Loading...
HomeMy WebLinkAbout20190396 Ver 1_R.128_Permit_Plans_2019-03-21_20190401i � � � � � 0 � a � � � T � � N � + L E L a � � � .3 0 L � � � � 0 C N � � � � a U .- m oa L� �oo � T� —Lo �/C M L? 00 N � • � 0 � � � � • � �Q � � V � O � � ., � V � � O V SR 1637 (JACK'S BRAIVCH ROAD) � STRUCTURE S URFACE WATER IMPACTS PERMIT /11 ry0 ZP �� 0 �� I�I DBBCRIOTION P.E. R /W & UTIL CONSTRUCTION ,. .., . � .+�������1���►����� �L1ii�������i11�'i#k r�1�r�d►��ii i�'��#''��"� � �'�t END AROJECT WBS 17BA.IO.R.128 /� �' i i /, THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUA'DARIES. � 6 CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS EST.9BLISHED BY METHOD IL % / GRAPHIC SCALES DESIGN DATA PROJECT LENGTH 20 l0 0 20 40 PLANS 20 l0 0 20 40 PROFILE (HORIZONTAL) 4 2 0 4 8 PROFILE (VERTICAL) ADT 2014 = 150 ADT 2025 = 300 DHV = N/A D = N/A T = 6% V = 45 MPH FUNC. CLASSIFICATION: LOCAL ����� �� ����� �������� �������� �� �������� 'AT8 STAT6 PROl8C1' R6P6R6NC8 N6 ��� 17BP.10.R.128 srwre vaa.Hn r.n.mta.Na 17BP.10.R.128 17BP.10.R.128 17BP.10.R.128 A1�S01� CO U1�TY LOCATI0111: BRIDGE #234 OVER CABBAGE BRANCH 01V TYPE OF WORK GRADI11lG, PAVI11lG, DRAI11lAGE, Permit Drawing Sheet � of 9 LEIVGTH OF ROADWAY PROJECT WBS I7BP.IO.R.128 =.095 MILES LEIVGTH OF STRUCTURE PROJECT WBS I7BP.IO.R.128 =.005 MILES TOTAL LEIVGTH OF PROJECT WBS 17BP.IO.R.128 =.100 MILES NCDOT CONTACT: GARLAND HAYWOOD, PE Division Bridge Manager 80' 0' 80' GRAPHIC SCALE PLAIVS PREPARED FOR THE NCDOT BY.• HYDRAULICS S�� T 100 STV Engineers, Inc. ENGINEER y 90o wes� 1�ade s�-, s�ae �u �, cna�iorte. Nc zssoz NC License Number F-099� 2018 STANDARD SPEC7FICATIONS RIGHT OF WAY DATE: NIKKI T. HONEYCUTT, PE ROADwAY NOVEMEBER 1� ZO�H PROJECT ENGINEER DESIGN ENGINEER LETTING DATE: CLARK E. GROVES J U N E 5� Z O� �% PROJECT DESIGNER �, \ � �_ �� �� DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED ag NOWTy !4� C''� 4 �i b : o > : • > _ 0 E��P eO�,tif �F TRNNf P.E. See Sheet lA For Index of Sheets See Sheet iB For Standard Symbology Sheet � 0 � m LEGEND S E E � NEN URFACERW TER T IMPACTS � F I G U R E � IMPAOCTSS INE SUORFACE WATER N S I T E 1 � DONALD L BEARD DB 859 PG 181 STREAM PERMIT IMPACT AREA (AC) LENGTH (FT) WOOD� PERMAMENT 0.021 141 � SW IMPACTS TEMPORARY 0.02 93 � SW IMPACTS �,:�,-�;r�i��.r,���.�-�-U�.� ,.����., r,�,-u- - ,-�:�r�r r - - - - - - - - " � - - - - - - - - - ' ' - ' -'---'---- r - -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- --'---• ------ - _ P----------•-----•--•-•--"--�---F--� ___---- F---------------------- PAVED ROADWAY -L- ,f'/ �� IMPERVIOUS DIKE (TYP.) FOR FLOW AROUND OPERATION �DUE— � 0 - �� i F�� O _'- --. � ' , i ` � iF � � � \� - ���F _______ \� �F_ --- . . _tiir . . . � PERMAMENT IMPACTS _SZ IN