Loading...
HomeMy WebLinkAbout090004_INSPECTIONS_20171231Division of Water Resources ❑Division of Soil and Wager Conservation Other Agency FaciINy Number: 090004 Facifity Status: Acbve Permit: AWS090004 [] Denied Access Inspection Type: Compliance Inspection Reason for Yrsit: Routine Date of Visit: 03/23/2017 Entry Time. 10:30 am Fann Name: Cain Complex Owner. Murphy -Brown LLC Exit Time Inactive Or Closed Date: County: Bladen Region: Fayetteville 11.00 am Incident # Owner Email: Phone: 910-296-1800 Mailing Address: PO Box 487 Warsaw NC 28398 Physical Address: 882 Opportunity Ln White Oak NC 28399 Facility Status: Compliant ❑ Not Compliant Integrator. Murphy -Brown LLC Location of Fenn: Latitude: 34° 45' 35" Longitude: 78° 40' 27" From Ammon take NC 242 South 2.4 miles, turn right onto SR 1325, go 5.9 miles to complex entrance on left. Question Areas: Dischrge & Stream Impacts Waste Col, Slor, & Treat Waste Application Records and Documents Other Issues Certified Operator: Robert T Young Operator Certification Number: 18461 Secondary OIC(s): On-Slte Repnesentative(s): 24 hour contact name On -site representative Primary Inspector. Inspector Signature: Secondary Inspector(s): Inspection Summary: Lagoon 2 is dry. Name Title Phone Mike Ammons Phone Mike Ammons Phone Robert Marble Phone: Dale: page: 1 Permit: AWS090004 Owner - Facility: Murphy -Brown LLC Facility Number. 090004 Inspection Date: 03t23/17 Inppection Type: Compliance Inspection Reason for Visit: Routine Regulated Operations Design Capacity Current promotions Swine ❑ Swine- Farrow to Wean 2,500 [] Swine- Feeder to Finish 10,000 Swine - Wean to Feeder 7,000 Total Design Capacity: 19,500 Total SSLW: 2,642,500 Waste_ Structures Observed Dis ignated Type Identifier Closed Date Start Date Freeboard Freeboard Lagoon 7443-1 19.00 31,00 Lagoon 7443-2 19.00 Lagoon 7443-3 19.00 48.00 Lagoon 7443-4 19.00 56.00 Lagoon DEPOT Lagoon DEPOT 1 19.00 Lagoon FINISHER Lagoon FINISHER 2 19.00 Lagoon NURSERY Lagoon NURSERY 3 19.00 Lagoon SOW Lagoon SOW 4 19,00 page: 2 Permit: AWS090004 Owner - Facility : Murphy -Brown LLC Facility Number. 090004 Inspection Date: 03/23M Inpsection Type: Compliance Inspection Reason for Visit: Routine Dischames & Stream Impacts vet No Na Me 1. Is any discharge observed from any part of the operation? ❑ 0 ❑ ❑ Discharge originated at: Structure ❑ Application Field ❑ Other ❑ a. Was conveyance man-made? ❑ ❑ M ❑ b. Did discharge reach Waters of the State? (if yes, notify DWQ) ❑ ❑ M ❑ c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (if yes, notify DWQ) ❑ ❑ M ❑ 2. Is there evidence of a past discharge from any part of the operation? ❑ 0 ❑ ❑ 3. Were there any observable adverse impacts or potential adverse impacts to Waters of the ❑ 0 ❑ ❑ State other than from a discharge? Waste Collection, Storage & Treatment Yes No Na We 4. Is storage capacity less than adequate? ❑ 0 ❑ ❑ If yes, is waste level into structural freeboard? ❑ 5. Are there any immediate threats to the integrity of any of the structures observed (I.eJ large ❑ 0 ❑ ❑ trees, severe erosion, seepage, etc.)? B. Are there structures on -site that are not property addressed and/or managed through a ❑ ❑ ❑ waste management or closure plan? 7. Do any of the structures need maintenance or improvement? ❑ M ❑ ❑ B. Do any of the structures lack adequate markers as required by the permit? (Not applicable ❑ ❑ ❑ to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ M ❑ ❑ maintenance or improvement? Waste Application Yes No No No 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ 0 ❑ ❑ maintenance or improvement? 11. Is there evidence of incorrect application? ❑ M ❑ ❑ If yes, check the appropriate box below. Excessive Ponding? ❑ Hydraulic Overload? ❑ Frozen Ground? ❑ Heavy metals (Cu, Zn, etc)? ❑ PAN? ❑ Is PAN > 100/o/10 Ibs.? ❑ Total Phosphorus? ❑ Failure to incorporate manure/sludge into bare soil? ❑ Outside of acceptable crop window? ❑ Evidence of wind drift? ❑ Application outside of application area? ❑ page: 3 Permit: AWS090004 Owner - Facility : Murphy -Brown LLC Facility Number. 090004 Inspection Date: 03/23/17 Inppection Type: Compliance Inspection Reason for Visit: Routine Waste Application _ Yes No Na No Crop Type 1 Coastal Bermuda Grass (Hay, Pasture) Crop Type 2 Small Grain Overseed Crop Type 3 Natural Vegetation Crop Type 4 Crop Type 5 Crop Type 6 Soil Type 1 Centenary sand Soil Type 2 Leon sand, 0 to 3% slopes Soil Type 3 Wagram fine sand. 0 to 6% slopes Soil Type 4 Soil Type 5 Soil Type 6 14. Do the receiving crops differ from those designated in the Certified Animal Waste ❑ ❑ ❑ Management Plan(CAWMP)? 15. Does the receiving crop andlor land application site need improvement? ❑ ❑ [] 16, Did the facility fail to secure and/or operate per the irrigation design or wettable acre ❑ ❑ ❑ determination? 17. Does the facility lack adequate acreage for land application? ❑ M ❑ ❑ 18. Is there a lack of properly operating waste application equipment? ❑ M ❑ ❑ Records and Documents Yes No Na No 19. Did the facility fail to have Certificate of Coverage and Permit readily available? ❑ ❑ ❑ 20. Does the facility fail to have all components of the CAWMP readily available? [] ■ ❑ ❑ If yes, check the appropriate box below. WUP? ❑ Checklists? ❑ Design? ❑ Maps? ❑ Lease Agreements? ❑ Other? ❑ If Other, please specify 21. Does record keeping need improvement? ❑ 0 ❑ ❑ If yes, check the appropriate box below. Waste Application? ❑ Weekly Freeboard? ❑ Waste Analysis? ❑ Soil analysis? ❑ Waste Transfers? ❑ Weather code? ❑ Rainfall? ❑ page: 4 Permit: AWS090004 Owner - Facility : Murphy -Brown LLC Facility Number. 090004 Inspection Date: 03/23/17 Inpsection Type: Compliance Inspection Reason for Visit: Routine Records and Documents Yes NO Na No Stocking? ❑ Crop yields? ❑ 120 Minute inspections? ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey ❑ 22. Did the facility fail to install and maintain a rain gauge? [] M ❑ ❑ 23. If selected, did the facility fail to instal and maintain a rainbreaker on irrigation equipment El El ❑ (NPDES only)? 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ ❑ ❑ 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check the ❑ ❑ ❑ appropriate box(es) below: Failure to complete annual sludge surrey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon ❑ List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ 0 ❑ ❑ 27. Did the facility fail to secure a phosphorous loss assessment (PLAT) certification? ❑ ❑ ❑ Other Issues Yea No Na No 28. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ 0 ❑ ❑ and report mortality rates that exceed normal rates? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, ❑ ❑ ❑ contact a regional Air Quality representative immediately. 30. Did the facility fail to notify regional DWQ of emergency situations as required by Permit? ❑ M ❑ ❑ (i.e., discharge, Freeboard problems, over -application) 31. Do subsurface file drains exist at the facility? ❑ 0 ❑ ❑ If yes, check the appropriate box below. Application Field ❑ Lagoon / Storage Pond ❑ Other ❑ If Other, please specify 32. Were any additional problems noted which cause non-compliance of the Permit or ❑ 0 ❑ ❑ CAWMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ 0 ❑ ❑ 34. Does the facility require a follow-up visit by same agency? ❑ 0 ❑ ❑ page: 5 Division of Water Resources ❑ Division of Soil and Water Conservation Other Agency Facility Number. 