Loading...
HomeMy WebLinkAbout20161268 Ver 2_U-4751 Utility WIS 20190402_20190402WETLAND PERMIT IMPACT SUMMARY WETLANDIMPACTS SURFACE WATERIMPACTS Permanent Fill Temp. Fill In Temp. Mechanized Hand permanent Temp. SW Existing Existing Natural Site No. Station (From/To) Structure Size / Type In Wetlands Excavation in Clearing Clearing in SW impacts Channel Channel Stream Wetlands in Wetlands Wetlands Impacts Impacts Wetlands (ac) (ac) impacts (ac) (ac) Oesign (ft) (ac) (ac) (ac) Permanent (ft) Temp. (ft) 1 -Y 1 RP D- 11 +gg.34 to -Y1 RPD- 15+03.30 Overhead Power & FO lines 0.16 (Sheet NES-05) 1 -Y1 RPD- 12+49.01 Power Pole <0.01 (Sheet NES-05) z -Y1RPD-11+07.63 to Underground 16" Water Line 0.03 0.10 Y1 RPD 15+04.47 (Sheet NES-05) 3 -L-26+76.71 Power Pole <0.01 (Sheet NES-05) 3 -L-26+66.38 to -L- Guy Pole 0.02 26+86.64 (Sheet NES-05) -Y1 RPD- 24+17.80 Overhead Power & FO Line 4 to -Y1 RPD- 24+g7.31 0.02 (Sheet NES-06) -Y1 RPD- 22+19.51 5 to -Y1 RPD- 23+21.59 Overhead Power & FO Line 0.03 (Sheet NES-06) 6 -L- 52+62.23 to -L- Overhead Power 0.15 54+53.85 (Sheet NES-07) 6 -L- 54+17.56 Power Pole <0.01 (Sheet NES-07) � -L-51+g1.93 to -�- Overhead Power & FO Line 0.04 52+42.64 (Sheet NES-07) 7 -L- 52+0620 Power Pole <0.01 (Sheet NES-07) 8 -L- 53+33.1 Power Pole <0.01 (Sheet NES-07) 9 -L- 52+75.53 Power Pole <0.01 (Sheet NES-07) 10 -L- 64+48.89 Power Pole <0.01 (Sheet NES-08) 10 -L- 64+60.07 Power Pole <0.01 (Sheet NES-08) 10 -L- 64+50.00 to -L- Overhead Power & FO lines 0.06 64+g6.50 (Sheet NES-08) 10 -L- 64+54.98 to -L- Underground Power & Communication <0.01 0.01 64+7g.39 (Sheet NES-08) 11 -L- 67+68.33 Power Pole <0.01 (Sheet NES-08) 11 -L- 67+75.17 Power Pole <0.01 (Sheet NES-08) 12 -L- 65+71.70 Power Pole <0.01 (Sheet NES-08) 12 -L- 68+32.03 Power Pole <0.01 (Sheet NES-08) �2 -L- 65+36.00 to -L- Overhead Power & FO lines 0.31 70+00.00 (Sheet NES-08) �2 -L- 65+56.53 to -L- Underground Power & Communication <0.01 <0.01 65+76.47 (Sheet NES-08) 13 -L- 70+g1.80 Power Pole <0.01 (Sheet NES-09) 13 -L- 73+55.09 Power Pole <0.01 (Sheet NES-09) 13 -L- 70+00.00 to -L- Overhead Power & FO lines 0.27 73+g1.00 (Sheet NES-09) 14 -L- 75+04.28 Power Pole <0.01 (Sheet NES-09) 14 -L- 75+11.12 Power Pole <0.01 (Sheet NES-09) 15 -L- 117+g7.70 to -L- Underground 12" & 16" Water Line <0.01 <0.01 118+29.74 (Sheet NES-12) 16 'L- 138+07.56 to -L- Underground 12" & 16" 0.01 <0.01 138+17.02 Water Line (Sheet NES-14) �� -L- 197+52 to -L- Overhead Power 0.03 198+71.95 (Sheet NES-18) �$ -L- 198+58.72 to Overhead Power 0.01 199+72.04 (Sheet NES-18) TOTALS: <0.01 0.04 0.13 0.00 1.11 0.00 0.01 0.00 0.00 0.00 Note: 4 sq. fr. (Each) = 0.0001 ac (Each) permanet impact in wetlands for pole installarion Tota1= 64 sq. ft. = 0.001 ac =< 0.01 ac Note: 871.2 sq. ft. = 0.02 ac Temp. Fill in Wetlands 171.54 sq. ft. = 0.0040 ac. 144.22 sq. ft. = 0.0033 ac Tota1= ll 86.96 sq. ft. = 0.027 ac = 0.03 ac Note: 871.2 sq. fr. = 0.02 ac Excavation in Wetlands 435.60 sq. ft. = 0.01 ac 37530 sq. ft. = 0.0086 ac 201.67 sq. ft. = 0.0042 ac 435.60 sq. ft. = 0.01 ac Total = 2319.37 sq. ft. = 0.053 ac = 0.05 ac Note: 205.43 sq. ft. = 0.0053 ac Temp. SW Impacts 114.94 sq. ft. = 0.0026 ac Tota1= 320.37 sq. ft. = 0.007 ac =O.OI ac NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS NEW HANOVER COUNTY TIP PROJECT (U-4751) REVISED DATE 4/2/19