SURFACE WATER (BANK STABILIZATION) 91 LF i F —����_F _ 12" RCP --____ F PERMAMENT IMPACT$` S� f� woo�s IN SURFACE WATER � `-,Z (CULVERT) 50 LF WOODS � CULT/vATEO �`") / � O ALBERT E TYSON CAhIERINE H TYSON 40' 0' 40' cHnR�s e� KAiHERINE F iYSON DB 370 PG 276 GRAPHIC SCALE Permit Drawing Sheet 2 of s 2 60 j DES GN SPEED SHOWN FOR VERTICAL CURVE lS UP TO 20 MPH LESS THAN OVERALL DESIGN SPEED PER SUB-REGIONAL TIER DESIGN GUIDEUNES. 256 252 BEGIN PROJECT WBS l7BPJORJ28 �' i'i^ STA10+70.W m 248 ; EL = 244.00' �I a ii E I �� Q � 244 '�' ---- ---- _ `I' �J �{ � �_— � � -����— � �. � - � ` BL-5 "� —`� � �' 240 `--EXIST (-135373 % � � CULVERT HYDRAUUC DATA�I, � 2 3 6 DESIGN DISCHARGE = 650 CFS �;�I � DESIGN FRE(]UENCY = 25 YRS II � DESIGN HW ELEVATION = 2qp,/ FT �;��, � BASE DISCHARGE = 900 CFS E 232 BASE FREOUENCY = lOiO YRS ��� � BASE HW ELEVATION = 242A fT � OVERTOPPING DISCHARGE = 70i0 CFS II �'� OVERTOPPING FREQUENCY= 50+ YRSIi E 228 OVERTOPPING ELEVATION = 24�.7 fT �����, a DATE OF SURVEY = 9/30/20/7 II � WS.ELEVATION �5.4 � �� o° 224 AT DATE OF SURVEY ' „ N� � : 11 + 00 ML �—� , . . Pl = 11+80A0 E/L� = 2�4�0ry.63' Vli — GGV K=49 DS = 35 MPH R �G F �DUE ! � � W 0 �� d F jl�' �` � �O��T � � ` ��� �C - - ^ r '�h . - . . � � J`�' O DUE DUE�l SPECIAL STILLING BASW (TYP.) / TEMPORARY PIPE (TYP.) O FOR DEWATERING JANETiE W HANNA WORK AREA DB 523 PG 179 Sr�„ , STV Engineers, Inc. 1 V �QQ 900 West Trade SL, Su'ite 715 e� cnanotre, Nc sazos NC Llcense Number F-0991 i �� i 11 j �i� % �� �� � � �ti i � ;, 2 � ; ; , , i ^7 i i ' � O AMY B JAqCSON Q DENNIS W JACKSON � DB 716 PG 310 WOODS TEMPORARY IMPACTS _ 53 IN SURFACE WATER 93 LF 6"RCP � �\ � � � � � J ` �� � �i � N � � � i - i � � ' �� � � � � � � i � i � ' � i i i i i i i � i i , � , , � � , , , , , PROIECT REFERENCE NO. SHEET NO. l7BPJO.RJ28 2 ILW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER i i � i � i �' DOCUMENT NOT CONSIDERED FINAL f � UNLESS ALL SIGNATURES COMPLETED i � i ; ExisnNc Riw � IS" RCP ���`� `�� •s���-''�t ----' --'_---'---'-'----�-----••---------'---'------------------ C----------�------�� C-�i tx�_TiNc �iw SITE 1 w000s n PavEo Raar�,var � " � '2_r' ti1" �.r'. ws' . EAST CULVERT CONSTRUCTION 260 END PROJECT WBS (7BPJOJ -- ------------------------ STA/5+30.Oi0 EL = 24726 END CONSTRUCTION --------------------- 2 5 6 ST,4 /6+o0A0 � - 1��+ 252 �I�I �� -- I -- -- - �� Pl = 14f60A0 � -- ii BEGIN CULVERT � . . � 'I EL = 24455' p, --�--_"•• -------------------- _.....- � -L- STA 12t89.88 � ' VC = l40' '�i (+�4�555"/� '• _,,: 248 , ; END CULVERT K - � " EX�� -"--` ,,- � �-------------- - DS = 35 MPH �L.,.- -L- STA /3+/6J3 -- - - - - � � _...--, 8c�6� i i 4% --.�n��="'�-::' . __.....v'(kl i i t��!I .._....- BL-7 ____ _ i PROPOSED GRADE--� ��-`�`� ' I I � �+J1.4000Y -----�_.