Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
260072_INSPECTIONS_20171231
NORTH CAROLINA Department of Environmental Qual � Divl"lion of Water Resources Facility Number - � ®Division of Soil and Water Conservation 9 Other Agency Cype of Visit: 0 Compliance Inspection 0 Operation Review 0 Structure Evaluation, 0 Technical Assistance teason for Visit: 40 Routine 0 Complaint _O Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access ^ Date of Visit: Arrival Time: -:l Departure Time: County tm �tLn� Region: F00 Farm Name: iq Owner Email: Owner Name: i D iZld`V►�S .yY1C 1 Phone: Mailing Address: Physical Address: Facility Contact: %� fj Title: Phone: M Onsite Representative: Integrator: -M M Certified Operator: Certification Number: O p q l'7 Back-up Operator: Certification Number: Location of Farm: Latitude: Longitude: 11 Design Current Design Current Design Current ne Capacity Pop. Wet Poultry C.len to Finish Z La er Dait Cow an to Feeder Q� Non -La er Dai Calf der to Finish DairyHeifer Farrow to Wean Design Current D Cow Farrow to Feeder Dr. I;ouIts Ga aci P.a Non -Dairy Farrow to Finish [Layers Beef Stocker Gilts Non -Layers Beet' Feeder Boars Pullets Beef Brood Cow Turkeys Other Turkey Poults Other Other Discharees and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes � No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ No [� NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes ❑ No Un NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? ❑ Yes ❑ No 1 NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE Page 1 of 3 21412015 Continued Faclllty ZNumber: Date of Inspection: Waste Collection & Treatment l0 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes No � NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): t y 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes to No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes F No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑Yes No ❑ NA ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc. ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13, Soil Type(s): 14. Do the receiving crops from those designated in the CAWMP? 15. Does the receiving crop and/or land application site need improvement? 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acres determination? 17. Does the facility lack adequate acreage for land application? 18. is there a lack of properly operating waste application equipment? Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check the appropriate box. ❑ Yes ❑ Yes ❑ Yes ❑ Yes ❑ Yes ❑ NE �No ❑NA ❑NE No ❑ NA ❑ NE No ❑NA ❑NE No ❑ NA ❑ NE No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑Yes �No ❑NA ❑NE ❑WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes 1P No ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Rainfall [:]Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and l" Rainfall Inspections 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes No 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes No ❑NA ❑NE ❑ Weather Code ❑ Sludge Survey ❑NA ❑NE ❑NA ❑NE Page 2 of 3 21412015 Continued Facility ,Number: - Date of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes 1� No 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes No the appropriate box(es) below. fp ❑ Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes No 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes No Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? Reviewer/Inspector Name: Reviewer/Inspector Signature: Page 3 of 3 ❑ NA ❑ NE ❑ NA ❑ NE ❑ NA ❑ NE ❑ NA ❑ NE ❑ Yes P No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes ¢o] No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE Phone: 4ftLWy ?i aU Date: 61, ezgr 21412019 Type of Visit: 0 Compliance Inspection 0 Operation Review Q Structure Evaluation Q Technical Assistance Reason for Visit: 4D Routine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access Date of Visit: M Arrival Time: i rj/j , yy(z/`j Departure Time: ; County: eA 4n0(Region: r-120 Farm Name: -�rb-14 2,� Owner Email: Owner Name: �I'k? 1q2_7_^x3_ Phone: Mailing Address: Physical Address: Facility Contact: 1%4 �et"Q gI Title: Onsite Representative: N Integrator: Certified Operator: Back-up Operator: Location of Farm: Latitude: Phone: 7VP 1 AC4,ris Certification Number: l A V1 7 Certification Number: Longitude: Swine Wean to Finish Design Current Capacity Pop. Wet Poultry er Design Capacity Current Pop. Design Cattle Capacity DairyCow Current Pop. Wean to Feeder p'J ULa Nan -La er DairyCalf Feeder to Finish Dairy Heifer JCJ Farrow to Wean Farrow to Feeder D,r, P,oultr, ign Ga acit Current R;o Dry Cow Non -Dairy Farrow to Finish Layers _ Beef Stocker Gilts Non -La ers Beef Feeder Boars JPullets Beef Brood Cow Other Other Turkeys Turkey Poults Other Discharees'and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? ❑ Yes [�a No ❑ NA ❑ NE [:]Yes [-]No [:]Yes ❑ No C] Yes [:]No []Yes No C] Yes No NA ❑ NE NA ❑ NE NA ❑ NE ❑ NA ❑ NE ❑NA ❑NE Page 1 of 3 21412015 Continued Facili Number: - Date of Inspection: 4 Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes P9 No ❑ NA [] NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No '� NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes J] No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need [] Yes P No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside eyo_f�Approved 'Area 12. Crop Type(s): — 1ST�i' �'�-- G' U ss ���, gmh � tJ�•� K C�'ae,, -�.d 13. Soil Type(s): r' 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes 0 No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes [�j No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes ® No ❑ NA ❑ NE Reauired Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes 1PNo ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? if yes, check ❑ Yes M No ❑ NA ❑ NE the appropriate box. ❑ WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers [] Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes [� No ❑ NA ❑ NE Page 2 of 3 21412015 Continued I~acili Number: 2,L- Date of Inspection: 20 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes C, No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ® No ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? Reviewer/Inspector Name: ReviewerlInspector Signaturrx_5;�V<�;'��� Page 3 of 3 ❑Yes �No ❑NA ❑NE ❑ Yes R No ❑ NA ❑ NE ❑ Yes ® No ❑ NA ❑ NE ❑ Yes M No ❑ NA ❑ NE ❑ Yes [r No ❑ NA ❑ NE ❑ Yes [P No ❑ NA ❑ NE ❑ Yes [R No ❑ NA ❑ NE Phone: 9,f0 `q i'7g�V Date: -` I7 21412015 Type of Visit: 0 Compliance Inspection Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: 0 Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Q Arrival Time: r► Departure Time: r pr p� County: C.141 E" i(1 Reglon: Farm Name: M Owner Name: —m m Favtvt,s Mailing Address: Owner Email: Phone: Physical Address: Facility Contact: (V )e,W10 Title: Phone: Qnsite Representative: Certified Operator: N Integrator: TWK ►�5 Certification Number: ig L�l Back-up Operator: Certification Number: Location of Farm: Latitude: Longitude: Design Current Design Current Deslgn Current Swine 0 Capacity np. Wet Poultry Cap —he ity Pop. Cattle Capacity Pop. W11 ean to Finish Layer Dai Cow Wean to Feeder Non -La er Dairy Calf Feeder to Finish Dairy Heifer Farrow to Wean 2�� Design Current D Cow Farrow to Feeder Dr. P.oultr Ca taci P.o Non -Doi Farrow to Finish DrH— Lavers Beef Stocker Gilts Non -Layers Beef Feeder $oars Pullets Beef Brood Cow s Other TurkeyPoults Other Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? ❑Yes No ❑NA ❑NE ❑ Yes ❑ No [:]Yes []No NA ❑ NE NA ❑ NE ❑ Yes ❑ No NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE Page I of 3 21412015 Continued Facility Number: Date of Ins ection: O. 6 Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? []Yes ❑ No NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: T� Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes ® No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) T 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes �No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window � ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): f ( -aa `g"r��S� (&qn,�,-&-ako, & 5@f�0► --.. 