Loading...
HomeMy WebLinkAboutNCG140037_CEI with cover letter_20190401ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Interim Director Concrete Service Company, Inc. Attn: Richard R. Allen PO Box 1867 Fayetteville, NC 28302 NORTH CAROLINA Environmental Quality April 1, 2019 Subject: COMPLIANCE EVALUATION INSPECTION NPDES General Permit NCG140000 Concrete Service Company, Inc. Concrete Service - Dunn, Certificate of Coverage NCG140037 Harnett County Dear Mr. Allen: On March 25, 2019, a site inspection was conducted for the Concrete Service - Dunn facility located at 401 North Fayetteville Avenue, Dunn, Harnett County, North Carolina. A copy of the Compliance Inspection Report is enclosed for your review. Mr. Ricky Parker, Plant Manager, and Mr. Donald Blue, Operations Manager, were also present during the inspection and their time and assistance is greatly appreciated. The site visit and file review revealed that the subject facility is covered by NPDES General Permit NCG140000 under Certificate of Coverage NCG140037. Permit coverage authorizes the discharge of stormwater and process wastewater from the facility to receiving waters designated as a UT (unnamed tributary) of Stony Run, a Class C;Sw waterbody in the Cape Fear River Basin. As a result of the inspection, the facility was found to be in compliance with the conditions of the NCG140000 permit. Please refer to the enclosed Compliance Inspection Report for additional comments and observations made during the inspection. Please be advised that violations of the NPDES General Permit are subject to a civil penalty assessment of up to $25,000 per day for each violation. If you or your staff have any questions, comments, or needs assistance with understanding any aspect of your permit, please contact me at (910) 433-3394 or by e-mail at mike.lawyer@ncdenr.gov. Sincerely, Michael Lawyer, CPSWQ Environmental Program Consultant DEMLR Enclosure ec: Donald Blue, Operations Manager— Concrete Service Company, Inc. Winnie Jenkins, H R/Safety/Environ mental Director — Concrete Service Company, Inc. cc: FRO — DEMLR, Stormwater Files-NCG140037 �D E Q7> North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Fayetteville Regional Office 1 225 Green Street, Suite 7141 Fayetteville, North Carolina 28301 Noan+cnaouwn D".ft.d W Eaw— W 0.;a 910.433.3300 Compliance Inspection Report Permit: NCG140037 Effective: 08/01/17 Expiration: 06/30/22 Owner: Concrete Service Company Inc SOC: Effective: Expiration: Facility: Concrete Service - Dunn 401 N Fayetteville Av County: Harnett Region: Fayetteville Dunn NC 28335 Contact Person: Winnie Jenkins Title: Phone: 910-323-9198 Ext.313 Directions to Facility: System Classifications: Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representative(s): On -site representative Ricky Parker 910-892-3188 On -site representative Donald Blue 910-323-9198 Related Permits: Inspection Date: 03/25/2019 Entry Time: 11:4� Exit Time: 12:30PM Primary Inspector: 'Mike Lawyer-Z, Phone: 910-433-3300 ExtV,2T 3314 Secondary Inspector(s): Reason for Inspection: Complaint Inspection Type: Compliance Evaluation Permit Inspection Type: Ready Mix Concrete Stormwater/Wastewater Discharge COC Facility Status: Compliant Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG140037 Owner - Facility: Concrete Service Company Inc Inspection Date: 03/25/2019 Inspection Type : Compliance Evaluation Reason for Visit: Complaint Inspection Summary: Inspection conducted in response to a complaint received on March 22, 2019 made by staff with the City of Dunn concerning possible illicit discharges coming off the site onto city street. Met with Ricky Parker, Plant Manager, and Donald Blue, Operations Manager, who relayed that the facility recently completed a concrete resurfacing project on a portion of the site and that the area was washed off, however the water was directed into the facility's settling basin (reclaimer pit) through concrete swales that were installed as part of the resurfacing project. There was no water in the street at the time of inspection. Mr. Parker and Mr. Blue expressed that another portion of the site would be resurfaced in the near future. Both were advised to ensure that any wash water, rinse water, process water, etc. is directed into the settling basin prior to any discharges as authorized under the NCG140000 permit. Reviewed facility's Stormwater Pollution Prevention Plan (SPPP) and monitoring records under the current permit cycle. The SPPP appeared to contain all permit -required components. Completion of associated documents related to the required annual review and update (spills, employee training, etc.) was discussed. Monitoring records for 2018 when facility ownership changed indicate no discharges. Site observations were made including the settling basin, admixture storage with secondary containment as well as an active project regarding a clogged storm drain on King Avenue and cleaning out of the associated ditch. A recommendation was made to coordinate this project with the City of Dunn. Page 2 of 3 Permit: NCG140037 Owner - Facility: Concrete Service Company Inc Inspection Date: 03/25/2019 Inspection Type : Compliance Evaluation Reason for Visit: Complaint Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? N ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? 0 ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? 0 ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? N ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? 0 ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? 0 ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ❑ ❑ ❑ # Does the Plan include a BMP summary? N ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ❑ # Does the facility provide and document Employee Training? ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? 0 ❑ ❑ ❑ # Is the Plan reviewed and updated annually? 0 ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? 0 ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? 0 ❑ ❑ ❑ Comment Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? N ❑ ❑ ❑ Comment: See Inspection Summary for details. Analytical Monitorinq Yes No NA NE Has the facility conducted its Analytical monitoring? 0 ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ On Comment: See Inspection Summary for details. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑ # Were all outfalls observed during the inspection? 0 ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ N ❑ # Has the facility evaluated all illicit (non stormwater) discharges? N ❑ ❑ ❑ Comment: Page 3 of 3