090004 Facility Status: Active Permit: AWS090004 ❑ Denied Access Inpsection Type: Compliance Inspection Inactive Or Closed Date: Reason for Visit: Routine County: Bladen Region: Fayetteville Date of Visit: 09/23/2015 Entry Time: 12:00 pm Exit Time: 1:00 pm Incident # Farm Name: Cain Complex Owner Email: Owner: Murphy -Brown LLC Phone: 910-296-f 800 Mailing Address: PO Box 487 Warsaw NC 28398 Physical Address: 882 Opportunity Ln White Oak NC 28399 Facility Status: Compliant ❑ Not Compliant Integrator. Murphy -Brown LLC Location of Farm: Latitude: 34° 45' 35" Longitude: 78' 40' 27" From Ammon take NC 242 South 2.4 miles, turn right onto SR 1325, go 5.9 miles to complex entrance on left. Question Areas: Dischrge & Stream Impacts Waste Col, Star, & Treat Waste Application Records and Documents Other Issues Certified Operator: Robert T Young Secondary OIC(s): Operator Certification Number: 18461 On -Site Representative(s): Name Title Phone 24 hour contact name Mike Ammons Phone: On -site representative Mike Ammons Phone: Primary Inspector: Robert Marble Phone: Inspector Signature: Date: Secondary Inspector(s): Inspection Summary: page: 1 Permit: AWS090004 Owner - Facility : Murphy -Brown LLC Facility Number: 090004 Inspection Date: 09/23/15 Inppection Type: Compliance inspection Reason for Visit: Routine Regulated Operations Design Capacity Current promotions Swine ❑ Swine - Farrow to Wean 2.500 Swine - Feeder to Finish 10,000 ❑ Swine - Wean to Feeder 7,000 Total Design Capacity: 19,500 Total SSLW: 2,642,500 Waste Structures Disignated Observed Type Identifier Closed Date Start Date Freeboard Freeboard Lagoon 7443-1 19.00 31.00 Lagoon 7443-2 19.00 83.00 Lagoon 7443-3 _E 19.00 50A0 Lagoon 7443-4 19.00 67.00 Lagoon DEPOT Lagoon DEPOT 1 19.00 Lagoon FINISHER Lagoon FINISHER 2 19.00 Lagoon NURSERY Lagoon NURSERY 3 19.00 Lagoon SOW Lagoon SOW 4 19.00 page: 2 Permit: AWS090004 Owner - Facility : Murphy -Brown LLC Facility Number: 090004 Inspection Date: 09/23/15 Inpsection Type: Compliance Inspection Beason for Visit: Routine Discharges & Stream ImpaCtS Yes No Na Ne 1. Is any discharge observed from any part of the operation? ❑ 0110 Discharge originated at: Structure ❑ Application Field ❑ Other ❑ a. Was conveyance man-made? ❑ 0 ❑ ❑ b. Did discharge reach Waters of the State? (if yes, notify DWQ) ❑ ■ ❑ ❑ c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (if yes, notify DWQ) ❑ 0 ❑ ❑ 2. Is there evidence of a past discharge from any part of the operation? ❑ 0 ❑ ❑ 3. Were there any observable adverse impacts or potential adverse impacts to Waters of the ❑ M ❑ ❑ State other than from a discharge? Waste Collection Storage & Treatment Yes No Na Ne 4. Is storage capacity less than adequate? ❑ ❑ ❑ If yes, is waste level into structural freeboard? ❑ 5. Are there any immediate threats to the integrity of any of the structures observed (Le./ large ❑ M ❑ ❑ trees, severe erosion, seepage, etc.)? 6. Are there structures on -site that are not properly addressed and/or managed through a ❑ M ❑ ❑ waste management or closure plan? 7. Do any of the structures need maintenance or improvement? ❑ M ❑ ❑ B. Do any of the structures tack adequate markers as required by the permit? (Not applicable ❑ 0 ❑ ❑ to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ M ❑ ❑ maintenance or improvement? Waste Application Yes No Na Ne 10. Are there any required buffers, setbacks, or compliance altematives that need ❑ ❑ ❑ maintenance or improvement? 11. Is there evidence of incorrect application? ❑ ❑ ❑ If yes, check the appropriate box below. Excessive Ponding? [] Hydraulic Overload? ❑ Frozen Ground? ❑ Heavy metals (Cu, Zn, etc)? ❑ PAN? ❑ Is PAN > 10%/10 lbs.? ❑ Total Phosphorus? ❑ Failure to incorporate manure/sludge into bare soil? ❑ Outside of acceptable crop window? ❑ Evidence of wind drift? ❑ Application outside of application area? ❑ page: 3 Permit: AWS090004 Owner - Facility : Murphy -Brown LLC Facility Number: 090004 Inspection Date: 09/23/15 Inpsection Type: Compliance Inspection Reason for Visit: Routine Waste Application Yes No No Ne Crop Type 1 coastal Bermuda Grass (Hey, Pasture) Crop Type 2 Small Grain Overseed Crop Type 3 Natural vegetation Crop Type 4 Crop Type 5 Crop Type 6 Soil Type 1 Centenary sand Soil Type 2 Wagram fine sand, 0 to 6% slopes Soil Type 3 Leon sand, 0 to 3% slopes Soil Type 4 Soil Type 5 Soil Type 6 14. Do the receiving crops differ from those designated in the Certified Animal Waste ❑ ■ ❑ ❑ Management Plan(CAWMP)? 15. Does the receiving crop and/or land application site need improvement? ❑ 0 ❑ ❑ 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre ❑ M ❑ ❑ determination? 17. Does the facility lack adequate acreage for land application? ❑ ❑ ❑ 18. Is there a lack of properly operating waste application equipment? ❑ ❑ ❑ Records and Documents Yes No Na No 19. Did the facility fail to have Certificate of Coverage and Permit readily available? ❑ 0 ❑ ❑ 20, Does the facility fail to have all components of the CAWMP readily available? [] 0 ❑ ❑ If yes, check the appropriate box below WU P? ❑ Checklists? ❑ Design? ❑ Maps? ❑ Lease Agreements? ❑ Other? ❑ If Other, please specify 21. Does record keeping need improvement? ❑ M ❑ ❑ If yes, check the appropriate box below. Waste Application? ❑ Weekly Freeboard? ❑ Waste Analysis? ❑ Soil analysis? ❑ Waste Transfers? ❑ Weather code? ❑ Rainfall? ❑ page: 4 Permit: AWS090D04 Owner - Facility : Murphy -Brown LLC Facility Number: 090004 Inspection Date: 09/23/15 Inppection Type: Compliance Inspection Reason for Visit: Routine Records and Documents Yes No Na No Stocking? ❑ Crop yields? ❑ 120 Minute inspections? ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey ❑ 22. Did the facility fail to install and maintain a rain gauge? ❑ E ❑ ❑ 23. If selected, did the facility fail to install and maintain a rainbreaker on irrigation equipment ❑ E ❑ ❑ (NPDES only)? 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ 0 ❑ ❑ 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check the ❑ ❑ ❑ appropriate box(es) below: Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon ❑ List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ E ❑ ❑ 27. Did the facility fail to secure a phosphorous loss assessment (PLAT) certification? ❑ E ❑ ❑ Other Issues Yes No Na Na 28. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ ❑ ❑ and report mortality rates that exceed normal rates? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, ❑ M ❑ ❑ contact a regional Air Quality representative immediately, 30, Did the facility fail to notify regional DWQ of emergency situations as required by Permit? ❑ E ❑ ❑ (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? ❑ ■ ❑ ❑ If yes, check the appropriate box below. Application Field ❑ Lagoon 1 Storage Pond ❑ Other ❑ If Other, please specify 32. Were any additional problems noted which cause non-comp[iance of the Permit or ❑ 0 ❑ ❑ CAWMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ 0 ❑ ❑ 34. Does the facility require a follow-up visit by same agency? ❑ 0 ❑ ❑ page: 5 U Division of Water Resources El Division of Soil and Water Conservation El Other Agency Facility Number: 090004 Facility Status: Active Permit: AWS090004 Inpsection Type: Compliance Inspection Inactive Or Closed Date: Reason for visit: Routine County: Bladen Region: Date of Visit: 08/20/2014 EntryTime: 11:30 am Exit Time: 12:30 pm Incident # Farm Name: Cain Complex Owner Email: Owner: Murphy -Brown LLC Phone: Mailing Address: PO Box 487 Warsaw NC 28398 Physical Address: 882 Opportunity Ln White Oak NC 28399 Facility Status: ECompliant ❑ Not Compliant Integrator: Murphy -Brown LLC Location of Farm: Latitude: 34' 45' 35" Longitude: 78° 40- 27" From Ammon take NC 242 South 2.4 miles, turn right onto SR 1325, go 5.9 miles to complex entrance on left. Question Areas: Dischrge & Stream Impacts Waste Col, Stor, & Treat Waste Application Records and Documents Other Issues ❑ Denied Access Fayetteville 910-296-1800 Certified Operator: John S Cain Operator Certification Number: 23570 Secondary OIC(s): On -Site Representative(s): 24 hour contact name On -site representative Primary Inspector: Inspector Signature: Secondary Inspector(s): Inspection Summary: Lagoon 4 is dry. Name Mike Ammons Mike Ammons Title Phone : Phone: Phone Robert Marble Phone: Date: page: 1 Permit: AWS090004 Owner - Facility : Murphy -Brown LLC Facility Number: 090004 Inspection Date: 08/20/14 Inpsection Type: Compliance Inspection Reason for Visit: Routine Regulated Operations Design Capacity Current promotions Swine Swine - Farrow to Wean Swine - Feeder to Finish Swine - Wean to Feeder Total Design Capacity: Total SSLW: Waste Structures Disignated Observed Type identifier Closed Date Start Date Freeboard Freeboard Lagoon 7443-1 19.00 Lagoon 7443-2 19.00 Lagoon 7443-3 19.00 Lagoon 7443-4 19.00 Lagoon DEPOT Lagoon DEPOT 1 19.00 Lagoon FINISHER Lagoon FINISHER 2 19.00 Lagoon NURSERY Lagoon NURSERY 3 19.00 Lagoon SOW Lagoon SOW 4 19.00 pages 2 Permit: AWS090004 Owner - Facility : Murphy -Brown LLC Facility Number: 090004 Inspection Date: 08/20/14 Inpsection Type: Compliance Inspection Reason for Visit: Routine DischaEgees & Stream Impacts Yes No Na No 1. Is any discharge observed from any part of the operation? ❑ M ❑ ❑ Discharge originated at: Structure ❑ Application Field ❑ Other ❑ a. Was conveyance man-made? ❑ M ❑ ❑ b. Did discharge reach Waters of the State? (if yes, notify DWQ) ❑ M ❑ ❑ c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (if yes, notify DWQ) ❑ 0 ❑ ❑ 2. Is there evidence of a past discharge from any part of the operation? El M ❑ ❑ 3. Were there any observable adverse impacts or potential adverse impacts to Waters of the ❑ 0 ❑ ❑ State other than from a discharge? Waste Collection, Storage & Treatment Yes No No No 4. Is storage capacity less than adequate? ❑ 0 ❑ ❑ If yes, is waste level into structural freeboard? ❑ 5. Are there any immediate threats to the integrity of any of the structures observed (Le./ large ❑ ■ ❑ ❑ trees, severe erosion, seepage, etc.)? 6. Are there structures on -site that are not properly addressed and/or managed through a ❑ ❑ ❑ waste management or closure plan? 7. Do any of the structures need maintenance or improvement? ❑ 0 ❑ ❑ 8. Do any of the structures lack adequate markers as required by the permit? (Not applicable ❑ 0 ❑ ❑ to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ M ❑ ❑ maintenance or improvement? Waste Application Yes No Na Ne 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ 0 ❑ ❑ maintenance or improvement? 11. Is there evidence of incorrect application? ❑ 0❑ ❑ If yes, check the appropriate box below. Excessive Ponding? ❑ Hydraulic Overload? ❑ Frozen Ground? ❑ Heavy metals (Cu, Zn, etc)? ❑ PAN? ❑ Is PAN > 10%/10 lbs.? ❑ Total Phosphorus? ❑ Failure to incorporate manure/sludge into bare soil? ❑ Outside of acceptable crop window? ❑ Evidence of wind drift? ❑ Application outside of application area? ❑ page: 3 Permit: AWS090004 Owner - Facility : Murphy -Brown LLC Facility Number: 090004 Inspection Date: 08/20/14 Inpsection Type: Compliance Inspection Reason for Visit: Routine Waste Appllcabon Yes No Na No Crop Type 1 Coastal Bermuda Grass (Hay, Pasture) Crop Type 2 Small Grain Overseed Crop Type 3 Natural Vegetation Crop Type 4 Crop Type 5 Crop Type 6 Soil Type 1 Centenary sand Soil Type 2 vvagram fine sand, 0 to 6% slopes Soil Type 3 Leon sand, 0 to 3% slopes Soil Type 4 Soil Type 5 Soil Type 6 14. Do the receiving crops differ from those designated in the Certified Animal Waste ❑ 0 ❑ ❑ Management Plan(CAWMP)? 15. Does the receiving crop and/or land application site need improvement? ❑ 0 ❑ ❑ 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre ❑ E ❑ ❑ determination? 17. Does the facility lack adequate acreage for land application? ❑ E ❑ ❑ 18. Is there a lack of properly operating waste application equipment? ❑ 0 ❑ ❑ Records and Documents Yes No N@ No 19. Did the facility fail to have Certificate of Coverage and Permit readily available? ❑ ❑ ❑ 20. Does the facility fail to have all components of the CAWMP readily available? ❑ N ❑ ❑ If yes, check the appropriate box below WUP? ❑ Checklists? ❑ Design? ❑ Maps? ❑ Lease Agreements? ❑ Other? ❑ If Other, please specify 21, Does record keeping need improvement? ❑ ■ ❑ ❑ If yes, check the appropriate box below. Waste Application? ❑ Weekly Freeboard? ❑ Waste Analysis? ❑ Soil analysis? ❑ Waste Transfers? ❑ Weather code? ❑ Rainfall? ❑ Page: 4 Permit: AWS090004 Owner - Facility : Murphy -Brown LLC Facility Number: 090004 Inspection Date: 08/20/14 Inpsection Type: Compliance Inspection Reason for Visit: Routine Records and Documents Yes No No Ne Stocking? ❑ Crop yields? ❑ 120 Minute inspections? ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey ❑ 22. Did the facility fail to install and maintain a rain gauge? ❑ 0 ❑ ❑ 23. If selected, did the facility fail to install and maintain a rainbreaker on irrigation equipment ❑ M ❑ ❑ (NPDES only)? 24, Did the facility fail to calibrate waste application equipment as required by the permit? ❑ 0 ❑ ❑ 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check the ❑ M ❑ ❑ appropriate box(es) below: Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon ❑ List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ M ❑ ❑ 27. Did the facility fail to secure a phosphorous loss assessment (PLAT) certification? ❑ 0 ❑ ❑ Other Issues Yes No Na Ne 28. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ 0 ❑ ❑ and report mortality rates that exceed normal rates? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, ❑ M ❑ ❑ contact a regional Air Quality representative immediately. 30. Did the facility fail to notify regional DWQ of emergency situations as required by Permit? ❑ M ❑ ❑ (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? ❑ ❑ ❑ If yes, check the appropriate box below. Application Field ❑ Lagoon / Storage Pond ❑ Other ❑ If Other, please specify 32. Were any additional problems noted which cause non-compliance of the Permit or ❑ 0 ❑ ❑ CAWMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ 0 ❑ ❑ 34. Does the facility require a follow-up visit by same agency? ❑ 0 ❑ ❑ page: 5 Division of Water Resources Division of Soil and Water Conservation ❑ Other Agency Facility Number: 090004 Facility Status: Active permit: AVVS090004 ❑ Denied Access Inppection Type: Compliance Inspection Inactive Or Closed Date: Reason for Visit: Routine County: Bladen Region: Fayetteville Rate of Visit: 10/21/2013 Entry Time: 10:00 am Exit Time: 11700 am Incident # Farm Name: Cain Complex Owner Email: Owner: Murphy -Brown LLC Phone: 910-296-1800 Mailing Address: PO Box 487 Warsaw NC 28398 Physical Address: 882 Opportunity Ln White Oak NC 28399 Facility Status: Compliant ❑ Not Compliant Integrator: Murphy -Brown LLC Location of Farm: Latitude: 34' 45' 35" Longitude: 78° 40' 27" From Ammon take NC 242 South 2.4 miles, turn right onto SR 1325, go 5.9 miles to complex entrance on left. Question Areas: Dischrge & Stream Impacts Waste Col, Slur, & Treat Waste Application Records and Documents Other Issues Certified Operator: William Victor Sutton Operator Certification Number: 26076 Secondary OIC(s): On -Site Representative(s): Name Title Phone 24 hour contact name Mike Ammons Phone On -site representative Mike Ammons Phone Primary Inspector: Robert Marble Phone: Inspector Signature: Date: Secondary Inspector(s): Inspection Summary: page: 1 Permit: AWS090004 Owner - Facility : Murphy -Brown LLC Facility Number: 090004 Inspection Date: 10/21/13 inpsection Type: Compliance Inspection Reason for Visit: Routine Regulated Operations Design Capacity Current promotions Swine Swine - Farrow to wean Swine - Feeder to Finish Swine - Wean to Feeder Total Design Capacity: Total SSLW: Waste Structures Designated Observed Type Identifier Closed Date Start Date Freeboard Freeboard Lagoon 7443-1 19.00 Lagoon T7443-2 19.00 Lagoon 7443-3 19.00 Lagoon 7443-4 19.00 Lagoon DEPOT Lagoon DEPOT.1 19.00 Lagoon FINISHER Lagoon FINISHER 2 19.00 Lagoon NURSERY Lagoon NURSERY 3 19.00 Lagoon SOW Lagoon SOW 4 19.00 page: 2 r Permit: AWS090004 Owner - Facility : Murphy -Brown LLC Facility Number: 090004 Inspection Date: 10/21/13 Inpsection Type: Compliance Inspection Reason for Visit: Routine Discharges & Stream Impacts Yes No Na No 1. Is any discharge observed from any part of the operation? ❑ 0 ❑ ❑ Discharge originated at: Structure ❑ Application Field ❑ Other ❑ a. Was conveyance man-made? ❑ ❑ ■ ❑ b. Did discharge reach Waters of the State? (if yes, notify DWQ) ❑ ❑ ❑ c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (if yes, notify DWQ) ❑ ❑ ❑ 2. Is there evidence of a past discharge from any part of the operation? ❑ E ❑ ❑ 3. Were there any observable adverse impacts or potential adverse impacts to Waters of the ❑ M ❑ ❑ State other than from a discharge? Waste Collection Storage & Treatment Yes No Na, No 4. Is storage capacity less than adequate? ❑ ❑ ❑ If yes, is waste level into structural freeboard? ❑ 5. Are there any immediate threats to the integrity of any of the structures observed (Le.l large ❑ M ❑ ❑ trees, severe erosion, seepage, etc.)