Loading...
HomeMy WebLinkAbout20190224 Ver 1_Jordan Falls-LSNL-Accounting tool-030819_20190328Watershed Characteristics Ver2.0 I Clear All Values I Return to Instructions , I Proceed to RMP Characteristics I Skip to Development Summary Instructions 1. Select your physiographic/geologic region. (see map on 'instructions' page) 2. Enter the area of the entire development in square feet (ft'). 3. Select the location that is most representative of the site's precipitation characteristics. (see map on 'instructions' page) 4. For each applicable land use, enter the total area of that land use that lies within the development under pre -development conditions. 5. For each applicable land use, enter the total area of that land use that lies within the development under post -development conditions, before BMP implementation. 6. Ensure that the sum of pre- and post -development areas entered equal the orginal development area. 7. Continue to "BMP Characteristics" tab. Additional Guidelines - For non-residential watersheds, indicate acreages of each land use type in Column 1 for both pre -and post -development conditions. - For residential watersheds, complete the required information in Column 2 for both pre- and post -development conditions. If a given land use is not present in the given watershed, leave the cell blank or enter a zero. Ensure that land use areas entered for both pre -and post -development conditions match the total development area entered in cell 021. Residential areas may be entered by average lot size (column, part A), or may be separated into individual land uses (column 2, part B) -- do NOT list out individual land uses within an area already described by lot size. Unless runoff flowing onto the development from offsite is routed separately around or through the site, the offsite catchment area draining in must be included in the acreage values of the appropriate land use(s) and treated. Physiographic/Geologic Region: Piedmont Soil Hydrologic Group B Precipitation location: Butner COLUMN 1 -- NON-RESIDENTIAL LAND USES COLUMN 2 -- RESIDENTIAL LAND USES COMMERCIAL Parking lot TN EMC (mg/L) 1.44 TP EMC (mg/L) 0.16 Pre- Development W) Post - Development W) Roof 1.08 0.15 Open/Landscaped 2.24 0.44 %-ac lots INDUSTRIAL Y -ac lots Parking lot 1.44 0.39 9,907 15,425 Roof 1.08 0.15 23,126 25,350 Open/Landscaped 2.24 0.44 14,625 5,383 TRANSPORTATION Multi -family High Density (interstate, main) 3.67 0.43 Townhomes Low Density (secondary, feeder) 1.4 0.52 Custom Lot Size Rural 1.14 0.47 PART B Sidewalk 1.4 1.16 Roadway Driveway Parking lot Roof Sidewalk/Patio PERVIOUS 1.4 0.52 1.44 0.39 1.44 0.39 1.08 0.15 1.4 1.16 Lawn Managed pervious 3.06 0.59 Managed pervious Unmanaged (pasture) 3.61 1.56 Forest Forest 1.47 0.25 Natural wetland` JURISDICTIONAL LANDS' Riparian buffer` Open water' LAND TAKEN UP BY BMPs Natural wetland Riparian buffer Open water LAND TAKEN UP BY BMPs 1.08 0.15 1,500 'Jurisdictional land uses are not included in nutrient/flow calculations. Total Development Area (ft'): 47,658 Development Name: Creedmoor - Building C Resin Storage Expa Model Prepared By: CE LAND USE AREA CHECK Total Development Area Entered (ft'): 47,658 Total Pre -Development Calculated Area (ft'): 47,658 Total Post -Development Calculated Area (ft'): 47,658 COLUMN 2 -- RESIDENTIAL LAND USES Custom Lot Size Age (ac) (Yrs) Pre- TN EMC TP EMC Development (mg/L) (mg/L) (ft) Post - Development W) PART A %-ac lots Y -ac lots Y. -ac lots 1 -ac lots 2 -ac lots Multi -family Townhomes Custom Lot Size PART B Roadway Driveway Parking lot Roof Sidewalk/Patio 1.0 1.4 0.52 1.44 0.39 1.44 0.39 1.08 0.15 1.4 1.16 Lawn 2.24 0.44 Managed pervious 3.06 0.59 Forest 1.47 0.25 Natural wetland` Riparian buffer` Open water' LAND TAKEN UP BY BMPs 1.08 0.15 LAND USE AREA CHECK Total Development Area Entered (ft'): 47,658 Total Pre -Development Calculated Area (ft'): 47,658 Total Post -Development Calculated Area (ft'): 47,658 BMP Characteristics Vill C-All— mem , khth I Ih 11aeauxsbmt. lh— . ..... ..... �00 000 000 000 000 000 3. Development Summary Development: Al- Creedmppr- Building C Resin SWmge Expansion Prepared By: CE Dare: March 26, 2019 WATERSHED SUMMARY Ver2.0 BMP VOLUME REDUCTIONS/EFFLUENT CONCENTRATIONS REGION: Piedmont TOTAL DEVELOPMENT AREA (ft-): 47,658 Pre-Deyelopmem Conditions Post De lopmem C .ditbm ppst4 elopmem w/ BMps Pe -M Impervious 69.3% 88.7% 88.7% (%) 0.95 0.12 Annual Runoff Volume 125,614 158,150 130,]95 (U) Bbretentlon whhout 35% Total Nltmgen EMC 1.21 1.22 1.09 (mg/L) Total Nitrogen Loading 8.69 11.00 8.11 (Ib/ac/yr) Grassed Swale 0% Total Phosphorus EMC 0.23 0.24 0.13 XL) 1.08 0.15 Total Phosphorus Loading 1.63 2.16 0.97 (lb/aJttl Strip Percent Di(/erenm Between: 'Negative percent difkrentt values indicate a decrease in runoRvolume, pollutant cpncenbadon or pollutant loading. Posidve values Indkate an increase. BMP SUMMARY Ver2.0 Return to lnrtructions Return to Watershed Characteristic I Return to BMP Characteristics Print Summary Catchment Outflow Nitrogen EMC(mg/L) Volume Reduction Effluent Con<en. TPEHluent Concen. 8.05 - -- - - - IT. 1%) Img/L) (mg/L) Bbretention with 50% 0.95 0.12 IWS Wtchment Outflow 0.984 - -- - - - Total Phosphoms (Ib/nm Bbretentlon whhout 35% 1.00 0.12 IWS Dry Detemipn pond o% 1.20 0.20 Grassed Swale 0% 1.21 0.26 Green Roof 50% 1.08 0.15 Level Spdr, Fllter 40% 1.20 0.15 Strip Permeable Paw:mear 0% 1.44 0.39 Sand Filter 5% 0.92 0.14 Water Harvesting user de0ned 1.08 0.15 Wet Detention Pond 10% 1.01 0.11 Wetland 20% 1.08 0.12 Return to lnrtructions Return to Watershed Characteristic I Return to BMP Characteristics Print Summary Catchment Outflow Nitrogen EMC(mg/L) 1.10 - - - - - 6Uhment Outflow 8.05 - -- - - - TotalNltrogenllb/ac/tt) Percent ...wm Nitrogen Load (%) 30% - - - - - Crtchment 0u 1_Phosphoms EMC 0.135 - -- - - - (mg/L) Wtchment Outflow 0.984 - -- - - - Total Phosphoms (Ib/nm Percent Reductlon In Phosphorus Load (%) 58% - -- - - -