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes MNo ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes t3 No ❑ NA ❑ NE I6. Did the facility fail to secure and/or operate per the irrigation design or wettable [] Yes No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? Yes �No 0 NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes P No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check [] Yes P No ❑ NA ❑ NE the appropriate box. ❑W11P [:]Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes t No ❑ Waste'Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes No 23. If selected, did the facility fait to install and maintain rainbreakers on irrigation equipment? ❑ Yes No . Page 2 of 3 ❑ NA ❑ NE ❑ Weather Code []Sludge Survey ❑ NA ❑ NE ❑ NA ❑ NE 21412011 Continued [Facilit yNumber: Date of Ins ection: o 24. bid the Facility fail to calibrate waste application equipment as required by the permit? Yes [:]No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check §5 Yes ❑ No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey [] Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? Yes [:]No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ® Yes ❑ No ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ® Yes ❑ No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? [ Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ® Yes [] No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. Yes ❑ No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ® Yes ❑ No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ®. Yes ❑ No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? [B Yes ❑ No ❑ NA ❑ NE Reviewer/Inspector Name: Reviewer/Inspector Signatu► Page 3 of 3 Phone: I /0 -Y-; 713W Date: 1179, % 21412015 (Type of Visit: ® Compliance Inspection Q Operation Review Q Structure Evaluation Q Technical Assistance I Reason for Visit: 0 Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Arrival Time: 'ODctiw Departure Time: '� County egion: Farm Name: :IQ (vk ? Owner Email: Owner Name:. Phone: Mailing Address: Physical Address: Facility Contact: ` pkag _ _ Title: Phone: Onsite Representative: Integrator: " Certified Operator: Back-up Operator: Location of Farm: i Latitude: Certification Number: W111 Certification Number: Longitude: Swine Design Current Design Current Capacity Pop. Wet Poultry Capacity Pop. Cattle Design Current Capacity Pop. inish Layer DairyCow eeder pQp Non -La er DairyCalf inish Design Current Dr, P,oultr, Ca acI P,o P. Dai Heifer D Cow Non-Dai Wean Feeder wolts Finish La ers Beef Stocker Non -La ers Beef Feeder Boars Pullets Beef Brood Cow Other Turkeys Turkey Poults Other Other Discharges and Stream lmnacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? _ d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other.than from a discharge? []Yes [P No ❑ NA ❑ NE ❑ Yes ❑ No ❑ Yes ❑ No []Yes [:]No ❑ Yes P No [:]Yes ® No NA ❑ NE 1�1 NA ❑ NE [� NA ❑ NE ❑ NA ❑ NE ❑ NA ❑ NE Page I of 3 21412014 Continued Facili Number: - Date of Ins ection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes a. If yes, is waste level into the structural freeboard? ❑ Yes Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Identifier: No ❑ NA ❑ NE No [� NA ❑ NE Structure 6 Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes P No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes 1� No [DNA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes PM No ❑ NA ❑ NE maintenance or improvement? Waste ADDiication 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE maintenance or improvement? P 11. is there evidence of incorrect land application? if yes, check the appropriate box below. [:]Yes [N)No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes No D NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes [P No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? 1f yes, check [] Yes No ❑ NA r] NE the appropriate box. ❑WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes [ No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes P No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes [g No ❑ NA ❑ NE Page 2 of 3 21412014 Continued Facility umber: - Date of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box(cs) below. rM ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes No ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? Comments (refer to question #) Explain.any:YES,answers�and/orany additionalerecom nei Use firstwinQii.of;facllity.tnyli`etter:eynlain zitaationR (tile aiiditinnal nuuec gs neee kii- : Reviewer/Inspector Name: Reviewer/Inspector Signature: Page 3 of 3 ❑ Yes No ❑ NA ❑ NE ❑ Yes No [] NA ❑ NE ❑Yes No ❑NA ❑NE ❑ Yes (� No ❑ NA ❑ NE ❑ Yes No ❑ Yes No ❑ Yes ® No -t. : 9 �P. t. ..» ❑ NA ❑ NE ❑NA ❑NE ❑ NA [] NE ominentst� Phone:7/0 3?pl►j Date: 21412014 Type of Visit: i♦ Compliance Inspection U Operation Review U Structure Evaluation U Technical Assistance I Reason for Visit: & Routine 0 Complaint 0 Follow-up O Referral O Emergency O Other O Denied Access Date of Visit: Arrival Time: Departure Time: County: l LL{N Region: f Farm Name: M %-6 Owner Email: Owner Name: V NV wi S Phone: Mailing Address: Physical Address: Facility Contact: G( /+/it°.J•nOj Title: Onsite Representative: Certified Operator: k Back-up Operator: Location of Farm: Latitude: Phone: Integrator: —10 M rjt%,S Certification Number: i' g"I Certification Number: Longitude: Design Current Design Cttrrent Design Current Swine Capacity Pap. Wet Poultry Capacity Pap. Cattle Capacity Pop. Wean to Finish Layer - Dairy Cow »-.. Wean to Feeder D490 Non -La er I Dairy Calf Feeder to Finish Dai Heifer Farrow to Wean 2.4011, 1400 gn C►urrent Dry Cow Farrow to Feeder Ity, P. Non -Dairy Farrow to Finish Layers Beef Stocker Gilts Non -Layers Beef Feeder Boars Pullets Beef Brood Cow Turkeys OtherM1 ITurkey Poults Other Other ji Discharees and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made7 ❑ Yes nNo ❑ NA ❑ NE ❑ Yes [] No [R NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes ❑ No E4 NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes [] No NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes [i No ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes No ❑ NA ❑ NE of the State other than from a discharge? Page 1 of 3 21412014 Continued Facili Number: - Date of Inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? [:] Yes No NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: f Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes ER No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes CR No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes [;g No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes CR No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes ( No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes [� No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evide W�J' e offWind Drift � ❑ Application Outside of Approved Area 12. Crop Type(s): 1� 1 ��41, 4 �l 5� '/ 13. Soil Type(s): AElville� � 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes No �"] NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists []Design [:]maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. [:]Yes ® No ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rainfall Inspections 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes UNo 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes [A No ❑ NA ❑ NE ❑ Weather Code ❑ Sludge Survey ❑ NA ❑ NE ❑NA ❑NE Page 2 of 3 21412014 Continued acili Number: - Date of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes LAI No 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes ® No the appropriate box(es) below. T ❑ Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes No 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes No Other Issues ❑ NA ❑ NE ❑ NA ❑ NE ❑NA ❑NE ❑ NA ❑ NE 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document [:]Yes P No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes M No [DNA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes � No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes E� No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes E� No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes E5] No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes TNo ❑ NA ❑ NE Comments (refer to:queshon#) Explain any YESj answers,and/or Any additionai�recor"ebdatlons of any othercomments l)sc,drawings offacilityto bettet:'eaiplainasituations;(usea'siiditiungl pa es asne�Cessary) oc't46'a, V'a � rzp/�)' Reviewer/Inspector Name: Reviewer/Inspector Signature: Page 3 of 3 Phone: Date: ! G / �( 21412014 4 • Division of Water Quality Facility Number ®- FTTI 0 Division of Soil and Water Conservation 0 Other Agency Type of Visit: 0 Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance [season for Visit: 0 Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Arrival Time:j Departure Time: Z: d vh County:(.'Q/�WRcgion: F"P0 Farm Name: �� %�24 Owner Email: Owner Name: �"1 Fb ,,s Phone: Mailing Address: Physical Address: Facility Contact: / Title: Onsite Representative: K Certified Operator: Back-up Operator: Location of Farm: Swine Wean to Finish' Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Other Other u Latitude: Phone: Integrator: —/-P/hf Certification Number: /9'711 Certification Number: Design Current Design Current Capacity Pop. Wet Poultry Capacity Pop. La er a-ngpl tD OI I Non -Layer I ]EI Discharees and Stream Impacts Non-L Pullets Other Poults Design Current Longitude: .Design Current Cattle Capacity Pop. Dairy Cow Dairy Calf Dairy Heifer Dry Cow Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow 1. Is any discharge observed from any part of the operation? ❑ Yes P No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ No NA NE b. Did the discharge reach waters of the State? (If yes, notify DWQ) ❑ Yes ❑ No FM NA LP ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWQ) ❑ Yes ❑ No NA 0 NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes LIP No ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes 171 No ❑ NA ❑ NE of the State other than from a discharge? Page 1 of 3 21412011 Continued [Facility.Number: - Za Date of Inspection: 2� Z— Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes �No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No � NA ❑ NE Strut re 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? [:]Yes EpNo [DNA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes No ❑ NA ❑ NE waste management or closute plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes P No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? [+] Yes P No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes [PNo ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes Co No ❑ NA ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lb.s. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wip4 Drift ❑ ApRlication Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops from those designated in the CAWMP? 15. Does the receiving crop and/or land application site need improvement? 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acres determination? 17. Does the facility lack adequate acreage for land application? 18. Is there a lack of properly operating waste application equipment? Reuuired Records & Documents ❑ Yes ❑ Yes ❑ Yes ❑ NA ❑ NA ❑ NA ❑ NE ❑ NE ❑ NE ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes ® No ❑ NA ❑ NE 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes P No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes [P No ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes 9 No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes No ❑ NA ❑ NE Page 2 of 3 21412011 Continued Facility Number: _ y- Date of inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes 2;No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes R No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structurc(s) and date of first survey indicating non-compliance: 26, Did the facility fail to provide documentation of an actively certified operator in charge? [:]Yes No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes No ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32, Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes No ❑ NA ❑ NE 34, Does the facility require a follow-up visit by the same agency? ❑ Yes ® No ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments: Use drawings of facility to better explain situations, (use additional pages as necessary), 2a/q Reviewer/Inspector Name: Reviewer/Inspector Signature: \ Page 3 of 3 Phone: ?lo— —3— W Date: 21412011 ?,XKAS 8-11-2010 / ivision of Water Quality Facility Number cp ' % Z O Division of Soil and Water Conservation O Other Agency Type of Visit ompllance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit outine 0 Complaint 0 Follow up 0 Referral 0 Emergency 0 Other ❑ Denied Access Date of Visit: %-2 —/0 Arrival Time: Departure Time: 7; dG ,., County: Farm Name: T,b & -2 6' Owner Email: Owner Name: / b 44 I z '."S Z^<<- Phone: Mailing Address: Physical Address: Region: 10�2t7 Facility Contact: �)Ocerq ke44t"�`� Title: EN✓, '�fr Phone No: Onsite Representative: 4).oV4 _�44 d integrator: +%b /ff Certified Operator: � '� -K'e ua'` d Operator Certification Number: 8 y17 Back-up Operator: Location of Farm: Swine Other ❑ Other Back-up Certification Number: Latitude: 0 0 0' 0 " Longitude: 00 0' 0" Design Current Design Current Capacity Population Wet Poultry Capacity Population ❑ Layer ❑ Non -Layer Dry Poultry ❑ Layers ❑ Non -Layers ❑ Puliets ❑ Turkeys ❑ Turkey Poults ❑ Other Discharges & Stream lmnacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (if yes, notify DWQ) Design Current Cattle Capacity Population ❑ Dairy Cow ❑ Dairy Calf ❑ Dairy Heifer ❑ Dry Cow ❑ Non -Dairy ❑ Beef Stocker ❑ Beef Feeder ❑ Beef Brood Cow c. What is the estimated volume that reached waters of the State (gallons)? Number of Structures: d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Page 1 of 3 ❑ Yes 2 o ❑ NA ❑ NE ❑ Yes ❑ No VA' ❑ NE ❑Yes ❑No ,� MINA El NE D A ❑NE ❑Yes El No ❑ Yes is<o ❑ NA ❑ NE ❑Yes al ❑NA ❑NE 12128104 Continued Facility Number: Date of Inspection 7,- z -/O Waste Collection & Treatment 4. is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a. If yes, is waste level into the structural freeboard? Structure 1 Structure 2 Structure 3 Structure 4 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): �}Z 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes R�o ❑ NA ❑ NE ❑ Yes Q'1qo'- ❑ NA ❑ NE Structure 5 Structure 6 ❑ Yes ❑llo'- ❑ NA ❑ NE ❑ Yes ❑"15o ❑ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes G�N'o ❑ NA ❑ N I- 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes 0-No ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks),,� 9. Does any part of the waste management system other than the waste structures require El Yes o ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes �,� l± o ❑ NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ElB Yes o ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ }-Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 Ibs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ElEvidence of Wind Drift Application Outside of Area /❑ 12. Croptype(s) eP'A4ttC1P_ efAxj 'S�Ma[r arn:r.l_ R 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes 0<o ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination ? ❑ Yes 17. Does the facility lack adequate acreage for land application? ❑ Yes 18. Is there a lack of properly operating waste application equipment? ❑ Yes Q o ❑NA ❑NE E�,,-�No ❑ NA ❑ NE ,i_�,,I'No� NA ❑ NE LSNo LI NA ❑ NE Comments" (refer to,question #}: Explain any',YES answers` and/or any recammend'a`tioiis urany other coniments°','�t' Use drawings of facility to hotter ekpIain situations: (use`addiI11)naI pnges`is iieccssary), � P. t ' : � a • Reviewer/Inspector ]Name I �i � Zede Phone: 9/0, $�33. 