? 6. Are there structures on -site that are not properly addressed and/or managed through a ❑ 0 ❑ ❑ waste management or closure plan? 7. Do any of the structures need maintenance or improvement? ❑ S ❑ ❑ 8. Do any of the structures lack adequate markers as required by the permit? (Not applicable ❑ 0 ❑ ❑ to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ M ❑ ❑ maintenance or improvement? Waste Application Yes No Na Ne 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ 0 ❑ ❑ maintenance or improvement? 11. Is there evidence of incorrect application? ❑ M ❑ ❑ If yes, check the appropriate box below. Excessive Ponding? ❑ Hydraulic Overload? ❑ Frozen Ground? ❑ Heavy metals (Cu, Zn, etc)? ❑ PAN? ❑ Is PAN > 10%l10 lbs.? ❑ Total Phosphorus? ❑ , Failure to incorporate manurelsludge into bare soil? ❑ Outside of acceptable crop window? ❑ Evidence of wind drift? ❑ Application outside of application area? ❑ page: 3 Permit: AWS090004 Owner - Facility : Murphy -Brown LLC Facility Number: 090004 Inspection Date: 10/21/13 Inpsection Type: Compliance Inspection Reason for Visit: Routine Waste Applicabon Yes No Na No Crop Type 1 Coastal Bermuda Grass (Hay, Pasture) Crop Type 2 Small Grain Overseed Crop Type 3 Natural Vegetation Crop Type 4 Crop Type 5 Crop Type 6 Soil Type 1 Centenary sand Soil Type 2 Leon sand, 0 to 3% slopes Soil Type 3 Wagram fine sand, 0 to 6% slopes Soil Type 4 Soil Type 5 Soil Type 6 14. Do the receiving crops differ from those designated in the Certified Animal Waste ❑ 0 ❑ ❑ Management Plan(CAWMP)? 15. Does the receiving crop and/or land application site need improvement? ❑ M ❑ ❑ 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre ❑ M ❑ ❑ determination? 17, Does the facility lack adequate acreage for land application? ❑ 0 ❑ ❑ 18, Is there a lack of properly operating waste application equipment? ❑ 0 ❑ ❑ Records and Documents Yes No Na Ne 19. Did the facility fail to have Certificate of Coverage and Permit readily available? ❑ M ❑ ❑ 20. Does the facility fail to have all components of the CAWMP readily available? ❑ 0 ❑ ❑ If yes, check the appropriate box below. WUP? ❑ Checklists? ❑ Design? ❑ Maps? ❑ Lease Agreements? ❑ Other? ❑ If Other, please specify 21. Does record keeping need improvement? ❑ 0 ❑ ❑ If yes, check the appropriate box below. Waste Application? ❑ Weekly Freeboard? ❑ Waste Analysis? ❑ Soil analysis? ❑ Waste Transfers? ❑ Weather code? ❑ Rainfall? ❑ page: 4 Permit: AWS090004 Owner - Facility : Murphy -Brown LLC Facility Number: 090004 Inspection Date: 10/21 /13 Inpsedon Type: Compliance Inspection Reason for Visit: Routine Records and Documents Yes No No No Stocking? ❑ Crop yields? ❑ 120 Minute inspections? ❑ Monthly and 1" Rainfall inspections ❑ Sludge Survey ❑ 22, Did the facility fail to install and maintain a rain gauge? ❑ M ❑ ❑ 23. If selected, did the facility fail to install and maintain a rainbreaker on irrigation equipment ❑ ❑ ❑ (NPDFS only)? 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ 01111 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check the ❑ 01111 appropriate box(es) below: Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon ❑ List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ M ❑ ❑ 27. Did the facility fail to secure a phosphorous loss assessment (PLAT) certification? ❑ ■ ❑ ❑ Other Issues Yes No No No 28. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ 0 ❑ ❑ and report mortality rates that exceed normal rates? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, ❑ M ❑ ❑ contact a regional Air Quality representative immediately. 30. Did the facility fail to notify regional DWQ of emergency situations as required by Permit? ❑ 0 ❑ ❑ (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? ❑ ❑ ❑ If yes, check the appropriate box below. Application Field ❑ Lagoon / Storage Pond ❑ Other ❑ If Other, please specify 32. Were any additional problems noted which cause non-compliance of the Permit or ❑ M ❑ ❑ CAWM P? 33. Did the Reviewer/Inspector fail to discuss reviewlinspection with on -site representative? ❑ M ❑ ❑ 34. Does the facility require a follow-up visit by same agency? ❑ 0 ❑ ❑ page: 5 Type of Visit: *Compliance Inspection 0 Operation Review O Structure Evaluation O Technical Assistance Reason for Visit: 0 Routine Q Complaint Q Follow-up O Referral O Emergency O Other O Denied Access Date of Visit: �'S� Arrival Time: Z', M Departure Timer County: 5� � Region: ` O lq L43 Qnn,' Farm Name: — Owner Email: Owner Name: r.�Oli1—r,. Phone: Mailing Address: Physical Address: Facility Contact: Wilk inthoy+s _Title: N Onsite Representative: Certified Operator: Back-up Operator: Location of Farm: Latitude: Phone: Integrator: P4 Certification Number: dip Certification Number: I S✓ Longitude: - � rt .Design Current - D gu Current Swine Capacity Pop. Wet Poultry Cap ity Pap. r Design Current Cattle Capacity Pop. Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish I ILayer I Dairy Cow 70M Non -La er I Dairy Calf D , Pouf Layers Ca'a�ci P,o , Dairy Heifer Dry Cow Non-Dairy Beef Stocker Gilts Non -Layers Beef Feeder Boars Pullets Beef Brood Cow Qther Turke s Turkey Poults Other Other Discharees and Stream Imnacts 1. Is any discharge observed from any part of the operation? ❑ Yes No i ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ No NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWQ) ❑ Yes ❑ No Qq NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWQ) ❑ Yes ❑ No 1�51 NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes No ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes No ❑ NA ❑ NE of the State other than from a discharge? Page l of 3 21412011 Continued Faotlity Nuanber: - Date of inspection- y 2 t— Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes P No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No �q NA ❑ NE Struc e I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: S Spillway?: Designed Freeboard (in): Observed Freeboard (in): u piZY 5. Are there any immediate threats to the integrity of any of the structures observed? [:]Yes No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes 0 No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes ® No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) T 9. Does any part of the waste management system other than the waste structures require ❑ Yes `1"' No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes `ham No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes M No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area � r 12. Crop Type(s): -6 ` RjerGM95 / , kv 13. Soil Type(s): C , wa'g- 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes FM No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes No ❑ NA ❑ NE lb. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes ( No ❑ NA ❑ NE acres determination? T 17. Does the facility lack adequate acreage for land application? 18. Is there a lack of properly operating waste application equipment? Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check the appropriate box. ❑WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑ Yes ep No ❑ Yes No [:]Yes [P No ❑ Yes `p No ❑ Other: ❑ NA ❑ NE ❑ NA ❑ NE [] NA ❑ NE ❑ NA ❑ NE 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ YesIs No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste fers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections [:]Monthly and V Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE Page 2 of 3 21412011 Continued FaeiliNumber: jDate of Inspection: 2_ 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: ❑ Yes Qa No []Yes �§ No ❑NA ❑NE ❑NA ❑NE ❑ Yes P No ❑ NA ❑ NE ❑ Yes Q§ No ❑ NA ❑ NE ❑ Yes ® No ❑ NA ❑ NE ❑ Yes Qa No ❑ NA ❑ NE 32. Were any additional problems noted which cause non-compliance of the permit or CAV*rw? ❑ Yes No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ® No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes T No ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations (use additional pages as necessary). 0kX Reviewer/Inspector Name: Reviewer/Inspector Signature: Page 3 of 3 �L� Phone: ?to-'Y; j3- 3W Date: 21412011 Type of Visit: 0 Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: 0 Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Arrival Time: .ems Departure Time: lqp County: 13 Farm Name: `l ^- l_QA r\ CD r-rl Owner Email: Owner Name:u,y�p�..t -?,�.Ow vt , LLC Phone: Mailing Address: Physical Address: Region: F02D Facility Contact: jLA �-e -Am "ns Title: Phone: Onsite Representative: Integrator: h w - 1 Certified Operator: �p n (n� n Certification Number: 2.3-5-70 Back-up Operator: to I'6 rvt p rL5 Certification Number: 90 5 I0 Location of Farm: Latitude: Longitude: Design Current Design Cnrrept Deslgn Current Swine C•agacity Pop.Poultry C►apacity Pop. Cattle Capacity Pop. Wean to Finish La er Dairy Cow Wean to Feeder Non -La er Dai Calf Feeder to Finish 10 Dairy Heifer Farrow to Wean Farrow to Feeder Design ci Current P,o Dry Cow Non -Dairy Farrow to Finish La ers Beef Stocker Gilts Non -La ers Beef Feeder Boars Pullets Turke s Beef Brood Cow t?ther Turkey Poults Other 1� Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? Page I of 3 ❑ Yes ;D No ❑ NA ❑ NE [—]Yes ❑ No [-]Yes [:]No �NA ❑NE �NA ❑NE ❑ Yes ❑ No PNA ❑ NE ❑ Yes In No ❑ NA ❑ NE [a Yes F No ❑ NA ❑ NE .214/2011 Continued Facili Number: - Date of Inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes P No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ® NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: N J F .150 Spillway?: Designed Freeboard (in): re Observed Freeboard (in): 101, �yu Q 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes 0 No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes `f1 No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes N No [DNA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes [$a No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes P No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE maintenance or improvement? 1p 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes W No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window %� �❑ Evidence of Wind Drift ❑ Application Outside ofApprovedArea 12. Crop Type(s): C�a_Q k r1j�[{J� LJ'rl�a' i��i �Jh � D{JQ/ �/ j hR /Irees /I --�— ,i ,- a . n t a 13. Soil Type(s): :1!1 14. Do the receiving crops differ from those designated in the CAWMP? [:]Yes ® No �� ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes No D NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes [� No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes] No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? if yes, check ❑ Yes ® No ❑ NA ❑ NE the appropriate box. 7� ❑WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes ® No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes [;9 No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ® No ❑ NA ❑ NE Page 2 of 3 T 21412011 Continued y.Y Facility Number: jDate of Inspection: 11,0111 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes the appropriate box(es) below. ❑ Failure to complete annual sludge survey 0 Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: No ❑ NA ❑ NE No ❑ NA ❑ NE 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes No ❑ NA ❑ NE Other issues 28- Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately- 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes W No ❑ NA ❑ NE Comments (refer to question ft Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations (use additional vases as necessarv). 514C 411'_Sl� corjua�j pe,lS red k ewea( Reviewer/Inspector Name: Reviewer/Inspector Signature: Page 3 of 3 elln Phone: 9IV"t ✓ J �✓�.(J Date: 4 2D 214120; l j Type of Visit 0 Compliance Inspection Q Operation Review O Structure Evaluation O Technical Assistance Reason for Visit 4PRoutine Q Complaint 0 Follow up O Referral O Emergency O Other ❑ Denied Access Q� Date of Visit: vor"Gp?�Ieh(— Arrival Time: ®r Departure Time: County: Region:Farm Name: I 1 L13-�Ownner Email: Owner Name: /' 9wmf Mailing Address: Physical Address: Facility Contact: � I/� 'le`hDGi�s _Title: y Onsite Representative: Certified Operator: Back-up Operator: Location of Farm: Phone: Phone No. Integrator: r Op� ertification Number: 92 Back-up Certification Number: Latitude: 0 c = ' ❑ " Longitude: ❑ 0 0 d = it Design Current `U'esign Current Design C►urrent Swine Capacity Population Wet Poultry Capacity Population Cattle C•apaci#y Population ❑ Wean to Finish ❑ La er ❑ Dairy Cow Wean to Feeder ❑Non -La er ❑ Dairy Calf Feeder to Finish 0 z:- ' ` Y ❑ DairyHeifer Farrow to Wean Dry Poultry r ❑ Dry Cow r' Farrow to Feeder` ❑ La ers Non -Dairy ❑ Farrow to Finish El Beef Stocker ❑ Gilts ❑Non -La Non -Layers ❑ Beef Feeder �❑Boars El Pullets ❑Beef Brood Cowi - ❑ Turke s "Other ❑ Turkey Poults.„k ❑ Other ❑ Other Numtiefaof Structures: Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes r No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? ❑ Yes ❑ No NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWQ) ❑ Yes ❑ No NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) ❑ Yes ❑ No NA /❑ ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes No NA ❑ NE 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State ❑ Yes 1P No ❑ NA ❑ NE other than from a discharge? Page I of 3 12128104 Continued OQ Facility Number: Date of Inspection Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes )21 No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No to NA ❑ NE tructure 1 ActurL Structure3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes 'on No ❑ NA ❑ NE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes No ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7_ Do any of the structures need maintenance or improvement? ❑ Yes No ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit'? ❑ Yes No ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require Yes No ❑ ❑ NA NE maintenance or improvement? ❑ Waste ADDliCatiOn 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes {Q] No ❑ NA ❑ NE maintenance/improvement? {{ 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes 1P No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Malit indow ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) A PWtte) 5r, Gza, (JIQfI�J Ae 47,-Q,,� 13. Soil type(s) 010 l WL(.tI/ 14. Do the receiving crops differ from those designated in the CAWMP? 