Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
470007_INSPECTIONS_20171231
NUH I H UAHULI NA DWrurmit u Environmental Qua ? "1 El Division of Water Resources Division of Soil and Water Conservation Other Agency Facility Number: 470007 Facility Status: Active Permit: AWS470007 ❑ Denied Access Inpsection Type: Compliance Inspection Inactive Or Closed Date: Reason for visit: Routine County: Hoke Region: Fayetteville Date of Visit: 02/06/2017 Entry Time: 09:00 am - Exit Time: 10:00 am Incident # Farm Name: Farm 5786 Owner Email: Owner: Murphy -Brown LLC Phone: 910-296-1800 Mailing Address: PO Box 487 Warsaw NC 28398 Physical_ Address: Facility Status: Compliant ❑ Not Compliant Integrator: Murphy -Brown LLC Location of Farm: Latitude: 34' 56' 29" Longitude: 79' 19' 18" On southwest side of SR 1204 approx. 1 mile northwest of its intersection with Hwy 401 at Bowmore. Question Areas: - I Dischrge & Stream Impacts Waste Col, Stor, & Treat Waste Application Records and Documents Other Issues Certified Operator: Secondary OIC(s): James Brian McGugan Operator Certification Number: 986752 On -Site Representative(s): Name Title Phone 24 hour contact name Mike Cuddy Phone On -site representative Mike Cudd Phone Primary Inspector: Robert Marble Phone: Inspector Signature: Date: Secondary Inspector(s): Inspection Summary: page: 1 f r Permit: AWS470007 Owner - Facility : Murphy -Brown LLC Facility Number: 470007 Inspection Date: 02/06/17 Inpsection Type: Compliance Inspection( Reason for Visit: Routine Regulated Operations Design Capacity Current promotions Swine Swine - Farrow to Wean 2,400 I Total Design Capacity: 2,400 Total SSLW: 1,039,200 Waste Structures. Disignated Observed Type Identifier Closed Date Start Date Freeboard Freeboard Lagoon 1 19.00 44.00 page: 2 Y `l Permit: AWS470007 Owner - Facility : Murphy -Brown LLC Facility Number: Inspection Date: 02/06/17 Inpsection Type: Compliance Inspection Reason for Visit: 470007 Routine Discharges & Stream Impacts Yes No Na Ne 1. Is any discharge observed from any part of the operation? ❑ M ❑ ❑ Discharge originated at: Structure ❑ Application Field' ❑ • Other ❑ a. Was conveyance man-made? _ ❑ . ❑ M ❑ b. Did discharge reach Waters of the State? (if yes, notify DWQ) ❑ ❑ M ❑ c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (if yes,,notify DWQ) ❑ ❑ ❑ 2. Is there evidence of a past discharge from any part of the operation? ❑ 'M ,❑ El . 3. Were there any observable adverse impacts or potential adverse impacts to Waters of the . ❑ ❑ ❑ State other than from a discharge? Waste Collection, Storage& Treatment Yes No Na Ne 4. Is storage "capacity less than adequate? ❑: M ❑ ❑ .If yes, is waste level into structural freeboard? ❑ 5. Are there any immediate threats to the integrity of any of the structures observed (I.e./ large ❑ M ❑ ❑ trees, severe erosion, ? : seepage, etc.) - r 6. Are there structures on -site that are not properly addressed and/or managed through'a ❑ M ❑ ❑ waste management or closure plan? 7. Do any of the structures need maintenance or improvement? ❑ 0 ❑ ❑ 8. Do any of the structures lack adequate markers as required by the permit? (Not applicable ❑ M ❑ ❑ to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ M. ❑ ❑ maintenance or improvement? Waste Application Yes No Na Ne 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ M ❑ ❑ maintenance or improvement? 11. Is there evidence of incorrect application? _ ❑ M ❑ .❑ . If yes, check the appropriate box below. Excessive Ponding? ❑ Hydraulic Overload? ❑ Frozen -Ground? ❑. Heavy metals (Cu, Zn, etc)? ❑ PAN? ❑ Is PAN > 10016/1 b lbs.? ❑ Total. Phosphorus? ❑ Failure to incorporate manure/sludge into bare soil? ❑ Outside of acceptable crop window? ❑ Evidence of wind drift? ❑ Application outs'ide.of application area? ❑ page: 3 tr � Permit: AWS470007 Owner - Facility : Murphy -Brown LLC Facility Number: 470007 Inspection Date: 02/06/17 Inppection Type: Compliance Inspection Reason for Visit: Routine Waste Application Yes No Na No Crop Type 1 Coastal Bermuda Grass (Pasture) Crop Type 2 Small Grain Overseed Crop Type 3 Crop Type 4 ' Crop Type 5 Crop Type 6 Soil Type 1 Soil Type 2 Soil Type 3 Soil Type 4 - Soil Type 5 Soil Type 6, a 14. Do the receiving crops differ from those designated in the Certified Animal Waste Management Plan(CAWMP)? 15. Does the receiving crop and/or land application site need improvement? 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination? 17. Does the facility lack adequate acreage for land.application? 18. Is there a lack of properly operating waste application equipment? Records and Documents 19. Did the facility fail to have Certificate of Coverage and Permit readily available? 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check the appropriate box below. WUP? Checklists? Design? Maps? Lease Agreements? Other? .If Other, please specify 21. Does record keeping need improvement? If yes; check the appropriate box below. Waste Application? Weekly Freeboard? Waste Analysis? Soil analysis? Waste Transfers? Weather code? Candor sand, 1 to 8% slopes Norfolk loamy sand, 0 to 2% slopes ❑■❑❑ ❑ ❑ ❑ ❑■❑❑ ❑0❑❑ Yes No Na Ne ❑ N ❑. ❑ ❑■❑❑ ❑■❑❑ page: 4 Permit: AWS470007 Owner- Facility: Murphy -Brown LLC Facility. Number: 470007 Inspection Date: 02/06/17 Inpsection Type: Compliance Inspection Reason for Visit: Routine Records and Documents Yes No Na Ne Rainfall? ❑ Stocking? ❑ Crop yields? ❑ 120 Minute inspections? ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey ❑ 22. Did the facility fail to install and maintain a rain gauge? ❑ 0 ❑ ❑ 23. If selected, did the facility fail to install and maintain a rainbreaker on irrigation equipment ❑ •N ❑ ❑ (NPDES only)? 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ 0 ❑ ❑ 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check the ❑ ❑ ❑ appropriate box(es) below: Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon ❑ List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? 110 ❑ ❑ 27. Did the facility fail to secure a phosphorous loss assessment (PLAT) certification? ❑ 0 ❑ ❑ Otherlssues ; Yes No Na Ne 28. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ 0 ❑ ❑ and report mortality rates that exceed normal rates? _ 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, ❑ N ❑ ❑ contact a regional Air Quality representative immediately. 30. Did the facility fail to notify regional DWQ of emergency situations as required by Permit? ❑ N ❑ ❑ (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? ❑ WEI ❑ If yes, check the appropriate box below. Application Field ❑. Lagoon / Storage Pond ❑ Other ❑ If Other, please specify 32. Were any additional problems noted which cause non-compliance of the Permit or ❑ N ❑ ❑ CAWM P? 33. Did the Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ 0 ❑ ❑ 34. Does the facility require a follow-up visit by same agency? ❑ 0 ❑ ❑ page: 5 0 Division of Water Resources ❑ Division of Soil and Water Conservation ❑ Other Agency Facility Number: 470007 Facility Status: Active Permit: AWS470007 ❑ Denied Access Inpsection Type: Compliance Inspection Inactive Or Closed Date: Reason for Visit: Routine County: Woke Region: Fayetteville Date of Visit: 03/09/2015 Entry Time: 04:00 pm Exit Time: ' 5:00 pm Incident # Farm Name: Farm 5786 Owner Rmail: Owner: Murphy -Brown LLC Phone: 910-296-1800 Mailing Address: PO Box 487 Physical Address: Warsaw NC 28398 Facility Status: Compliant ❑ Not Compliant Integrator: Murphy -Brown LLC Location of Farm: Latitude: 34° 56' 29" Longitude: 79° 19' 18" On southwest side of SR 1204 approx. 1 mile northwest of its intersection with Hwy 401 at Bowmore. Question Areas: Dischrge & Stream Impacts Waste Col, Stor, & Treat Waste Application . Records and Documents Other Issues Certified Operator: James Brian McGugan Operator Certification Number: 986752 Secondary OIC(s): On -Site Representative(s): Name Title Phone 24 hour contact name Mike Cudd Phone On -site representative Mike Cudd Phone Primary Inspector: Robert Marble Phone: Inspector Signature: Date: Secondary Inspector(s): Inspection Summary: page: 1 Permit: AWS470007 Owner -Facility: Murphy -Brown LLC Facility Number: 470007 Inspection fate: 03/09/15 Inpsection Type: Compliance Inspection Reason for Visit: Routine Regulated Operations Design Capacity Current promotions Swine Swine - Farrow to Wean 2,400 Total Design Capacity: 2,400 Total SSLW: 1,039,200 Waste 3tr�u .Ees Dlsignated Observed Type Identifier Closed Date Start Date Freeboard Freeboard Lagoon 1 19.00 31.00 page: 2 Permit: AWS470007 Owner - Facility : Murphy -Brown LLC Facility Number: 470007 Inspection Date: 03/09/15 Inpsection Type: Compliance Inspection Reason for Visit: Routine Discharges & Stream Impacts Yes No Na No 1. Is any discharge observed from any part of the operation? ❑ 0 ❑ ❑ Discharge originated at: Structure ❑ Application Field ❑ Other ❑ a. Was conveyance man-made? ❑ [] 0 ❑ b. Did discharge reach Waters of the State? (if yes, notify DWQ) ❑ ❑ 0 ❑ c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (if yes, notify DWQ) ❑ 110 ❑ 2. Is there evidence of a past discharge from any part of the operation? ❑ ■ ❑ ❑ 3. Were there any observable adverse impacts or potential adverse impacts to Waters of the ❑ 0 ❑ ❑ State other than from a discharge? Waste Collection, Storage & Treatment Yea. No NP No 4. Is storage capacity less than adequate? ❑ ❑ ❑ If yes, is waste level into structural freeboard? ❑ 5. Are there any immediate threats to the integrity of any of the structures observed (Le./ large ❑ ❑ ❑ trees, severe erosion, seepage, etc.)? 