�. ...._-- � 244 I 1 1 . _�'oo _'�1Y�r.�._ --•"'""' � � � � � �----_----..s---- --_:-.,_ --� � _. -- -"" � �CT � l� � .� ��- ___�._.._.-- : 3,50' _ - - � BM-I J� o —o�_���_ _"_'_ T __ _• _ — __� -�}------_�"""- ,.BM-2 _o._ -,--- -- EXISTING GROUND --� ------T _P_L1�+7_��9_ � ------------ ----- --- --- ------ --��__---- __�.�. - ___ -- E/ = 246.3/ i-- --- .v ._.._-- - _ � --.Y�� _ . __._ ,......_ - ___ _. -�- --- -�- ______�=•�--------.._..------._.._..__�Y ---- �-�---�,BC-6 __--- -- 24 000 � � ,r � � _ 0 � ,�,-i---�� _ - _PJ_=Lfz-�49� 13L_ .. - _ ------- -- ------ i : ii i_- i'_- _n ___.-- E/ = 248.45 ; EXISTING STRUCTURE ----' ;; ;-- �'�- p • �•---- � . c�'�Tb�� �I� � u -- -- _:— __ _ _ __ _ ' 3J8� --�'"' " 236 ' (-�-��..� .. �� i .��i ,c � � II ■F.//\ VI II '�F7i��T777C-p II �o`_•�`�+�1� � �ii Pl=13+50A0 RT _----+---� Pl�l3+/6.00 RT, El= 238.44�� 232 i F/ _ �3r, R5 � 12 + 00 13+00 e 14+00 15+00 16+00 228 � � LEGEND ^ S E E STV Erig1172Z7S, Il]C. PROIECT REFERENCE NO SHEET NO. �"T�% ZOQ eoo wesr rraae si, s����e �u l7BPJO.RJ28 3 � � etiy,� Chodotte, NC 28202 g,yy SHEET NO. F I G U R E N� ����e�se N�mee� F_a99, � DENOTES PERMEMANT IMPACTS , \Q Q 'Q ROADWAY DESIGN HYDRAULICS IN SURFACE WATER � Q\ p 11 ��p i �0�� �� ENGINEER ENGINEER �DENOTES TEMPORARY N S I TE 1 \ '� � �O 7'� / \� �/ innrnas iN suRFnce wnreR � IMPERVIOUS DIKE (TYP.) Q- � '� DONALD L BEARD FOR FLOW AROUND � Z � i DB 859 PG 181 OPERATION �DUE E STREAM PERMIT IMPACT w � �� O i� ,`� � AMY B JAqCSON i i i AREA (AC) LENGTH (FT) WOODS � o �� D DB I716 PGC310� �� � PERMAMENT 0.021 141 � ��� R �� � � SW IMPACTS � � ��� � J � � "� �'''= i � DOCUMENT NOT CONSIDERED FINAL TEMPORARY - � � -f ' p , -� - - \� � WOODS — �! r3 / J / �� UNLESS ALL SIGNATURES COMPLETED SW IMPACTS 0.02 93 i � ,/ _�_f,;.Y �, .� �:;r4.�4r���.r�� �`- , -. � � � , .T � F ��� ., - --------'---'--'-----•----------'---'------------•'--�•'--------' ---- \ � � - � _ . - � - ----'---'-' / � p �-. _ - -----'---"= �_, � ' `� - -- ----•- 'P---•-------••-------------'--'---F"'_ __-------� `' �.'; . ---- F" ��_� ----_"- - -- - --- - ---------------------- �r � r i5' RCP F ---------- '� � ----------- `, t.' -"- -- .�.�s�'r�-- -F`------'-----•--'-'-- F - �-�- ---= -=----------� .� - oF � ���-- F o � _�_ PERMAMENTIMPACTS TEMPORARY IMPACTS � � IN SURFACE WATER -S2 IN SURFACE WATER -51 !'{PavEO RoaDwar SR /637 � (BANK STABILIZATION) 93 LF I i� PavED Raaavar � ( lACI�:$ _BIiAAICI%_RQ9D 91 LF _ - - — - F�� . . . - - � � � � _ .. � _ � i F -_- i2 � F -- ---'--------- -------- - - - - ----- - - - - ' _"---------------..�-- RCP �----- F ---�-- -- - -- - - --- - - --- • -'--- _ .. . -...._. � - - ---- ' _"____`___ - _____'_____"_'____________'_'___'_'_a.a_ _' _------ � i T ---_— ____ �',.J .