit ®Compliance Inspection O Operation Review O Structure Evaluation Q Technical Assistance Reason for Visit O Routine O Complaint O Follow up O Referral Q Emergency O Other ❑Denied Access Date of Visit: Arrival Time: Departure Time: County: JR 429SA& L_ Region: F� Farm Name: _ 76o 90___/ 7& 91 Owner Email: Owner Name: AG110 n 4 — u. Ln1 Phone: Mailing Address: Physical Address: Facility Contact: Title: Onsite Representative: -at LA 4 Q uwt ae tlJ�te Certified Operator: Back-up Operator: N Phone No: Integrator: 1VI t"y 011 a VZ i', ^j Operator Certification Number: Back-up Certification Number: Location of Farm: Latitude: ❑ e = ❑ it Longitude: = ° = 4 = 1i Design Current i� Design Current (Design Current Swine Cap city Population Wet PouEtar. � Cap ty Popnlatton ' Cattle Capacity Populati [] La er ', ❑ Non-Layet ltryMO. Dry. Pftj .. Other ❑ Other ' Number of Structures? ❑ Wean to Finish ❑ Wean to Feeder ❑ Feeder to Finish Farrow to Wean �(� a Farrow to Feeder 'Z OO'a ❑ Farrow to Finish ❑ Gilts ❑ Boars Discharges & Stream Impacts ❑ Layers ❑ Non -Layers ❑ Pullets ❑ Turkeys ❑ Turkey Poults ❑ Other ❑ Dairy Cow ❑ Dairy Calf ❑ Dai Heifer ❑ D Cow ❑ Non -Dairy ❑ Beef Stocker ❑ Beef Feeder ❑ Beef Brood Co 1. is any discharge observed from any part of the operation? ❑Yes ®No ❑ NA ❑ NE Discharge originated at: El Structure ❑Application Field El other a. Was the conveyance man-made? ❑Yes ®No ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWQ) ❑Yes ®No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge by the waste management system? (If yes., notify DWQ) El Yes �No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑Yes � No ❑ NA ❑ NE 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State ❑Yes � No ❑ NA ❑ NE other than from a discharge? 12/28/04 Cantiitued Facility Number:, — Date of Inspection �I�Z9-OS Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes ® No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes [A No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: --7-42!3Q - 7 f!p 9 1 _ Spillway?: Designed Freeboard (in): _ '2 0 Observed Freeboard (in): 7W 7 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes N No ❑ NA ❑ NE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes ® No ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes [9 No ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes ® No ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes N No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes [VNo ❑ NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes ® No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) t:�> s . A o__ C ".. / a r a a e_ ) _ SIMrx // A vial 13. Soil type(s) ND A 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ® No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes (9 No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination` ❑ Yes ® No ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes ® No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes ® No ❑ NA ❑ NE to:quest�on ##) Explatnfady YES.answersRand/or.a�} Reviewer/inspector Name � '�'C eK i �' t`S ^ ` . Phone: �1O� iw '4 .k t' ":ti'"'u4 'G' h . Reviewer/Inspector Signature: Date: I/- Z9 -195 12128104 Continued Facility Number: 7 — Date of Inspection Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes tK No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes to No ❑ NA ❑ NE the appropirate box. ❑ WUp ❑ Checklists ❑ Design ❑ Maps ❑ Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes fig No ❑ NA ❑ NE /�— �P_/L ❑ Waste Application El Weekly Freeboard ❑Waste Analysis ❑Soil Analysis El Waste Transfers nual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ® No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers-on irrigation equipment? ❑ Yes 00 No ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes Q9 No ❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes 0 No ❑ NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes [9No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes [KNo ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ® No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes IN No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes �d No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes CM No ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes 55 No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes U No ❑ NA ❑ NE ' A''ddrtionai Comments'and/or`Dr:awirr gs -_i. 12128104 Type of visit O Compliance Inspection O Operation Review O Lagoon Evaluation I for Visit 9 Routine O Complaint O Follow up O Emergency Notification O Other ❑ Denied Access Facility Number Date of Visit: Tune: — • — .�� O Not Operational O Below Threshold ® Permitted ® Certified ❑ Conditionally Certified 0 Registered Date -Last Operated or Above Threshold: Farm Nance: _�trr� #/ -- f -- -- .. �G County: me: C l2 D Owner Name: G _ ��i.