Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
470001_INSPECTIONS_20171231
NUH I H UAHULINA Department of Environmental Qual j� I �f g 9-�- i� __ F7 1�_b Division of Water Resources ❑ Division of Soil and Water Conservation ❑ Other Agency Facility Number: 470001 Facility Status: Active Permit: AWS470001 Denied Access Inppection Type: Compliance Inspection Inactive Or Closed Date: Reason for Visit: Routine County: Hoke Region: Fayetteville Date of Visit: 11/03/2017 EntryTime: 11:00 am Exit Time: 11:40 am Incident # Farm Name: Hog's Breath Farm Owner Email: Owner: Swine Relief LLC Phone: 910-862-4549 Mailing Address: PO Box 535 Elizabethtown NC 283370535 Physical Address: 1224 Dave Currie Rd Red Springs NC 28377 Facility Status: Compliant ❑ Not Compliant Integrator: Murphy -Brown LLC Location of Farm: Latitude: 34° 52' 17" Longitude: 79' 18' 10" On east side of SR 1118 approx. 0.5 miles north of SR 1117. Jordan Swamp. Question Areas: Dischrge & Stream Impacts . Waste Col, Stor, & Treat Waste Application Records and Documents Other Issues r 1 Certified Operator: T avis Rya 13�r Operator Certification Number: Q�t) Secondary OIC(s): On -Site Representative(s): Name Title Phone 24 hour contact name Kathy Barker Phone On -site representative Kathy Barker Phone Primary Inspector: Inspector Signature: Secondary Inspector(s): Bill Dunlap Inspection Summary: Calibration Sept 2015, Sludge Survey March 2017, 0-3.5, P-3,6 50% Phone: Date: page: 1 f ' Permit: AWS470001 Owner - Facility : Swine Relief LLC f Facility. Number: 470001. Inspection Date: 11/03/17 Inpsection Type: Compliance Inspection Reason for Visit: Routine Regulated Operations Design Capacity Current promotions Swine Swine - Feeder to Finish 8,800 6,800 Total Design Capacity: 8,800 Total SSLW 1,188,000. Waste Structures Disignated Observed Type Identifier Closed Date Start Date Freeboard Freeboard Lagoon 1 19.00 44.00 page: 2 1 Permit: AWS470001 Owner - Facility : Swine Relief LLC Facility Number: 470001 Inspection Date: 11/03/17 Inpsection Type: Compliance Inspection Reason for Visit: Routine charges & Stream Imoac 1. Is any discharge observed from any part of the operation? ❑ 0 ❑ ❑ Discharge originated at: Structure ❑ Application Field ❑ Other ❑ a. Was conveyance man-made? ❑ ❑ ❑ b. Did discharge reach Waters of the State? (if yes, notify DWQ) ❑ 0 ❑ ❑ c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (if yes, notify DWQ) ❑ ❑ ❑ 2. Is there evidence of a past discharge from any part of the operation? ❑ 0 ❑ ❑ 3. Were there any observable adverse impacts or potential adverse impacts to Waters of the ❑ 0 ❑ ❑ State other than from a discharge? Waste Collection. Storage & Treatment Yes No Na Na 4. Is storage capacity less than adequate? ❑ ■ ❑ ❑ If yes, is waste level into structural freeboard? ❑ 5. Are there any immediate threats to the integrity of any of the structures observed (Le./ large ❑ 0 ❑ ❑ trees, severe erosion, seepage, etc.)? 8. Are there structures on -site that are not properly addressed and/or managed through a ❑ M ❑ ❑ waste management or'closure plan? 7. Do any of the structures need maintenance or improvement? ❑ M ❑ ❑ 8. Do any of the structures lack adequate markers as required by the permit? (Not applicable ❑ M ❑ ❑ to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ M ❑ ❑ maintenance or improvement? Waste Application Yes No Na No 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ E ❑ ❑ maintenance or improvement? 11. Is there evidence of incorrect application? ❑ M ❑ ❑ If yes, check the appropriate box below. Excessive Ponding? ❑ Hydraulic Overload? ❑ Frozen Ground? ❑ Heavy metals (Cu, Zn, etc)? ❑ PAN? ❑ Is PAN > 10%/10 Ibs,? ❑ Total Phosphorus? ❑ Failure to incorporate manure/sludge into bare soil? ❑ Outside of acceptable crop window? ❑ Evidence of wind drift? ❑ Application outside of application area? ❑ page: 3 -�a Permit: AWS470001 Owner- Facility:, Swine Relief LLC Facility Number. 470001 Inspection Date: 11/03/17 Inpsection Type: Compliance Inspection Reason for Visit: Routine Waste Application Yes No Na Ne' Crop Type 1 Coastal Bermuda Grass (Hay) Crop Type 2 Coastal Bermuda Grass w/ Rye Omseed Crop Type 3 Crop Type 4 Crop Type 5 Crop Type 6 Soil Type 1 Soil Type 2 Soil Type 3 Soil Type 4 Soil Type 5 Soil Type 6 14. Do the receiving crops differ from those designated in the Certified Animal Waste Management Plan(CAWMP)? 15. Does the receiving crop and/or land application site need improvement? 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination? 17. Does the facility lack adequate acreage for land application? 18. Is there a lack of properly operating waste application equipment? Records and Documents 19. Did the facility fail to have Certificate of Coverage and Permit readily available? 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check the appropriate box below. WUP? Checklists? Design? Maps? Lease Agreements? Other? If Other, please specify 21. Does record keeping need improvement? If yes, check the appropriate box below. Waste Application? Weekly Freeboard? Waste Analysis? Soil analysis? Waste Transfers? Weather code? Rainfall? Candor ❑■❑❑ ❑ N ❑ ❑ ❑■❑❑ ❑■❑❑ ❑ ❑ ❑ Yes No Na Ne ❑■❑❑ page: 4 Permit: AWS470001 Owner - Facility : Swine Relief LLC Facility Number. 470001 Inspection Date: 11/03/17 Inppection Type: Compliance Inspection! Reason for Visit: Routine ords and Docume Stocking? ❑ Crop yields? ❑ 120 Minute inspections? ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey ❑ 22. Did the facility fail to install and maintain a rain gauge? ❑ 0 ❑ ❑ 23. If selected, did the facility fail to install and maintain a rainbreaker on irrigation equipment ❑ ❑ ❑ (NPDES only)? 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ 01113 25, Is the facility out of compliance with permit conditions related to sludge? If yes, check the ❑ ❑ ❑ appropriate box(es) below, Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon ❑ List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ ❑ ❑ 27. Did the facility fail to secure a phosphorous loss assessment (PLAT) certification? ❑ ❑ ❑ 01haE 1psges Yes No Na Ne 28. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ ❑ ❑ and report mortality rates that exceed normal rates? , 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, ❑ 0 ❑ ❑ contact a regional Air Quality representative immediately. 30. Did the facility fail to notify regional DWQ of emergency situations as required by Permit? ❑ M ❑ ❑ (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? ❑ ❑ ❑ If yes, check the appropriate box below. Application Field ❑ Lagoon / Storage Pond ❑ Other ❑ If Other, please specify 32. Were any additional problems noted which cause non-compliance of the Permit or ❑ 01111 CAWMP? 33, Did the Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ ❑ ❑ 34. Does the facility require a follow-up visit by same agency? ❑ ❑ ❑ page: 5 ■ Division of Water Resources ❑ Division of Soil and Water Conservation El Other Agency Facility Number: 470001 Facility Status: Active permit; AWS470001 ❑ Denied Access Inppection Type; Compliance Inspection Reason for Visit: Routine Date of Visit: 03/11/2015 Entry Time: 09:00 am Farm Name: Hogs Breath Inc 1 Farm 5077 Owner; Murphy -Brown LLC Mailing Address: PO Box 487 Physical Address: 1224 Dave Currie Rd Facility Status: ■ 0,,..,...11, 4 n KI-6 t'--- 1,- Inactive Or Closed Date: County: Hoke Region: Fayetteville Exit Time: 9:30 am Incident # Owner Email: Phone: 910-296-1800 Warsaw NC 28398 Red Springs NC 28377 Integrator: Murphy -Brown LLC Location of Farm: Latitude: 3452' 17" Longitude: 79° 18' 10" On east side of SR 1118 approx. 0.5 miles north of SR 1117. Jordan Swamp. Question Areas: Dischrge & Stream Impacts Waste Col, Stor, & Treat Waste Application Records and Documents Other Issues Certified Operator; Ronald Lee Matthews Operator Certification Number: 990008 Secondary OIC(s): On -Site Reprosentative(s): Name Title Phone 24 hour contact name Mike Cudd Phone: On -site representative Mike Cudd Phone: Primary Inspector: Robert Marble Phone: Inspector Signature: Date: Secondary Inspector(s): Inspection Summary: page: 1 Permit: AWS470001 Owner -Facility: Murphy -Brown LLC Facility Number, 470001 Inspection Date: 03/11/15 Inppection Type: Compliance Inspection Reason for Visit: Routine Regulated Operations Design Capacity Current promotions Swine Swine - Feeder to Finish 8,800 Total Design Capacity: 8,800 Total SSLW: 1,188,000 Waste Structures Dislgnated Observed Type Identifier Closed Date Start Date freeboard Freeboard Lagoon 1 19.00 37.00 page: 2 Permit: AWS470001 Owner - Facility : Murphy -Brown LLC Facility Number: 470001 Inspection Date: 03/11/15 Inpsection Type: Compliance Inspection Reason for Visit: Routine Discharaes & Stream Impacts Yea No Na Ne 1. Is any discharge observed from any part of the operation? ❑ 01311 Discharge originated at: Structure ❑ Application Field ❑ Other ❑ a. Was conveyance man-made? ❑ ❑ ■ ❑ b. Did discharge reach Waters of the State? (if yes, notify DWQ) ❑ ❑ m ❑ c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (if yes, notify DWQ) ❑ ❑ 0 ❑ 2. Is there evidence of a past discharge from any part of the operation? ❑ ❑ ❑ 3. Were there any observable adverse impacts or potential adverse impacts to Waters of the ❑ ■ ❑ ❑ State other than from a discharge? Waste Collection, Storage & Treatment Yea No Na Ne 4. Is storage capacity less than adequate? ❑ O ❑ ❑ If yes, is waste level into structural freeboard? ❑ 5. Are there any immediate threats to the integrity of any of the structures observed (Led large ❑. M ❑ ❑ trees, severe erosion, seepage, etc.)? 6. Are there structures on -site that are not properly addressed and/or managed through a ❑ ■ ❑ ❑ waste management or closure plan? 7. Do any of the structures need maintenance or improvement? ❑ 0 ❑ ❑ B. Do any of the structures lack adequate markers as required by the permit? (Not applicable ❑ ❑ ❑ to roofed pits, dry stacks and/or wet stacks) 9, Does any part of the waste management system other than the waste structures require ❑ 0 ❑ ❑ maintenance or improvement? Waste Application Yea No Na Ne 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ ❑ ❑ maintenance or improvement? 