• / �----------- ------- F � :� -, ����� ------���_ �� � . .. . .. .. _ ._ _ __ •,.. - � �� . �,_ . ,, , 9 � � _ �� a� � .Fa-- � ,._,_.,_ --� < c .,- c � ��, ,_ _ 2,r _ _ �, - � �'���� n ' J� _�--, . �"^ - � � � � � ExisTwc Riw /' - PERMAMENT IMPACTS Sl f F �'�I F ` ` � ,� - woo�s i� IN SURFACE WATER - �� C i � �� / � (CULVERT) 50 LF � R �_J f � � / / '�� o '�, ' SITE 1 0 �' ', , wooDs / cu�rNarEo � �� � `� r I J�. � � I � � /� � ��F' i �� � / I / � ,i � ` / �/ I � /� � �DUE - ---DUE DUE�i `\ P„ ,�� � / � 4:\ SPECIAL STILLING BASW (TYP.) '� � ��� wooDs � � � "� S � � Q i �e . / / / / �f"� ALBERT E TYSON p ,' � �� / / /� / q O� O� q �� CAhIERINE H TYSON �i i KAiHER�I�N�E F�1 �� TEMPORARY PIPE (TYP.) � ' ' � j /� �� � DB 370 PG 276 i � � i F �' FOR DEWATERING JANETiE W HANNA i � i GRAPHIC SCALE E�E J WORK AREA DB 523 PG 179 � � � � i � � � i' i � / Permit Drawing � �aP��� ;' ;' � �,,�� � EAST CULVERT Sheet 3 of s P��'/ , , - CONSTRUCTION 2 60 j DES GN SPEED SHOWN FOR VERTICAL CURVE lS UP 2 60 TO 20 MPH LESS THAN OVERALL DESIGN SPEED PER SUB-REGIONAL TIER DESIGN GUIDEUNES. END CONSTRUCTION i--------------------- STAl6+OOA0 256 END PROJECT WBS (7BPJORJ28 256 � -------- ------ ---------- _, _ _ - -- -- -- ------ , � -- ' ,li � � � � � � � � � � , STA/5+30.Oi0 _ --- , --- � — ----,--- — , , , I EL = 24726 li ` ,,. . 1�� 252 _ � N . ,_, .- 252 �� BEGIN PROJECT WBS l7BPJORJ28 �� � � � ' " -- -- - � Pl = 14f60A0 � ii - --- --�--_^ ""' '-. � ��------- BEGIN CULVERT � 248 �� . � -------------------- EL = 24455' P� _,....- I' ELA=' 244.00' -L- STA 12t89.88 � � VC = l40' �+)4�555�%- ••-- 248 m �� �� ' ' END CULVERT K= 57 II EX�� -��" a il ; I i �-------------- __ ____ _ DS = 35 MPH ^ SL.,.- ,_. E i'i Pl= 11+80A0 I i ., i i-L- STA /3+/6J3 --' �c„�� � Q ii - � i i __.�n��=""-::' _ . _ .....v' k) , EL - 24063 &7�4%,� ___ - l �� ---- -----' � � � .._...•- - � «¢_-- BL 7 � 2 44 ��� K - 4� � � PROPOSED GRADE -- � ( )1.4000� _ =-- " _ =�y �t?� - - ' _ ' -:� � � � + -- ■__-- _., .._ . ..,__ _ � � 244 m� - _ � � � �----_ �--=---- � / __. -- � N DS 35 MPH V_ _.__ __ ,_ � �' �—�' �am��-:�-������� BM-1 �� "'_ --�-""�_ o ���-----�i =- � � --J ---(±, 3�•• ' ' t i � r� - ____----- --- ....-- -------�}_ ,.BM-2 _o EX/ST/NG GROUND _ --_" _P_Ll� I_`�d�9_ � : — ----- ---------- ------ --- --- '.�'-- ._.__- -- E/ = 246.3/ ` BL-5 `�=�- --�- -�-- �� _�� . _ - - � ---- --------- ----- --.Y�� s - ------------ -----.._..------._.._..__ ,......- �' 240 `--EXIST (-135373 % �3�g.—c>— -----� �--------.._..--- :r �'i- ��BL-6 _-_ _ 240 E / (+)1.4000'• ,r- �� - - - ----- -- . - , - ` - ' =P_J_=Lf_z-�49� 13L- z � �� �-�-- —�---- ----.. � ----------------�ii i : iii i,_ _ n ______---- E/ = 248.45 �, II � EXISTING STRUCTURE ----' ���" '�"� _ _ _ CULVERT HYDRAUUC DATA „ --- ' "' " p b2�-- "` — �'" -- - -- _ :_ ' TO BE REMOVED n� ■- u T u _ r-_ - 3 �ii L O W P O I N T i ii i i u �'��.