Loading...
HomeMy WebLinkAboutSW3130302_NOV_20190212Energy, Mineral and Land Resources ENVIRONMENTAL QUALITY February 12, 2019 CERTIFIED MAIL RETURN RECEIPT REQUESTED Love's Travel Stops & Country Stores Attention: Director of Real Estate and Development Post Office Box 26210 Oklahoma City, Oklahoma 73126 Love's Travel Stops & Country Store Attention: J.T. Ross 1105 Peeler Road Salisbury, North Carolina 28146 Subject: NOTICE OF VIOLATION Love's Travel Stops & Country Store SW3130302 1105 Peeler Road Salisbury, North Carolina 28146 Dear Sir or Madame: ROY COOPER Gownnr MICHAEL S. REGAN Secretary S. DANIEL SMITH fnlerim Director 7016 1370 0000 2595 9225 7016 1370 0000 2595 9232 REOFIVED FEB 19 2019 DENR-LAND QUALITY STORMWATER PERMITTING No\/ - klq-pG - v � On February 6, 2019 NCDEQ Land Quality staff inspected the subject facility for compliance with the State Stormwater Post Construction Permit SW3130302. Based on the inspection and lack of maintenance and possible oil/diesel release/impacts to the BMPs, the site is not in compliance. Please see the attached inspection report. Also, as part of the response please evaluate operational changes that can be implemented to prevent future BMP impacts. Required Response: Accordingly, you are directed to respond to this letter in writing Nvithin 15 calendar days of receipt of this Notice. Your response should be sent to this office at the letterhead address. Pursuant to G.S. 143-215.6A, State of North Carolina I Environmental Quality I Energy, Mineral and land Resources Mooresville Regional Office 1610 East Center Ave Ste 301 1 Mooresvillc, NC 2S115 704 663 1699 T Love's Truck Stops & Country Stores Notice of Violation February 12, 2019 Page 2 of 2 these violations and any future violations are subject to a civil penalty assessment of up to a maximum of $25,000.00 per day for each violation. Your above -mentioned response to this correspondence, the degree and extent of harm to the environment and the duration and gravity of the violation(s) will be considered in any civil penalty assessment process that may occur. Should you have any questions regarding these matters, please contact Angela Lee at(704) 235-2139. Sincerely, 3_e_� S . l(__ Zahid S. Khan, CPM, CPESC, CPSWQ Regional Engineer AL/cys Attached: Inspection Report cc: entra' ffice "Stormwater Permitting Program Compliance Inspection Report Permit: SW3130302 Effective:03/26/13 Expiration: 03/26/21 Project: Love's Travel Stops & Country Stores Inc Owner: Love's Travel Stops & Country Stores Inc County: Rowan Adress: 1105 Peeler Rd Region: Mooresville City/State/Zip: Salisbury NC 28146 Contact Person: J T Ross Title: Phone: 405-302-6725 Directions to Project: southwest quadrant of the intersection of 1-85 exit #71 at peeler rd head south 200 ft site on rt (existing prior truck stop) Type of Project: State Stormwater - HD - Sand filters Drain Areas: F1 -(Town Creek) (03-07-04) ( C) On -Site Representative(s): Related Permits: Inspection Date: 02/06/2019 Primary Inspector: Angela Y Lee Secondary Inspector(s): James D Moore State Stormwater - Redevelopment Entry Time: 02:40PM Reason for Inspection: Routine Permit Inspection Type: State Stormwater Facility Status: ❑ Compliant N Not Compliant Question Areas: ® State Stormwater (See attachment summary) Exit Time: 03:OOPM Phone: 704-235-2139 Inspection Type: Compliance Evaluation page: 1 permit: SW3130302 Owner - Project: Love's Travel Stops & Country Stores Inc Inspection Date: 02/06/2019 Inspection Type Compliance Evaluation Reason for Visit: Routine Inspection Summary: A Notive of Violation is recommended based on this inspection. File Review Yes No NA NE Is the permit active? 0 ❑ ❑ ❑ Signed copy of the Engineer's certification is in the file? ❑ N ❑ ❑ Signed copy of the Operation & Maintenance Agreement is in the file? ❑ ❑ ❑ Copy of the recorded deed restrictions is in the file? ❑ E ❑ ❑ Comment: Please provide the Designer's certification and a copy of the recorded deed restrictions._ SW Measures Yes No NA NE Are the SW measures constructed as per the approved plans? ® ❑ ❑ ❑ Are the inlets located per the approved plans? ® ❑ ❑ ❑ Are the outlet structures located per the approved plans? 0 ❑ ❑ ❑ Comment: Operation and Maintenance Yes No NA NE Are the SW measures being maintained and operated as per the permit requirements? ❑ ®❑ ❑ Are the SW BMP inspection and maintenance records complete and available for review or provided to ❑ ®❑ ❑ DWQ upon request? Comment: It appears there has been an oil/diesel fuel release that has impacted the basins. All cells must be cleaned out and replaced with appropriate media to restore to as built conditions. A NOV is recommended based on site conditions and no maintenance. Please provide inspection and maintenance records. page: 2