HomeMy WebLinkAbout770019_ENFORCEMENT_20171231Page 2
Cognac Farm
May 28, 1999
4. Need to maintain the coastal fields that have recently been resprigged to allow the coastal to
establish.
5. Take a waste sample as close to the date of application as practical but at least 60 days before or
after application.
Please provide a written response to this office on or before June 25, 1999 regarding corrective
actions taken or planned. Nothing in this letter should be taken as absolving this facility of the
responsibility and liability of any violations that have or may result from these deficiencies. If you
have any questions concerning this matter, please call Jeffery Brown, at (910) 486-1541.
Sincerely,
/;0 2 ao-'C'�
Jeffery Brown
Environmental Engineer
cc: Sonya Avant - Compliance Group
Central Files
Audrey Oxendine - FRO DSWC
Vilma Marra - Richmond Co. MRCS
Cargill Farms
It ��•-'�' .I.r. �,,Y,�� ��.
NORTH CAROLINA DEPARTMENT OF
ENVIRONMENT AND NATURAL RESOURCES
FAYErrEVILLE REGIONAL OFFICE
DIVISION OF WATER QUALITY
May 28, 1999
Kenneth Robinette
126 Scotch Lane
Marston, NC 28363
SUBJECT: NOTICE OF DEFICIENCY
Cognac Farms
Facility No. 77 - 19
Richmond County
Dear Mr. Robinette:
On May 19, 1999, staff from the Fayetteville Regional Office of the Division
of Water Quality inspected the Cognac Farm swine facility. It was observed that
portions of the back slopes along with an area at the toe of the lagoon dike
contained some erosion. There was some trash (bottles, syringes, needles, etc.)
observed within the lagoon. It was noted from the inspection that one of the
application fields contained small grain. However, according to the Certified
Animal Waste Management Plan (CAWMP) coastal bermuda was the specified
crop for this field. Some of the spray fields had recently been resprigged. Only
one waste sample was taken in 1998 according to the on-site records. The
CAWMP requires that waste should be tested within 60 days of application.
In regard to the deficiencies noted during the inspection, the following actions are
requested:
1. Establish vegetation on the back slopes and the toe of the lagoon dikes to
prevent further erosion.
2. Need to prevent trash from entering the lagoon through the discharge pipes
from the buildings.
3. Contact a technical specialist in order to revise the CAWMP to reflect the
current crops along with the specified Plant Available Nitrogen (PAN) rates for
each crop.
228 GREEN STREET, SUITE 714, FAYETTEVILLE, NORTH CAROLINA 28301-5043
PHONE 010.486-1841 FAX IDM -486-0707
AN EQUAL OPPORTUNITY / AFFIRMATIVE ACTION EMPLOVER - 1S0% RECYCLER/I 0% P09T•CONSUMER PAPER