11. Is there evidence of incorrect application? ❑ n ❑ ❑ If yes, check the appropriate box below. Excessive Ponding? ❑ Hydraulic Overload? ❑ Frozen Ground? ❑ Heavy metals (Cu, Zn, etc)? ❑ PAN? ❑ Is PAN > 10%/10 lbs.? ❑ Total Phosphorus? ❑ Failure to incorporate manure/sludge into bare soil? ❑ Outside of acceptable crop window? ❑ Evidence of wind drift? ❑ Application outside of application area? ❑ page: 3 Permit: AWS470001 Owner -Facility: Murphy -Brown LLC facility Number, 470001 Inspection Date: 03/11/15 1npsection Type: Compliance Inspection Reason for Visit: Routine Waste Application Yes No Na No Crop Type 1 Coastal Bermuda Gress (Hay) Crop Type 2 5matt Grain Oversaad Crop Type 3 Crop Type 4 Crop Type 5 Crop Type 6 Soil Type 1 Candor sand, 1 to 8% slopes Soil Type 2 Soil Type 3 Soil Type 4 Soil Type 5 Soil Type 6 14. Do the receiving crops differ from those designated in the Certified Animal Waste ❑ 0 ❑ ❑ Management Plan(CAWMP)? 15. Does the receiving crop and/or land application site need improvement? ❑ 0 ❑ ❑ 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre ❑ ■ ❑ ❑ determination? 17. Does the facility lack adequate acreage for land application? ❑ ❑ ❑ 18, Is there a lack of properly operating waste application equipment? ❑ ❑ ❑ Records and Documents Yes No Na No 19. Did the facility fail to have Certificate of Coverage and Permit readily available? ❑ ❑ ❑ 20. Does the facility fail to have all components of the CAWMP readily available? ❑ 0 ❑ ❑ If yes, check the appropriate box below. WUP? ❑ - Checklists? ❑ Design? ❑ Maps? ❑ Lease Agreements? ❑ Other? ❑ If Other, please specify 21. Does record keeping need improvement? ❑ moo If yes, check the appropriate box below. Waste Application? ❑ Weekly Freeboard? ❑ Waste Analysis? ❑ Soil analysis? ❑ Waste Transfers? ❑ Weather code? ❑ Rainfall? ❑ page: 4 Permit, AWS470001 Owner -Facility: Murphy -Brown LLC Facility Number: 470001 Inspection Date: 03/11/15 Inppection Type: Compliance Inspection Reason for Visit: Routine Records and Documents Yea No Ne No Stocking? ❑ Crop yields? ❑ 120 Minute inspections? ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey ❑ 22. Did the facility fail to install and maintain a rain gauge? ❑ M ❑ ❑ 23. If selected, did the facility fail to install and maintain a rainbreaker on irrigation equipment ❑ ❑ ❑ (NPDES only)? 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ e ❑ ❑ 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check the ❑ ■ ❑ ❑ appropriate box(es) below: Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon [a List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ M ❑ ❑ 27. Did the facility fail to secure a phosphorous loss assessment (PLAT) certification? ❑ 0 ❑ ❑ Other Issues Yee No No No 28. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑M ❑ ❑ and report mortality rates that exceed normal rates? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, ❑ 0 ❑ ❑ contact a regional Air Quality representative immediately. 30. Did the facility fail to notify regional DWQ of emergency situations as required by Permit? ❑ MIJEI (i.e., discharge, freeboard problems, over -application) 31. Do subsurface the drains exist at the facility? ❑ M ❑ ❑ If yes, check the appropriate box below. Application Field ❑ Lagoon / Storage Pond ❑ Other ❑ If Other, please specify 32. Were any additional problems noted which cause non-compliance of the Permit or ❑ 0 ❑ ❑ CAWM P? 33. Did the Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ ❑ ❑ 34. Does the facility require a follow-up visit by same agency? ❑ 0 ❑ ❑ page: 5 Division of Water Resources ❑ Division of Soil and Water Conservation ❑ Other Agency Facility Number: 470001 Facility Status: Active Permit: AWS470001 Denied Access Inppection Type: Compliance Inspection Inactive Or Closed Date: Reason for Visit: Routine County: Hoke Region: Fayetteville Date of Visit: 03/20/2014 Entry Time: 12:00 pm Exit Time: 1:00 pm Incident # Farm Name: Hog's Breath Inc I Farm 5077 Owner Emall: Owner: Murphy -Brown LLC Phone: 910-296-1800 Mailing Address: PO Box 487 Warsaw NC 28398 Physical Address: 1224 Dave Currie Rd Red Springs NC 28377 Facility Status: Compliant ❑ Not Compliant Integrator: Murphy -Brown LLC Location of Farm: Latitude: 34' 52' 17" Longitude: 79° 18' 10" On east side of SR 1118 approx. 0.5 miles north of SR 1117. Jordan Swamp, Question Areas: Dischrge & Stream Impacts Waste Col, Sior, & Treat Waste Application Records and Documents Other Issues Certified Operator: Michael L Cudd Operator Certification Number: 25233 Secondary OIC(s): On -Site Representative(s): Name Title Phone 24 hour contact name Mike Cudd Phone On -site representative Mike Cudd Phone Primary Inspector: Robert Marble Phone: Inspector Signature: Date: Secondary Inspector(s): Inspection Summary: Records reviewed 3/10114. Site visit 3/20114, page: 1 Permit: AWS470001 Owner -. Facility : Murphy -Brown LLC Facility Number: 470001 Inspection Date: 03/20/14 Inpsection Type: Compliance Inspection Reason for Visit: Routine Regulated Operations Design Capacity - Current promotions Swine �] Swine - Feeder to Finish Total Design Capacity: Total SSLW: Waste StruclUres Dlaignata' Observed Type Identifier Closed Date Start Date Freeboard Freeboard Lagoon 1 19.00 page: 2 Permit: AWS470001 Owner -Facility: Murphy -Brawn LLC Facility Number: 470001 Inspection Date: 03/20/14 Inppection Type: Compliance Inspection Reason for Visit: Routine Discharges & Stream Impacts Yes No No No 1. Is any discharge observed from any part of the operation? ❑ 0 ❑ ❑ Discharge originated at: Structure ❑ Application Field ❑ Other ❑ a. Was conveyance man-made? ❑ ❑ M ❑ b. Did discharge reach Waters of the State? (if yes, notify DWQ) ❑ ❑ 0 ❑ c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (if yes, notify DWQ) ❑ 110 ❑ 2. Is there evidence of a past discharge from any part of the operation? ❑01111 3. Were there any observable adverse impacts or potential adverse impacts to Waters of the ❑ No ❑ State other than from a discharge? Waste Collection, Storage & Treatment Yes No Na No 4. Is storage capacity less than adequate? ❑ ❑ ❑ If yes, is waste level into structural freeboard? ❑ 5. Are there any immediate threats to the integrity of any of the structures observed (I.e./ large ❑ ❑ ❑ trees, severe erosion, seepage, etc.)? 6. Are there structures on -site that are not properly addressed and/or managed through a ❑ 0 ❑ ❑ waste management or closure plan? 7. Do any of the structures need maintenance or improvement? ❑ ❑ ❑ B. Do any of the structures lack adequate markers as required by the permit? (Not applicable ❑ ❑ ❑ to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ ❑ El maintenance or improvement? Waste Application Yes No No Ne 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ 0 ❑ ❑ maintenance or improvement? 11. Is there evidence of incorrect application? ❑ 0 ❑ ❑ If yes, check the appropriate box below, Excessive Ponding? ❑ Hydraulic Overload? ❑ Frozen Ground? ❑ Heavy metals (Cu, Zn, etc)? ❑ PAN? [] Is PAN > 10%/10 lbs.? ❑ Total Phosphorus? ❑ Failure to incorporate manure/sludge into bare soil? ❑ Outside of acceptable crop window? ❑ Evidence of wind drift? ❑ Application outside of application area? ❑ page: 3 Permit: AWS470001 Owner -Facility: Murphy -Brown LLC Facility Number: 470001 Inspection Date: 03/20/14 Inpsection Type: Compliance Inspection Reason for Visit: Routine Waste Application Y21 No No Ne Crop Type 1 4 Coastal Bermuda Grass (Hey) Crop Type 2 Small Grain Overseed Crop Type 3 Crop Type 4 Crop Type 5 Crop Type 6 Soil Type 1 Candor sand, 1 to 9% slopes Soil Type 2 Soil Type 3 Soil Type 4 Soil Type 5 Soil Type 6 14. Do the receiving crops differ from those designated in the Certified Animal Waste ❑ 0 ❑ ❑ Management Plan(CAWMP)? 15. Does the receiving crop and/or land application site need improvement? ❑ N ❑ ❑ 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre ❑ ❑ ❑ determination? 17. Does the facility lack adequate acreage for land application? ❑ N ❑ ❑ 18. Is there a lack of properly operating waste application equipment? ❑ 013 ❑ Records and Documents Yes No Na No 19. Did the facility fail to have Certificate of Coverage and Permit readily available? ❑ ■ ❑ ❑ 20. Does the facility fail to have all components of the CAWMP readily available? ❑ E ❑ ❑ If yes, check the appropriate box below. WUP? ❑ Checklists? ❑ Design? ❑ ' Maps? ❑ Lease Agreements? ❑ Other? ❑ If Other, please specify 21. Does record keeping need improvement? ❑ 0 ❑ ❑ If yes, check the appropriate box below. Waste Application? ❑ Weekly Freeboard? ❑ Waste Analysis? ❑ Soil analysis? ❑ Waste Transfers? ❑ Weather code? ❑ Rainfall? ❑ page: 4 r Permit: AWS470001 Owner - Facility ; Murphy -Brown LLC Facility Number: 470001 Inspection Date: 03/20/14 Inpsection Type: Compliance Inspection Reason for Visit: Routine Records and Documents Yes No Na No Stocking? ❑ Crop yields? I ❑ 120 Minute inspections? ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey ❑ 22. Did the facility fail to install and maintain a rain gauge? ❑ 0 ❑ ❑ 23. If selected, did the facility fail to install and maintain a rainbreaker on irrigation equipment ❑ ■ ❑ ❑ (NPDES only)? 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ 0 ❑ ❑ 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check the ❑ M ❑ ❑ appropriate box(es) below: Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon ❑ List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ ❑ [] 27. Did the facility fail to secure a phosphorous loss assessment (PLAT) certification? ❑ M ❑ ❑ Other Issues Yes No No Ne 28. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ 0 ❑ ❑ and report mortality rates that exceed normal rates? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, ❑ ❑ ❑ contact a regional Air Quality representative immediately. 