--••-.. �ii 236 � 236 DESIGN DISCHARGE = 650 CFS;I ------' ;: ; 3,18/� ..--' ;I ° DESIGN FRE(]UENCY = 25 YRS'J - �A 12t2/.00 a;' ; (�;;� � '�i -'� ELEV 24/.69 i n • ■ r✓ ,: �, m u � DESIGN HW ELEVATION = 2qQJ FT II ' :� I�Y�%��Yiv77nw iI � BASE DISCHARGE = 900 CFS',i ; ;� __:-�p� ��_Pl =13+50Ap RT � 2 32 - „ , PROPOSED DOUBLE l2' X 5' RCBC ---�' � , � El = 238.44� BASE FREOUENCY lOiO YRS ��� � �Pl =13+/6.00 RT 232 � BASE HW ELEVATION = 242A � ��� SEE STRUCTURE PLANS � El= 235.85 � OVERTOPPING DISCHARGE = 70i0 CFS'�I � ' � Pl�l3-f05.OQ� — iOVERTOPPING FREQUENCY= 50+ YRSi� E 22 8 �ERTOPPING ELEVATION = 24�J fT ��I�� . El =�5� 2 2 8 a DATE OF SURVEY = 9/30/2011 '� � _ _ _ � � � ° WS. ELEVATION 235.4 FT �'J o° 224 AT DATE OF SURVEY ' „ N� � : 11+00 12+00 13+00 ML 14+00 15+00 16+00 � 0 � m LEGEND �DENOTES PERMEMANT IMPACTS IN SURFACE WATER �DENOTES TEMPORARY IMPACTS IN SURFACE WATER STREAM PERMIT IMPACT AREA (AC) LENGTH (FT) PERMAMENT 0.021 141 SW IMPACTS TEMPORARY 0.02 93 SW IMPACTS �rti:��:��:��.r'���v-'-U,r� -�.��r� r'-W-c.:- - �,: r� -- -----�-----�-----'-"---' -'--'-- -'---'---- r - _ P-----------------•-•--"--�---F--' _--- F---------------------- PAVED ROADWAY WOODS WOODS —L— ,f'/ IMPERVIOUS DIKE (TYP.) FOR FLOW AROUND OPERATION �DUE � 0 - �� i F�� PERMAMENT IMPACT$` S� IN SURFACE WATER (CULVERT) 50 LF ��; ,;��-_ �� / � O ALBERT E TYSON 40' 0' 40' cHnRRiFs e"�" KAiHERINE F iYSON DB 370 PG 276 GRAPHIC SCALE Permit Drawing Sheet 5 of s 2 60 j DES GN SPEED SHOWN FOR VERTICAL CURVE lS UP TO 20 MPH LESS THAN OVERALL DESIGN SPEED PER SUB-REGIONAL TIER DESIGN GUIDEUNES. 256 252 BEGIN PROJECT WBS l7BPJORJ28 �' i'i^ STA10+70.W m 248 ; EL = 244.00' s �I a II E I II Q � 244 '�' ---- ---- _J', m �T '�_— � � -����— � —__. � - � ` BL-5 "� —`� � �' 240 `--EXIST (-135373 % � � CULVERT HYDRAUUC DATA�I, � 2 3 6 DESIGN DISCHARGE = 650 CFS �;�I � DESIGN FRE(]UENCY = 25 YRS II � DESIGN HW ELEVATION = 2qp,/ FT �;��, � BASE DISCHARGE = 900 CFS E 232 BASE FREOUENCY = lOiO YRS ��� � BASE HW ELEVATION = 242A fT � OVERTOPPING DISCHARGE = 70i0 CFS II �'� OVERTOPPING FREQUENCY= 50+ YRSIi E 228 OVERTOPPING ELEVATION = 24�.7 fT �����, a DATE OF SURVEY = 9/30/20/7 II � WS.ELEVATION �5.4 � �� o° 224 AT DATE OF SURVEY ' „ N� � : 11 + 00 ML SEE � FIGURE � N SITE 1 i / DONALD L BEARD DB 859 PG 181 wcoo: _�� __F _ 12"_RCP _ _ -------_ F �—� , . . Pl = 11+80A0 EL = 240.63' VC = 220' K=49 DS = 35 MPH TEMPORARY PIPE (TYP. �FOR DEWATERING �pRK AREA ` SPECIAL STILLWG BASIRI (NP.) �� Sr�„ , STV Engineers, Inc. 1 V �QQ 900 West Trade SL, Su'ite 715 e� cnanotre, Nc sazos NC