330 a Reviewer/Inspector Signature: Date: 7--2 6 - 12128104 Continued As T Facility Number: Date of Inspection Required Records & Documents ,, �� 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes LTNo ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes 871 o ❑ NA ❑ NE the appropriate box. ❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes Ell o ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ t20 Minute Inspections ❑ Monthly and 1 ° Rain Inspections ❑Weather Code 22. Did the facility fail to install and maintain a rain gauge? ElL yes N"oo ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ,' B<o ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes IJ No ❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes [ 1'go ❑ NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes 0-i<o_ ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes ETT or ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes E<o ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes 21qo— ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes 01qo' ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes fo ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/inspector fail to discuss review/inspection with an on -site representative? ❑ Yes NA El NE 33. Does facility require a follow-up visit by same agency? El Yes ,�--}�'❑ Iw�o 0 NA ❑ NE 12128104 ' Division of Water Quality t Facility Number ®- ® 0 Division of Soil and Water Conservation 0 Other Agency Type of Visit: Q Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: 0 Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Arrival Time: Departure Time: 491 CountyAi egion: 449 Farm Name: �Ni z�rj Owner Email: Owner Name: Phone: Phone: Mailing Address: Physical Address: �f� Facility Contact: nog(, �ltan0 Title: Phone: Onsite Representative: Integrator: %>M Aarms Certified Operator: 0 Certification Number: A //q Back-up Operator: Certification Number: Location of Farm: Swine Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Boars Other Other Latitude: Longitude: Design Current Design Current Capacity Pop. Wet Poultry Capacity Pop. HLa er gar Non -Layer Design Current Dry Poultry Capacity Pop. Layers Non -Layers Pullets Turkeys Turkey Poults Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (if yes, notify DWQ) Design Current Cattle Capacity Pop. Dairy Cow Dairy Calf Dairy Heifer Dry Cow ,Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow ❑ Yes W No ❑ NA ❑ NE ❑ Yes ❑ No ❑ Yes ❑ No NA ❑ NE NA ❑ NE c. What is the estimated volume that reached waters ofthe State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWQ) [] Yes ❑ No M NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes No ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes No ❑ NA ❑ NE of the State other than from a discharge? Page 1 of 3 21412011 Continued Facilif Number: 21 - 7.2 Date of -Inspection: G Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? [] Yes P No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes []No F NA ❑ NE Structure l Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: 1 Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes �n No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes r{.No [3 NA 0 NE waste management or closure plan? `P If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environ ental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes No ❑ NA ❑ NE 8. Do any ofthe structures lack adequate markers as required by the permit? ❑ Yes No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes ® No ❑ NA ❑ NE maintenance or improvement? i Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes ® No ❑ NA ❑ NE maintenance or improvement? T 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes E� No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes [M No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑,Yes PQ No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes q No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes `'P' No ❑ NA ❑ NE 20. Does the facility fail to have all components ofthe CAWMP readily available? If yes, check ❑ Yes ®No ❑ NA ❑ NE the appropriate box. TT ❑WUP ❑Checklists C] Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes ® No ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis [] Soil Analysis ❑ Waste Transfers ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rainfall Inspections 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes j" No 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes �[!RNo ❑ NA ❑ NE ❑ Weather Code ❑ Sludge Survey ❑NA ❑NE ❑ NA ❑ NE Page 2 of 3 21412011 Continued Fadili - Number: - 'l Date of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ED Yes RD No 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes No the appropriate box(es) below, ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes ;,No 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 33. Did the Reviewer/Inspector tail to discuss review/inspection with an on -site representative? Reviewer/Inspector Name: Reviewerllnspector Signature: Page 3 of 3 ❑ NA ❑ NE ❑ NA ❑ NE ❑ NA ❑ NE [� NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes �@ No ❑ NA ❑ NE [:]Yes No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE Phone: 9/0--4133-3_?OD Date: 21412011 �r- Division of Water Quality Division of Soil and Water Conservation _. = 0 Other Agency Facility Number I EZJ Type of Visit *Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit 0 Routine 0 Complaint 0 Follow up 0 Referral 0 Emergency 0 Other ❑ Denied Access Date of Visit: jl q Q Arrival Time: Departure'rime: D; County: FMB W Region: Farm Name: DM Owner Email: Owner Name: 1 M m S Phone: Mailing Address: Physical Address Facility Contact: Pa ,U 1 e m _ _ Title: Phone No: �t Onsite Representative:' ' integrator: i�-��-^D t,l+'�M__ 1Bt 7 Certified Operator: Operator Certification Number: .� Back-up Operator: Back-up Certification Number: Location of Farm: Latitude: = e = I =" Longitude: = e =' 0 Swine Design Current Design Current Capacity Population Wet Poultry Capacity Population ❑ La er �0 2 ❑ Non -Layer ❑ Wean to Finish ER Wean to Feeder Feeder to Finish I I —d Darrow to Wean ❑ Farrow to Feeder El Farrow to Finish El Gilts ❑ Boars Other ❑ Other Dry Poultry ❑ Layers ElNon-Layers El Pullets ❑ Turke s ❑ TurkeyPoults ❑ Other Discharges & Stream Impacts 1, is any discharge observed from any part of the operation? Discharge originated at: [I Structure El Application Field El Other a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) Design Current Cattle Capacity Population ❑ DairyCow El Dairy Calf ElDai Heifer El Dry Cow ElNon-Dairy El Beef Stocker ❑ Beef Feeder ❑ Beef Brood Cow c. What is the estimated volume that reached waters of the State (gallons)? �Number of Structures: 1 d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes P No ❑ NA ❑ NE ❑ Yes Type of Visit *Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit 0 Routine 0 Complaint 0 Follow up 0 Referral 0 Emergency 0 Other ❑ Denied Access Date of Visit: jl q Q Arrival Time: Departure'rime: D; County: FMB W Region: Farm Name: DM Owner Email: Owner Name: 1 M m S Phone: Mailing Address: Physical Address Facility Contact: Pa ,U 1 e m _ _ Title: Phone No: �t Onsite Representative:' ' integrator: i�-��-^D t,l+'�M__ 1Bt 7 Certified Operator: Operator Certification Number: .