30. Did the facility fail to notify regional DWQ of emergency situations as required by Permit? ❑ M ❑ ❑ (i.e„ discharge, freeboard problems, over -application) 31. Do subsurface the drains exist at the facility? ❑ M ❑ ❑ If yes, check the appropriate box below. Application Field ❑ Lagoon 1 Storage Pond ❑ Other ❑ If Other, please specify 32. Were any additional problems noted which cause non-compliance of the Permit or ❑ 0 ❑ ❑ CAWM P? 33. Did the Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ 00 ❑ 34. Does the facility require a follow-up visit by same agency? ❑ M ❑ ❑ page: 5 Division of Water Resources ❑ Division of Soil and Water Conservation ❑ Other Agency Facility Number: 470001 Facility Status: Active Permit: AWS470001 Denied Access Inpeection Type: Compliance Inspection Inactive Or Closed Date: Reason for visit: Routine County: Hoke Region: Fayetteville Date of visit: 0212712013 Entry Time: 09:30 am Exit Time: 10:00 am Incident # Farm Name: Hog's Breath Inc / Farm 5077 Owner Email: Owner: Murphy -Brown LLC Phone: 910-296-1800 Mailing Address: PO Box 487 Warsaw NC 28398 Physical Address: 1224 Dave Currie Rd Red Springs NC 28377 Facility Status: Compliant ❑ Not Compliant Integrator: Murphy -Brown LLC Location of Farm: Latitude: 34' 52' 17" Longitude: 79° 18' 10" On east side of SR 1118 approx. 0.5 miles north of SR 1117. Jordan Swamp. Question Areas: Dischrge & Stream Impacts Waste Cal, Stor, & Treat Waste Application S Records and Documents Other Issues Certified Operator: Ronald Lee Matthews Operator Certification Number: 990008 Secondary OIC(s): On -Site Representative(s): Name Title Phone 24 hour contact name Mike Cudd Phone: On -site representative Mike Cudd Phone: Primary Inspector: Robert Marble Phone: Inspector Signature: Date: Secondary Inspector(s): Inspection Summary: Records reviewed 2/14/13 Site visit 2/27113 page: 1 Permit: AWS470001 Owner - Facility : Murphy -Brown LLC Facility Number: 470001 Inspection Date: 02/27/13 Inppection Type: Compliance Inspection Reason for \Asit: Routine Regulated Operations Design Capacity Current promotions Swine Swine - Feeder to Finish 8,800 Total Design Capacity: Total SSLW: Waste %ru2tures Dielgnated Observed Type identifier Closed Data Start Date Freeboard Freeboard Lagoon I page: 2 Permit: AWS470001 Owner - Facility : Murphy -Brown LLC Facility Number: 470001 Inspection Date: 02/27/13 Inssection Type: Compliance Inspection Reason for Visit: Routine Discharnes & Stream Impacts Yes No No No 1. Is any discharge observed from any part of the operation? ❑ 0 ❑ ❑ Discharge originated at: Structure ❑ Application Field ❑ Other ❑ a. Was conveyance man-made? ❑ ❑ 0 ❑ b. Did discharge reach Waters of the State? (if yes, notify DWQ) ❑ ❑ 0 ❑ c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (if yes, notify DWQ) ❑ ❑ 0 ❑ 2. Is there evidence of a past discharge from any part of the operation? ❑ 0 ❑ ❑ 3. Were there any observable adverse impacts or potential adverse impacts to Waters of the ❑ 0 ❑ ❑ State other than from a discharge? Waste Collection Storage & Treatment Yes No No No 4. Is storage capacity less than adequate? ❑ 0 ❑ ❑ If yes, is waste level into structural freeboard? ❑ 5. Are there any immediate threats to the integrity of any of the structures observed (Le./ large ❑ 0 ❑ ❑ trees, severe erosion, seepage, etc.)? 6. Are there structures on -site that are not properly addressed and/or managed through a ❑ 0 ❑ ❑ waste management or closure plan? 7. Do any of the structures need maintenance or improvement? ❑ 0 ❑ ❑ 8. Do any of the structures lack adequate markers as required by the permit? (Not applicable ❑ 0 ❑ ❑ to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ 0 ❑ ❑ maintenance or improvement? Waste Application Ygs No Na No 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ 0 ❑ ❑ maintenance or improvement? 11. Is there evidence of incorrect application? ❑ 0 ❑ ❑ If yes, check the appropriate box below. Excessive Ponding? ❑ Hydraulic Overload? ❑ Frozen Ground? ❑ Heavy metals (Cu, Zn, etc)? ❑. PAN? ❑ Is PAN > 10%/10 lbs.? ❑ Total Phosphorus? ❑ Failure to incorporate manurelsludge into bare soil? ❑ Outside of acceptable crop window? ❑ Evidence of wind drift? ❑ Application outside of application area? ❑ page: 3 Permit: AWS470001 Owner - Facility : Murphy -Brown LLC Facility Number: 470001 Inspection Date: 02/27/13 Inpsection Type: Compliance Inspection Reason for Visit: Routine Waste Application Yes_ No Na No Crop Type 1 Coastal Bermuda Grass (Hay) Crop Type 2 Small Grain Oversead Crop Type 3 Crop Type 4 Crop Type 5 Crop Type 6 Soil Type 1 Candor Soil Type 2 Soil Type 3 Soil Type 4 Soil Type 5 Soil Type 6 14. Do the receiving crops differ from those designated in the Certified Animal Waste ❑ ❑ ❑ Management Plan(CAWMP)? 15. Does the receiving crop and/or land application site need improvement? ❑ ■ ❑ ❑ 16. Did the facility fail to secure and/or, operate per the irrigation design or wettable acre ❑ ❑ ❑ determination? 17. Does the facility lack adequate acreage for land application? EIN ❑ ❑ 18. Is there a lack of properly operating waste application equipment? ❑ 0 ❑ ❑ Records and Documents Yes No Na Ne 19. Did the facility fail to have Certificate of Coverage and Permit readily available? ❑ 013 ❑ 20. Does the facility fail to have all components of the CAWMP readily available? ❑ 0 ❑ ❑ If yes, check the appropriate box below. WUP? ❑ Checklists? ❑ Design? ❑ Maps? ❑ Lease Agreements? ❑ Other? ❑ If Other, please specify 21. Does record keeping need improvement? ❑ E ❑ ❑ If yes, check the appropriate box below. Waste Application? ❑ Weekly Freeboard? ❑ Waste Analysis? ❑ Soil analysis? ❑ Waste Transfers? ❑ Weather code? ❑ Rainfall? ❑ Stocking? ❑ page: 4 Permit: AWS470001 Owner - Facility : Murphy -Brown LLC Facility Number: 470001 Inspection Date: 02/27/13 Inppection Type: Compliance Inspection Reason for Visit: Routine Records and Documents Yoe _No Na Ne Crop yields? ❑ 120 Minute inspections? ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey ❑ 22. Did the facility fail to install and maintain a rain gauge? ❑ M ❑ ❑ 23. If selected, did the facility fail to install and maintain a rainbreaker on irrigation equipment ❑ 0 ❑ ❑ (NPDES only)? 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ 0 ❑ ❑ 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check the ❑ 0 ❑ ❑ appropriate box(es) below: Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon ❑ List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ ❑ ❑ 27. Did the facility fail to secure a phosphorous loss assessment (PLAT) certification? ❑ ■ ❑ ❑ Other Issues Yes No Na No 28. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ ❑ ❑ and report mortality rates that exceed normal rates? 29. At the time of the inspection did the facility pose an odor or,air quality concern? If yes, ❑ M ❑ ❑ contact a regional Air Quality representative immediately. 30. Did the facility fail to notify regional DWQ of emergency situations as required by Permit? ❑0 ❑ ❑ (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? [] ■ ❑ ❑ if yes, check the appropriate box below. Application Field ❑ Lagoon / Storage Pond ❑ Other ❑ If Other, please specify 32. Were any additional problems noted which cause non-compliance of the Permit or ❑ 0 ❑ ❑ CAWM P? 33, Did the Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ ■ ❑ ❑ 34. Does the facility require a follow-up visit by same agency? ❑ 0 ❑ ❑ page: 5 Division of Water Quality Lacffity.Number O Division of Sail and Water Conservation Q Other Agency Type of Visit Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance I Reason for Vlslt ©Routine O Complaint O Follow up O Referral O Emergency 0 Other ❑ Denied Access Date of Visit: Arrival Time: [M.'000h.,j Departure Time: !oo County: Farm Name: Owner Email: ,,�/ Owner Name: I r ` —6wwln Phone: _ Mailing Address: Physical Address: Region: Facility Contact: I' t t ne— L'u-M Title: [ l ,�/� Phone No: Onsite Representative: Integrator: Wo L}i� - 1�Q wh UL Certified Operator: Operator Certification Number: Back-up Operator: Location of Farm: Swine ❑ Wean to Finish ❑ Wean to Feeder Feeder to Finish Farrow to Wean ❑ Farrow to Feeder ❑ Farrow to Finish ❑ Gilts ❑ Boars Other ❑ Other Back-up Certification Number: Latitude: 0 e = ' ❑ Longitude: 0 ° = , ❑ 1f Design Current Design Current Capacity Population Wet Poultry Capacity Population ❑ Layer ❑ Non -Layer Dry Poultry ❑ Layers ❑ Non -Layers ❑ Pullets ❑ Turkeys ❑ Turkey Pou Its ❑ Other Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) Design Current Cattle Capacity Population ❑ Dairy Cow ❑ Dairy Calf ❑ Dairy Heifer ❑ Dry Cow ❑ Non -Dairy ❑ Beef Stocker ❑ Beef Feeder ❑ Beef Brood Cow c. What is the estimated volume that reached waters of the State (gallons)? Number of Structures: 01 d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes [RNo ❑ NA ❑ NE ❑ Yes ❑ No QRNA ❑ NE ❑ Yes ❑ No [NNA ❑ NE ❑ Yes ❑ No [PNA ❑ NE ❑ Yes [PNo ❑ NA ❑ NE ❑ Yes [INo ❑ NA ❑ NE Page I of 3 12128104 Continued acllity Number: — Date of Inspection Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? W Yes ❑ No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ;9 No ❑ NA ❑ NE Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): i� Observed Freeboard (in): 33 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No ❑ NA ❑ NE (iel large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes No ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement'? ❑ Yes [� No ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes No ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes LP No ElNA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes (N No ❑ NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? if yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes 29 No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination?[] Yes No ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? Cl Yes No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes [ No ❑ NA ❑ NE eco,mm�ye�ngtl d gns or any oth r comets. 