6. Are there structures on -site that are not properly addressed and/or managed through a ❑ A ❑ ❑ waste management or closure plan? 7. Do any of the structures need maintenance or improvement? ❑ 0 ❑ ❑ 8. Do any of the structures lack adequate markers as required by the permit? (Not applicable ❑ 0 ❑ ❑ to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ M ❑ ❑ maintenance or improvement? Waste ARRlication Yos No No Me 10, Are there any required buffers, setbacks, or compliance alternatives that need ❑ ❑ ❑ maintenance or improvement? 11, Is there evidence of incorrect application? ❑ ❑ ❑ If yes, check the appropriate box below. Excessive Ponding? [] Hydraulic Overload? ❑ Frozen Ground? ❑ Heavy metals (Cu, Zn, etc)? ❑ PAN? ❑ Is PAN > 10%110 lbs.? ❑ Total Phosphorus? ❑ Failure to incorporate manure/sludge into bare soil? ❑ Outside of acceptable crop window? ❑ Evidence of wind drift? ❑ Application outside of application area? ❑ page: 3 Permit: AWS470007 Owner - Facility : Murphy -Brown LLC Facility Number: 470007 Inspection Date: 03/09/15 Inpsection Type: Compliance Inspection Reason for Visit: Routine Waste Application Yes No Na No Crop Type 1 Coastal Bermuda Grass (Pasture) Crop Type 2 Small Grain Overseed Crop Type 3 Crop Type 4 Crop Type 5 Crop Type 6 Soil Type 1 Candor Soil Type 2 Norfolk Soil Type 3 Soil Type 4 Soil Type 5 Soil Type 6 14. Do the receiving crops differ from those designated in the Certified Animal Waste ❑ M ❑ ❑ Management Plan(CAWMP)? 15. Does the receiving crop and/or land application site need improvement? ❑ ❑ ❑ 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre ❑ 0 ❑ ❑ determination? 17. Does the facility lack adequate acreage for land application? ❑ ❑ ❑ 18. Is there a lack of properly operating waste application equipment? ❑ M ❑ ❑ Records and Documents Yes No Na Ne 19. Did the facility fail to have Certificate of Coverage and Permit readily available? ❑ N ❑ ❑ 20. Does the facility fail to have all components of the CAWMP readily available? ❑ M ❑ ❑ If yes, check the appropriate box below. WUP? ❑ Checklists? ❑ Design? ❑ Maps? ❑ Lease Agreements? ❑ Other? If Other, please specify 21. Does record keeping need improvement? ❑ ❑ ❑ If yes, check the appropriate box below. Waste Application? ❑ Weekly Freeboard? ❑ Waste Analysis? ❑ Soil analysis? ❑ Waste Transfers? ❑ Weather code? ❑ Rainfall? ❑ Stocking? ❑ page: 4 Permit: AWS470007 Owner -Facility: Murphy -Brown LLC Facility Number: 470007 Inspection Date: 03/09/15 Inpsection Type: Compliance Inspection Reason for Visit: Routine Records and Documents Yes No Na No Crop yields? ❑ 120 Minute inspections? ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey [] 22. Did the facility fail to install and maintain a rain gauge? ❑ E ❑ ❑ 23. If selected, did the facility fail to install and maintain a rainbreaker on irrigation equipment ❑ 0 ❑ ❑ (NPDES only)? 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ ❑ ❑ 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check the ❑ 0013 appropriate box(es) below: Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon ❑ List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ 0 ❑ ❑ 27. Did the facility fail to secure a phosphorous loss assessment (PLAT) certification? ❑ 0 ❑ ❑ Other Issues Yoe No Na No 28. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ ❑ ❑ and report mortality rates that exceed normal rates? 29, At the time of the inspection did the facility pose an odor or air quality concern? If yes, ❑ 0 ❑ ❑ contact a regional Air Quality representative immediately. 30. Did the facility fail to notify regional DWQ of emergency situations as required by Permit? ❑ ❑ ❑ (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? ❑ ❑ ❑ If yes, check the appropriate box below. Application Field ❑ Lagoon ! Storage Pond ❑ Other ❑ If Other, please specify 32, Were any additional problems noted which cause non-compliance of the Permit or ❑ ❑ ❑ CAWMP? 33. Did the Reviewer/inspector fail to discuss review/inspection with on -site representative? ❑ ❑ [] 34. Does the facility require a follow-up visit by same agency? ❑ E ❑ ❑ page: 5 ■ Division of Water Resources ❑ Division of Soil and Water Conservation ❑ Other Agency Facility Number: 470007 Facility Status: Active Permit: AWS470007 D Denied Access Inpsection Type: Compliance Inspection Inactive Or Closed Date: Reason for visit: Routine County: Hoke Region: Fayetteville Dale of Visit: 03/18/2014 Entry Time: 10:30 am Exit Time: 11:00 am Incident # Farm Name: Farm 5786 Owner Email: Owner: Murphy -Brown LLC Phone: 910-296-1800 Mailing Address: PO Box 487 Warsaw NC 28398 Physical Address: Facility Status: 0 Compliant ❑ Not Compliant Integrator: Murphy -Brown LLC Location of Farm: Latitude: 34° 56' 29" Longitude: 79' 19' 18" On southwest side of SR 1204 approx. 1 mile northwest of its intersection with Hwy 401 at Bowmore. Question Areas: Dischrge & Stream Impacts Waste Col, Stor, & Treat Waste Application S Records and Documents Other lssues Certified Operator: Michael L Cudd Operator Certification Number: 25233 Secondary OIC(s): On -Site Rep rosentative(s): Name Title Phone 24 hour contact name Mike Cudd Phone On -site representative Mike Cudd Phone Primary Inspector: Robert Marble Phone: Inspector Signature: Date: Secondary Inspector(s): Inspection Summary: Records reviewed 2/26/14. Site visit 3118114. page: 1 Permit: AWS470007 Owner - Facility : Murphy -Brown LLC Facility Number: 470007 Inspection Date: 03/18/14 Inpsection Type: Compliance Inspection Reason for Visit: Routine Regulated Operations Design Capacity Current promotions Swine Swine - Farrow to Wean Total Design Capacity: Total SSLW: Waste Structures Disignated Observed Type Identifier Closed Date Start Date Freeboard Freeboard Lagoon 1 19.00 page: 2 Permit: AWS470007 Owner - Facility : Murphy -Brawn LLC , Facility Number: 470007 Inspection Date: 03/18/14 Inppection Type: Compliance Inspection Reason for Visit: Routine Discharrnes & Stream Impacts Yea No Na Ne 1. Is any discharge observed from any part of the operation? ❑ ❑ ❑ Discharge originated at: Structure ❑ Application Field ❑ Other ❑ a. Was conveyance man-made? ❑ ❑ M ❑ b. Did discharge reach Waters of the State? (if yes, notify DWQ) ❑ ❑ 0 ❑ c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (if yes, notify DWQ) ❑ ❑ ■ ❑ 2. Is there evidence of a past discharge from any part of the operation? ❑ 0 ❑ ❑ 3. Were there any observable adverse impacts or potential adverse impacts to Waters of the ❑ MEI ❑ Slate other than from a discharge? Waste Collection, 5toraoe & Treatment Yes No Na Ne 4. Is storage capacity less then adequate? D ❑ ❑ If yes, is waste level into structural freeboard? ❑ 5. Are there any immediate threats to the integrity of any of the structures observed (I.e./ large ❑ 0 ❑ ❑ trees, severe erosion, seepage, etc.)? 6. Are there structures on -site that are not properly addressed and/or managed through a ❑ ■ ❑ ❑ waste management or closure plan? 7. Do any of the structures need maintenance or improvement? ❑ ■ ❑ ❑ B. Do any of the structures lack adequate markers as required by the permit? (Not applicable ❑ ❑ ❑ to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ 0 ❑ ❑ maintenance or improvement? Waste Application Yea No Na No 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ 0 ❑ ❑ maintenance or improvement? 11. Is there evidence of incorrect application? ❑ ❑ ❑ If yes, check the appropriate box below. Excessive Ponding? ❑ Hydraulic Overload? ❑ Frozen Ground? ❑ Heavy metals (Cu, Zn, etc)? ❑ PAN? ❑ Is PAN > 10%110 lbs.? ❑ Total Phosphorus? ❑ Failure to incorporate manure/sludge into bare soil? ❑ Outside of acceptable crop window? ❑ Evidence of wind drift? ❑ Application outside of application area? ❑ page: 3 Permit: AWS470007 Owner - Facility : Murphy -Brown LLC Facility Number: 470007 Inspection Date: 03/18/14 Inppection Type: Compliance Inspection Reason for Visit: Routine Waste Application Yoq, No Na No Crop Type 1 Coastal Bermuda Gress (Posture) Crop Type 2 Small Grain Overseed Crop Type 3 Crop Type 4 Crop Type 5 Crop Type 6 Soil Type 1 Candor Soil Type 2 Norfolk Soil Type 3 Soil Type 4 Soil Type 5 Soil Type 6 14. Do the receiving crops differ from those designated in the Certified Animal Waste ❑ ❑ ❑ Management Plan(CAWMP)? 15, Does the receiving crop and/or land application site need improvement? ❑ MEI ❑ 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre ❑ M ❑ ❑ determination? 17. Does the facility lack adequate acreage for land application? ❑ M ❑ ❑ 18. Is there a lack of properly operating waste application equipment? ❑ M ❑ ❑ Records and Documents Yes No No No 19. Did the facility fail to have Certificate of Coverage and Permit readily available? ❑ M ❑ ❑ 20, Does the facility fail to have all components of the CAWMP readily available? ❑ ❑ ❑ If yes, check the appropriate box below. WL)P? ❑ Checklists? ❑ Design? ❑ Maps? ❑ Lease Agreements? ❑ Other? ❑ If Other, please specify 21. Does record keeping need improvement? ❑ 0 ❑ ❑ If yes, check the appropriate box below. Waste Application? ❑ Weekly Freeboard? ❑ Waste Analysis? ❑ Soil analysis? ❑ Waste Transfers? ❑ Weather code? ❑ Rainfall? ❑ Stocking? ❑ page: 4 Permit: AWS470007 Owner - Facility : Murphy -Brown LLC Facility Number: 470007 Inspection Date: 03/18/14 Inpsection Type: Compliance Inspection Reason for Visit: Routine Records and Documents Yes No No Ne Crop yields? ❑ 120 Minute inspections? ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey ❑ 22. Did the facility fail to install and maintain a rain gauge? ❑ ■ ❑ ❑ 23. If selected, did the facility fail to install and maintain a rainbreaker on irrigation equipment ❑ MID ❑ (NPDES only)? 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ ❑ ❑ 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check the ❑ ■ ❑ ❑ appropriate box(es) below: Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels [] Non -compliant sludge levels in any lagoon ❑ List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ ❑ ❑ 27. Did the facility fail to secure a phosphorous loss assessment (PLAT) certification? ❑ 0 ❑ ❑ Other Issues Yes No Na No 28. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ ❑ ❑ and report mortality rates that exceed normal rates? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, ❑ 0 ❑ ❑ contact a regional Air Quality representative immediately. 30. Did the facility fail to notify regional DWQ of emergency situations as required by Permit? ❑ ❑ ❑ (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? ❑ ❑ ❑ If yes, check the appropriate box below. Application Field ❑ Lagoon / Storage Pond ❑ Other ❑ If Other, please specify 32. Were any additional problems noted which cause non-compliance of the Permit or ❑ ❑ ❑ CAWMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ M ❑ ❑ 34. Does the facility require a follow-up visit by same agency? ❑ ■ ❑ ❑ 0 page: 5 a ■ Division of Water Resources El Division of Soil and Water Conservation El Other Agency Facility Number: 470007 Facility Status: Active Inpsection Type: Compliance Inspection Permit: AWS470007 Denied Access Inactive Or Closed Date: Reason for Visit: Routine County: Hoke R I . Fayetteville Date of Visit: 02/27/2013 EntryTime: 10:30 am Exit Time: 11:00 am Farm Name: Farm 5786 Owner: Murphy -Brown LLC Mailing Address: PO Box 487 Physical Address: eg on. Incident # Owner Email; Phone: Warsaw NC 28398 910.296-1800 Facility Status: Compliant F1 Not Compliant Integrator: Murphy -Brown LLC Location of Farm: Latitude: 34` 56' 29" Longitude: 79° 19' 18" On southwest side of SR 1204 approx. 1 mile northwest of Its intersection with Hwy 401 at Bowmore. Question Areas: Dischrge & Stream Impacts Waste Col, Stor, & Treat Waste Application Records and Documents Other Issues Certified Operator: Ronald Lee Matthews Operator Certification Number: 990008 Secondary OIC(s): On -Site Representative(s): Name Title Phone 24 hour contact name Mike Cudd Phone: On -site representative Mike Cudd Phone: Primary Inspector: Robert Marble Phone: Inspector Signature: Date: Secondary Inspactor(s): Inspection Summary: Records reviewed 2/14113 Site visit 2127113 page: 1 i 'It Permit: AWS470007 Owner - Facility : Murphy -Brown LLC Facility Number: 470007 Inspection Date: 02/27/13 inpsection Type: Compliance Inspection Reason for Visit: Routine Regulated Operations Design Capacity Current promotions Swine Swine - Farrow to Wean 2,400 Total Design Capacity: Total SSLW: Waste Structures Disignated Observed Type Identifier Closed Date Start Date Freoboard Freeboard Lagoon 1 19.00 page: 2 Permit: AWS470007 Owner -Facility: Murphy -Brown LLC Facility Number: 470007 Inspection Date: 02/27/13 Inpsection Type: Compliance Inspection Reason for Visit: Routine Discharees„& Stream Impacts Yea No Na No 1. Is any discharge observed from any part of the operation? ❑ M ❑ ❑ Discharge originated at: Structure ❑ Application Field ❑ Other ❑ a. Was conveyance man-made? ❑ 13011 b. Did discharge reach Waters of the State? (if yes, notify DWQ) ❑ ❑M ❑ c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (if yes, notify DWQ) ❑ ❑ ❑ 2. Is there evidence of a past discharge from any part of the operation? ❑ M ❑ ❑ 3. Were there any observable adverse impacts or potential adverse impacts to Waters of the ❑ ❑ ❑ Slate other than from a discharge? Waste Collection. Storane & Treatment Yee No-Na _ Ne 4. Is storage capacity less than adequate? ❑ ■ ❑ ❑ If yes, is waste level into structural freeboard? ❑ 5. Are there any immediate threats to the integrity of any of the structures observed (I,e.1 large ❑ ■ ❑ ❑ trees, severe erosion, seepage, etc.)? 6. Are there structures on -site that are not properly addressed andbr managed through a ❑ ■ ❑ ❑ waste management or closure plan? 7. Do any of the structures need maintenance or improvement? ❑ 0 ❑ �] S. Do any of the structures lack adequate markers as required by the permit? (Not applicable ❑ MED ❑ to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ 0 ❑ ❑ maintenance or improvement? Waste Application Yel No No No 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ M ❑ maintenance or improvement? 11, Is there evidence of incorrect application? ❑ 0 ❑ ❑ If yes, check the appropriate box below. Excessive Ponding? ❑ Hydraulic Overload? ❑ Frozen Ground? ❑ Heavy metals (Cu, Zn, etc)? ❑ PAN? ❑ Is PAN > 10%/10 lbs.? ❑ Total Phosphorus? ❑ Failure to incorporate manure/sludge into bare soil? ❑ Outside of acceptable crop window? ❑ Evidence of wind drift? ❑ Application outside of application area? ❑ page: 3 Permit: AWS470007 Owner - Facility : Murphy -Brown LLC Facility Number: 470007 Inspection Date: 02/27/13 Inpsection Type: Compliance Inspection Reason for Visit: Routine Waste Application Yos No No No Crop Type 1 Coastal Bermuda Grass (Pasture) Crop Type 2 Small Grain Overseed Crop Type 3 Crop Type 4 Crop Type 5 Crop Type 6 Soil Type 1 Candor Soil Type 2 Norfolk Soil Type 3 Soil Type 4 Soil Type 5 Soil Type 6 14. Do the receiving crops differ from those designated in the Certified Animal Waste ❑ ❑ ❑ Management Plan(CAWMP)? 15. Does the receiving crop and/or land application site need improvement? ❑ ❑ ❑ 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre ❑ 0 ❑ ❑ determination? 17. Does the facility lack adequate acreage for land application? ❑ ❑ ❑ 18. Is there a lack of properly operating waste application equipment? ❑ [] ❑ Records and Documents Yoe No No No 19. Did the facility fail to have Certificate of Coverage and Permit readily available? E] M [] ❑ 20. Does the facility fail to have all components of the CAWMP readily available? ❑ 0 ❑ ❑ If yes, check the appropriate box below. WUP? ❑ Checklists? ❑ Design? [] Maps? ❑ Lease Agreements? ❑ Other? ❑ If Other, please specify 21. Does record keeping need improvement? ❑ ❑ ❑ If yes, check the appropriate box below. Waste Application? ❑ Weekly Freeboard? ❑ Waste Analysis? ❑ Soil analysis? ❑ Waste Transfers? [] Weather code? ❑ Rainfall? ❑ Stocking? ❑ page: 4 Permit: AWS470007 Owner - Facility : Murphy -Brown LLC Facility Number: 470007 Inspection Date: 02/27/13 Inpsection Type: Compliance Inspection Reason for Visit: Routine Records and Documents Yea No Na No Crop yields? ❑ 120 Minute inspections? ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey ❑ 22. Did the facility fail to install and maintain a rain gauge? ❑ ❑ ❑ 23, If selected, did the facility fail to install and maintain a rainbreaker on irrigation equipment ❑ ■ ❑ ❑ (NPDES only)? 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ ❑ ❑ 25, Is the facility out of compliance with permit conditions related to sludge? ILyes, check the ❑ M ❑ ❑ appropriate box(es) below: Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon ❑ List structure(s) and date of first survey indicating non-compliance: 26, Did the facility fail to provide documentation of an actively certified operator in charge? ❑ 0 ❑ ❑ 27. Did the facility fail to secure a phosphorous loss assessment (PLAT) certification? ❑ 0 ❑ ❑ Other Issues 'Le�__No_No Ne 28. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ 0 ❑ ❑ and report mortality rates that exceed normal rates? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, ❑ 0 ❑ ❑ contact a regional Air Quality representative immediately. 30, Did the facility fail to notify regional DWQ of emergency situations as required by Permit? ❑ s ❑ ❑ (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? ❑ 0 ❑ ❑ If yes, check the appropriate box below. Application Field ❑ Lagoon 1 Storage Pond ❑ Other ❑ If Other, please specify 32. Were any additional problems noted which cause non-compliance of the Permit or ❑ 0 ❑ ❑ CAWMP? 33, Did the Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ 0 ❑ ❑ 34. Does the facility require a follow-up visit by same agency? ❑ 0 ❑ ❑ page: 5 Division of Water Quality Facility Number 0 Division of Soil and Water Conservation 0 Other Agency 11 Type of Visit • Compliance inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit & Routine 0 Complaint 0 Follow up 0 Referral 0 Emergency O,Other ❑ Denied Access Date of Visit: 1212S ArrivalTime: � 1 1�� Departure Time: D,$' M County: D Region: Farm Name:r1 / Owner Email: Owner Name: ut; Phone: Mailing Address: Physical Address: Facility Contact: ' " `'k Title: N Onsite Representative: Certified Operator: Back-up Operator: Location of Farm: Swine Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feedei Farrow to Finish Gilts Boars Other ❑ Other Phone No: Integrator: Operator Certification Number: Back-up Certification Number: Latitude: 0 0 =1 Longitude: 0 ° = ` = Design Current Design Current Capacity Population Wet Poultry Capacity Population ❑ Layer ❑ Non -Layer Dry Poultry ❑ Layers ❑ Non -Layers ❑ Pullets ❑ Turkeys ❑ urkey Poults ❑ Other Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) Design Current Cattle Capacity Population ❑ Dairy Cow ❑ Dairy Calf ❑ Dairy Heifer ❑ Dry Cow ❑ Non -Dairy ❑ Beef Stocker ❑ Beef Feeder ❑ Beef Brood Cow c. What is the estimated volume that reached waters of the State (gallons)? Number of Structures: M d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? []Yes j� No ❑ NA ❑ NE ❑ Yes ❑ No paNA ❑ NE ❑ Yes ❑ No- �9 NA ❑ NE ❑ Yes ❑ No 1P NA ❑ NE ❑ Yes F No ❑ NA ❑ NE El Yes LwNo ❑ NA ❑ NE Page 1 of 3 12128104 Continued Facility Number: Date of inspection Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No PNA ❑ NE Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): c/ 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No ❑ NA ❑ NE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes No ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes 1� No ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes No ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes PNo ❑ NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? if yes, check the appropriate box below. ❑ Yes [j No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑//EEvQvidence of Wind Drift El Application Outside of Area 12. Crop type(s) Nt?41 "C as�G I !;,, - aa_t'1 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes QlNo ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes F No ElNA ElNE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination?[:] yes Ep No ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes 03 No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes P No ❑ NA ❑ NE Comments (refer to;quegtion #) �Ezplain any YES answers andlor any recommendations ar any other comments, ��ll]se dr�;jaydwing.;JJs of..{�facillty.tobetter�expiain�situati°ns:�(utie�additionAl pages as necessary}; YS hL i7@LS «LA.,p R.4��A�.}�iV:i �4AEt'.'$.�i4Y!'.°'WN"'31fii•�iYAM'��»��:�, R-ecmds rewe,&j eP( zl"'r-1 i I , 5jt +� '+- coK d 3/11/11 r Reviewer/Inspector Name �� Phone: j3G�7 Reviewer/Inspector Signature: Date: Page 2 of 3 12128104 Continued Facility Number: — Date of Inspection Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes [�No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes �bNo ❑ NA ❑ NE the appropirate box. ❑ WUP ❑ Checklists ❑ Design ❑Maps ❑Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes [;jVNo ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? El Yes Lp No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes No ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes No ❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes No ❑ NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes P1 No ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes [P No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes [P No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes [� No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately / 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes No P ❑ NA ElNE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes No ❑ NA ❑ NE Page 3 of 3 12128104 il 0 Division of Water Quality ' Factlity Number ElFal - © 0 Division of Soil and Water Conservation 0 Other Agency Type of Visit: 4D Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: ® Routine 0 Complaint 0 Follow-up_ 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: 01 / Arrival Time: Departure Time: County: �Q Farm Name: 5qi f ©S) Owner Email: Owner Name: V-V Phone: Mailing Address: Physical Address: Facility Contact: 'e k aid Title: Onsite Representative: Certified Operator: Region: Phone: Integrator: Lt Certification Number: Back-up Operator: Certification Number: Location of Harm: Swine Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Boars Other Other Latitude: Design Current Design Current Capacity Pop. Wet Poultry Capacity Pop. Layer Non -La er Design Current Dry Poultry Capacity Pop. Layers Non -Layers Pullets Turkeys Turkey Pouets Other Discharaes and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? Longitude: Design Current Cattle Capacity Pop, Dairy Cow Dairy Calf Dairy Heifer Dry Cow .Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow 0 Yes g No ❑ NA ❑ NE ❑ Yes ❑ No ❑ Yes ❑ No [—]Yes [:]No ❑ Yes No [:]Yes No [r NA ❑ NE 0 NA ❑ NE NA ❑ NE ❑ NA ❑ NE ❑NA ❑NE Page 1 of 3 21412011 Continued Facili Number: - Date of Inspection: a 1 , Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No WNA ❑ NE Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Frecboard (in): go 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a [:]Yes No ❑ NA ❑ NE LOW waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes P No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? [-]Yes No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? r Waste ApBlication 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. [] Yes [� No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of ind Drift ❑ Application Outside of Approved Area 12.Cro T es: s aZ' Y,.,, Q,,� &.,fd 13. Soil Type(s): k_OYJCVW, 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes P No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes T [ 1] No ❑ NA ❑ NE the appropriate box. ❑ WUP [:]Checklists []Design ❑ Maps ❑ Lease Agreements ❑ Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes 10 No ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes;No No ❑NA ❑NE [] Weather Code ❑ Sludge Survey ❑NA ❑NE ❑NA ❑NE Page 2 of 3 21412011 Continued Facility Number: H- Date of Inspection: 42 a1 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? Other Issues 29. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) ❑ Yes +ram] No ❑ Yes T� No ❑ NA ❑ NE ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes [ No ❑ NA ❑ NE E] Yes ( No ❑ NA ❑ NE 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below.] Yes No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ](�No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes No ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any additional) recommendations or any other comments. , Use drawings of facility to better explain situations (use additional pages as necessary). :ce s rev'k&L,-� ZlGtf'& oi -,k vt4 - P/.07/1 3 Reviewer/Inspector Name: Reviewer/Inspector Signature: Page 3 of 3 Phone: L00' T B1f7F0 Date: CP _-2 % /3 21412011 Type of Visit: Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: 0 Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Arrival Time: Departure Time: County: b Region: Farm Name: �,-� F 1 �g' Owner Email: Owner Name: r L�-� Phone: Mailing Address: Physical Address: Facility Contact: Onsite Representative: u Certified Operator: Back-up Operator: Location of Farm: Title: Latitude: Phone: Integrator: U.iv Certification Number: Certification Number: Longitude: Design Current Design Current Design Current Swine Capacity Pop. Wet Poultry Capacity Pop. o Cattle Capacity Pop, Wean to Finish La er Dai Cow Wean to Feeder Non -La er Dai Calf Feeder to Finish Dai Heifer Farrow to Wean Design Current D Cow Farrow to Feeder Dr, Poultr, Ca aci P,o Non -Dairy Farrow to Finish Layers Beef Stocker Gilts Non -Layer Beef Feeder Boars Pullets Beef Brood Cow keys 0thcr Turkey Poults Other Other Discharees and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? _ d. Does the discharge bypass the waste management system? (if yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? ❑ Yes P No ❑ NA ❑ NE ❑ Yes ❑ No NA ❑ NE ❑ Yes ❑ No [ NA ❑ NE [:]Yes [—]No []Yes L No ❑ Yes P9 No NA ❑ NE ❑NA ❑NE ❑NA ❑NE Page I of 3 21412011 Continued Facility Number: -rl jDate of Inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes a. If yes, is waste level into the structural freeboard? ❑ Yes Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Identifier: RNo ❑ NA ❑ NE ❑ No [DNA Structure 6 ❑ NE Spillway?: Designed Freeboard (in): Observed Freeboard (in): No 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes ONo [] NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes No [DNA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? [] Yes PNo ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? [:]Yes No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes [P No ❑ NA ❑ NE maintenance or improvement? TT 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes P No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground [] Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus [] Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acce able Cro Window ❑Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop TYp e(s) : !:S Slc V �YI�I� 13. Soil Type(s): LAVObt-,It0-1 V 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes r;No TT ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes �j No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check [:]Yes F3 No ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes 6 No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and l" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes No ❑ NA ❑ NE Page 2 of 3 21412011 Continued Facilit Number: - Date of Inspection: 31 QIL 24: Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ❑ No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes ❑ No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes ❑ No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes r] No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA [] NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes ❑ No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ No ❑ NA ❑ NE Comments (refer to question #E): Explain any YES answers and/or any additional recommendations or,. any other comments, Use drawings of facility to better explaln situations (use additional panes as necessary). j al Reviewer/inspector Name: Reviewer/Inspector Signature: Page 3 of 3 Phone:IKYW j 33 Date: 3 2- 21412011 L Z 0/V (� �3ivision of Water Quality Facility Number �% , 007 0 Division of Soil and Water Conservation 0 Other Agency Type of Visit ompliance Inspection O Operation Review O Structure Evaluation O Technical Assistance Reason for Visit routine O Complaint Q Follow up Q Referral Q Emergency 0 Other ❑ Denied Access Date of Visit: Arrival Time: Departure Time: County: Farm Name: .57 96 -- % (0)d IT- —I-70 S, Owner Email: Owner Name: _. /ff —8yd'&JW_ LLG Phone: _ Mailing Address: Physical Address: 9pt4-,-- Region: r20 Facility Contact: / "f �+� �� Title: L A/A4 M.A14 Phone No: Onsite Representative: Integrator: X4-.8rb-L'rAl Certified Operator: �d""` iyle.Gc�� Operator Certification Number: 18 6752- Back-up Operator: Location of Farm: Swine ini Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Boars Other ❑ Other Back-up Certification Number: Latitude: [= 0 0 i Longitude: 0 o =, = Design Current Design Current Capacity Population Wet Poultry Capacity Population ❑ Layer I I 0 Non -Layer Dry Poultry ❑ Layers ❑ Non -Layers ❑ Pullets ❑ Turkeys ❑ Turkey Poults ❑ Other Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: - ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? Design Current Cattle Capacity Population ❑ Dairy Cow ❑ Dairy Calf ❑ Daia Heifer ❑ Dry Cow ❑ Non -Dairy ❑ Beef Stocker ❑ Beef Feeder ❑ Beef Brood Cow Number of Structures: D b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes [M No ❑ NA ❑ NE []Yes ❑ No 12 NA ❑ NE ❑ Yes ❑ No (3NA ❑ NE 2YNA ❑ NE ❑ Yes ❑ No ❑ Yes 0 No ❑ NA ❑ NE ❑ Yes RFNo ❑ NA ❑ NE Pale I of 3 121128104 Continued Facility Number: Date of Inspection 13 ZPv /ice Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a. If yes, is waste level into the structural freeboard? Structure I Structure 2 Structure 3 Structure 4 Identifier: 57194 — / Spillway?: Designed Freeboard (in): Observed Freeboard (in): 31 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes (6 No ❑ NA ❑ NE ❑ Yes ® No ❑ NA ❑ NE Structure 5 Structure 6 ❑ Yes 0 No ❑ NA ❑ NE ❑ Yes 0 No ❑ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes tO No ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes JM No ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes ❑ No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes CE No ❑ NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes ® No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) �w �.