� Back-up Operator: Back-up Certification Number: Location of Farm: Latitude: = e = I =" Longitude: = e =' 0 Swine Design Current Design Current Capacity Population Wet Poultry Capacity Population ❑ La er �0 2 ❑ Non -Layer ❑ Wean to Finish ER Wean to Feeder Feeder to Finish I I —d Darrow to Wean ❑ Farrow to Feeder El Farrow to Finish El Gilts ❑ Boars Other ❑ Other Dry Poultry ❑ Layers ElNon-Layers El Pullets ❑ Turke s ❑ TurkeyPoults ❑ Other Discharges & Stream Impacts 1, is any discharge observed from any part of the operation? Discharge originated at: [I Structure El Application Field El Other a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) Design Current Cattle Capacity Population ❑ DairyCow El Dairy Calf ElDai Heifer El Dry Cow ElNon-Dairy El Beef Stocker ❑ Beef Feeder ❑ Beef Brood Cow c. What is the estimated volume that reached waters of the State (gallons)? �Number of Structures: 1 d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes P No ❑ NA ❑ NE ❑ Yes Other ❑ Other Dry Poultry ❑ Layers ElNon-Layers El Pullets ❑ Turke s ❑ TurkeyPoults ❑ Other Discharges & Stream Impacts 1, is any discharge observed from any part of the operation? Discharge originated at: [I Structure El Application Field El Other a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) Design Current Cattle Capacity Population ❑ DairyCow El Dairy Calf ElDai Heifer El Dry Cow ElNon-Dairy El Beef Stocker ❑ Beef Feeder ❑ Beef Brood Cow c. What is the estimated volume that reached waters of the State (gallons)? �Number of Structures: 1 d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes P No ❑ NA ❑ NE ❑ Yes Discharges & Stream Impacts 1, is any discharge observed from any part of the operation? Discharge originated at: [I Structure El Application Field El Other a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) Design Current Cattle Capacity Population ❑ DairyCow El Dairy Calf ElDai Heifer El Dry Cow ElNon-Dairy El Beef Stocker ❑ Beef Feeder ❑ Beef Brood Cow c. What is the estimated volume that reached waters of the State (gallons)? �Number of Structures: 1 d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes P No ❑ NA ❑ NE ❑ Yes c. What is the estimated volume that reached waters of the State (gallons)? �Number of Structures: 1 d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes P No ❑ NA ❑ NE ❑ Yes ❑ No P NA ❑ NE ❑ Yes ❑ No [RNA ❑ NE ❑ Yes ❑ No IP NA ❑ NE ❑ Yes IF No ❑ NA ❑ NE ❑ Yes g No ❑ NA ❑ NE 12/28/04 Continued Date of Inspection ll facility Number: 02 — 72 Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes PNo ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No �@ NA ❑ NE Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No F ❑ NA ElNE (iel large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes No ElNA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes [PNo ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes No ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes ( No ❑ NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 IN ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s 13. Soil type(s) 14: Do the receiving crops differ from those designated in the CAWMP? ❑ Yes [�No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes [6No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination?❑ Yes P No ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes M No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes E�l No ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any recommendations or any other comments. Use drawings of facility to better explain situations. (use additional pages as necessary): t AL Reviewer/Inspector Name Phone: q1D 415 3,90 Reviewer/Inspector Signature: Date: 12128104 Continued Facility Number: — Date of Inspection Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available'? ❑ Yes No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ❑ NA ❑ NE the appropirate box. ❑ WUP ❑ Checklists ❑ Design ❑Maps ❑ Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes 1PNo ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge'? ❑ Yes ( No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ® No ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes No ❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes No ❑ NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge'? ❑ Yes P No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes �RjNo ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes CpNo ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes [p No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes qiiNo ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes N No ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes 1�No ❑ NA ❑ NE Page 3 of 3 12128104 Type of Vlsit *Compliance Inspection O Operation Review O Structure Evaluation O Technical Assistance Reason for Visit Routine O Complaint Q Follow up O Referral 0 Emergency Q Other ❑ Denied Access Date of Visit: Arrival Time: Departure Time: County: Farm Name: TDNA Owner Email: Owner Name: M5 Phone: Mailing Address: Physical Address: Facility Contact: DOU0,M-emo Title: Phone No: Onsite Representative: ►I Integrator: Certified Operator: Operator Certification Number: Back-up Operator: I Sack -up Certification Number: Region: Location of Farm: Latitude: = e = 0 Longitude: = o =' = Design Current X Design Current Design Current Swine Capacity Population Wet Poultry Capacity Population Cattle Capaclty Population ❑ Wean to Finish ❑ La er ❑ Dai Cow Wean to Feeder �� ❑Non -La er ❑ Dairy Calf Feeder to Finish ❑ Dai Heifcr Farrow to Wean pry Poultry ❑ D Cow Farrow to Feeder ❑ Layers Non -Dairy ❑ Farrow to Finish ❑ Beef Stocker ❑ Gilts Non -Layers ❑ Beef Feeder ❑ Boars ❑ Pullets ❑Beef Brood Cow ❑ Turkeys otl 10 Turkey Pou Its ❑ Other ther Number OWN Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? El Yes �No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? ❑ Yes ❑ No P NA ❑ NE b. Did the discharge reach waters of the State? (if yes, notify DWQ) ❑ Yes ❑ No W NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) ❑ Yes ❑ No EP NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes ERNo ❑ NA ❑ NE 3. Were there any adverse impacts or potential adverse impacts to the Waters ofthe State ❑ Yes ® No ❑ NA ❑ NE other than from a discharge? Page 1 of 3 12128104 Continued Date of Inspection Facility Number: — Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes INo ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes i❑ No Z NA ❑ NE Stru Lure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes ONo ❑ NA ❑ NE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes f 9 No ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? [:]Yes E' No ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes 29 No ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes ®No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes] No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) []PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) 13. Soil type(s)-�,., V r 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes gg No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ?0 No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination?❑ Yes V No ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes P No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes K,No ❑ NA ❑ NE Reviewer/Inspector Name777 Phone: Reviewer/inspector Signature: Date: Page 2 of 3 121, Continued • %' Facility Number: — Date of Inspection Required Records &_Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes PNo ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes PNo ❑ NA ❑ NE the appropirate box. ❑ WUP ❑ Checklists ❑ Design El Maps ❑Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes �_kbNo ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes [PNo ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ff No ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes PNo ❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes ® No ❑ NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes M No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes M No ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes Wo ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes %No ❑ NA ❑ NE and report the mortality rates that were higher than normal'? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes 9No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes No ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes a No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes ® No ❑ NA ❑ NE Page 3 of 3 12128104 Division of Water Quality Facility Number d1 0 Division of Soil and Water Conservation O Other Agency QQ l�101 / n 1 Type of Visit ,Compliance inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit 1) Routine 0 Complaint 0 Follow up 0 Referral 0 Emergency 0 Other ❑ Denied Access Date of Visit: a Arrival Time: ® Departure Time. County: Region: Jzi' a Farm Name: `-[ om-4 2'k [ _ Owner Email: Owner Name: ID M t`al` YYIS 1 I(1i� Phone: Mailing Address: Physical Address: Facility Contact: W� le Yl _ Title: V ty 12r Phone No: Onsite Representative: �, I t V � �.If_Y1b`(�� Integrator: — TD � r l Certified Operator: ,,_ Operator Certification Number: %'T ` _ Back-up Operator: Location of Farm: L Swine Wean to Finish ,Wean to Feeder Feeder to Finish farrow to Wean Farrow to Feeder Farrow to Finish Gilts Other ❑ Other Back-up Certification Number: Latitude: = o = A = i1 Longitude: = 0 0 ` 0 Design Current Design Current Capacity Population Wet Poultry Capacity Population ❑ Layer Z~] ❑ Non -La et Dry Poultry ❑ Layers ❑ Non -Layers ❑ Pullets ❑ Turkeys ❑ Turkey Poults ❑ Other Discharees & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) Design Current Cattle Capacity Population ❑ Dairy Cow ❑ Dairy Calf ❑ Dai Heifei ❑ Dry Cow ❑ Non -Dairy ❑ Beef Stocker ❑ Beef Feeder ❑ Beef Brood Cow c, What is the estimated volume that reached waters of the State (gallons)? Number of Structures: ITI d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation'? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes VNo ❑ NA ❑ NE ❑ Yes ❑ No NA ❑ NE ❑ Yes ❑ No NA ❑ NE ❑ Yes ❑ No RNA ❑ NE ❑ Yes %No ❑ NA ❑ NE ❑ Yes fANo ❑ NA ❑ NE 12128104 Continued Facility Number: -- 07 Date of Inspection 0 Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes Wo ❑ NA [IN E a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No DNA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): ILt y Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes 19 No ❑ NA ElNE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes"10 ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes V No ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes No ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes [P No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes P No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 101bs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable CropWindow ❑ Evidence of Wind Drifl ❑ Application Outside of Area 12. Crop typecc s) ` 9j mJ-0.. AA C"1 f Cij S 13. Soil type(s) A Awk �Ve_ ^ 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes �ZNo ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes 1� No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination?[] Yes 1 JNo �� [I NA ❑ NE 17. Does the facility lack adequate acreage for land application? [I Yes // No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment'? ❑ Yes No ❑ NA ❑ NE Comments (refer to question ft Explain any YES answers and/or any recommendations or any other comments. Use drawings of facility to better explain situations. (use additional pages as necessary): a Reviewer/inspector Name PUS-7/ AJ AT7Q Phone: C) 9) V'3a..3 M0 Reviewer/inspector Signature: rc - Date: 12128104 V Continued + Facility Number: Date of Inspection Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ❑ NA ❑ NE the appropirate box. ❑ WUP ❑ Checklists ❑ Design [I Maps ❑Other ' 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes M,No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes 1� No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes 'Q No ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes No ❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes No ❑ NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes No ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes �INo /� [I NA El NE 29, Did the facility fail to properly dispose of dead animals within 24 hours and/or document El Yes No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes] No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately / 3 L Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes j No ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes C$No ❑ NA ❑ NE Additional Comments and/or Drawings: V Qxly 'I ce �v M o 12128104 Facility Nor)'� Time InC�GQQ Time Out Date 0� Farm Name Dm Integrator ti i + 1 �yVyl S _ Owner -7D M Tc-.v �S , ( n CG _ Site R 1p Operator �- a� No. ,� Back-up No. COC Circle: General or NPDES Design Current Design Current can = F 6 C).0 U-1 Farrow — Feed Wean — Finish Farrow — Finish Feod.,Fini Gilts / Boars arrow — Wean `7a Others FREEBOARD: Design Sludge Survey Crop Yield Rain Gauge Soil Test PLAT Weekly Freeboard Daily Rainfall Spray/Freeboard Drop Weather Codes ✓~ Waste Analysis: 120 min Inspections Observed C� Calibration/GPM Waste Transfers Rain Breaker 4--� Wettable Acres Z, 1-in Inspections Date Nitrogen (N) Date Nitrogen (N) 101 1 . -? 'i�, I I . Z 'Z I �, C) Type of Visit 0 Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit 0 Routine 0 Complaint 0 Follow up 0 Referral 0 Emergency 0 Other ❑ Denled Access Date of Visit: Arrival Time: : 4�OA Departure Time: ��/f" County: t Region: Farm Name: �r�ly% 2t� Owner Email: Owner Name: 724f �Z Phone: (/0 5-911 02 Mailing Address: Physical Address: �J Facility Contact: oua it 434..j J Title: Phone No: Onsite Representative: boua A�WQ1J i - Integrator: Certified Operator: /i%/e on/d Operator Certification Number: _/5-/ 7 Back-up Operator: Location of Farm: Back-up Certification Number: Latitude: = e = 6 Longitude: = o = t Design Current Design Current Design Current Swine C►apacity Population Wet Poultry Capacity Population C►attle C►apacity Population ❑ Wean to Finish ❑ Layer ❑ DairyCow Wean to Feeder d .2 ❑ Non -Layer ❑ DairyCalf ❑ Feeder to Finish ❑ DairyHeifer Farrow to Wean Z(p/ Dry Poultry ❑ D Cow ❑ Farrow to Feeder ❑ Non -Dairy ❑ Farrow to Finish ❑ Layers ❑ Beef Stocker ❑ Non -Layers El Beef Feeder ❑ Gilts ❑ Boars ❑ Pullets Beef Brood Cow ❑ Turkeys Other. ❑ Turkey Poults ❑ Other Number of Structures: ❑ Other Discharees & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes %No ❑ NA ❑ NE ❑ Yes �Z No ❑ NA ❑ NE ❑ Yes R No ❑ NA ❑ NE ❑ NA ❑ NE ❑ Yes [A No ❑ Yes R No ❑ Yes RN No Page 1 of 3 12128104 ❑ NA ❑ NE ❑NA ❑NE Continued Facility Number: 2 7 Z Date of Inspection Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a. if yes, is waste level into the structural freeboard? Structure I Structure 2 Structure 3 Structure 4 Identifier: / Spillway?: Designed Freeboard (in): 9 Observed Freeboard (in): 4 % 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes [&No ❑ NA ❑ NE ❑ Yes RNo ❑ NA ❑ NE Structure 5 Structure 6 ❑ Yes P No ❑ NA ❑ NE ❑ Yes [ANo ❑ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes P No ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes Q0 No ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require [ 1 Yes [M No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes 4p No ❑ NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes M No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable CropWindow ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) ei-hfu 0/ a - �t. , �INull magi N -- 13. Soil type(s) AU 14,_ 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes 1KNo ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes KNo ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination ? ❑ Yes K No ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes [;}No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes WNo ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any recommendations or any other comments. Use drawings of facility to better explain situations. (use additional pages as necessary): i Reviewer/Inspector Name Phone: Reviewer/Inspector Signature: Date: Page 2 of 3 `" 12128104 Continued if . . Facility Number: ;Z& —']'Z Date of Inspection ~O!o Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily availabie? ❑ Yes [)$No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check []Yes 'No ❑ NA ❑ NE the appropriate box. ❑ WUP ❑ Checklists ❑ Design El Maps El Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes [,2 No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes No ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes [,WNo ❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes rQ No ❑ NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes P No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes ;?No ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes [XNo ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes P No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes RQNo ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes Pa No ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes 5MNo ElNA [INE 33. Does facility require a follow-up visit by same agency? ❑ Yes PNo ❑ NA ❑ NE Additional Comments and/or Drawings: 1 Nir .