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ❑ Yes 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination ? ❑ Yes 17. Does the facility lack adequate acreage for land application? ❑ Yes 18. Is there a lack of properly operating waste application equipment? ❑ Yes �?No ❑ NA ❑ NE 1P No ❑ NA ❑ NE No ❑ NA ❑ NE No ❑ NA ❑ NE IP No ❑ NA ❑ NE IComments (refer to question #): Explain any YES answers and/or any recommendations or any other comments. I Use drawings of facility to better explain situations. (use additional pages as necessary): Reviewer/inspector Name r �— --� Phone: Reviewer/Inspector Signature: Date: /D rage z of -i LL/6dVU4 Lonrinuea Facility Number: — Date of Inspection WIVO Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes P No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes 1PNo ❑ NA ❑ NE the appropriate box. ❑ WUp ❑ Checklists ❑ Desig n El Maps El Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes 9allo ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes 1PNo ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes AQNo ❑ NA ❑ NE 24. Did the facility fait to calibrate waste application equipment as required by the permit? ❑ Yes ONo ❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes No ❑ NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes PNo ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes �9 No ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes W'No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes ?No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes 10 No ❑ NA [INE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes Ep No ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes O No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes EpNo ❑ NA ❑ NE Additional Comments and/or Drawings:' Page 3 of 3 12128104 Type of Visit 4P Compliance inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit r Routine 0 Complaint 0 Follow up 0 Referral 0 Emergency 0 Other ❑ Denied Access Date of Visit: Arrival Time: Departure Time: 0 /O �'7Lj � Farm Name: t /I I �I 3 _ Own County: Region: r` er Email: Owner Name: Phone: Mailing Address: Physical Address: �,�AA Facility Contact: /I�l l m014��. _._ Title: Phone No: Onsite Representative: I f Integrator: tL(� Certified Operator: �ro-.SA R+''{'I Operator Certification Number: �z ��� Back-up Operator: Back-up Certification Number: Location of Farm: Latitude: = e 0 I = " Longitude: 0 ° =' ED « 11 Design Current Design Current Design Current Swine Capacity Population Wet Poultry Capacity Population @attle Capacity Population ❑ Wean to Finish ❑ Layer ❑ Dairy Cow Wean to Feeder r7 CW ❑ Non -Layer ❑ Dairy Calf Feeder to Finish Dairy Heifer Dry Poultry ❑ Dry Cow ❑ Non -Dairy ❑ La ers Farrow to Wean a Farrow to Feeder ❑ Farrow to Finish ❑ Beef Stocker on -Layers ❑ Pullets ❑Beef Feeder ❑ Beef Brood Co ❑ Turkeys ❑ Gilts ❑ Boars Other ❑ Turkey Pouits ❑ Other ❑ Other Number of Structures: Discharges & Stream impacts 1. Is any discharge observed from any part of the operation? ❑ Yes 'PNo ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? ❑ Yes ❑ No [�l NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWQ) ❑ Yes ❑ No NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) ❑ Yes ❑ No t�NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes [9�.No ❑ NA ❑ NE 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State ❑ Yes `�No El NA El NE other than from a discharge? `` Page I of 3 12128,104 Continued Facility Number: — Date of Inspection Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a. If yes, is waste level into the structural freeboard? Structure 1 Structure 2 Struct re Structure 4 c � Identifier: I SO Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes P No ❑ NA ❑ NE []Yes [:]No In NA ❑ NE Structure 5 Structure 6 ❑ Yes PNo ❑ NA ❑ NE ❑ Yes Jjj No ❑ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes 1PNo ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes No ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement'? l Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes YyNo ❑ NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes V% No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 Ibs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes P No 15. Does the receiving crop and/or land application site need improvement? ❑ Yes 10 No 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination?[:] Yes ONo 17. Does the facility lack adequate acreage for land application? ❑ Yes P9 No 18. Is there a lack of properly operating waste application equipment? ❑ Yes P No ❑ NA ❑ NE ❑ NA ❑ NE ❑NA El NE ❑ NA ❑ NE ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers aadtor any recammendatians or any other comments. Use drawings of facility to better explain situations. (nse additional pages as necessary): rq1 ��r ReviewerlInspector Name 4 ` Phone: Reviewer/Inspector Signature: Date: Page 2 of 3 12128104 Continued Facility Number: — Date of Inspection I _T__► _HY Il Required Records & Documents � 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes PNo El NA El NE 20. Does the facility fail to have all components of the CAWMP readily available? if yes, check ❑ Yes 0 No ❑ NA ❑ NE the appropirate box. ❑ WUP ❑ Checklists ❑ Desig n ❑ Maps ❑ Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes P No ElNA ❑ NE [IWaste Application ElWeekly Freeboard ElWaste Analysis ❑ Soil Analysis ElWaste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes e] No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes 0 No ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes 1PNo ❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes (ONo ❑ NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes MNo ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes bnNo [INA ElNE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes [ No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes 10 No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes No ❑ NA ❑ NE General Permit? (iel discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes] No ❑ NA ❑ NE Page 3 of 3 12128104 r Type of Visit (),C5`mpliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit Routine 0 Complaint 0 Follow up 0 Referral 0 Emergency 0 Other ❑Denied Access Date of Visit: 11;2__7y,V Arrival Time: Departure Time: •�� County: /� Farm Name: C_ Gt It rt �ffim� k Owner Email: Owner Name: zi Lr,4&ajyt 116 Phone: _ Mailing Address: Region: �[2 Physical Address: Facility Contact: !r u Title: Phone No: g/D--,y776--OG y� Onsite Representative: --��-- J'f�^--� Integrator: N Certified Operator:� jiA -- �"r�i' Operator Certification Number: Back-up Operator: Back-up Certification Number: Location of Farm: Latitude: ❑ u [= f ❑ t. Longitude: ❑ ° ❑ ❑ ds Design Current Design C++urgent Design Current Swine Capacity Population Wet Poultry Capacity Population ...-- Cattle Capacity Population ❑ Wean to Finish ❑ Layer ❑ DairyCow 50 ❑ Dai Calf Feeder to Finish pop /12000 ❑ Dai Heifer Farrow to Wean O Dry Poultry } ❑ Da Cow $, ❑ Farrow to Feeder` rs [I Non -Dairy ❑ Farrow to Finish ❑ Lavers ❑ Beef Stocker ❑ Gilts ❑ Non -Layers El Beef Feeder ❑ Boars ❑ Pullets ❑ Beef Brood Cowl ❑ Turkeys _ Other ❑ TurkeyPoults r;=-�_1 ❑ Other ❑ Other �- Number of Structures: Discharges Wean to Feeder p� p O ❑Non -La er &Stream Impacts . Is any discharge observed from any part of the operation'? ❑Yes $4 No ❑ NA ❑ NE Discharge originated at: El Structure El Application Field El Other a. Was the conveyance man-made'? El Yes ❑ No ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWQ) El Yes ❑ No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system`? (If yes. notif}' D1ItirQ) ❑Yes ❑ No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? El Yes A No ❑ NA ❑ NE 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State El Yes 14 No ❑ NA ❑ NE other than ls-om a discharge? Page 1 of 3 I2/28/04 Continued Facility Number: — ® Date of Inspection D Waste Collection & 'Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes B-No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure I Structure, 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: 41116e,,IK Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes �Rj No ❑ NA ❑ NE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes JZ No ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ igio 7. Do any of the structures need maintenance or improvement? Ryes Iffo ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes El ❑ NA El NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes W No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes PNo ❑ NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes 5-No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) [:]PAN ❑ PAN > 10% or 10 Ibs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ElEvidence of Wind Drift ElApplication Outside of Area 12. Crop type(s) Ze "'!7 --t 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes [XNo ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes U No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination?❑ Yes R No ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application'? ❑ Yes R No ❑ NA ❑ NE 18, is there a lack of properly operating waste application equipment? ❑ Yes 9 No ❑ NA ❑ NE Comments (refer to question ft Explain any YES answers and/or any recommendations or any other comments. Use drawings of facility to better explain situations. (use additional pages as necessary): Reviewer/Inspector Name r. Phone: �j /y-33�37aO Reviewer/inspector Signature: Date: 12128104 Continued .I Facility Number: �0' —O!y I Date of Inspection LZ Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes ® No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes & No ❑ NA ❑ NE the appropiatc box. ❑ WUP ❑ Checklists ❑ Design ❑ Maps []Other 21. Does record keeping need improvement? if yes, check the appropriate box below. ❑ Yes ®-No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes [5No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? . ❑ Yes �9 No ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes 9 No ❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes [3No ❑ NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes % No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes BNo ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes MNo ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes (,� No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ® No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes No ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes No ❑ NA ❑ NE 12128104 Type of Visit &Compliance Inspection O Operation Review Q Structure Evaluation O Technical Assistance Reason for Visit outine O Complaint O Follow up O Referral O Emergency O Other ❑ Denied Access Date of Visit: [ Arrival Time: � i0 Ot Departure Time: County: Farm Name: L1213_ - __ J!::1m 2L eY, Owner Email: Owner Name: 7&ii/iSf Lf� _ aoezm_S Phone: Mailing Address: Physical Address: Facility Contact: Title: Onsite Representative:��.-,_� Certified Operator:. .�e� Back-up Operator: Location of Farm: Swine Phone No: Integrator: Operator Certific ton Number: Back-up Certification Number: Region: Latitude: [= Q = , Longitude: 0 ° = ❑ u Design Current Design Current Capacity Population Wet Poultry Capacity Population h �.❑Layer r Da O D to !..-❑ Non -La et ❑ Wean to Finis 29 Wean to Feede 0 Feeder to Finish DOOD DD00 Farrow to Wean 0 a El Farrow to Feeder El Farrow to Finish ❑ Gilts ❑ Boars Other ❑ Other Dry Poultry ❑ Layers ElNon-Layers El Pullets ElTurkeys ElTurke Poults El Other Discharges & Stream impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field El Other a. Was the conveyance man-made'? Design. Current Cattle Capacity Population El Dairy Cow El Dairy Calf [I Dairy Heife3 El Dry Cow ElNon-Dairy El Beef Stocker El Beef Feeder El Beef Brood Cow Number of Structures: �iyf b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the ,.vaste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes [9No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ NA ❑ NE ❑ Yes ❑ No ❑ Yes 0 No ❑ NA ❑ NE ❑ Yes (WNo ❑ NA ❑ NE 12128104 Continued Facility Number: — Date of Inspection Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes & No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Fi p _ttr t —5buJ TfVjjlsl Spillway?: Designed Freeboard (in): Observed Freeboard (in): `� —� p� C) yr 41 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes 10 No ❑ NA ❑ NE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes J& No ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? W Yes ❑ No ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes J@ No ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes 60 No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes LANo ❑ NA ❑ NE maintenance/improvement? 11. is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes ® No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) / 13. Soil type(s) / - C= �� A Lt a's 14. Do the receiving crops differ from those designated in the CAWMP? 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ❑ Yes 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination ? ❑ Yes 17. Does the facility lack adequate acreage for land application? ❑ Yes 18. Is there a lack of properly operating waste application equipment? ❑ Yes P No ❑ NA ❑ NE 14 No ❑ NA ❑ NE �f No ❑ NA ❑ NE No ❑ NA ❑ NE V]No [I NA El NE Comments (refer to question ft Explain any YES answers and/or any recommendations or any other comments. Use drawings of facility to better explain situations. (use additional pages as necessary): {,rj Reviewer/Inspector Name j T�-�--�� Phone: 9jp-3�3 3D0 r Reviewer/Inspector Signature: Date: Page 2 of 3 12128104 Continued Facility Number: — Date of Inspection 114 Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes 10 No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes 25 No ❑ NA ❑ NE the appropriate box. ❑ WUP ❑ Checklists ❑ Desig n El Maps El other 21. Does record keeping need improvement? If yes, check the appropriate box below. Yes ❑ No ❑ NA ❑ NE •Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? 24. Did the facility fail to calibrate waste application equipment as required by the permit? 25. Did the facility fail to conduct a sludge survey as required by the permit? 26. Did the facility fail to have an actively certified operator in charge? 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 33. Does facility require a follow-up visit by same agency? Comments and/or Drawings: QD_5' nad ❑ Yes ® No ❑ NA ❑ NE ❑ Yes 4 No ❑ NA ❑ NE ❑ Yes FM No El NA El NE ❑ Yes C&No ❑ NA ❑ NE ❑ Yes IMNo ❑ NA El NE ❑ Yes ® No ❑ NA ❑ NE ❑ Yes UNo ❑ NA ❑ NE' ❑ Yes No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes [KNo []NA [:]NE ❑ Yes 1,No ❑ NA ❑ NE ❑ Yes [9 No ❑ NA ❑ NE Page 3 of 12128104 I -- ® Division 01' _ter Quality �Faeility Number 9 1® �jL Q Division of 5oi1 and Water Conservation 0 Other Agency Type of Visit ®Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit 4W Routine 0 Complaint 0 Follow up 0 Referral 0 Emergency 0 Other ❑ Denied Access Date of Visit: Arrival Time: Departure Time: f Z ; County: BlQclC.y Region: Farm Name: . w ("AAA ] -e- JQ _ Owner Email: l Owner Name: . _K Jest-.1'�I Phone: Mailing Address: Physical Address: Facility Contact: Title: Onsite Representative: plat4j �u vise Certified Operator: Back-up Operator: Phone No: Integrator: Operator Certification Number: Back-up Certification Number: Location of Farm: Latitude: E=1 o El' =" Longitude: = ° 0 I = u Design Current Design Current Design Current Swine Capacity Popufatian Wet Poultry Capacity Popu r Cattle Capacity Population ❑ Wean to Finish ❑ La er ❑Non -La er x DrY Poulit'ryxi' ❑ Dairy Cow Wean to Feeder ❑ Dairy Calf Feeder to Finish Dairy Heifer ® Farrow to Wean 00 El Dry Cow ❑ Farrow to Feeder` El Farrow to Finish ❑ N erson-Laers on-Layers❑ ❑ El Pullets ti ❑ Turkeys ❑ Turkey Poults El Beef Stocker ❑ Gilts ❑ Beef Feeder ❑Boars ❑Beef Brood Cold - ,...,: Other µ Number o#'Structures: ❑ Other ❑ Other Discharges & Stream Impacts 1. is any discharge observed from any part of the operation? ❑ Yes [91 No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? ❑ Yes [R No ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWQ) ❑ Yes 1�1 No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) ❑ Yes M No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes E4 No ❑ NA ❑ NE 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State ❑ Yes V No ❑ NA ❑ NE other than from a discharge'? Page I of 3 12128104 Continued r i, Facility Number: — Date of Inspection Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes [9 No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes 0 No ❑ NA ❑ NE Structure 1 Structure Structure 3 Structure 4 Structure 5 Structure 6 Identifier: DePo+( 7VY_?