� c` (P-1-4 r c.r� 11 6 ,, fm %0, S - 13. Soil type(s) //d —Fo1 K , Ca nl d oY 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes V] No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes [ff No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination ? ❑ Yes ,® No ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? []Yes ZNo []NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes RNo ❑ NA ❑ NE r .: mF;- .�' '�='a*� j'�yrrr_ . CommeFnts (refer to question #): Explain any YES 144 answers and/or any recommendat�ons�or,any othergcomments , Use drawings of facility to better explain situatians. (use additional pageaslnc ssary)c (` s =, Reviewer/Inspector Namei�'';5a Phone: y/0.P33.3 3� Reviewer/Inspector Signature: Date: 'V a7- Z0/a Page 2 of 3 12128104 Continued . Facility Number: Date of Inspection Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes OfNo ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes JTVo ❑ NA ❑ NE the appropriate box. ❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ g Other p 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes eNo ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ZNo ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes El No ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes 92No ❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes WNo ❑ NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes WNo ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes Olo ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes e No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes VNo ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30, At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes [EPNo ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes VNo ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes [2 No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes EgNo ❑ NA ❑ NE AdditiianaGCamments and/or Drawings: Page 3 of 3 12128104 1374lS e�✓�c�'cd�vS�za�9 112 'Ivision of Water Quality Y Facility Number Q �% Division of Soil and Water Conservation.�� O Other Agency Type of Visit ompliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit a, outine 0 Complaint 0 Follow up 0 Referral 0 Emergency 0 Other ❑ Denied Access Date or visit: Arrival Time: 7`, µ5" Departure Time: .S; /D ,yr County: _ I Region: it � t Farm Name: %(a gjn �ot.J iMo it 21 Farrv� Owner Email: OwnerName; MfArD—� VdUfAl Phone: Mailing Address: Physical Address: j Facility Contact: o'-''r ��� �� A C� �r+c.lri'itle: �G-Yt ^-� Phone No: Onsite Representative: Integrator: 9�!W> 4, I- - Certified Operator: Operator Certification Number: Back-up Operator: Back-up Certification Number: Ceo Location of Farm: Latitude: [=] 0 0' = Longitude: = ° =' = Swine Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Boars Other ❑ Other Design Current Design Current Capacity Population Wet Poultry Capacity Population 1 ❑ La er ❑ Non -La et Dry Poultry ❑ Layers ❑ Non -La ers ❑ Pullets ❑ Turkeys ❑ Turkey Poults ❑ Other Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? Cattle Design ; ; Cprrent-..', Capacity Population :" ❑ Dairy Cow ❑ Dairy Calf ❑ Dairy Heifer ❑ Dry Cow ❑ Non -Dairy ❑ Beef Stocker ❑ Beef Feeder ❑ Beef Brood Cow Number of Structures I b. Did the discharge reach waters of the State'? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes [] No ❑ NA ❑ NE ❑ Yes ❑ No L=1 NA ❑ NE ❑ Yes ❑ No E NA ❑ NE 0 NA ❑ NE ❑ Yes ❑l No El Yes O'NNo ❑ NA ❑ NE ❑ Yes LT No ❑ NA ❑ NE 12128104 Continued FacilityNumber; NumI,/ % -" d % Date of Inspection Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes EJNoo ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No E'1�A ❑ NE Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: _ 7& g Spillway?: Designed Freeboard (in): Observed Freeboard (in): :2 7 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes [`j'No - ❑ NA ❑ NE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes 0"qo'--❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes No ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? El Yes No El NA El NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes D ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or l0 lbs []Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drill ❑ Application Outside of Area 12. Crop ripe(s) ,-C"11 _ WkaL SC1110- r-.,JS -- 13. Soil type(s) daCaN d O 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes 2<o ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes 01C ❑ NA ❑ NE , 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination?❑ Yes 0-90 ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes 21 o— ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes PNo- ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any recommendations or any other comments. Use drawings of facility to better explain situations. (use additional pages as necessary): Reviewer/Inspector Name Phone: 910• `f33 . 33d0 Reviewer/inspector Signature: Date: 3 — Z— Z= 9 12128104 Continued r ...;6 Facility Number: 7— D 7 Date of Inspection Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes ETINo ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes EJNo ❑ NA ❑ NE the appropirate box. ❑ WUP ❑ Checklists ❑ Design [I Maps ❑Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes to ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes CTNo ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes vo ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes No ❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes [3'go- ❑ NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes O'lgo ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes D<o ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes BNo ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes B IlTo ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ yes 2iq ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes CTZ ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspcction with an on -site representative? El Yes r�� i_i No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes B'5o ❑ NA ❑ NE Additional Comments and/or Drawings: 12128104 •: . .V (Type of Visit 0 Compliance Inspection O Operation Review O Structure Evaluation Q Technical Assistance Reason for Visit 0 Routine O Complaint O Follow up O Referral O Emergency O Other ❑ Denied Access Date of Visit: Arrival Time: Departure Time: County: Farm Name: �/� � Owner Email: Owner Name: A ux� 'KV&"14 Phone: Mailing Address: Physical Address: Facility Contact: I �N,� �00&.S - Title: Phone No: Onsite Representative: Integrator: Certified Operator: Operator Certification Number: Back-up Operator: Location of Farm: Back-up Certification Number: Region: Latitude: = o = I = Longitude: = o = i Design Current Design Swine Capacity Population Wct Poultry Capacity Current Design Current Population Cattle Capacity Population ❑ Wean to Finish ❑ La er ❑ Dai Cow ❑ Wean to Fecdcr ❑Non -La er ❑Dai Calf ❑ Feeder to Finish El Dairy Heifer Farrow to Wean Dry Poultry El Farrow to Feeder ❑ Farrow to Finish ❑ Layers ❑ Gilts ❑Non -La ers ❑ Pullets ❑ Boars ❑ Turkeys Other ❑ TurkeyPoults ❑ D Cow ❑ Non -Dairy ❑ Beef Stocker ❑ Beef Feeder ❑ Beef Brood Cowl I Number of Structures: ❑ Other El Other Discharges & Stream Impacts l . Is any discharge observed from any part of the operation? Discharge originated at; ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (if yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Page 1 of 3 ❑ Yes 1] No ❑ NA ❑ NE ❑ Yes ❑ No t9NA ❑ NE ❑ Yes ❑ No 19 NA ❑ NE 29 NA ❑ NE ❑ Yes ❑ No ❑ Yes [P No ❑ NA ❑ NE ❑ Yes M No ❑ NA ❑ NE 12128104 Continued Facility Number: — Date of Inspection �i 8 Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a. If yes, is waste level into the structural freeboard? Structure 1 Structure 2 Structure 3 Structure 4 Identifier: %0 Spillway?: Designed Freeboard (in): Observed Freeboard (in): ❑ Yes N No ❑ NA ❑ NE El Yes El No 19NA ONE Structure 5 Structure 6 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes �No El NA ❑ NE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes 'M No ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes P No ❑ NA ElNE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes 9 No ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes PM No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes IP No ❑ NA ❑ NE maintenance/improvement? 