Llcense Number F-0991 i �� i 11 j �i� % �� �� � � �ti i � ;, 2 � � ; ; ; i � i , �� � 1 � AMY B JAqCSON c Q DENNIS W JACKSON � � DB 716 PG 310 WOODS i '�� � � _ ���F � -- ti� -- — F`� PERMAMENT IMPACTS _SZ IN SURFACE WATER (BANK STABILIZATION) 91 LF �5 � � �-_� c �,��L� P � JANETiE W HANNA DB 523 PG 179 TEMPORARY IMPACTS _ 53 IN SURFACE WATER 93 LF 6"RCP �` � � �� � `� o ,� � N � � � i - � � � ' �� i \ i � i � i � � � ; � i � i i i i 1 � � i , � , , � � , , � r � PROIECT REFERENCE NO. SHEET NO. l7BPJO.RJ28 5 ILW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER � i / ; i �' DOCUMENT NOT CONSIDERED FINAL f � UNLESS ALL SIGNATURES COMPLETED i � i ; ExisnNc Riw � IS" RCP ��'-`.�;.' `'.sr`�`�,t - - - .�-----••- -'-- -------------- C----------�------�� C-�i tx�_TiNc �iw SITE 1 w000s n PavEo Raar�,var � ������ WEST CULVERT CONSTRUCTION END CONSTRUCTION -------------------- STAl6+OOA0 END PROJECT WBS (7BPJORJ28 ----- -- ------ ---------- I� — -- �, STA/5+30.Oi0 ,��� ' : I EL = 24726 p, — u 1 __ , II �� �� �� - -- -- - �� Pl = 14f60A0 - ii BEGIN CULVERT � . ' EL = 24455' P� _.....- --�--_".• -------------------- � -L- STA 12t89.88 � ' VC = l40' '�i (+�4�555"/� '• _,,: ' END CULVERT K - � " EX�� -"--` i �--------- - DS = 35 MPH SL.,.-- � � -L- STA /3+/6J3 -- --- - _..� ' j6� i i . --.�e■�='•"-�r: _ ...v'�k18 i i �_�t��!�4% ��,_,..._ .. BL-7 ____ _ . - •. � l ., _ .. • � � PROPOSED GRADE --� • - _ �■��-- . •-•- - �" � I I I -(� .�%�� _ �—��1Y�rr�'� _ _ . I %� _' ' i i � � --..s=-- ' .,� -_. __- i ---- _ " ""'. � --- - � � � �----_-' __ --r' _. -- � «_— --"' � �/ - - � .� ��-�T ___,._.._.-- �+) 3 - ' ' BM-/ _�}------_�----- ,.BM-2 _o._ -,--- EX/ST/NG GROUND --� -----_�' _P_Ll�`+I_`�d�9_ � ------------ ----- --- --- ------ --��__---- __,�.�. - __- -- E/ = 246.3/ i-- --- .v ._.._-- - _ � --.Y�� _ . __._ ,......_ - -�- --- -�- =_____�-•�--------.._..------._.._..__��-----x----�, - ___ _. � i nr n w BL-6 __---- "- � �� � ,�,-i---�� _ - _PJ_=Lfz-�49� 13L_ .. - _ ------- -- ------ i : ii i_- i'_- _n ___.-- E/ = 248.45 ; EXISTING STRUCTURE ----' ;; ;-- �'�- p • �•---- .-,r r � u 1b� - �� — -- _:— ' - --:_ _ - - � . tk) ...-.. N ; (��8�__..--.- �I�� � .��� � � � �� ■F.//\ VI II '�F7i��T777C-p II �o`_•�`�+�1� � �ii Pl=13+50A0 RT _----+--� Pl�l3+/6.00 RT, El = 238.44�� i F/ _ �3r, R5 � 12 + 00 �. 13+00 e 14+00 15+00 16+00 260 256 252 248 244 240 236 232 228 � � LEGEND ^ S E E STV Erig1172Z7S, Il]C. PROIECT REFERENCE NO SHEET NO. �"T�% ZOQ eoo wesr rraae si, s����e �u l7BPJO.RJ28 6 � � etiy,� Chodotte, NC 28202 g,yy SHEET NO. � F I G U R E �, � � N� ����e�se N�mee� F_a99, � DENOTES PERMEMANT IMPACTS \ IN SURFACE WATER ROADWAY DESIGN HYDRAULICS ..