• k �i3 r w a ' Phone No: �! " �9 L &` 0 0 W Mading Address: , P a a o x - "? S 9----- �(2 b c- !� % /l N G P YS.F Facility Contact: . _ . _ _ Title:. Onsite Representative: v h.rp r A 1 o _ r" r 5 s Certified Operator: - - .-------- o.- ►�?, _, -..N-•-- Location of Farm: Phone No: Integrator. -- Operator Certification Number: d ,3 7 0 w ® Swine ❑ Poultry ❑ Cattle ❑ Horse Latitude �• �' �" Longitude �• ��" •Cmzent Swine.Caaac;iv, ]Pennhitinn . .,Poalttr Wean to Feeder Feeder to Finish Farrow to Wean oCv' Farrow to Feeder 2 0 U Farrow to Finish Gilts Boars Ilesga Ctirimt xPopolatiotr CatBe . �. Other Total Desip,,.Capadty k, Discharges & Stream Imaacts 1. Is any discharge observed from any part of the operation? ❑ Yes No Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a_ If discharge is observed, was the conveyance man-made? ❑ Yes ❑ No b. If discharge is observed, did it reach Water of the State? (If yes, notify DWQ) ❑Yes ❑ No c. If discharge is observed, what is the estimated flow in gal/min? _ M//I d. Does discharge bypass a lagoon system? (If yes, notify DWQ) ❑ Yes ❑ No 2. Is there evidence of past discharge from any part of the operation? ❑ Yes [5 No 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes No Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway ❑ Yes No Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 5 Identifier: — % A —_ . - - �- t� 1r Freeboard (inches): `7 12112103 continued Facility.Numher: 79 -- Date of Inspection 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? 8. Does any part of the waste management system other than waste structures require maintenance/improvement? 9. Do any stuctures tack adequate, gauged markets with required maximum and minimum liquid level elevation markings? Waste Application 10. Are there any buffers that need maintenance/improvement? 11. Is there evidence of over application? If yes, check the appropriate box below. ❑ Excessive Ponding ❑ PAN ❑ Hydraulic Overload ❑ Frozen Ground ❑ Copper and/or Zinc 12. Crop type Ae r r►a •��� ez r c ❑ Yes [g No ❑ Yes ® No to Yes ❑ No ❑ Yes 53 No ❑ Yes (g No ❑ Yes M No ❑ Yes ® No 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAVWMP)? ❑ Yes No 14, a) Does the facility lack adequate acreage for land application? ❑ Yes No b) Does the facility need a wettable acne determination? ❑ Yes No c) This facility is pended for a wettable acre determination? ❑ Yes WNo 15. Does the receiving crop need improvement? ❑ Yes EWNo 16. Is there a lack of adequate waste application equipment? ❑ Yes ® No Odor Issues 17. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge attor below [j Yes W No liquid level of lagoon or storage pond with no agitation? 18. Are there any dead animals not disposed of properly within 24 hours? Yes j31 No 19. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, ❑ Yes No roads, building structure, and/or public property) 20. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional ❑ Yes ® No Air Quality representative immediately. Facility Number: Date of Inspection Required Records & Documents. 21. Fail to have Certificate of Coverage & General Permit or other Permit readily available? 22. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (ief VV JP, checklists, design, maps, etc.) 23. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Waste Application ❑ Freeboard ❑ Waste Analysis ❑ Soil Sampling 24. Is facility not in compliance with any applicable setback criteria in effect at the time of design? 25_ Did the facility fail to have a actively certified operator in charge? 26. Fail to notify regional DWQ of emergency situations as required by General Permit? Oe/ discharge, freeboard problems, over application) 27. Did Reviewer/Impector fail to discuss reviewCmspection with on -site representative? 28. Does facility require a follow-up visit by same agency? 29. Were any additional problems noted which cause noncompliance of the Certified AWMP? LAMES Permitted Facilities 30. Is the facility covered under a NPDES Permit? (If no, skip questions 31-35) 31. If selected, did the facility fail to install and maintain rainbr Bakers on irrigation equipment? 32. Did the facility fail to install and maintain a rain gauge? 33. Did the facility fail to conduct an annual sludge survey? 34. Did the facility fail to calibrate waste application equipment? 35. Does record keeping for NPDES required forms need improvement? If yes, check the appropriate box below ❑ Stocking Form ❑ Crop Yield Form ❑ Rainfall ❑ Inspection After I" Rain ❑ 120 Minute Inspections ❑ Annual Certification Form ❑ Yes 50 No ❑ Yes ® No ❑ Yes CO No ❑ Yes ® No ❑ Yes M No ❑ Yes ® No ❑ Yes [I No Yes ❑ No [:]Yes j9 No ® Yes ❑ No ❑ Yes ® No ❑ Yes ® No ❑ Yes 9 No 09 Yes ❑ No ❑ Yes ❑ No 12112103