11. is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes 1K No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidenceof Wind Drift [IApplicatiioonn Outside of Area 12. Crop type(s) !W Q (t'jqM)Im1 _ a /tf�n 6 ® 1 -'�'4lm S', , 4147L 13. Soil typc(s) 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes M No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes IS No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination ? ❑ Yes W No ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes � No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes ® No ❑ NA ❑ NE Comments (refer to duestion #): Explainany YES. answers andliar any,3 reconimendations or and other comments° Use drawings of facility to better explain situations. (use additional pages as necessary): AL ... Reviewer/Inspector Name° �. .a TF ._ ram.... 77 Phone• Reviewer/Inspector Signature: Date:I if/ 111A%Z Page 2 of 3 12/28104 Continued Facility Number: TE= Date of Inspection Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes JpNo ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes P No ❑ NA ❑ NE the appropriate box. ❑ wup ❑ Checklists ❑ Design ❑Maps ❑Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes q9 No ❑ NA Cl NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rain Inspections . ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes PQ No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes R No ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes No ❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes No ❑ NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? Cl Yes ,� No ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes �Q No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes 9 No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes P No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes- P No ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes 0 No ❑ NA ❑ NE Page 3 of 3 12128104 Type of Visit ® Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit 0 Routine 0 Complaint 0 Follow up 0 Referral 0 Emergency 0 Other ❑ Denied Access Date of Visit: Z`+3-07 Arrival Time: 7;Un Departure Time: (o; O County: �YGKe. Region: �24 Farm Name: SD W rn ore- i, 76 g�4 � Owner Email: Owner Name: 44arA4� Brow] Phone: Mailing Address: Physical Address: Facility Contact: R4md�j 8 uM a ex n—rJ '_ Title: Onsite Representative: Certified Operator: Back-up Operator: Phone No: Integrator: 1NovP4Fy Ujt,/ Operator Certification Number: Back-up Certification Number: Location of Farm: Latitude: [= o [= 1 = s, Longitude: 0 ° = = Design Current Design C►urrent Design Current Swine Capacity Population Wet Poultry Capacity Population Cattle Capacity Population ❑ Layer ElDai Cow ❑ Wean to Finish El Dairy Calf ❑ Dai Heifer El Dry Cow ElNon-Dai ElBeef Stocker ElBeef Feeder ❑ Beef Brood Cow Number of Structures: [:]Wean to Feeder ❑Non -La Non -Layer ❑ Feeder to Finish ® Farrow to Wean 2 Dry Poultry El Farrow to Feeder Discharges &Stream Impacts 1. Is any discharge observed from any part of the operation? El Yes 19 No ❑ NA ❑ NE Discharge originated at: ❑Structure ❑Application Field [I Other a. Was the conveyance man-made? ❑Yes � Na ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWQ) El Yes (� No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) ❑Yes 1PNo ❑ NA ❑ NE 2. is there evidence of a past discharge from any part of the operation? [I Yes � No ❑ NA ❑ NE 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State El Yes 5fl No ❑ NA ❑ NE other than from a discharge? Page 1 of 3 12/28/04 Continued Facility Number: Date of Inspection Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes 9 No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes [A No ❑ NA ❑ NE Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): 119 Observed Freeboard (in): -2"7 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes OfNo ❑ NA ❑ NE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes QNo ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes [2 No ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes [$ No ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes [XNo ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes i 1 No ❑ NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes �rNo ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) l7' S S Co -"f L,.lL-41- 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes [PNo ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes [0 No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination ? ❑ Yes No ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes Q?No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes [9 No ❑ NA ❑ NE If ILK Comments (refer to question #): Explain any YES answers and/or any recommendations or, anyrother comments Use drawings -of facility to better explain situations. (use additional )ages�as necessary) Reviewer/inspector Name Phone: 910.0 33f 3330 Reviewer/inspector Signature: Date: 7--13 Z(so Page 2 of 3 12/28/04 Continued Facility Number: '9 7 -- 7 Date of Inspection Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes [� No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes ® No ❑ NA ❑ NE the appropriate box. ❑ WUP ❑ Checklists El Design [I Maps El Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Frccboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? El Yes No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes No ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes No ❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes [ 1 No ❑ NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes VNo ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes VNo ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes [M No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes FNo ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes P No ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes PNo ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes �'iNo ❑ NA El NE I Comments and/or Page 3 of 3 12128104 0 Type of Visit ® Compliance Inspection O Operation Review O Structure Evaluation O Technical Assistance Reason for Visit ® Routine Q Complaint O Follow up O Referral O Emergency O Other ❑ Denied Access Date of Visit: Arrival Time: Departure Time: //,��p County: Farm Name: 0 % (a S? FowlVat . ry,m Owner Email: Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: Title: Onsite Representative: Certified Operator: Back-up Operator: Location of Farm: Region: Aigo Phone No: Integrator• v /✓ Operator Certification Number: Back-up Certification Number: Latitude: 0 e= 1=di Longitude: = 0 0 6= [1 Design Current Design C*Ugent Design Current Swine Capacity Population Wet Poultry C►►opacity Population Cattle Capacity Population ❑ Wean to Finish ❑ Layer 1 ❑ Dairy Cow ❑ Dairy Calf ❑ Wean to Feeder JE1 Non -La er I ❑ Feeder to Finish ❑ Dairy Heifer %Farrow to Wean 2 DO Dry Poultry ❑ Dry Cow El Farrow to Feeder ❑ Layers ElNon-Dairy ❑ Farrow to Finish ❑ Beef Stocker ❑ Gilts ❑ Non -La ers El Beef Feeder ❑ Boars El Puliets ❑ Beef Brood Cow ❑ Turkeys Other ❑ Turkey Poults ❑ Other ❑ Other Number of Structures: Discharees & Stream Impacts 1. is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (if yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (if yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Page I of 3 ❑ Yes [:0 No ❑ NA ❑ NE ❑ Yes [0 No ❑ NA ❑ NE ❑ Yes ®No ❑ NA ❑ NE ❑ NA ❑ NE []Yes [9No ❑ Yes A No ❑ NA ❑ NE ❑ Yes QQNo ❑ NA ❑ NE 12128104 Continued Facility Number: W- 07 Date of Inspection Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes 14"1 No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes M No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): 0, Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes ® No ❑ NA ❑ NE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes 2d No ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes EVNo ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes 0 No ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes 0 No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes f UNo ❑ NA ❑ NE maintenance/improvement? 11, is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes 99 No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop ❑ Evidence of Wind Drift ❑ Application Outside of/Area //Window 12. Crop type(s) Bu1A26C p4. ssutl� �hxi'ry r!d uuiSGd J.