9 Comm�yents (r`e'fer `to q stion #)� xExxptlaln*n iy Ys S answers ndlo5pagesas Use drawings off ll^ ha etter ex Main situations (use �dditivnanecessary): V Si� JiS:�— CaKdkc� 3�n/tl, Reviewer/Inspector Name' - W - Phone: —Y2 -3300 Reviewer/Inspector Signature: Date: 2�25//1 Page 2 of 3 12128104 Continued Facility Number: — Date of Inspection u (( Re uired Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes [P No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes [P No ❑ NA ❑ NE the appropirate box. ❑ WDP ❑ Checklists ❑ Design El Maps ❑Other 21. Does record keeping need improvement? if yes, check the appropriate box below. ❑ Yes [NNo ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes 59 No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes No ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ® No ❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit'? ❑ Yes W No ❑ NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes N No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes U No ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance ofthe permit or CAWMP? ❑ Yes J�J No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes M No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern'? ❑ Yes [Q No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes [ No ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes E� No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes 4No ❑ NA ❑ NE Additional Comments and/or Drawings. Page 3 of 3 12128104 • Division of Water Quality Facility Number - L1J 0 Division of Soil and Water Conservation 0 Other Agency Type of visit: 0 Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance iieason for Visit: ® Routine 0 Complaint Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Arrival Time: � Departure Time: 10'.cv County: Farm Name: 50 15. YrcA Owner Email: Owner Name: MLA-9--Ipv" �{/pt�,� LJjC' Phone: Mailing Address: Region: Physical Address: Facility Contact: i Ke� Title: Phone: 1� Onsite Representative: Integrator: rocu o U Certified Operator: Certification Number: Back-up Operator: Location of Farm: Swine Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Other Other J Certification Number: Latitude: Design Current Design Current Capacity Pop. Wet Poultry Capacity Pop. La er Non -La er Dry Poultry Layers Non -Layers Pullets Turkeys Turkey Poults Other Design Current Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (if yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? _ d. Does the discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? Longitude: Design Current Cattle Capacity Pop. Dairy Cow Dairy Calf Dairy Heifer Dry Cow .Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow ❑ Yes �g No ❑ NA ❑ NE ❑Yes No NA ❑NE ❑ Yes [] No NA ❑ NE [:]Yes [:)No ❑ Yes No [:]Yes ® No 6Z NA ❑ NE ❑NA ❑NE ❑NA ❑NE Page I of 3 21412011 Continued Facili ' Number: - I Date of Inspection,: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No \M NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): �f 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No ❑ NA ❑ NE (i.e., iarge trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes [P No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 ibs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes P No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes 171No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes UhNo Lfftr ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes R No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes [PNo ❑ NA ❑ NE the appropriate box. 7� ❑ WUP ❑Checklists [:]Design ❑ Maps ❑ Leasc Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes F No ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Rainfall ❑Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rainfall Inspections 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes � No 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes F No ❑NA ONE ❑ Weather Code ❑ Sludge Survey ❑ NA ❑ NE ❑ NA ❑ NE Page 2 of 3 21412011 Continued Facility Number: - I I jDate of Ins ecdon: a 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes fA No 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes ® No the appropriate box(es) below. T ❑ Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes allo 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? [] Yes ❑ No Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 3 I. Do subsurface the drains exist at the facility? If yes, check the appropriate box below. ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? ❑ NA ❑ NE ❑ NA ❑ NE ❑ NA ❑ NE NA ❑ NE ❑ Yes �g No ❑ NA ❑ NE ❑ Yes �0 No ❑ NA ❑ NE ❑ Yes [ff No ❑ NA ❑ NE ❑ Yes 0 No ❑ NA ❑ NE []Yes M No ❑ NA ❑ NE ❑ Yes [�3 No ❑ NA ❑ NE ❑ Yes V] No ❑ NA ❑ NE Comments (refer to question ft Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facilit to better explain situations (use additional pages as necessary). e_C0(4 s P-('-J; C--�e-L *`(((3 i e_ J i s t - a /a 7//3 Reviewer/Inspector Name: Reviewer/Inspector Signature Page 3 of 3 Phone: q l o LB 3 3 3 oo Date: 21412011 (Type of Visit: 0 Compliance Inspection U Operation Review p Structure Evaluation Q Technical Assistance I Reason for Visit: 0 Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: IT[ (Z I Arrival Time: i� Departure Time: �4 County: � Farm Name: �6 rr� r[ —3r�ms` Qq,,Q Owner Email: Owner Name: M.A1A rDL4)V%,, LkC Phone: Mailing Address: Physical Address: Region: FO Facility Contact: Mry Yam. " Title: Phone: Onsite Representative: Integrator: j62:2 t " u.( Certified Operator: Certification Number: Back-up Operator: Certification Number: Location of Farm: Latitude: Longitude: EMW Design C*urrent Swine Capacity Pop. Wean to Finish Wet Poultry Design Current Capacity Pop: I Design Current Cattle KIMP. airy Cow Wean to Feeder I jNon-Layer airy Calf Feeder to Finish Dairy Heifer Farrow to Wean Design Current Dry Cow Farrow to Feeder Farrow to Finish Layers Non-Dairy Beef Stocker Gilts Non -Layers Beef Feeder Boars Pullets Beef Brood Cow Other Other Turkeys Turkey Pouets Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? ❑ Yes No ❑ NA ❑ NE ❑ Yes [] No [' NA ❑ NE ❑ Yes ❑ No NA ❑ NE ❑ Yes ❑ No ❑ Yes � No ❑ Yes WNo NA ❑ NE ❑ NA ❑ NE ❑ NA ❑ NE Page 1 of 3 21412011 Continued Facili Number: - Date of Ins ection: 2 Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes [?DNo ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: �T Spillway?: Designed Freeboard (in): Observed Freeboard (in): 3 rr 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes � No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes M No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes T No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste_ Application 10. Are there any required buffers, setbacks, or compliance alternatives that need [] Yes ® No ❑ NA ❑ NE maintenance or improvement? r 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes [9 No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus [] Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ ence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes 10 No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No NA ❑ NE the appropriate box. ❑ WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes JR No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall [] Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1 ° Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes No ❑ NA ❑ NE Page 2 of 3 21412011 Continued Facility Number: - Date of Inspection: 24. Did the facility fail to calibrate'waste application equipment as required by the permit? ❑ Yes 0 No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes E0 No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No [ZNA T ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes [ No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes Cr No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes No ❑ NA ❑ NE Comments (refer to question #): Explain any: YES answers'and/orAny additional recommendations or,any other�commenta,gf �t: s Use: drawings;nf facility to`better: explain situations '(use additional pages'as necessary).. ; e,a rw it U4 311 b Sty ✓10- 360(t. Reviewer/Inspector Name: Reviewer/Inspector Signature: Page 3 of 3 Phone: �%�d3- 3300 Date: 3 -L- 21412011 ArOfS ZI - ( 7---20/0 ivision of Water Quality Facility Number 7 �__D O Division of Soil and Water Conservation Q Other Agency Type of Visit ompliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit outine 0 Complaint 0 Follow up 0 Referral 0 Emergency 0 Other ❑ Dented Access Date of Visit: 3 Z6`/D Arrival Time: Departure Time: C Farm Name: 5-6-7-7-3 old Nowc. llzq S 13i-cc4-& Owner Name: gr5pjAj LGG Mailing Address: Physical Address: Facility Contact: County: 0 JAL Region: Cad Owner Email: Phone: Title: '� Phone No: Onsite Representative: Integrator: ,4"f''RI" Certified Operator: MV.&� � AA G L,a N Operator Certification Number: 996752- Back-up Operator: Location of Farm: A4,14_ Cu ld Design Current Swine Capacity Population �❑ Wean to Finish ❑ Wean to Feeder ® Feeder to Finish 6800 ❑ Farrow to Wean ❑ Farrow to Feeder ❑ Farrow to Finish Boars Other ❑ Other A Back-up Certification Number: Latitude: [= o = 6 a Longitude: = ° = 6 = {1 Design Current Design Current Wet Poultry Capacity Population Cattle Capacity Population ❑ Layer ❑ Non -Layer Dry Poultry ❑ Layers ❑ Non -Layers ❑ Pullets ❑ Turkeys ❑ Turkey Poults ❑ Other ❑ Dairy Cow ❑ Dairy CaIf ❑ Dairy Heifer ❑ Dry Cow ❑ Non -Dairy ❑ Beef Stocker ❑ Beef Feeder ❑ Beef Brood Cow Number of Structures: �J Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes 8 No ❑ NA ❑ NE ❑ Yes ❑ No 2 fA ❑ NE ❑ Yes ❑ No 9 NA ❑ NE [9NA ❑ NE ❑ Yes ❑ No ❑ Yes LkNo ❑ NA ❑ NE ❑ Yes Zj No ❑ NA ❑ NE Page 1 of 3 12178104 Continued rj Facility Number: 47 —Q 0 Date of Inspection Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a. If yes, is waste level into the structural freeboard? Structure I Structure 2 Structure 3 Structure 4 Identifier:. .�o77 =3 Spillway?: Designed Freeboard (in): Observed Freeboard (in): Z 5. Are there any immediate threats to the integrity of any of the structures observed? (ic/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE Structure 5 Structure 6 ❑ Yes [ffNo ❑ NA ❑ NE ❑ Yes [ffNo ❑ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes 7 No ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes JE"JIINo ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes ffNo ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes ff No ❑ NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes Z No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop types) (14a l (01J r5eej, ) 13. Soil type(s) COL" d 0 V- 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes Q No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ff No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination ? El Yes km No ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes E5No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes ®'No ❑ NA ❑ NE Comments (refer to question #):.,Explain any YE&answeri and/oar any, recommendations br any other., comments, Use dra'wingsof facility tobetterexplain situations ;(use,additional page® as necessary) ; r Reviewer/inspector Name i�-S �33. 