-0 Page 3 of 3 12128104 Type of Visit 9 Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit ® Routine 0 Complaint 0 Follow up 0 Referral 0 Emergency 0 Other ❑ Denied Access C �jbe. -/AAOF Date of Visit: Arrival Time: a ; d Departure Time: County: Region: 600 Farm Name: Owner Email: Owner Name: T_D_M._.:Fawt c -------__-.. Phone: Mailing Address: O 13o tc .3 0 �_— aU� w �'��. irxro ui A e- A 73 Physical Address: Facility Contact: 004, Me-04o..ed h Title: Onsite Representative: d�_ryrc iMn�ri' Certified Operator: •. �' .wok Back-up Operator: Location of Farm: Phone No: q&O - Integrator: Operator Certification Number: Back-up Certification Number: Latitude: ❑ e = Longitude: ❑ ° = ` = " Design Swine Capaeity Current Population Design Wet Poultry Gapaeity Cur"rent h # Design Current Population Cattle Capacity Population ❑ Dairy Cow ❑ Dairy Calf ❑ Dairy Heifer El Dry Cow ❑ Non -Dairy ❑ $eef Stocker ❑Beef Feeder ❑Beef Brood Cow Number of Structures: ❑ Wean to Finish ❑ Layer ® Wean to Feeder JAjo00 I I IS ❑ Non -La er ❑ Feeder to Finish I A Dry Poultry- ® Farrow to Wean OLGIG ❑ Farrow to Feeder ❑ La ers ❑ Farrow to Finish ❑Non -La ers ❑ Gilts ❑ Pullets ❑ Turkeys ❑ Boars Other , ❑ Turkey Poults ❑ Other I ❑ Other Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes [B No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWQ) ❑ Yes ❑ No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) ❑ Yes ❑ No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes ® No ❑ NA ❑ NE 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State ❑ Yes ®,No ❑ NA ❑ NE other than from a discharge? 12128104 Continued Facility Number: are — ki2 Date of Inspection 2-4-oS Renuired Records &_Documents 19. Did the facility fail to have Ccrtif ieate of Coverage & Permit readily available? ❑ Yes 9 No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes [jg No ❑ NA ❑ NE the appropirate box. ❑ VAM ❑ Checklists ❑ Deeign ❑ w4n ❑ Other 21, Does record keeping need improvement'? If yes, check a appTropria+� blow. ❑ Yes @ No ❑ NA ❑ NE ❑ Waste AppimoRt ❑ Vk-ck-fTrMbrard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Amiuttl49eAX4cf►tion ❑ ge�whtii - El S4"k-i"g ❑ Cmr�� ❑ 1 ions ❑ ❑ Weatim. a de 22. Did the facility fail to install and maintain a rain gauge? 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? 24. Did the facility fail to calibrate waste application equipment as required by the permit? 25. Did the facility fail to conduct a sludge survey as required by the permit? 26. Did the facility fail to have an actively certified operator in charge? 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) 32. Did ReviewerAnspector fail to discuss review/inspection with an on -site representative? 33. Does facility require a follow-up visit by same agency? ❑ Yes ® No ❑ NA ❑ NE ❑ Yes [?j No ❑ NA ❑ NE ❑ Yes [] No ❑ NA Pk NE ❑ Yes ❑ No ❑ NA [R NE ❑ Yes Z No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ® NE ❑ Yes Y9 No ❑ NA ❑ NE ❑ Yes ® No ❑ NA ❑ NE ❑ Yes ® No ❑ NA ❑ NE ❑ Yes K No ❑ NA ❑ NE ❑ Yes ® No ❑ NA ❑ NE ❑ Yes Pq No ❑ NA ❑ NE D�rjawings: Additional Comments and/or Drawings: Kt t7 k ;to 12128104 a Facility Number: — Date of Inspection Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes ® No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: j Spillway?: A e Designed Freeboard (in): I Q if Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes ® No ❑ NA ❑ NE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes ® No ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes m No ❑ NA ❑ NE 8. Do any of the stuetures lack adequate markers as required by the permit? ❑ Yes ® No ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes ® No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes ® No ❑ NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application'? If yes, check the appropriate box below. ❑ Yes R No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drifl ❑ Application Outside of Area 12. Crop type(s)Zerk�,.�i���a--J��,..,.�,��iva� 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes m No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ® No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination',❑ Yes ® No ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes ® No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes ® No ❑ NA ❑ NE Reviewer/Inspector Name 113.1t Jlaa - 'L" ' firk . f e .; Phone: Reviewer/Inspector Signature: Date: 12128104 Continuer! f fY.a`��,` P. x3...'..'�.ii . hE tFg j `F { -Y IS, r .Other' fY �l a. �i r -i i . ; ri o ,& d° #� + fit 'E i•lcd°( r lit je A};encY "y im _ ..ttMs r teL s!?' t �. k , . #r1N� t j C i Y n�=�1 ,.,+ � wil s l���¢¢^^° i :i �.S..F,,. t —.,» �;'. ,fi r}:h .,�F id?:3'rn��T,�^4 f ��'.i�....+.e.G ,.»� .0� ,'.1. i. .. . �� r .. a.. �,. ...c._ �f.f ,._ �i_�f... � 5. _....61...�e,L .. ti .�.'�..r3..�"��.�Y. �..1L e'•�� Type of Visit .® Compliance inspection O Operetiori Review O Lagoon Evaluation Reason for Visit O Routine O Complaint O Follow up O Emergency Notification O Other ❑ Denied Access Date of Visit: ime: Facility lumber QN t-Operational 0 He ® Permitted ® Certified 0 Conditionally Certified Li Registered Date Last Operated or Above Threshold: Farm Name: Countv:-- Owner ?dame: � �il1j��� Phone No: q UN Mailing Address: 3bQ nn O Facility Contact: MU[ _ ]e,vLaOndl Title: Phone No: Onsite Representative: �1%u1t.A 4_ &_ csvj Integrator: i — Certified Operator: ha 0-aOperator Certification Number: '1 aTis0 Location of Farm: JW Swine ❑ Poultry ❑ Cattle ❑ Horse Latitude ' 6 " Longitude 0 1 �µ Design Current Design Current Design Current Swine Capacity Population Poultry Capacitv Population Cattle capacity Population ❑ Wean to Feeder ❑ Laver ❑ Dairy El Feeder to Finish Non -La er ❑ Non-Dairy ❑ Farrow to Wean ® Farrow to Feeder ❑ Other ❑ Farrow to Finish Total Design Capacity ❑ Gilts ❑ Boars Total SSLW Number of Lagoons �© '` ❑ Subsurface Drains Present ❑ Lagoon Area 10 S rig Field Area • Holding Ponds 1 Solid Traps' ! "� ` ❑ No Liquid Waste Mana emert Svstem Discharges 8 Stream Impacts 1. is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. if discharge is observed, was the conveyance man-made? b. If discharge is observed, did it reach Water of the State? (if yes, notify DWQ) c. if discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? (If ves, notify DWQ) 2. is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Waste Collection & Treatment 4. is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway Structure 1 Structure 2 Structure 3 Structure 4 Structure S Identifier: Freeboard (inches): 03103101 ❑ Yes A No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ® No ❑ Yes [% No ❑ Yes [5kNo Structure 6 Continued Facility Number: — bate of Inspection 5. Are there any immediate threats to the integrity of any of the structures observed? (ic/ trees, severe erosion, ❑ Ycs �] No seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes M] No (If any of questions 4-6 was answered yes, and the situation poses an Immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? ❑ Yes U No 8. Does any part of the waste management system other than waste structures require maintenance/improvement? ❑ Yes [2 No 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? ❑ Yes No Waste AnWication 10. Arc there any buffers that need maintenance/improvement? ❑ Yes No 11 • Is there evidence of over application? ❑ Excessive Ponding ❑ PAN ❑ Hydraulic Overload ❑ Yes No 12. Crop hype erw,4ey 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? ❑ Yes No 14. a) Does the facility lack adequate acreage for land application? ❑ Yes [ No b) Does the facility need a wettable acre determination? ❑ Yes No c) This facility is pended for a wettable acre determination? ❑ Yes QjNo 15. Does the receiving crop need improvement? ❑ Yes MNo 16. Is there a lack of adequate waste application equipment? ❑ Yes ® No Rewired Records & Documents 17. Fail to have Certificate of Coverage & General Permit or other Permit readily available? ❑ Yes [S No 18. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (ie/ WUP, checklists, design, maps, etc.) ❑ Yes ® No 19. Does record keeping need improvement? (ie/ irrigation, freeboard, waste analysis & soil sample reports) ❑ Yes [71 No 20. Is facility not in compliance with any applicable setback criteria in effect at the time of design? ❑ Yes $ No 21. Did the facility fail to have a actively certified operator in charge? ❑ Yes [P No 22. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) ❑ Yes ® No 23. Did Reviewer/inspector fail to discuss review/inspection with on -site representative? ❑ Yes ® No 24. Does facility require a follow-up visit by same agency? ❑ Yes M No 25. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes M No [� No violations or deficiencies were noted during this visit. You will receive no further correspondence about this visit. J mments'(ieferta*questiun�#) i+xpaln, i«y YES answer and/or-anyr ect►mmendations grant' other comments 'Cn �... , Usedrawings of farllity to b'ctter explainrsltuations .(itse,addlt€onal pagcsasnettssary) ❑Field Cony ❑Final Notes s. I��, wt., � S �°� �-P�.Q. �/v � o� [�-. t,�r-�i'���/ •ice s., � f L F64-r`a tJ-,�""�����Ql.��se �r�v` d CC��¢�. °�S GS�N �-' `��•��(y u�,(5�('"`� Reviewer/Inspector Name Reviewer/Inspector Signature: Date: 05103101 Continued Facility Number: (,— . Date of Inspection Odor Lssues 26. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge at/or below liquid level of lagoon or storage pond with no agitation? 27. Are there any dead animals not disposed of properly within 24 hours? 28. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, roads, building structure, and/or public property) 29. Is the land application spray system intake not located near the liquid surface of the lagoon? 30. Were any major maintenance problems with the ventilation fan(s) noted? (i.e. broken fan belts, missing or or broken fan blade(s), inoperable shutters, etc.) 31. Do the animals feed storage bins fail to have appropriate cover? 32. Do the flush tanks lack a submerged fill pipe or a permanent/temporary cover? ❑ Yes ❑ No ❑ Yes IM No ❑ Yes ® No ❑ Yes E�No ❑ Yes [&No ❑ Yes 1�9 No ❑ Yes ❑ No r dditl"onul(,Cnmments endlo`_r Drawln �: ; r, „ti 05103101 05103101 � 4.,�i�� 'lAn••�.. .. ... •. ., m.:..m.�]Sn's:�33.1. •.. .. •. •..�.•w..,.w:«.rrwA ..a+. :'.:fXc'..:Ni3r �i � ', ^ a' Division of Soil and Water Conservation ❑ Other Agency �# Division of Water Qualityy Routine O Complaint O Follow-up of MVQ inspection O Follow-up or Dswc review O Other Date of Inspection Facility Number Time of Inspection 24 hr. (hh:mm) © Registered Certified 13 Applied for Permit 0 Permitted 113 Not Operational Date 'lLast +Operated : Farm Name: .......''..+.T��..� � � Countv:....i....�.N!�YJtr..l. 0..!1 s� ............................... Owner Name:..4,.,,....PAC �t........... Phone No: ��`t. Z i� I., ............. FacilityContact:.....pp.....................................................•.................. Title: ................................................................ Phone No: ................................................... Mailing Address: .... I� �... ., ...?...1../"!'••..................................... :.......... ...kl.psat'1Qr•q. f p1 c........................... ..'a3 Onsite Representative:... Oehe.........i le ..I..kv..ker.......................................• Integrator:.......,..,..�'..........�Zzl./l............................. Certified Operator; .............................. •................... ..................................... •....................... Operator Certification Number ......................................... Location of Farm: Latitude U• 0' « Longitude • 4 ir General 1. Are there any buffers that need maintenance/improvement? El Yes I 2. Is any discharge observed from any part of the operation? ❑ Yes No Discharge originated at: ❑ Lagoon, ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? r ❑ Yes ❑ No b. If discharge is observed, dill it reach Surface Water? (If yes, notify DWQ) ❑ Yes ❑ No c. If discharge is observed, what is the estimated flow in gaVmin? .d. Does discharge bypass a lagoon system'! (If yes, notify DWQ) ❑ Yes ❑ No 3. Is there evidence of past discharge from any part of the operation? ❑ Yes No 4• Were there any adverse impacts to the waters of the State other than from a discharge? ❑ Yes *No 5. Does any part of the waste management system (other than lagoons/holding ponds) require ❑ Yes No maintenance/improvement? 6. Is facility not in compliance with any applicable setback criteria in effect at the time of design? ❑ Yes A No 7. Did the facility fail to have a certified operator in responsible charge? ❑ Yes WNo 7I25197 Continued on back Facility Number: 8. Are there lagoons or storage ponds on site which need to be properly closed? ❑ Yes No Structures (Lagoons,Ifolding Ponds. Flush Pits, etc.) 9. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Yes f No Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: 7".......................................................................................................................................................................................... Freeboard(ft): S................. ................................................................................................................................................................................... IU. Is seepage observed from any of the structures? ❑ Yes tNo o 11. Is erosion, or any other threats to the integrity of any of the structures observed? ❑ Yes 12. Do any of the structures need maintenance/improvement? ❑ Yes /t<No (If any of questions 9-12 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 13. Do any of the structures lack adequate minimum or maximum liquid level markers? Xyes ❑ No Waste Application 14. Is there physical evidence of over application? ❑ Yes 'gNo (If in excess of WMP, or runoff enteri g waters of the State, notify DWQ) 15. Crop type 6en r..�r .............................. NL +�.......°�: ((....................................................................................................................................... 16. Do the receiving crops differ with those designated in the Animal Waste Management Plan (AWMP)? ❑ Yes ANo 17. Does the facility have a lack of adequate acreage for land application? ❑ Yes *No 18. Does the receiving crop need improvement? ❑ Yes A No 19. Is there a lack of available waste application equipment? ❑ Yes *NO 20. Does facility require a follow-up visit by same agency? ❑ Yes XNO 21. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yes ,KNo 22. Does record keeping need improvement? ❑ Yes No For Cerlif5ed or Permitted Facilities Qnly ' \ 23. Does the facility fail to have a copy of the Animal Waste Management Plan readily available? ❑ Yes XNo 24. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes 0 No 25. Were any additional problems noted which cause noncompliance of the Permit? ❑ Yes ❑ No No'NiolatiOnS°or de'riciencies.were noted during this.visit.-:Yoia"VdH i6ce' i've-na•€urther�: :: - cprrespotidence ah:out this:visit.-: � � :: � :. -' � �' • � � � � :. � � - � . � � � � :. :.. � . : � � . � :. �:� Y '�9',h �k r "�' I - 'W --'� d Cnrnments (refer to3yuestlon #) ,''xplatn3anytlr)�S answers and/ar any rergm#ttendatlons or any pfher c6tnrnents ,' '� k Use drawings of'ftcllity'ta bbettee. explatrt sttuahonsll(u8d d,cion�l ptsges eces�lc�ary)^;?'I i.se 1 niS Is 0` ►1eU3 4xrM cs-A-A 6_4411 AAe-t'� L' 0&S 4)1` . Aa jrr1547k'O t Pe1�rw1.eA f ralm6lj be_43m S(Awt ter 199?, 13 . nl eec� i A.-S40-k1 S tr S�p ►►'�crker I�/� 1��17 t 7/25/97 Y Reviewer/Inspector Name 2, Reviewer/Inspector Signature: Date:zb- MAOF