-Ghltl / € •�f�r 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes XNo ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes 0 No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination ? ❑ Yes ® No ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes EgNo ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes [2 No ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or, any recommendafiuns or any other comments ty�? Use drawings of facility to better explain situations. (use additional. pagesas.necessary): Reviewer/Inspector Name I F )c'�' e. V CJ S 7. _ Phone: C91491 #96 /519,1 Reviewer/Inspector Signature: Date: t'P-06 -- ZD� (o Cage t q/ J I2/28104 Continued r, Facility Number: 447-4971 Date of Inspection O —O Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes C9 No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes CA No ❑ NA ❑ NE the appropriate box. ❑ WUP El Checklists El Design [I Maps ❑Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes [2 No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes %No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes % No ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes C& No ❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? El Yes [�No ❑ NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes XNo ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ElYes LA ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes [A No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document [] Yes No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes V No ❑ NA ❑ NE General Permit? (iel discharge, freeboard problems, over application) 32. Did Reviewer/inspector fail to discuss review/inspection with an on -site representative? ❑ Yes 54No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes 'XNo ❑ NA ❑ NE Additional Comments and/or Drawings: Page 3 of 3 12128104 Type of Visit 0 Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit 0 Routine 0 Complaint 0 Follow up 0 Referral 0 Emergency 0 Other ❑ Denied Access Date of Visit: i� �Z - Arrival Time: Departure Time: County: go K'L- Region: Farm Name: AA B xt -7 iv g & Owner Email: Owner Name: �Yu 1cQ 81�D :�I� Phone: Mailing Address: _ Physical Address: Facility Contact: Title: Phone No: Onsite Representative: R tj d atAt-Nqz rule-✓ Integrator: luupPf b'►��� Certified Operator: Operator Certification Number: Back-up Operator: Location of Farm: Design Current Swine Capacity Population 10 Wean to Finish 1 ❑ Wean to Feeder ❑ Feeder to Finish Farrow to Wean ❑ Farrow to Feeder ❑ Farrow to Finish ❑ Gilts ❑ Boars Other ❑ Other Back-up Certification Number: Latitude: = o = 1 = Longitude: = ° = 6 Design Current Wet Poultry Capacity Population ❑ Layer ❑ Non -La et Dry Poultry ❑ Layers ❑ Non -Layers ❑ Pullets ❑ Turkeys ❑ Turkey Points ❑ Other Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? FRU Design Current Cattle Capacity Population ❑ Dairy Cow ❑ Dairy Calf. ❑ Dairy Heifer ❑ Dry Cow ❑ Non -Dairy ❑ Beef Stocker ❑ Beef Feeder ❑ Beef Brood Cow Number of Structures: b. Did the discharge reach waters of the State? (if yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes Nf No ❑ NA ❑ NE ❑ Yes [XNo ❑ NA ❑ NE ❑ Yes C@No ❑ NA ❑ NE ❑ NA ❑ NE ❑ Yes No ❑ Yes No ❑ NA ❑ NE ❑Yes t@No ❑NA ❑NE 12128104 Continued Facility Number: L1L�►— Q ] Date of Inspection Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes DdNo ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes (XNo ❑ NA ❑ NE Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): / 9 Observed Freeboard (in): �(o 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes [$No ❑ NA ❑ NE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes D?No ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes [K No ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes 09 No ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes [yNo ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes XNo ❑ NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes XNo ❑ NA ❑ NE ❑ Excessive Ponding ❑ hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 Ibs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drifl ❑ Application Outside of Area 12. Crop type(s) 8Grh4 &c-._ 4. 'Sm i/% 6 j-r,1'N ( 6v-v5'eee1 Ci+vin! wk s £ SabectAIS 13. Soil type(s) AloV.Po I K C(X"id 0 i✓'- 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes W No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ® No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination, El Yes 1KNo ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes C9 No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes M No ❑ NA ❑ NE ReviewerlInspector Name .'1� K' p'V>�rt . �1': I E : Phone: lO)g Reviewer/Inspector Signature: Date: O S 12128104 Continued Facility Number: '5L7 —d Date of Inspection Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes 5TNo ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes [9No ❑ NA ❑ NE the approprrate box. ❑ WUP ❑Checklists ❑Design ❑Maps ❑Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes EgNo ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes W No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes [R No ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes [R No ❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes X No ❑ NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes CgNo ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes ® No ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes Z No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes ® No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes [9No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes ® No ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes [29 No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes CR No ❑ NA ❑ NE AAdditibnal Comments�and/or Drawings , ', 5 r�,,}y +gg' ,�'z° y{"* . .. .. _ ...'a� Y+'Iir.k iAF'r�k3t�RceY�:.`SV.3.:' ri 12128104 4 air -: h , I 1 ,a GG iM a g it S , t7 �i.Dlvlsltln oT Wateru ug]ity li ` Qa#DiVls�an 0�3.�iAil And st@r 611serV8ti01t ', �sQtller,ACitCy;: a Type of Visit Q1I` Compliance Inspection 0 Operation Review O Lagoon Evaluation Reason for Visit o Routine (D Complaint 0 Follow up O Emergency Notification O Other ❑ Denied Access Facility Number Date ot'Visit: c'=/ Time: of O e tionai 0 Below T es old 0 Permitted 0 Certified 0 Conditionally Certified 0 Registered Date Last Operated or Above Threshold: Farm Name d rf o rS lC�Ptr / l 'r �i'sm 6 ��,o County: Owner Name: ���rrrd Phone No: Mailing Address: F O nx Z S 2 c2 it{"�V ' 00 S f r7. 4 Ale Facility Contact: Title: Onsite Representative: I Integrator: Certified Operator: Location of Farm: Phone No: Operator Certification Number: ❑ Swine ❑ Poultry ❑ Cattle ❑ horse Latitude a • u" Longitude ' Design,, Current Design ' Current Design Current • Swine-_=:Caachy--, Poulstion •Ponitrv. Ca acitv: Population. ,....'_Cacity Po elation . " ❑ Wean to Feeder ❑ Layer ❑ Dairy [] Feeder to Finish ;. , ❑ Non -Layer I IrWon-Dai } a, ❑ Farrow to Wean m . E ❑ Farrow to Feeder Other ❑rowinish Total Design Capacity i ` ❑ Gilts 11 i"1 ❑ Boars _ :; `Tots1SSLW' b t',' =„Number of iaagaoas ❑ Subsurface Drains Present ❑ La oon Area S rav Field Ares 3. f, i •s€ f;3 . �';,I:,3 III�°..1. � I, i,•p' 6 - - - ¢ „- .. - - . Holdinji g Pond0 Solid Traps No Liquid Waste Management System Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes GR*N"o Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? ❑ Yes ❑ No b. If discharge is observed, did it reach Water of the State? (If yes, notify DWQ) ❑ Yes ❑ No c. If discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system..^•(If yes, notify DWQ) ❑ Yes ❑ No 2. Is there evidence of past discharge from any part of the operation? ❑ Yes ❑ No 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes ❑ No Waste Collection & Treatment 4, Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway ❑ Yes ❑ No Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: e Freeboard (inches): 05103101 Continued Fa&lity Number: aq — r[ Date of Inspection I — - � r 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, [--]Yes ❑ No seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or ❑ Yes ❑ No closure plan? (If any of questions 4.6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? ❑ Yes ❑ No S. Does any part of the waste management system other than waste structures require maintenanceJimprovement? ❑ Yes ❑ No 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level ❑ Yes ❑ No elevation markings? Waste Application 10. Are there any buffers that need maintenance/improvement? ❑ Yes ❑ No 11. Is there evidence of over application? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ Excessive Ponding ❑ PAN ❑ Hydraulic Overload ❑ Frozen Ground ❑ Copper and/or Zinc 12. Crop type 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? ❑ Yes ❑ No 14. a) Does the facility lack adequate acreage for land application? ❑ Yes ❑ No b) Does the facility need a wettable acre determination? ❑ Yes ❑ No c) This facility is pended for a wettable acre determination? ❑ Yes ❑ No 15. Does the receiving crop need improvement? ❑ Yes ❑ No 16. Is there a lack of adequate waste application equipment? ❑ Yes ❑ No Odor Issues 17. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge at/or below ❑ Yes ❑ No liquid level of lagoon or storage pond with no agitation? 1S. Are there any dead animals not disposed of properly within 24 hours? ❑ Yes ❑ No 19. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, ❑ Yes ❑ No roads, building structure, and/or public property) 20. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional ❑ Yes ❑ No Air Quality representative immediately. �Cansmcnts (re%x� ta�es�aa d�Fsplaia�tY�54answrrs�and/or asaysreaana�ans or�any atbe��ommsnts� � �' N' =tl "il.L:4s is?i�s4#t$3�,TE F �'9.bU�' ryf;�s+;�iP "3� °� ' �yFi: fiw i "`"s� `4�P+p 'GfCfYft}ti"� '96.�"♦,� �t� tk3' � .��s,rr�tw:mu.nF�a.:.ai - Use �av�s of',fa�lity to`b�e�tsrdc�cplsit��sitaaticats. {u�xe�ttdditiamt��pages,�: 1, ❑Field COPY ❑Final Notes = P'r 1iie.'s.