33 DC� s l$=< ]?hone: 9/0AO t' r - • Reviewer/Inspector Signature: Date: —0 %— ZOO Page 2 of 3 12128104 Continued . Facility Number: Date of Inspection Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes PYNo ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes [9No ❑ NA ❑ NE the appropriate box. ❑ WUP ❑ Checklists ❑ Design ❑Maps ❑Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes M No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V Rain Inspections ❑ Weather Code 22, Did the facility fail to install and maintain a rain gauge? ❑ Yes j] No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes .,9 No ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes fO No ❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes BNo ❑ NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes ® No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes B No ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes LONo ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes ,� No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes �] No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31, Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes No ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes 9 No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes R No ❑ NA ❑ NE Additin'nal Cnntments and/nr Driiwitigs r r a : ' 4 ,� �.,e, * °, . ' .a L d f i ,., a` � '. ` :y , � ti ; � �i'.....IVA ° 1 Page 3 of 3 12128104 V E f Visit Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance n for Visit 0 Routine 0 Complaint 0 Follow up 0 Referral 0 Emergency 0 Other ❑ Denied Access_TEE(") Date of Visit: D Arrival Time: eparture Time: County: �� Region: 5Farm Name: D 7 f 3 r `� �Ownner Email: Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: tT¢:3Ihlea 06.) Title: Phone No: !!� Onsite Representative: V1 Integrator: &4[.t G Certified Operator; C g.ln_ „,,,_, Operator Certification Number: �/� Back-up Operator: /'' � � � 7'7� h'!D�'` S � Back-up Certification Number: Location of Farm: Latitude: 0 0 ' = Longitude: Design Current Design Current Design Current Swine C►opacity Population Wet Poultry Capacity Population Cattle Capacity Population ❑ Wean to Finish ❑ Layer I ow ❑ Wean to Feeder I I I JE1 Non -Layer I I❑ 17air Calf Feeder to Finish ❑Dai Heifer El Farrow to Wean Dry Poultry ❑ Dry Cow ❑ Farrow to Feeder ❑ Layers ❑ Non -Dairy ❑ Farrow to Finish El Beef Stocker ❑ Gilts ❑ Non -Layers El Beef Feeder ❑ Boars ❑ Pullets ❑ Beef Brood Cow ❑ Turkeys it e 010 Turkey Poults ❑ Other 1 10 Other Number of Structures: ME �wiiiiiiiiiiii Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge'? Page I of 3 El Yes PNo [I NA El NE ❑ Yes ❑ No PNA ❑ NE ❑ Yes ❑ No [NA El NE VNA ❑ NE ❑ Yes ❑ No ❑ Yes 7 No ❑ NA ❑ NE ❑ Yes 5�4o ❑ NA ❑ NE 12128104 Continued Facility Number: Date of Inspection Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes VpNo NA [I NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ,❑l TUNA ❑ NE Stru ure 1 Structure 2 Structure 3 Structure 4 Identifier: Structure 5 Structure 6 Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No ❑ NA ❑ NE (ie/ large trees, severe erosion, seepage, etc.) \ 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes �3 No ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes ® No ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑Yes �] No El NA El NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes R No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes Z] No ❑ NA ❑ NE maintenance/improvement? 1.1. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes P No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) �/1'frG.1 13. Soil type(s) CAJD6f_- 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes '[!o No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes [A No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination ? ❑ Yes f� No ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes q9 No ❑ NA ❑ NE 18. is there a lack of properly operating waste application equipment? ❑ Yes IF No ❑ NA ❑ NE Comments (refer to question#): Explain any YES answers and/or any:recommendations or any. other comments.,4 ` 1 UseFdrawings of facility to better explain situations.(use additional pages as necessary):;. Reviewer/Inspector Name I j Phone: qt0-J433A 300 Reviewer/Inspector Signature: NA Date: Page 2 of 3 12128104 Continued Facility Number: Date of Inspection Reauired Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes #No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box. ❑ WUP ❑ Checklists ❑ Design ❑Maps El Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes [ftNo ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No RNA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes 1] No ❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes No ❑ NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes ❑ No 3NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes $ No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes 4No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes �No ElNA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes ;9 No ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes [P No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes EDNo ❑ NA ❑ NE Additional Comments and/or Drawings: Page 3 of 3__ 12128104 40 Division of Water Quality Facility Number O Division of Soil and Water Conservation 0 Other Agency Type of Visit 0 Compliance Inspection Q Operation Review Q Structure Evaluation Q Technical Assistance Reason for Visit 0 Routine O Complaint 0 Follow up 0 Referral 0 Emergency 0 Other ❑ Denied Access Date of Visit: I 't / /dr/'ice Arrival Time: Departure Time: 3 %u� �'^ County: Region: Farm Name: mSb7 S ) Owner Email: Owner Name: , frtw'O" !ld 14 Phone: Mailing Address: Physical Address: Facility Contact: ► "+ 34tt 21,4 0,1S Title: Onsite Representative: It Certified Operator: Back-up Operator: Location of Farm: Swine Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Other ❑ Other Phone No: Integrator: A UI.>0 1 &2211 Operator Certification Number: Back-up Certification Number: Latitude: 0 0 = 6 Longitude: = ° 0 , = Design Current Design Current Capacity Population Wet Poultry Capacity Population ❑ Layer ❑ Non -Layer Dry Poultry ❑ Layers ❑ Non -Layers ❑ Pullets ❑ Turkeys ❑ Turkey Poults ❑ Other Discharme5 & Stream Impacts I, is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? Design Current Cattle Capacity Population ❑ Dairy Cow ❑ Dairy Calf ❑ Dairy Heifer ❑ Dry Cow ❑ Non -Dairy ❑ Beef Stocker ❑ Beef Feeder ❑ Beef Brood Cow Number of Structures: b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes- 15 No ❑ NA ❑ NE ❑ Yes ❑ No NA ❑ NE ❑ Yes ❑ No NA ❑ NE ❑ Yes ❑ No NA ❑ NE ❑ Yes Jallo ❑ NA ❑ NE ❑ Yes �No El NA El NE Page I of 3 12128104 Continued Facility Number: — Date of Inspection 18 Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes $ No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No [-NA ❑ NE Stru. ture1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: 3 Spillway?; Designed Freeboard (in): Observed Freeboard (in): N 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No ❑ NA ❑ NE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes No ElNA [INE through a waste management or closure plan? IU If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes 51 No ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes �5 No ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require []Yes EgNo ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes X No ❑ NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes ® No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 Ibs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ElApplication Outside of Area 12. Crop type(s) ep-., ,a" ), 54, , "n oo-ee-cwJ .._ 13. Soil type(s) �� -- 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes W No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes 10 No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination?[] Yes 93 No ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes �] No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes OS No ❑ NA ❑ NE ReviewerAnspector Name Phone: 0 333W Reviewer/Inspector Signature: Date: / iJ Page 2 of 3 12128104 Continued 1 Facility Number: — Date of Inspection Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check the appropirate box. ❑ WUP ❑ Checklists ❑ Design ❑Maps ❑Other ❑ Yes ® No ❑ NA ❑ NE ❑ Yes 1�3 No ❑ NA ❑ NE 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes 55 No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? 24. Did'the facility fail to calibrate waste application equipment as required by the permit? 25. Did the facility fail to conduct a sludge survey as required by the permit? 26. Did the facility fail to have an actively certified operator in charge? Y 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately 3 I. Did the facility fail to notify the regional office of emergency situations as required by General Permit? (iel discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 33. Does facility require a follow-up visit by same agency? ❑ Yes 0 No ❑ NA ❑ NE ❑ Yes to No ❑ NA ❑ NE ❑ Yes toNo ❑ NA ❑ NE ❑ Yes 19 No ❑ NA ❑ NE El Yes ONo El NA [I NE ❑ Yes No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes MNo ❑ NA ❑ NE El Yes ®No El NA El NE ❑ Yes �9 No ❑ NA ❑ NE ❑ Yes 4 No ❑ NA ❑ NE Page 3 of 3 12128104 Wts 3113J .4 -) V S Type of Visit ® Compliance Inspection O Operation Review O Structure Evaluation O Technical Assistance Reason for Visit ® Routine O Complaint Q Follow up Q Referral O Emergency O Other ❑ Denied Access Date of Visit: Z'13-D} Arrival Time: Departure Time: County: Ke- Region: F—ko Farm Name: Npa brtaAArx Owner Email: Owner Name: +, 3� Phone: Mailing Address: Physical Address: �7 Facility Contact: 0.Nd in Q y+^ft-a CIv-Ne*� Title: $44 v . Phone No: Onsite Representative: Integrator: 014 grOWA/ Certified Operator: Operator Certification Number: Back-up Operator: Back-up Certification Number: Location of Farm: Latitude: = e = I = 11 Longitude: 0 ° = ` = " Swine Design Current Capacity Population Design Current Design Current Wet Poultry C►apacity Population Cattle C►apacity Population ❑ Wean -to Finish ❑ La er ❑ DairyCow ❑ Wean to Feeder ❑ Non -La er ❑ Dai Calf 50 Feeder to Finish Farrow to Wean ❑ Farrow to Feeder 3 ❑ Farrow to Finish ❑ Gilts El Boars Other $$O0 ❑ DairyHeifer Dry Poultry ❑ D Cow Non -Dairy ❑ Layers ❑ Beef Stocker ❑ Non -Layers ❑ Pullets El Beef Feeder ❑ Beef Brood Cow ❑ turkeys ❑ Turkey Poults ❑ Other Number of Structures: ❑ Other Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Page 1 of 3 ❑ Yes [;gNo ❑ NA ❑ NE ❑ Yes [% No ❑ NA ❑ NE ❑ Yes R] No ❑ NA ❑ NE ❑ NA ❑ NE ❑ Yes M No ❑ Yes P� No ❑ NA ❑ NE ❑ Yes ® No ❑ NA ❑ NE 12128104 Continued Facility Number: 97 - Q Date of Inspection x- ~d-t Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes No ❑ NA ❑ NE Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Zao �} Observed Freeboard (in): Z4 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No ❑ NA ❑ NE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes [9 No ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes [� No ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes [Y No ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes [� No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ElNA ElNE maintenance/improvement? LP 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes P No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ FAN ❑ PAN > 10% or l0 Ibs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) J5eV-w&kA_ci 0_ Ot.,, _ SmAcj/ G pa.i n/ (� • S 13. Soil type(s) ca0. 