� 11 � �0�� � � ENGINEER ENGINEER � DENOTES TEMPORARY N S I TE 1 �\/ � �O 7� /' \� �/ a\ IMPACTS IN SURFACE WATER O IMPERVIOUS DIKE (TYP.) "J'� �T �Q� r ��r � DONALD L BEARD FOR FLOW AROUND � � DB 859 PG 181 OPERATION �DUE E � STREAM PERMIT IMPACT w '� �� O i� ,`� � AMY B JAqCSON i i O i AREA (AC) LENGTH (FT) WOODS � C �� D DB I716 PGC310� �� � PERMAMENT 0.021 141 � �= R .� � � SW IMPACTS � � ��� � J � � "� �" i � DOCUMENT NOT CONSIDERED FINAL TEMPORARY — � � —f ' p : —� �- — � � WOODS — �! r3 / J / �� UNLESS ALL SIGNATURES COMPLETED SW IMPACTS 0.02 93 i � ,/ _�_f,;.Y �,.��:;r4.�4r���.r�� ��„—. �i 3. �� i - -----'---'= / F �_ i � '� \ ----------------•---•--•--------------------------•—••---•---- � ,. \`-- — — ---- _"----•-----'P F �--�_, --.—'--'----_"— — - - — -- - ------- -----••---------------------- ---•-------••---- �—�-- _ . . �r . ., � _ .r��� r i5' RCP ---------'--'---F"' __------ : � . F �__.,,� _ - F --------------------- �r -- _ ���,�s�'r___— _F`------'-----• F - ' � - � F � ��--- . ,,'d — __'---------� o � "�— F � -- `� _�_ PERMAMENT IMPACTS TEMPORARY IMPACTS � �� IN SURFACE WATER —S2 IN SURFACE WATER =53 !'{PavEO RoaDwar SR /637 (BANK STABILIZATION) 93 LF I i� PavED Raaavar SPINDLE � ! �ACK=S -BRl#NCH--RQ9D 91 LF _ _ _ — F � � — � _ - — � F --- = _ IS" RCP � F — � i2R C P -- _ _ _ _ — F --- ---'---------------------- -- — — - — ----- -- - -- _ . . . - - - - - .. . - --- ' _��---------------..�-- - ---------- - RETAIN -------------------------===�-_-_-------- — ----•--- --•-- —' � C --�=1---- ---- + — � ^ T n, ,✓�. i''�� _ _ � "i�' �.���� �. < - •�..� ������� ., —�` . .. . .� 'i. .F+.� . '�'j" _ �__'_'�_._.._ .�� m— F < ��� � �._ � �_ � // 9 • . .. ��1 . ,.� : ^ � ._� — — � � h �� rV,s'�— ��� . J• �„, ��. -" �� �� �� � � ExisTwc Riw / _ PERMAMENT IMPACTS S� f F F C � � / i woo�s i IN SURFACE WATER — \ �� �� / � (CULVERT) 50 LF � R / / �� � SITE 1 � ' „ ' WOOD$ �� CULTNATED \ ` `� �`` , � � � �,� �I �\ G � � � /� � �`c� � 6' i� � �i �� � l� 1 / � �/� � �DUE �: � �_DUE DUE� �� �, � � � / / / � o � � / 4'- TEMPORARY PIPE (TYP.) ; — '� wooDs � � � � 5 Q FOR DEWATERING �' � ,� � / / � f"� ALBERT E TYSON �QRK AREA �� �� � `� � /� � � q O� O� q �� CAhIERINE H TYSON �i i CHARLES B TYSON C� � � � � / / KAiHERINE F iYSON i � � � i / / � � DB 370 PG 276 �. � �' JANETiE W HANNA �i � i� � � '1 5 w DB 523 PG 179 ) i /� � GRAPHIC SCALE �� ' ' � ' � E�EJ � � / Permit Drawing SPECIAL STILLWG BASIR(�1(NP.) �OP�c.� � ;� �� ,, ��/ � WEST CULVERT Sheet 6 of s '�` � ' % � CONSTRUCTION 2 60 j DES GN SPEED SHOWN FOR VERTICAL CURVE lS UP 2 60 TO 20 MPH LESS THAN OVERALL DESIGN SPEED PER SUB-REGIONAL TIER DESIGN GUIDEUNES. END CONSTRUCTION i--------------------- STAl6+OOA0 256 END PROJECT WBS (7BPJORJ28 256 � -------- ------ ---------- _, _ _ - -- -- -- ------ , � -- ' ,li � � � � � � � � � � , STA/5+30.Oi0 _ --- , --- � - ----,--- - , , , I EL = 24726 li ` ,,. . 