- F`uAsL� 4�V3 3 N 1rl13-2 $o �` 3-/ Spillway?: Designed Freeboard (in): / 9.r Observed Freeboard (in): .39 7 � , 3 zr 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes [0 No ❑ NA ❑ NE (iel large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes pfNo ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes [� No ❑ NA ❑ NE S. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes No ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) T 9. Does any part of the waste management system other than the waste structures require ❑ Yes No [INA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes [;9 No ❑ NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes [RNo ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) (--]PAN ❑ PAN > 10% or l0 Ibs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) tSCVk&"e-.. Swrr_// (s n i 13. Soil type(s) T 14. Do the receiving crops differ from those designated in the CA WMP? ❑ Yes DO No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes [9 No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination'? ❑ Yes [;I No ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes [ZfNo ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes [:NNo ❑ NA ❑ NE Comments (refer to question: Explain any YESanswers and/or any recommendations or any other comments [Ise.drawtngs;of.faciliry to better explain plain situatton�s, (use additional pages as necessary): 3 Reviewer/Inspector Name G fze4dS Phone:(910) $ Reviewer/Inspector Signature: Date: (p-©7- ZUA ►-age t of s 12128104 Continued 1� Facility Number: Q' -041 1 Date of Inspection 4-07-0 Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes (A No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes 1�9 No ❑ NA ❑ NE the appropriate box. ❑ WUp ❑ Checklists ❑ Desig n El Maps El Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes [51 No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and l" Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes to No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes [0 No ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes [RNo ❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes 151 No ❑ NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes (A No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes M No ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes [2 No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes [HNo ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes PYNo ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 3 L Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes �dNo ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes [YPNo ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes RYNo ❑ NA ❑ NE Additional Comments and/or Drawings: x, Page 3 of 3 12128104 Type of Visit Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit 0 Routine 0 Complaint 0 Follow up 0 Referral 0 Emergency 0 Other ❑ Denied Access Date of Visit: Arrival Time: (' ; Departure Time: ; t) f] County: ffi�Region: /F90 Farm Name: e " ► - Owner Email: Owner Name: `ta ✓ Phone: Mailing Address: /� a f RVA .z � 3Y !�,' Physical Address: .5.V 1 a oz Facility Contact: ��'h��L�N�.ti'Nri Title: Onsite Representative: /Tics s: r— IP' �,1 e r/ Certified Operator: Back-up Operator: Location of Farm: Swine Phone No: %G 061 Integrator: /tIk��►� Operator Certification Number: 624. Back-up Certification Number: Latitude: ❑ o [= ❑ Longitude: = o E ❑ u Design Current Design Current Capacity Population Wet Poultry Capacity Population ' ❑ Layer DDO ❑Non -La ei ❑ Wean to Finish Wean to Feeder Feeder to Finish c> (Farrow to Wean D�7 El Farrow to Feeder El Farrow to Finish ❑ Gilts ❑ Soars Other ❑ Other ' Dry Poultry [__1Layers ElNon-Layers El Pullets ElTurkeys [EllTurke Poults ❑ Other Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation'? Discharge originated at: ❑ Structure El Application Field El other a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (if yes, notify DWQ) Design Current Cattle Capacity Population El Dairy Cow El Dairy Calf El Dairy Heifei El Dry Cow ❑ Non -Dairy ❑ Beef Stocker ❑ Beef Feeder ❑ Beef Brood Co c. What is the estimated volume that reached waters of the State (gallons)? Number of Structures:R] d. Does discharge bypass the waste management system'? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 1 Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes M No ❑ NA ❑ NE ❑ Yes [0 No ❑ NA ❑ NE ❑ Yes CK No ❑ NA ❑ NE ❑ Yes R No ❑ NA ❑ NE ❑ Yes MNo ❑ NA ❑ NE ❑ Yes M No ❑ NA ❑ NE 12128104 Continued Facility number: Date of Inspection --O Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes RBI No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes No ❑ NA ❑ NE Structure I Structure 22 Structure 3 Structure 4 Structure 5 Structure 6 Identifier:' ' Jwr.t ►Z i, h .. it Spillway?: Designed Freeboard (in):.. x- A ,a """ Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ yes No ❑ NA ❑ NE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes Z No ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? RSYes NNo ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes X No ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes RNo ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes EKNo ❑ NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes 9jNo ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crap type(s) .d*/3ri'n�ua/e� rZ/y o� Gruzc / See l/•`�- 13. Soil type(s) ry 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes i4 No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes IQNo ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination,[] yes ® No ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes RNo ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes CNo ❑ NA ❑ NE Comments (refer to question #}: Explain any YES answers and/or any recommendations or any other comments. ro Use drawings of facility to better explain situations. (use addition_! pages as necessary): (Ocpnrho ' G�vrf: i�ti w� i .7�e �+'1' � .5 cam'+ Reviewer/Inspector Name f rl Phone: Reviewer/Inspector Signature: Date: 1i_7--OS 12128104 Continued Facility'Number: p —p Date of Inspection Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available'? ❑ Yes KNo ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes 54 No ❑ NA ❑ NE the appropirate box_ ❑ WUP ❑Checklists El Design ❑Maps ❑Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes R No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes [I No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes E&No ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes 54No ❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes ® No ❑ NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes [A No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes f)? No ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes Z No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes [K No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes 'No ❑ NA ElNE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ®.No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes ja No ❑ NA ❑ NE Addl[tip4alCori7lllentS;sQd/or"Dra�S'Iitp6S:;i_! Iy '�. u.( ii ,H I2/2&04