�}c"i k.6. `aS�`"',. RevfewerlYnspector Name r . ; „w i Reviewer/iaspector Signature: r Date: 12112103 Con inued (Type of Visit ® Compliance Inspection Q Operation Review Q Lagoon Evaluation I Reason for Visit ® Routine O Complaint Q Follow up O Emergency Notification O Other ❑ Denied Access Date of Visit: > 1— Time: Facility. lumber Not Operational 0 Below Threshold ® Permitted M Certified 0 Conditionally Certified [3 Registered Date Last Operated or Above Threshold: Farm Name: C, rLio F'od zhr County: ffi2k it ,,,, _ri T Owner?Name: �:C�MD(��S Phone No: �'(D a_)- 4- Mailing Address: P� L� a0z SS-6 __ _a93-44 Facility Contact: _feriaf:L_la!4P�i,8��c ,cictr Title: Phone No: Onsite Representative: fAALd, fL MC lg(P, 104, C"Z/ Integrator: Certified Operator: IZA ' Eer ry ll Operator Certification Number: Location of Farm: USSwine ❑ Poultry ❑ Cattle ❑Horse Latitude ' 6 u Longitude • 1 Design Current Design Current Design Current Swine Capacity Population Poultry Ca aclty Population Cattle Ca ac9ty Population ❑ Wean to Feeder I JE1 Laver ❑ Dairy ❑ Feeder to Finish I ❑ Non -Layer ❑ Non -Dairy ® -Farrow to Wean 00 ❑ Farrow to Feeder ❑ Other ❑ Farrow to Finish Total Design Capacity ❑ Gilts Boars Total SSLW Number of Lagoons `., ❑ Subsurface Drains Present ❑ La oon Area S rav Field Area , Holding Ponds / Solid Traps 0 ❑ No Liquid Waste Management System Discharges & Stream impacts 1. is any discharge observed from any part of the operation? ❑ Yes No Discharge originated at: ❑ Laeoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? ❑ Yes ❑ No b. If discharge is observed, did it reach Water of the State? (if yes, notify DWQ) ❑ Yes ❑ No c. if discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass'a lagoon. system? (If yes, notify DWQ) ❑ Yes ❑ No 2. Is there evidence of past discharge from any part of the operation? ❑ Yes 51 No 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes r--' No Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway ❑ Yes No Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Freeboard (inches): h� 05103101 a� Continued Facility Number: —El Date of Inspection 5. Are there any immediate threats to the integrity of any of the structures observed? (ic/ trees, severe erosion, ❑ Yes, ['lo seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? (if any of questions 4-6 was answered yes, and the situation poses an ❑ Yes q No immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? ❑ Yes RNo 8. Does any part of the waste management system other than waste structures require maintenance/improvement? ❑ Yes [[JNo 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? ❑ Yes No Waste Application 10. Are there any buffers that need maintenance/improvement? ❑,Yes PNo 11. Is there evidence of over application? ❑ Excessive Ponding ❑ PAN ❑ Hydraulic Overload ❑ Yes [�No 12. Crop type 13P t-r a CMG A evx 13. Do the receiving crops differ with (hose designated in the Certified Animal Waste Management Plan (CAWMP)? ❑ Yes No 14. a) Does the facility lack adequate acreage for land application? ElYes No b) Does the facility need a wettable acre determination? ❑ Yes ❑ No c) This facility is pended for a wettable acre determination? ❑ Yes ❑ No 15. Does the receiving crop need improvement? ❑ Yes [VNo 16. Is there a lack of adequate waste application equipment? ❑ Yes CiNo Required Rer�grds & Documents 17. Fail to have Certificate of Coverage & General Permit or other Permit readily available? ❑ Yes R No 18. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (icl WUP, checklists, design, maps, etc.) ❑ Yes [�[No 19. Does record keeping need improvement? (ie/ irrigation, freeboard, waste analysis & soil sample reports) ❑ Yes �Sj No 20. Is facility not in compliance with any applicable setback criteria in effect at the time of design? ❑ Yes �No 21. Did the facility fail to have a actively certified operator in charge? ❑ Yes FXNo 22. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) ❑ Yes [ No 23. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yes j No 24. Does facility require a follow-up visit by same agency? ❑ Yes P No 25. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes [� No 0 No violations or deficiencies were noted during this visit. You will receive no further correspondence about this visit. Facility Number: — p Date of Inspection Odor Issues 26. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge attor below liquid level of lagoon or storage pond with no agitation? 27. Are there any dead animals not disposed of properly within 24 hours? 28, is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, roads, building structure, and/or public property) 29, Is the land application spray system intake not located near the liquid surface of the lagoon? 30. Were any major maintenance problems with the ventilation fan(s) noted? (i.e. broken fan,belts, missing or or broken fan blade(s), inoperable shutters, etc.) 31. Do the animals feed storage bins fail to have appropriate cover? 32. Do the flush tanks lack a submerged fill pipe or a permanent/temporary cover? 05103101 ❑ Yes ❑ No ❑ Yes No ❑ Yes No ❑ Yes EX No ❑ Yes [NNo ❑ Yes No ❑ Yes ❑ No Site Requires Immediate Attention: IV O Facility No. 15�7 7 DIVISION OF ENVIRONMENTAL MANAGEMENT ANIMAL FEEDLOT OPERATIONS SITE VISITATION RECORD DATE: 14 1995 Time: /& ! 15 Farm Name/Owner- 01 rro 1 `.5 l�lo �-7 o S / Cal-Yoll rodel .Ziy 'Mailing Address: County: 140 K� Integrator: Phone: On Site Representative: a l '149�1 P-trvcr Phone:_ C109L -16 05 .Physical Address/Location: 4 140 KCo . Type of Operation: Swine ✓ Poultry Cattle Design Capacity: Z*00 -wow Number of Animals on Site: DEM Certification Number: ACE DEM Certification Number: ACNEW Latitude: 3 4 ° 56 ' 19 " Longitude: ° I `D ' 2-N-" Circle Yes or No Does the Animal Waste Lagoon have sufficie (approximately 1 Foot + 7 inches) Q es or No Was any seepage observed from the la oon(s)? Is adequate land available for spray? Ye or No -Crop(s) being utilized: erw�u�l o� Does the facility meet SCS minimum setback criteria? 200 Feet from Dwellin s? Yes r No 100 Feet from Wells? Ye or No Is the animal waste stockpiled within 100 Feet of USGS Blue Line Stream? Yes of NlD Is animal waste land applied or spray irrigated within 25 Feet of a USGS Map Blue Line: Yes o No Is animal waste discharged into water of he state by man-made ditch, flushing system, or other similar man-made devices? Yes or Ni If Yes, Please Explain. Does the facility maintain adequate waste management records (volumes of manure, land applied, spray irrigated on specific acreage with cover crop)? Yes or No Additional Comments: C e is f; e. J 1-OaC.i t nt freeboard of 1 Foot + 25 year 24 hour storm event Actual Freeboard: 3 Ft. Q' Inches Yes o<D Was any erosion observed? Yes o No Is the cover crop adequate? (D or No Rom.. Q Inspector Name Signature cc: Facility Assessment Unit Use Attachments if Needed. 101 00 100 00:00 021 P02 iS - DIVISION OF ENVIRONMENTAL MANAGEMENT November 4, 1994 SUBJECT: Compliance Inspection County Dear : on , an inspection of your animal operation was performed by the Fayetteville Regional Office (PRO). Please find enclosed a copy of our Compliance inspection Report for your information. It is the opinion of this office that this facility is in compliance with 15A NCAC 2x, Part .0217, and that Animal Waste Management is being properly performed. Should you have any questions regarding this matter, feel free to contact me at (910) 486-1541. Sincerely, Enclosure cc: Facility Compliance Group r Twit TnT 9m wff 7Tr 0 4 & 7Frr tsrsm "Tt FnT r obu Trrr dy Ira av ern at tag mv i . or 6 TM TTrr fie art it TTO 'TaT TM a iiii e. Iq 4 InT c itOWAIR Alyin tag "TIMM n 0 r 4 imhtSWU a Ix a; 00— 1 "Ov t! -TOT � I r L. ol INOA v I % I I I J% % I 021 P03 NORTH CAROLINA D$PARTM M OF ENVIROKI+IMT, EM TH A NATURAL RMURCES DIVISION OF FNVIROMMAL RANAGffi NT Fayetteville Regional Office Animal Operation Compliance Inspection Form !�M{Nsil•`4'.Ms:ahF q�pe � • .w41o:a .r: a. wyy Mnwn•n••vivn•.v.v.v. .r. uvMVY�f�V.Y.VM1.lsW�YY4= �YhaY � N[�+1Ni11WW11M'Nly[WY[X 4hNAF11M[ ry � �yy�V��MM nu•fvAKN'INRµJ11X �hWXF 'v^'^M•vay.r.r�v it+� x.�.. {t5lAtuY •.MK.INvn4 h0+..on1+44H•,1v.iAWnaa.nyiAv.aV... •••••r� KbrWYrll6iWil�xseilnYaX.ei:tlf41t1��' R•w.w.ew .i �:h�+.r•IJIWK...K.I+.swWsnA.v....y..0 :. //�y1� }�j/+y���� y(.y)�� A q 4 .i:H:ui.:MV.tF�4l u �,.fr.•�� �N• . .. Y�M���':!^.lf.^�.�RS .l�.S�JHi'�a'> �ilH�gs o ����WwyyyV[� yy y. 1 6nM MR^w •X N •�1 1• :Mn.Ij:R.n. �.�i:H+inli�.wl�M.+•�XM[ Y�Y III N.w. Y� yN. .[W M4.M4h��yy +��ryM{. M:1 h A.+1.n .•n.n•n.' Mvilt�'nl+l I Y' '��[� YI Y :-0H 4 �AalXI.tM.•'MhMr{A{I[� Y�..: N W W W 1 .•+.v.+•.. r. r.vn XA �• M Ml�il+1'INM.I+.In[nMl IJi*FXN•n lvmn: a avn �tisnlhl��Xr{.VnhFl{Yni1•': 44F`IVKMY �. TTY..IN. �.�(.�]�p1�.yy Wk v � AA[Y+tt k•• SM ]���y�YY X ! I ?l v V a ..[aAt•MY3a.XJ:I MYVSkX•K.Wv.�RIM�+h�Tu• .•+Iv.x.a.n.+b+n•A�VrI. nw.�ii u�arr .+.u�v�1 �•11ii LL 9�.Y�\��a��n.n 4.+.y.r.a��l. u..a ., All questions ans"red negatively will be discussed in sufficient detail in the Comments Section to enable the deemed Permittee to perform the appropriate corrections: o I Animal _.Operation-yipe: horses, cattle, swine poultry, or sheep f--V-G! 4kii;Mq !Alit 1, Does the number and type of animal meet or exceed the (.0217) criteria? (Cattle (100 head), horses (75), swine (250), sheep (1,000), and poultry (30,000 birds with liquid waste system)] 2. Does this facility meet criteria for Animal Operation MISTRATION? 3. Are animals confined fed or maintained in this facility for a 12-month period? 4. Does this facility have a CRRT M ANIMAL MASTS MANAGEPU _P? S. Does this facility maintain waste management records (volumes of manure, land applied, spray irrigated on specific acreage with specific cover crop)? 6. Does this facility meet the SC5 minimum setback criteria for neighboring houses, wells, etc? Y 00 • , 101 00 100 00:00 4' fI � f BHCTION III Fieldte_Manavement 1. Is animal waste stockpiled or lagoon construction Within 100 ft. of a USGS Map Blue Line Stream? 2. Is animal waste land applied or spray irrigated within 25 ft. of a USGS Hap Blue Line Stream? 3. Does this facility have adequate acreage on which to apply the waste? 4. Does the land application site have a cover crop its accordance with the CERTIFMIM kl 1w 5. le animal waste discharged into Waters of the state by man-made ditch, flushing system, or other similar man-made devices? 6. noes the animal waste management at this farm adhere to Best Management Practices OMP) of the approved T YCATION? 7. Does animal waste lagoon have sufficient q�a freeboard? How much? (Approximately - 3 ^) S. Is the general condition of this CAFO facility, including management and operation, satisfactory? SECTION Iv K • T1 %WS4ficYc0 � ��LK�1 RSOEIL-3 ifs l� It on �r14I�1� . I 021 PO4 T I N I CON)MRTS