1�� 252 _ � N . ,_, .- 252 �� BEGIN PROJECT WBS l7BPJORJ28 �� � � � ' " -- -- - � Pl = 14f60A0 � ii - --- --�--_^ ""' '-. � ��------- BEGIN CULVERT �24$ ili , i -------------------- EL = 24455' i�i _,.�.•- � I� ELA-' 244.00' . �I -L- STA 12t89.88 � ' VC = l40' '�i (+)4�555"/� �� 248 E ,, , I�, I END CULVERT K= 57 �� EX�S� _.,.,. ',, _,,: �� ; � �-------------- - DS = 35 MPH �L.�-- a ;�, Pl= 11+80A0 I i i i-L- STA /3+/6J3 __ ____ _ _...-., _.8c�% ii - � , i i __.�n��=""-::' .....v' k) Q , EL - 24063 &7�4% ,� _ . - - l � �� � � � _.._....- - ___ � ---- ---' BL 7 � iii VC = 220' i � PROPOSED GRADE -- i / _ ii:=�t�'� _« - -__ i L 244 __�_ati K= 49 i i � (+J1.4000'• --------_-' __ 244 .�_.. ----..s==------_.,_ =_. _ -- � m '\ -_—�' �a� DS = 35 MPH � � �-;�-"'-�T '�� --- ----•--T ' �+� ¢ , __. - � � � , - -��_-�—____ BM-1 '� -----_�_".'r— � V -- -,--- -°- - ' - �-.._.=- ; ---_-- 3.50X.._ + � � r� - ____----- --- ....-- -------�}_ ,.BM-2 _o EX/ST/NG GROUND _ --_" _P_Ll� I_`�d�9_ � : — ----- ---------- ------ --- --- '.�'-- ._.__- -- E/ = 246.3/ ` BL-5 `�=�- --�- -�-- �� _�� . _ - - � ---- --------- ----- --.Y�� s - ------------ -----.._..------._.._..__ ,......- �' 240 `--EXIST (-135373 % �3�g.-c>— -----� �--------.._..--- :r �'i- ��BL-6 _-_ _ 240 E / (+)1.4000'• ,r- �� - - - ----- -- . - , - ` - ' =P_J_=Lf_z-�49� 13L- z � �� �-�-- —�---- ----.. � ----------------�ii i : iii i,_ _ n ______---- E/ = 248.45 �, II � EXISTING STRUCTURE ----' ���" '�"� _ _ _ CULVERT HYDRAUUC DATA „ --- ' "' " p b2�-- "` — �'" -- - -- _ :_ ' TO BE REMOVED n� ■- u T u _ r-_ - 3 �ii L O W P O I N T i ii i i u �'��.--••-.. �ii 236 � 236 DESIGN DISCHARGE = 650 CFS;I ------' ;: ; 3,18/� ..--' ;I ° DESIGN FRE(]UENCY = 25 YRS'J - �A 12t2/.00 a;' ; (�;;� � '�i -'� ELEV 24/.69 i n • ■ r✓ ,: �, m u � DESIGN HW ELEVATION = 2qQJ FT II ' :� I�Y�%��Yiv77nw iI � BASE DISCHARGE = 900 CFS',i ; ;� __:-�p� ��_Pl =13+50Ap RT � 2 32 - „ , PROPOSED DOUBLE l2' X 5' RCBC ---�' � , � El = 238.44� BASE FREOUENCY lOiO YRS ��� � �Pl =13+/6.00 RT 232 � BASE HW ELEVATION = 242A � ��� SEE STRUCTURE PLANS � El= 235.85 � OVERTOPPING DISCHARGE = 70i0 CFS'�I � ' � Pl�l3-f05.OQ� - iOVERTOPPING FREQUENCY= 50+ YRSi� E 22 8 �ERTOPPING ELEVATION = 24�J fT ��I�� . El =�5� 2 2 8 a DATE OF SURVEY = 9/30/2011 '� � _ _ _ � � � ° WS. ELEVATION 235.4 FT �'J o° 224 AT DATE OF SURVEY ' „ N� � : 11+00 12+00 13+00 ML 14+00 15+00 16+00 WETLAND PERMIT IMPACT SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS an Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design ac ac ac ac ac ac ac ft ft ft 1 12+89.88 / 13+16.13 DOUBLE 12' X 5' RCBC 0.021 0.02 141 93 TOTALS: 0.021 0.02 141.00 93.00