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ANo ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes D6 No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination ? ❑ Yes No ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes ZNo ❑ NA ❑ NE `Comments (refer to question#):. Explain any YES answers and/or any recommendations or any other comments. ,,;Use diawIngs of facility.to better explain situations. (use additional pages as necessary): AL Reviewer/Inspector Name t` J Rom/ S Fhone:/t7, SL33. 3334 ReviewerlInspector Signature: Date: Z -/3 Page 2 of 3 12128104 Continued Facility Number: — Date of Inspection Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes ,� No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box. ❑ WUP ❑ Checklists ❑ Design [I Maps ❑Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes [ No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rain Inspections ❑ Weather Cade 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes [KNo ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes [�No ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes 0 No ❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes U9 No ❑ NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes P No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes 9No ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes [3 No ❑ NA [I NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document [l Yes WNo ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes [� No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes Z No ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes PNo ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes JgNo ❑ NA ❑ NE Additional Comments and/or. Drawings: Page 3 of 3 12128104 Michael F. Easley, Governor Uj William G. Ross Jr., Secretary > North Carolina Department of Environment and Natural Resources p Alan W. Klimek, P.E. Director Division of Water Quality December 1, 2006 CERTIFIED MAIL RETURN RECEIPT REOUESTED a. Wade S Dunbar ti 1 a Hog's Breath Inc PO Box 568 Laurinburg, NC 28353 Subject: Application for Renewal of Coverage for Expiring NPDES General Permit Dear Permittee: Your facility is currently approved for operation under one of the Animal Waste Operation NPDES General Permits, which expire on July 1, 2007. Due to changes in federal rules, facilities that do not discharge nor propose to discharge may choose whether or not to retain coverage under an NPDES General Permit. Copies of the draft animal waste operation NPDES general permits and the State Non -Discharge General Permits are available at http://h2o.enr.state.nc.uslaps/afou/downioads,htrn or by writing or calling: NCDENR — DWQ Animal Feeding Operations Unit 1636 Mail Service Center Raleigh, North Carolina 27699-1636 Telephone number: (919) 733-3221 In order to assure your continued coverage under one of these two types of general permits, you must submit an application for permit coverage to the Division. Enclosed you will find a `Request for Certificate of Coverage Facility Currently Covered b, a� n Expiring NPDES General Permit.' The avolication form must be completed and returned by 3anuary 2 2007. Please noteyou must include two (2)copies of Your most recent WasteUtilizationPlan with the application form. Failure to request renewal of your coverage under a general permit within the time period specified may result in a civil penalty. Operation of your facility without coverage under a valid general permit would constitute a violation ofNCGS 143-215.1 and could result in assessments of civil penalties of up to $25,000 per day. If you have any questions about the draft general permits, the enclosed application, or any related matter please feel free to contact the Animal Feeding Operations Unit staff at 919-733-3221. Sincerely, Ted L. Bush, Jr., Chief Aquifer Protection Section Enclosures cc (w/o enclosures): Hoke County Soil and Water Conservation District Fayetteville Regional Office, Aquifer Protection Section AFO Unit Central Files - 470001 Carroll's Foods Inc Aquifer Protection Section 1636 Mail Service Center Raleigh, NC 27699-1636 Internet: www.ncwaterqualitv.org Location: 2728 Capital Boulevard Raleigh, NC 27604 An Equal Opportunity/Affirmative Action Employer— 50% Recycled110% Posl Consumer Paper Telephone: Fax 1: Fax 2: Customer Service: N-ort Carolina (919),1�?tatura!!� (919)715-0588 (919)715-6048 (877)623-6748 W A 7- iQ Michael F. Easley, Governor William G. Ross Jr,. Secretary r- Alan W. Klimek, P.E. Director North Carolina Department of Environment and Natural Resources Division of Water Quality September 1, 2006 CERTIFIED MAIL RETURN RECEIPT REQUESTED MR. WADE DUNBAR HOG'S BREATH INC FARM PO Box 568 LAURINBURG, NC 28353 RrECEI ED ru _..- OENB-FA0T 'LLEREGIONALOFRGE Subject: Phosphorus Loss Assessment Tool Hog's Breath Inc Farm Permit Number NCA247001 Facility 47-1 Hoke County Dear Mr. Dunbar: The Division's records show that a completed PLAT Form has NOT been submitted for this facility. If our records are in error please resubmit the completed PLAT Form for this farm. There is a condition in your Animal Waste Management General NPDES Permit addressing the completion of the Phosphorous Loss Assessment Tool for your animal feeding operation upon notification by the Division of Water Quality (Division). Your NPDES Permit Number NCA247001 Condition I,6 states: "If prior to the expiration date of this permit either the state or federal government establishes Phosphorus loss standards that are applicable to land application activities at a facility operating under this permit, the Permittee must conduct an evaluation of the facility and its CAWMP under the requirements of the Phosphorus loss standards to determine the. facility's ability to comply with the standards. This evaluation must be documented on forms supplied or approved by the Division and must be submitted to the Division. This evaluation must be completed by existing facilities within six (6) months of receiving notification from the Division. The method of evaluation is the Phosphorous Loss Assessment Tool (PLAT) developed by NC State University and the Natural Resources Conservation Service. PLAT addresses four potential loss pathways: leaching, erosion, runoff and direct movement of waste over the surface. Each field must be individually evaluated and rated as either low, medium, high or very high according to its Phosphorus loss potential. The ratings for your farm must be reported to DWQ using the attached certification form. The PLAT forms must be kept as records on your farm for future reference. The Division's records show that you received the notification to conduct PLAT on January 8, 2004. To avoid possible enforcement action for a violation of your permit, The Division of Water Quality requests that the following items be addressed: Aquifer Protection Section 1636 Mail Service Center Raleigh, NC 27699-1636 Internet: www.newaterquality.org Location: 2728 Capital Boulevard Raleigh, NC 27604 Telephone: Fax 1: Fax 2: Customer Service: Nene i Carolina Ataru!!U An Equal Opportunity/Affirmative Action Employer— 50% Recycled/10% Post Consumer Paper (919)733-3221 (919)715-0588 (919)715-6048 (877)623-6748 1. Submit justification for not responding within 180 days of receipt of the PLAT notification letter. 2. Consult with your technical specialist and submit a written schedule for completing the PLAT evaluation. Failure to comply with the above conditions may result in a civil penalty assessment for the facility. Please be advised that this notice does not prevent the Division of Water Quality from taking enforcement actions for any past or future violation. Furthermore, the Division of Water Quality has the authority to levy a civil penalty of not more than $25,000.00 per day per violation. Please provide this office with a written response on or before September 30, 2006. If you have any questions regarding this request, please do not hesitate to contact me by email at duane.leith@ncmail.net or.by phone at (919) 715-6186 or you may contact the Fayetteville Regional Office at (910) 433-3300. Thank you for your cooperation. Sincerely, Duane Leith Animal Feeding Operations Unit cc: la`yetteville3Regional-Office-; Facility File 47-1 M cj ® Division of Water Quultty Facility Number / O Division of Sail and Water Conservation �Other Agency Type of Visit 0 Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit ® Routine 0 Complaint 0 Follow up 0 Referral 0 Emergency 0 Other ❑ Denied Access Date of Visit. %-Q II - Arrival Time: / ; Departure Time: .' County: �1[e Region - Farm Farm Name: w'5 _�6 .cab --"- 70 % -73 Owner Email: Owner Name: N U L"D c. gdww /j Phone: Mailing Address: Physical Address: Facility Contact: I Title: Onsite Representative: d5 Certified Operator: Back-up Operator: Location of Farm: Phone No: Integrator: 9bh W n/ Operator Certification Number: Back-up Certification Number: FP- 0 Latitude: = o = 6 =if Longitude: = ° 0 , = `, Design Current Design Current Design Current Swine Capacity PopWation Wet Poultry C+apacity Population Cattle Capacity Population ❑ Wean to Finish 110 Layer ❑Dai Cow ❑ Wean to Feeder I 11--l-Non-Layer 1. 