Loading...
HomeMy WebLinkAbout090015_ENFORCEMENT_20171231NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Charfes Waklid, P. E. Dee Freeman Governor [Director Secretary January 20, 2012 CERTIFIED MAIL RETURN RECEIPT REQUESTED Mr. Kenneth Inman 11.3 Field Rd. Tar Heel, North Carolina 28392-1143 Subject: NOTICE OF VIOLATION/ NOV-2012-PC-0023 Administrative Code 15A NCAC 2T .1304 Kenneth Inman Farms Facility No. 09-15, Permit No. AWS090015 Bladen County Dear Mr. Inman: On January 17, 2012, staff of the NC Division of Water Quality (DWQ), Aquifer Protection Section (APS), inspected the Kenneth Inman Farms and the permitted waste disposal system. We wish to thank Mr. Kenneth Inman, who was present and assisted during the inspection. As a result of this inspection, you are hereby notified that, having been permitted to have a non -discharge permit for the subject animal waste disposal system pursuant to 15A NCAC 2T .1304, you have been found to be in violation of your permit as follows: Violation 1: Failure to conduct an annual survey of the sludge accumulation in all lagoons every year in accordance with the facilities Certified Animal Waste Management Plan. (Permit No. AWS090015 Section III 19) On January 17, 2012 during a routine inspection of your facility it was documented that no sludge survey was conducted during 2011 for your lagoons. Required Corrective Action for Violation 1: If you have not done so already conduct a sludge survey of your lagoons before December 3 I, 2012. When completed send a copy to the Fayetteville Regional office. AQUIFER PROTECTION SECTION 225 Green St., Ste. 714 Fayetteville, North Carolina 28301 Phone: 910-433-33001 FAX: 910486-07071 Customer Service 1-877-623-6748 Internet: www,h20.enr.state.nc.us An Equal Opportunity 1 Affirmative Action EmP10yer One NoI-EhCa.rofina Alaturally Mr. Inman January 20, 2012 Page 2 The Division of Water Quality requests that, in addition to the specified corrective action above, please submit the following items on or before February 29, 2012: 1. An explanation from the OIC for this farm regarding how this violation occurred. 2. A list from the OIC concerning the steps that will betaken to prevent this violation from occurring in the future. You are required to take any necessary action to correct the above violations on or before December 31, 2012 and to provide a written response to this Notice by February 29, 2012. Please include in your response all corrective actions already taken and a schedule for completion of any corrective actions not addressed. Failure to comply with conditions in a permit may result in a recommendation of enforcement action, to the Director of the Division of Water Quality who may issue a civil penalty assessment of not more that twenty-five thousand ($25,000) dollars against any "person" who violates or fails to act in accordance with the terms, conditions, or requirements of a permit under authority of G.S. 143-215.6A. If you have any questions concerning this Notice, please contact Steve Guyton or me at 910-433-3300 Sincerely, k, 4 Stephen A. Barnhardt Environmental Program Supervisor cc: Keith Larick CAFO Unit FRO Files Murphy Farms DENR--FRO FEB 2 2 2012 (M) � � c Appendix 1. Lagoon Sludge Survey Form A. Farm Permit or DWQ Identification Number B. Lagoon Identification C. Person(s) Taking Measurements D. Date of Measurement E. Methods/Devices Used for Measurement of: Revised August 2008 r79- 4 � l ao 1 a. Distance from the lagoon liquid surface to the top of the sludge layer. Sonar b. Distance from the lagoon liquid surface to the bottom (soil) of the lagoon. Previous Survey c. Thickness of the sludge layer if making a direct measurement with "core sampler". N/A F. Lagoon Surface Area (using dimensions at inside top of bank): (acres) (Draw a sketch of the lagoon on a separate sheet, list dimensions, and calculate surface area. The lagoon may have been built different than designed, so measurements should be made.) G. Estimate number of sampling points: a. Less than 1.33 acres: Use 8 points b. If more than 1.33 ac. acres x 6 = L G, 0 with maximum of 24. (Using sketch and dimensions, develop a uniform grid that has the same number of intersections as the estimated number of sampling points needed. Number the intersection points on the lagoon grid so that data recorded at each can be easily matched.) H. Conduct sludge survey and record data on "Sludge Survey Data Sheet' (Appendix 2). Also, at the location of the pump intake, take measurements of distance from liquid surface to top of sludge layer and record it on the Data Sheet (last row); this must be at least 2.5 ft. when irrigating. 1. At the time of the survey, also measure the distance from the Maximum Liquid Level to the Present Liquid Level (measure at the lagoon gauge pole): /-9 J. Determine the distance from the top of bank to the Maximum Liquid Level 6 (use lagoon management plan or other lagoon records) K. Determine the distance from the Maximum Liquid to the Minimum Liquid level: �. O (use lagoon management plan or other lagoon records) L. Calculate the distance from the present liquid surface level to the Minimum Liquid Level (Item K Minus Item I, assuming the present liquid level is below the Maximum Liquid Level) M. Record from the Sludge Survey Data Sheet the distance from the present liquid surface level to the lagoon bottom (average for all the measurement points) Z N. Record from the Sludge Survey Data Sheet the distance from the present liquid surface level to the top of the sludge layer (average for all the measurement points): S, O. Record from the Sludge Survey Data Sheet the average thickness of the sludge layer: a• 1 P. Calculate the thickness of the existing Liquid Treatment Zone ( Item N minus Item L): 57.() x Q. If Item O is greater than Item P, proceed to the Worksheet for Sludge Volume and Treatment Volume. If Item O is equal to or less than Item P, you,do not have to determine volumes. Completed by: 7„ ; , / ,� _ (�_�n,�o �fiu_i_K.l� Date: Print Name /Signature �, " I Appendix 2. Sludge Survey Data Sheet" Revised August 2008 Lagoon Identification: ken n 0-"� Zn ma A Ech r m .S Completed by: —7o m OA Lo 44 ac�.tndi-i, _ Date: Print Name Signature (A) ( B ) ( C ) (C) -(B) Grid Point Distance from liquid surface Distance from liquid surface Thickness of sludge layer No. to top of slud a to lagoon bottom (soil) Ft. & in. Ft. (tenths) Ft. & in. Ft. tenths Ft. & in. Ft. (tenths) 1 2 Remote 3 Boat 4 1e7bo w b6 5 Readings 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Number of oints with readings Ib 4 X X tJ A X X nJ A Average of Dints X X 5 X X ,7` X X a 1 At pump X X X X X X X X intake *All Grid Points and corresponding sludge layer thicknesses must be shown on a sketch attached to this Sludge Survey Data Sheet. 11...