1 Dair Calf Feeder to Finish ❑ DaiEy Heifer ❑ Farrow to Wean Dr.y Poultry ❑ Dry Cow ❑ Farrow to Feeder ElNon-Dairy El Farrow to Finish ❑ Layers ❑ Beef Stocker ❑Gilts ❑ Non -Layers El Beef Feeder ❑ Pullets ❑ Boars❑ Beef Brood Cow ❑ Turkeys Other ❑ Turkey Poults 1110 Other ❑ Other Number of Structures: Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? b. Did the discharge reach waters of the State'? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Page 1 of 3 ❑ Yes IM No ❑ NA ❑ NE ❑Yes JMNo ❑NA ONE El Yes No ❑NA ❑NE ❑ NA ❑ NE ❑ Yes No ❑ Yes No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE 12128104 Continued Facility Number: — Q Date of Inspection -b Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a. If yes, is waste level into the structural freeboard? Structure I Structure 2 Structure 3 Structure 4 Identifier: Spillway?: Designed Freeboard (in): r Observed Freeboard (in): 3 4 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes QRNo ❑ Yes � No Structure 5 ❑ NA ❑ NE ❑ NA ❑ NE Structure 6 ❑ Yes [)I No ❑ NA ❑ NE ❑ Yes 0 No ❑ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes 0 No ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes M No ElNA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes (M No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need maintenance/improvement? ❑ Yes 0 No ❑ NA ❑ NE 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes Wo ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drill [I Application Outside of Area 12. Crop types} /7�.v reG'y s/yral� t9 AklvtJ T —T 13. Soil type(s) R j 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes V No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes J91 No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination ? ❑ Yes No ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes ® No ❑ NA ❑ NE Comments (refer to question ft Explain any YESlanswers and/orany recommendations or any other,comments. Use drawings of facility to better explain situations. (use additional pages as necessary): AL Reviewer/Inspector Name rZ e.t/ s I Phone: m Reviewer/Inspector Signature: Date: Page 2 of 3 12128104 Continued In 4 Facility Number: 7— Date of Inspection Reaulred Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes M No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes R1 No ❑ NA ❑ NE the appropriate box. ❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes ,1 No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ® No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes El No ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ® No ❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes R No ❑ NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes ,® No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes (UNo ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes ,® No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes � No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes ® No ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes 0 No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes ® No ❑ NA ❑ NE nal Comments and/or Drawings: Page 3 of 3 12128104 Type of Visit 0 Compliance Inspection O Operation Review O Structure Evaluation O Technical Assistance Reason for Visit O Routine O Complaint O Follow up O Referral O Emergency O Other ❑ Denied Access Date of Visit: Arrival Time, Departure Time: County: 01< Region: FR-0 Farm Name: I��A S &_eo'41 7077 Owner Email: Owner Name: f1d S414P n yo w N Phone: Mailing Address: Physical Address: Facility Contact: Title: Onsite Representative: Ro�+J ILL%__ _ Gum gae±/ Certified Operator: Back-up Operator: Location of Farm: I " Swine Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Boars Other ❑ Other �o Latitude: Phone No: Integrator: Aliti'g Bwbt,/A/ Operator Certification Number: Back-up Certification Number: Design Current Design Current Capacity Population Wet Poultry Capacity Population FEEILaer Non -La ct Dry Poultry Layers Non -Layers Pullets Turkeys Turkey Poults Other ...� Discharees & Stream Impacts I. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? Longitude; = 0 Design Current Cattle Capacity Population ❑ Dairy Cow ❑ Dairy Calf ❑ Dai_ry Heifer ❑ D Cow ❑ Non -Dairy ❑ Beef Stocker ❑ Beef Feeder ❑ Beef Brood Cow Number of Structures: b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes 5d No ❑ NA ❑ NE ❑ Yes [9 No ❑ NA ❑ NE ❑ Yes ® No ❑ NA ❑ NE ❑ NA ❑ NE ❑ Yes XNo ❑ Yes D9 No ❑ NA ❑ NE ❑ Yes U No ❑ NA ❑ NE 12128104 Continued Facility Number:"] — p f Date of Inspection Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes [9 No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes CKNo ❑ NA ❑ NE Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): -2.0.* Y y Observed Freeboard (in): ZAZ 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes ® No ❑ NA ❑ NE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes ® No ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes M No ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes 3 No ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes 0 No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes D9 No ❑ NA ❑ NE maintenance/improvement? ,,++bb,, 1. Is there evidence of incorrect application? If yes, check the appropriate box below. []Yes JX No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > l 0% or l0 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Dritl ❑ Application Outside of Area 12. Crop type(s) R evuw u A e,`. 1-�a �. 5`t4 a !/ Gkrk 13. Soil type(s) C'7�- S 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes N No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ® No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination%❑ Yes ® No ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes ;0 No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes N No ❑ NA ❑ NE Reviewerllnspector Name Phone: (9/D� Reviewer/Inspector Signature: Date: Z2—Q5 12128104 Continued Facility Number: V7-0/ Date of Inspection //-Z9-D Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? [--]Yes [(No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes. ® No ❑ NA ❑ NE the appropirate box. ❑ WUP ❑ Checklists ❑ Design ❑Maps El Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes 5d No [I NA ❑ NE [I Waste Application El Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rain Inspections ❑ Weather Code 22, Did the facility fail to install and maintain a rain gauge? ❑ Yes 12 No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ® No ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ® No ❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes No ❑ NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes CR No ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ® No ❑ NA ❑ NL 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes ® No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ® No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes ® No ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ® No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes ® No ❑ NA ❑ NE Additional;Comments and/or Drawings: 12128104 kNo,r %'i4i t�k ° � � Dlvisioin of Water Qus�lity � � +� i u 0. q iwoh of Soil'aad Water CouservatiOtt lei � '' ,A gene ' `al f u Q Oilier r lli ( Yho +, r 4 ; t�t€� ° i� ft{ E #+ # ._ _ ,.•E< i�:f ,... .a >: "..,-, ,.,. 5,3. saP> ..�c s._„�_,- I. ,..�,i.. �e,.. ._�..i.�.L'.mi.:rl rPl Z„"e,i .�,d 4a.,� °tEE€�'sl it; �z`,r...diS, IIt.,,-ns= Type of Visit 0 Compliance Inspection Q Operation Review 0 Lagoon Evaluation Reason for Visit AbRoutine O Complaint O Follow up 0 Emergency Notification 0 Other ❑ Denied Access Facility Number irate [AVisit: �Time: 115 57 N t O e to al J213elow Threshold Permitted 0 Certified nn U Conditionally Certified [3 Registered Date Last Operated orr Above Threshold: Farm Name: Uk�h Y S. County: //�/ e Owner Name: l [o Z .1k e . 1 Phone No: i/ 4d 0- Mailing Address: —ra 8'K S- 3 1. a-N.R; Facility Cont} ct: Title: Phone No: Onsite Representative: Integrator: Certified Operator: Operator Certification Number: Location of Farm: ❑ Swine []Poultry ❑ Cattle ❑ Horse Latitude 0 0u Longitude ' 0• l� w Design Design + ;'.' EE„`, Design ; Currenfy !" Swine Capacity Poalai on . ' Poultry Ca 'achy •pCurrent a idati6n iCattle y �.; I.. Ca' achy °!PA ulation ❑ Wean to Feeder y€ ❑ Layer I '{ ji ❑ Dairy ❑ Feeder to Finish . ; `' Non La er IE ` ❑ Nan Dai ' ❑ Farrow to Wean }I ', E ! <�'.� I-S 1, "`�4 i !l; ...E v I# # [E ail, ! ai7a� �+ €1 1 I�j ej �, § �P ill it ❑ Farrow to Feeder ❑ Other ❑ Farrow to Finish 0 , Total Design Capacity -;� € ❑ Gilts t :� Ir I€ ❑ Boars f'rVtilif l is i'.I �I. �' k .��8 3 - I E y;aj33 j i1-4: 3k d LWgi€ E#: fl9! ; j ll Number 'of,Lagoons ❑ Subsurface Drains Present_JIEI Lagoon Area 10 Spray Field Area 'I' Holdlng Ponds Traps ❑ No Liquid Waste Management System ; € ��,;' �,,,,`` Es�°sl ..Soid . ,� ,� ! ,�I•�i � Discharges & Stream hmp cts ,,.,,��,,��� 1. Is any discharge observed from any part of the operation? ElM Yes <0- Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man -trade? ❑ Yes ❑ No b. If discharge is observed, did it reach Water of the State? (If yes, notify DWQ) ❑ Yes ❑ No c. If discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) ❑ Yes ❑ No 2. Is there evidence of past discharge from any part of the operation? ❑ Yes ❑ No 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes ❑ No Waste Collection & I[eatMCUt 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway ❑ Yes ❑ No Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Ir Freeboard (inches): / 9 05103101 Continued FaZility Number: — / Date of Inspection 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, ❑ Yes ❑ No seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or ❑ Yes ❑ No CI05UIe plan? (If any of questions 4.6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? ❑ Yes ❑ No 8. Does any part of the waste management system other than waste structures require maintenancerimprovement? ❑ Yes ❑ No 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level ❑ Yes ❑ No elevation markings? Waste Application 10. Are there any buffers that need maintenance./improvement? ❑ Yes ❑ No 11. Is there evidence of over application? if yes, check the appropriate boa below. ❑ Yes ❑ No ❑ Excessive Ponding ❑ PAN ❑ Hydraulic Overload ❑ Frozen Ground ❑ Copper and/or Zinc 12. Crop type 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? ❑ Yes ❑ No 14. a) Does the facility lack adequate acreage for land application? ❑ Yes ❑ No b) Does the facility need a wettable acre determination? ❑ Yes ❑ No c) This facility is pended for a wettable acre determination? ❑ Yes ❑ No 15. Does the receiving crop need improvement? ❑ Yes ❑ No I6. Is there a lack of adequate waste application equipment? ❑ Yes ❑ No Odor Issues 17. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge at/or below ❑ Yes ❑ No liquid level of lagoon or storage pond with no agitation? 18. Are there any dead animals not disposed of properly within 24 hours? ❑ Yes ❑ No 19. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, ❑ Yes ❑ No roads, building structure, and/or public property) 20. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional ❑ Yes ❑ No Air Quality representative immediately. i r� ter, am' wq:t3 rrr ;p epee • ae*.r ttt ow ^r ter t3 ar u� m 3 K r r q� ro m ivnEr2 ;::k,:. z� PCommmts referitojquist ofi#) E.irplstia atey Y& apswers ar aayarecamnsaadatfaris ar wty�a Tier commeats: i . ' ' ' �( �.� [lse dravvin Qf�facili to fetter lainui nse�addinal� asg SS gr h` �P �, p�� aiY) � ❑ I~<eid COPY ❑Final Noses Reviewer/Inspector Name ' �; R . 11 gala ... �� . TMINFAW9.s; i `" t r u Reviewer/Inspector Signature: Date: P- 12112103 Continued t MINI Type of Visit 411 Compliance Inspection 0 Operation Review 0 Lagoon Evaluation Reason for Visit 0 Routine 0 Complaint 0 Follow up 0 Emergency Notification 0 Other © Denied Access Faeilits_ Number Date of Visit: 0 Time: ' Not Operational Q Below Threshold ® Permitted ® Certified 0 Conditionally Certified [3Registered Date Last Operated or Above Threshold: Farm Name: County: Owner Name: _ (16 CIE, 121"& C.- / iAA arL I� Phone No: 6 4A& Mailing Address: 0_8 __ �g _ — _ aeis _3 Ffleilit%' Contact: ! h01MC�S Title: Phone No: Onsite Representative: K'�--6'-n.it IL-T Integrator:---C&rI,?," r Certified Operator: !!A rn�.-S �,� -.k Le_(" Operator Certification Number: Location of Farm: 00 swine ❑ Poultry ❑ Cattle ❑ Horse Latitude 0 6 " Longitude • �OK Design Current Swine ranarav Pnmasitinn Wean to Feeder ® Feeder to Finish 0 i+ ❑ Farrow to Wean ❑ Farrow to Feeder ❑ Farrow to Finish ❑ Gilts Boars Design Current Design Current Poultry Ca achy Population Cattle Ca acity Po ulation ❑ Layer I ❑ Dairy ❑ Non -Layer ❑ Non -Dairy ❑ Other Total Design Capacity Total SSLW Number of Lagoons ❑ Subsurface Drains Present ❑ La oon Area ❑ Spray Field Area Holding Ponds / SoUd Traps V . =' ❑ No Liquid Waste Management Svstem Discharges S Stream ImRacts I . Is any discharge observed from any part of the operation? ❑ Yes No Discharge originated at: ❑ Lat?oon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? ❑ Yes ❑ No b. If discharge is observed, did it reach Water of the State? (If yes, notify DWQ) El Yes ❑ No c. If discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? (if yes, notify DWQ) ❑ Yes ❑ No 2. Is there evidence of past discharge from any part of the operation? ❑ Yes [X No 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes 91 No ff_= Collgetion & TreatMent 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway ❑ Yes 5allo Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Freeboard (inches): a.15 05103101 Continued Facility Number: Alt- I Date of Inspection aga 5. Are there any immediate threats to the integrity oi'any of the structures observed? (ic/ trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? (If any of questions 4-5 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? ❑ Yes No ❑ Yes [0 No ❑ Yes [Z No 8. Does any part of the waste management system other than waste structures require maintenance/improvement? ❑ Yes ® No 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? ❑ Yes ® No Wiasity-App ication 10. Are there any buffers that need maintenance/improvement? ❑ Yes ® No 11. is there evidence of over application? ❑ Excessive Ponding ❑ PAN ❑ Hydraulic Overload ❑ Yes ® No 12. Crop type S e -4- s1M i &,rr„ Z" a , S . .. 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? ❑ Yes [ No 14. a) Does the facility lack adequate acreage for land application? ❑ Yes No b) Does the facility need a wettable acre determination? ❑ Yes ❑ No c) This facility is pended for a wettable acre determination? ❑ Yes ❑ No 15. Does the receiving crop need improvement? ❑ Yes P No 16. Is there a lack of adequate waste application equipment? ❑ Yes ® No Reuuired Records & Documents 17. Fail to have Certificate of Coverage & General Permit or other Permit readily available? ❑ Yes ["No 18. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (ic/ WUP, checklists, design, maps, etc.) [I�7jN Yes �:o 19. Does record keeping need improvement? (ic/ irrigation, freeboard, waste analysis & soil sample reports) ❑ Yes ® No 20. Is facility not in compliance with any applicable setback criteria in effect at the time of design? ❑ Yes (ZNo 21. Did the facility fail to have a actively certified operator in charge? ❑ Yes ® No 22. Fail to notify regional DWQ of emergency situations as required by General Permit? ❑ Yes ® No (iel discharge, freeboard problems, over application) 23. Did Reviewer/Inspeclor fail to discuss review/inspection with on -site representative? ❑ Yes ® No 24. Does facility require a follow-up visit by same agency? ❑ Yes ® No 25. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes 0 No 10 No violations or deficiencies were noted during this visit. You will receive no further correspondence about this visit. . f>r1L � � e - "E.a Comments (refer to ilu4stiori 4) Explain any YE9 Answers and/or anyrecomfii4Wilon" nr my other comments. Ugedraingstof iacllity to better sltuatlons` (use asjnecessary). `..r. explain acliiltlanal pages Field Col Copy ❑Final Notes k y R , Alk Reviewer/inspector Name Reviewerllnspector Signature: Date: O 05103101 L. Continued , i Y Facility Number: / Date of inspection 0 Odor Issues 26. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge at/or below liquid level of lagoon or storage pond with no agitation? 27. Are there any dead animals not disposed of properly within 24 hours? 28. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, roads, building structure, and/or public property) 24. Is the land application spray system intake not located near the liquid surface of the lagoon? 30. Were any major maintenance problems with the ventilation fan(s) noted? (i.e, broken fan belts, missing or or broken fan blade(s), inoperable shutters, etc.) 31. Do the animals feed storage bins fail to have appropriate cover? 32. Do the flush tanks lack a submerged fill pipe or a permanent/temporary cover? ❑ Yes ❑ No ❑ Yes L No ❑ Yes ® No ❑ Yes ® No ❑ Yes ® No ❑ Yes ® No ❑ Yes ❑ No �Atiiiitibnal�Cnr►Tmenty�a"niilor;�Drawingai .�.;.; r, ;;„�;; '�,, �r�,„� �,i.,� � :�,,, i 05103101 %-Q o State of North Carolina Department of Environment, Health and Natural Resources Fayetteville Regional Office James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary Andrew McCall, Regional Manager A 37 �qc. wo, *7 -O 1 ova [D FE F1 DIVISION OF ENVIRONMENTAL MANAGEMENT July 19, 1995 Mr. Wade Dunbar Hog's Breath Farm P. 0. Box 3621 Laurinburg, NC 28353 SUBJECT: Compliance Inspection Hog' s Breath Farm � Zuc . Hoke County Dear Mr. Dunbar: On July 14, 1995, and inspection of your animal operation was performed by the Fayetteville Regional Office (FRO). Please find enclosed a copy of our Compliance Inspection Report for your information. It is the opinion of this office that this facility is in compliance with 15A NCAC 2H, Part .0217, and that Animal Waste Management is being properly performed. Should you have any question regarding this matter, feel free to contact me at (910) 486-1541. Sincerely, Ricky Revels. - Environmental Technician IV RR/sc Enclosure CC: Facility Compliance Group Wachovia Building, Suite 714, Fayetteville, North Carolina 28301-5043 Telephone 910-48&1541 FAX 910-486-0707 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper NORTH CAROLINA DEPARTMENT OF ENVIRONMENT, HEALTH & NATURAL RESOURCES DIVISION OF ENVIRONMENTAL MANAGEMENT Fayetteville Regional Office Animal Operation Compliance Inspection Form Hog's Breath Farm/Wade S. Dunbar July 14, 1995 �.�, Q Mark M. Murphy P. O. Box 3621 I 910 369-2861 Laurinburg, NC 28353 All questions answered negatively will be discussed in sufficient detail in the Comments Section to enable the deemed Permittee to perform the appropriate corrections: SECTION I Animal O eration e: Horses, cattle, swine, poultry, or sheep SECTION II 1. Does the number and type of animal meet or exceed the (.0217) criteria? [Cattle (100 head), horses (75), swine (250), sheep (1,000), and poultry (30,000 birds with liquid waste system)] 2. Does this facility meet criteria for Animal Operation REGISTRATION? 3. Are animals confined fed or maintained in this facility for a 12-month period? 4. Does this facility have a CERTIFIED ANIMAL WASTE MANAGEMENT PLAN? 5.. Does this facility maintain waste management records (Volumes of manure, land applied, spray irrigated on specific acreage with specific cover crop)? 6. Does this facility meet the SCS minimum setback criteria for neighboring houses, wells, etc? ee �1■ OEM OEM 0�� RXCTION III Field Site Management 1. Is animal waste stockpiled or lagoon construction within 100 ft. of a USGS Map Blue Line Stream? 2. Is animal waste land applied or spray irrigated within 25 ft. of a USGS Map Blue Line Stream? 3. Does this facility have adequate acreage on which to apply the waste? 4. Does the land application site have a cover crop in accordance with the CERTIFICATION PLAN? S. Is animal waste discharged into waters of the state by man-made ditch, flushing system, or other similar man-made devices? 6. Does the animal waste management at this farm adhere to Best Management Practices (BMP) of the approved CERTIFICATION? 7. Does animal waste lagoon have sufficient freeboard? How much? (Approximately 9 ft plus) 8. Is the general condition of this CAFO facility, including management and operation, satisfactory? SECTION IV Comments